1 |
UL INDIA PRIVATE LIMITED
| IS 14286 : Part 1 : Sec 4 (2023) |
Terrestrial photovoltaic PV modules Design qualification and type approval Part 1-4: Special requirements for testing of thin-film CuInGASSe2 based photovoltaic PV modules Third Revision |
PHOTOVOLTAIC (PV) MODULE |
2384500 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
Cl-8(Major visual defects) |
- |
30000 |
|
- |
Cl-11.1(Visual inspection (MQT 01)) |
- |
30000 |
|
- |
Cl-11.2(Maximum power determination (MQT 02)) |
- |
26000 |
|
- |
Cl-11.3(Insulation test (MQT 03)) |
- |
70000 |
|
- |
Cl-11.4(Measurement of temperature coefficients (MQT 04)) |
- |
100000 |
|
- |
Cl-11.5(Measurement of nominal module operating temperature (NMOT) (MQT 05)) |
- |
0 |
|
- |
Cl-11.6(Performance at STC (MQT 06.1) and NMOT (MQT 06.2) |
- |
42000 |
|
- |
Cl-11.7(Performance at low irradiance (MQT 07)) |
- |
19500 |
|
- |
Cl-11.8(Outdoor exposure test (MQT 08)) |
- |
80000 |
|
- |
Cl-11.9(Hot-spot endurance test (MQT 09)) |
- |
25000 |
|
- |
Cl-11.10(UV preconditioning test (MQT 10)) |
- |
120000 |
|
- |
Cl-11.11(Thermal cycling test (MQT 11)) |
- |
400000 |
|
- |
Cl-11.12(As per IEC 61215-1:2016) |
- |
250000 |
|
- |
Cl-11.13(Damp heat test (MQT 13)) |
- |
400000 |
|
- |
Cl-11.14(Robustness of terminations test (MQT 14)) |
- |
12000 |
|
- |
Cl-11.15(Robustness of terminations test (MQT 14)) |
- |
65000 |
|
- |
Cl-11.16(Static mechanical load test (MQT 16)) |
- |
20000 |
|
- |
Cl-11.17(Hail test (MQT 17)) |
- |
20000 |
|
- |
Cl-11.18(Bypass diode testing (MQT 18)) |
- |
20000 |
|
- |
Cl-11.19(Stabilization (MQT 19)) |
- |
150000 |
|
- |
11.20(Cyclic (dynamic) mechanical load test (MQT 20)) |
- |
80000 |
|
- |
11.21(Potential induced degradation test (MQT 21)) |
- |
350000 |
|
- |
11.22(Bending test (MQT 22)) |
- |
70000 |
|
- |
5(Marking and documentation) |
- |
5000 |
|
- |
|
12 May, 2027 |
- Included w.e.f.09.04.2025 |
2 |
UL INDIA PRIVATE LIMITED
| IS 14286 : Part 1 : Sec 3 (2023) |
Terrestrial photovoltaic PV modules Design qualification and type approval Part 1-3: Special requirements for testing of thin-film amorphous silicon based photovoltaic PV modules Third Revision |
PHOTOVOLTAIC (PV) MODULE |
2384500 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
Cl-8(Major visual defects) |
- |
30000 |
|
- |
Cl-11.1(Visual inspection) |
- |
30000 |
|
- |
Cl-11.2(Maximum power determination) |
- |
26000 |
|
- |
Cl-11.3(Insulation test) |
- |
70000 |
|
- |
Cl-11.4(Measurement of temperature coefficients) |
- |
100000 |
|
- |
Cl-11.5(Measurement of nominal module operating temperature) |
- |
0 |
|
- |
Cl-11.6(Performance at STC and NMOT) |
- |
42000 |
|
- |
Cl-11.7(Performance at low irradiance) |
- |
19500 |
|
- |
Cl-11.8(Outdoor exposure test) |
- |
80000 |
|
- |
Cl-11.9(Hot-spot endurance test) |
- |
25000 |
|
- |
Cl-11.10(UV preconditioning test) |
- |
120000 |
|
- |
Cl-11.11(Thermal cycling test) |
- |
400000 |
|
- |
Cl-11.12(Humidity-freeze test) |
- |
250000 |
|
- |
Cl-11.13(Damp heat test) |
- |
400000 |
|
- |
Cl-11.14(Robustness of terminations test) |
- |
12000 |
|
- |
Cl-11.15(Wet leakage current test) |
- |
65000 |
|
- |
Cl-11.16(Static mechanical load test) |
- |
20000 |
|
- |
Cl-11.17(Hail test) |
- |
20000 |
|
- |
Cl-11.18(Bypass diode testing) |
- |
20000 |
|
- |
Cl-11.19(Stabilization) |
- |
150000 |
|
- |
11.20(Cyclic (dynamic) mechanical load test (MQT 20)) |
- |
80000 |
|
- |
11.21(Potential induced degradation test (MQT 21)) |
- |
350000 |
|
- |
11.22(Bending test (MQT 22)) |
- |
70000 |
|
- |
5(Marking and documentation) |
- |
5000 |
|
- |
|
12 May, 2027 |
- Included w.e.f.09.04.2025 |
3 |
UL INDIA PRIVATE LIMITED
| IS 14286 : Part 1 : Sec 2 (2023) |
Terrestrial photovoltaic PV modules Design qualification and type approval Part 1-2: Special requirements for testing of thin-film Cadmium Telluride CdTe based photovoltaic PV modules Third Revision |
PHOTOVOLTAIC (PV) MODULE |
2384500 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
Cl-8(Major visual defects) |
- |
30000 |
|
- |
Cl-11.1(Visual inspection) |
- |
30000 |
|
- |
Cl-11.2(Maximum power determination) |
- |
26000 |
|
- |
Cl-11.3(Insulation tes) |
- |
70000 |
|
- |
Cl-11.4(Measurement of temperature coefficients) |
- |
100000 |
|
- |
Cl-11.5(Measurement of nominal module operating temperature) |
- |
0 |
|
- |
Cl-11.6(Performance at STC and NMOT) |
- |
42000 |
|
- |
Cl-11.7(Performance at low irradiance) |
- |
19500 |
|
- |
Cl-11.8(Outdoor exposure test) |
- |
80000 |
|
- |
Cl-11.9(Hot-spot endurance test) |
- |
25000 |
|
- |
Cl-11.10(UV preconditioning test) |
- |
120000 |
|
- |
Cl-11.11(Thermal cycling test) |
- |
400000 |
|
- |
Cl-11.12(Humidity-freeze test) |
- |
250000 |
|
- |
Cl-11.13(Damp heat test) |
- |
400000 |
|
- |
Cl-11.14(Robustness of terminations test) |
- |
12000 |
|
- |
Cl-11.15(Wet leakage current test) |
- |
65000 |
|
- |
Cl-11.16(Static mechanical load test) |
- |
20000 |
|
- |
Cl-11.17(Hail test) |
- |
20000 |
|
- |
Cl-11.18(Bypass diode testing) |
- |
20000 |
|
- |
Cl-11.19(Stabilization) |
- |
150000 |
|
- |
11.20(Cyclic (dynamic) mechanical load test (MQT 20)) |
- |
80000 |
|
- |
11.21(Potential induced degradation test (MQT 21)) |
- |
350000 |
|
- |
11.22(Bending test (MQT 22)) |
- |
70000 |
|
- |
5(Marking and documentation) |
- |
5000 |
|
- |
|
12 May, 2027 |
- Included w.e.f.09.04.2025 |
4 |
UL INDIA PRIVATE LIMITED
| IS 14286 : Part 1 : Sec 1 (2023) |
Terrestrial photovoltaic PV modules Design qualification and type approval Part 1-1: Special requirements for testing of crystalline silicon photovoltaic PV modules Third Revision |
PHOTOVOLTAIC (PV) MODULE |
2384500 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
Cl-8(Major visual defects) |
- |
30000 |
|
- |
Cl-11.1(Visual inspection) |
- |
30000 |
|
- |
Cl-11.2(Maximum power determination) |
- |
26000 |
|
- |
Cl-11.3(Insulation test) |
- |
70000 |
|
- |
Cl-11.4(Measurement of temperature coefficients) |
- |
100000 |
|
- |
Cl-11.5(Measurement of nominal module operating temperature) |
- |
0 |
|
- |
Cl-11.6(Performance at STC) |
- |
42000 |
|
- |
Cl-11.7(Performance at low irradiance) |
- |
19500 |
|
- |
Cl-11.8(Outdoor exposure test) |
- |
80000 |
|
- |
Cl-11.9(Hot-spot endurance test) |
- |
25000 |
|
- |
Cl-11.10(UV preconditioning test) |
- |
120000 |
|
- |
Cl-11.11(Thermal cycling test) |
- |
400000 |
|
- |
Cl-11.12(Humidity-freeze test) |
- |
250000 |
|
- |
Cl-11.13(Damp heat test) |
- |
400000 |
|
- |
Cl-11.14(Robustness of terminations test) |
- |
12000 |
|
- |
Cl-11.15(Wet leakage current tes) |
- |
65000 |
|
- |
Cl-11.16(Static mechanical load test) |
- |
20000 |
|
- |
Cl-11.17(Hail test) |
- |
20000 |
|
- |
Cl-11.18(Bypass diode thermal test) |
- |
20000 |
|
- |
Cl-11.19(Stabilization) |
- |
150000 |
|
- |
11.20(Cyclic (dynamic) mechanical load test (MQT 20)) |
- |
80000 |
|
- |
11.21(Potential induced degradation test (MQT 21)) |
- |
350000 |
|
- |
11.22(Bending test (MQT 22)) |
- |
70000 |
|
- |
5(Marking and documentation) |
- |
5000 |
|
- |
|
12 May, 2027 |
- Included w.e.f.09.04.2025 |
5 |
UL INDIA PRIVATE LIMITED
| IS 14286 : Part 1 (2023) |
Terrestrial Photovoltaic PV Modules Design Qualification and Type Approval Part 1: Test Requirements (Third Revision) |
PHOTOVOLTAIC (PV) MODULE |
2349500 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
4.1(Visual inspection (MQT 01)) |
- |
30000 |
|
- |
4.2(Maximum power determination (MQT 02)) |
- |
26000 |
|
- |
4.3(Insulation test (MQT 03)) |
- |
70000 |
|
- |
4.4(Measurement of temperature coefficients (MQT 04)) |
- |
100000 |
|
- |
4.6(Performance at STC (MQT 06.1)) |
- |
42000 |
|
- |
4.7(Performance at low irradiance (MQT 07)) |
- |
19500 |
|
- |
4.8(Outdoor exposure test (MQT 08)) |
- |
80000 |
|
- |
4.9(Hot-spot endurance test (MQT 09)) |
- |
25000 |
|
- |
4.10(UV preconditioning test (MQT 10)) |
- |
120000 |
|
- |
4.11(Thermal cycling test (MQT 11)) |
- |
400000 |
|
- |
4.12(2 Humidity-freeze test (MQT 12)) |
- |
250000 |
|
- |
4.13(Damp heat test (MQT 13)) |
- |
400000 |
|
- |
4.14(Robustness of terminations (MQT 14)) |
- |
12000 |
|
- |
4.15(5 Wet leakage current test (MQT 15)) |
- |
65000 |
|
- |
4.16(Static mechanical load test (MQT 16)) |
- |
20000 |
|
- |
4.17(Hail test (MQT 17)) |
- |
20000 |
|
- |
4.18(Bypass diode testing (MQT 18)) |
- |
20000 |
|
- |
4.19(Stabilization (MQT 19)) |
- |
150000 |
|
- |
4.20(Cyclic (dynamic) mechanical load test (MQT 20)) |
- |
80000 |
|
- |
4.21(Potential induced degradation test (MQT 21)) |
- |
350000 |
|
- |
4.22(Bending test (MQT 22)) |
- |
70000 |
|
- |
4.5(Placeholder section, formerly NMOT) |
- |
0 |
|
- |
|
12 May, 2027 |
- Included w.e.f.09.04.2025 |
6 |
Mitsui Chemicals India Pvt. Ltd.
