Search by IS Number
Reset
49 Results
S.No. Lab Name Osl Code Indian Standard No. Product Grade / Type / Size / Designation etc. Testing Charges (Excl. Of Taxes) Validity Date Remark
31 REACT COMPLIANCE AND TESTING LABORATORIES LLP, BENGALURU 6130526 IS 16242 : Part 1 (2014) Uninterruptible power systems (UPS): Part 1 general and safety requirements for UPS - 65000 View breakup
UPS / Inverters of rating ≤ 5KVA- Rs. 55,000/-, UPS / Inverters of rating > 5KVA and ≤ 10KVA- Rs. 65,000/-
10 Mar, 2027 -
IS Included w.e.f. 13/3/2018 Excluding following tests: Components (cl.4.5/RD 1.5); Moving parts (cl.5.6/RD 2.8.5); Overload test (cl.5.6/RD 2.8.7.2); Endurance test (cl.5.6/RD 2.8.7.3); Semi-conductor devices (cl.5.7/RD 2.10.5.4); Insulation in wound components (cl.5.7/RD 2.10.5.11); Construction of printed circuit boards (cl.5.7/RD/ 2.10.6); Test on coated printed boards and coated components (cl.5.7/RD 2.10.8); Thermal cycling (cl.5.7/ RD 2.10.9); Test for pollution degree 1 environment and for insulating components (cl.5.7/RD 2.10.10); Enclosed sealing parts (cl.5.7/RD 2.10.12); Resistance to fire-Flammability test (cl.7.5, Annex A); Ventilation (cl. 7.6.7 & Annex M)
32 Electrical Research and Development Association (ERDA), Vadodara, Gujarat 7101125 IS 16242 : Part 1 (2014) Uninterruptible power systems (UPS): Part 1 general and safety requirements for UPS Capacity up to 10 kVA. 95000 View breakup
Rs. 95,000/- (Upto and including 10kVA)
30 Nov, 2028 -
Exclusion: Cl. 4.5/RD 1.5 (Components), Cl. 2.10.6 (PCB Material), Cl. 2.10.5.4 (Semiconductor devices), Cl. 2.10.5.6 (Thin sheet material)
33 Hi Physix Laboratory India Private Limited, Pune 7126926 IS 16242 : Part 1 (2014) Uninterruptible power systems (UPS): Part 1 general and safety requirements for UPS - 190000 View breakup
-
20 Jun, 2028 -
Excluding following tests: Thermal Controls Test (Cl. 4.5 (Cl. 1.5.3 of RD)), Capacitor Bridging Insulation (Cl. 4.5 (Cl. 1.5.6 of RD)), Components in Equipment for IT Power Distribution Systems (Cl. 4.5 (Cl. 1.5.8 of RD)), Safety Interlocks (Cl. 5.6 (Cl. 2.8.5, Cl. 2.8.7 of RD)), Semiconductor Devices (Only Opto-coupler tests as per IEC 60747- 5-5) (Cl. 5.7 (Cl. 2.10.5.4 of RD)), Construction of Printed Boards (Except Dimensional Measurement) (Cl. 5.7 (Cl. 2.10.6 of RD)), Component External Terminations (Except Dimensional Measurement) (Cl. 5.7 (Cl. 2.10.7 of RD)), Tests on Coated Printed Boards and Coated Components (Except Dimension Measurement) (Cl. 5.7(Cl. 2.10.8 of RD)), AC Power Supply Cords (Except Cross Sectional area of cable /cords) (Cl. 6.2.2 (Cl. 3.2.5.1 of RD)), Cathode Ray Tube (Cl. 7.3 (Cl. 4.2.8 RD)), Solid state back feed protection (ESD tests, Radio frequency electromagnetic field test, Fast transient burst test, Surge test, conducted radio frequency commen mode test, Immunity to low frequency signal test, Immunity to power frequency magnetic field test), Insulating Winding Wire for use without Interleaved Insulation (Annex U of RD) and Evaluation of Integrated Circuit (IC) Current Limiter (Annex CC of RD).
34 AA Electro Magnetic Laboratory Pvt Ltd, Gurugram 8165826 IS 16242 : Part 1 (2014) Uninterruptible power systems (UPS): Part 1 general and safety requirements for UPS - 75000 View breakup
Rs.65,000/- for UPS/Inverters upto 2 kVA
24 Sep, 2026 -
Single Phase only. Restricted upto and including 5 kVA Excluding: Components (Cl.4.5)
35 IEC TEST LABS LLP 8165726 IS 16242 : Part 1 (2014) Uninterruptible power systems (UPS): Part 1 general and safety requirements for UPS - 50000 View breakup
Rs.50000/-(20% discount to BIS).
