BIS, Western Regional Laboratory (WRL)

BUREAU OF INDIAN STANDARDS (WESTERN REGIONAL LABORATORY), PLOT NO. E9, ROAD NO. 8, M.I.D.C, ANDHERI (EAST), MUMBAI, MAHARASHTRA, INDIA, MUMBAI, Mumbai Suburban, Maharashtra, 400093
- wrol@bis.gov.in
Scope List
Reset
195 Results
S.No. Indian Standard No. Product Grade / Type / Size / Designation etc. Testing Charges (Excl. Of Taxes) Validity Date Remark
61 IS 10124 : Part 10 (2009) Fabricated pvc - U fittings for potable water supplies - Specification: Part 10 specific requirements for 45 degree bends (Second Revision) - - View breakup
-
- -
The following test facilities are not available: (1)Effect on water (2) Testing facility above 250 mm for Short Term Hydrostatic test
62 IS 10124 : Part 9 (2009) Fabricated pvc - U fittings for potable water supplies - Specification: Part 9 specific requirements for 60 degree bends (Second Revision) - - View breakup
-
- -
The following test facilities are not available: (1)Effect on water (2) Testing facility above 250 mm for Short Term Hydrostatic test
63 IS 10124 : Part 8 (2009) Fabricated pvc - U fittings for potable water supplies - Specification: Part 8 specific requirements for 90 degree bends (Second Revision) - - View breakup
-
- -
The following test facilities are not available: (1)Effect on water (2) Testing facility above 250 mm for Short Term Hydrostatic test
64 IS 10124 : Part 7 (2009) Fabricated pvc - U fittings for potable water supplies - Specification: Part 7 specific requirements for threaded adaptors (Second Revision) - - View breakup
-
- -
The following test facilities are not available: (1)Effect on water (2) Testing facility above 250 mm for Short Term Hydrostatic test
65 IS 10124 : Part 6 (2009) Fabricated pvc - U fittings for potable water supplies - Specification: Part 6 specific requirements for flanged tail pieces with metallic flanges (Second Revision) - - View breakup
-
- -
The following test facilities are not available: (1)Effect on water (2) Testing facility above 250 mm for Short Term Hydrostatic test
66 IS 10124 : Part 5 (2009) Fabricated pvc - U fittings for potable water supplies - Specification: Part 5 specific requirements for equal tees (Second Revision) - - View breakup
-
- -
The following test facilities are not available: (1)Effect on water (2) Testing facility above 250 mm for Short Term Hydrostatic test
67 IS 10124 : Part 4 (2009) Fabricated pvc - U fittings for potable water supplies - Specification: Part 4 specific requirements for caps (Second Revision) - - View breakup
-
- -
The following test facilities are not available: (1)Effect on water (2) Testing facility above 250 mm for Short Term Hydrostatic test
68 IS 10124 : Part 3 (2009) Fabricated PVC-U Fittings for Potable Water Supplies - Specification Part 3 Specific Requirements for Straight Reducers - - View breakup
-
- -
Test facilities are not available for the following: (1)Effect on water (2) Testing facility above 250 mm for Short Term Hydrostatic test
69 IS 4199 (2001) Toilet soap, liquid - Specification (Third Revision) - Rs 2980/- View breakup
-
- -
Test facility not available for following; 1.SKIN SENSITIZATION TEST ON GUINEA PIGS
70 IS 252 (2013) Caustic soda - Specification (Fourth Revision) - Rs 5100/- (for Lye & Solid) View breakup
-
- -
Test facility not available for the following: 1. Mercury
71 IS 21 (1992) Wrought aluminium and aluminium alloys for manufacture of utensils specification (Fourth Revision) - Rs.6600/- View breakup
-
- -
Test facilities are not available for the following: 1. Chemical composition as per Cl. 4.2 2.Tensile Test (Proof Stress ) 3.Bend Test
72 IS 13489 (2000) Textiles – Bed mattress – Specification (first revision) - - View breakup
-
- -
-
73 IS 9873 : Part 4 (2017) Safety of toys: Part 4 swings, slides and similar activity toys for indoor and outdoor family domestic use - Rs.5475/- View breakup
-
- -
Test facilities are not available for the following: 1) Loads & pulling arrangements
74 IS 9873 : Part 1 (2019) Safety of toys: Part 1 safety aspects related to mechanical and physical properties (Fourth Revision) - 16,189 View breakup
-
- -
Test facilities are not available for the following: 1) clause 4.29 Acoustic requirements,
75 IS 14625 (2015) Plastics Feeding Bottles ( First Revision ) - Rs 16930 (Excluding tests for material as per Cl.4.1 an View breakup
-
- -
The following test facilities are not available: 1. Bisphenol A (BPA) 2. Migration of Certain Elements & Specific Migration 3. Environmental Stress-Crack Resistance
76 IS 7834 : Part 8 (1987) injection moulded PVC socket fittings with solvent cement joints for water supplies: Part 8 Specific requirements for caps - Rs.2800/- View breakup
-
- -
The following test facilities are not available: 6.3 Effect on water
