"Cl. 6 IS 4159:2021"(Classification) |
- |
500 |
|
- |
"Cl. 8 IS 4159:2021"(Protection against access to live parts) |
- |
800 |
|
- |
"Cl. 9 IS 4159:2021"(Starting of motor operated appliances) |
- |
1000 |
|
- |
"Cl. 10 IS 4159:2021"(Power Input and Current) |
- |
900 |
|
- |
"Cl. 11 IS 4159:2021"(Heating) |
- |
1500 |
|
- |
"Cl. 13 IS 4159:2021"(Leakage Current & Electrical Strength at Operating Temperature) |
- |
1000 |
|
- |
"Cl. 14 IS 4159:2021"(Transient Over Voltage) |
- |
1500 |
|
- |
"Cl. 15 IS 4159:2021"(Moisture Resistance) |
- |
1000 |
|
- |
"Cl. 16 IS 4159:2021"(Leakage Current and Electric strength) |
- |
1000 |
|
- |
"Cl. 17 IS 4159:2021"(Overload protection of transformers and associated circuits.) |
- |
1000 |
|
- |
"Cl. 18 IS 4159:2021"(Endurance) |
- |
1500 |
|
- |
"Cl. 19 IS 4159:2021"(Abnormal Operation) |
- |
1500 |
|
- |
"Cl. 20 IS 4159:2021"(Stability and mechanical Hazards) |
- |
1000 |
|
- |
"Cl. 21 IS 4159:2021"(Mechanical Strength) |
- |
1500 |
|
- |
"Cl. 22 IS 4159:2021"(Construction) |
- |
1500 |
|
- |
"Cl. 23 IS 4159:2021"(Internal Wiring) |
- |
500 |
|
- |
"Cl. 24 IS 4159:2021"(Components) |
- |
500 |
|
- |
"Cl. 25 IS 4159:2021"(Supply Connections and External Flexible Cables and Cords) |
- |
1500 |
|
- |
"Cl. 26 IS 4159:2021"(Terminal For External Conductors) |
- |
1000 |
|
- |
"Cl. 27 IS 4159:2021"(Provision For Earthing) |
- |
500 |
|
- |
"Cl. 28 IS 4159:2021"(Screws and Connections) |
- |
500 |
|
- |
"Cl. 29 IS 4159:2021"(Creepage Distances, Clearances And Distances Through Insulation) |
- |
500 |
|
- |
"Cl. 30 IS 4159:2021"(Resistance To Heat, Fire And Tracking) |
- |
1000 |
|
- |
"Cl. 31 IS 4159:2021"(Resistance To Rusting) |
- |
500 |
|
- |
"Cl. 102 IS 4159:2021"(Leakage and hydrostatic strength (for oil heating elements)) |
- |
500 |
|
- |
Cl.22.106(CONSTRUCTION) |
- |
1500 |
|
- |
19.11.4.7(Harmonics) |
- |
0 |
|
- |
19.11.4.6(Class 3 Voltage dips and interruptions) |
- |
0 |
|
- |
19.11.4.5(Immunity to conducted discharges) |
- |
0 |
|
- |
19.11.4.4(Surge immunity test) |
- |
0 |
|
- |
19.11.4.3(Fast transient bursts) |
- |
0 |
|
- |
19.11.4.2(Radiated fields) |
- |
0 |
|
- |
19.11.4.1(Electrostatic discharges) |
- |
0 |
|
- |
Cl.7.1 of IS 4159:2021(Marking) |
- |
100 |
|
- |
Cl.7.1 of IS 4159:2021(Marking) |
- |
100 |
|
- |
Cl.7.1 of IS 4159:2021(Marking) |
- |
100 |
|
- |
Cl.7.1 of IS 4159:2021(Marking) |
- |
100 |
|
- |
Cl.7.1 of IS 4159:2021(Marking) |
- |
100 |
|
- |
Cl.7.1 of IS 4159:2021(Marking) |
- |
100 |
|
- |
Cl.7.2 of IS 4159:2021(Marking) |
- |
100 |
|
- |
Cl.7.3 of IS 4159:2021(Marking) |
- |
100 |
|
- |
Cl.10 of IS 302-1:2008(Power Input & Current) |
- |
500 |
|
- |
Cl.11 of IS 4159:2021 & IS 302‐1:2008(Heating) |
- |
500 |
|
- |
Cl.11 of IS 4159:2021 & IS 302‐1:2008(Heating) |
- |
500 |
|
- |
Cl.11.2 of IS 4159:2021(Heating) |
- |
500 |
|
- |
Cl.11.101 of IS 4159:2021(Heating) |
- |
500 |
|
- |
Cl.18 of IS 4159:2021(Endurance Test) |
- |
500 |
|
- |
Cl.19.2 of IS 302-1: 2008(Abnormal Operation) |
- |
500 |
|
- |
Cl.19.3 of IS 302-1: 2008(Abnormal Operation) |
- |
500 |
|
- |
Cl.19.13 IS 302-1: 2008(Abnormal Operation) |
- |
500 |
|
- |
Cl.19.13 IS 302-1: 2008(Abnormal Operation) |
- |
500 |
|
- |
Cl.19.13 IS 302-1: 2008(Abnormal Operation) |
- |
500 |
|
- |
Cl.22.101 of IS 4159:2021(Construction) |
- |
500 |
|
- |
Cl.22.102 of IS 4159:2021(Construction) |
- |
500 |
|
- |
Cl.22.103 of IS 4159:2021(Construction) |
- |
500 |
|
- |
Cl.22.104 of IS 4159:2021(Construction) |
- |
500 |
|
- |
Cl.22.105 of IS 4159:2021(Construction) |
- |
500 |
|
- |
Cl.22.106 of IS 4159:2021(Construction) |
- |
500 |
|
- |
Cl.22.107 of IS 4159:2021(Construction) |
- |
500 |
|
- |
Cl.22.108 of IS 4159:2021(Construction) |
- |
500 |
|
- |
Cl.22.109 of IS 4159:2021(Construction) |
- |
500 |
|
- |
Cl.22.110 of IS 4159:2021(Construction) |
- |
500 |
|
- |
Cl.22.111 of IS 4159:2021(Construction) |
- |
500 |
|
- |
Cl.27 & IS 302-1: 2008(Provision for Earthing) |
- |
500 |
|
- |
Cl.27 & IS 302-1: 2008(Provision for Earthing) |
- |
0 |
|
- |
Cl.28.1 & IS 302-1: 2008(Screws & Connection) |
- |
500 |
|
- |
Cl.28.4 IS 302-1: 2008(Screws & Connection) |
- |
500 |
|
- |
Cl. 29.1 & IS 302-1: 2008(Creepage Distances & Clearances) |
- |
500 |
|
- |
Cl. 29.2 & IS 302-1: 2009(Creepage Distances & Clearances) |
- |
500 |
|
For BIS-1kv to 3 kv= 8800
Above 3kv =20000
For Others- 1 kv to 3 kv= 20000
Above 3 kv= 40000 |
"Cl. 6 IS 4159:2021"(Classification) |
- |
0 |
|
- |
"Cl. 8 IS 4159:2021"(Protection against access to live parts) |
- |
0 |
|
- |
"Cl. 9 IS 4159:2021"(Starting of motor operated appliances) |
- |
0 |
|
- |
"Cl. 10 IS 4159:2021"(Power Input and Current) |
- |
0 |
|