07 Sep, 2026 -
Included w.e.f. 11-01-2022. Exclusions: components (Cl.4.5/ RD, Cl.1.5), Safety interlocks- Moving Parts (Cl. 2.8.5 of RD), Switches & Relays- overload test ( Cl. 2.8.7.2 of RD), Swithces & Relays – Endurance test (Cl.2.8.7.3 of RD), (Annex U) Insulated winding wires , Insulating compound as solid insulation (Cl. 2.10.5.3 of RD), Semiconductor devices ( Cl.2.10.5.4 of RD), SMPS/Mains Transformer (Cl 2.10.5.11 of RD), Construction of printed Boards (Cl. 2.10.6 of RD), Power Supply Cords (Cl. 3.2.5 of RD) & Batteries (Cl.4.3.8)
36 MARQUIS TECHNOLOGIES PRIVATE LIMITED, NOIDA 8175126 IS 16242 : Part 1 (2014) Uninterruptible power systems (UPS): Part 1 general and safety requirements for UPS - 50000 View breakup
-
13 Dec, 2026 -
Exclusion: Cl. 4.5/RD 1.5 (Components), Cl. 2.10.5.4 (Semiconductor devices), Cl. 2.10.5.13 (Winding wires), Cl. 2.10.5.11 (SMPS/Main transformer), Cl. 2.10.6 (PCB Material), Annex I.5 (Solid-state backfeed protection), Cl.I.5 (transient overvoltages, voltage variations, electromagnetic susceptibility, electrostatic discharge)
37 National Research and Technology Consortium (NRTC), Parwanoo 9136024 IS 16242 : Part 1 (2014) Uninterruptible power systems (UPS): Part 1 general and safety requirements for UPS - 47600 View breakup
-
10 Apr, 2026 -
Up to 50Hz only For UPS/Inverter up to 10 KVA) Excluding Cl.3.3.3, Annex-L.5 - Non- linear loads Cl.4.5- Components Cl.5.6- Protection of Personnel-Safety Interlocks Cl.6.2.1 /RD Cl.3.2.6.1-Power supply cords Cl.7.6.7, Annex M- Gas Concentration, Ventilation of Battery Compartments Annex I.5-Solid State back feed protection
38 Vardhamana Testing Laboratory OPC Pvt. Ltd. 8178226 IS 16242 : Part 1 (2014) Uninterruptible power systems (UPS): Part 1 general and safety requirements for UPS - 40000 View breakup
-
29 Apr, 2027 -
Exclusion: Cl. 1.5 (Components), Cl. 2.10.6 (PCB Material), Cl. 3.2.5 (Non-rewirable plug with PVC sheathed cable), Cl. 3.2.4 (Appliances inlets/connectors), Cl. 2.10.5.4 (Semiconductor devices), Cl. 2.10.11 of RD (Tests for semiconductor devices and for cemented joints), Cl. 2.10.9 of RD (Thermal cycling), Cl. 2.10.10 of RD (Test for Pollution Degree 1 environment and for insulating compound), Cl. 4.3.8 (Batteries), CL. I.5 (electromagnetic susceptibility), Cl. I.5 (electrostatic discharge), Cl. 2.10.5.11 (SMPS/Main transformer), Cl. 4.5 (Components), Cl. 2.10.8 of RD (Tests on coated printed boards and coated components), Cl. 2.10.5.6 (Thin sheet material), Cl. Annex M (Ventilation of battery compartments), Cl. I.5 (voltage variations), Cl. Annex I.5 (Solid-state backfeed protection), Cl. I.5 (transient overvoltages), Cl. 2.10.5.13 (Winding wires)
39 ATCC TEST LABS LLP 8172626 IS 16242 : Part 1 (2014) Uninterruptible power systems (UPS): Part 1 general and safety requirements for UPS - 30000 View breakup
-
15 Jun, 2026 -
Exclusion: Components (Cl.4.5/RD, Cl.1.5), Semiconductor devices (Cl.2.10.5.4), Tests for semiconductor devices & cemented joints (Cl.2.10.11), Batteries (Cl.4.3.18), AC power cords (Cl.6.2.1/RD Cl.3.2.6.1), Non-rewirable plug with PVC sheathed cable (Cl.3.2.5), Power supply cords (Cl.3.2.5 of RD) & Solid state back –feed protection (EMC tests) (Annex 1.5), Performance test: simulators (ESD/EFT/Voltage dip interruption/PFMF), Scope restricted to all types of UPS up to 10 kVA.
