1 |
IS 14697 (2021) |
ac STATIC TRANSFORMER OPERATED WATTHOUR METERS CLASS 02 S AND 05 S AND VAR-HOUR METERS CLASS 02 S 05 S AND 10 S - SPECIFICATION First Revision |
- |
-
|
490000 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
"12.8.6(Radio Interference Measurement) |
- |
19890 |
|
- |
"12.8.5(Surge Immunity Test) |
- |
19450 |
|
- |
6.1(General) |
- |
0 |
|
Complete Test Charges for Cl. No. 6.1 to 6.7 is 15000 |
"12.8.4(Fast Transient Burst Test) |
- |
10190 |
|
- |
"12.8.3(Test for Immunity to Electromagnetic HF Fields) |
- |
13890 |
|
0 |
6.2(Meter Case) |
- |
0 |
|
- |
"12.8.2("Test for Immunity to Electrostatic Discharge (ESD)
") |
- |
8340 |
|
- |
6.3(Window) |
- |
0 |
|
- |
12.4(Test of resistance to heat and fire) |
- |
8340 |
|
- |
6.4(Terminals, Terminals Block(s) and Protective Earth Terminal) |
- |
0 |
|
- |
12.5(Protection against penetration of dust and water) |
- |
17140 |
|
- |
12.3.3(Spring hammer test) |
- |
2550 |
|
- |
6.5(Terminal Cover(s)) |
- |
0 |
|
- |
12.3.1(Shock test) |
- |
5040 |
|
- |
12.3.2(Vibration test) |
- |
7000 |
|
- |
6.6(Clearance and Creepage Distance) |
- |
0 |
|
- |
12.6.3(Damp Heat Cycle Test) |
- |
21010 |
|
- |
12.6.2(Cold Test) |
- |
11240 |
|
- |
6.7(Insulating Encased Meter) |
- |
0 |
|
- |
12.6.1(Dry heat test) |
- |
11240 |
|
- |
6.10(Display of Measured Values) |
- |
0 |
|
- |
9.6 & 12.17(Immunity to Earth/Phase Fault) |
- |
9950 |
|
- |
6.11(Output Device) |
- |
0 |
|
- |
9.4 & 12.7.5(Influence of Heating) |
- |
2080 |
|
- |
9.3 & 12.7.4(Influence of Self-heating) |
- |
5320 |
|
- |
9.2.3 & 12.7.3(Short Time Over Current) |
- |
8450 |
|
- |
7.1(Name Plate) |
- |
0 |
|
- |
9.2.2 & 12.7.2(Influence of Supply Voltage) |
- |
4810 |
|
- |
9.1 & 12.7.1(Power Consumption) |
- |
6950 |
|
- |
7.2(Connections, Diagrams and Terminal Marking) |
- |
0 |
|
- |
11.2(Electrical fast transient burst) |
- |
10190 |
|
- |
11.2(‘Abnormal’ ac magnetic induction of external origin 10 mT) |
- |
9030 |
|
- |
9.5 & 12.7.6.2(Impulse voltage test) |
- |
20370 |
|
- |
11.2(Continuous ‘abnormal’ magnetic induction of external origin) |
- |
6020 |
|
- |
11.2(Electromagnetic HF fields) |
- |
13890 |
|
- |
9.5 & 12.7.6.3(a.c. voltage test) |
- |
1280 |
|
- |
11.2(Magnetic induction of external origin 0.5 mT) |
- |
9030 |
|
- |
12.7.6.4(Insulation resistance test) |
- |
1160 |
|
- |
11.2("Phase of Auxiliary supply
voltage by 120 degree") |
- |
2670 |
|
- |
11.1(Limits of Error Due to Variation of the Current) |
- |
16440 |
|
- |
11.2(Auxiliary voltage ± 15 percent) |
- |
2670 |
|
- |
11.2(Continuous magnetic induction of external origin) |
- |
6020 |
|
- |
12.15(Interpretation of Test Results) |
- |
1390 |
|
- |
11.2(Voltage unbalance) |
- |
3010 |
|
- |
11.2(Reversed phase sequence) |
- |
2670 |
|
- |
11.3 & 12.11(Limits of Error Due to Ambient Temperature Variation) |
- |
10420 |
|
- |
11.2(Wave form: 10 percent of third harmonic in the current) |
- |
8280 |
|
- |
11.2(Frequency variation) |
- |
18060 |
|
- |
11.2(Voltage variation) |
- |
15970 |
|
- |
11.4.1(Initial Start-up of the Meter) |
- |
2670 |
|
- |
11.7 & 12.16(Repeatability of Error Test) |
- |
5550 |
|
- |
11.6 & 12.14(Meter Constant) |
- |
2670 |
|
- |
12.13 & 11.5(Starting Current) |
- |
2670 |
|
- |
11.4.2 & 12.12(Running with No-Load) |
- |
1330 |
|
- |
6(General and Constructional requirements) |
- |
17370 |
|
- |
6.1(General) |
- |
0 |
|
Included |
6.2(Meter case) |
- |
0 |
|
Included |
6.3(Window) |
- |
0 |
|
Included |
6.4(Terminals, terminals block(s) and protective earth terminal) |
- |
0 |
|
Included |
6.5(Terminal Cover(s)) |
- |
0 |
|
Included |
6.6(Clearance and creepage distances) |
- |
0 |
|
Included |
6.7() |
- |
0 |
|
Included |
6.10(Display of measured values) |
- |
0 |
|
Included |
6.11(Output device) |
- |
0 |
|
Included |
7.1 a)(MARKING OF METERS : Name Plate) |
- |
0 |
|
Included |
7.1 b)(MARKING OF METERS : Name Plate) |
- |
0 |
|
Included |
7.1 c)(MARKING OF METERS : Name Plate) |
- |
0 |
|
Included |
7.1 d)(MARKING OF METERS : Name Plate) |
- |
0 |
|
Included |
7.1 e)(MARKING OF METERS : Name Plate) |
- |
0 |
|
Included |
7.1 f)(MARKING OF METERS : Name Plate) |
- |
0 |
|
Included |
7.1 g)(MARKING OF METERS : Name Plate) |
- |
0 |
|
Included |
7.1 h)(MARKING OF METERS : Name Plate) |
- |
0 |
|
Included |
7.1 j)(MARKING OF METERS : Name Plate) |
- |
0 |
|
Included |
7.1 k)(MARKING OF METERS : Name Plate) |
- |
0 |
|
Included |
7.1 m)(MARKING OF METERS : Name Plate) |
- |
0 |
|
Included |
7.1 n)(MARKING OF METERS : Name Plate) |
- |
0 |
|
Included |
7.1 p)(MARKING OF METERS : Name Plate) |
- |
0 |
|
Included |
7.1(MARKING OF METERS : Name Plate) |
- |
0 |
|
Included |
7.1(MARKING OF METERS : Name Plate) |
- |
0 |
|
Included |
7.1(MARKING OF METERS : Name Plate) |
- |
0 |
|
Included |
7.1.1(BIS certification Marking) |
- |
0 |
|
Included |
7.2(Connection diagrams and terminal marking) |
- |
0 |
|
Included |
8(Climatic Conditions) |
- |
0 |
|
Included |
12.7.6.1, 9.5(Test of insulation Properties : General test conditions) |
- |
0 |
|
Included |
9.5, 12.7.6.1(Test of insulation Properties : General test conditions) |
- |
0 |
|
Included |
12.7.6.2, 9.5() |
- |
0 |
|
Included |
9.5, 12.7.6.2(Impulse voltage test) |
- |
0 |
|
Included |
12.7.6.3, 9.5(ac Voltage test) |
- |
0 |
|
Included |
9.5, 12.7.6.3(ac Voltage test) |
- |
0 |
|
Included |
12.7.6.4, 9.5() |
- |
0 |
|
Included |
9.5, 12.7.6.4() |
- |
0 |
|
Included |
12.9.1(Test of Accuracy Requirements : General Test Conditions) |
- |
0 |
|
Included |
9.1, 12.7.1(Test of Power Consumption) |
- |
0 |
|
Included |
12.7.1, 9.1(Test of Power Consumption) |
- |
0 |
|
Included |
9.2.1(Test of Influence of Supply Voltage) |
- |
0 |
|
Included |
9.2.2, 12.7.2(Test of Influence of Supply Voltage) |
- |
0 |
|
Included |
12.7.2, 9.2.2(Test of Influence of Supply Voltage) |
- |
0 |
|
Included |
9.2.3 12.7.3(Test of Influence of Short-time Overcurrents) |
- |
0 |
|
Included |
12.7.3, 9.2.3() |
- |
0 |
|
Included |
9.3, 12.7.4(Test of Influence of Self-Heating) |
- |
0 |
|
Included |
12.7.4, 9.3(Test of Influence of Self-Heating) |
- |
0 |
|
Included |
9.4, 12.7.5(Test of Influence of Heating) |
- |
0 |
|
Included |
12.7.5, 9.4(Test of Influence of Heating) |
- |
0 |
|
Included |
9.6, 12.17(Test of Immunity to Earth/Phase Fault) |
- |
0 |
|
Included |
12.17, 9.6(Test of Immunity to Earth/Phase Fault) |
- |
0 |
|
Included |
10.1, 12.8.2(Test for Immunity to Electrostatic Discharge (ESD)) |
- |
0 |
|
Included |
12.8.2, 10.1(Test for Immunity to Electrostatic Discharge (ESD)) |
- |
0 |
|
Included |
10.1, 12.8.3(Test for immunity to electromagnetic HF field) |
- |
0 |
|
Included |
12.8.3, 10.1(Test for immunity to electromagnetic HF field) |
- |
0 |
|
Included |
10.1, 12.8.4(Fast Transient Burst Test) |
- |
0 |
|
Included |
12.8.4, 10.1(Fast Transient Burst Test) |
- |
0 |
|
Included |
10.1, 12.8.5(Surge Immunity test) |
- |
0 |
|
Included |
12.8.5, 10.1(Surge Immunity test) |
- |
0 |
|
Included |
12.8.6, 10.2(Radio Interference Measurement) |
- |
0 |
|
Included |
10.2, 12.8.6(Radio Interference Suppression) |
- |
0 |
|
Included |
11.1(Limits of error due to variation of the current) |
- |
0 |
|
Included |
12.15(Limits of Error and Interpretation or Test Results) |
- |
0 |
|
Included |
11.2, 12.10(Limits of error due to other Influence Quantities) |
- |
0 |
|
Included |
12.10, 11.2(Test of Influence Quantities) |
- |
0 |
|
Included |
11.3, 12.11(Test of Ambient Temperature Influence) |
- |
0 |
|
Included |
12.11, 11.3(Test of Ambient Temperature Influence) |
- |
0 |
|
Included |
11.4, 12.12(Test of No-Load Condition) |
- |
0 |
|
Included |
12.12, 11.4(Test of No-Load Condition) |
- |
0 |
|
Included |
11.5, 12.13(Test of Starting Conditions) |
- |
0 |
|
Included |
12.13, 11.5(Test of Starting Conditions) |
- |
0 |
|
Included |
11.6, 12.14(Meter Constant) |
- |
0 |
|
Included |
12.14, 11.6(Test of Meter Constant/Registration) |
- |
0 |
|
Included |
11.7, 12.16(Repeatability of Error Test) |
- |
0 |
|
Included |
12.16, 11.7(Repeatability of Error Test) |
- |
0 |
|
Included |
12.3.1(Shock Test) |
- |
0 |
|
Included |
12.3.2(Vibration Test) |
- |
0 |
|
Included |
12.3.3(Spring Hammer Test) |
- |
0 |
|
Included |
6.8, 12.4(Test of Resistance to Heat and Fire) |
- |
0 |
|
Included |
12.4, 6.8(Test of Resistance to Heat and Fire) |
- |
0 |
|
Included |
6.9, 12.5(Test of Protection Against Penetration of Dust and Water) |
- |
0 |
|
-Included |
6.9, 12.5(Test of Protection Against Penetration of Dust and Water) |
- |
0 |
|
Included |
12.5, 6.9(Test of Protection Against Penetration of Dust and Water) |
- |
0 |
|
Included |
12.5, 6.9(Test of Protection Against Penetration of Dust and Water) |
- |
0 |
|
-Included |
12.6.1(Dry Heat Test) |
- |
0 |
|
Included |
12.6.2(Cold Test) |
- |
0 |
|
Included |
12.6.3(Damp Heat Cycle Test) |
- |
0 |
|
Included |
|
Complete
|
|
30 Jun, 2027 |
REVISED VERSION STANDARD INCLUDED W.E.F. 04-03-2022. EXCLUSIONS: Radio interference measurement 9b) for meters having or to be used with wireless communication feature (Cl.12.8.6 (b)]. |
2 |
IS 13779 (2020) |
ac STATIC WATTHOUR METERS CLASS 1 AND 2-Specefication |
- |
-
|
203800 View breakup
Rs.1,69,000/- for single phase energy meter. Rs.2038000/- for three phase energy meters.
