1 |
ER 01 (2024) |
Essential Requirement (s) for Security of CCTV |
- |
-
|
275000 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
1.1(Application Debug Interface Protection) |
- |
9166.66 |
|
- |
1.2(Device Unique Crypto Keys) |
- |
9166.66 |
|
- |
1.3(On-Chip Debug Interface Protection) |
- |
9166.66 |
|
- |
1.4(Trusted Execution) |
- |
9166.66 |
|
- |
1.5(Secure Storage) |
- |
9166.66 |
|
- |
1.6(Tamper Protection) |
- |
9166.66 |
|
- |
1.7(IP Protection) |
- |
9166.66 |
|
- |
1.8(Boot Image Validation) |
- |
9166.66 |
|
- |
1.9(Secure PRNG Usage) |
- |
9166.66 |
|
- |
2.1(Memory Protection Controls) |
- |
9166.66 |
|
- |
2.2(Data Transit Security) |
- |
9166.66 |
|
- |
2.3(Server Connection Validation) |
- |
9166.66 |
|
- |
2.4(Banned C Functions) |
- |
9166.66 |
|
- |
2.5(Software Bill of Materials) |
- |
9166.66 |
|
- |
2.6(Secure Code Review) |
- |
9166.66 |
|
- |
2.7(Digital Signature Pinning) |
- |
9166.66 |
|
- |
2.8(Reverse Engineering Protection) |
- |
9166.66 |
|
- |
2.9(Update Process Security) |
- |
9166.66 |
|
- |
2.10(Code Signing Verification) |
- |
9166.66 |
|
- |
2.11(Firmware Downgrade Protection) |
- |
9166.66 |
|
- |
2.12(Scheduled Firmware Updates) |
- |
9166.66 |
|
- |
3.1(Wireless Mutual Authentication) |
- |
9166.66 |
|
- |
3.2(Wireless Encrypted Channel) |
- |
9166.66 |
|
- |
3.3(Trusted Supply Chain) |
- |
9166.66 |
|
- |
3.4(Supply Chain Risk Management) |
- |
9166.66 |
|
- |
3.5(Proprietary Protocols Management) |
- |
9166.66 |
|
- |
4.1(Anti-Counterfeit Measures) |
- |
9166.66 |
|
- |
4.2(Threat Mitigation) |
- |
9166.66 |
|
- |
4.3(Malware Detection Deployment) |
- |
9166.66 |
|
- |
4.4(Supply Chain Risk Assessment) |
- |
9166.66 |
|
- |
1.1(Application Debug Interface Protection) |
- |
9166.66 |
|
- |
1.2(Device Unique Crypto Keys) |
- |
9166.66 |
|
- |
1.3(On-Chip Debug Interface Protection) |
- |
9166.66 |
|
- |
1.4(Trusted Execution) |
- |
9166.66 |
|
- |
1.5(Secure Storage) |
- |
9166.66 |
|
- |
1.6(Tamper Protection) |
- |
9166.66 |
|
- |
1.7(IP Protection) |
- |
9166.66 |
|
- |
1.8(Boot Image Validation) |
- |
9166.66 |
|
- |
1.9(Secure PRNG Usage) |
- |
9166.66 |
|
- |
2.1(Memory Protection Controls) |
- |
9166.66 |
|
- |
2.2(Data Transit Security) |
- |
9166.66 |
|
- |
2.3(Server Connection Validation) |
- |
9166.66 |
|
- |
2.4(Banned C Functions) |
- |
9166.66 |
|
- |
2.5(Software Bill of Materials) |
- |
9166.66 |
|
- |
2.6(Secure Code Review) |
- |
9166.66 |
|
- |
2.7(Digital Signature Pinning) |
- |
9166.66 |
|
- |
2.8(Reverse Engineering Protection) |
- |
9166.66 |
|
- |
2.9(Update Process Security) |
- |
9166.66 |
|
- |
2.10(Code Signing Verification) |
- |
9166.66 |
|
- |
2.11(Firmware Downgrade Protection) |
- |
9166.66 |
|
- |
2.12(Scheduled Firmware Updates) |
- |
9166.66 |
|
- |
3.1(Wireless Mutual Authentication) |
- |
9166.66 |
|
- |
3.2(Wireless Encrypted Channel) |
- |
9166.66 |
|
- |
3.3(Trusted Supply Chain) |
- |
9166.66 |
|
- |
3.4(Supply Chain Risk Management) |
- |
9166.66 |
|
- |
3.5(Proprietary Protocols Management) |
- |
9166.66 |
|
- |
4.1(Anti-Counterfeit Measures) |
- |
9166.66 |
|
- |
4.2(Threat Mitigation) |
- |
9166.66 |
|
- |
4.3(Malware Detection Deployment) |
- |
9166.66 |
|
- |
4.4(Supply Chain Risk Assessment) |
- |
9166.66 |
|
- |
1.1(Application Debug Interface Protection) |
- |
9166.66 |
|
- |
1.2(Device Unique Crypto Keys) |
- |
9166.66 |
|
- |
1.3(On-Chip Debug Interface Protection) |
- |
9166.66 |
|
- |
1.4(Trusted Execution) |
- |
9166.66 |
|
- |
1.5(Secure Storage) |
- |
9166.66 |
|
- |
1.6(Tamper Protection) |
- |
9166.66 |
|
- |
1.7(IP Protection) |
- |
9166.66 |
|
- |
1.8(Boot Image Validation) |
- |
9166.66 |
|
- |
1.9(Secure PRNG Usage) |
- |
9166.66 |
|
- |
2.1(Memory Protection Controls) |
- |
9166.66 |
|
- |
2.2(Data Transit Security) |
- |
9166.66 |
|
- |
2.3(Server Connection Validation) |
- |
9166.66 |
|
- |
2.4(Banned C Functions) |
- |
9166.66 |
|
- |
2.5(Software Bill of Materials) |
- |
9166.66 |
|
- |
2.6(Secure Code Review) |
- |
9166.66 |
|
- |
2.7(Digital Signature Pinning) |
- |
9166.66 |
|
- |
2.8(Reverse Engineering Protection) |
- |
9166.66 |
|
- |
2.9(Update Process Security) |
- |
9166.66 |
|
- |
2.10(Code Signing Verification) |
- |
9166.66 |
|
- |
2.11(Firmware Downgrade Protection) |
- |
9166.66 |
|
- |
2.12(Scheduled Firmware Updates) |
- |
9166.66 |
|
- |
3.1(Wireless Mutual Authentication) |
- |
9166.66 |
|
- |
3.2(Wireless Encrypted Channel) |
- |
9166.66 |
|
- |
3.3(Trusted Supply Chain) |
- |
9166.66 |
|
- |
3.4(Supply Chain Risk Management) |
- |
9166.66 |
|
- |
3.5(Proprietary Protocols Management) |
- |
9166.66 |
|
- |
4.1(Anti-Counterfeit Measures) |
- |
9166.66 |
|
- |
4.2(Threat Mitigation) |
- |
9166.66 |
|
- |
4.3(Malware Detection Deployment) |
- |
9166.66 |
|
- |
4.4(Supply Chain Risk Assessment) |
- |
9166.66 |
|
- |
1.1(Application Debug Interface Protection) |
- |
- |
|
- |
1.2(Device Unique Crypto Keys) |
- |
- |
|
- |
1.3(On-Chip Debug Interface Protection) |
- |
- |
|
- |
1.4(Trusted Execution) |
- |
- |
|
- |
1.5(Secure Storage) |
- |
- |
|
- |
1.6(Tamper Protection) |
- |