| IS 14286 : Part 1 (2023) |
Terrestrial Photovoltaic PV Modules Design Qualification and Type Approval Part 1: Test Requirements (Third Revision) |
- |
1814240 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
4.1(Visual inspection (MQT 01)) |
- |
30960 |
|
- |
4.2(Maximum power determination (MQT 02)) |
- |
99360 |
|
- |
4.3(Insulation test (MQT 03)) |
- |
22770 |
|
- |
4.4(Measurement of temperature coefficients (MQT 04)) |
- |
49680 |
|
- |
4.5(Placeholder section, formerly NMOT) |
- |
0 |
|
- |
4.6(Performance at STC (MQT 06.1)) |
- |
529200 |
|
- |
4.7(Performance at low irradiance (MQT 07)) |
- |
8280 |
|
- |
4.8(Outdoor exposure test (MQT 08)) |
- |
41472 |
|
- |
4.9(Hot-spot endurance test (MQT 09)) |
- |
120960 |
|
- |
4.10(UV preconditioning test (MQT 10)) |
- |
96336 |
|
- |
4.11(Thermal cycling test (MQT 11)) |
- |
169344 |
|
- |
4.12(2 Humidity-freeze test (MQT 12)) |
- |
63676.8 |
|
- |
4.13(Damp heat test (MQT 13)) |
- |
220563 |
|
- |
4.14(Robustness of terminations (MQT 14)) |
- |
2289.6 |
|
- |
4.15(5 Wet leakage current test (MQT 15)) |
- |
60840 |
|
- |
4.16(Static mechanical load test (MQT 16)) |
- |
24624 |
|
- |
4.17(Hail test (MQT 17)) |
- |
27216 |
|
- |
4.18(Bypass diode testing (MQT 18)) |
- |
22608 |
|
- |
4.19(Stabilization (MQT 19)) |
- |
149540 |
|
- |
4.20(Cyclic (dynamic) mechanical load test (MQT 20)) |
- |
20520 |
|
- |
4.21(Potential induced degradation test (MQT 21)) |
- |
46800 |
|
- |
4.22(Bending test (MQT 22)) |
- |
7200 |
|
- |
|
02 Dec, 2026 |
- Included w.e.f. 04.04.2025 |
7 |
Bharat Test House Pvt Ltd 1474 Haryana
| IS 14286 : Part 1 (2023) |
Terrestrial Photovoltaic PV Modules Design Qualification and Type Approval Part 1: Test Requirements (Third Revision) |
Terrestrial Photovoltaic PV Modules |
1502500 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
4.1(Visual inspection (MQT 01)) |
- |
7000 |
|
- |
4.2(Maximum power determination (MQT 02)) |
- |
7000 |
|
- |
4.3(Insulation test (MQT 03)) |
- |
20000 |
|
- |
4.4(Measurement of temperature coefficients (MQT 04)) |
- |
110000 |
|
- |
4.5(Placeholder section, formerly NMOT) |
- |
0 |
|
- |
4.6(Performance at STC (MQT 06.1)) |
- |
7500 |
|
- |
4.7(Performance at low irradiance (MQT 07)) |
- |
10000 |
|
- |
4.8(Outdoor exposure test (MQT 08)) |
- |
50000 |
|
- |
4.9(Hot-spot endurance test (MQT 09)) |
- |
125000 |
|
- |
4.10(UV preconditioning test (MQT 10)) |
- |
125000 |
|
- |
4.11(Thermal cycling test (MQT 11)) |
- |
160000 |
|
- |
4.12(2 Humidity-freeze test (MQT 12)) |
- |
80000 |
|
- |
4.13(Damp heat test (MQT 13)) |
- |
160000 |
|
- |
4.14(Robustness of terminations (MQT 14)) |
- |
15000 |
|
- |
4.15(5 Wet leakage current test (MQT 15)) |
- |
25000 |
|
- |
4.16(Static mechanical load test (MQT 16)) |
- |
50000 |
|
- |
4.17(Hail test (MQT 17)) |
- |
50000 |
|
- |
4.18(Bypass diode testing (MQT 18)) |
- |
75000 |
|
- |
4.19(Stabilization (MQT 19)) |
- |
95000 |
|
- |
4.20(Cyclic (dynamic) mechanical load test (MQT 20)) |
- |
95000 |
|
- |
4.21(Potential induced degradation test (MQT 21)) |
- |
175000 |
|
- |
4.22(Bending test (MQT 22)) |
- |
60000 |
|
- |
|
19 Mar, 2026 |
- Included w.e.f 05.03.2025 |
8 |
TUV Rheinland (India) Pvt., Ltd.
| IS 14286 : Part 1 : Sec 1 (2023) |
Terrestrial photovoltaic PV modules Design qualification and type approval Part 1-1: Special requirements for testing of crystalline silicon photovoltaic PV modules Third Revision |
- |
2097500 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
Cl-8(Major visual defects) |
- |
0 |
|
- |
Cl-11.1(Visual inspection) |
- |
30000 |
|
- |
Cl-11.2(Maximum power determination) |
- |
50000 |
|
- |
Cl-11.3(Insulation test) |
- |
25000 |
|
- |
Cl-11.4(Measurement of temperature coefficients) |
- |
50000 |
|
- |
Cl-11.5(Measurement of nominal module operating temperature) |
- |
30000 |
|
- |
Cl-11.6(Performance at STC) |
- |
50000 |
|
- |
Cl-11.7(Performance at low irradiance) |
- |
7500 |
|
- |
Cl-11.8(Outdoor exposure test) |
- |
20000 |
|
- |
Cl-11.9(Hot-spot endurance test) |
- |
75000 |
|
- |
Cl-11.10(UV preconditioning test) |
- |
75000 |
|
- |
Cl-11.11(Thermal cycling test) |
- |
350000 |
|
- |
Cl-11.12(Humidity-freeze test) |
- |
125000 |
|
- |
Cl-11.13(Damp heat test) |
- |
125000 |
|
- |
Cl-11.14(Robustness of terminations test) |
- |
10000 |
|
- |
Cl-11.15(Wet leakage current tes) |
- |
25000 |
|
- |
Cl-11.16(Static mechanical load test) |
- |
75000 |
|
- |
Cl-11.17(Hail test) |
- |
40000 |
|
- |
Cl-11.18(Bypass diode thermal test) |
- |
50000 |
|
- |
Cl-11.19(Stabilization) |
- |
275000 |
|
- |
11.20(Cyclic (dynamic) mechanical load test (MQT 20)) |
- |
300000 |
|
- |
11.21(Potential induced degradation test (MQT 21)) |
- |
250000 |
|
- |
11.22(Bending test (MQT 22)) |
- |
50000 |
|
- |
5(Marking and documentation) |
- |
10000 |
|
- |
|
10 Sep, 2027 |
- Included w.e.f.04.04.2025 |
9 |
TUV Rheinland (India) Pvt., Ltd.