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
4(Classification) |
- |
17370 |
|
for all General constructional Requirement and marking Tests as per cl. No. 4,5,6,7 ( All test charges excluding GST) |
5.1(Standard Reference Voltages) |
- |
0 |
|
Included |
5.2(Standard Basic Currents) |
- |
0 |
|
Included |
5.3(Rated Maximum Current) |
- |
0 |
|
Included |
5.4(Standard Frequency) |
- |
0 |
|
Included |
6.1(General) |
- |
0 |
|
Included |
6.2(Meter Case) |
- |
0 |
|
Included |
12.16 & 11.7(Test of repeatability of error) |
- |
2780 |
|
for single phase and Three phase |
6.3(Window) |
- |
0 |
|
Included |
6.4(Terminals, terminal block and protective earth terminal) |
- |
0 |
|
Included |
6.5(Terminals covers and Extended Terminal Cover) |
- |
0 |
|
Included |
6.6(Clearance and creepage distances) |
- |
0 |
|
Included |
12.15 & 11.6(Test of meter constant) |
- |
1050 |
|
For Three Phase 1150 |
6.7(Insulating encased meter) |
- |
0 |
|
Included |
6.10(Display of measured values) |
- |
0 |
|
Included |
6.11(Output device) |
- |
0 |
|
Included |
7.1(Name Plate) |
- |
0 |
|
Included |
7.2(Connection diagrams and terminal marking) |
- |
0 |
|
Included |
12.3.1(Shock test) |
- |
3070 |
|
For Three Phase 4120 |
12.14 & 11.5(Test of starting condition) |
- |
1050 |
|
For Three Phase 1330 |
12.3.2(Vibration test) |
- |
6770 |
|
For Three Phase 8850 |
12.13 & 11.4(Test of no-load condition) |
- |
1050 |
|
For Three Phase 1330 |
12.3.3(Spring hammer test) |
- |
1280 |
|
For Three Phase 1620 |
12.4(Test of resistance to heat and fire) |
- |
6950 |
|
For Three Phase 7640 |
12.12 & 11.3(Test of ambient temperature influence) |
- |
3480 |
|
For Three Phase 5220 |
12.5(Test of protection against penetration of dust and water) |
- |
14580 |
|
For Three Phase 14580 |
11.2(Test on limits of error due to other influence quantities) |
- |
64870 |
|
For Three Phase 75800 |
12.6.1(Dry heat test) |
- |
9950 |
|
For Three Phase 10310 |
12.6.2(Cold test) |
- |
9950 |
|
For Three Phase 10310 |
11.1(Test on limits of error due to variation of current) |
- |
2780 |
|
For Three Phase 8220 |
12.6.3(Damp heat cyclic test) |
- |
19160 |
|
For Three Phase 19500 |
12.9.5(Surge Immunity Test) |
- |
14480 |
|
For Three Phase 37970 |
12.7.1(Test of power consumption) |
- |
2320 |
|
For Three Phase 6950 |
12.9.6(Radio Interference Measurement) |
- |
27880 |
|
27880 For Three Phase |
12.7.1(Test of power consumption) |
- |
2320 |
|
For Three Phase 6950 |
12.7.2(Test of influence of supply voltage) |
- |
2780 |
|
For Three Phase 4810 |
12.7.2(Voltage interruptions of Vref=100% Interruption time: 1sec Number of interruptions: 3 Restoring time between interruptions: 50msec.) |
- |
2780 |
|
For Three Phase 4810 |
12.9.3(Test of Immunity to electromagnetic HF field) |
- |
13890 |
|
For Three Phase 13890 |
12.9.2(Test of Immunity to electrostatic discharge) |
- |
5220 |
|
For Three Phase 6710 |
12.7.2(Voltage interruptions of Vref=100% Interruption time: 20msec Number of interruptions: 1) |
- |
2780 |
|
For Three Phase 4810 |
12.7.2(Voltage dip of Vref=50% Dip time: 1 min Number of dips: 1) |
- |
2780 |
|
For Three Phase 4810 |
12.8(Test of immunity to earth/phase fault) |
- |
8110 |
|
For Three Phase 8110 |
12.7.3(Test of influence of short time over currents) |
- |
3070 |
|
8450 For Three Phase |
12.7.6.4(Insulation resistance test) |
- |
590 |
|
For Three Phase 640 |
12.7.4(Test of Influence of self heating) |
- |
1150 |
|
For Three Phase 1330 |
12.7.5(Test of influence of heating) |
- |
0 |
|
Included |
12.7.6.2(Impulse voltage test) |
- |
0 |
|
Included |
12.7.6.2(Impulse voltage tests for circuits and between the circuits) |
- |
0 |
|
Included |
12.7.6.2(Impulse voltage test of electric circuits relative to earth) |
- |
0 |
|
Included |
12.7.6.3(ac high voltage test) |
- |
0 |
|
Included |
12.7.6.4(Insulation resistance test) |
- |
0 |
|
Included |
6(General and Constructional requirements) |
- |
0 |
|
Included |
6.1(General) |
- |
0 |
|
Included |
6.3(Window) |
- |
0 |
|
Included |
6.4(Terminals, terminals block(s) and protective earth terminal) |
- |
0 |
|
Included |
6.5(Terminal Cover(s)) |
- |
0 |
|
Included |
6.6(Clearance and creepage distances) |
- |
0 |
|
Included |
6.7(Insulating encased meter) |
- |
0 |
|
Included |
6.10(Display of measured values) |
- |
0 |
|
Included |
6.11(Output device) |
- |
0 |
|
Included |
7.1 a)(MARKING OF METERS : Name Plate) |
- |
0 |
|
Included |
7.1 b)(MARKING OF METERS : Name Plate) |
- |
0 |
|
Included |
7.1 c)(MARKING OF METERS : Name Plate) |
- |
0 |
|
Included |
7.1 d)(MARKING OF METERS : Name Plate) |
- |
0 |
|
Included |
7.1 e)(MARKING OF METERS : Name Plate) |
- |
0 |
|
Included |
7.1 f)(MARKING OF METERS : Name Plate) |
- |
0 |
|
Included |
7.1 g)(MARKING OF METERS : Name Plate) |
- |
0 |
|
Included |
7.1 h)(MARKING OF METERS : Name Plate) |
- |
0 |
|
Included |
7.1 j)(MARKING OF METERS : Name Plate) |
- |
0 |
|
Included |
7.1 k)(MARKING OF METERS : Name Plate) |
- |
0 |
|
Included |
7.1 m)(MARKING OF METERS : Name Plate) |
- |
0 |
|
Included |
7.1 n)(MARKING OF METERS : Name Plate) |
- |
0 |
|
Included |
7.1 p)(MARKING OF METERS : Name Plate) |
- |
0 |
|
Included |
7.1(MARKING OF METERS : Name Plate) |
- |
0 |
|
Included |
7.1(MARKING OF METERS : Name Plate) |
- |
0 |
|
Included |
7.1(MARKING OF METERS : Name Plate) |
- |
0 |
|
Included |
7.1.1(BIS certification Marking) |
- |
0 |
|
Included |
7.2(Connection diagrams and terminal marking) |
- |
0 |
|
Included |
8(Climatic Conditions) |
- |
0 |
|
Included |
12.7.6.1, 9.5(Test of insulation Properties : General test conditions) |
- |
0 |
|
Included |
9.5, 12.7.6.1(Test of insulation Properties : General test conditions) |
- |
0 |
|
Included |
12.7.6.2, 9.5(Impulse voltage test) |
- |
0 |
|
Included |
9.5, 12.7.6.2(Impulse voltage test) |
- |
0 |
|
Included |
12.7.6.3, 9.5(ac Voltage test) |
- |
0 |
|
Included |
9.5, 12.7.6.3(ac Voltage test) |
- |
0 |
|
Included |
12.7.6.4, 9.5(Insulation resistance test) |
- |
0 |
|
Included |
9.5, 12.7.6.4(Insulation resistance test) |
- |
0 |
|
Included |
12.10.1(Test of Accuracy Requirements : General Test Conditions) |
- |
0 |
|
Included |
12.7.1, 9.1(Test of Power Consumption) |
- |
0 |
|
Included |
9.1, 12.7.1(Test of Power Consumption) |
- |
0 |
|
Included |
9.2.1(Test of Influence of Supply Voltage) |
- |
0 |
|
Included |
12.7.2, 9.2.2(Test of Influence of Supply Voltage) |
- |
0 |
|
Included |
9.2.2, 12.7.2(Test of Influence of Supply Voltage) |
- |
0 |
|
Included |
12.7.3, 9.2.3(Test of Influence of Short-time Overcurrents) |
- |
0 |
|
Included |
9.2.3, 12.7.3(Test of Influence of Short-time Overcurrents) |
- |
0 |
|
Included |
12.7.4, 9.3(Test of Influence of Self-Heating) |
- |
0 |
|
Included |
9.3, 12.7.4(Test of Influence of Self-Heating) |
- |
0 |
|
Included |
12.7.5, 9.4(Test of Influence of Heating) |
- |
0 |
|
Included |
9.4, 12.7.5(Test of Influence of Heating) |
- |
0 |
|
Included |
12.8, 9.6(Test of Immunity to Earth/Phase Fault) |
- |
0 |
|
Included |
9.6, 12.8(Test of Immunity to Earth/Phase Fault) |
- |
0 |
|
Included |
10.1, 12.9.2(Test for Immunity to Electrostatic Discharge (ESD)) |
- |
0 |
|
Included |
12.9.2, 10.1(Test for Immunity to Electrostatic Discharge (ESD)) |
- |
0 |
|
Included |
10.1, 12.9.3(Test for immunity to electromagnetic HF field) |
- |
0 |
|
Included |
12.9.3, 10.1(Test for immunity to electromagnetic HF field) |
- |
0 |
|
Included |
10.1, 12.9.4(Fast Transient Burst Test) |
- |
0 |
|
Included |
12.9.4, 10.1(Fast Transient Burst Test) |
- |
0 |
|
Included |
10.1, 12.9.5(Surge Immunity test) |
- |
0 |
|
Included |
12.9.5, 10.1(Surge Immunity test) |
- |
0 |
|
Included |
12.9.6, 10.2(Radio Interference Measurement) |
- |
0 |
|
Included |
10.2, 12.9.6(Radio Interference Measurement) |
- |
0 |
|
Included |
11.1(Limits of error due to variation of the current) |
- |
0 |
|
Included |
12.16(Limits of Error and Interpretation or Test Results) |
- |
0 |
|
Included |
11.2, 12.11(Limits of error due to other Influence Quantities) |
- |
0 |
|
Included |
12.11, 11.2(Test of Influence Quantities) |
- |
0 |
|
Included |
11.3, 12.12(Test of Ambient Temperature Influence) |
- |
0 |
|
Included |
12.12, 11.3(Test of Ambient Temperature Influence) |
- |
0 |
|
Included |
11.4, 12.13(Test of No-Load Condition) |
- |
0 |
|
Included |
12.13, 11.4(Test of No-Load Condition) |
- |
0 |
|
Included |
11.5, 12.14(Test of Starting Conditions) |
- |
0 |
|
Included |
12.14, 11.5(Test of Starting Conditions) |
- |
0 |
|
Included |
11.6, 12.15(Meter Constant) |
- |
0 |
|
Included |
12.15, 11.6(Test of Meter Constant/Registration) |
- |
0 |
|
Included |
11.7, 12.17(Repeatability of Error Test) |
- |
0 |
|
Included |
12.17, 11.7(Repeatability of Error Test) |
- |
0 |
|
Included |
12.3.1(Shock Test) |
- |
0 |
|
Included |
12.3.2(Vibration Test) |
- |
0 |
|
Included |
12.3.3(Spring Hammer Test) |
- |
0 |
|
Included |
6.8, 12.4(Test of Resistance to Heat and Fire) |
- |
0 |
|
Included |
12.5, 6.9(Test of Protection Against Penetration of Dust and Water) |
- |
0 |
|
Included |
6.9, 12.5(Test of Protection Against Penetration of Dust and Water) |
- |
0 |
|
Included |
12.5, 6.9(Test of Protection Against Penetration of Dust and Water) |
- |
0 |
|
Included |
12.6.1(Dry Heat Test) |
- |
0 |
|
Included |
12.6.2(Cold Test) |
- |
0 |
|
Included |
12.6.3(Damp Heat Cycle Test) |
- |
0 |
|
Included |
|
Complete
|
|
30 Jun, 2027 |
REVISED VERSION OF STANDARD INCLUDED W.E.F. 04-03-2022. |
3 |
IS 16444 : Part 2 (2017) |
AC static transformer operated watthour and var - Hour smart meters, class 0.2 S, 0.5 S and 1.0 S: Part 2 specification transformer operated smart meters |
- |
-
|
590000 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
6.8.1(Additional information) |
- |
17380 |
|
for all General constructional requirements |
6.8(Connection diagrams and terminal marking) |
- |
0 |
|
included |
6.8(BIS Standard Mark) |
- |
0 |
|
included |
6.8(Marking of meters
Name plate) |
- |
0 |
|
included |
6.3(Clearance and creepage distances) |
- |
0 |
|
included |
10.0(Smart Meter Functional Requirements) |
- |
11600 |
|
- |
8, 9.5(Smart Meter Communicability) |
- |
150500 |
|
- |
9.3(Test of Display) |
- |
0 |
|
included |
7, 9.4(Data Exchange for Electricity Meter Reading, Tariff and Load Control Companion Specification
(The requirement as per IS 15959 : Part 1 & Part 3 shall apply)) |
- |
0 |
|
included |
6.4(Test of resistance to heat and fire) |
- |
8750 |
|
- |
Note b of Table 1(Access and data read test) |
- |
11600 |
|
- |
Note a of Table 1(Accuracy of the meter at pre-defined points) |
- |
0 |
|
included |
6.5(Test of protection against penetration of dust and water) |
- |
17140 |
|
- |
6.5(Spring hammer test) |
- |
2550 |
|
- |
6.5(Shock test) |
- |
5040 |
|
- |
6.5(Vibration test) |
- |
8550 |
|
- |
6.9(Damp heat cyclic test) |
- |
21010 |
|
- |
6.9(Cold test) |
- |
11240 |
|
- |
6.9(Dry heat test) |
- |
11240 |
|
- |
6.11(Surge Immunity test) |
- |
38890 |
|
- |
6.11(Test of immunity to electromagnetic HF field) |
- |
13890 |
|
- |
6.11(Test of immunity to electrostatic discharge) |
- |
7640 |
|
- |
6.11(Fast transient burst test) |
- |
10190 |
|
- |
6.11(Radio interference measurement) |
- |
13890 |
|
- |
6.10.7(Test of immunity to earth/phase fault) |
- |
7640 |
|
- |
6.10.5(Test of influence of heating) |
- |
2670 |
|
- |
6.10.4(Test of influence of self-heating) |
- |
5320 |
|
- |
6.10.3(Test of influence of short time over currents) |
- |
8910 |
|
- |
6.10.2(Test of influence of supply voltage) |
- |
4810 |
|
- |
6.10.1(Test of power consumption) |
- |
10420 |
|
- |
6.12(Operation of Accessories) |
- |
1160 |
|
- |
6.12(Abnormal Magnetic Induction of External Origin 10mT) |
- |
9030 |
|
- |
6.12(Magnetic induction of External Origin 0.5mT) |
- |
9030 |
|
- |
6.12(Continuous Magnetic Induction of External Origin 0.2 Tesla) |
- |
6020 |
|
- |
6.12(Continuous Magnetic Induction of External Origin 67 milli Tesla) |
- |
6020 |
|
- |
6.12(Voltage Unbalanced) |
- |
3010 |
|
- |
6.12(Reversed Phase Sequence) |
- |
2670 |
|
- |
6.12(Waveform 10% of 3rd Harmonics) |
- |
33000 |
|
- |
6.12(Frequency Variation) |
- |
18060 |
|
- |
6.12(Voltage Variation) |
- |
15970 |
|
- |
6.12(Test of influence quantities) |
- |
0 |
|
included |
6.12(Test of repeatability of error) |
- |
18420 |
|
- |
6.12(Test of ambient temperature influence) |
- |
10420 |
|
- |
6.12(Test of no-load condition) |
- |
1330 |
|
- |
6.12(Test of starting condition) |
- |
2670 |
|
- |
6.12(Test of meter constant) |
- |
2670 |
|
- |
6.12(Test on limits of error) |
- |
16440 |
|
- |
6.10.6(Insulation test) |
- |
1160 |
|
- |
6.10.6(ac high voltage test) |
- |
1280 |
|
- |
6.10.6(Impulse voltage test) |
- |
8000 |
|
- |
6.7(Output device) |
- |
0 |
|
included |
6.6(Display of measured values) |
- |
0 |
|
-included |
6.2.2(Insulating encased meter) |
- |
0 |
|
-included |
6.2.2(Terminal Cover(s)) |
- |
0 |
|
-included |
6.2.1(Heat Deflection Test) |
- |
5800 |
|
- |
6.2.1(Terminals, terminal block and protective earth terminal) |
- |
0 |
|
-included |
6.2(Communication module) |
- |
0 |
|
included |
6.2(Window) |
- |
0 |
|
included |
6.2(Meter case) |
- |
0 |
|
included |
6.2(General Constructional requirements) |
- |
0 |
|
included |
10(Smart Meter Functional Requirement) |
- |
0 |
|
included |
9.5(Test for Smart meter communicability ) |
- |
0 |
|
included |
9.4(Test for Data Exchange Protocol) |
- |
0 |
|
included |
6.5(Mechanical Requirement) |
- |
0 |
|
included |
6.5(Mechanical Requirement) |
- |
0 |
|
included |
6.5(Mechanical Requirement) |
- |
0 |
|
included |
6.5(Mechanical Requirement) |
- |
0 |
|
included |
6.9(Climatic Codition) |
- |
0 |
|
included |
6.9(Climatic Codition) |
- |
0 |
|
included |
6.9(Climatic Codition) |
- |
0 |
|
included |
6.9(Climatic Codition) |
- |
0 |
|
included |
6.11(Electromagnetic Compatibility) |
- |
0 |
|
included |
6.11(Electromagnetic Compatibility) |
- |
0 |
|
included |
6.11(Electromagnetic Compatibility) |
- |
0 |
|
included |
6.11(Electromagnetic Compatibility) |
- |
0 |
|
included |
6.11(Electromagnetic Compatibility) |
- |
0 |
|
included |
6.1(Electrical Requirments) |
- |
0 |
|
included |
6.1(Electrical Requirments) |
- |
0 |
|
included |
6.1(Electrical Requirments) |
- |
0 |
|
included |
6.1(Electrical Requirments) |
- |
0 |
|
included |
6.1(Electrical Requirments) |
- |
0 |
|
included |
6.12((11 of IS 14697 ) Accuracy Requirement ) |
- |
0 |
|
included |
6.12((11 of IS 14697 ) Accuracy Requirement ) |
- |
0 |
|
included |
6.12((11 of IS 14697 ) Accuracy Requirement ) |
- |
0 |
|
included |
6.12((11 of IS 14697 ) Accuracy Requirement ) |
- |
0 |
|
included |
6.12((11 of IS 14697 ) Accuracy Requirement ) |
- |
0 |
|
included |
6.12((11 of IS 14697 ) Accuracy Requirement ) |
- |
0 |
|
included |
6.12((11 of IS 14697 ) Accuracy Requirement ) |
- |
0 |
|
included |
6.10.6((9.5 of IS 14697 ) Insulation Rtequirement ) |
- |
0 |
|
included |
6.10.7((9.6 of IS 14697 ) Insulation Rtequirement ) |
- |
0 |
|
included |
6.10.6((9.5 of IS 14697 ) Insulation Requirement ) |
- |
0 |
|
included |
6.10.6((9.5 of IS 14697 ) Insulation Rtequirement ) |
- |
0 |
|
included |
9.3(Measurement) |
- |
0 |
|
included |
6.8(Inspection ) |
- |
0 |
|
included |
6.8(Inspection ( 7 of IS 14697) ) |
- |
0 |
|
included |
6.7(Inspection ( 6.11 of IS 14697)) |
- |
0 |
|
included |
6.6(Inspection ( 6.10 of IS 14697)) |
- |
0 |
|
included |
6.3(Measurement ( 6.6 of IS 14697)) |
- |
0 |
|
included |
6.2(General constructional Requirement) |
- |
0 |
|
included |
|
Complete
|
|
30 Jun, 2027 |
Included w.e.f. 04-03-2022. |
4 |
IS 1180 : Part 3 (2021) |
Outdoor/Indoor Type Liquid Immersed Distribution Transformers Up to and Including 2 500 kVA, 33 kV — Specification Part 3 Natural/Synthetic Organic Ester Liquid Immersed |
- |
-
|
1151180 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
21.2 a(Measurement of winding resistance
[IS 2026 (Part 1)].) |
- |
23600 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates.