40 Classic Instrumentation Pvt. Ltd. (8135126), Noida 8135126 IS 16242 : Part 1 (2014) Uninterruptible power systems (UPS): Part 1 general and safety requirements for UPS - 35000 View breakup
-
23 Oct, 2028 -
-
41 CONFORMITY TESTING LABS PVT LTD (WH52) 8134626 IS 16242 : Part 1 (2014) Uninterruptible power systems (UPS): Part 1 general and safety requirements for UPS - 185625 View breakup
-
19 Sep, 2028 -
Excluding: Non-linear loads (Cl.3.3), Solid State Back-feed protection (Cl.5.1.4, Cl. I.5 of Annex I), Protection of Personnel Safety Interlocks (Cl. 5.6).
42 DELHI TEST HOUSE (50) KUNDLI SONIPAT 9127026 IS 16242 : Part 1 (2014) Uninterruptible power systems (UPS): Part 1 general and safety requirements for UPS - 110000.00 View breakup
-
23 Jun, 2028 -
Excluding testing of Components (Cl.4.5) Cl. 7.6 and Annex-M – Ventilation of Battery Compartments Annex I.5 – Solid state backfeed protection Cl. 2.8.5/RD –Moving Parts Cl. 2.8.7.2/RD – Switches and Relays (Overload Test) Cl. 2.8.7.3/RD - Switches and Relays (Endurance Test) Cl. 2.10.5.4/RD and Annex- U – Semiconductor devices. Cl. 2.10.5.6/RD – Thin sheet Materials Cl. 2.10.5.8/RD –Non- Separable Thin sheet Materials Cl. 2.10.8/RD –Coated PCBs
43 Aforeserve Labs Private Limited, Gurugram 9140626 IS 16242 : Part 1 (2014) Uninterruptible power systems (UPS): Part 1 general and safety requirements for UPS upto 5kVA 35000 View breakup
-
06 Jun, 2027 -
Switches & Relays (Cl.2.8.2,2.8.5,2.8.7), Winding wires (Cl.2.10.5.3), Semi-conductor Devices (Cl.2.10.5.4), SMPS/Mains transformer (Cl. 2.10.5.11), PCB material (Cl.2.10.6), Wire in wound component (Cl.2.10.5.12), Wire with solvent based enamel in wound component (Cl.2.10.5.13), Additional insulation in wound component (Cl.2.10.5.14), Test for pollution degree 1 environment and insulating compound (Cl.2.10.10), Test for semiconductor devices and for cemented joints (Cl.2.10.11), enclosed and sealed parts (Cl.2.10.12), Internal wire (Cl.3.1.4), Batteries (Cl.4.3.8), Protection of personnel safety interlock (Cl.5.6), Ac power cords (Cl.6.2.1/RD-cl.3.2.6.1), Non rewirable plug with PVC sheathed cable (Cl.3.2.5)
44 BLUESKY LAB LLP, GHAZIABAD 8170306 IS 16242 : Part 1 (2014) Uninterruptible power systems (UPS): Part 1 general and safety requirements for UPS - 75000 View breakup
-
22 May, 2028 -
Exclusions: Restricted upto 10Kva Single Phase only. Excluding: Components (Cl.4.5/ RD, CI. 1.5), Winding Wires (Cl. 2.10.5.3), Semiconductor Devices (Cl. 2.10.5.4), SMPS/Main transformer (cl.2.10.5.11); PCB Material (cl.2.10.6); SMPS/ Mains Transformer (Cl. 2.10.5.11), Wire in wound components (Cl. 2.10.5.12), Wire with solvent based enamel in wound components (Cl. 2.10.5.13), Additional insulation in wound components (Cl. 2.10.5.14), Tests for pollution degree 1 environment & for insulating compound (Cl. 2.10.10), Tests for semiconductor devices & for cemented joints (Cl. 2.10.11), Enclosed & sealed parts (Cl. 2.10.12), Internal Wire (Cl. 3.1.4), Batteries (Cl.4.3.8), Non-rewirable Plug with PVC Sheathed Cable (Cl. 3.2.5), Construction of printed circuit boards (Cl.5.7/RD/2.10.6), Wiring, connection and supply (Cl.6.1.1/RD 3.1.4), Batteries (Cl. 4.3.8), Performance Tests: Simulators (ESD/EFT/Voltage Dip Interruption/PFMF), Gas Concentration, Ventilation of Battery Compartments (Cl.7.4.3, Cl.7.6.7 & Annex- M), Non-rewirable plug with PVC sheathed cable (Cl.3.2.5), Performance tests:simulators immunity to Low frequency signals (Annex L.5.2 (IEC 32040-2,CI.7.3)). Switches & Relays (cl.5.6.1 / RD cl.2.8.7); Insulating Conductors (cl.6.1.1/RD cl.3.1.4)