- |
|
- |
1.7(IP Protection) |
- |
- |
|
- |
1.8(Boot Image Validation) |
- |
- |
|
- |
1.9(Secure PRNG Usage) |
- |
- |
|
- |
2.1(Memory Protection Controls) |
- |
- |
|
- |
2.2(Data Transit Security) |
- |
- |
|
- |
2.3(Server Connection Validation) |
- |
- |
|
- |
2.4(Banned C Functions) |
- |
- |
|
- |
2.5(Software Bill of Materials) |
- |
- |
|
- |
2.6(Secure Code Review) |
- |
- |
|
- |
2.7(Digital Signature Pinning) |
- |
- |
|
- |
2.8(Reverse Engineering Protection) |
- |
- |
|
- |
2.9(Update Process Security) |
- |
- |
|
- |
2.10(Code Signing Verification) |
- |
- |
|
- |
2.11(Firmware Downgrade Protection) |
- |
- |
|
- |
2.12(Scheduled Firmware Updates) |
- |
- |
|
- |
3.1(Wireless Mutual Authentication) |
- |
- |
|
- |
3.2(Wireless Encrypted Channel) |
- |
- |
|
- |
3.3(Trusted Supply Chain) |
- |
- |
|
- |
3.4(Supply Chain Risk Management) |
- |
- |
|
- |
3.5(Proprietary Protocols Management) |
- |
- |
|
- |
4.1(Anti-Counterfeit Measures) |
- |
- |
|
- |
4.2(Threat Mitigation) |
- |
- |
|
- |
4.3(Malware Detection Deployment) |
- |
- |
|
- |
4.4(Supply Chain Risk Assessment) |
- |
- |
|
- |
|
Complete
|
|
31 Dec, 2023 |
included w.e.f.17.10.2024 |
2 |
IS 16444 : Part 2 (2017) |
AC static transformer operated watthour and var - Hour smart meters, class 0.2 S, 0.5 S and 1.0 S: Part 2 specification transformer operated smart meters |
- |
-
|
200000 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
6.10.6(Impulse voltage test) |
- |
7200 |
|
- |
6.10.6(ac high voltage test) |
- |
3000 |
|
- |
6.10.6(Insulation test) |
- |
3000 |
|
- |
6.12(Test on limits of error) |
- |
12000 |
|
- |
6.12(Test of meter constant) |
- |
3000 |
|
- |
6.12(Test of starting condition) |
- |
3000 |
|
- |
6.12(Test of no-load condition) |
- |
3000 |
|
- |
6.12(Test of ambient temperature influence) |
- |
11500 |
|
- |
6.12(Test of repeatability of error) |
- |
4000 |
|
- |
6.12(Test of influence quantities) |
- |
28000 |
|
- |
6.10.1(Test of power consumption) |
- |
3000 |
|
- |
6.10.2(Test of influence of supply voltage) |
- |
3000 |
|
- |
6.10.3(Test of influence of short time over currents) |
- |
3000 |
|
- |
6.10.4(Test of influence of self-heating) |
- |
3000 |
|
- |
6.10.5(Test of influence of heating) |
- |
3000 |
|
- |
6.10.7(Test of immunity to earth/phase fault) |
- |
7000 |
|
- |
6.11(Radio interference measurement) |
- |
10500 |
|
- |
6.11(Fast transient burst test) |
- |
12000 |
|
- |
6.11(Test of immunity to electrostatic discharge) |
- |
7000 |
|
- |
6.11(Test of immunity to electromagnetic HF field) |
- |
17500 |
|
- |
6.11(Surge Immunity test) |
- |
3000 |
|
- |
6.9(Dry heat test) |
- |
14400 |
|
- |
6.9(Cold test) |
- |
25200 |
|
- |
6.9(Damp heat cyclic test) |
- |
50400 |
|
- |
6.5(Vibration test) |
- |
12000 |
|
- |
6.5(Shock test) |
- |
6000 |
|
- |
6.5(Spring hammer test) |
- |
6000 |
|
- |
6.5(Test of protection against penetration of dust and water) |
- |
6000 |
|
- |
6.4(Test of resistance to heat and fire) |
- |
8000 |
|
- |
6.8(Marking of meters
Name plate) |
- |
3000 |
|
- |
6.7(Inspection ( 6.11 of IS 14697)) |
- |
3000 |
|
- |
6.2(General Constructional requirements) |
- |
3000 |
|
- |
6.3(Clearance and creepage distances) |
- |
3000 |
|
- |
6.6(Inspection ( 6.10 of IS 14697)) |
- |
3000 |
|
- |
|
Complete
|
|
31 Dec, 2023 |
Included w.e.f. 14.03.2023
Exclusion: Cl.9.4 (Data exchange protocol)
2. Cl.10 (Functional requirements)
3. Cl.9.5.1 (The modules for WAN/NAN/HD)
4 Cl.9.5.2 (Test for smart meter communicability) |
3 |
IS 16444 (2015) |
AC static direct connected watthour smart meter class 1 and 2 - Specification |
- |
-
|
180000 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
cl. 12.7.6.2 of IS 13779(Impulse voltage test) |
- |
7200 |
|
- |
cl. 12.7.6.3 of IS 13779(ac Voltage test) |
- |
3000 |
|
- |
cl. 12.7.6.4 of IS 13779(Insulation resistance test) |
- |
3000 |
|
- |
cl 11.1 of IS 13779(Limits of Error and Interpretation or Test Results) |
- |
12000 |
|
- |
cl. 11.6 of IS 13779(Meter Constant) |
- |
3000 |
|
- |
cl. 11.5 of IS 13779(Starting Current) |
- |
3000 |
|
- |
12.13 of IS 13779(Test of No-Load Condition) |
- |
3000 |
|
- |
6.12(Test of ambient temperature influence) |
- |
11500 |
|
- |
12.17 of IS 13779(Repeatability of Error Test
) |
- |
4000 |
|
- |
12.11 of IS 13779(Test of Iniluence Quantities) |
- |
32000 |
|
- |
12.7.1 of IS 13779(Test of Power Consumption) |
- |
3000 |
|
- |
12.7.2 of IS 13779(Test of Influence of Supply Voltage) |
- |
3000 |
|
- |
4.4.3 of IS 15844(Influence of Short-Time Overcurrents) |
- |
3000 |
|
- |
12.7.4 of IS 13779(Test of Influence of Self-Heating) |
- |
3000 |
|
- |
4.4.5 of IS 15844(Influence of Heating) |
- |
3000 |
|
- |
12.8 of IS 13779(TestorImmunity to Earth Fault) |
- |
3000 |
|
- |
12.9.5 of IS 13779(Radio Interference Measurement) |
- |
10500 |
|
- |
6.11(Fast transient burst test) |
- |
7000 |
|
- |
6.11(Test of immunity to electrostatic discharge) |
- |
7000 |
|
- |
12.9.3 of IS 13779(Test for Immunity to EIectromagnetic HF Fields) |
- |
17500 |
|
- |
6.11(Surge Immunity test) |
- |
3000 |
|
- |
6.9(Dry heat test) |
- |