| IS 14286 : Part 1 : Sec 3 (2023) |
Terrestrial photovoltaic PV modules Design qualification and type approval Part 1-3: Special requirements for testing of thin-film amorphous silicon based photovoltaic PV modules Third Revision |
- |
2097500 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
Cl-8(Major visual defects) |
- |
0 |
|
- |
Cl-11.1(Visual inspection) |
- |
30000 |
|
- |
Cl-11.2(Maximum power determination) |
- |
50000 |
|
- |
Cl-11.3(Insulation test) |
- |
25000 |
|
- |
Cl-11.4(Measurement of temperature coefficients) |
- |
50000 |
|
- |
Cl-11.5(Measurement of nominal module operating temperature) |
- |
30000 |
|
- |
Cl-11.6(Performance at STC and NMOT) |
- |
50000 |
|
- |
Cl-11.7(Performance at low irradiance) |
- |
7500 |
|
- |
Cl-11.8(Outdoor exposure test) |
- |
20000 |
|
- |
Cl-11.9(Hot-spot endurance test) |
- |
75000 |
|
- |
Cl-11.10(UV preconditioning test) |
- |
75000 |
|
- |
Cl-11.11(Thermal cycling test) |
- |
350000 |
|
- |
Cl-11.12(Humidity-freeze test) |
- |
125000 |
|
- |
Cl-11.13(Damp heat test) |
- |
125000 |
|
- |
Cl-11.14(Robustness of terminations test) |
- |
10000 |
|
- |
Cl-11.15(Wet leakage current test) |
- |
25000 |
|
- |
Cl-11.16(Static mechanical load test) |
- |
75000 |
|
- |
Cl-11.17(Hail test) |
- |
40000 |
|
- |
Cl-11.18(Bypass diode testing) |
- |
50000 |
|
- |
Cl-11.19(Stabilization) |
- |
275000 |
|
- |
5(Marking and documentation) |
- |
10000 |
|
- |
11.20(Cyclic (dynamic) mechanical load test (MQT 20)) |
- |
300000 |
|
- |
11.21(Potential induced degradation test (MQT 21)) |
- |
250000 |
|
- |
11.22(Bending test (MQT 22)) |
- |
50000 |
|
- |
|
10 Sep, 2027 |
- Included w.e.f.04.04.2025 |
10 |
TUV Rheinland (India) Pvt., Ltd.
| IS 14286 : Part 1 : Sec 2 (2023) |
Terrestrial photovoltaic PV modules Design qualification and type approval Part 1-2: Special requirements for testing of thin-film Cadmium Telluride CdTe based photovoltaic PV modules Third Revision |
- |
2097500 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
Cl-8(Major visual defects) |
- |
0 |
|
- |
Cl-11.1(Visual inspection) |
- |
30000 |
|
- |
Cl-11.2(Maximum power determination) |
- |
50000 |
|
- |
Cl-11.3(Insulation tes) |
- |
25000 |
|
- |
Cl-11.4(Measurement of temperature coefficients) |
- |
50000 |
|
- |
Cl-11.5(Measurement of nominal module operating temperature) |
- |
30000 |
|
- |
Cl-11.6(Performance at STC and NMOT) |
- |
50000 |
|
- |
Cl-11.7(Performance at low irradiance) |
- |
7500 |
|
- |
Cl-11.8(Outdoor exposure test) |
- |
20000 |
|
- |
Cl-11.9(Hot-spot endurance test) |
- |
75000 |
|
- |
Cl-11.10(UV preconditioning test) |
- |
75000 |
|
- |
Cl-11.11(Thermal cycling test) |
- |
350000 |
|
- |
Cl-11.12(Humidity-freeze test) |
- |
125000 |
|
- |
Cl-11.13(Damp heat test) |
- |
125000 |
|
- |
Cl-11.14(Robustness of terminations test) |
- |
10000 |
|
- |
Cl-11.15(Wet leakage current test) |
- |
25000 |
|
- |
Cl-11.16(Static mechanical load test) |
- |
75000 |
|
- |
Cl-11.17(Hail test) |
- |
40000 |
|
- |
Cl-11.18(Bypass diode testing) |
- |
50000 |
|
- |
Cl-11.19(Stabilization) |
- |
275000 |
|
- |
5(Marking and documentation) |
- |
10000 |
|
- |
11.20(Cyclic (dynamic) mechanical load test (MQT 20)) |
- |
300000 |
|
- |
11.21(Potential induced degradation test (MQT 21)) |
- |
250000 |
|
- |
11.22(Bending test (MQT 22)) |
- |
50000 |
|
- |
|
10 Sep, 2027 |
- Included w.e.f.04.04.2025 |
11 |
TUV Rheinland (India) Pvt., Ltd.
| IS 14286 : Part 1 (2023) |
Terrestrial Photovoltaic PV Modules Design Qualification and Type Approval Part 1: Test Requirements (Third Revision) |
- |
2087500 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
4.1(Visual inspection (MQT 01)) |
- |
30000 |
|
- |
4.2(Maximum power determination (MQT 02)) |
- |
50000 |
|
- |
4.3(Insulation test (MQT 03)) |
- |
25000 |
|
- |
4.4(Measurement of temperature coefficients (MQT 04)) |
- |
50000 |
|
- |
4.6(Performance at STC (MQT 06.1)) |
- |
50000 |
|
- |
4.7(Performance at low irradiance (MQT 07)) |
- |
7500 |
|
- |
4.8(Outdoor exposure test (MQT 08)) |
- |
20000 |
|
- |
4.9(Hot-spot endurance test (MQT 09)) |
- |
75000 |
|
- |
4.10(UV preconditioning test (MQT 10)) |
- |
75000 |
|
- |
4.11(Thermal cycling test (MQT 11)) |
- |
350000 |
|
- |
4.12(2 Humidity-freeze test (MQT 12)) |
- |
125000 |
|
- |
4.13(Damp heat test (MQT 13)) |
- |
125000 |
|
- |
4.14(Robustness of terminations (MQT 14)) |
- |
10000 |
|
- |
4.15(5 Wet leakage current test (MQT 15)) |
- |
25000 |
|
- |
4.16(Static mechanical load test (MQT 16)) |
- |
75000 |
|
- |
4.17(Hail test (MQT 17)) |
- |
40000 |
|
- |
4.18(Bypass diode testing (MQT 18)) |
- |
50000 |
|
- |
4.19(Stabilization (MQT 19)) |
- |
275000 |
|
- |
4.20(Cyclic (dynamic) mechanical load test (MQT 20)) |
- |
300000 |
|
- |
4.21(Potential induced degradation test (MQT 21)) |
- |
250000 |
|
- |
4.22(Bending test (MQT 22)) |
- |
50000 |
|
- |
4.5(Placeholder section, formerly NMOT) |
- |
30000 |
|
- |
|
10 Sep, 2027 |
- Included w.e.f.04.04.2025 |
12 |
DELHI TEST HOUSE KUNDLI
| IS 14286 : Part 1 (2023) |
Terrestrial Photovoltaic PV Modules Design Qualification and Type Approval Part 1: Test Requirements (Third Revision) |
-- |
1600000 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
4.1(Visual inspection (MQT 01)) |
- |
2000 |
|
- |
4.2(Maximum power determination (MQT 02)) |
- |
7000 |
|
- |
4.3(Insulation test (MQT 03)) |
- |
15000 |
|
- |
4.4(Measurement of temperature coefficients (MQT 04)) |
- |
105000 |
|
- |
4.5(Placeholder section, formerly NMOT) |
- |
5000 |
|
- |
4.6(Performance at STC (MQT 06.1)) |
- |
2500 |
|
- |
4.7(Performance at low irradiance (MQT 07)) |
- |
8500 |
|
- |
4.8(Outdoor exposure test (MQT 08)) |
- |
45000 |
|
- |
4.9(Hot-spot endurance test (MQT 09)) |
- |
120000 |
|
- |
4.10(UV preconditioning test (MQT 10)) |
- |
120000 |
|
- |
4.11(Thermal cycling test (MQT 11)) |
- |
155000 |
|
- |
4.12(2 Humidity-freeze test (MQT 12)) |
- |
75000 |
|
- |
4.13(Damp heat test (MQT 13)) |
- |
155000 |
|
- |
4.14(Robustness of terminations (MQT 14)) |
- |
15000 |
|
- |
4.15(5 Wet leakage current test (MQT 15)) |
- |
20000 |
|
- |
4.16(Static mechanical load test (MQT 16)) |
- |
45000 |
|
- |
4.17(Hail test (MQT 17)) |
- |
50000 |
|
- |
4.18(Bypass diode testing (MQT 18)) |
- |
70000 |
|
- |
4.19(Stabilization (MQT 19)) |
- |
90000 |
|
- |
4.20(Cyclic (dynamic) mechanical load test (MQT 20)) |
- |
25000 |
|
- |
4.21(Potential induced degradation test (MQT 21)) |
- |
400000 |
|
- |
4.22(Bending test (MQT 22)) |
- |
70000 |
|
- |
|
23 Jun, 2025 |
- Included w.e.f.07.03.2025 |
13 |
URS PRODUCTS AND TESTING PVT. LTD.
| IS 14286 : Part 1 (2019) |
Terrestrial photovoltaic (PV) modules - Design qualification and type approval: Part 1 test requirements (Second Revision) |
- |
950000 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
5(Marking and documentation) |
- |
150000 |
|
- |
6(Testing) |
- |
150000 |
|
- |
8(Major visual defects) |
- |
150000 |
|
- |
9(Report) |
- |
150000 |
|
- |
10(Modifications) |
- |
150000 |
|
- |
11(Test flow and procedures) |
- |
200000 |
|
- |
|
26 Sep, 2027 |
- - |
14 |
URS PRODUCTS AND TESTING PVT. LTD.