- |
"Cl. 11 IS 4159:2021"(Heating) |
- |
0 |
|
- |
"Cl. 13 IS 4159:2021"(Leakage Current & Electrical Strength at Operating Temperature) |
- |
0 |
|
- |
"Cl. 14 IS 4159:2021"(Transient Over Voltage) |
- |
0 |
|
- |
"Cl. 15 IS 4159:2021"(Moisture Resistance) |
- |
0 |
|
- |
"Cl. 16 IS 4159:2021"(Leakage Current and Electric strength) |
- |
0 |
|
- |
"Cl. 17 IS 4159:2021"(Overload protection of transformers and associated circuits.) |
- |
0 |
|
- |
"Cl. 18 IS 4159:2021"(Endurance) |
- |
0 |
|
- |
"Cl. 19 IS 4159:2021"(Abnormal Operation) |
- |
0 |
|
- |
"Cl. 20 IS 4159:2021"(Stability and mechanical Hazards) |
- |
0 |
|
- |
"Cl. 21 IS 4159:2021"(Mechanical Strength) |
- |
0 |
|
- |
"Cl. 22 IS 4159:2021"(Construction) |
- |
0 |
|
- |
"Cl. 23 IS 4159:2021"(Internal Wiring) |
- |
0 |
|
- |
"Cl. 24 IS 4159:2021"(Components) |
- |
0 |
|
- |
"Cl. 25 IS 4159:2021"(Supply Connections and External Flexible Cables and Cords) |
- |
0 |
|
- |
"Cl. 26 IS 4159:2021"(Terminal For External Conductors) |
- |
0 |
|
- |
"Cl. 27 IS 4159:2021"(Provision For Earthing) |
- |
0 |
|
- |
"Cl. 28 IS 4159:2021"(Screws and Connections) |
- |
0 |
|
- |
"Cl. 29 IS 4159:2021"(Creepage Distances, Clearances And Distances Through Insulation) |
- |
0 |
|
- |
"Cl. 30 IS 4159:2021"(Resistance To Heat, Fire And Tracking) |
- |
0 |
|
- |
"Cl. 31 IS 4159:2021"(Resistance To Rusting) |
- |
0 |
|
- |
"Cl. 102 IS 4159:2021"(Leakage and hydrostatic strength (for oil heating elements)) |
- |
0 |
|
- |
Cl.22.106(CONSTRUCTION) |
- |
0 |
|
- |
19.11.4.7(Harmonics) |
- |
0 |
|
- |
19.11.4.6(Class 3 Voltage dips and interruptions) |
- |
0 |
|
- |
19.11.4.5(Immunity to conducted discharges) |
- |
0 |
|
- |
19.11.4.4(Surge immunity test) |
- |
0 |
|
- |
19.11.4.3(Fast transient bursts) |
- |
0 |
|
- |
19.11.4.2(Radiated fields) |
- |
0 |
|
- |
19.11.4.1(Electrostatic discharges) |
- |
0 |
|
- |
Cl.7.1 of IS 4159:2021(Marking) |
- |
0 |
|
- |
Cl.7.1 of IS 4159:2021(Marking) |
- |
0 |
|
- |
Cl.7.1 of IS 4159:2021(Marking) |
- |
0 |
|
- |
Cl.7.1 of IS 4159:2021(Marking) |
- |
0 |
|
- |
Cl.7.1 of IS 4159:2021(Marking) |
- |
0 |
|
- |
Cl.7.1 of IS 4159:2021(Marking) |
- |
0 |
|
- |
Cl.7.2 of IS 4159:2021(Marking) |
- |
0 |
|
- |
Cl.7.3 of IS 4159:2021(Marking) |
- |
0 |
|
- |
Cl.10 of IS 302-1:2008(Power Input & Current) |
- |
0 |
|
- |
Cl.11 of IS 4159:2021 & IS 302‐1:2008(Heating) |
- |
0 |
|
- |
Cl.11 of IS 4159:2021 & IS 302‐1:2008(Heating) |
- |
0 |
|
- |
Cl.11.2 of IS 4159:2021(Heating) |
- |
0 |
|
- |
Cl.11.101 of IS 4159:2021(Heating) |
- |
0 |
|
- |
Cl.18 of IS 4159:2021(Endurance Test) |
- |
0 |
|
- |
Cl.19.2 of IS 302-1: 2008(Abnormal Operation) |
- |
0 |
|
- |
Cl.19.3 of IS 302-1: 2008(Abnormal Operation) |
- |
0 |
|
- |
Cl.19.13 IS 302-1: 2008(Abnormal Operation) |
- |
0 |
|
- |
Cl.19.13 IS 302-1: 2008(Abnormal Operation) |
- |
0 |
|
- |
Cl.19.13 IS 302-1: 2008(Abnormal Operation) |
- |
0 |
|
- |
Cl.22.101 of IS 4159:2021(Construction) |
- |
0 |
|
- |
Cl.22.102 of IS 4159:2021(Construction) |
- |
0 |
|
- |
Cl.22.103 of IS 4159:2021(Construction) |
- |
0 |
|
- |
Cl.22.104 of IS 4159:2021(Construction) |
- |
0 |
|
- |
Cl.22.105 of IS 4159:2021(Construction) |
- |
0 |
|
- |
Cl.22.106 of IS 4159:2021(Construction) |
- |
0 |
|
- |
Cl.22.107 of IS 4159:2021(Construction) |
- |
0 |
|
- |
Cl.22.108 of IS 4159:2021(Construction) |
- |
0 |
|
- |
Cl.22.109 of IS 4159:2021(Construction) |
- |
0 |
|
- |
Cl.22.110 of IS 4159:2021(Construction) |
- |
0 |
|
- |
Cl.22.111 of IS 4159:2021(Construction) |
- |
0 |
|
- |
Cl.27 & IS 302-1: 2008(Provision for Earthing) |
- |
0 |
|
- |
Cl.27 & IS 302-1: 2008(Provision for Earthing) |
- |
0 |
|
- |
Cl.28.1 & IS 302-1: 2008(Screws & Connection) |
- |
0 |
|
- |
Cl.28.4 IS 302-1: 2008(Screws & Connection) |
- |
0 |
|
- |
Cl. 29.1 & IS 302-1: 2008(Creepage Distances & Clearances) |
- |
0 |
|
- |
Cl. 29.2 & IS 302-1: 2009(Creepage Distances & Clearances) |
- |
0 |
|
For BIS-1kv to 3 kv= 8800
Above 3kv =20000
For Others- 1 kv to 3 kv= 20000
Above 3 kv= 40000 |
"Cl. 6 IS 4159:2021"(Classification) |
- |
0 |
|
- |
"Cl. 8 IS 4159:2021"(Protection against access to live parts) |
- |
0 |
|
- |
"Cl. 9 IS 4159:2021"(Starting of motor operated appliances) |
- |
0 |
|
- |
"Cl. 10 IS 4159:2021"(Power Input and Current) |
- |
0 |
|
- |
"Cl. 11 IS 4159:2021"(Heating) |
- |
0 |
|
- |
"Cl. 13 IS 4159:2021"(Leakage Current & Electrical Strength at Operating Temperature) |
- |
0 |
|
- |
"Cl. 14 IS 4159:2021"(Transient Over Voltage) |
- |
0 |
|
- |
"Cl. 15 IS 4159:2021"(Moisture Resistance) |
- |
0 |
|
- |
"Cl. 16 IS 4159:2021"(Leakage Current and Electric strength) |
- |
0 |
|
- |
"Cl. 17 IS 4159:2021"(Overload protection of transformers and associated circuits.) |