14400 |
|
- |
6.9(Cold test) |
- |
25200 |
|
- |
6.9(Damp heat cyclic test) |
- |
50400 |
|
- |
6.5(Vibration test) |
- |
12000 |
|
- |
12.3.1 of IS 13779(Shock Test) |
- |
6000 |
|
- |
12.3.3 of IS 13779( Spring Hammer Test) |
- |
6000 |
|
- |
12.5 b) of IS 13779(Test of Protection Against Penetration of Dust
and Water) |
- |
6000 |
|
- |
12.4 of IS 13779(Testof Resistance to Heat and Fire
) |
- |
8000 |
|
- |
6.2(General and constructional requirements) |
- |
3000 |
|
- |
6.3(Measurement) |
- |
3000 |
|
- |
6.6(Inspection) |
- |
3000 |
|
- |
6.7(Output device) |
- |
3000 |
|
- |
6.8(Marking of smart meters
Name plate) |
- |
3000 |
|
- |
|
Complete
|
|
31 Dec, 2023 |
Included w.e.f. 14.03.2023
Exclusion: 1. Cl.10.5 (Data exchange protocol)
2. Cl.11 (Functional requirements)
3. Cl.10.6.1 (The modules for WAN/NAN/HD)
4. Cl.10.6.2 (Tests for smart meter communicability) |
4 |
IS 14697 (2021) |
ac STATIC TRANSFORMER OPERATED WATTHOUR METERS CLASS 02 S AND 05 S AND VAR-HOUR METERS CLASS 02 S 05 S AND 10 S - SPECIFICATION First Revision |
- |
-
|
144000 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
9.5 & 12.7.6.2(Impulse voltage test) |
- |
7200 |
|
- |
9.5 & 12.7.6.3(a.c. voltage test) |
- |
3000 |
|
- |
12.7.6.4(Insulation resistance test) |
- |
3000 |
|
- |
11.1(Limits of Error Due to Variation of the Current) |
- |
12000 |
|
- |
11.6 & 12.14(Meter Constant) |
- |
3000 |
|
- |
12.13 & 11.5(Starting Current) |
- |
3000 |
|
- |
11.4.2 & 12.12(Running with No-Load) |
- |
3000 |
|
- |
11.3 & 12.11(Limits of Error Due to Ambient Temperature Variation) |
- |
11500 |
|
- |
11.7 & 12.16(Repeatability of Error Test) |
- |
4000 |
|
- |
9.1 & 12.7.1(Power Consumption) |
- |
3000 |
|
- |
9.2.2 & 12.7.2(Influence of Supply Voltage) |
- |
3000 |
|
- |
9.2.3 & 12.7.3(Short Time Over Current) |
- |
3000 |
|
- |
9.3 & 12.7.4(Influence of Self-heating) |
- |
3000 |
|
- |
9.4 & 12.7.5(Influence of Heating) |
- |
3000 |
|
- |
9.6 & 12.17(Immunity to Earth/Phase Fault) |
- |
3000 |
|
- |
"12.8.6(Radio Interference Measurement) |
- |
10500 |
|
- |
"12.8.4(Fast Transient Burst Test) |
- |
12000 |
|
- |
"12.8.2("Test for Immunity to Electrostatic Discharge (ESD)
") |
- |
7000 |
|
- |
"12.8.3(Test for Immunity to Electromagnetic HF Fields) |
- |
17500 |
|
- |
"12.8.5(Surge Immunity Test) |
- |
3000 |
|
- |
12.6.1(Dry heat test) |
- |
14400 |
|
- |
12.6.2(Cold Test) |
- |
25200 |
|
- |
12.6.3(Damp Heat Cycle Test) |
- |
50400 |
|
- |
12.3.2(Vibration test) |
- |
12000 |
|
- |
12.3.1(Shock test) |
- |
6000 |
|
- |
12.3.3(Spring hammer test) |
- |
8000 |
|
- |
12.5(Protection against penetration of dust and water) |
- |
6000 |
|
- |
12.4(Test of resistance to heat and fire) |
- |
8000 |
|
- |
11.2(Electrical fast transient burst) |
- |
12000 |
|
- |
11.2(‘Abnormal’ ac magnetic induction of external origin 10 mT) |
- |
3000 |
|
- |
11.2(Continuous ‘abnormal’ magnetic induction of external origin) |
- |
4000 |
|
- |
11.2(Electromagnetic HF fields) |
- |
17500 |
|
- |
11.2(Wave form: 10 percent of third harmonic in the current) |
- |
3000 |
|
- |
11.2(Voltage variation) |
- |
3000 |
|
- |
11.2(Frequency variation) |
- |
3000 |
|
- |
11.2(Reversed phase sequence) |
- |
3000 |
|
- |
11.2(Voltage unbalance) |
- |
3000 |
|
- |
11.2(Continuous magnetic induction of external origin) |
- |
4000 |
|
- |
11.2("Phase of Auxiliary supply
voltage by 120 degree") |
- |
3000 |
|
- |
11.2(Magnetic induction of external origin 0.5 mT) |
- |
4000 |
|
- |
6.3(Window) |
- |
3000 |
|
- |
6.4(Terminals, Terminals Block(s) and Protective Earth Terminal) |
- |
3000 |
|
- |
6.5(Terminal Cover(s)) |
- |
3000 |
|
- |
6.6(Clearance and Creepage Distance) |
- |
3000 |
|
- |
6.7(Insulating Encased Meter) |
- |
3000 |
|
- |
6.10(Display of Measured Values) |
- |
3000 |
|
- |
6.11(Output Device) |
- |
3000 |
|
- |
7.1(Name Plate) |
- |
3000 |
|
- |
7.2(Connections, Diagrams and Terminal Marking) |
- |
3000 |
|
- |
|
Complete
|
|
31 Dec, 2023 |
Included w.e.f. 14.03.2023 |
5 |
IS 13779 (2020) |
ac STATIC WATTHOUR METERS CLASS 1 AND 2-Specefication |
- |
-
|
110000 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
12.7.6.2(Impulse voltage test) |
- |
7200 |
|
- |
12.7.6.3(ac high voltage test) |
- |
3000 |
|
- |
12.7.6.4(Insulation resistance test) |
- |
3000 |
|
- |
11.1(Test on limits of error due to variation of current) |
- |
4000 |
|
- |
12.15 & 11.6(Test of meter constant) |
- |
3000 |
|
- |
12.14 & 11.5(Test of starting condition) |
- |
3000 |
|
- |
12.13 & 11.4(Test of no-load condition) |
- |
3000 |
|
- |
12.12 & 11.3(Test of ambient temperature influence) |
- |
11500 |
|
- |
12.16 & 11.7(Test of repeatability of error) |
- |
3000 |
|
- |
11.2(Test on limits of error due to other influence quantities) |
- |
28000 |
|
- |
12.7.1(Test of power consumption) |
- |
3000 |
|
- |
12.7.2(Test of influence of supply voltage) |
- |
3000 |
|
- |
12.7.3(Test of influence of short time over currents) |
- |
3000 |
|
- |
12.7.4(Test of Influence of self heating) |
- |
3000 |
|
- |
12.7.5(Test of influence of heating) |
- |
3000 |
|
- |
12.8(Test of immunity to earth/phase fault) |