Without tap -11800
With tap- 23600 |
6.1 Table 1(Standard Ratings) |
- |
0 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates. |
6.2, 7.2, 8.2(Rated Frequency) |
- |
0 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates. |
6.3, 7.3(Nominal System Voltage) |
- |
0 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates. |
6.4(Table 2 Minimum Basic Insulation Level) |
- |
0 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates. |
6.5, 7.5(No-Load Voltage Ratios) |
- |
0 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates. |
6.6, 7.6(Winding Connections and Phase Displacement) |
- |
0 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates. |
6.7(Tapping Range and Tapping Methods) |
- |
0 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates. |
6.8(Table 3 Losses and Impedance Values) |
- |
0 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates. |
6.9(Permissible Flux Density and Over Fluxing) |
- |
0 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates. |
6.10(Limits of Temperature-rise) |
- |
0 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates. |
7.1(Table 4 Standard Ratings) |
- |
0 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates. |
7.4(Table 5 Minimum Basic Insulation Level) |
- |
0 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates. |
7.7(Tapping Ranges and Tapping Methods) |
- |
0 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates. |
7.8(Losses and Impedance Values) |
- |
0 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates. |
7.9(Permissible Flux Density and Overfluxing) |
- |
0 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates. |
7.10(Limits of Temperature Rise) |
- |
0 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates. |
8.1 Table 7(Standard Ratings) |
- |
0 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates. |
8.3(Nominal System Voltage) |
- |
0 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates. |
8.5(No Load Voltage Ratio) |
- |
0 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates. |
8.6(Number of Phases and Polarity) |
- |
0 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates. |
8.4(Table 8 Minimum Basic Insulation Level) |
- |
0 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates. |
8.8(Losses and Impedance Values) |
- |
0 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates. |
8.9(Permissible Flux Density and Overfluxing) |
- |
0 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates. |
8.10(Limits of Temperature Rise) |
- |
0 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates. |
9(Standard Materials) |
- |
0 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates. |
10(Terminal Arrangement) |
- |
0 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates. |
11(Minimum clearances in air) |
- |
0 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates. |
12(Connectors (Applicable for bare bushing terminations only)) |
- |
0 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates. |
13(Marking) |
- |
0 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates. |
14(Mounting Arrangement) |
- |
0 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates. |
15(Transformer Tank) |
- |
0 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates. |
16(Conservator for non-sealed typetransformers) |
- |
0 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates. |
17(Ability of Transformers to withstand external short circuit) |
- |
0 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates. |
18(Efficiency and regulation) |
- |
0 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates. |
19(Tolerances) |
- |
0 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates. |
20(Fittings) |
- |
0 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates. |
21.2 b(Measurement of voltage ratio and check of phase
displacement [IS 2026 (Part 1)].) |
- |
41000 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates.
Without tap -5900
4 tap- 23500
5 tap-29400
7 Tap-41000 |
21.2 c(Measurement of short-circuit impedance
(principal tapping, when applicable) and load
loss at 50 percent and 100 percent load
[IS 2026 (Part 1)].) |
- |
6900 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates.
Without tap -4900
With tap-6900 |
21.2 d(Measurement of no-load loss and current
[IS 2026 (Part 1)].) |
- |
4000 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates. |
21.2 e(Measurement of insulation resistance
[IS 2026 (Part 1)].) |
- |
5900 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates. |
21.2 f(Induced over-voltage withstand test
[IS 2026 (Part 3)].) |
- |
7400 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates. |
21.2 g(Separate-source voltage withstand test
[IS 2026 (Part 3)]) |
- |
3910 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates. |
21.3 a(Lightning impulse test [IS 2026 (Part 3)].) |
- |
112040 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates.
UPTO 500 KVA-₹64130/-
above 500 KVA TO 2 MVA-₹74090/-
above2 MVA TO 2.5 MVA- ₹112040/- |
21.3 b(Temperature-rise test [IS 2026 (Part 2)].) |
- |
154000 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates.
63 KVA-₹23540
63 KVA TO 500KVA-₹35530
500 KVA TO 1000KVA-₹44000
500 KVA TO 1 MVA-₹74090
1 MVA TO 2.5 MVA ₹1,54,000 |
21.3 c(Short-circuit withstand test [IS 2026 (Part 5)]
(up to 200 kVA) and) |
- |
179200 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates.
Charges 250 kVA (<=11kV),Without Tap-105400, 5 Tap-151400, 7 Tap-163400
Charges 250 kVA (>11kV),Without Tap-121200, 5 Tap-167200, 7 Tap-179200 |
21.3 d(Pressure test) |
- |
25300 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates. |
21.4 a(Determination of sound levels [IS 2026 (Part 10)];) |
- |
61780 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates.
5 kVA to 630 kVA- 33350
631 kVA to 1600 kVA- 42320
1600 kVA to 2500 kVA- 61780 |
21.4 b(Short-circuit withstand test [IS 2026 (Part 5)]
(above 200 kVA);) |
- |
588750 |
|
Estimated tests charges do not include GST.
251 kVA to 500 kVA (<=11kV) 5 tap-184200, 7 Tap-196200
251 kVA to 500 kVA (>11kV) 5 tap-226700, 7 Tap-238700
501 kVA to 1600 kVA, 5 tap-465300, 9 Tap- 489300
1600 kVA to 2500 kVA, 5 tap-564800,9 Tap- 588750 |
21.4 c(No load current at 112.5 percent voltage
(see 6.9.2, 7.9.2, 8.9.2);) |
- |
2680 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates. |
21.4 d(Paint adhesion test — The test is performed as
per ASTM D3359 (Standard Test Methods for
measuring adhesion by tape test).) |
- |
2520 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates. |
21.5(Pressure and Ester Liquid Leakage Test) |
- |
25300 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates. |
4(SERVICE CONDITIONS) |
- |
0 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates. |
5(General) |
- |
0 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates. |
21.4 e(BDV and Moisture content of liquid in the
transformer (IS 16081, IS 16099, IS 16899 or
IS 16659, whichever is applicable).) |
- |
3600 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates. |
|
Complete
|
|
30 Jun, 2027 |
- |
5 |
IS/IEC 60947 : Part 2 (2016) |
Low - Voltage switchgear and controlgear: Part 2 circuit - Breakers (First Revision) |
- |
-
|
4337830 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
8.3.3.2(Tripping limits and characteristics) |
- |
75600 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates.
Charges for one rating
SP ₹39600
SPN ₹43200
DP ₹46800
TP ₹61200
TPN ₹72000
FP ₹75600
considering as adjustable release in each case |
8.3.3.3(Test of dielectric properties) |
- |
67780 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates.
Charges for one rating
SP ₹17480
SPN/DP ₹42120
TP ₹54920
FP ₹67780 |
8.3.3.4(Mechanical operation and operational performance capability) |
- |
87500 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates.
Charges for one rating
SP, SPN/DP, TPN & FP ₹87500 |
8.3.3.5(Overload performance) |
- |
81770 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates.
Charges for one rating
SP, SPN/DP & TPN upto 10kA ₹40890
FP upto 10kA is ₹81770 |
8.3.3.6(Verification of dielectric withstand) |
- |
22770 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates.
Charges for one rating
SP ₹5180
SPN/DP ₹14490
TP ₹18630
FP ₹22770 |
8.3.3.7(Verification of temperature-rise) |
- |
32260 |
|
Charges for one rating
upto 200A ₹6850
201A to 1000A ₹10530/-
1001A to 2000A ₹15180
2001A to 3000A ₹20240/-
3001A to 4000A ₹26220/-
4001A to 5000A ₹32260/-
per rating without GST |
8.3.3.8(Verification of Overload releases) |
- |
2100 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates.
Charges for one rating
SP, SPN/DP, TPN & FP ₹2100 |
8.3.3.9(Verification of undervoltage and shunt releases) |
- |
3800 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates.
Charges for one rating
SP, SPN/DP, TPN & FP ₹3800 |
8.3.3.10(Verification of main contact position) |
- |
4140 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates.
Charges for one rating
SP, SPN/DP, TPN & FP ₹4140 |
8.3.4.3(Verification of operational performance capability) |
- |
40890 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates.
Charges for one rating
SP, SPN/DP, TPN & FP upto 630A ₹27900
SP, SPN/DP, TPN & FP above 630A ₹40890 |
8.3.8.5(Verification of operational performance capability) |
- |
40890 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates.
Charges for one rating
SP, SPN/DP, TPN & FP upto 630A ₹27900
SP, SPN/DP, TPN & FP above 630A ₹40890 |
8.4.2(Mechanical operation tests) |
- |
8980 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates.
Charges for one rating
SP, SPN/DP, TPN & FP ₹8980 |
8.4.3(Verification of the calibration of overcurrent releases) |
- |
75600 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates.
Charges for one rating
SP ₹39600
SPN ₹43200
DP ₹46800
TP ₹61200
TPN ₹72000
FP ₹75600
considering as adjustable release in each case |
8.4.4(Verification of the operation of undervoltage and shunt releases) |
- |
3800 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates.
Charges for one rating
SP, SPN/DP, TPN & FP ₹3800 |
8.4.5(Additional tests for CBRs) |
- |
17600 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates.
Charges for one rating
SP ₹5900
SPN/DP ₹9800
TP ₹13700
TPN/FP ₹17600
considering as adjustable release in each case |
8.4.6(Dielectric tests) |
- |
67780 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates.
Charges for one rating
SP ₹17480
SPN/DP ₹42120
TP ₹54920
FP ₹67780 |
8.4.7(Test for the verifiacation of clearances less than those corresponding to case A of Table 13 of IEC 60947-1:2007) |
- |
1750 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates.
Charges for one rating
SP, SPN/DP, TPN & FP ₹1750 |
8.3.4.4(Verification of dielectric withstand) |
- |
22770 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates.
Charges for one rating
SP ₹5180
SPN/DP ₹14490
TP ₹18630
FP ₹22770 |
8.3.5.4(Verification of dielectric withstand) |
- |
22770 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates.
Charges for one rating
SP ₹5180
SPN/DP ₹14490
TP ₹18630
FP ₹22770 |
8.3.6.6(Verification of dielectric withstand) |
- |
22770 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates.