- |
0 |
|
- |
"Cl. 18 IS 4159:2021"(Endurance) |
- |
0 |
|
- |
"Cl. 19 IS 4159:2021"(Abnormal Operation) |
- |
0 |
|
- |
"Cl. 20 IS 4159:2021"(Stability and mechanical Hazards) |
- |
0 |
|
- |
"Cl. 21 IS 4159:2021"(Mechanical Strength) |
- |
0 |
|
- |
"Cl. 22 IS 4159:2021"(Construction) |
- |
0 |
|
- |
"Cl. 23 IS 4159:2021"(Internal Wiring) |
- |
0 |
|
- |
"Cl. 24 IS 4159:2021"(Components) |
- |
0 |
|
- |
"Cl. 25 IS 4159:2021"(Supply Connections and External Flexible Cables and Cords) |
- |
0 |
|
- |
"Cl. 26 IS 4159:2021"(Terminal For External Conductors) |
- |
0 |
|
- |
"Cl. 27 IS 4159:2021"(Provision For Earthing) |
- |
0 |
|
- |
"Cl. 28 IS 4159:2021"(Screws and Connections) |
- |
0 |
|
- |
"Cl. 29 IS 4159:2021"(Creepage Distances, Clearances And Distances Through Insulation) |
- |
0 |
|
- |
"Cl. 30 IS 4159:2021"(Resistance To Heat, Fire And Tracking) |
- |
0 |
|
- |
"Cl. 31 IS 4159:2021"(Resistance To Rusting) |
- |
0 |
|
- |
"Cl. 102 IS 4159:2021"(Leakage and hydrostatic strength (for oil heating elements)) |
- |
0 |
|
- |
Cl.22.106(CONSTRUCTION) |
- |
0 |
|
- |
19.11.4.7(Harmonics) |
- |
0 |
|
- |
19.11.4.6(Class 3 Voltage dips and interruptions) |
- |
0 |
|
- |
19.11.4.5(Immunity to conducted discharges) |
- |
0 |
|
- |
19.11.4.4(Surge immunity test) |
- |
0 |
|
- |
19.11.4.3(Fast transient bursts) |
- |
0 |
|
- |
19.11.4.2(Radiated fields) |
- |
0 |
|
- |
19.11.4.1(Electrostatic discharges) |
- |
0 |
|
- |
Cl.7.1 of IS 4159:2021(Marking) |
- |
0 |
|
- |
Cl.7.1 of IS 4159:2021(Marking) |
- |
0 |
|
- |
Cl.7.1 of IS 4159:2021(Marking) |
- |
0 |
|
- |
Cl.7.1 of IS 4159:2021(Marking) |
- |
0 |
|
- |
Cl.7.1 of IS 4159:2021(Marking) |
- |
0 |
|
- |
Cl.7.1 of IS 4159:2021(Marking) |
- |
0 |
|
- |
Cl.7.2 of IS 4159:2021(Marking) |
- |
0 |
|
- |
Cl.7.3 of IS 4159:2021(Marking) |
- |
0 |
|
- |
Cl.10 of IS 302-1:2008(Power Input & Current) |
- |
0 |
|
- |
Cl.11 of IS 4159:2021 & IS 302‐1:2008(Heating) |
- |
0 |
|
- |
Cl.11 of IS 4159:2021 & IS 302‐1:2008(Heating) |
- |
0 |
|
- |
Cl.11.2 of IS 4159:2021(Heating) |
- |
0 |
|
- |
Cl.11.101 of IS 4159:2021(Heating) |
- |
0 |
|
- |
Cl.18 of IS 4159:2021(Endurance Test) |
- |
0 |
|
- |
Cl.19.2 of IS 302-1: 2008(Abnormal Operation) |
- |
0 |
|
- |
Cl.19.3 of IS 302-1: 2008(Abnormal Operation) |
- |
0 |
|
- |
Cl.19.13 IS 302-1: 2008(Abnormal Operation) |
- |
0 |
|
- |
Cl.19.13 IS 302-1: 2008(Abnormal Operation) |
- |
0 |
|
- |
Cl.19.13 IS 302-1: 2008(Abnormal Operation) |
- |
0 |
|
- |
Cl.22.101 of IS 4159:2021(Construction) |
- |
0 |
|
- |
Cl.22.102 of IS 4159:2021(Construction) |
- |
0 |
|
- |
Cl.22.103 of IS 4159:2021(Construction) |
- |
0 |
|
- |
Cl.22.104 of IS 4159:2021(Construction) |
- |
0 |
|
- |
Cl.22.105 of IS 4159:2021(Construction) |
- |
0 |
|
- |
Cl.22.106 of IS 4159:2021(Construction) |
- |
0 |
|
- |
Cl.22.107 of IS 4159:2021(Construction) |
- |
0 |
|
For BIS-1kv to 3 kv= 8800
Above 3kv =20000
For Others- 1 kv to 3 kv= 20000
Above 3 kv= 40000 |
Cl.22.108 of IS 4159:2021(Construction) |
- |
0 |
|
- |
Cl.22.109 of IS 4159:2021(Construction) |
- |
0 |
|
- |
Cl.22.110 of IS 4159:2021(Construction) |
- |
0 |
|
- |
Cl.22.111 of IS 4159:2021(Construction) |
- |
0 |
|
- |
Cl.27 & IS 302-1: 2008(Provision for Earthing) |
- |
0 |
|
- |
Cl.27 & IS 302-1: 2008(Provision for Earthing) |
- |
0 |
|
- |
Cl.28.1 & IS 302-1: 2008(Screws & Connection) |
- |
0 |
|
- |
Cl.28.4 IS 302-1: 2008(Screws & Connection) |
- |
0 |
|
- |
Cl. 29.1 & IS 302-1: 2008(Creepage Distances & Clearances) |
- |
0 |
|
- |
Cl. 29.2 & IS 302-1: 2009(Creepage Distances & Clearances) |
- |
0 |
|
- |
"Cl. 6 IS 4159:2021"(Classification) |
- |
0 |
|
- |
"Cl. 8 IS 4159:2021"(Protection against access to live parts) |
- |
0 |
|
- |
"Cl. 9 IS 4159:2021"(Starting of motor operated appliances) |
- |
0 |
|
- |
"Cl. 10 IS 4159:2021"(Power Input and Current) |
- |
0 |
|
- |
"Cl. 11 IS 4159:2021"(Heating) |
- |
0 |
|
- |
"Cl. 13 IS 4159:2021"(Leakage Current & Electrical Strength at Operating Temperature) |
- |
0 |
|
- |
"Cl. 14 IS 4159:2021"(Transient Over Voltage) |
- |
0 |
|
- |
"Cl. 15 IS 4159:2021"(Moisture Resistance) |
- |
0 |
|
- |
"Cl. 16 IS 4159:2021"(Leakage Current and Electric strength) |
- |
0 |
|
- |
"Cl. 17 IS 4159:2021"(Overload protection of transformers and associated circuits.) |
- |
0 |
|
- |
"Cl. 18 IS 4159:2021"(Endurance) |
- |
0 |
|
- |
"Cl. 19 IS 4159:2021"(Abnormal Operation) |
- |
0 |
|
- |
"Cl. 20 IS 4159:2021"(Stability and mechanical Hazards) |
- |
0 |
|
- |
"Cl. 21 IS 4159:2021"(Mechanical Strength) |
- |
0 |
|
- |
"Cl. 22 IS 4159:2021"(Construction) |
- |
0 |
|
- |
"Cl. 23 IS 4159:2021"(Internal Wiring) |
- |
0 |
|
- |