- |
7000 |
|
- |
12.3.3(Spring hammer test) |
- |
8000 |
|
- |
12.4(Test of resistance to heat and fire) |
- |
8000 |
|
- |
12.9.6(Radio Interference Measurement) |
- |
10500 |
|
- |
12.9.4(Fast transient burst test) |
- |
12000 |
|
- |
12.9.2(Test of Immunity to electrostatic discharge) |
- |
7000 |
|
- |
12.9.3(Test of Immunity to electromagnetic HF field) |
- |
17500 |
|
- |
12.9.5(Surge Immunity Test) |
- |
7200 |
|
- |
12.6.1(Dry heat test) |
- |
14400 |
|
- |
12.6.2(Cold test) |
- |
25400 |
|
- |
12.6.3(Damp heat cyclic test) |
- |
50400 |
|
- |
12.3.2(Vibration test) |
- |
12000 |
|
- |
12.3.1(Shock test) |
- |
6000 |
|
- |
12.5(Test of protection against penetration of dust and water) |
- |
6000 |
|
- |
6.2(Meter Case) |
- |
3000 |
|
- |
6.3(Window) |
- |
3000 |
|
- |
6.4(Terminals, terminal block and protective earth terminal) |
- |
3000 |
|
- |
6.5(Terminals covers and Extended Terminal Cover) |
- |
3000 |
|
- |
6.6(Clearance and creepage distances) |
- |
3000 |
|
- |
6.7(Insulating encased meter) |
- |
3000 |
|
- |
6.10(Display of measured values) |
- |
3000 |
|
- |
6.11(Output device) |
- |
3000 |
|
- |
7.1(Name Plate) |
- |
3000 |
|
- |
7.2(Connection diagrams and terminal marking) |
- |
3000 |
|
- |
5.1(Standard Reference Voltages) |
- |
3000 |
|
- |
5.2(Standard Basic Currents) |
- |
3000 |
|
- |
5.3(Rated Maximum Current) |
- |
3000 |
|
- |
5.4(Standard Frequency) |
- |
3000 |
|
- |
|
Complete
|
|
31 Dec, 2023 |
Included w.e.f. 14.03.2023 |
6 |
IS 15884 (2010) |
Alternating current direct connected static prepayment meters for active energy (Class 1 And 2) - Specification |
1 |
-
|
180000 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
4.6.1(As per table 10 & 11, cl 5.6.1) |
- |
12000 |
|
- |
5.4.6.3(Table 15, power source 500 VA) |
- |
2000 |
|
- |
5.4.6.2(12.7.6.2 of IS 13779) |
- |
7200 |
|
- |
5.4.6.4(500±50V dc) |
- |
2000 |
|
- |
5.6.7(Test shall be carried out at 0.05Ib and Ib at UPF load under reference conditions. Twenty error samples shall be taken at time-intervals of 30 minutes) |
- |
4000 |
|
- |
5.2.1(As per cl 12.3.3 of IS 13779) |
- |
6000 |
|
- |
5.4.5(As per cl 4.4.5) |
- |
2000 |
|
- |
5.4.4(Table 9, and cl 4.4.4) |
- |
2000 |
|
- |
5.4.3(Table 8, as per cl4.4.3) |
- |
2000 |
|
- |
4.4.2(Table 7) |
- |
2000 |
|
- |
4.6.2(As per table 12) |
- |
22000 |
|
- |
5.6.5(As per cl 4.6.5) |
- |
2000 |
|
- |
5.6.3(I= open circuit
V= 115% of rated voltage
test period 60 000/k minutes) |
- |
2000 |
|
- |
5.4.1(As per 4.4.1.1) |
- |
2000 |
|
- |
5.6.4(As per cl 4.6.3, Table 13) |
- |
2000 |
|
- |
5.2.4(As per IS 11000 (Part 2 / Sec1)) |
- |
8000 |
|
- |
5.5.5(according to IEC 62052-11) |
- |
10500 |
|
- |
5.5.4(according to IS 14700
(Part 4/Sec 4)) |
- |
12000 |
|
- |
5.5.3(Table 12 &
IS 14700 (Part 4/Sec 3)) |
- |
17500 |
|
- |
5.5.2(according to IS 14700 (Part 4/Sec 2)) |
- |
7000 |
|
- |
5.3.1(according to IS 9000
(Part 3/ Sec 1 to 5)) |
- |
14400 |
|
- |
5.3.2(according to IS 9000
(Part 2/Sec 1 to 4)) |
- |
25200 |
|
- |
5.3.3(according to IS 9000 (Part 5/Sec 1 and 2)) |
- |
50400 |
|
- |
5.2.3(As per IS 9000 (Part 8)) |
- |
1200 |
|
- |
5.2.2(As per IS 9000 (Part 7/Sec 1)) |
- |
6000 |
|
- |
5.2.5(Protection against penetration of dust (IP5X)) |
- |
6000 |
|
- |
|
Complete
|
|
31 Dec, 2023 |
Exclusions: Terminals (Cl.9), Short circuit across creepage distances and clearances - PCB (14.1), Resistance to heat, fire and Tracking (19), Immunity to Electromagnetic HF fields (80MHz to 2000 MHz) (Cl.5.5.3) |
7 |
IS 13252 : Part 1 (2010) |
Information technology equipment - Safety: Part 1 general requirements (Second Revision) |
- |
-
|
78000 View breakup
Rs. 78,000/- for Laptop, Notebook, Rs. 45,500/- for Tablet, Rs. 78,000/- for VDU units, Video monitors of screen size 32" & 42", Rs. 1,10,500/- for VDU units, Video monitors of screen size above 42", Rs. 45,000/- for Printers, Plotters & Scanners of Paper size : A3, Rs. 1,10,500/- for Printers, Plotters & Scanners of Paper size :> A3, Rs. 45,500/- for Wireless Keyboards, Rs. 45,500/- for Telephone Answering Machine (Battery operated), Rs. 1,10,500/- for Telephone Answering Machine (Main operated), Rs. 45,500/- for Set Top Box (SD), Rs. 78,000/- for Set Top Box (HD), Rs. 78,000/- for Automatic Data Processing Machine, Rs. 1,10,500/- for Automatic Data Processing Machine(Servers), Rs. 45,500/- for Power adaptor for Audio & IT equipment, Rs. 45,500/- for Mobiles Phones, Rs. 78,000/- for Cash Registers, Rs. 78,000/- for Point of Sale Terminals, Rs. 45,500/- for Copying Machines/Duplicators of Paper size : A4 & Legal, Rs. 78,500/- for Copying boards & coated Machines/Duplicators of Paper size : A3, Rs. 1,10,500/- for Copying Machines/Duplicators of Paper size : >A3, Rs. 45,500/- for Smart Card Readers, Rs. 78,000/- for Mail Processing machines/ Postage Machines/ Franking Machines, Rs. 45,500/- for Passport Readers, Rs. 45,500/- for Power Banks for use in portable applications. [NOTE: Charges included are for each model, for series formation 10% additional charges for each additional model covered in the series shall be charged.]