Charges for one rating
SP ₹5180
SPN/DP ₹14490
TP ₹18630
FP ₹22770 |
8.3.7.4(Verification of dielectric withstand) |
- |
22770 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates.
Charges for one rating
SP ₹5180
SPN/DP ₹14490
TP ₹18630
FP ₹22770 |
8.3.7.8(Verification of dielectric withstand) |
- |
22770 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates.
Charges for one rating
SP ₹5180
SPN/DP ₹14490
TP ₹18630
FP ₹22770 |
8.3.8.6(Verification of dielectric withstand) |
- |
22770 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates.
Charges for one rating
SP ₹5180
SPN/DP ₹14490
TP ₹18630
FP ₹22770 |
8.3.4.5(Verifiation of temperature-rise) |
- |
32260 |
|
Charges for one rating
upto 200A ₹6850
201A to 1000A ₹10530/-
1001A to 2000A ₹15180
2001A to 3000A ₹20240/-
3001A to 4000A ₹26220/-
4001A to 5000A ₹32260/-
per rating without GST |
8.3.6.4(Verification of temperature-rise) |
- |
32260 |
|
Charges for one rating
upto 200A ₹6850
201A to 1000A ₹10530/-
1001A to 2000A ₹15180
2001A to 3000A ₹20240/-
3001A to 4000A ₹26220/-
4001A to 5000A ₹32260/-
per rating without GST |
8.3.7.3(Verification of temperature-rise) |
- |
32260 |
|
Charges for one rating
upto 200A ₹6850
201A to 1000A ₹10530/-
1001A to 2000A ₹15180
2001A to 3000A ₹20240/-
3001A to 4000A ₹26220/-
4001A to 5000A ₹32260/-
per rating without GST |
8.3.8.7(Verification of temperature-rise) |
- |
32260 |
|
Charges for one rating
upto 200A ₹6850
201A to 1000A ₹10530/-
1001A to 2000A ₹15180
2001A to 3000A ₹20240/-
3001A to 4000A ₹26220/-
4001A to 5000A ₹32260/-
per rating without GST |
8.3.4.6(Verification of Overload releases) |
- |
2100 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates.
Charges for one rating
SP, SPN/DP, TPN & FP ₹2100 |
8.3.5.2(Verification of Overload releases) |
- |
8280 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates.
Charges for one rating
SPSPN ₹2100
DP ₹4140
TP/TPN ₹6210
FP ₹8280 |
8.3.5.5(Verification of Overload releases) |
- |
8280 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates.
Charges for one rating
SPSPN ₹2100
DP ₹4140
TP/TPN ₹6210
FP ₹8280 |
8.3.6.2(Verification of Overload releases) |
- |
8280 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates.
Charges for one rating
SPSPN ₹2100
DP ₹4140
TP/TPN ₹6210
FP ₹8280 |
8.3.6.7(Verification of Overload releases) |
- |
8280 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates.
Charges for one rating
SPSPN ₹2100
DP ₹4140
TP/TPN ₹6210
FP ₹8280 |
8.3.7.5(Verification of Overload releases) |
- |
8280 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates.
Charges for one rating
SPSPN ₹2100
DP ₹4140
TP/TPN ₹6210
FP ₹8280 |
8.3.7.9(Verification of Overload releases) |
- |
8280 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates.
Charges for one rating
SPSPN ₹2100
DP ₹4140
TP/TPN ₹6210
FP ₹8280 |
8.3.8.2(Verification of Overload releases) |
- |
8280 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates.
Charges for one rating
SPSPN ₹2100
DP ₹4140
TP/TPN ₹6210
FP ₹8280 |
8.3.8.8(Verification of Overload releases) |
- |
8280 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates.
Charges for one rating
SPSPN ₹2100
DP ₹4140
TP/TPN ₹6210
FP ₹8280 |
B.8.2(Operating characteristics) |
- |
57820 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates.
Charges for one rating
SP, SPN/DP, TPN & FP ₹57820 |
B.8.3(Dielectric Properties) |
- |
67780 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates.
Charges for one rating
SP ₹17480
SPN/DP ₹42120
TP ₹54920
FP ₹67780 |
B.8.4(Operation of the test device at the limits of rated voltage) |
- |
17400 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates.
Charges for one rating
SP, SPN/DP, TPN & FP ₹17400 |
B.8.5(Limiting value of the non-operating current under over-current conditions) |
- |
27900 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates.
Charges for one rating
SP, SPN/DP, TPN & FP ₹27900 |
B.8.6(Resistance against unwanted tripping due to surge currents resulting from impulse voltage) |
- |
29800 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates.
Charges for one rating
SP, SPN/DP, TPN & FP ₹29800 |
8.3.4.2(Test of service short circuit breaking capacity) |
- |
437460 |
|
SP, SPN/DP & TPN upto 10kA ₹40890
FP upto 10kA is ₹81770
SP, SPN/DP & TPN 10kA to 50kA ₹50550
FP 10kA to 50kA ₹101010
SP, SPN/DP & TPN 50kA to 80kA ₹76390
FP 50kA to 80kA ₹152780
SP, SPN/DP, TPN& FP 80kA to 150kA ₹437460
per rating without GST |
8.3.5.3(Rated ultimate short-circuit breaking capacity) |
- |
437460 |
|
SP, SPN/DP & TPN upto 10kA ₹40890
FP upto 10kA is ₹81770
SP, SPN/DP & TPN 10kA to 50kA ₹50550
FP 10kA to 50kA ₹101010
SP, SPN/DP & TPN 50kA to 80kA ₹76390
FP 50kA to 80kA ₹152780
SP, SPN/DP, TPN& FP 80kA to 150kA ₹437460
per rating without GST |
8.3.6.3(Rated short-time withstand current) |
- |
418900 |
|
SP, SPN/DP & TPN upto 35kA ₹48450
FP upto 35kA is ₹96950
SP, SPN/DP & TPN 35kA to 50kA ₹55780
FP 35kA to 50kA ₹111550
SP, SPN/DP TPN& FP 50kA to 80kA ₹111550
SP, SPN/DP, TPN& FP 80kA to 150kA ₹418900
per rating without GST |
8.3.6.5(Short-circuit breaking capacity at maximum short-time withstand current) |
- |
418900 |
|
SP, SPN/DP & TPN upto 35kA ₹48450
FP upto 35kA is ₹96950
SP, SPN/DP & TPN 35kA to 50kA ₹55780
FP 35kA to 50kA ₹111550
SP, SPN/DP TPN& FP 50kA to 80kA ₹111550
SP, SPN/DP, TPN& FP 80kA to 150kA ₹418900
per rating without GST |
8.3.7.2(Short-circuit at the selectivity limit current) |
- |
437460 |
|
SP, SPN/DP & TPN upto 10kA ₹40890
FP upto 10kA is ₹81770
SP, SPN/DP & TPN 10kA to 50kA ₹50550
FP 10kA to 50kA ₹101010
SP, SPN/DP & TPN 50kA to 80kA ₹76390
FP 50kA to 80kA ₹152780
SP, SPN/DP, TPN& FP 80kA to 150kA ₹437460
per rating without GST |
8.3.7.6(Short-circuit at 1,1 times take-over current) |
- |
81770 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates.
Charges for one rating
SP, SPN/DP & TPN upto 10kA ₹40890
FP upto 10kA is ₹81770 |
8.3.7.7(Short-circuit at ultimate short-circuit breaking capacity) |
- |
437460 |
|
SP, SPN/DP & TPN upto 10kA ₹40890
FP upto 10kA is ₹81770
SP, SPN/DP & TPN 10kA to 50kA ₹50550
FP 10kA to 50kA ₹101010
SP, SPN/DP & TPN 50kA to 80kA ₹76390
FP 50kA to 80kA ₹152780
SP, SPN/DP, TPN& FP 80kA to 150kA ₹437460
per rating without GST |
8.3.8.3(Rated short-time withstand current) |
- |
418900 |
|
SP, SPN/DP & TPN upto 35kA ₹48450
FP upto 35kA is ₹96950
SP, SPN/DP & TPN 35kA to 50kA ₹55780
FP 35kA to 50kA ₹111550
SP, SPN/DP TPN& FP 50kA to 80kA ₹111550
SP, SPN/DP, TPN& FP 80kA to 150kA ₹418900
per rating without GST |
8.3.8.4(Rated service short-circuit breaking capacity*) |
- |
437460 |
|
SP, SPN/DP & TPN upto 10kA ₹40890
FP upto 10kA is ₹81770
SP, SPN/DP & TPN 10kA to 50kA ₹50550
FP 10kA to 50kA ₹101010
SP, SPN/DP & TPN 50kA to 80kA ₹76390
FP 50kA to 80kA ₹152780
SP, SPN/DP, TPN& FP 80kA to 150kA ₹437460
per rating without GST |
C.2(individual pole short circuit breaking capacity (Isu)) |
- |
81770 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates.
Charges for one rating
SP, SPN/DP & TPN upto 10kA ₹40890
FP upto 10kA is ₹81770 |
C.3(verification of dielectric withstand) |
- |
22770 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates.
Charges for one rating
SP ₹5180
SPN/DP ₹14490
TP ₹18630
FP ₹22770 |
C.4(verification of overload releases) |
- |
8280 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates.
Charges for one rating
SPSPN ₹2100
DP ₹4140
TP/TPN ₹6210
FP ₹8280 |
H.2(individual pole short circuit (IIT)) |
- |
81770 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates.
Charges for one rating
SP, SPN/DP & TPN upto 10kA ₹40890
FP upto 10kA is ₹81770 |
H.3(verification of dielectric withstand) |
- |
22770 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates.
Charges for one rating
SP ₹5180
SPN/DP ₹14490
TP ₹18630
FP ₹22770 |
H.4(verification of overload releases) |
- |
8280 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates.
Charges for one rating
SPSPN ₹2100
DP ₹4140
TP/TPN ₹6210
FP ₹8280 |
|
Complete
|
|
30 Jun, 2027 |
Included w.e.f. 08.04.2024
Exclusion:Cl. 8.3.9 (Critical d.c. load current test), Cl. B.8.7 (Behavior in the case of an earth fault current comprising a d.c. component), Cl. B.8.8 (Behavior in the case of failure of line voltage for CBRs classified under B.3.1.2.1), Cl. B.8.9 (Behavior in the case of failure of line voltage for CBRs classified under B.3.1.2.2), Cl. 7.3 Annexure J Table J.1 (Electrostatic discharges, Radiated radio-frequency electromagnetic fields, Electrical fast transients/bursts, Surges, Conducted disturbances induced by radio frequency fields, Power frequency magnetic fields, Voltage dips and interruptions), Cl. 7.3 Annexure J Table J.3 ("Conducted RF disturbances 150 kHz to 30 MHz", Radiated RF disturbances 30 MHz to 1 000 MHz |
6 |
IS/IEC 60269 : Part 2 (2016) |
Low-Voltage Fuses Part 2 Supplementary Requirements for Fuses for Use by Authorized Persons ( Fuses Mainly for Industrial Application )  Examples of Standardized Systems of Fuses A to K |
- |
-
|
623500 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
Cl 8.5(Verification of the breaking capacity Fuse System A) |
- |
385742 |
|
Complete testing charges are only for one type of fuse system.
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates.
Up to 80 kA 239688
Above 80 kA up to 150 kA 385742 |
Cl 8.1.6-Table No. 109-Serial No.1(Verification of the peak withstand current of a fuse-base Fuse System A) |
- |
385742 |
|
Complete testing charges are only for one type of fuse system.
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates.
Up to 80 kA 239688
Above 80 kA up to 150 kA 385742 |
Cl 8.5(Verification of the breaking capacity Fuse System B) |
- |
385742 |
|
Complete testing charges are only for one type of fuse system.
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates.
Up to 80 kA 239688
Above 80 kA up to 150 kA 385742 |
Cl 8.5.5.1(Verification of the peak withstand current of a fuse-base Fuse System B) |
- |
385742 |
|
Complete testing charges are only for one type of fuse system.
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates.
Up to 80 kA 239688
Above 80 kA up to 150 kA 385742 |
Cl 8.5(Verification of the breaking capacity Fuse System C) |
- |
385742 |
|
Complete testing charges are only for one type of fuse system.
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates.
Up to 80 kA 239688
Above 80 kA up to 150 kA 385742 |
Cl 8.5.5.1(Verification of the peak withstand current of a fuse-base Fuse System C) |
- |
385742 |
|
Complete testing charges are only for one type of fuse system.
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates.
Up to 80 kA 239688
Above 80 kA up to 150 kA 385742 |
Cl 8.5(Verification of the breaking capacity Fuse System D) |
- |
385742 |
|
Complete testing charges are only for one type of fuse system.
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates.
Up to 80 kA 239688
Above 80 kA up to 150 kA 385742 |
Cl 8.5(Verification of the peak withstand current of a fuse-base Fuse System D) |
- |
385742 |
|
Complete testing charges are only for one type of fuse system.
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates.
Up to 80 kA 239688
Above 80 kA up to 150 kA 385742 |
Cl 8.5(Verification of the breaking capacity Fuse System E) |
- |
385742 |
|
Complete testing charges are only for one type of fuse system.
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates.
Up to 80 kA 239688
Above 80 kA up to 150 kA 385742 |
Cl 8.5.5.1(Verification of the peak withstand current of a fuse-base Fuse System F) |
- |
385742 |
|
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates.
Up to 80 kA 239688
Above 80 kA up to 150 kA 385742 |
Cl 8.5(Verification of the breaking capacity Fuse System F) |
- |
385742 |
|
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates.
Up to 80 kA 239688
Above 80 kA up to 150 kA 385742 |
Cl 8.5(Verification of the breaking capacity Fuse System G) |
- |
385742 |
|
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates.
Up to 80 kA 239688
Above 80 kA up to 150 kA 385742 |
Cl 8.5(Verification of the breaking capacity Fuse System H) |
- |
385742 |
|
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates.
Up to 80 kA 239688
Above 80 kA up to 150 kA 385742 |
Cl 8.5(Verification of the breaking capacity Fuse System I) |
- |
385742 |
|
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates.
Up to 80 kA 239688
Above 80 kA up to 150 kA 385742 |
Cl 8.5(Verification of the breaking capacity Fuse System J) |
- |
385742 |
|
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates.
Up to 80 kA 239688
Above 80 kA up to 150 kA 385742 |
Cl 8.5(Verification of the breaking capacity Fuse System K) |
- |
385742 |
|
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates.
Up to 80 kA 239688
Above 80 kA up to 150 kA 385742 |
Cl 8.9(Verification of resistance to heat Fuse System-A) |
- |
14900 |
|
Rs.7650/-(upto200A)/sample
Rs.10850/-(upto 1000A)/Sample
Rs.14900/-(upto 2000A)/sample
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates.