"Cl. 24 IS 4159:2021"(Components) |
- |
0 |
|
- |
"Cl. 25 IS 4159:2021"(Supply Connections and External Flexible Cables and Cords) |
- |
0 |
|
- |
"Cl. 26 IS 4159:2021"(Terminal For External Conductors) |
- |
0 |
|
- |
"Cl. 27 IS 4159:2021"(Provision For Earthing) |
- |
0 |
|
- |
"Cl. 28 IS 4159:2021"(Screws and Connections) |
- |
0 |
|
- |
"Cl. 29 IS 4159:2021"(Creepage Distances, Clearances And Distances Through Insulation) |
- |
0 |
|
- |
"Cl. 30 IS 4159:2021"(Resistance To Heat, Fire And Tracking) |
- |
0 |
|
- |
"Cl. 31 IS 4159:2021"(Resistance To Rusting) |
- |
0 |
|
- |
"Cl. 102 IS 4159:2021"(Leakage and hydrostatic strength (for oil heating elements)) |
- |
0 |
|
- |
Cl.22.106(CONSTRUCTION) |
- |
0 |
|
- |
19.11.4.7(Harmonics) |
- |
0 |
|
- |
19.11.4.6(Class 3 Voltage dips and interruptions) |
- |
0 |
|
- |
19.11.4.5(Immunity to conducted discharges) |
- |
0 |
|
- |
19.11.4.4(Surge immunity test) |
- |
0 |
|
- |
19.11.4.3(Fast transient bursts) |
- |
0 |
|
- |
19.11.4.2(Radiated fields) |
- |
0 |
|
- |
19.11.4.1(Electrostatic discharges) |
- |
0 |
|
- |
Cl.7.1 of IS 4159:2021(Marking) |
- |
0 |
|
- |
Cl.7.1 of IS 4159:2021(Marking) |
- |
0 |
|
- |
Cl.7.1 of IS 4159:2021(Marking) |
- |
0 |
|
- |
Cl.7.1 of IS 4159:2021(Marking) |
- |
0 |
|
- |
Cl.7.1 of IS 4159:2021(Marking) |
- |
0 |
|
- |
Cl.7.1 of IS 4159:2021(Marking) |
- |
0 |
|
- |
Cl.7.2 of IS 4159:2021(Marking) |
- |
0 |
|
- |
Cl.7.3 of IS 4159:2021(Marking) |
- |
0 |
|
- |
Cl.10 of IS 302-1:2008(Power Input & Current) |
- |
0 |
|
- |
Cl.11 of IS 4159:2021 & IS 302‐1:2008(Heating) |
- |
0 |
|
- |
Cl.11 of IS 4159:2021 & IS 302‐1:2008(Heating) |
- |
0 |
|
- |
Cl.11.2 of IS 4159:2021(Heating) |
- |
0 |
|
- |
Cl.11.101 of IS 4159:2021(Heating) |
- |
0 |
|
- |
Cl.18 of IS 4159:2021(Endurance Test) |
- |
0 |
|
- |
Cl.19.2 of IS 302-1: 2008(Abnormal Operation) |
- |
0 |
|
- |
Cl.19.3 of IS 302-1: 2008(Abnormal Operation) |
- |
0 |
|
- |
Cl.19.13 IS 302-1: 2008(Abnormal Operation) |
- |
0 |
|
- |
Cl.19.13 IS 302-1: 2008(Abnormal Operation) |
- |
0 |
|
- |
Cl.19.13 IS 302-1: 2008(Abnormal Operation) |
- |
0 |
|
- |
Cl.22.101 of IS 4159:2021(Construction) |
- |
0 |
|
- |
Cl.22.102 of IS 4159:2021(Construction) |
- |
0 |
|
- |
Cl.22.103 of IS 4159:2021(Construction) |
- |
0 |
|
- |
Cl.22.104 of IS 4159:2021(Construction) |
- |
0 |
|
- |
Cl.22.105 of IS 4159:2021(Construction) |
- |
0 |
|
- |
Cl.22.106 of IS 4159:2021(Construction) |
- |
0 |
|
- |
Cl.22.107 of IS 4159:2021(Construction) |
- |
0 |
|
- |
Cl.22.108 of IS 4159:2021(Construction) |
- |
0 |
|
- |
Cl.22.109 of IS 4159:2021(Construction) |
- |
0 |
|
- |
Cl.22.110 of IS 4159:2021(Construction) |
- |
0 |
|
- |
Cl.22.111 of IS 4159:2021(Construction) |
- |
0 |
|
- |
Cl.27 & IS 302-1: 2008(Provision for Earthing) |
- |
0 |
|
- |
Cl.27 & IS 302-1: 2008(Provision for Earthing) |
- |
0 |
|
- |
Cl.28.1 & IS 302-1: 2008(Screws & Connection) |
- |
0 |
|
- |
Cl.28.4 IS 302-1: 2008(Screws & Connection) |
- |
0 |
|
- |
Cl. 29.1 & IS 302-1: 2008(Creepage Distances & Clearances) |
- |
0 |
|
- |
Cl. 29.2 & IS 302-1: 2009(Creepage Distances & Clearances) |
- |
0 |
|
- |
"Cl. 6 IS 4159:2021"(Classification) |
- |
0 |
|
- |
"Cl. 8 IS 4159:2021"(Protection against access to live parts) |
- |
0 |
|
- |
"Cl. 9 IS 4159:2021"(Starting of motor operated appliances) |
- |
0 |
|
- |
"Cl. 10 IS 4159:2021"(Power Input and Current) |
- |
0 |
|
- |
"Cl. 11 IS 4159:2021"(Heating) |
- |
0 |
|
- |
"Cl. 13 IS 4159:2021"(Leakage Current & Electrical Strength at Operating Temperature) |
- |
0 |
|
- |
"Cl. 14 IS 4159:2021"(Transient Over Voltage) |
- |
0 |
|
- |
"Cl. 15 IS 4159:2021"(Moisture Resistance) |
- |
0 |
|
- |
"Cl. 16 IS 4159:2021"(Leakage Current and Electric strength) |
- |
0 |
|
- |
"Cl. 17 IS 4159:2021"(Overload protection of transformers and associated circuits.) |
- |
0 |
|
- |
"Cl. 18 IS 4159:2021"(Endurance) |
- |
0 |
|
- |
"Cl. 19 IS 4159:2021"(Abnormal Operation) |
- |
0 |
|
- |
"Cl. 20 IS 4159:2021"(Stability and mechanical Hazards) |
- |
0 |
|
- |
"Cl. 21 IS 4159:2021"(Mechanical Strength) |
- |
0 |
|
- |
"Cl. 22 IS 4159:2021"(Construction) |
- |
0 |
|
- |
"Cl. 23 IS 4159:2021"(Internal Wiring) |
- |
0 |
|
- |
"Cl. 24 IS 4159:2021"(Components) |
- |
0 |
|
- |
"Cl. 25 IS 4159:2021"(Supply Connections and External Flexible Cables and Cords) |
- |
0 |
|
- |
"Cl. 26 IS 4159:2021"(Terminal For External Conductors) |
- |
0 |
|
- |
"Cl. 27 IS 4159:2021"(Provision For Earthing) |
- |
0 |
|
- |
"Cl. 28 IS 4159:2021"(Screws and Connections) |
- |
0 |
|
- |
"Cl. 29 IS 4159:2021"(Creepage Distances, Clearances And Distances Through Insulation) |
- |
0 |
|
- |
"Cl. 30 IS 4159:2021"(Resistance To Heat, Fire And Tracking) |
- |