| IS 14286 : Part 1 : Sec 4 (2019) |
Terrestrial photovoltaic (PV) modules - Design qualification and type approval: Part 1 test requirements: Sec 4 special requirements for testing of thin - Film Cu(In,ga)(S,se)2 based photovoltaic (Pv) modules (Second Revision) |
- |
1000000 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
11.1(Visual inspection (MQT 01)) |
- |
3000 |
|
- |
11.2(Maximum power determination (MQT 02)) |
- |
25000 |
|
- |
11.3(Insulation test (MQT 03)) |
- |
20000 |
|
- |
11.4(Measurement of temperature coefficients (MQT 04)) |
- |
25000 |
|
- |
11.5(Measurement of nominal module operating temperature (NMOT)
(MQT 05)) |
- |
25000 |
|
- |
11.6(Performance at STC and NMOT
(MQT 06)) |
- |
70000 |
|
- |
11.7(Performance at low irradiance
(MQT 07)) |
- |
25000 |
|
- |
11.8(Outdoor exposure test (MQT 08)) |
- |
25000 |
|
- |
11.9(Hot-spot endurance test (MQT 09)) |
- |
125000 |
|
- |
11.1(UV preconditioning test
(MQT 10)) |
- |
70000 |
|
- |
11.11(Thermal cycling test (MQT 11)) |
- |
175000 |
|
- |
11.12(Humidity-freeze test (MQT 12)) |
- |
70000 |
|
- |
11.13(Damp heat test (MQT 13)) |
- |
150000 |
|
- |
11.14(Robustness of terminations
(MQT 14)) |
- |
25000 |
|
- |
11.15(Wet leakage current test (MQT 15)) |
- |
25000 |
|
- |
11.16(Static mechanical load test
(MQT 16)) |
- |
95000 |
|
- |
11.17(Hail test (MQT 17)) |
- |
25000 |
|
- |
11.18(Bypass diode thermal test (MQT 18)) |
- |
20000 |
|
- |
11.19(Stabilization (MQT 19)) |
- |
2000 |
|
- |
|
26 Sep, 2027 |
- - |
15 |
URS PRODUCTS AND TESTING PVT. LTD.
| IS 14286 : Part 1 : Sec 3 (2019) |
Terrestrial photovoltaic (PV) modules - Design qualification and type approval: Part 1 test requirements: Sec 3 special requirements for testing of thin - Film amorphous silicon based photovoltaic (Pv) modules (Second Revision) |
- |
1122000 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
5
IS 14286( Marking and Documentation) |
- |
2000 |
|
- |
11.1
IS 14286( Visual inspection) |
- |
3000 |
|
- |
11.2
IS 14286( Maximum power determination) |
- |
25000 |
|
- |
11.3
IS 14286( Insulation Test) |
- |
20000 |
|
- |
11.4
IS 14286( Measurement of temperature coefficients) |
- |
25000 |
|
- |
11.5
IS 14286( Measurement of nominal module operating temperature (NMOT)) |
- |
25000 |
|
- |
11.6
IS 14286( Performance at STC and NMOT) |
- |
25000 |
|
- |
11.7
IS 14286( Performance at low irradiance) |
- |
25000 |
|
- |
11.8
IS 14286( Outdoor exposure Test) |
- |
25000 |
|
- |
11.9
IS 14286( Hot-spot endurance test) |
- |
25000 |
|
- |
11.10
IS 14286( UV Preconditioning test ) |
- |
70000 |
|
- |
11.11
IS 14286( Thermal cycling test) |
- |
175000 |
|
- |
11.12
IS 14286( Humidity-freeze test) |
- |
70000 |
|
- |
11.13
IS 14286(Damp heat test) |
- |
150000 |
|
- |
11.14, Table 1
IS 14286( Robutness of terminations test - Retention of Junction Box on Mounting Surface - Test of Cord Anchorage) |
- |
25000 |
|
- |
11.15
IS 14286( Wet leakage current test) |
- |
25000 |
|
- |
11.16
IS 14286( Static Mechanical load test) |
- |
95000 |
|
- |
11.17, Table 3 & 4,
IS 14286( Hail test) |
- |
25000 |
|
- |
11.18
IS 14286( Bypass diode testing) |
- |
20000 |
|
- |
11.19
IS 14286( Stabilization ) |
- |
2000 |
|
- |
11.15(Wet leakage current test (MQT 15)) |
- |
25000 |
|
- |
11.16(Static mechanical load test
(MQT 16)) |
- |
50000 |
|
- |
11.17(Hail test (MQT 17)) |
- |
25000 |
|
- |
11.18(Bypass diode thermal test (MQT 18)) |
- |
20000 |
|
- |
11.19(Stabilization (MQT 19)) |
- |
2000 |
|
- |
|
26 Sep, 2027 |
- - |
16 |
URS PRODUCTS AND TESTING PVT. LTD.
| IS 14286 : Part 1 : Sec 2 (2019) |
Terrestrial photovoltaic (PV) modules - Design qualification and type approval: Part 1 test requirements: Sec 2 special requirements for testing of thin - Film cadmium telluride (CdTe) based photovoltaic (Pv) modules (Second Revision) |
- |
810000 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
5
IS 14286( Marking and Documentation) |
- |
2000 |
|
- |
11.1
IS 14286( Visual inspection) |
- |
3000 |
|
- |
11.2
IS 14286( Maximum power determination) |
- |
25000 |
|
- |
11.3
IS 14286( Insulation Test) |
- |
20000 |
|
- |
11.4
IS 14286( Measurement of temperature coefficients) |
- |
25000 |
|
- |
11.5
IS 14286( Measurement of nominal module operating temperature (NMOT)) |
- |
25000 |
|
- |
11.6
IS 14286( Performance at STC and NMOT) |
- |
25000 |
|
- |
11.7
IS 14286( Performance at low irradiance) |
- |
25000 |
|
- |
11.8
IS 14286( Outdoor exposure Test) |
- |
25000 |
|
- |
11.9
IS 14286( Hot-spot endurance test) |
- |
25000 |
|
- |
11.10
IS 14286( UV Preconditioning test ) |
- |
70000 |
|
- |
11.11
IS 14286( Thermal cycling test) |
- |
175000 |
|
- |
11.13
IS 14286(Damp heat test) |
- |
150000 |
|
- |
11.14, Table 1
IS 14286( Robutness of terminations test - Retention of Junction Box on Mounting Surface - Test of Cord Anchorage) |
- |
25000 |
|
- |
11.15
IS 14286( Wet leakage current test) |
- |
25000 |
|
- |
11.16
IS 14286( Static Mechanical load test) |
- |
95000 |
|
- |
11.17, Table 3 & 4,
IS 14286( Hail test) |
- |
25000 |
|
- |
11.18
IS 14286( Bypass diode testing) |
- |
20000 |
|
- |
11.19
IS 14286( Stabilization ) |
- |
2000 |
|
- |
11.18(Bypass diode thermal test (MQT 18)) |
- |
20000 |
|
- |
11.19(Stabilization (MQT 19)) |
- |
3000 |
|
- |
|
26 Sep, 2027 |
- - |
17 |
URS PRODUCTS AND TESTING PVT. LTD.
| IS 14286 : Part 1 : Sec 1 (2019) |
Terrestrial photovoltaic (PV) modules - Design qualification and type approval: Part 1 test requirements: Sec 1 special requirements for testing of crystalline silicon photovoltaic (Pv) modules (Second Revision) |
- |
810000 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
11.1(Visual inspection (MQT 01)) |
- |
3000 |
|
- |
11.2(Maximum power determination (MQT 02)) |
- |
25000 |
|
- |
11.3(Insulation test (MQT 03)) |
- |
20000 |
|
- |
11.4(Measurement of temperature coefficients (MQT 04)) |
- |
25000 |
|
- |
11.5(Measurement of nominal module operating temperature (NMOT)
(MQT 05)) |
- |
25000 |
|
- |
11.6(Performance at STC and NMOT
(MQT 06)) |
- |
25000 |
|
- |
11.7(Performance at low irradiance
(MQT 07)) |
- |
25000 |
|
- |
11.8(Outdoor exposure test (MQT 08)) |
- |
25000 |
|
- |
11.9(Hot-spot endurance test (MQT 09)) |
- |
25000 |
|
- |
11.1(UV preconditioning test
(MQT 10)) |
- |
70000 |
|
- |
11.11(Thermal cycling test (MQT 11)) |
- |
175000 |
|
- |
11.12(Humidity-freeze test (MQT 12)) |
- |
70000 |
|
- |
11.13(Damp heat test (MQT 13)) |
- |
150000 |
|
- |
11.14(Robustness of terminations
(MQT 14)) |
- |
25000 |
|
- |
11.15(Wet leakage current test (MQT 15)) |
- |
25000 |
|
- |
11.16(Static mechanical load test
(MQT 16)) |
- |
50000 |
|
- |
11.17(Hail test (MQT 17)) |
- |
25000 |
|
- |
11.18(Bypass diode thermal test (MQT 18)) |
- |
20000 |
|
- |
11.19(Stabilization (MQT 19)) |
- |
2000 |
|
- |
|
26 Sep, 2027 |
- - |
18 |
URS PRODUCTS AND TESTING PVT. LTD.