For fuse link I1 to I5 test applicable.
Cl 8.9.1 fuse base |
Cl 8.11.1.1 and 8.11.1.2(Mechanical strength of fuse base and fuse holders Fuse System-A) |
- |
14050 |
|
Rs.6800/-(upto200A)/sample Rs.10000/-(upto 1000A) /sample Rs.14050/-(upto 2000A) )/sample
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates. |
8.11.2.4(Non-Deterioration of insulating parts of fuse link and fuse base Fuse System-A) |
- |
13600 |
|
Rs.13600/sample
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates.
For fuse link I1 & I2 test applicable. |
Cl 8.3(Verification of temperature rise and power dissipation Fuse System-B) |
- |
14200 |
|
Rs.6950/-(upto200A)/sample Rs.10150/-(upto 1000A)/sample
Rs.14200/-(upto 2000A)/sample
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates. |
Cl 8.9(Verification of resistance to heat Fuse System-B) |
- |
14900 |
|
Rs.7650/-(upto200A)/sample
Rs.10850/-(upto 1000A)/Sample
Rs.14900/-(upto 2000A)/sample
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates.
For fuse link I1 to I5 test applicable.
Cl 8.9.1 fuse base |
Cl 8.11.1.1 (Mechanical strength of fuse Holder Fuse System-B) |
- |
14050 |
|
Rs.6800/-(upto200A)/sample Rs.10000/-(upto 1000A) /sample Rs.14050/-(upto 2000A) )/sample
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates. |
Cl 8.11.1.2(Mechanical strength of fuse Base Fuse System-B) |
- |
14050 |
|
Rs.6800/-(upto200A)/sample Rs.10000/-(upto 1000A) /sample Rs.14050/-(upto 2000A) )/sample
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates. |
Cl 8.3(Verification of temperature rise and power dissipation Fuse System-C) |
- |
14200 |
|
Rs.6950/-(upto200A)/sample Rs.10150/-(upto 1000A)/sample
Rs.14200/-(upto 2000A)/sample
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates. |
Cl 8.9(Verification of resistance to heat Fuse System-C) |
- |
14900 |
|
Rs.7650/-(upto200A)/sample
Rs.10850/-(upto 1000A)/Sample
Rs.14900/-(upto 2000A)/sample
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates.
For fuse link I1 to I5 test applicable.
Cl 8.9.1 fuse base |
Cl 8.10(Verification of Non-Deterioration of contacts Fuse System-C) |
- |
163750 |
|
Rs.46000/-(upto200A/500hours) Rs.84150/-(upto 200A/1000hours)Rs.160550/-(upto 200A/above 1000hours)
Rs.49200/-(upto1000A/500hours)Rs.87350/-(upto 1000A/1000hours)Rs.163750/-(upto 1000A/above 1000hours)
Estimated tests charges do not include GST. |
Cl 8.3(Verification of temperature rise and power dissipation Fuse System-D) |
- |
14200 |
|
Rs.6950/-(upto200A)/sample Rs.10150/-(upto 1000A)/sample
Rs.14200/-(upto 2000A)/sample
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates. |
Cl 8.10(Verification of Non-Deterioration of contacts Fuse System-D) |
- |
163750 |
|
Rs.46000/-(upto200A/500hours) Rs.84150/-(upto 200A/1000hours)Rs.160550/-(upto 200A/above 1000hours)
Rs.49200/-(upto1000A/500hours)Rs.87350/-(upto 1000A/1000hours)Rs.163750/-(upto 1000A/above 1000hours)
Estimated tests charges do not include GST. |
8.3(Verification of temperature rise and power dissipation Fuse System-E) |
- |
14200 |
|
Rs.6950/-(upto200A)/sample Rs.10150/-(upto 1000A)/sample
Rs.14200/-(upto 2000A)/sample
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates. |
Cl 8.4(Verification of operation Fuse System-E) |
- |
15250 |
|
Rs.6500/-(upto63A) )/sample
Rs.9500/-(63-160A) )/sample
Rs.12500/-(160-400A) )/sample
Rs.15250/-(above 400A) )/sample
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates. |
Cl 8.9(Verification of resistance to heat Fuse System-E) |
- |
14900 |
|
Rs.7650/-(upto200A)/sample
Rs.10850/-(upto 1000A)/Sample
Rs.14900/-(upto 2000A)/sample
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates.
For fuse link I1 to I5 test applicable.
Cl 8.9.1 fuse base |
Cl 8.10(Verification of Non-Deterioration of contacts Fuse System-E) |
- |
163750 |
|
Rs.46000/-(upto200A/500hours) Rs.84150/-(upto 200A/1000hours)Rs.160550/-(upto 200A/above 1000hours)
Rs.49200/-(upto1000A/500hours)Rs.87350/-(upto 1000A/1000hours)Rs.163750/-(upto 1000A/above 1000hours)
Estimated tests charges do not include GST. |
Cl 8.9(Verification of resistance to heat Fuse System-F) |
- |
14900 |
|
Rs.7650/-(upto200A)/sample
Rs.10850/-(upto 1000A)/Sample
Rs.14900/-(upto 2000A)/sample
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates.
For fuse link I1 to I5 test applicable.
Cl 8.9.1 fuse base |
Cl 8.10(Verification of Non-Deterioration of contacts Fuse System-F) |
- |
163750 |
|
Rs.46000/-(upto200A/500hours) Rs.84150/-(upto 200A/1000hours)Rs.160550/-(upto 200A/above 1000hours)
Rs.49200/-(upto1000A/500hours)Rs.87350/-(upto 1000A/1000hours)Rs.163750/-(upto 1000A/above
1000hours)
Estimated tests charges do not include GST. |
Cl 8.3.3(Measurement of Power dissipation of fuse link Fuse System-G) |
- |
1000 |
|
Rs.1000/-)/sample
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates. |
Cl 8.4.1 and 8.5.1(Arrangement of fuse Fuse System-G) |
- |
850 |
|
Rs.850/-)/sample
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates. |
Cl 8.9(Verification of resistance to heat Fuse System-G) |
- |
14900 |
|
Rs.7650/-(upto200A)/sample
Rs.10850/-(upto 1000A)/Sample
Rs.14900/-(upto 2000A)/sample
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates.
For fuse link I1 to I5 test applicable.
Cl 8.9.1 fuse base |
Cl 8.10(Verification of Non-Deterioration of contacts Fuse System-G) |
- |
163750 |
|
Rs.46000/-(upto200A/500hours) Rs.84150/-(upto 200A/1000hours)Rs.160550/-(upto 200A/above 1000hours)
Rs.49200/-(upto1000A/500hours)Rs.87350/-(upto 1000A/1000hours)Rs.163750/-(upto 1000A/above 1000hours)
Estimated tests charges do not include GST. |
8.3(Verification of temperature rise and power dissipation Fuse System-H) |
- |
14200 |
|
Rs.6950/-(upto200A)/sample Rs.10150/-(upto 1000A)/sample
Rs.14200/-(upto 2000A)/sample
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates. |
Cl 8.4(Verification of operation Fuse System-H) |
- |
15250 |
|
Rs.6500/-(upto63A) )/sample
Rs.9500/-(63-160A) )/sample
Rs.12500/-(160-400A) )/sample
Rs.15250/-(above 400A) )/sample
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates. |
Cl 8.9(Verification of resistance to heat Fuse System-H) |
- |
14900 |
|
Rs.7650/-(upto200A)/sample
Rs.10850/-(upto 1000A)/Sample
Rs.14900/-(upto 2000A)/sample
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates. |
Cl 8.10(Verification of Non-Deterioration of contacts Fuse System-H) |
- |
163750 |
|
Rs.46000/-(upto200A/500hours) Rs.84150/-(upto 200A/1000hours)Rs.160550/-(upto 200A/above 1000hours)
Rs.49200/-(upto1000A/500hours)Rs.87350/-(upto 1000A/1000hours)Rs.163750/-(upto 1000A/above 1000hours)
Estimated tests charges do not include GST. |
Cl 8.3.3(Measurement of Power dissipation of fuse link Fuse System-I) |
- |
1000 |
|
Rs.1000/-)/sample
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates. |
Cl 8.4.1, Cl 8.3.1 and 8.5.1(Arrangement of fuse Fuse System-I) |
- |
850 |
|
Rs.850/-)/sample
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates. |
Cl 8.9(Verification of resistance to heat Fuse System-I) |
- |
14900 |
|
Rs.7650/-(upto200A)/sample
Rs.10850/-(upto 1000A)/Sample
Rs.14900/-(upto 2000A)/sample
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates.
For fuse link I1 to I5 test applicable.
Cl 8.9.1 fuse base |
8.3(Verification of temperature rise and power dissipation Fuse System-J) |
- |
14200 |
|
Rs.6950/-(upto200A)/sample Rs.10150/-(upto 1000A)/sample
Rs.14200/-(upto 2000A)/sample
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates. |
Cl 8.4(Verification of operation Fuse System-J) |
- |
15250 |
|
Rs.6500/-(upto63A) )/sample
Rs.9500/-(63-160A) )/sample
Rs.12500/-(160-400A) )/sample
Rs.15250/-(above 400A) )/sample
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates. |
Cl 8.9(Verification of resistance to heat Fuse System-J) |
- |
14900 |
|
Rs.7650/-(upto200A)/sample
Rs.10850/-(upto 1000A)/Sample
Rs.14900/-(upto 2000A)/sample
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates.
For fuse link I1 to I5 test applicable.
Cl 8.9.1 fuse base |
Cl 8.10(Verification of Non-Deterioration of contacts Fuse System-J) |
- |
163750 |
|
Rs.46000/-(upto200A/500hours)Rs.84150/-(upto 200A/1000hours)Rs.160550/-(upto 200A/above 1000hours)
Rs.49200/-(upto1000A/500hours)Rs.87350/-(upto 1000A/1000hours)Rs.163750/-(upto 1000A/above 1000hours)
Estimated tests charges do not include GST. |
8.3(Verification of temperature rise and power dissipation Fuse System-K) |
- |
14200 |
|
Rs.6950/-(upto200A)/sample Rs.10150/-(upto 1000A)/sample
Rs.14200/-(upto 2000A)/sample
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates. |
Cl 8.9(Verification of resistance to heat Fuse System-K) |
- |
14900 |
|
Rs.7650/-(upto200A)/sample
Rs.10850/-(upto 1000A)/Sample
Rs.14900/-(upto 2000A)/sample
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates.
For fuse link I1 to I5 test applicable.
Cl 8.9.1 fuse base |
Cl 8.10(Verification of Non-Deterioration of contacts Fuse System-K) |
- |
163750 |
|
Rs.46000/-(upto200A/500hours) Rs.84150/-(upto 200A/1000hours)Rs.160550/-(upto 200A/above 1000hours)
Rs.49200/-(upto1000A/500hours)Rs.87350/-(upto 1000A/1000hours)Rs.163750/-(upto 1000A/above 1000hours)
Estimated tests charges do not include GST. |
|
Complete
|
|
30 Jun, 2027 |
- |
7 |
IS 2086 (1993) |
Carriers and bases in rewirable type electric fuses for voltages up to 650 v - Specification (Third Revision) |
- |
-
|
265600 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
Cl 9.9(Test for Breaking Capacity) |
- |
111700 |
|
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates.
For 2 4 kA & 4 kA Rs. 111700
Applicable for six samples submitted for testing |
Cl 9.1(Visual examination) |
- |
5100 |
|
Applicable for six samples submitted for testing |
Cl 9.2(Test For dimension) |
- |
5100 |
|
Applicable for six samples submitted for testing |
Cl 9.3(Test for mechanical endurance) |
- |
6300 |
|
Applicable for six samples submitted for testing |
Cl 9.4(Test for mechanical strength) |
- |
3300 |
|
Applicable for six samples submitted for testing |
Cl 9.5(Test for withdrawal force) |
- |
10200 |
|
Applicable for six samples submitted for testing |
Cl 9.6(Temperature rise test) |
- |
35700 |
|
Applicable for six samples submitted for testing |
Cl 9.7(Insulation resistance test) |
- |
10200 |
|
Applicable for six samples submitted for testing |
Cl 9.8(High Voltage test) |
- |
20400 |
|
Applicable for six samples submitted for testing |
Cl 9.10(Test for water absorption) |
- |
19200 |
|
Applicable for six samples submitted for testing |
Cl 9.11(Test on ceramic material) |
- |
38400 |
|
Applicable for six samples submitted for testing |
|
Complete
|
|
30 Jun, 2027 |
Excluding ‘Ignition test’
(for non-ceramic
materials only) (Cl.9.12) |
8 |
IS 12640 : Part 1 (2016) |
Residual current operated circuitBreakers without integral overcurrent protection for household and similar uses (Rccbs): Part 1 general rules (Second Revision) |
- |
-
|
972950 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
9.11.2.3(VERIFICATION OF PERFORMANCE AT Im) |
- |
106650 |
|
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates.