0 |
|
- |
"Cl. 31 IS 4159:2021"(Resistance To Rusting) |
- |
0 |
|
- |
"Cl. 102 IS 4159:2021"(Leakage and hydrostatic strength (for oil heating elements)) |
- |
0 |
|
- |
Cl.22.106(CONSTRUCTION) |
- |
0 |
|
- |
19.11.4.7(Harmonics) |
- |
0 |
|
- |
19.11.4.6(Class 3 Voltage dips and interruptions) |
- |
0 |
|
- |
19.11.4.5(Immunity to conducted discharges) |
- |
0 |
|
- |
19.11.4.4(Surge immunity test) |
- |
0 |
|
- |
19.11.4.3(Fast transient bursts) |
- |
0 |
|
- |
19.11.4.2(Radiated fields) |
- |
0 |
|
- |
19.11.4.1(Electrostatic discharges) |
- |
0 |
|
- |
Cl.7.1 of IS 4159:2021(Marking) |
- |
0 |
|
- |
Cl.7.1 of IS 4159:2021(Marking) |
- |
0 |
|
- |
Cl.7.1 of IS 4159:2021(Marking) |
- |
0 |
|
- |
Cl.7.1 of IS 4159:2021(Marking) |
- |
0 |
|
- |
Cl.7.1 of IS 4159:2021(Marking) |
- |
0 |
|
- |
Cl.7.1 of IS 4159:2021(Marking) |
- |
0 |
|
- |
Cl.7.2 of IS 4159:2021(Marking) |
- |
0 |
|
- |
Cl.7.3 of IS 4159:2021(Marking) |
- |
0 |
|
- |
Cl.10 of IS 302-1:2008(Power Input & Current) |
- |
0 |
|
- |
Cl.11 of IS 4159:2021 & IS 302‐1:2008(Heating) |
- |
0 |
|
- |
Cl.11 of IS 4159:2021 & IS 302‐1:2008(Heating) |
- |
0 |
|
- |
Cl.11.2 of IS 4159:2021(Heating) |
- |
0 |
|
- |
Cl.11.101 of IS 4159:2021(Heating) |
- |
0 |
|
- |
Cl.18 of IS 4159:2021(Endurance Test) |
- |
0 |
|
- |
Cl.19.2 of IS 302-1: 2008(Abnormal Operation) |
- |
0 |
|
- |
Cl.19.3 of IS 302-1: 2008(Abnormal Operation) |
- |
0 |
|
- |
Cl.19.13 IS 302-1: 2008(Abnormal Operation) |
- |
0 |
|
- |
Cl.19.13 IS 302-1: 2008(Abnormal Operation) |
- |
0 |
|
- |
Cl.19.13 IS 302-1: 2008(Abnormal Operation) |
- |
0 |
|
- |
Cl.22.101 of IS 4159:2021(Construction) |
- |
0 |
|
- |
Cl.22.102 of IS 4159:2021(Construction) |
- |
0 |
|
- |
Cl.22.103 of IS 4159:2021(Construction) |
- |
0 |
|
- |
Cl.22.104 of IS 4159:2021(Construction) |
- |
0 |
|
- |
Cl.22.105 of IS 4159:2021(Construction) |
- |
0 |
|
- |
Cl.22.106 of IS 4159:2021(Construction) |
- |
0 |
|
- |
Cl.22.107 of IS 4159:2021(Construction) |
- |
0 |
|
- |
"Cl. 6 IS 4159:2021"(Classification) |
- |
0 |
|
- |
"Cl. 8 IS 4159:2021"(Protection against access to live parts) |
- |
0 |
|
- |
"Cl. 9 IS 4159:2021"(Starting of motor operated appliances) |
- |
0 |
|
- |
"Cl. 10 IS 4159:2021"(Power Input and Current) |
- |
0 |
|
- |
"Cl. 11 IS 4159:2021"(Heating) |
- |
0 |
|
- |
"Cl. 13 IS 4159:2021"(Leakage Current & Electrical Strength at Operating Temperature) |
- |
0 |
|
- |
"Cl. 14 IS 4159:2021"(Transient Over Voltage) |
- |
0 |
|
- |
"Cl. 15 IS 4159:2021"(Moisture Resistance) |
- |
0 |
|
- |
"Cl. 16 IS 4159:2021"(Leakage Current and Electric strength) |
- |
0 |
|
- |
"Cl. 17 IS 4159:2021"(Overload protection of transformers and associated circuits.) |
- |
0 |
|
- |
"Cl. 18 IS 4159:2021"(Endurance) |
- |
0 |
|
- |
"Cl. 19 IS 4159:2021"(Abnormal Operation) |
- |
0 |
|
- |
"Cl. 20 IS 4159:2021"(Stability and mechanical Hazards) |
- |
0 |
|
- |
"Cl. 21 IS 4159:2021"(Mechanical Strength) |
- |
0 |
|
- |
"Cl. 22 IS 4159:2021"(Construction) |
- |
0 |
|
- |
"Cl. 23 IS 4159:2021"(Internal Wiring) |
- |
0 |
|
- |
"Cl. 24 IS 4159:2021"(Components) |
- |
0 |
|
- |
"Cl. 25 IS 4159:2021"(Supply Connections and External Flexible Cables and Cords) |
- |
0 |
|
- |
"Cl. 26 IS 4159:2021"(Terminal For External Conductors) |
- |
0 |
|
- |
"Cl. 27 IS 4159:2021"(Provision For Earthing) |
- |
0 |
|
- |
"Cl. 28 IS 4159:2021"(Screws and Connections) |
- |
0 |
|
- |
"Cl. 29 IS 4159:2021"(Creepage Distances, Clearances And Distances Through Insulation) |
- |
0 |
|
- |
"Cl. 30 IS 4159:2021"(Resistance To Heat, Fire And Tracking) |
- |
0 |
|
- |
"Cl. 31 IS 4159:2021"(Resistance To Rusting) |
- |
0 |
|
- |
"Cl. 102 IS 4159:2021"(Leakage and hydrostatic strength (for oil heating elements)) |
- |
0 |
|
- |
Cl.22.106(CONSTRUCTION) |
- |
0 |
|
- |
19.11.4.7(Harmonics) |
- |
0 |
|
- |
19.11.4.6(Class 3 Voltage dips and interruptions) |
- |
0 |
|
- |
19.11.4.5(Immunity to conducted discharges) |
- |
0 |
|
- |
19.11.4.4(Surge immunity test) |
- |
0 |
|
- |
19.11.4.3(Fast transient bursts) |
- |
0 |
|
- |
19.11.4.2(Radiated fields) |
- |
0 |
|
- |
19.11.4.1(Electrostatic discharges) |
- |
0 |
|
- |
Cl.7.1 of IS 4159:2021(Marking) |
- |
0 |
|
- |
Cl.7.1 of IS 4159:2021(Marking) |
- |
0 |
|
- |
Cl.7.1 of IS 4159:2021(Marking) |
- |
0 |
|
- |
Cl.7.1 of IS 4159:2021(Marking) |
- |
0 |
|
- |
Cl.7.1 of IS 4159:2021(Marking) |
- |
0 |
|
- |
Cl.7.1 of IS 4159:2021(Marking) |
- |
0 |
|
- |
Cl.7.2 of IS 4159:2021(Marking) |
- |
0 |
|
- |
Cl.7.3 of IS 4159:2021(Marking) |
- |
0 |
|
- |
Cl.10 of IS 302-1:2008(Power Input & Current) |
- |
0 |
|
- |
Cl.11 of IS 4159:2021 & IS 302‐1:2008(Heating) |
- |
0 |
|
- |
Cl.11 of IS 4159:2021 & IS 302‐1:2008(Heating) |