| IS 14286 (2010) |
Crystalline silicon terrestrial photovoltaic (PV) modules - Design qualification and type approval (First Revision) |
- |
810000 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
4(Marking) |
- |
2000 |
|
- |
10.1(Visual inspection) |
- |
3000 |
|
- |
10.2(Maximum power determination) |
- |
25000 |
|
- |
10.3(Insulation test) |
- |
20000 |
|
- |
10.4(Measurement of temperature coefficients) |
- |
25000 |
|
- |
10.5(Measurement of NOCT) |
- |
25000 |
|
- |
10.6(Performance at STC and NOCT) |
- |
25000 |
|
- |
10.7(Performance at low irradiance) |
- |
25000 |
|
- |
10.8(Outdoor exposure test) |
- |
25000 |
|
- |
10.9(Hot-spot endurance test) |
- |
25000 |
|
- |
10.10(UV preconditioning) |
- |
70000 |
|
- |
10.11(Thermal cycling test) |
- |
175000 |
|
- |
10.12(Humidity freeze test) |
- |
70000 |
|
- |
10.13(Damp heat test) |
- |
150000 |
|
- |
10.14(Robustness of termination test) |
- |
25000 |
|
- |
10.15(Wet leakage current test) |
- |
25000 |
|
- |
10.16(Mechanical load test) |
- |
50000 |
|
- |
10.17(Hail test) |
- |
25000 |
|
- |
10.18(Bypass diode thermal' test) |
- |
20000 |
|
- |
|
26 Sep, 2027 |
- - |
19 |
URS PRODUCTS AND TESTING PVT. LTD.
| IS 14286 : Part 1 (2023) |
Terrestrial Photovoltaic PV Modules Design Qualification and Type Approval Part 1: Test Requirements (Third Revision) |
- |
1800000 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
4.1(Visual inspection (MQT 01)) |
- |
10000 |
|
- |
4.2(Maximum power determination (MQT 02)) |
- |
100000 |
|
- |
4.3(Insulation test (MQT 03)) |
- |
100000 |
|
- |
4.4(Measurement of temperature coefficients (MQT 04)) |
- |
100000 |
|
- |
4.5(Placeholder section, formerly NMOT) |
- |
10000 |
|
- |
4.6(Performance at STC (MQT 06.1)) |
- |
100000 |
|
- |
4.7(Performance at low irradiance (MQT 07)) |
- |
100000 |
|
- |
4.8(Outdoor exposure test (MQT 08)) |
- |
100000 |
|
- |
4.9(Hot-spot endurance test (MQT 09)) |
- |
100000 |
|
- |
4.10(UV preconditioning test (MQT 10)) |
- |
100000 |
|
- |
4.11(Thermal cycling test (MQT 11)) |
- |
100000 |
|
- |
4.12(2 Humidity-freeze test (MQT 12)) |
- |
100000 |
|
- |
4.13(Damp heat test (MQT 13)) |
- |
100000 |
|
- |
4.14(Robustness of terminations (MQT 14)) |
- |
100000 |
|
- |
4.15(5 Wet leakage current test (MQT 15)) |
- |
100000 |
|
- |
4.16(Static mechanical load test (MQT 16)) |
- |
100000 |
|
- |
4.17(Hail test (MQT 17)) |
- |
100000 |
|
- |
4.18(Bypass diode testing (MQT 18)) |
- |
100000 |
|
- |
4.19(Stabilization (MQT 19)) |
- |
100000 |
|
- |
4.20(Cyclic (dynamic) mechanical load test (MQT 20)) |
- |
100000 |
|
- |
4.21(Potential induced degradation test (MQT 21)) |
- |
100000 |
|
- |
4.22(Bending test (MQT 22)) |
- |
100000 |
|
- |
|
26 Sep, 2027 |
- Included w.e.f 04.03.2025 |
20 |
URS PRODUCTS AND TESTING PVT. LTD.
| IS 14286 : Part 1 : Sec 1 (2023) |
Terrestrial photovoltaic PV modules Design qualification and type approval Part 1-1: Special requirements for testing of crystalline silicon photovoltaic PV modules Third Revision |
- |
1450000 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
Cl-8(Major visual defects) |
- |
10000 |
|
- |
Cl-11.1(Visual inspection) |
- |
10000 |
|
- |
Cl-11.2(Maximum power determination) |
- |
200000 |
|
- |
Cl-11.3(Insulation test) |
- |
200000 |
|
- |
Cl-11.4(Measurement of temperature coefficients) |
- |
200000 |
|
- |
Cl-11.5(Measurement of nominal module operating temperature) |
- |
10000 |
|
- |
Cl-11.6(Performance at STC) |
- |
200000 |
|
- |
Cl-11.7(Performance at low irradiance) |
- |
100000 |
|
- |
Cl-11.8(Outdoor exposure test) |
- |
100000 |
|
- |
Cl-11.9(Hot-spot endurance test) |
- |
100000 |
|
- |
Cl-11.10(UV preconditioning test) |
- |
100000 |
|
- |
Cl-11.11(Thermal cycling test) |
- |
200000 |
|
- |
Cl-11.12(Humidity-freeze test) |
- |
200000 |
|
- |
Cl-11.13(Damp heat test) |
- |
100000 |
|
- |
Cl-11.14(Robustness of terminations test) |
- |
100000 |
|
- |
Cl-11.15(Wet leakage current tes) |
- |
100000 |
|
- |
Cl-11.16(Static mechanical load test) |
- |
100000 |
|
- |
Cl-11.17(Hail test) |
- |
100000 |
|
- |
Cl-11.18(Bypass diode thermal test) |
- |
100000 |
|
- |
Cl-11.19(Stabilization) |
- |
100000 |
|
- |
5(Marking and documentation) |
- |
100000 |
|
- |
11.20(Cyclic (dynamic) mechanical load test (MQT 20)) |
- |
100000 |
|
- |
11.21(Potential induced degradation test (MQT 21)) |
- |
100000 |
|
- |
11.22(Bending test (MQT 22)) |
- |
100000 |
|
- |
|
26 Sep, 2027 |
- Included w.e.f 04.03.2025 |
21 |
TUV Rheinland (India) Pvt., Ltd.
| IS 14286 (2010) |
Crystalline silicon terrestrial photovoltaic (PV) modules - Design qualification and type approval (First Revision) |
- |
850000.00 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
10.1(Visual inspection) |
- |
25000.00 |
|
- |
10.2(Maximum power determination) |
- |
50000.00 |
|
- |
10.3(Insulation test) |
- |
25000.00 |
|
- |
10.4(Measurement of temperature coefficients) |
- |
50000.00 |
|
- |
10.5(Measurement of NOCT) |
- |
50000.00 |
|
- |
10.6(Performance at STC and NOCT) |
- |
10000.00 |
|
- |
10.7(Performance at low irradiance) |
- |
7500.00 |
|
- |
10.8(Outdoor exposure test) |
- |
7500.00 |
|
- |
10.9(Hot-spot endurance test) |
- |
75000.00 |
|
- |
10.10(UV preconditioning) |
- |
50000.00 |
|
- |
10.11(Thermal cycling test) |
- |
150000.00 |
|
- |
10.12(Humidity freeze test) |
- |
75000.00 |
|
- |
10.13(Damp heat test) |
- |
75000.00 |
|
- |
10.14(Robustness of termination test) |
- |
25000.00 |
|
- |
10.15(Wet leakage current test) |
- |
25000.00 |
|
- |
10.16(Mechanical load test) |
- |
50000.00 |
|
- |
10.17(Hail test) |
- |
50000.00 |
|
- |
10.18(Bypass diode thermal' test) |
- |
40000.00 |
|
- |
4(Marking) |
- |
10000.00 |
|
- |
|
10 Sep, 2027 |
- - |
22 |
Mitsui Chemicals India Pvt. Ltd.