Pole wise charges in Rs given below
Charges for One rating up to 10 kA
DP 90000
FP 106650 |
6(Marking) |
- |
1700 |
|
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates. |
8.1.1(General) |
- |
1700 |
|
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates. |
8.1.2(Mechanism) |
- |
5100 |
|
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates. |
9.3(Indelibility of marking) |
- |
1700 |
|
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates. |
8.1.3 (Creepage distances) |
- |
2900 |
|
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates. |
9.15(Trip-free mechanism) |
- |
3400 |
|
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates. |
9.4(Test of reliability of screws, current carrying parts and connections ) |
- |
3400 |
|
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates. |
9.5(Test of reliability of terminals
for external conductors) |
- |
3400 |
|
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates. |
9.6(Protection against electric shock) |
- |
2000 |
|
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates. |
9.13(Test of resistance to heat) |
- |
1700 |
|
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates. |
(Cl. No. 9.14 & 4 to 10
of IEC : 60695-2-10)(Resistance to abnormal heat and to fire ) |
- |
15600 |
|
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates. |
9.7.1(Dielectric Properties : Resistance to humidity) |
- |
4800 |
|
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates. |
9.7.2 (Insulation resistance of main circuit) |
- |
22950 |
|
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates. |
9.7.7.1(Rated impulse withstand voltage) |
- |
14400 |
|
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates. |
9.8(Test of Temperature rise) |
- |
35700 |
|
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates. |
9.22.2(Testing with temperature of 40) |
- |
94700 |
|
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates. |
9.23(Verification of ageing of electronic components
) |
- |
27500 |
|
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates. |
9.1(Verification of mechanical and electrical endurance) |
- |
100200 |
|
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates. |
9.9.1(Verification of the operating characteristic) |
- |
5100 |
|
FOR THREE SAMPLES
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates. |
9.9.2.2(Verification of the correct operation at closing on residual current ) |
- |
25500 |
|
FOR THREE SAMPLES Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates. |
9.9.2.4(Verification of the correct operation in case of sudden appearance of residual currents of values between
5 IΔn and 500A) |
- |
30600 |
|
FOR THREE SAMPLES Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates. |
9.9.4(Tests at the temperature limits
) |
- |
76500 |
|
FOR THREE SAMPLES Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates. |
9.9.3(Verification of the correct operation with load at the reference temperature
) |
- |
25500 |
|
FOR THREE SAMPLES Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates. |
9.19.1(
Verification of behaviour of RCCBs in case of current surges caused by impulse voltages (Current surge test for all RCCBs (0,5 µs/100 kHz ring wave test))) |
- |
12300 |
|
FOR THREE SAMPLES Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates. |
9.19.2(Verification of behaviour at
surge currents up to 3000A
(8/20 s surge current test)) |
- |
12300 |
|
FOR THREE SAMPLES Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates. |
9.12.1(Verification of resistance to
mechanical shock) |
- |
2550 |
|
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates. |
9.12.2(Verification of resistance to
mechanical impact) |
- |
4800 |
|
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates. |
9.12.2.2(Verification of resistance to
mechanical shock and impact) |
- |
5100 |
|
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates. |
9.22.1(Climatic test) |
- |
99800 |
|
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates. |
9.16 a)(Verification of the operation of the test device at the limits of rated voltage ) |
- |
17600 |
|
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates. |
9.16 b)(Verification of the operation of the test device at the limits of rated voltage ) |
- |
0 |
|
The test charges for this test are already included in cl. 9.16 (a) Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates. |
9.16 c)(Verification of the operation of the test device at the limits of rated voltage ) |
- |
0 |
|
The test charges for this test are already included in cl. 9.16 (a) Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates. |
9.25(Resistance to rusting) |
- |
5100 |
|
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates. |
9.7.6(Capability of control circuits connected to the main circuits
etc.) |
- |
1700 |
|
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates. |
9.7.3(Dielectric strength of the main circuit) |
- |
22950 |
|
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates. |
9.7.4(Insulation resistance and dielectric strength of auxiliary
circuits) |
- |
10200 |
|
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates. |
9.7.5(Secondary circuit of detection transformers) |
- |
1700 |
|
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates. |
9.7.7.4(Resistance of the insulation of open contacts and basic
insulation against an impulse voltage in normal conditions) |
- |
21600 |
|
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates. |
9.7.7.5(Verification of the behaviour of components bridging the
basic insulation) |
- |
2550 |
|
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates. |
9.11.2.4 (Verification of the coordination between the RCCB and the SCPD) |
- |
140000 |
|
For Test Seq F As per cl.9.11.2.4 (b) & (c)
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates.
Pole wise charges in Rs given below
Charges for One rating up to 10 kA
DP 120000
FP 140000 |
|
Complete
|
|
30 Jun, 2027 |
- |
9 |
IS/IEC 60947 : Part 4 : Sec 1 (2012) |
Low - Voltage switchgear and controlgear: Part 4 contactors and motor - Starters: Sec 1 electromechanical contactors and motor - Starters (First Revision) |
- |
-
|
460000 View breakup
Testing charges sequence wise: Test Sequence 1 : 93050/- Test sequence 2 : 280000/- Test sequence 3 : 460000/- Test sequence 4 (applicable to contactors only): 380400/- Test sequence 5 : 61600/-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
9.3.5(Overload current withstand capability of contactors) |
- |
380400 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates.
Charges for one rating in Rs
Up to 10 kA - 71100
Above 10 kA to 50 kA - 87900
Above 50 kA to 80 kA - 132850
Above 80 kA to 150 kA - 380400 |
9.3.3.3.3( Temperature rise of a part ) |
- |
10850 |
|
- |
9.3.3.3.2 (Measurement of the temperature of parts ) |
- |
0 |
|
The test charges are already included in cl. 9.3.3.3.3 |
9.3.3.3.4 (Temperature rise of the main circuit ) |
- |
0 |
|
The test charges are already included in cl. 9.3.3.3.3 |
9.3.3.3.6( Temperature rise of coils and electromagnets ) |
- |
0 |
|
The test charges are already included in cl. 9.3.3.3.3 |
9.3.3.3.5( Temperature rise of control circuit) |
- |
0 |
|
The test charges are already included in cl. 9.3.3.3.3 |
9.3.3.3.8 (Temperature rise of starting resistors for rheostatic rotor starters ) |
- |
0 |
|
The test charges are already included in cl. 9.3.3.3.3 |
9.3.3.3.9( Temperature rise of the auto-transformer for two-step auto-transformer starters) |
- |
18300 |
|
- |
9.3.3.3.7 (Temperature rise of auxiliary circuits ) |
- |
0 |
|
The test charges are already included in cl. 9.3.3.3.3 |
9.3.3.4 (Dielectric properties ) |
- |
32500 |
|
- |
9.3.3.4.1( Type tests ) |
- |
0 |
|
The test charges are already included in cl. 9.3.3.4 |
9.3.3.1(Ambient air temperatur) |
- |
26250 |
|
- |
8.1.2.2 (Glow wire testing ) |
- |
5200 |
|
- |
8.1.4(Clearance) |
- |
1450 |
|
- |
8.1.4( creepage distances ) |
- |
1450 |
|
- |
9.3.3.3.3( Temperature rise of a part ) |
- |
10850 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates. |
|
Complete
|
|
30 Jun, 2027 |
- |
10 |
IS/IEC 60947 : PART 3 (2012) |
Low - Voltage switchgear and controlgear: Part 3 switches, disconnectors, switch disconnectors and fuse - Combination units (First Revision) |
- |
-
|
1909950 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
8.3.5.1( Short-time withstand current test) |
- |
438850 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates.
Charges for one rating in Rs
Up to 35 kA 84300
Above 35 kA to 50 kA 97000
Above 50 kA to 80 kA 150800
Above 80 kA to 150 kA 438850 |
8.3.5.2(Short-circuit making capacity test) |
- |
380400 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates.
Charges for one rating in Rs
Up to 10 kA 71100
Above 10 kA to 50 kA 87900
Above 50 kA to 80 kA 132850
Above 80 kA to 150 kA 380400 |
8.3.6.2, 1 a)(Fuse protected short-circuit withstand) |
- |
380400 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates.
Charges for one rating in Rs
Up to 10 kA 71100
Above 10 kA to 50 kA 87900
Above 50 kA to 80 kA 132850
Above 80 kA to 150 kA 380400 |
8.3.3.1(Temperature-rise) |
- |
21300 |
|
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates.
Charges for One rating |
8.3.3.2(Test of dielectric properties) |
- |
42450 |
|
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates.
Charges for One rating |
8.3.3.4(Dielectric verification) |
- |
8500 |
|
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates.
Charges for One rating |
8.3.3.5(Leakage current) |
- |
8500 |
|
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates.
Charges for One rating |
8.3.3.6(Temperature-rise verification) |
- |
21300 |
|
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates.
Charges for One rating |
8.3.3.7(Strength of actuator mechanism) |
- |
1700 |
|
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates.
Charges for One rating |
8.3.4.1.5(Operational performance test) |
- |
39950 |
|
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates.
Charges for One rating |
8.3.4.1.6(Operational performance test) |
- |
0 |
|
The test charges was already included in above test as mentioned in clause no. 8.3.4.1.5 |
8.3.4.2(Dielectric verification) |
- |
8500 |
|
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates.
Charges for One rating |
8.3.4.3(Leakage current) |
- |
8500 |
|
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates.
Charges for One rating |
8.3.4.4(Temperature-rise verification) |
- |
21300 |
|
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates.
Charges for One rating |
8.3.5.3(Dielectric verification) |
- |
8500 |
|
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates.
Charges for One rating |
8.3.5.4(Leakage current) |
- |
8500 |
|
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates.
Charges for One rating |
8.3.5.5(Temperature-rise verification) |
- |
21300 |
|
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates.
Charges for One rating |
8.3.6.3(Dielectric verification) |
- |
8500 |
|
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates.
Charges for One rating |
8.3.6.4(Leakage current) |
- |
8500 |
|
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates.
Charges for One rating |
8.3.6.5(Temperature-rise verification) |
- |
21300 |
|
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates.
Charges for One rating |
8.3.7.1(Overload test) |
- |
10850 |
|
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates.
Charges for One rating |
8.3.7.2(Dielectric verification) |
- |
8500 |
|
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates.
Charges for One rating |
8.3.7.3(Leakage current) |
- |
8500 |
|
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates.
Charges for One rating |
8.3.7.4(Temperature-rise verification) |
- |
21299.97 |
|
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates.
Charges for One rating |
|
Complete
|
|
30 Jun, 2027 |
scope restricted to testing except UTILIZATION category DC as per Annex A |
11 |
IS 12640 : Part 2 (2016) |
Residual current operated circuit - Breakers with integral overcurrent protection for household and similar uses (Rcbos): Part 2 general rules |
- |
-
|
1296400 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
9.12.11.2(PERFORMANCE AT REDUCED SHORT-CIRCUIT CURRENTS) |
- |
71100 |
|
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates.
Pole wise charges in Rs given below
Charges for One rating
SP, SPN, DP 71100
TP, TPN & FP 106650 |
9.12.11.3(SHORT-CIRCUIT PERFORMANCE AT 1500 A) |
- |
71100 |
|
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates.
Pole wise charges in Rs given below
Charges for One rating
SP, SPN, DP 71100
TP, TPN & FP 106650 |
9.12.11.4(TEST AT SERVICE SHORT-CIRCUIT CAPACITY (Ics) |
- |
71100 |
|
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates.
Charges for One rating |
9.12.12.1(VERIFICATION OF THE RCBO AFTER SHORT CIRCUIT TEST) |
- |
85200 |
|
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates.
Pole wise charges in Rs given below
Charges for One rating
SP 34200
SPN 49500
DP 49500
TP 69900
TPN & FP 85200 |
9.12.12.2(VERIFICATION OF THE RCBO AFTER SHORT CIRCUIT TEST) |
- |
85200 |
|
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates.
Pole wise charges in Rs given below
Charges for One rating
SP 34200
SPN 49500
DP 49500
TP 69900
TPN & FP 85200 |
8.1.3(Clearances and creepage distances (internal parts)) |
- |
2900 |
|
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates.
Charges for One rating |
Cl. No. 9.15 & 4 to 10
of IEC : 60695-2-1(Resistance to abnormal heat and to fire) |
- |
15600 |
|
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates.
Charges for One rating |
9.7.1(Resistance to humidity) |
- |
4800 |
|
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates.
Charges for One rating |
9.7.2(Insulation resistance of main circuit) |
- |
22950 |
|
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates.
Charges for One rating |
9.7.3 a)(Dielectric strength of the main circuit) |
- |
22950 |
|
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates.
Charges for One rating |
9.7.3 b)(Dielectric strength of the main circuit) |
- |
0 |
|
The test charges was already included in above clause No. 9.7.3 (a) |
9.7.3 c)(Dielectric strength of the main circuit) |
- |
0 |
|
The test charges was already included in above clause No. 9.7.3 (a) |
9.9.1.2 c)(Verification of the correct operation in case of sudden appearance of residual current) |
- |
20400 |
|
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates.
Charges for One rating |
9.8(Test of temperature-rise ) |
- |
35700 |
|
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates.
Charges for One rating |
9.2(Verification of resistance of the insulation against an impulse voltage) |
- |
14400 |
|
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates.
Charges for One rating |
9.22.2(Test with temperature of
40 ºC) |
- |
94700 |
|
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates.
Charges for One rating |
9.1(Verification of mechanical and electrical endurance) |
- |
100200 |
|
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates.
Charges for One rating |
9.9.1.2(Verification of the operating characteristic under residual current conditions) |
- |
61200 |
|
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates.
Charges for One rating |
9.9.1.3(Verification of the correct operation with load at the reference temperature) |
- |
43350 |
|
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates.
Charges for One rating |
9.9.1.4(Tests at the temperature limits) |
- |
58650 |
|
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates.
Charges for One rating |
9.9.1.5(Particular test conditions for RCBOs functionally dependent on line voltage) |
- |
10200 |
|
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates.
Charges for One rating |
9.19.1(Current surge test for all RCBOs (0,5 µs/100 kHz ring wave test)) |
- |
12300 |
|
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates.
Charges for One rating |
9.19.2(Verification of behavior at surge currents up to 3000A (8/20µs surge current test)) |
- |
12300 |
|
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates.
Charges for One rating |
9.16(Verification of the operation of the test device at the limits of rated voltage ) |
- |
17850 |
|
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates.
Charges for One rating |
9.16 b)(Verification of the operation of the test device at the limits of rated voltage) |
- |
0 |
|
The test charges was already included in above clause No. 9.16 |
9.9.2.1 a)(Test of time-(over)current characteristic) |
- |
1450 |
|
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates.
Charges for One rating |
9.9.2.1 b)(Test of time-(over)current characteristic) |
- |
3400 |
|
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates.
Charges for One rating |
9.9.2.2(Test of instantaneous tripping) |
- |
11300 |
|
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates.
Charges for One rating |
9.9.2.3 a)(Test of effect of ambient temperature on the tripping characteristic) |
- |
3400 |
|
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates.
Charges for One rating |
9.9.2.3 b)(Test of effect of ambient temperature on the tripping characteristic) |
- |
2900 |
|
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates.
Charges for One rating |
9.13.1(Verification of
resistance to
mechanical shock ) |
- |
4800 |
|
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates.
Charges for One rating |
9.13.2(Verification of
resistance to
mechanical impact ) |
- |
5100 |
|
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates.
Charges for One rating |
9.22.1(Reliability (Climatic test)) |
- |
99800 |
|
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates.
Charges for One rating |
9.22.1.3 b) 2(Reliability (Climatic test) : procedure) |
- |
0 |
|
The test charges was already included in above clause No. 9.22.1 |
9.22.1.4(Reliability (Climatic test) : Recovery) |
- |
0 |
|
The test charges was already included in above clause No. 9.22.1 |
9.22.1.5(Reliability (Climatic test) : Final verification) |
- |
10200 |
|
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates.
Charges for One rating 6 samples |
6(Marking (except indelibility of marking)) |
- |
1700 |
|
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates.
Charges for One rating |
8.1.1(Mechanical Design(General)) |
- |
1700 |
|
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates.