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
1.6(Power interface .) |
- |
2000 |
|
- |
1.7(Markings and instructions) |
- |
2000 |
|
- |
2.1(Protection from electric shock and energy hazards) |
- |
2000 |
|
- |
2.2(SELV circuits) |
- |
2000 |
|
- |
2.3(TNV circuits) |
- |
2000 |
|
- |
2.4(Limited current circuits) |
- |
2000 |
|
- |
2.5(Limited power sources .) |
- |
2000 |
|
- |
2.6(Provisions for earthing and bonding) |
- |
2000 |
|
- |
2.7(Overcurrent and earth fault protection in primary circuits) |
- |
2000 |
|
- |
2.8(Safety interlocks) |
- |
2000 |
|
- |
2.9(Electrical insulation) |
- |
2000 |
|
- |
2.10(Clearances, creepage distances and distances through insulation) |
- |
2000 |
|
- |
3.1(General) |
- |
2000 |
|
- |
3.2(Connection to a mains supply) |
- |
2000 |
|
- |
3.3(Wiring terminals for connection of external conductors) |
- |
2000 |
|
- |
3.4(Disconnection from the mains supply) |
- |
2000 |
|
- |
3.5(Interconnection of equipment) |
- |
2000 |
|
- |
4.1(Stability) |
- |
2000 |
|
- |
4.2(Mechanical strength) |
- |
8000 |
|
- |
4.3(Design and construction) |
- |
2000 |
|
- |
4.4(Protection against hazardous moving parts) |
- |
2000 |
|
- |
4.5(Thermal requirements) |
- |
11500 |
|
- |
4.6(Openings in enclosures) |
- |
2000 |
|
- |
4.7(Resistance to fire) |
- |
2000 |
|
- |
5.1(Touch current and protective conductor curren) |
- |
2000 |
|
- |
5.2(Electric strength) |
- |
2000 |
|
- |
5.3(Abnormal operating and fault conditions) |
- |
4000 |
|
- |
6.1(Protection of telecommunication network service persons, and users of other equipment connected to the network, from hazards in the equipment) |
- |
2000 |
|
- |
6.2(Protection of equipment users from overvoltages on networks telecommunication) |
- |
2000 |
|
- |
6.3(Protection of the telecommunication wiring system from overheating) |
- |
2000 |
|
- |
7.2(Protection of cable distribution system service persons, and users of other equipment connected to the system, from hazardous voltages in the equipment) |
- |
2000 |
|
- |
7.4(Insulation between primary circuits and cable distribution systems) |
- |
7200 |
|
- |
7.3(Protection of equipment users from overvoltages on the cable distribution system) |
- |
7200 |
|
- |
|
Complete
|
|
31 Dec, 2023 |
Excluding following tests:Components (Cl.1.5), Moving parts (Cl.2.8.5), Switches & Relays and their related circuit (2.8.7), Overload test (Cl.2.8.7.2), Switches & Relays---Endurance test (Cl.2.8.7.3), Semiconductor devices (Cl.2.10.5.4), Insulation in wound components (Cl. 2.10.5.11), Wire in wound components (Cl.2.10.5.12), Wire with solvent-based enamel in wound components (Cl.2.10.5.13), Additional insulation in wound components (Cl.2.10.5.14), Tests on coated printed boards and coated components(2.10.8), Sample preparation and preliminary inspection (Cl. 2.10.8.1), Thermal Conditioning (Cl.2.10.8.2), Abrasion resistance (Cl.2.10.8.4), Thermal Cycling (Cl.2.10.9), Test for Pollution Degree 1 environment and for insulating compound (Cl.2.10.10), Tests for semiconductor devices and for cemented joints (Cl. 2.10.11), Enclosed and sealed parts (Cl.2.10.12), Appliance inlets (Cl.3.2.4), AC Power Supply Cords (Cl.3.2.5.1), Cathode ray tubes (Cl.4.2.8), Batteries (Cl. 4.3.8), Flammable liquids (Cl.4.3.12), Effect of ultra(UV) radiation on material (Cl.4.3.13.3), Human Exposure to ultraviolet(UV) radiation (Cl. 4.3.13.4), 25. Laser (including LEDs) (Cl.4.3.13.5), Light emitting diodes (LEDs) (4.3.13.5.2), Conditions for a fire enclosure (Cl. 4.7.2), Parts requiring a fire encloser (4.7.2.1), Parts not requiring a fire enclosure (4.7.2.2), Materials (Cl.4.7.3), General (Cl.4.7.3.1), Material for fire enclosures (Cl.4.7.3.2), Material for components and other parts outside fire enclosure (4.7.3.3), Materials for components and other parts inside fire enclosure (4.7.3.4), Materials for air filter assemblies (4.7.3.5), Materials used in high voltage components (4.7.3.6) |
8 |
IS 11037 (2019) |
Electronic Type Fan Regulators — Specification ( First Revision ) |
- |
-
|
30000 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
5.4.6.3(Table 15, power source 500 VA) |
- |
11500 |
|
- |
5.4.6.2(6 KV, As per cl 12.7.6.2 of IS 13779) |
- |
7200 |
|
- |
5.4.6.4(500±50V dc) |
- |
5000 |
|
- |
9.5.1 , 7.3(Temperature Rise) |
- |
11500 |
|
- |
9.5.2, 7.2(Leakage Current Test(as per Cl.13.2 of IS 302 (Part 1).) |
- |
2000 |
|
- |
9.5.3(High Voltage Test) |
- |
2000 |
|
- |
9.5.5(Earthing Connection) |
- |
2000 |
|
- |
9.5.6(Protection against electric shock (as per Cl.8 of IS 302 (Part 1)) |
- |
2000 |
|
- |
7.7(Voltage drop) |
- |
2000 |
|
- |
8.1(Performance) |
- |
2000 |
|
- |
9.5.7, 9.5.4(Moisture Resistance ) |
- |
16800 |
|
- |
7.4.1(a)(Mechanical strength ) |
- |
6000 |
|
- |
9.5.9, 7.5, Table-1(Creepage Distances and Clearances (as per Cl. 29 of IS 302-1)) |
- |
2000 |
|
- |
9.5.11.2(Environmental Tests) |
- |
13200 |
|
- |
9.5.11.3(Environmental Tests) |
- |
12000 |
|
- |
9.5.10( Electrical Endurance Test) |
- |
2000 |
|
- |
9.5.12(Resistance to Abnormal Heat and to Fire) |
- |
2000 |
|
- |
9.1(Marking ) |
- |
2000 |
|
- |
9.5.14(Checking of Dimensions) |
- |
2000 |
|
- |
9.5.8, (Mechanical strength (as per Cl.21.1 of IS 302-1:2008)) |
- |
12000 |
|
- |
8.1(Performance) |
- |
6000 |
|
- |
9.5.6(Protection against electric shock (as per Cl.8 of IS 302 (Part 1)) |
- |
2000 |
|
- |
9.5.11.4(Environmental Tests) |
- |
12000 |
|
- |
|
Complete
|
|
31 Dec, 2023 |
- |
9 |
IS 15885 : Part 2 : Sec 13 (2012) |
Safety of lamp controlgear: Part 2 particular requirements: Sec 13 d.c. or a.c. supplied electronic controlgear for led modules |
- |
-
|