- |
0 |
|
- |
Cl.11.2 of IS 4159:2021(Heating) |
- |
0 |
|
- |
Cl.11.101 of IS 4159:2021(Heating) |
- |
0 |
|
- |
Cl.18 of IS 4159:2021(Endurance Test) |
- |
0 |
|
- |
Cl.19.2 of IS 302-1: 2008(Abnormal Operation) |
- |
0 |
|
- |
Cl.19.3 of IS 302-1: 2008(Abnormal Operation) |
- |
0 |
|
- |
Cl.19.13 IS 302-1: 2008(Abnormal Operation) |
- |
0 |
|
- |
Cl.19.13 IS 302-1: 2008(Abnormal Operation) |
- |
0 |
|
- |
Cl.19.13 IS 302-1: 2008(Abnormal Operation) |
- |
0 |
|
- |
Cl.22.101 of IS 4159:2021(Construction) |
- |
0 |
|
- |
Cl.22.102 of IS 4159:2021(Construction) |
- |
0 |
|
- |
Cl.22.103 of IS 4159:2021(Construction) |
- |
0 |
|
- |
Cl.22.104 of IS 4159:2021(Construction) |
- |
0 |
|
- |
Cl.22.105 of IS 4159:2021(Construction) |
- |
0 |
|
- |
Cl.22.106 of IS 4159:2021(Construction) |
- |
0 |
|
- |
Cl.22.107 of IS 4159:2021(Construction) |
- |
0 |
|
- |
Cl.22.108 of IS 4159:2021(Construction) |
- |
0 |
|
- |
Cl.22.109 of IS 4159:2021(Construction) |
- |
0 |
|
- |
Cl.22.110 of IS 4159:2021(Construction) |
- |
0 |
|
- |
Cl.22.111 of IS 4159:2021(Construction) |
- |
0 |
|
- |
Cl.27 & IS 302-1: 2008(Provision for Earthing) |
- |
0 |
|
- |
Cl.27 & IS 302-1: 2008(Provision for Earthing) |
- |
0 |
|
- |
Cl.28.1 & IS 302-1: 2008(Screws & Connection) |
- |
0 |
|
- |
Cl.28.4 IS 302-1: 2008(Screws & Connection) |
- |
0 |
|
- |
Cl. 29.1 & IS 302-1: 2008(Creepage Distances & Clearances) |
- |
0 |
|
- |
Cl. 29.2 & IS 302-1: 2009(Creepage Distances & Clearances) |
- |
0 |
|
- |
"Cl. 6 IS 4159:2021"(Classification) |
- |
0 |
|
- |
"Cl. 8 IS 4159:2021"(Protection against access to live parts) |
- |
0 |
|
- |
"Cl. 9 IS 4159:2021"(Starting of motor operated appliances) |
- |
0 |
|
- |
"Cl. 10 IS 4159:2021"(Power Input and Current) |
- |
0 |
|
- |
"Cl. 11 IS 4159:2021"(Heating) |
- |
0 |
|
- |
"Cl. 13 IS 4159:2021"(Leakage Current & Electrical Strength at Operating Temperature) |
- |
0 |
|
- |
"Cl. 14 IS 4159:2021"(Transient Over Voltage) |
- |
0 |
|
- |
"Cl. 15 IS 4159:2021"(Moisture Resistance) |
- |
0 |
|
- |
"Cl. 16 IS 4159:2021"(Leakage Current and Electric strength) |
- |
0 |
|
- |
"Cl. 17 IS 4159:2021"(Overload protection of transformers and associated circuits.) |
- |
0 |
|
- |
"Cl. 18 IS 4159:2021"(Endurance) |
- |
0 |
|
- |
"Cl. 19 IS 4159:2021"(Abnormal Operation) |
- |
0 |
|
- |
"Cl. 20 IS 4159:2021"(Stability and mechanical Hazards) |
- |
0 |
|
- |
"Cl. 21 IS 4159:2021"(Mechanical Strength) |
- |
0 |
|
- |
"Cl. 22 IS 4159:2021"(Construction) |
- |
0 |
|
- |
"Cl. 23 IS 4159:2021"(Internal Wiring) |
- |
0 |
|
- |
"Cl. 24 IS 4159:2021"(Components) |
- |
0 |
|
- |
"Cl. 25 IS 4159:2021"(Supply Connections and External Flexible Cables and Cords) |
- |
0 |
|
- |
"Cl. 26 IS 4159:2021"(Terminal For External Conductors) |
- |
0 |
|
- |
"Cl. 27 IS 4159:2021"(Provision For Earthing) |
- |
0 |
|
- |
"Cl. 28 IS 4159:2021"(Screws and Connections) |
- |
0 |
|
- |
"Cl. 29 IS 4159:2021"(Creepage Distances, Clearances And Distances Through Insulation) |
- |
0 |
|
- |
"Cl. 30 IS 4159:2021"(Resistance To Heat, Fire And Tracking) |
- |
0 |
|
- |
"Cl. 31 IS 4159:2021"(Resistance To Rusting) |
- |
0 |
|
- |
"Cl. 102 IS 4159:2021"(Leakage and hydrostatic strength (for oil heating elements)) |
- |
0 |
|
- |
Cl.22.106(CONSTRUCTION) |
- |
0 |
|
- |
19.11.4.7(Harmonics) |
- |
0 |
|
- |
19.11.4.6(Class 3 Voltage dips and interruptions) |
- |
0 |
|
- |
19.11.4.5(Immunity to conducted discharges) |
- |
0 |
|
- |
19.11.4.4(Surge immunity test) |
- |
0 |
|
- |
19.11.4.3(Fast transient bursts) |
- |
0 |
|
- |
19.11.4.2(Radiated fields) |
- |
0 |
|
- |
19.11.4.1(Electrostatic discharges) |
- |
0 |
|
- |
Cl.7.1 of IS 4159:2021(Marking) |
- |
0 |
|
- |
Cl.7.1 of IS 4159:2021(Marking) |
- |
0 |
|
- |
Cl.7.1 of IS 4159:2021(Marking) |
- |
0 |
|
- |
Cl.7.1 of IS 4159:2021(Marking) |
- |
0 |
|
- |
Cl.7.1 of IS 4159:2021(Marking) |
- |
0 |
|
- |
Cl.7.1 of IS 4159:2021(Marking) |
- |
0 |
|
- |
Cl.7.2 of IS 4159:2021(Marking) |
- |
0 |
|
- |
Cl.7.3 of IS 4159:2021(Marking) |
- |
0 |
|
- |
Cl.10 of IS 302-1:2008(Power Input & Current) |
- |
0 |
|
- |
Cl.11 of IS 4159:2021 & IS 302‐1:2008(Heating) |
- |
0 |
|
- |
Cl.11 of IS 4159:2021 & IS 302‐1:2008(Heating) |
- |
0 |
|
- |
Cl.11.2 of IS 4159:2021(Heating) |
- |
0 |
|
- |
Cl.11.101 of IS 4159:2021(Heating) |
- |
0 |
|
- |
Cl.18 of IS 4159:2021(Endurance Test) |
- |
0 |
|
- |
Cl.19.2 of IS 302-1: 2008(Abnormal Operation) |
- |
0 |
|
- |
Cl.19.3 of IS 302-1: 2008(Abnormal Operation) |
- |
0 |
|
- |
Cl.19.13 IS 302-1: 2008(Abnormal Operation) |
- |
0 |
|
- |
Cl.19.13 IS 302-1: 2008(Abnormal Operation) |
- |
0 |
|
- |
Cl.19.13 IS 302-1: 2008(Abnormal Operation) |
- |
0 |
|
- |
