Switchgear Testing Laboratories, Schneider Electric India Private Limited, Ahmednagar

A9, A10, ESE ESP MFG. PROCESS, MIDC AREA, NAGAPUR, Ahmednagar, Ahmednagar, Maharashtra, 414111, Nagapur, Ahmednagar, Maharashtra, 414111
9987033570 vikram.jadhav@lntebg.com
Scope List
Reset
3 Results
S.No. Indian Standard No. Product Grade / Type / Size / Designation etc. Testing Charges (Excl. Of Taxes) Validity Date Remark
1 IS/IEC 61439 : Part 3 (2012) Low - Voltage switchgear and controlgear assemblies: Part 3 distribution boards intended to be operated by ordinary persons (Dbo) - 520000 View breakup
-
25 Mar, 2028 -
included w.e.f.03.07.2025
2 IS/IEC 60947 : Part 5 : Sec 1 (2016) Low-Voltage Switchgear And Control Gear : Part 5-1 Control Circuit Devices And Switching Elements Electromechanical Control Circuit Devices - 4012000 View breakup
-
25 Mar, 2028 -
iNCLUDED W.E.F.21.08.2025 EXCLUSION 7.3.2.4 (Electrostatic discharges) 7.3.2.5 (Radiated radio-frequency electromagnetic fields) 7.3.2.6 (Electrical fast transients/bursts) 7.3.2.7 (Surges) 7.3.2.8 (Conducted disturbances induced by radio-frequency fields) 7.3.2.9 (Power-frequency magnetic fields) 7.3.2.10 (Voltage dips and interruptions) 7.3.2.11 (Harmonics in the supply) 7.3.3 (Emission) 8.4.2.4 (Surges) H.8.7 ("Verification of electromagnetic compatibility") Cl-7.3 (Electromagnetic compatibility (EMC)) 8.4.2.4 (Surges) Cl-7.3.2 (Immunity)
3 IS/IEC 60947 : Part 4 : Sec 1 (2018) Low-Voltage switchgear and controlgear : Part 4-1 Contactors and motor starters electromechanical contactors and motor-Starters - 2055000 View breakup
-
25 Mar, 2028 -
Exclusions: 8.3 (Electromagnetic compatibility (EMC)), 8.3.2 (Immunity), 8.3.3 (Emission), 9.4.2 (Immunity), 9.4.2.2 (Electrostatic discharge), 9.4.2.3 (Radiated radio-frequency electromagnetic field), 9.4.2.4 (Conducted disturbances induced by radio-frequency fields), 9.4.2.5 (Electrical fast transient/bursts), 9.4.2.6 (Surges), 9.4.2.7 (Power frequency magnetic field), 9.4.2.8 (Voltage dips and short-time interruptions), 9.4.2.9 (Harmonics in the supply), 9.4.3 (Emission), M.8.3 (Electromagnetic compatibility (EMC))

Designed, Developed and Maintained by:

Arohatech IT Services (P) Ltd.

Contact for any query/support: supportlims@bis.gov.in