All india First applications - IS 7867 (2024)
1 Results
S. No. | Lab | Testing Facility | Remarks (In case of Partial) |
Testing Time (turnaround time) |
Sample Quantity required for testing |
Testing Charges |
---|---|---|---|---|---|---|
1 | IDMA LABORATORIES LIMITED | Partial | Complete Test Facilities Available except Clause 4.1 Identification by melting point,5.1 and 7.3 Table 2 (vi) Boiling water shrinkage, 5.1 and 7.3 Table 2 (viii) Unevenness of linear density, 5.1 and 7.3 Table 2 (xii) Limiting oxygen 5.1 and 7.3 Table 2 (xv) Colour strength with reference to standard yarn,5.1 and 7.3 Table 2 (xvi) Colour difference with reference to standard yarn, Table 2 , Note: 5 Interlace in nips/m (for multifilament), 5.1 and 7.3 Table 3 (vi) Hot air shrinkage,5.1 and 7.3 Table 3 (viii) Unevenness of linear density,5.1 and 7.3 Table 3 (xii) Limiting oxygen, 5.1 and 7.3 Table 3 (xv) Colour strength with reference to standard yarn,5.1 and 7.3 Table 3 (xvi) Colour difference with reference to standard yarn, 5.1 and 7.3 Table 4 (vi) Boiling water shrinkage, 5.1 and 7.3 Table 4 (viii) Unevenness of linear density,5.1 and 7.3 Table 4 (xii) Limiting oxygen, 5.1 and 7.3 Table 4 (xv) Colour strength with reference to standard yarn, 5.1 and 7.3 Table 4 (xvi) Colour difference with reference to standard yarn, Table 4 , Note: 2 Interlace in nips/m (for multifilament) Sample size- 1 Bobbin of Each Type Total Testing Charges Rs. 131200/- (for the available Test Facilities) of Each Type, Excluding ECO MARK Parameters | 12 | 1 bobbin | 131200.0 |