45500 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
7(Marking) |
- |
45000 |
|
- |
8(Protection against accidental contact with live parts) |
- |
2000 |
|
- |
9(Terminals) |
- |
2000 |
|
- |
10(PROVISION FOR EARTHING) |
- |
2000 |
|
- |
11(MOISTURE RESISTANCE) |
- |
16800 |
|
- |
12(Electric Strength) |
- |
2000 |
|
- |
14(Fault conditions) |
- |
2000 |
|
- |
15(Transformer heating) |
- |
11500 |
|
- |
16(Construction) |
- |
2000 |
|
- |
17(Creepage distance and clearances) |
- |
2000 |
|
- |
18(Screws, current carrying parts and connections) |
- |
2000 |
|
- |
19(Resistance to heat, fire and tracking) |
- |
8000 |
|
- |
20(Resistance to corrosion) |
- |
2000 |
|
- |
|
Complete
|
|
31 Dec, 2023 |
- |
10 |
IS 16242 : Part 1 (2014) |
Uninterruptible power systems (UPS): Part 1 general and safety requirements for UPS |
- |
-
|
78000 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
4.6(Power interface) |
- |
2000 |
|
- |
4.7(Marking & instructions) |
- |
2000 |
|
- |
5.1(Protection against shock and energy hazards) |
- |
2000 |
|
- |
5.2(Requirement of auxiliary circuits) |
- |
2000 |
|
- |
5.3(Protective earthing and bonding) |
- |
2000 |
|
- |
5.4(AC and DC power isolation) |
- |
2000 |
|
- |
5.5(Over current and earth fault condition) |
- |
2000 |
|
- |
5.6(Safety interlocks) |
- |
2000 |
|
- |
5.7(CLEARANCES, CREEPAGE DISTANCES AND SOLID INSULATION) |
- |
2000 |
|
- |
6.1(Wiring, connections and supply) |
- |
2000 |
|
- |
6.2(Connection to power) |
- |
2000 |
|
- |
6.3(Wiring terminals for external power conductors) |
- |
2000 |
|
- |
7.1(Enclosure) |
- |
2000 |
|
- |
7.2(STABILITY) |
- |
2000 |
|
- |
7.3(MECHANICAL STRENGTH) |
- |
6000 |
|
- |
7.4(Construction details) |
- |
2000 |
|
- |
7.5(Resistance to fire) |
- |
8000 |
|
- |
7.6(Battery location) |
- |
2000 |
|
- |
7.7(Temperature rise) |
- |
11500 |
|
- |
8.1(General procision for earth leakage) |
- |
4000 |
|
- |
8.2(Electric Strength) |
- |
4000 |
|
- |
8.3(Abnormal operating and fault conditions) |
- |
4000 |
|
- |
9.0(Connection to telecommunication networks) |
- |
8000 |
|
- |
4.5(Components) |
- |
6000 |
|
Test charges includes component data verification |
|
Complete
|
|
31 Dec, 2023 |
Excluding following Tests
: Components (Cl.4.5), Protection of personal-safety Interlock (Cl.5.6), Resistance to fire (Cl.7.5) |
11 |
IS 13779 (1999) |
AC static watihour meters, class 1 and 2 - Specification (First Revision) |
- |
-
|
100000 View breakup
Rs. 90,000/- Single phase AC Static Watthour Meters of Class 1 & 2, Rs. 1,00,000/- Three phase AC Static Watthour Meters of Class 1 & 2.
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
12.7.6.2(Impulse voltage test) |
- |
7200 |
|
- |
12.7.6.3(ac Voltage test) |
- |
2000 |
|
- |
12.7.6.4(Insulation resistance test) |
- |
2000 |
|
- |
11.1(Limits of Error and Interpretation or Test Results) |
- |
12000 |
|
- |
12.15(Test of Meter Constant/Registration) |
- |
2000 |
|
- |
12.14(Test of Starting Conditions) |
- |
2000 |
|
- |
12.13(Test of No-Load Condition) |
- |
2000 |
|
- |
12.12(Test ofAmbient Temperature Influence) |
- |
11500 |
|
- |
12.17(Repeatability of Error Test
) |
- |
4000 |
|
- |
12.11(Test of Iniluence Quantities) |
- |
32000 |
|
- |
12.7.1(Test of Power Consumption) |
- |
2000 |
|
- |
12.7.2(Test of Influence of Supply Voltage) |
- |
2000 |
|
- |
12.7.3( Test of Influence of Short-time Overcurrents) |
- |
2000 |
|
- |
12.7.4(Test of Influence of Self-Heating) |
- |
2000 |
|
- |
12.7.5(Test of Influence of Heating) |
- |
2000 |
|
- |
12.8(TestorImmunity to Earth Fault) |
- |
2000 |
|
- |
12.9.2(Test for Immunity to Electrostatic Discharge
(ESD)) |
- |
7000 |
|
- |
12.9.4(FastTransient BurstTest) |
- |
7000 |
|
- |
12.9.3(Test for Immunity to EIectromagnetic HF Fields) |
- |
17500 |
|
- |
12.9.5(Radio Interference Measurement) |
- |
10500 |
|
- |
12.6.1(Dry Heat Test) |
- |
14400 |
|
- |
12.6.2(Cold Test) |
- |
25200 |
|
- |
12.6.3( Damp Heat Cycle Test) |
- |
50400 |
|
- |
12.3.2(Vibration Test) |
- |
12000 |
|
- |
12.3.1(Shock Test) |
- |
6000 |
|
- |
12.3.3( Spring Hammer Test) |
- |
6000 |
|
- |
12.5 a)(Test of Protection Against Penetration of Dust
and Water) |
- |
6000 |
|
- |
12.5 b)(Test of Protection Against Penetration of Dust
and Water) |
- |
6000 |
|
- |
12.4(Testof Resistance to Heat and Fire
) |
- |
8000 |
|
- |
6(General and constructional requirements) |
- |
5000 |
|
- |
6.4(Heat deflection test) |
- |
5000 |
|
- |
7.1 a)(MARKING OF METERS : Name Plate
) |
- |
2000 |
|
- |
|
Complete
|
|
31 Dec, 2023 |
- |
12 |
IS 14697 (1999) |
AC static transformer operated , watthour and var - Hour meters, class 0.2 S and 0.5 S - Specification |
- |
-
|
144000 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
12.7.6.2(Impulse voltage test ) |
- |
7200 |
|
- |
12.7.6.3(ac Voltage test) |
- |
2000 |
|
- |
12.7.6.4(Insulation resistance test) |
- |
2000 |
|
- |
11.1(Limits of Error Due to Variation of the Current) |
- |
12000 |
|
- |
12.14(Test of Meter Constant/ Registration) |
- |
2000 |
|
- |
12.13(Test of Starting Conditions) |
- |
2000 |
|
- |
12.12(Test of No-Load Condition) |
- |
2000 |
|
- |
12.11(Test of Ambient Temperature Influence) |
- |
11500 |
|
- |
12.1(Test of Influence Quantities) |
- |
28000 |
|
- |
12.7.1(Test of Power Consumption ) |
- |
2000 |
|
- |
12.7.2(Test of Influence of Supply Voltage) |
- |
2000 |
|
- |
12.7.3(Test of Influence of Short-Time Over Currents) |
- |
2000 |
|
- |
12.7.4(Test of influence of self-heating) |
- |
2000 |
|
- |
12.7.5(Test of Influence of Heating ) |
- |
2000 |
|
- |
12.8.2(Test for Immunity to Electrostatic Discharge (ESD)) |
- |
7000 |
|
- |
12.8.5(Radio interference measurement) |