| IS 14286 : Part 1 : Sec 1 (2023) |
Terrestrial photovoltaic PV modules Design qualification and type approval Part 1-1: Special requirements for testing of crystalline silicon photovoltaic PV modules Third Revision |
- |
1814240 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
Cl-8(Major visual defects) |
- |
0 |
|
- |
Cl-11.1(Visual inspection) |
- |
17200 |
|
- |
Cl-11.2(Maximum power determination) |
- |
55200 |
|
- |
Cl-11.3(Insulation test) |
- |
12650 |
|
- |
Cl-11.4(Measurement of temperature coefficients) |
- |
27600 |
|
- |
Cl-11.5(Measurement of nominal module operating temperature) |
- |
0 |
|
- |
Cl-11.6(Performance at STC) |
- |
294000 |
|
- |
Cl-11.7(Performance at low irradiance) |
- |
4600 |
|
- |
Cl-11.8(Outdoor exposure test) |
- |
23040 |
|
- |
Cl-11.9(Hot-spot endurance test) |
- |
67200 |
|
- |
Cl-11.10(UV preconditioning test) |
- |
53520 |
|
- |
Cl-11.11(Thermal cycling test) |
- |
94080 |
|
- |
Cl-11.12(Humidity-freeze test) |
- |
35376 |
|
- |
Cl-11.13(Damp heat test) |
- |
122535 |
|
- |
Cl-11.14(Robustness of terminations test) |
- |
1272 |
|
- |
Cl-11.15(Wet leakage current tes) |
- |
33800 |
|
- |
Cl-11.16(Static mechanical load test) |
- |
13680 |
|
- |
Cl-11.17(Hail test) |
- |
15120 |
|
- |
Cl-11.18(Bypass diode thermal test) |
- |
12560 |
|
- |
Cl-11.19(Stabilization) |
- |
2100 |
|
- |
5(Marking and documentation) |
- |
0 |
|
- |
11.20(Cyclic (dynamic) mechanical load test (MQT 20)) |
- |
11400 |
|
- |
11.21(Potential induced degradation test (MQT 21)) |
- |
26000 |
|
- |
11.22(Bending test (MQT 22)) |
- |
4000 |
|
- |
Cl-8(Major visual defects) |
- |
0 |
|
- |
Cl-11.1(Visual inspection) |
- |
0 |
|
- |
Cl-11.2(Maximum power determination) |
- |
0 |
|
- |
Cl-11.3(Insulation test) |
- |
0 |
|
- |
Cl-11.4(Measurement of temperature coefficients) |
- |
0 |
|
- |
Cl-11.5(Measurement of nominal module operating temperature) |
- |
0 |
|
- |
Cl-11.6(Performance at STC) |
- |
0 |
|
- |
Cl-11.7(Performance at low irradiance) |
- |
0 |
|
- |
Cl-11.8(Outdoor exposure test) |
- |
0 |
|
- |
Cl-11.9(Hot-spot endurance test) |
- |
0 |
|
- |
Cl-11.10(UV preconditioning test) |
- |
0 |
|
- |
Cl-11.11(Thermal cycling test) |
- |
0 |
|
- |
Cl-11.12(Humidity-freeze test) |
- |
0 |
|
- |
Cl-11.13(Damp heat test) |
- |
0 |
|
- |
Cl-11.14(Robustness of terminations test) |
- |
0 |
|
- |
Cl-11.15(Wet leakage current tes) |
- |
0 |
|
- |
Cl-11.16(Static mechanical load test) |
- |
0 |
|
- |
Cl-11.17(Hail test) |
- |
0 |
|
- |
Cl-11.18(Bypass diode thermal test) |
- |
0 |
|
- |
Cl-11.19(Stabilization) |
- |
0 |
|
- |
5(Marking and documentation) |
- |
0 |
|
- |
11.20(Cyclic (dynamic) mechanical load test (MQT 20)) |
- |
0 |
|
- |
11.21(Potential induced degradation test (MQT 21)) |
- |
0 |
|
- |
11.22(Bending test (MQT 22)) |
- |
0 |
|
- |
Cl-8(Major visual defects) |
- |
0 |
|
- |
Cl-11.1(Visual inspection) |
- |
0 |
|
- |
Cl-11.2(Maximum power determination) |
- |
0 |
|
- |
Cl-11.3(Insulation test) |
- |
0 |
|
- |
Cl-11.4(Measurement of temperature coefficients) |
- |
0 |
|
- |
Cl-11.5(Measurement of nominal module operating temperature) |
- |
0 |
|
- |
Cl-11.6(Performance at STC) |
- |
0 |
|
- |
Cl-11.7(Performance at low irradiance) |
- |
0 |
|
- |
Cl-11.8(Outdoor exposure test) |
- |
0 |
|
- |
Cl-11.9(Hot-spot endurance test) |
- |
0 |
|
- |
Cl-11.10(UV preconditioning test) |
- |
0 |
|
- |
Cl-11.11(Thermal cycling test) |
- |
0 |
|
- |
Cl-11.12(Humidity-freeze test) |
- |
0 |
|
- |
Cl-11.13(Damp heat test) |
- |
0 |
|
- |
Cl-11.14(Robustness of terminations test) |
- |
0 |
|
- |
Cl-11.15(Wet leakage current tes) |
- |
0 |
|
- |
Cl-11.16(Static mechanical load test) |
- |
0 |
|
- |
Cl-11.17(Hail test) |
- |
0 |
|
- |
Cl-11.18(Bypass diode thermal test) |
- |
0 |
|
- |
Cl-11.19(Stabilization) |
- |
0 |
|
- |
5(Marking and documentation) |
- |
0 |
|
- |
11.20(Cyclic (dynamic) mechanical load test (MQT 20)) |
- |
0 |
|
- |
11.21(Potential induced degradation test (MQT 21)) |
- |
0 |
|
- |
11.22(Bending test (MQT 22)) |
- |
0 |
|
- |
|
02 Dec, 2026 |
- Included w.e.f. 04.04.2025 |
23 |
Hi Physix Laboratory India Private Limited
| IS 14286 : Part 1 : Sec 2 (2023) |
Terrestrial photovoltaic PV modules Design qualification and type approval Part 1-2: Special requirements for testing of thin-film Cadmium Telluride CdTe based photovoltaic PV modules Third Revision |
- |
1985000 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
Cl-8(Major visual defects) |
- |
0 |
|
- |
Cl-11.1(Visual inspection) |
- |
20000 |
|
- |
Cl-11.2(Maximum power determination) |
- |
30000 |
|
- |
Cl-11.3(Insulation tes) |
- |
15000 |
|
- |
Cl-11.4(Measurement of temperature coefficients) |
- |
60000 |
|
- |
Cl-11.5(Measurement of nominal module operating temperature) |
- |
0 |
|
- |
Cl-11.6(Performance at STC and NMOT) |
- |
30000 |
|
- |
Cl-11.7(Performance at low irradiance) |
- |
30000 |
|
- |
Cl-11.8(Outdoor exposure test) |
- |
30000 |
|
- |
Cl-11.9(Hot-spot endurance test) |
- |
200000 |
|
- |
Cl-11.10(UV preconditioning test) |
- |
150000 |
|
- |
Cl-11.11(Thermal cycling test) |
- |
250000 |
|
- |
Cl-11.12(Humidity-freeze test) |
- |
100000 |
|
- |
Cl-11.13(Damp heat test) |
- |
150000 |
|
- |
Cl-11.14(Robustness of terminations test) |
- |
15000 |
|
- |
Cl-11.15(Wet leakage current test) |
- |
20000 |
|
- |
Cl-11.16(Static mechanical load test) |
- |
40000 |
|
- |
Cl-11.17(Hail test) |
- |
20000 |
|
- |
Cl-11.18(Bypass diode testing) |
- |
80000 |
|
- |
Cl-11.19(Stabilization) |
- |
300000 |
|
- |
5(Marking and documentation) |
- |
5000 |
|
- |
11.20(Cyclic (dynamic) mechanical load test (MQT 20)) |
- |
120000 |
|
- |
11.21(Potential induced degradation test (MQT 21)) |
- |
300000 |
|
- |
11.22(Bending test (MQT 22)) |
- |
20000 |
|
- |
|
20 Jun, 2028 |
- Included w.e.f.08.11.2024 |
24 |
Hi Physix Laboratory India Private Limited
| IS 14286 : Part 1 : Sec 1 (2023) |
Terrestrial photovoltaic PV modules Design qualification and type approval Part 1-1: Special requirements for testing of crystalline silicon photovoltaic PV modules Third Revision |
- |
1835000 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
Cl-8(Major visual defects) |
- |
0 |
|
- |
Cl-11.1(Visual inspection) |
- |
20000 |
|
- |
Cl-11.2(Maximum power determination) |
- |
30000 |
|
- |
Cl-11.3(Insulation test) |
- |
15000 |
|
- |
Cl-11.4(Measurement of temperature coefficients) |
- |
60000 |
|
- |
Cl-11.5(Measurement of nominal module operating temperature) |
- |
0 |
|
- |
Cl-11.6(Performance at STC) |
- |
30000 |
|
- |
Cl-11.7(Performance at low irradiance) |
- |
30000 |
|
- |
Cl-11.8(Outdoor exposure test) |
- |
30000 |
|
- |
Cl-11.9(Hot-spot endurance test) |
- |
200000 |
|
- |
Cl-11.10(UV preconditioning test) |
- |
150000 |
|
- |
Cl-11.11(Thermal cycling test) |
- |
250000 |
|
- |
Cl-11.12(Humidity-freeze test) |
- |
100000 |
|
- |
Cl-11.13(Damp heat test) |
- |
150000 |
|
- |
Cl-11.14(Robustness of terminations test) |
- |
15000 |
|
- |
Cl-11.15(Wet leakage current tes) |
- |
20000 |
|
- |
Cl-11.16(Static mechanical load test) |
- |
40000 |
|
- |
Cl-11.17(Hail test) |
- |
20000 |
|
- |
Cl-11.18(Bypass diode thermal test) |
- |
80000 |
|
- |
Cl-11.19(Stabilization) |