Charges for One rating |
8.1.2(Mechanical Design (Mechanism)) |
- |
9200 |
|
Estimated tests charges do not include GST.
Final charges will include GST at the prevailing rates.
Charges for One rating |
8.1.4(Reliability of Screws,current-carrying parts and connections) |
- |
5100 |
|
Excluding gst |
6, 9.3(Indelibility of marking) |
- |
1700 |
|
Excluding gst |
8.1.6(Noninterchangeability) |
- |
1700 |
|
Excluding gst |
8.1.5(Reliability of Terminals for external conductors) |
- |
5100 |
|
Excluding gst |
8.1.2 , 9.11(Trip-free mechanism) |
- |
3400 |
|
Excluding gst |
8.2, 9.6(Protection against electric shock) |
- |
2000 |
|
Excluding gst |
8.9, 9.14(Resistance to heat) |
- |
1700 |
|
Excluding gst |
8.1.4.4 , 9.25(Resistance to rusting) |
- |
5100 |
|
Excluding gst |
8.1.3, 9.7.7.4(Resistance of the insulation of open contacts and basic insulation against an impulse voltage in normal conditions) |
- |
21600 |
|
For three samples
Excluding gst |
9.7.7.5(Verification of the behavior of components bridging the basic insulation) |
- |
2550 |
|
For three samples
Excluding gst |
8.1.3, 8.3, 9.7.4(Insulation resistance and dielectric strength of auxiliary circuits) |
- |
10200 |
|
For three samples
Excluding gst |
8.1.3, 8.3, 9.7.7.2(Verification of clearances with the impulse withstand voltage) |
- |
4350 |
|
For three samples
Excluding gst |
8.1.3, 8.3, Cl. 9.7.5(Secondary circuit of detection transformers) |
- |
1700 |
|
Excluding gst |
8.1.3, Cl. 8.3, Cl. 9.7.6(Capability of control circuits connected to the main circuits) |
- |
1700 |
|
Excluding gst |
8.16, Cl. 9.23(Ageing of electronic components) |
- |
27500 |
|
Excluding gst |
8.12, Cl.9.17(Behavior in the case of failure of line voltages) |
- |
40800 |
|
For three samples
Excluding gst |
|
Complete
|
|
30 Jun, 2027 |
- |
12 |
IS 16444 (2015) |
AC static direct connected watthour smart meter class 1 and 2 - Specification |
a.c. Static Direct connected Watthour Smart Meter |
-
|
672260 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
cl. 12.7.6.2 of IS 13779(Impulse voltage test) |
- |
3480 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates.
for single phase, Three phase: Rs.6000 |
cl. 12.7.6.3 of IS 13779(ac Voltage test) |
- |
590 |
|
for single phase, Three phase: Rs.550 |
cl. 12.7.6.4 of IS 13779(Insulation resistance test) |
- |
590 |
|
for single phase, Three phase: Rs.500 |
12.10.1 a) of IS 13779(Testof Accuracy Requirements : General Test Conditions
) |
- |
0 |
|
already included |
12.10.1 b) of IS 13779(Testof Accuracy Requirements : General Test Conditions
) |
- |
0 |
|
already included |
12.10.1 c) of IS 13779(Testof Accuracy Requirements : General Test Conditions
) |
- |
0 |
|
already included |
12.10.1 d) of IS 13779(Testof Accuracy Requirements : General Test Conditions
) |
- |
0 |
|
already included |
12.10.1 e) of IS 13779(Testof Accuracy Requirements : General Test Conditions
) |
- |
0 |
|
already included |
12.10.1 f) of IS 13779(Testof Accuracy Requirements : General Test Conditions
) |
- |
0 |
|
already included |
cl. 11.1 of IS 13779(Limits of Error Due to Variation of tile Current) |
- |
2780 |
|
for single phase, Three phase: Rs.7100 |
12.16 a) of IS 13779(Limits of Error and Interpretation or Test
Results) |
- |
590 |
|
for single phase, Three phase: Rs.600 |
12.16 b) of IS 13779(Limits of Error and Interpretation or Test
Results) |
- |
590 |
|
for single phase and Three phase: |
12.16 c) of IS 13779(Limits of Error and Interpretation or Test
Results) |
- |
590 |
|
for single phase and Three phase: |
12.15 of IS 13779(Test of Meter Constant/Registration) |
- |
1050 |
|
for single phase , Three phase: Rs 1150 |
12.14 of IS 13779(Test of Starting Conditions) |
- |
1050 |
|
for single phase, Three phase: 1150 |
12.13 of IS 13779(Test of No-Load Condition) |
- |
1050 |
|
for single phase , Three phase: 1150 |
12.12 of IS 13779(Test ofAmbient Temperature Influence) |
- |
3480 |
|
for single phase ,Three phase: 5220 |
12.17 of IS 13779(Repeatability of Error Test
) |
- |
2780 |
|
for single phase and Three phase |
12.11 of IS 13779(Test of Iniluence Quantities) |
- |
37360 |
|
for single phase , Three phase: : 57230 |
12.7.1 of IS 13779(Test of Power Consumption) |
- |
3480 |
|
for single phase , Three phase: 10420 |
4.4.2.7 of IS 15844(Voltage dips and short interruptions) |
- |
6780 |
|
for single phase and Three phase : 9500 |
4.4.3 of IS 15844(Influence of Short-Time Overcurrents) |
- |
48810 |
|
for single phase and Three phase: 48810 |
4.4.4 of IS 15844(Influence of Self-Heating) |
- |
2030 |
|
for single phase ,Three phase: |
4.4.5 of IS 15844(Influence of Heating) |
- |
1970 |
|
for single phase and Three phase:3100 |
12.8 of IS 13779(TestorImmunity to Earth Fault) |
- |
8110 |
|
for three phase |
12.9.2 of IS 13779(Test for Immunity to Electrostatic Discharge
(ESD)) |
- |
18530 |
|
for single phase and Three phase:23160 |
12.9.3 of IS 13779(Test for Immunity to EIectromagnetic HF Fields) |
- |
17370 |
|
for single phase and Three phase |
12.9.4 of IS 13779(FastTransient BurstTest) |
- |
11580 |
|
for single phase and Three phase :16000 |
12.9.5 of IS 13779(Radio Interference Measurement) |
- |
27780 |
|
for single phase and Three phase |
12.6.1 of IS 13779(Dry Heat Test) |
- |
9950 |
|
for single phase and Three phase |
12.6.2 of IS 13779(Cold Test) |
- |
9950 |
|
for single phase and Three phase = 10120 |
12.6.3 of IS 13779( Damp Heat Cycle Test) |
- |
19160 |
|
for single phase and Three phase :20410 |
12.3.1 of IS 13779(Shock Test) |
- |
3070 |
|
for single phase and Three phase :4120 |
12.3.2 of IS 13779(Vibration Test) |
- |
6770 |
|
for single phase and Three phase : 8850 |
12.3.3 of IS 13779( Spring Hammer Test) |
- |
1280 |
|
for single phase and Three phase :1820 |
12.5 a) of IS 13779(Test of Protection Against Penetration of Dust
and Water) |
- |
14580 |
|
for single phase and Three phase :17170 |
12.5 b) of IS 13779(Test of Protection Against Penetration of Dust
and Water) |
- |
14580 |
|
for single phase and Three phase 14580 |
4.4.2.6 of IS 15844(Abnormal voltage conditions) |
- |
6840 |
|
for single phase and Three phase : 17000 |
4.4.2.1 of IS 15844(Voltage range) |
- |
0 |
|
already included |
4.4.2.2 of IS 15844( Specified operating range
) |
- |
0 |
|
already included |
4.4.2.3 of IS 15844(Extended operating range) |
- |
0 |
|
already included |
4.4.2.4 of IS 15844( Limit range of operation) |
- |
0 |
|
already included |
4.4.2.5 of IS 15844(Withstand range) |
- |
0 |
|
already included |
cl. 7.1 a) of IS 13779(MARKING OF METERS : Name Plate
) |
- |
2040 |
|
for single phase and Three phase |
cl. 7.1 b) of IS 13779(MARKING OF METERS : Name Plate
) |
- |
0 |
|
already included |
cl. 7.1 c) of IS 13779(MARKING OF METERS : Name Plate
) |
- |
0 |
|
already included |
cl. 7.1 d) of IS 13779(MARKING OF METERS : Name Plate
) |
- |
0 |
|
already included |
cl. 7.1 e) of of IS 13779(MARKING OF METERS : Name Plate
) |
- |
0 |
|
already included |
cl. 7.1 f) of IS 13779(MARKING OF METERS : Name Plate
) |
- |
0 |
|
already included |
cl. 7.1 g) of IS 13779(MARKING OF METERS : Name Plate
) |
- |
0 |
|
already included |
cl. 7.1 h) of IS 13779(MARKING OF METERS : Name Plate
) |
- |
0 |
|
already included |
cl. 7.1 j) of IS 13779(MARKING OF METERS : Name Plate
) |
- |
0 |
|
already included |
cl. 7.1 k) of IS 13779(MARKING OF METERS : Name Plate
) |
- |
0 |
|
already included |
cl. 7.1 m) of IS 13779(MARKING OF METERS : Name Plate
) |
- |
0 |
|
already included |
cl. 7.1 p) of IS 13779(MARKING OF METERS : Name Plate
) |
- |
0 |
|
already included |
cl. 7.1 n) of IS 13779(MARKING OF METERS : Name Plate
) |
- |
0 |
|
already included |
12.4 of IS 13779(Testof Resistance to Heat and Fire
) |
- |
8570 |
|
for single phase and Three phase 9630 |
4.4.6 of IS 15844(Insulation) |
- |
590 |
|
for single phase and Three phase |
cl. 11.4 of IS 13779(Starting and Running w'th No-Load) |
- |
1050 |
|
for single phase and Three phase: 1330 |
cl. 11.2 of IS 13779(Limits of Error Due to Other Influence Quantities (Voltage-Variation, Frequency Variation,
Phase-Sequence, Wave Form, Voltage-Unba.ance)) |
- |
37360 |
|
for single phase and Three phase :57230 |
12.7.2 of IS 13779(Test of Influence of Supply Voltage) |
- |
9500 |
|
for single phase and Three phase:12000 |
12.7.3 of IS 13779( Test of Influence of Short-time Overcurrents) |
- |
48810 |
|
for single phase and Three phase : 48810 |
12.7.4 of IS 13779(Test of Influence of Self-Heating) |
- |
1750 |
|
for single phase and Three phase : 2300 |
12.7.5 of IS 13779(Test of Influence of Heating) |
- |
2300 |
|
for single phase and Three phase : 3100 |
cl. 11.5 of IS 13779(Starting Current) |
- |
1050 |
|
for single phase and Three phase : 1150 |
6.8(BIS Standard Mark) |
- |
0 |
|
Included in General and Construction Requirements Cl. No. 6.2 |
6.8(Marking of smart meters
Name plate) |
- |
0 |
|
Included in General and Construction Requirements Cl. No. 6.2 |
6.3(Clearance and creepage distances) |
- |
0 |
|
Included in General and Construction Requirements Cl. No. 6.2 |
11.0(Smart meter functional requirements) |
- |
34750 |
|
for single phase and three smart meter |
9, 10.6(Test of Smart Meter Communicability) |
- |
34750 |
|
for single phase and three smart meter |
10.3(Test of Display) |
- |
0 |
|
Included in General and Construction Requirements Cl. No. 6.2 |
8.0(Data Exchange for Electricity Meter Reading,
Tariff and Load Control Companion Specification (Verification up to two Port)) |
- |
150500 |
|
for single phase and three smart meter |
7.2, 10.4(Performance Requirements for Load Switching (UC1)) |
- |
53250 |
|
for single phase and for Three Phase Rs.8690 |
7.2, 10.4(Dielectric strength (G-8)) |
- |
4635 |
|
for single phase and for Three Phase Rs.8690 |
7.2, 10.4(Minimum switched current (G-7)) |
- |
2780 |
|
for single phase and for Three Phase Rs.4000 |
7.2, 10.4(Short circuit current carrying capacity (G-6)) |
- |
8230 |
|
for single phase and Three Phase |
7.2, 10.4(Fault current making capacity (G-5)) |
- |
82310 |
|
for single phase and Three Phase |
7.2, 10.4(Line to load voltage surge withstand (G-4)) |
- |
13900 |
|
for single phase and for Three Phase Rs.27800 |
7.2, 10.4(Electrical endurance (G-3)) |
- |
61350 |
|
for single phase and for Three Phase Rs.177000 |
7.2, 10.4(Normal operation (G-2)) |
- |
1165 |
|
for single phase and for Three Phase Rs.1860 |
6.5(Test of resistance to heat and fire) |
- |
8570 |
|
for single phase and Three Phase 9630 |
Note 1c of Table 1(Remote disconnect/connect) |
- |
1170 |
|
for single phase and for Three Phase Rs.1860 |
Note 1b of Table 1(Access and data read test) |
- |
1170 |
|
for single phase and for Three Phase Rs.1860 |
Note 1a of Table 1(Accuracy of the meter at pre-defined points) |
- |
1770 |
|
for single phase and for Three Phase Rs2670 |
6.5(Protection against penetration of dust and water) |
- |
14580 |
|
for single phase and for Three Phase Rs.14580 |
6.5(Spring Hammer test) |
- |
1100 |
|
for single phase and for Three Phase Rs.1400/- |
6.5(Shock test) |
- |
2150 |
|
for single phase and for Three Phase Rs.2750/- |
6.5(Vibration test) |
- |
6770 |
|
for single phase and for Three Phase Rs.8850 |
6.9(Damp heat cyclic test) |
- |
19160 |
|
for single phase and Three Phase |
6.9(Cold test) |
- |
9950 |
|
for single phase and Three Phase |
6.9(Dry heat test) |
- |
9950 |
|
for single phase and Three Phase |
6.11(Surge Immunity test) |
- |
15050 |
|
for single phase and for Three Phase Rs.43710 |
6.11(Test of immunity to electromagnetic HF field) |
- |
34740 |
|
for single phase and Three Phase |
6.11(Test of immunity to electrostatic discharge) |
- |
20000 |
|
for single phase and for Three Phase Rs.25000/- |
6.11(Fast transient burst test) |
- |
11580 |
|
for single phase and for Three Phase Rs.18520 |
6.11(Radio interference measurement) |
- |
15000 |
|
for single phase and for Three Phase Rs.45000 |
6.10.7(Test of influence of immunity to earth fault) |
- |
8110 |
|
for Three Phase |
6.10.5(Test of influence of heating) |
- |
1970 |
|
for single phase and for Three Phase Rs.3550 |
6.10.4(Test of influence of self-heating) |
- |
2030 |
|
2830 |
6.10.1(Test of influence of short time over currents) |
- |
48640 |
|
for single phase and Three Phase |
6.10.1(Test of influence of supply voltage) |
- |
9550 |
|
for single phase and for Three Phase Rs.12000 |
6.12(Abnormal Magnetic Induction of External Origin 10mT) |
- |
3070 |
|
for single phase and for Three Phase Rs. 4530 |
6.12(Magnetic induction of External Origin 0.5mT) |
- |
2650 |
|
for single phase and for Three Phase Rs.3950/- |
6.12(Continuous Magnetic Induction of External Origin 0.2 Tesla) |
- |
2320 |
|
for single phase and for Three Phase Rs.3010 |
6.12(Continuous Magnetic Induction of External Origin 67 milli Tesla) |
- |
2320 |
|
for single phase and for Three Phase Rs.3010 |
6.12(DC & Even Harmonics in the ac current circuit) |
- |
4050 |
|
for single phase and for Three Phase Rs.5790 |
6.12(Voltage Unbalanced) |
- |
1510 |
|
for Three Phase |
6.12(Reversed Phase Sequence) |
- |
1330 |
|
for Three Phase |
6.12(Waveform 10% of 3rd Harmonics) |
- |
8280 |
|
for single phase and Three Phase 16500 |
6.12(Frequency Variation) |
- |
6950 |
|
for single phase and for Three Phase Rs.9030 |
6.12(Voltage Variation) |
- |
7300 |
|
9030 |
6.12(Test of influence quantities) |
- |
37360 |
|
57230 |
6.12(Test of repeatability of error ) |
- |
2780 |
|
for single phase and Three Phase |
6.12(Test of ambient temperature influence) |
- |
3480 |
|
for single phase and for Three Phase Rs.5220 |
6.12(Test of no-load condition) |
- |
1050 |
|
for single phase and for Three Phase Rs.1330 |
6.12(Test of starting condition) |
- |
1050 |
|
for single phase and for Three Phase Rs.1330 |
6.12(Test of meter constant) |
- |
1050 |
|
for single phase and for Three Phase Rs.1330 |
6.12(Test on limits of error due to variation of the current) |
- |
5780 |
|
for single phase and for Three Phase Rs.8220 |
6.10.6(Insulation resistance test) |
- |
590 |
|
for single phase and Three Phase |
6.10.6(Impulse voltage test) |
- |
3450 |
|
for single phase and for Three Phase Rs.14820 |
6.10.6(ac high voltage test) |
- |
590 |
|
for single phase and for Three Phase Rs.550/- |
6.8.1(Additional information) |
- |
0 |
|
included in General and construction Requirements Cl. no. 6.2 |
6.8(Connection diagrams and terminal marking) |
- |
0 |
|
included in General and construction Requirements Cl. no. 6.2 |
6.7(Output device) |
- |
0 |
|
included in General and construction Requirements Cl. no. 6.2 |
6.6(Display of measured values) |
- |
0 |
|
included in General and construction Requirements Cl. no. 6.2 |
6.2.2(Insulating encased meter) |
- |
0 |
|
included in General and construction Requirements Cl. no. 6.2 |
6.2.2(Terminal Cover(s)) |
- |
0 |
|
included in General and construction Requirements Cl. no. 6.2 |
6.2.1(Terminals, terminal block and protective earth ter-minal) |
- |
0 |
|
included in General and construction Requirements Cl. no. 6.2 |
6.2(Communication module
Load switch) |
- |
0 |
|
included in General and construction Requirements Cl. no. 6.2 |
6.2(Window) |
- |
0 |
|
included in General and construction Requirements Cl. no. 6.2 |
6.2(Meter case) |
- |
0 |
|
included in General and construction Requirements Cl. no. 6.2 |
6.2(General and constructional requirements) |
- |
17350 |
|
Total Test charges for general and construction requirement for physical verification |
6.2.1(Heat Deflection Test) |
- |
5800 |
|
for single phase and three smart meter |
|
Complete
|
|
30 Jun, 2027 |
Testing Charges in detail:
1. All tests as per standard on Single phase Smart meter with Load switch UC1 category = Rs.4,55,800/- + GST per make for a set of 4 samples of same rating
2. All tests as per standard on Single phase Smart meter with Load switch UC2 or UC3 category = Rs.5,68,800/-+GST per make for a set of 8 samples of same rating.