- |
10500 |
|
- |
12.8.4(Fast Transient Burst Tes) |
- |
12000 |
|
- |
12.6.1(dry heat test) |
- |
14400 |
|
- |
12.6.2(cold test) |
- |
25200 |
|
- |
12.6.3(Damp Heat Cycle Test ) |
- |
50400 |
|
- |
12.3.2(Vibration Test) |
- |
12000 |
|
- |
12.3.1(Shock Test) |
- |
6000 |
|
- |
12.3.3(Spring Hammer Test) |
- |
8000 |
|
- |
12.5 a)(Test of Protection Against Penetration of Dust
) |
- |
6000 |
|
- |
12.5 b)( Protection against penetration of water) |
- |
6000 |
|
- |
12.4(Test of Resistance to Heat and Fire) |
- |
8000 |
|
- |
12.15 a)(Limits of error and Interpretation of Test
Results ) |
- |
12000 |
|
- |
12.12(Test of no-load condition) |
- |
2000 |
|
- |
12.11(Test of ambient temperature influence) |
- |
11500 |
|
- |
12.16(Test of repeatability of error) |
- |
4000 |
|
- |
12.1(Continuous Magnetic Induction of External Origin 0.2 Tesla) |
- |
4000 |
|
- |
12.8.3(Test for Immunity to Electromagnetic HF
Fields ) |
- |
17500 |
|
- |
|
Complete
|
|
31 Dec, 2023 |
- |
13 |
IS 616 (2017) |
Audio, video and similar electronic apparatus - Safety requirements (Fifth Revision) |
- |
-
|
78000 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
5(Marking and instructions) |
- |
2000 |
|
Clause wise test charges are based on efforts and complexity of test for specific parameter |
6(Hazardous radiations) |
- |
4000 |
|
- |
7(Heating under normal operating conditions) |
- |
4000 |
|
- |
8(Constructional requirements with regard to the protection against electric shock) |
- |
2000 |
|
Clause wise test charges are based on efforts and complexity of test for specific parameter |
9(Electric shock hazard under normal operating conditions) |
- |
2000 |
|
Clause wise test charges are based on efforts and complexity of test for specific parameter |
10(Insulation requirements) |
- |
27000 |
|
Clause wise test charges are based on efforts and complexity of test for specific parameter |
11(Fault conditions) |
- |
8000 |
|
Clause wise test charges are based on efforts and complexity of test for specific parameter |
12(Mechanical strength) |
- |
16800 |
|
Clause wise test charges are based on efforts and complexity of test for specific parameter |
13(CLEARANCES and CREEPAGE DISTANCES) |
- |
2000 |
|
Clause wise test charges are based on efforts and complexity of test for specific parameter |
15(TERMINALS) |
- |
2000 |
|
Clause wise test charges are based on efforts and complexity of test for specific parameter |
16(External flexible cords) |
- |
2000 |
|
Clause wise test charges are based on efforts and complexity of test for specific parameter |
17(Electrical connections and mechanical fixings) |
- |
2000 |
|
Clause wise test charges are based on efforts and complexity of test for specific parameter |
19(Stability and mechanical hazards) |
- |
2000 |
|
Clause wise test charges are based on efforts and complexity of test for specific parameter |
20(Resistance to fire) |
- |
8000 |
|
Clause wise test charges are based on efforts and complexity of test for specific parameter |
|
Complete
|
|
31 Dec, 2023 |
- |
14 |
IS 302 : Part 1 (2008) |
Safety of household and similar electrical appliances: Part 1 general requirements (Sixth Revision) |
- |
-
|
78000 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
7(Marking and instructions) |
- |
2000 |
|
Clause wise charges are based on effort and complexity of Test for specific parameter |
8.1.1(Protection against live parts in all positions) |
- |
2000 |
|
Clause wise charges are based on effort and complexity of Test for specific parameter |
8.1.2(Protection against live parts in openings) |
- |
2000 |
|
Clause wise charges are based on effort and complexity of Test for specific parameter |
8.1.3(Protection against live parts in visible glowing heating elements) |
- |
2000 |
|
Clause wise charges are based on effort and complexity of Test for specific parameter |
8.1.4(Protection against live parts against protective impedance) |
- |
2000 |
|
Clause wise charges are based on effort and complexity of Test for specific parameter |
10.1(Power input) |
- |
2000 |
|
Clause wise charges are based on effort and complexity of Test for specific parameter |
10.2(Current input) |
- |
2000 |
|
Clause wise charges are based on effort and complexity of Test for specific parameter |
11.2(General) |
- |
11500 |
|
Test charge is for complete test of clause no. 11 : HEATING |
11.1(General) |
- |
11500 |
|
Test charge is for complete test of clause no. 11 : HEATING |
11.3(Heating) |
- |
11500 |
|
Test charge is for complete test of clause no. 11 : HEATING |
13.1(General) |
- |
2000 |
|
clause wise charges are based on effort and complexity of Test for specific parameter |
13.2(Leakage current at operating temperature) |
- |
2000 |
|
clause wise charges are based on effort and complexity of Test for specific parameter |
13.3(Electric Strength at operating temperature) |
- |
2000 |
|
clause wise charges are based on effort and complexity of Test for specific parameter |
14(Transient Over Voltages) |
- |
7000 |
|
clause wise charges are based on effort and complexity of Test for specific parameter |
16.1(General) |
- |
2000 |
|
clause wise charges are based on effort and complexity of Test for specific parameter |
16.2(Leakage Current (after Clause 15)) |
- |
2000 |
|
clause wise charges are based on effort and complexity of Test for specific parameter |
16.3(Electric Strength (after clause 15 and 16.2)) |
- |
2000 |
|
clause wise charges are based on effort and complexity of Test for specific parameter |
17(Over Load Protection of Transformers and associated circuits) |
- |
2000 |
|
clause wise charges are based on effort and complexity of Test for specific parameter |