- |
150000 |
|
- |
5(Marking and documentation) |
- |
5000 |
|
- |
11.20(Cyclic (dynamic) mechanical load test (MQT 20)) |
- |
120000 |
|
- |
11.21(Potential induced degradation test (MQT 21)) |
- |
300000 |
|
- |
11.22(Bending test (MQT 22)) |
- |
20000 |
|
- |
|
20 Jun, 2028 |
- Included w.e.f 05.11.2024 |
25 |
UL INDIA PRIVATE LIMITED
| IS 14286 (2010) |
Crystalline silicon terrestrial photovoltaic (PV) modules - Design qualification and type approval (First Revision) |
CRYSTALLINE SILICON TERRESTRIAL PHOTOVOLTAIC (PV) MODUL |
800000 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
10.1(Visual inspection) |
- |
2000 |
|
- |
10.2(Maximum power determination) |
- |
4000 |
|
- |
10.3(Insulation test) |
- |
4000 |
|
- |
10.5(Measurement of NOCT) |
- |
30000 |
|
- |
10.6(Performance at STC and NOCT) |
- |
9000 |
|
- |
10.7(Performance at low irradiance) |
- |
4000 |
|
- |
10.8(Outdoor exposure test) |
- |
20000 |
|
- |
10.9(Hot-spot endurance test) |
- |
15000 |
|
- |
10.10(UV preconditioning) |
- |
35000 |
|
- |
10.11(Thermal cycling test) |
- |
230000 |
|
- |
10.12(Humidity freeze test) |
- |
150000 |
|
- |
10.13(Damp heat test) |
- |
230000 |
|
- |
10.14(Robustness of termination test) |
- |
10000 |
|
- |
10.15(Wet leakage current test) |
- |
7000 |
|
- |
10.16(Mechanical load test) |
- |
10000 |
|
- |
10.17(Hail test) |
- |
10000 |
|
- |
10.18(Bypass diode thermal' test) |
- |
10000 |
|
- |
10.4(Measurement of temperature coefficients) |
- |
20000 |
|
- |
|
12 May, 2027 |
- - |
26 |
Hi Physix Laboratory India Private Limited
| IS 14286 : Part 1 : Sec 4 (2023) |
Terrestrial photovoltaic PV modules Design qualification and type approval Part 1-4: Special requirements for testing of thin-film CuInGASSe2 based photovoltaic PV modules Third Revision |
- |
1985000 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
Cl-8(Major visual defects) |
- |
0 |
|
- |
Cl-11.1(Visual inspection (MQT 01)) |
- |
20000 |
|
- |
Cl-11.2(Maximum power determination (MQT 02)) |
- |
30000 |
|
- |
Cl-11.3(Insulation test (MQT 03)) |
- |
15000 |
|
- |
Cl-11.4(Measurement of temperature coefficients (MQT 04)) |
- |
60000 |
|
- |
Cl-11.5(Measurement of nominal module operating temperature (NMOT) (MQT 05)) |
- |
0 |
|
- |
Cl-11.6(Performance at STC (MQT 06.1) and NMOT (MQT 06.2) |
- |
30000 |
|
- |
Cl-11.7(Performance at low irradiance (MQT 07)) |
- |
30000 |
|
- |
Cl-11.8(Outdoor exposure test (MQT 08)) |
- |
30000 |
|
- |
Cl-11.9(Hot-spot endurance test (MQT 09)) |
- |
200000 |
|
- |
Cl-11.10(UV preconditioning test (MQT 10)) |
- |
150000 |
|
- |
Cl-11.11(Thermal cycling test (MQT 11)) |
- |
250000 |
|
- |
Cl-11.12(As per IEC 61215-1:2016) |
- |
100000 |
|
11.12 (Humidity-freeze test (MQT 12)) |
Cl-11.13(Damp heat test (MQT 13)) |
- |
150000 |
|
- |
Cl-11.14(Robustness of terminations test (MQT 14)) |
- |
15000 |
|
- |
Cl-11.15(Robustness of terminations test (MQT 14)) |
- |
20000 |
|
11.15 (Wet leakage current test (MQT 15)) |
Cl-11.16(Static mechanical load test (MQT 16)) |
- |
40000 |
|
- |
Cl-11.17(Hail test (MQT 17)) |
- |
20000 |
|
- |
Cl-11.18(Bypass diode testing (MQT 18)) |
- |
80000 |
|
- |
Cl-11.19(Stabilization (MQT 19)) |
- |
300000 |
|
- |
Cl-8(Major visual defects) |
- |
0 |
|
- |
Cl-11.1(Visual inspection (MQT 01)) |
- |
0 |
|
- |
Cl-11.2(Maximum power determination (MQT 02)) |
- |
0 |
|
- |
Cl-11.3(Insulation test (MQT 03)) |
- |
0 |
|
- |
Cl-11.4(Measurement of temperature coefficients (MQT 04)) |
- |
0 |
|
- |
Cl-11.5(Measurement of nominal module operating temperature (NMOT) (MQT 05)) |
- |
0 |
|
- |
Cl-11.6(Performance at STC (MQT 06.1) and NMOT (MQT 06.2) |
- |
0 |
|
- |
Cl-11.7(Performance at low irradiance (MQT 07)) |
- |
0 |
|
- |
Cl-11.8(Outdoor exposure test (MQT 08)) |
- |
0 |
|
- |
Cl-11.9(Hot-spot endurance test (MQT 09)) |
- |
0 |
|
- |
Cl-11.10(UV preconditioning test (MQT 10)) |
- |
0 |
|
- |
Cl-11.11(Thermal cycling test (MQT 11)) |
- |
0 |
|
- |
Cl-11.12(As per IEC 61215-1:2016) |
- |
0 |
|
- |
Cl-11.13(Damp heat test (MQT 13)) |
- |
0 |
|
- |
Cl-11.14(Robustness of terminations test (MQT 14)) |
- |
0 |
|
- |
Cl-11.15(Robustness of terminations test (MQT 14)) |
- |
0 |
|
- |
Cl-11.16(Static mechanical load test (MQT 16)) |
- |
0 |
|
- |
Cl-11.17(Hail test (MQT 17)) |
- |
0 |
|
- |
Cl-11.18(Bypass diode testing (MQT 18)) |
- |
0 |
|
- |
Cl-11.19(Stabilization (MQT 19)) |
- |
0 |
|
- |
5(Marking and documentation) |
- |
5000 |
|
- |
11.20(Cyclic (dynamic) mechanical load test (MQT 20)) |
- |
120000 |
|
- |
11.21(Potential induced degradation test (MQT 21)) |
- |
300000 |
|
- |
11.22(Bending test (MQT 22)) |
- |
20000 |
|
- |
|
20 Jun, 2028 |
- Included w.e.f 05.11.2024 |
27 |
ACE TEST LAB PRIVATE LIMITED
| IS 14286 (2010) |
Crystalline silicon terrestrial photovoltaic (PV) modules - Design qualification and type approval (First Revision) |
- |
740000 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
4(Marking) |
- |
39333.33 |
|
- |
10.1(Visual inspection) |
- |
39333.33 |
|
- |
10.2(Maximum power determination) |
- |
39333.33 |
|
- |
10.3(Insulation test) |
- |
39333.33 |
|
- |
10.4(Measurement of temperature coefficients) |
- |
39333.33 |
|
- |
10.5(Measurement of NOCT) |
- |
39333.33 |
|
- |
10.6(Performance at STC and NOCT) |
- |
39333.33 |
|
- |
10.7(Performance at low irradiance) |
- |
39333.33 |
|
- |
10.8(Outdoor exposure test) |
- |
39333.33 |
|
- |
10.9(Hot-spot endurance test) |
- |
39333.33 |
|
- |
10.10(UV preconditioning) |
- |
39333.33 |
|
- |
10.11(Thermal cycling test) |
- |
36888.90 |
|
- |
10.12(Humidity freeze test) |
- |
36888.90 |
|
- |
10.13(Damp heat test) |
- |
36888.92 |
|
- |
10.14(Robustness of termination test) |
- |
39333.33 |
|
- |
10.15(Wet leakage current test) |
- |
39333.33 |
|
- |
10.16(Mechanical load test) |
- |
39333.33 |
|
- |
10.17(Hail test) |
- |
39333.33 |
|
- |
10.18(Bypass diode thermal' test) |
- |
39333.33 |
|
- |
|
07 Jan, 2027 |
- - |
28 |
Hi Physix Laboratory India Private Limited
| IS 14286 : Part 1 : Sec 3 (2023) |
Terrestrial photovoltaic PV modules Design qualification and type approval Part 1-3: Special requirements for testing of thin-film amorphous silicon based photovoltaic PV modules Third Revision |
- |
1985000 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
Cl-8(Major visual defects) |
- |
0 |
|
- |
Cl-11.1(Visual inspection) |
- |
20000 |
|
- |
Cl-11.2(Maximum power determination) |
- |
30000 |
|
- |
Cl-11.3(Insulation test) |
- |
15000 |
|
- |
Cl-11.4(Measurement of temperature coefficients) |
- |
60000 |
|
- |
Cl-11.5(Measurement of nominal module operating temperature) |
- |
0 |
|
- |
Cl-11.6(Performance at STC and NMOT) |
- |
30000 |
|
- |
Cl-11.7(Performance at low irradiance) |
- |
30000 |
|
- |
Cl-11.8(Outdoor exposure test) |
- |
30000 |
|
- |
Cl-11.9(Hot-spot endurance test) |
- |
200000 |
|
- |
Cl-11.10(UV preconditioning test) |
- |
150000 |
|
- |
Cl-11.11(Thermal cycling test) |
- |
250000 |
|
- |
Cl-11.12(Humidity-freeze test) |
- |
100000 |
|
- |
Cl-11.13(Damp heat test) |
- |
150000 |
|
- |
Cl-11.14(Robustness of terminations test) |
- |
15000 |
|
- |
Cl-11.15(Wet leakage current test) |
- |
20000 |
|
- |