Cl.22.101 of IS 4159:2021(Construction) |
- |
0 |
|
- |
Cl.22.102 of IS 4159:2021(Construction) |
- |
0 |
|
- |
Cl.22.103 of IS 4159:2021(Construction) |
- |
0 |
|
- |
Cl.22.104 of IS 4159:2021(Construction) |
- |
0 |
|
- |
Cl.22.105 of IS 4159:2021(Construction) |
- |
0 |
|
- |
Cl.22.106 of IS 4159:2021(Construction) |
- |
0 |
|
- |
Cl.22.107 of IS 4159:2021(Construction) |
- |
0 |
|
- |
Cl.22.108 of IS 4159:2021(Construction) |
- |
0 |
|
- |
Cl.22.109 of IS 4159:2021(Construction) |
- |
0 |
|
- |
Cl.22.110 of IS 4159:2021(Construction) |
- |
0 |
|
- |
Cl.22.111 of IS 4159:2021(Construction) |
- |
0 |
|
- |
Cl.27 & IS 302-1: 2008(Provision for Earthing) |
- |
0 |
|
- |
Cl.27 & IS 302-1: 2008(Provision for Earthing) |
- |
0 |
|
- |
Cl.28.1 & IS 302-1: 2008(Screws & Connection) |
- |
0 |
|
- |
Cl.28.4 IS 302-1: 2008(Screws & Connection) |
- |
0 |
|
- |
Cl. 29.1 & IS 302-1: 2008(Creepage Distances & Clearances) |
- |
0 |
|
- |
Cl. 29.2 & IS 302-1: 2009(Creepage Distances & Clearances) |
- |
0 |
|
- |
"Cl. 6 IS 4159:2021"(Classification) |
- |
0 |
|
- |
"Cl. 8 IS 4159:2021"(Protection against access to live parts) |
- |
0 |
|
- |
"Cl. 9 IS 4159:2021"(Starting of motor operated appliances) |
- |
0 |
|
- |
"Cl. 10 IS 4159:2021"(Power Input and Current) |
- |
0 |
|
- |
"Cl. 11 IS 4159:2021"(Heating) |
- |
0 |
|
- |
"Cl. 13 IS 4159:2021"(Leakage Current & Electrical Strength at Operating Temperature) |
- |
0 |
|
- |
"Cl. 14 IS 4159:2021"(Transient Over Voltage) |
- |
0 |
|
- |
"Cl. 15 IS 4159:2021"(Moisture Resistance) |
- |
0 |
|
- |
"Cl. 16 IS 4159:2021"(Leakage Current and Electric strength) |
- |
0 |
|
- |
"Cl. 17 IS 4159:2021"(Overload protection of transformers and associated circuits.) |
- |
0 |
|
- |
"Cl. 18 IS 4159:2021"(Endurance) |
- |
0 |
|
- |
"Cl. 19 IS 4159:2021"(Abnormal Operation) |
- |
0 |
|
- |
"Cl. 20 IS 4159:2021"(Stability and mechanical Hazards) |
- |
0 |
|
- |
"Cl. 21 IS 4159:2021"(Mechanical Strength) |
- |
0 |
|
- |
"Cl. 22 IS 4159:2021"(Construction) |
- |
0 |
|
- |
"Cl. 23 IS 4159:2021"(Internal Wiring) |
- |
0 |
|
- |
"Cl. 24 IS 4159:2021"(Components) |
- |
0 |
|
- |
"Cl. 25 IS 4159:2021"(Supply Connections and External Flexible Cables and Cords) |
- |
0 |
|
- |
"Cl. 26 IS 4159:2021"(Terminal For External Conductors) |
- |
0 |
|
- |
"Cl. 27 IS 4159:2021"(Provision For Earthing) |
- |
0 |
|
- |
"Cl. 28 IS 4159:2021"(Screws and Connections) |
- |
0 |
|
- |
"Cl. 29 IS 4159:2021"(Creepage Distances, Clearances And Distances Through Insulation) |
- |
0 |
|
- |
"Cl. 30 IS 4159:2021"(Resistance To Heat, Fire And Tracking) |
- |
0 |
|
- |
"Cl. 31 IS 4159:2021"(Resistance To Rusting) |
- |
0 |
|
- |
"Cl. 102 IS 4159:2021"(Leakage and hydrostatic strength (for oil heating elements)) |
- |
0 |
|
- |
Cl.22.106(CONSTRUCTION) |
- |
0 |
|
- |
19.11.4.7(Harmonics) |
- |
0 |
|
- |
19.11.4.6(Class 3 Voltage dips and interruptions) |
- |
0 |
|
- |
19.11.4.5(Immunity to conducted discharges) |
- |
0 |
|
- |
19.11.4.4(Surge immunity test) |
- |
0 |
|
- |
19.11.4.3(Fast transient bursts) |
- |
0 |
|
- |
19.11.4.2(Radiated fields) |
- |
0 |
|
- |
19.11.4.1(Electrostatic discharges) |
- |
0 |
|
- |
Cl.7.1 of IS 4159:2021(Marking) |
- |
0 |
|
- |
Cl.7.1 of IS 4159:2021(Marking) |
- |
0 |
|
- |
Cl.7.1 of IS 4159:2021(Marking) |
- |
0 |
|
- |
Cl.7.1 of IS 4159:2021(Marking) |
- |
0 |
|
- |
Cl.7.1 of IS 4159:2021(Marking) |
- |
0 |
|
- |
Cl.7.1 of IS 4159:2021(Marking) |
- |
0 |
|
- |
Cl.7.2 of IS 4159:2021(Marking) |
- |
0 |
|
- |
Cl.7.3 of IS 4159:2021(Marking) |
- |
0 |
|
- |
Cl.10 of IS 302-1:2008(Power Input & Current) |
- |
0 |
|
- |
Cl.11 of IS 4159:2021 & IS 302‐1:2008(Heating) |
- |
0 |
|
- |
Cl.11 of IS 4159:2021 & IS 302‐1:2008(Heating) |
- |
0 |
|
- |
Cl.11.2 of IS 4159:2021(Heating) |
- |
0 |
|
- |
Cl.11.101 of IS 4159:2021(Heating) |
- |
0 |
|
- |
Cl.18 of IS 4159:2021(Endurance Test) |
- |
0 |
|
- |
Cl.19.2 of IS 302-1: 2008(Abnormal Operation) |
- |
0 |
|
- |
Cl.19.3 of IS 302-1: 2008(Abnormal Operation) |
- |
0 |
|
- |
Cl.19.13 IS 302-1: 2008(Abnormal Operation) |
- |
0 |
|
- |
Cl.19.13 IS 302-1: 2008(Abnormal Operation) |
- |
0 |
|
- |
Cl.19.13 IS 302-1: 2008(Abnormal Operation) |
- |
0 |
|
- |
Cl.22.101 of IS 4159:2021(Construction) |
- |
0 |
|
- |
Cl.22.102 of IS 4159:2021(Construction) |
- |
0 |
|
- |
Cl.22.103 of IS 4159:2021(Construction) |
- |
0 |
|
- |
Cl.22.104 of IS 4159:2021(Construction) |
- |
0 |
|
- |
Cl.22.105 of IS 4159:2021(Construction) |
- |
0 |
|
- |
Cl.22.106 of IS 4159:2021(Construction) |
- |
0 |
|
- |
Cl.22.107 of IS 4159:2021(Construction) |
- |
0 |
|
- |
Cl.22.108 of IS 4159:2021(Construction) |
- |
0 |
|
- |
Cl.22.109 of IS 4159:2021(Construction) |
- |
0 |
|
- |