19(Abnormal Operation) |
- |
4000 |
|
clause wise charges are based on effort and complexity of Test for specific parameter |
20(Stability test) |
- |
2000 |
|
clause wise charges are based on effort and complexity of Test for specific parameter |
21(Mechanical Strength Test) |
- |
2000 |
|
clause wise charges are based on effort and complexity of Test for specific parameter |
22(Construction verification related test) |
- |
2000 |
|
clause wise charges are based on effort and complexity of Test for specific parameter |
23(General) |
- |
2000 |
|
clause wise charges are based on effort and complexity of Test for specific parameter |
24(Components) |
- |
4000 |
|
clause wise charges are based on effort and complexity of Test for specific parameter |
25(Supply connection and external flexible cords) |
- |
2000 |
|
clause wise charges are based on effort and complexity of Test for specific parameter |
26(Terminals for external conductors) |
- |
2000 |
|
clause wise charges are based on effort and complexity of Test for specific parameter |
27(Provision for earthing) |
- |
2000 |
|
clause wise charges are based on effort and complexity of Test for specific parameter |
28(Screw test and connections) |
- |
2000 |
|
clause wise charges are based on effort and complexity of Test for specific parameter |
29(clearance, creepage distances and solid insulation) |
- |
2000 |
|
clause wise charges are based on effort and complexity of Test for specific parameter |
30.1(Ball pressure test) |
- |
10800 |
|
clause wise charges are based on effort and complexity of Test for specific parameter |
30.2(Glow Wire Test) |
- |
8000 |
|
clause wise charges are based on effort and complexity of Test for specific parameter |
30.2(Needle Flame Test) |
- |
4000 |
|
clause wise charges are based on effort and complexity of Test for specific parameter |
31(Resistance to Rusting) |
- |
4000 |
|
clause wise charges are based on effort and complexity of Test for specific parameter |
|
Complete
|
|
31 Dec, 2023 |
- |
15 |
IS 302 : Part 2 : Sec 26 (2014) |
Safety of household and similar electrical appliances: Part 2 particular requirements: Sec 26 clocks (First Revision) |
- |
-
|
45500 View breakup
Rs.45500/- (Clock withmains power)
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
6.0(Classification) |
- |
2000 |
|
- |
7(Marking and instructions) |
- |
2000 |
|
- |
8(Protection against live parts) |
- |
2000 |
|
- |
10(POWER INPUT AND CURRENT) |
- |
2000 |
|
- |
11(HEATING) |
- |
11500 |
|
- |
13(LEAKAGE CURRENT AND ELECTRIC STRENGTH AT OPERATING TEMPERATURE) |
- |
4000 |
|
- |
15(MOISTURE RESISTANCE) |
- |
4000 |
|
- |
16(LEAKAGE CURRENT AND ELECTRIC STRENGTH) |
- |
4000 |
|
- |
17(OVERLOAD PROTECTION OF TRANSFORMERS AND ASSOCIATED CIRCUITS) |
- |
2000 |
|
- |
19(ABNORMAL OPERATION) |
- |
4000 |
|
- |
20(STABILITY AND MECHANICAL HAZARDS) |
- |
2000 |
|
- |
21(MECHANICAL STRENGTH) |
- |
2000 |
|
- |
22(CONSTRUCTION) |
- |
2000 |
|
- |
23(INTERNAL WIRING) |
- |
2000 |
|
- |
24(COMPONENTS) |
- |
2000 |
|
- |
25(SUPPLY CONNECTION AND EXTERNAL FLEXIBLE CORDS) |
- |
2000 |
|
- |
26(TERMINALS FOR EXTERNAL CONDUCTORS) |
- |
2000 |
|
- |
27(PROVISION FOR EARTHING) |
- |
2000 |
|
- |
28(SCREWS AND CONNECTIONS) |
- |
2000 |
|
- |
29(CLEARANCES, CREEPAGE DISTANCES AND SOLID INSULATION) |
- |
2000 |
|
- |
30(RESISTANCE TO HEAT AND FIRE) |
- |
2000 |
|
- |
31(RESISTANCE TO RUSTING) |
- |
4800 |
|
- |
|
Complete
|
|
31 Dec, 2023 |
Excluding following Tests
: Automatic cord reels (Cl. 22.16), Parts of natural or synthetic rubber ceramic material (Cl.22.32), Softwares used in protective electronic circuits (Cl. 22.46), Appliances intended to be connected to the water mains (Cl. 22.47), Components (Cl.24) |
16 |
IS 302 : Part 2 : Sec 25 (2014) |
Safety of household and similar electrical appliances: Part 2 Particular requirements: Section 25 Microwave ovens |
- |
-
|
78000 View breakup
Rs.78000/- (Microwave Ovens)
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
6.0(Classification) |
- |
2000 |
|
- |
7(Marking and instructions) |
- |
2000 |
|
- |
8(Protection against live parts) |
- |
2000 |
|
- |
10(POWER INPUT AND CURRENT) |
- |
2000 |
|
- |
11(HEATING) |
- |
11500 |
|
- |
13(LEAKAGE CURRENT AND ELECTRIC STRENGTH AT OPERATING TEMPERATURE) |
- |
2000 |
|
- |
14(IMPULSE VOLTAGE TEST) |
- |
7200 |
|
- |
15(HUMIDITY TREATMENT TEST) |
- |
16500 |
|
- |
16(LEAKAGE CURRENT AND ELECTRIC STRENGTH) |
- |
4000 |
|
- |
17(OVERLOAD PROTECTION OF TRANSFORMERS AND ASSOCIATED CIRCUITS) |
- |
2000 |
|
- |
18(ENDURANCE) |
- |
2000 |
|
- |
19(ABNORMAL OPERATION) |
- |
40000 |
|
- |
20(STABILITY AND MECHANICAL HAZARDS) |
- |
2000 |
|
- |
21(MECHANICAL STRENGTH) |
- |
2000 |
|
- |
22(CONSTRUCTION) |
- |
22000 |
|
- |
23(INTERNAL WIRING) |
- |
2000 |
|
- |
24(COMPONENTS) |
- |
2000 |
|
- |
25(SUPPLY CONNECTION AND EXTERNAL FLEXIBLE CORDS) |
- |
2000 |
|
- |
26(TERMINALS FOR EXTERNAL CONDUCTORS) |
- |
2000 |
|
- |
27(PROVISION FOR EARTHING) |
- |
2000 |
|
- |
28(SCREWS AND CONNECTIONS) |
- |
2000 |
|
- |
29(CLEARANCES, CREEPAGE DISTANCES AND SOLID INSULATION) |
- |
4000 |
|
- |
30(RESISTANCE TO HEAT AND FIRE) |
- |
8000 |
|
- |
31(RESISTANCE TO RUSTING) |
- |
2000 |
|
- |
32(RADIATION, TOXICITY AND SIMILAR HAZARDS) |
- |
4000 |
|
- |
|
Complete
|
|
31 Dec, 2023 |
Excluding following Tests
: Automatic cord reels (Cl. 22.16), Parts of natural or synthetic rubber ceramic material (Cl.22.32), Softwares used in protective electronic circuits (Cl. 22.46), Appliances intended to be connected to the water mains (Cl. 22.47), Endurance test on Interlocks (Cl. 18.101), Components (Cl.24) |