Cl-11.16(Static mechanical load test) |
- |
40000 |
|
- |
Cl-11.17(Hail test) |
- |
20000 |
|
- |
Cl-11.18(Bypass diode testing) |
- |
80000 |
|
- |
Cl-11.19(Stabilization) |
- |
300000 |
|
- |
Cl-8(Major visual defects) |
- |
0 |
|
- |
Cl-11.1(Visual inspection) |
- |
0 |
|
- |
Cl-11.2(Maximum power determination) |
- |
0 |
|
- |
Cl-11.3(Insulation test) |
- |
0 |
|
- |
Cl-11.4(Measurement of temperature coefficients) |
- |
0 |
|
- |
Cl-11.5(Measurement of nominal module operating temperature) |
- |
0 |
|
- |
Cl-11.6(Performance at STC and NMOT) |
- |
0 |
|
- |
Cl-11.7(Performance at low irradiance) |
- |
0 |
|
- |
Cl-11.8(Outdoor exposure test) |
- |
0 |
|
- |
Cl-11.9(Hot-spot endurance test) |
- |
0 |
|
- |
Cl-11.10(UV preconditioning test) |
- |
0 |
|
- |
Cl-11.11(Thermal cycling test) |
- |
0 |
|
- |
Cl-11.12(Humidity-freeze test) |
- |
0 |
|
- |
Cl-11.13(Damp heat test) |
- |
0 |
|
- |
Cl-11.14(Robustness of terminations test) |
- |
0 |
|
- |
Cl-11.15(Wet leakage current test) |
- |
0 |
|
- |
Cl-11.16(Static mechanical load test) |
- |
0 |
|
- |
Cl-11.17(Hail test) |
- |
0 |
|
- |
Cl-11.18(Bypass diode testing) |
- |
0 |
|
- |
Cl-11.19(Stabilization) |
- |
0 |
|
- |
5(Marking and documentation) |
- |
5000 |
|
- |
11.20(Cyclic (dynamic) mechanical load test (MQT 20)) |
- |
120000 |
|
- |
11.21(Potential induced degradation test (MQT 21)) |
- |
300000 |
|
- |
11.22(Bending test (MQT 22)) |
- |
20000 |
|
- |
|
20 Jun, 2028 |
- Included w.e.f 05.11.2024 |
29 |
DELHI TEST HOUSE KUNDLI
| IS 14286 : Part 1 : Sec 1 (2023) |
Terrestrial photovoltaic PV modules Design qualification and type approval Part 1-1: Special requirements for testing of crystalline silicon photovoltaic PV modules Third Revision |
- |
2005000 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
Cl-8(Major visual defects) |
- |
6000 |
|
- |
Cl-11.1(Visual inspection) |
- |
2000 |
|
- |
Cl-11.2(Maximum power determination) |
- |
7000 |
|
- |
Cl-11.3(Insulation test) |
- |
20000 |
|
- |
Cl-11.4(Measurement of temperature coefficients) |
- |
110000 |
|
- |
Cl-11.5(Measurement of nominal module operating temperature) |
- |
5000 |
|
- |
Cl-11.6(Performance at STC) |
- |
2500 |
|
- |
Cl-11.7(Performance at low irradiance) |
- |
10000 |
|
- |
Cl-11.8(Outdoor exposure test) |
- |
50000 |
|
- |
Cl-11.9(Hot-spot endurance test) |
- |
125000 |
|
- |
Cl-11.10(UV preconditioning test) |
- |
125000 |
|
- |
Cl-11.11(Thermal cycling test) |
- |
160000 |
|
- |
Cl-11.12(Humidity-freeze test) |
- |
80000 |
|
- |
Cl-11.13(Damp heat test) |
- |
160000 |
|
- |
Cl-11.14(Robustness of terminations test) |
- |
15000 |
|
- |
Cl-11.15(Wet leakage current tes) |
- |
25000 |
|
- |
Cl-11.16(Static mechanical load test) |
- |
50000 |
|
- |
Cl-11.17(Hail test) |
- |
50000 |
|
- |
Cl-11.18(Bypass diode thermal test) |
- |
75000 |
|
- |
Cl-11.19(Stabilization) |
- |
95000 |
|
- |
Cl-8(Major visual defects) |
- |
6000 |
|
- |
Cl-11.1(Visual inspection) |
- |
2000 |
|
- |
Cl-11.2(Maximum power determination) |
- |
7000 |
|
- |
Cl-11.3(Insulation test) |
- |
20000 |
|
- |
Cl-11.4(Measurement of temperature coefficients) |
- |
110000 |
|
- |
Cl-11.5(Measurement of nominal module operating temperature) |
- |
5000 |
|
- |
Cl-11.6(Performance at STC) |
- |
2500 |
|
- |
Cl-11.7(Performance at low irradiance) |
- |
10000 |
|
- |
Cl-11.8(Outdoor exposure test) |
- |
50000 |
|
- |
Cl-11.9(Hot-spot endurance test) |
- |
125000 |
|
- |
Cl-11.10(UV preconditioning test) |
- |
125000 |
|
- |
Cl-11.11(Thermal cycling test) |
- |
160000 |
|
- |
Cl-11.12(Humidity-freeze test) |
- |
80000 |
|
- |
Cl-11.13(Damp heat test) |
- |
160000 |
|
- |
Cl-11.14(Robustness of terminations test) |
- |
15000 |
|
- |
Cl-11.15(Wet leakage current tes) |
- |
25000 |
|
- |
Cl-11.16(Static mechanical load test) |
- |
50000 |
|
- |
Cl-11.17(Hail test) |
- |
50000 |
|
- |
Cl-11.18(Bypass diode thermal test) |
- |
75000 |
|
- |
Cl-11.19(Stabilization) |
- |
95000 |
|
- |
5(Marking and documentation) |
- |
10000 |
|
- |
11.20(Cyclic (dynamic) mechanical load test (MQT 20)) |
- |
25000 |
|
- |
11.21(Potential induced degradation test (MQT 21)) |
- |
400000 |
|
- |
11.22(Bending test (MQT 22)) |
- |
70000 |
|
- |
Cl-8(Major visual defects) |
- |
6000 |
|
- |
Cl-11.1(Visual inspection) |
- |
2000 |
|
- |
Cl-11.2(Maximum power determination) |
- |
7000 |
|
- |
Cl-11.3(Insulation test) |
- |
20000 |
|
- |
Cl-11.4(Measurement of temperature coefficients) |
- |
110000 |
|
- |
Cl-11.5(Measurement of nominal module operating temperature) |
- |
5000 |
|
- |
Cl-11.6(Performance at STC) |
- |
2500 |
|
- |
Cl-11.7(Performance at low irradiance) |
- |
10000 |
|
- |
Cl-11.8(Outdoor exposure test) |
- |
50000 |
|
- |
Cl-11.9(Hot-spot endurance test) |
- |
125000 |
|
- |
Cl-11.10(UV preconditioning test) |
- |
125000 |
|
- |
Cl-11.11(Thermal cycling test) |
- |
160000 |
|
- |
Cl-11.12(Humidity-freeze test) |
- |
80000 |
|
- |
Cl-11.13(Damp heat test) |
- |
160000 |
|
- |
Cl-11.14(Robustness of terminations test) |
- |
15000 |
|
- |
Cl-11.15(Wet leakage current tes) |
- |
25000 |
|
- |
Cl-11.16(Static mechanical load test) |
- |
50000 |
|
- |
Cl-11.17(Hail test) |
- |
50000 |
|
- |
Cl-11.18(Bypass diode thermal test) |
- |
75000 |
|
- |
Cl-11.19(Stabilization) |
- |
95000 |
|
- |
5(Marking and documentation) |
- |
10000 |
|
- |
11.20(Cyclic (dynamic) mechanical load test (MQT 20)) |
- |
25000 |
|
- |
11.21(Potential induced degradation test (MQT 21)) |
- |
400000 |
|
- |
11.22(Bending test (MQT 22)) |
- |
70000 |
|
- |
|
23 Jun, 2025 |
- Included w.e.f.26.11.2024 |
30 |
Bharat Test House Pvt Ltd 1474 Haryana
| IS 14286 : Part 1 : Sec 4 (2023) |
Terrestrial photovoltaic PV modules Design qualification and type approval Part 1-4: Special requirements for testing of thin-film CuInGASSe2 based photovoltaic PV modules Third Revision |
- |
1502500 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
Cl-8(Major visual defects) |
- |
6000 |
|
- |
Cl-11.1(Visual inspection (MQT 01)) |
- |
2000 |
|
- |
Cl-11.2(Maximum power determination (MQT 02)) |
- |
7000 |
|
- |
Cl-11.3(Insulation test (MQT 03)) |
- |
20000 |
|
- |
Cl-11.4(Measurement of temperature coefficients (MQT 04)) |
- |
110000 |
|
- |
Cl-11.5(Measurement of nominal module operating temperature (NMOT) (MQT 05)) |
- |
5000 |
|
- |
Cl-11.6(Performance at STC (MQT 06.1) and NMOT (MQT 06.2) |
- |
2500 |
|
- |
Cl-11.7(Performance at low irradiance (MQT 07)) |
- |
10000 |
|
- |
Cl-11.8(Outdoor exposure test (MQT 08)) |
- |
50000 |
|
- |
Cl-11.9(Hot-spot endurance test (MQT 09)) |
- |
125000 |
|
- |
Cl-11.10(UV preconditioning test (MQT 10)) |
- |
125000 |
|
- |
Cl-11.11(Thermal cycling test (MQT 11)) |
- |
160000 |
|
- |
Cl-11.12(As per IEC 61215-1:2016) |
- |
80000 |
|
- |
Cl-11.13(Damp heat test (MQT 13)) |
- |
160000 |
|
- |
Cl-11.14(Robustness of terminations test (MQT 14)) |
- |
15000 |
|
- |
Cl-11.15(Robustness of terminations test (MQT 14)) |
- |
25000 |
|
- |
Cl-11.16(Static mechanical load test (MQT 16)) |
- |
50000 |
|
- |
Cl-11.17(Hail test (MQT 17)) |
- |
50000 |
|
- |
Cl-11.18(Bypass diode testing (MQT 18)) |
- |
75000 |
|
- |
Cl-11.19(Stabilization (MQT 19)) |
- |
95000 |
|
- |
|
19 Mar, 2026 |
- - |