Cl.22.110 of IS 4159:2021(Construction) |
- |
0 |
|
- |
Cl.22.111 of IS 4159:2021(Construction) |
- |
0 |
|
- |
Cl.27 & IS 302-1: 2008(Provision for Earthing) |
- |
0 |
|
- |
Cl.27 & IS 302-1: 2008(Provision for Earthing) |
- |
0 |
|
- |
Cl.28.1 & IS 302-1: 2008(Screws & Connection) |
- |
0 |
|
- |
Cl.28.4 IS 302-1: 2008(Screws & Connection) |
- |
0 |
|
- |
Cl. 29.1 & IS 302-1: 2008(Creepage Distances & Clearances) |
- |
0 |
|
- |
Cl. 29.2 & IS 302-1: 2009(Creepage Distances & Clearances) |
- |
0 |
|
- |
"Cl. 6 IS 4159:2021"(Classification) |
- |
0 |
|
- |
"Cl. 8 IS 4159:2021"(Protection against access to live parts) |
- |
0 |
|
- |
"Cl. 9 IS 4159:2021"(Starting of motor operated appliances) |
- |
0 |
|
- |
"Cl. 10 IS 4159:2021"(Power Input and Current) |
- |
0 |
|
- |
"Cl. 11 IS 4159:2021"(Heating) |
- |
0 |
|
- |
"Cl. 13 IS 4159:2021"(Leakage Current & Electrical Strength at Operating Temperature) |
- |
0 |
|
- |
"Cl. 14 IS 4159:2021"(Transient Over Voltage) |
- |
0 |
|
- |
"Cl. 15 IS 4159:2021"(Moisture Resistance) |
- |
0 |
|
- |
"Cl. 16 IS 4159:2021"(Leakage Current and Electric strength) |
- |
0 |
|
- |
"Cl. 17 IS 4159:2021"(Overload protection of transformers and associated circuits.) |
- |
0 |
|
- |
"Cl. 18 IS 4159:2021"(Endurance) |
- |
0 |
|
- |
"Cl. 19 IS 4159:2021"(Abnormal Operation) |
- |
0 |
|
- |
"Cl. 20 IS 4159:2021"(Stability and mechanical Hazards) |
- |
0 |
|
- |
"Cl. 21 IS 4159:2021"(Mechanical Strength) |
- |
0 |
|
- |
"Cl. 22 IS 4159:2021"(Construction) |
- |
0 |
|
- |
"Cl. 23 IS 4159:2021"(Internal Wiring) |
- |
0 |
|
- |
"Cl. 24 IS 4159:2021"(Components) |
- |
0 |
|
- |
"Cl. 25 IS 4159:2021"(Supply Connections and External Flexible Cables and Cords) |
- |
0 |
|
- |
"Cl. 26 IS 4159:2021"(Terminal For External Conductors) |
- |
0 |
|
- |
"Cl. 27 IS 4159:2021"(Provision For Earthing) |
- |
0 |
|
- |
"Cl. 28 IS 4159:2021"(Screws and Connections) |
- |
0 |
|
- |
"Cl. 29 IS 4159:2021"(Creepage Distances, Clearances And Distances Through Insulation) |
- |
0 |
|
- |
"Cl. 30 IS 4159:2021"(Resistance To Heat, Fire And Tracking) |
- |
0 |
|
- |
"Cl. 31 IS 4159:2021"(Resistance To Rusting) |
- |
0 |
|
- |
"Cl. 102 IS 4159:2021"(Leakage and hydrostatic strength (for oil heating elements)) |
- |
0 |
|
- |
Cl.22.106(CONSTRUCTION) |
- |
0 |
|
- |
19.11.4.7(Harmonics) |
- |
0 |
|
- |
19.11.4.6(Class 3 Voltage dips and interruptions) |
- |
0 |
|
- |
19.11.4.5(Immunity to conducted discharges) |
- |
0 |
|
- |
19.11.4.4(Surge immunity test) |
- |
0 |
|
- |
19.11.4.3(Fast transient bursts) |
- |
0 |
|
- |
19.11.4.2(Radiated fields) |
- |
0 |
|
- |
19.11.4.1(Electrostatic discharges) |
- |
0 |
|
- |
Cl.7.1 of IS 4159:2021(Marking) |
- |
0 |
|
- |
Cl.7.1 of IS 4159:2021(Marking) |
- |
0 |
|
- |
Cl.7.1 of IS 4159:2021(Marking) |
- |
0 |
|
- |
Cl.7.1 of IS 4159:2021(Marking) |
- |
0 |
|
- |
Cl.7.1 of IS 4159:2021(Marking) |
- |
0 |
|
- |
Cl.7.1 of IS 4159:2021(Marking) |
- |
0 |
|
- |
Cl.7.2 of IS 4159:2021(Marking) |
- |
0 |
|
- |
Cl.7.3 of IS 4159:2021(Marking) |
- |
0 |
|
- |
Cl.10 of IS 302-1:2008(Power Input & Current) |
- |
0 |
|
- |
Cl.11 of IS 4159:2021 & IS 302‐1:2008(Heating) |
- |
0 |
|
- |
Cl.11 of IS 4159:2021 & IS 302‐1:2008(Heating) |
- |
0 |
|
- |
Cl.11.2 of IS 4159:2021(Heating) |
- |
0 |
|
- |
Cl.11.101 of IS 4159:2021(Heating) |
- |
0 |
|
- |
Cl.18 of IS 4159:2021(Endurance Test) |
- |
0 |
|
- |
Cl.19.2 of IS 302-1: 2008(Abnormal Operation) |
- |
0 |
|
- |
Cl.19.3 of IS 302-1: 2008(Abnormal Operation) |
- |
0 |
|
- |
Cl.19.13 IS 302-1: 2008(Abnormal Operation) |
- |
0 |
|
- |
Cl.19.13 IS 302-1: 2008(Abnormal Operation) |
- |
0 |
|
- |
Cl.19.13 IS 302-1: 2008(Abnormal Operation) |
- |
0 |
|
- |
Cl.22.101 of IS 4159:2021(Construction) |
- |
0 |
|
- |
Cl.22.102 of IS 4159:2021(Construction) |
- |
0 |
|
- |
Cl.22.103 of IS 4159:2021(Construction) |
- |
0 |
|
- |
Cl.22.104 of IS 4159:2021(Construction) |
- |
0 |
|
- |
Cl.22.105 of IS 4159:2021(Construction) |
- |
0 |
|
- |
Cl.22.106 of IS 4159:2021(Construction) |
- |
0 |
|
- |
Cl.22.107 of IS 4159:2021(Construction) |
- |
0 |
|
- |
Cl.22.108 of IS 4159:2021(Construction) |
- |
0 |
|
- |
Cl.22.109 of IS 4159:2021(Construction) |
- |
0 |
|
- |
Cl.22.110 of IS 4159:2021(Construction) |
- |
0 |
|
- |
Cl.22.111 of IS 4159:2021(Construction) |
- |
0 |
|
- |
Cl.27 & IS 302-1: 2008(Provision for Earthing) |
- |
0 |
|
- |
Cl.27 & IS 302-1: 2008(Provision for Earthing) |
- |
0 |
|
- |
Cl.28.1 & IS 302-1: 2008(Screws & Connection) |
- |
0 |
|
- |
Cl.28.4 IS 302-1: 2008(Screws & Connection) |
- |
0 |
|
- |
Cl. 29.1 & IS 302-1: 2008(Creepage Distances & Clearances) |
- |
0 |
|
- |
Cl. 29.2 & IS 302-1: 2009(Creepage Distances & Clearances) |
- |
0 |
|
- |