77 IS 7834 : Part 7 (1987) injection moulded PVC socket fittings with solvent cement joints for water supplies: Part 7 Specific requirements for unions - 1050 View breakup
-
- -
The following test facilities are not available: 6.3 Effect on water
78 IS 7834 : Part 6 (1987) injection moulded PVC socket fittings with solvent cement joints for water supplies: Part 6 Specific requirements for sockets - - View breakup
-
- -
The following test facilities are not available: 6.3 Effect on water
79 IS 7834 : Part 5 (1987) Injection Moulded PVC Socket Fittings With Solvent Cement Joints for Water Supplies - Part 5 : Specific Requirements for 45 degree Tees - 1050 View breakup
-
- -
The following test facilities are not available: 6.3 Effect on water
80 IS 7834 : Part 4 (1987) injection moulded PVC socket fittings with solvent cement joints for water supplies: Part 4 Specific requirements for 90 degree tees - Rs.2800/- View breakup
-
- -
The following test facilities are not available: 6.3 Effect on water
81 IS 7834 : Part 2 (1987) injection moulded PVC socket fittings with solvent cement joints for water supplies: Part 2 Specific requirements for 45 degrees elbows - 1050 View breakup
-
- -
The following test facilities are not available: 6.3 Effect on water
82 IS 7285 : Part 2 (2017) Refillable seamless steel gas cylinders - Specification: Part 2 quenched and tempered steel cylinders with tensile strength less than 1 100 mpa (112 Kgf/mm²) (Fourth Revision) - - View breakup
-
- -
Test facilities are not available for the following: 1. Cr, Ni, Mo, V, Al, N, B, Zr 2.Pressure cycling Test 3. Base check 4. Hydrostatic Stretch Test 5. Leakage Test 6.Neck threads 7. Surface Defects 8. Verticality 9. Hydraulic Bursting Test 10. Sulphide Stress Cracking Resistance Test 11 Ultrasonic testing Remarks Prepared piece for tensile (2 nos), bend (4 nos) and impact (3 nos)
83 IS 7138 (1973) Specification for steel tubes for furniture purposes - RS/-300 Chemical View breakup
-
- -
Test facilities are not available for the following: 1. Bend Test 2.Drift Test
84 IS 3601 (2006) Steel tubes for mechanical and general engineering purposes - Specification (Second Revision) - Please see remarks. View breakup
Rs. 7370/- for Un-galvanized WT & HFS, For galvanized tubes Rs. 1945/- extra, Rs. 8060/- for CDS & CEW Material testing charges as per relevant referred ISs to be levied additionally
- -
Test facilities are not available for the following: 1. Bend Test 2. Drift Expansion Test 3. Crushing Test 4 For sizes above 200 mm
85 IS 3196 : Part 1 (2013) Welded low carbon steel cylinders exceeding 5 litres water capacity for low pressure liquefiable gases: Part 1 cylinders for liquefied petroleum gases (Lpg) - Specification (Sixth Revision) - 14900 View breakup
Rs. 14900/- for 3 Pc. Cylinder & Rs. 10900/- for 2 Pc. Cylinder. (Excluding Radiographic and Fatigue Test) Rs. 2760 /- for Fatigue Test. And Material testing charges as per relevant referred ISs to be levied additionally
- -
Test facilities are not available for the following: 1.Cycle Test 2. Impact and Drop Test 3.Radiographical Examination
86 IS 319 (2007) Free cutting brass bars, rods and section - Specification (Fifth Revision) - - View breakup
-
- -
Test facilities are not available for the following: 1. Cu, Pb, Fe, Zn
87 IS 1835 (1976) Specification for round steel wire for ropes (Third Revision) - Rs 4500/- View breakup
-
- -
Test facilities are not available for the following: 1. Cu, Ni, Cr
88 IS 513 : Part 2 (2016) Cold reduced carbon steel sheet and strip: Part 2 high tensile and multi - Phase steel (Sixth Revision) - Please see remarks View breakup
Rs.6900/- Excluding Tensile Strain Hardening component, Bake bardending index & surface finish test and Rs.1004/- for each of the elements other than carbon, sulphur, phosphorus and manganese.
- -
Test facilities are not available for the following: 1. Al, Nitrogen, Chromium, Nickel, Niobium, Vanadium, Titanium, Molybdenum,Boron, Calcium and others 2. Tensile Strain Hardening Component 3. Surface finish
89 IS 513 : Part 1 (2016) Cold reduced carbon steel sheet and strip: Part 1 cold forming and drawing purpose (Sixth Revision) - Rs.8850/- Excluding Tensile Strain Hardening component View breakup
-
- -
Test facilities are not available for the following: 1. Aluminium, Micro-alloying elements 2. Tensile Hardneing component 3. Bake Hardneing test 4. Cupping Test 5. Surface finish 6.Plastic Strain Ratio (r bar/r-90)
90 IS 6528 (1995) Stainless steel wire - Specification (First Revision) - - View breakup
-
- -
Test facilities are not available for the following: 1. Al, Ni, Cr, Mo, Nitrogen

Designed, Developed and Maintained by:

Arohatech IT Services (P) Ltd.

Contact for any query/support: supportlims@bis.gov.in