45 Conformity Testing Labs Pvt. Ltd. Unit 2 (A33) 8139626 IS 16242 : Part 1 (2014) Uninterruptible power systems (UPS): Part 1 general and safety requirements for UPS - 200000 View breakup
-
05 Apr, 2027 -
Solid State Back Feed Protection (I.5 of Annex I), Component (Cl.4.5 (1.5/RD)), Safety Interlocks (Cl.5.6.1(2.8/RD))
46 Bharat Test House Pvt Ltd 1474 Sonipat Haryana 9135626 IS 16242 : Part 1 (2014) Uninterruptible power systems (UPS): Part 1 general and safety requirements for UPS - 160000 View breakup
Rs.80000/- for ≤ 5KVA Rs.115000/- for ≥ 5KVA (5% discount for BIS). Rs.1,85,000/- for > 10 KVA (for 3 phase)
19 Mar, 2026 -
Single Phase and 3 phase. Except : Cl. 4.5 : Components Cl. 1.5 radio frequency electromagnetic field, amplitude modulated, immunity to power frequency magnetic field, immunity to low frequency signals, Cl. 5.6.1 Operator protection, Cl.7.6.7 & Annex M_Ventilation,Cl. 2.10.5.12 Insulated winding wires
47 Matrix Test Labs 8138626 IS 16242 : Part 1 (2014) Uninterruptible power systems (UPS): Part 1 general and safety requirements for UPS - 125000 View breakup
Rs.1,25,000/- UPS/ Invertors Up to 5 kVA) [10% discount to BIS]
31 Dec, 2026 -
Following Additional Test Facility included w.e.f. 18.09.2018: Protection against ingress of foreign objects (IPX7 & IPX8 only) (Cl.1.2 & AnnexH). Excluding: Non-linear loads (Cl.3.3), Components (Cl.4.5 / RD 1.5), Protection of Personnel-Safety Interlocks (Cl. 5.6/ RD Cl.2.8.5, Cl.2.8.7.1 to Cl.2.8.7.3), Semiconductor devices (Cl.2.10.5.4 of RD) and Insulation in wound components (Cl.2.10.5.11 of RD).
48 Ace Test Labs & Metrology Pvt. Ltd., Sonipat 9162826 IS 16242 : Part 1 (2014) Uninterruptible power systems (UPS): Part 1 general and safety requirements for UPS - 108000 View breakup
Rs.108000/- (10% discount for BIS)
14 Nov, 2027 -
Only for IP(0-4)(5-6) For UPS/Inverter up to 5KVA), UPS < =10 KVA Excluding: Cl. 4.5/1.5 of RD Components - Cl. 5.6/2.8 of RD Safety Interlocks Cl. 2.10.5.4 & Annex U of RD Semiconductor Devices Cl.2.10.6 PCB material, Cl. 2.10.5.11 Insulation in wound components, CL.7.6 & Annex-M Ventilation of battery Compartment, Annex-L.5 Non linear Loads, Annex-I.5 Solid state backfeed protection Annex-H /Table Protection against Ingress of foreign objects
49 URS PRODUCTS AND TESTING PVT LTD (F3), NOIDA 8136826 IS 16242 : Part 1 (2014) Uninterruptible power systems (UPS): Part 1 general and safety requirements for UPS - 75000 View breakup
Rs.75,000/- [15% Discount to BIS]
31 Dec, 2026 -
Excluding: Capacitor Bridging Insulation (Cl.4.5 / RD 1.5.6), Resistor Bridging Insulation (Cl.4.5 / RD 1.5.7), Surge Suppressor (Cl.4.5 / RD 1.5.7), Ventilation of Battery Compartment (Cl. Annex-M). Non-linear loads (Cl.3.3.3, Annex-L.5). Additional Products/ Test Facility included w.e.f. 18.07.2018. For rating up to 300V, 1Φ, AC

Designed, Developed and Maintained by:

Arohatech IT Services (P) Ltd.

Contact for any query/support: supportlims@bis.gov.in