3. All tests as per standard on Three phase Smart meter with Load switch UC1 category =Rs.5,48,900/-+ GST per make for a set of 4 samples of same rating.
4. All tests as per standard on Three phase Smart meter with Load switch UC2 or UC3 category = Rs.7,22,500/-+GST per make for a set of 8 samples of same rating . |
13 |
IS 15884 (2010) |
Alternating current direct connected static prepayment meters for active energy (Class 1 And 2) - Specification |
ac Direct connected static prepayment Meters for Active |
-
|
1065000 View breakup
Testing Charges in detail : For all tests for Utilization category UC1: Rs. 6,29,000/- for single phase meter and Rs. 7,54,000/- for Three phase. For Utilization category UC2 & UC3: Rs.7,25,000/- for single phase meter and Rs 10,65,000/- for three phase meters.
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
4(General Requirements) |
- |
23160 |
|
for Single phase and Three phase meters
Test charges are excluding GST. GST on the test charges will be applicable as per prevailing rate. |
4.1.1(By Inspection) |
- |
0 |
|
included in General requirement CL.no.4.0 |
4.1.2(By Inspection) |
- |
0 |
|
included in General requirement CL.no.4.0 |
4.1.3(By Inspection) |
- |
0 |
|
included in General requirement CL.no.4.0 |
4.1.4(By Inspection) |
- |
0 |
|
included in General requirement CL.no.4.0 |
4.2(Mechanical Requirements) |
- |
0 |
|
included in General requirement CL.no.4.0 |
4.2.1(By Inspection) |
- |
0 |
|
included in General requirement CL.no.4.0 |
4.2.1(By Inspection) |
- |
0 |
|
included in General requirement CL.no.4.0 |
4.2.1(By Inspection) |
- |
0 |
|
included in General requirement CL.no.4.0 |
4.2.1(By Inspection) |
- |
0 |
|
included in General requirement CL.no.4.0 |
4.2.1(By Inspection) |
- |
0 |
|
included in General requirement CL.no.4.0 |
4.2.1(By Inspection) |
- |
0 |
|
included in General requirement CL.no.4.0 |
4.2.1(By Inspection) |
- |
0 |
|
included in General requirement CL.no.4.0 |
4.2.1(By Inspection) |
- |
0 |
|
included in General requirement CL.no.4.0 |
4.2.1(By Inspection) |
- |
0 |
|
included in General requirement CL.no.4.0 |
4.2.2(By Inspection) |
- |
0 |
|
included in General requirement CL.no.4.0 |
4.2.2(By Inspection) |
- |
0 |
|
included in General requirement CL.no.4.0 |
4.2.2(By Inspection) |
- |
0 |
|
included in General requirement CL.no.4.0 |
4.2.2(By Inspection) |
- |
0 |
|
included in General requirement CL.no.4.0 |
4.2.2(By Inspection) |
- |
0 |
|
included in General requirement CL.no.4.0 |
4.2.3(By Inspection) |
- |
0 |
|
included in General requirement CL.no.4.0 |
4.2.4(IS 13360 (Part 6/Sec 17) for a temperature of 135°C and a pressure of 1.8 MPa (Method A).) |
- |
5000 |
|
For single phase and Three phase meter |
4.2.4(By Inspection) |
- |
0 |
|
included in General requirement CL.no.4.0 |
4.2.4(By Inspection) |
- |
0 |
|
included in General requirement CL.no.4.0 |
4.2.4(By Inspection) |
- |
0 |
|
included in General requirement CL.no.4.0 |
4.2.4(By Inspection) |
- |
0 |
|
included in General requirement CL.no.4.0 |
4.2.4(By Inspection) |
- |
0 |
|
included in General requirement CL.no.4.0 |
4.2.4(By Inspection) |
- |
0 |
|
included in General requirement CL.no.4.0 |
4.2.4(By Inspection) |
- |
0 |
|
included in General requirement CL.no.4.0 |
4.2.4(By Inspection) |
- |
0 |
|
included in General requirement CL.no.4.0 |
4.2.4(By Inspection) |
- |
0 |
|
included in General requirement CL.no.4.0 |
4.2.4(By Inspection) |
- |
0 |
|
included in General requirement CL.no.4.0 |
4.2.4(By Inspection) |
- |
0 |
|
included in General requirement CL.no.4.0 |
4.2.4(By Inspection) |
- |
0 |
|
included in General requirement CL.no.4.0 |
4.2.4(By inserting copper conductor of appropriate size) |
- |
0 |
|
included in General requirement CL.no.4.0 |
4.2.4(By Inspection) |
- |
0 |
|
included in General requirement CL.no.4.0 |
4.2.4(By Inspection) |
- |
0 |
|
included in General requirement CL.no.4.0 |
4.2.5(shall have a separate cover which can be sealed independently of the meter cover. The terminal cover shall enclose the actual terminals) |
- |
0 |
|
included in General requirement CL.no.4.0 |
4.2.5(The terminals their fixing screws, a suitable length of external insulated conductor and its insulation shall be enclosed by a cover with a provision for sealing. ) |
- |
0 |
|
included in General requirement CL.no.4.0 |
4.2.5(The fixing screws used on the terminal cover for fixing and sealing shall be held captive in the terminal cover.) |
- |
0 |
|
included in General requirement CL.no.4.0 |
4.2.5(When the meter is mounted on the meter board, no access to the terminals shall be possible without breaking the seal of the terminal cover.) |
- |
0 |
|
included in General requirement CL.no.4.0 |
4.2.6(By measurement) |
- |
0 |
|
included in General requirement CL.no.4.0 |
4.2.6(By measurement) |
- |
0 |
|
included in General requirement CL.no.4.0 |
4.2.6(By measurement) |
- |
0 |
|
included in General requirement CL.no.4.0 |
4.2.6(By measurement) |
- |
0 |
|
included in General requirement CL.no.4.0 |
4.2.7(Standard test fingure) |
- |
0 |
|
included in General requirement CL.no.4.0 |
4.2.10(Display of measured values) |
- |
0 |
|
included in General requirement CL.no.4.0 |
4.2.10.1(By inspection) |
- |
0 |
|
included in General requirement CL.no.4.0 |
4.2.10.1(By inspection) |
- |
0 |
|
included in General requirement CL.no.4.0 |
4.2.10.2(By inspection) |
- |
0 |
|
included in General requirement CL.no.4.0 |
4.2.10.3(By measurement) |
- |
0 |
|
included in General requirement CL.no.4.0 |
4.2.10.4(By inspection) |
- |
0 |
|
included in General requirement CL.no.4.0 |
4.2.10.5(By inspection) |
- |
0 |
|
included in General requirement CL.no.4.0 |
4.2.10.5(By inspection) |
- |
0 |
|
included in General requirement CL.no.4.0 |
4.2.10.5(By inspection) |
- |
0 |
|
included in General requirement CL.no.4.0 |
4.2.10.5(By inspection) |
- |
0 |
|
included in General requirement CL.no.4.0 |
4.2.10.5(By inspection) |
- |
0 |
|
included in General requirement CL.no.4.0 |
4.2.10.5(By inspection) |
- |
0 |
|
included in General requirement CL.no.4.0 |
4.2.10.6(By inspection) |
- |
0 |
|
included in General requirement CL.no.4.0 |
4.2.10.6(By inspection) |
- |
0 |
|
included in General requirement CL.no.4.0 |
4.2.10.6(By inspection) |
- |
0 |
|
included in General requirement CL.no.4.0 |
4.2.10.7(By inspection) |
- |
0 |
|
included in General requirement CL.no.4.0 |
4.2.10.7(By inspection) |
- |
0 |
|
included in General requirement CL.no.4.0 |
4.2.10.8(Fig. 4, annexure F) |
- |
1500 |
|
For single phase and Three phase meter |
4.2.10.9(Fig. 5, annexure F) |
- |
1500 |
|
For single phase and Three phase meter |
4.2.11(By inspection) |
- |
0 |
|
included in General requirement CL.no.4.0 |
4.2.11.1(By inspection) |
- |
0 |
|
included in General requirement CL.no.4.0 |
4.2.11.1(By inspection) |
- |
0 |
|
included in General requirement CL.no.4.0 |
4.2.11.1(By inspection) |
- |
0 |
|
included in General requirement CL.no.4.0 |
4.2.11.1(By inspection) |
- |
0 |
|
included in General requirement CL.no.4.0 |
4.2.11.1(By inspection) |
- |
0 |
|
included in General requirement CL.no.4.0 |
4.2.11.1(By inspection) |
- |
0 |
|
included in General requirement CL.no.4.0 |
4.2.11.1(By inspection) |
- |
0 |
|
included in General requirement CL.no.4.0 |
4.2.11.1(By inspection) |
- |
0 |
|
included in General requirement CL.no.4.0 |
4.2.11.1(By inspection) |
- |
0 |
|
included in General requirement CL.no.4.0 |
4.2.11.1(By inspection) |
- |
0 |
|
included in General requirement CL.no.4.0 |
4.2.11.1(By inspection) |
- |
0 |
|
included in General requirement CL.no.4.0 |
4.2.11.1(By inspection) |
- |
0 |
|
included in General requirement CL.no.4.0 |
4.2.11.1(By inspection) |
- |
0 |
|
included in General requirement CL.no.4.0 |
4.2.11.1(By inspection) |
- |
0 |
|
included in General requirement CL.no.4.0 |
4.2.11.1(By inspection) |
- |
0 |
|
included in General requirement CL.no.4.0 |
4.6.1(As per table 10 & 11, cl 5.6.1) |
- |
2800 |
|
for single phase and for three phase = 8230 |
4.6.2(As per table 12) |
- |
25600 |
|
for single phase and for three phase = 34650 |
4.4.2(Table 7) |
- |
0 |
|
For single phase and Three phase meter |
5.2(Test of mechanical requirements) |
- |
0 |
|
For single phase and Three phase meter |
5.2.1(As per cl 12.3.3 of IS 13779) |
- |
690 |
|
for single phase and for three phase |
5.2.2(As per IS 9000 (Part 7/Sec 1)) |
- |
2150 |
|
for single phase and for three phase = 3550 |
5.2.3(As per IS 9000 (Part 8)) |
- |
2500 |
|
for single phase and for three phase = 5160 |
5.2.4(As per IS 11000 (Part 2 / Sec1)) |
- |
8575 |
|
for single phase and for three phase |
5.2.5(Protection against penetration of dust (IP5X)) |
- |
14590 |
|
for single phase and for three phase = 15920 |
5.3(Tests of Climatic Influences) |
- |
0 |
|
For single phase and Three phase meter |
5.3.1(according to IS 9000
(Part 3/ Sec 1 to 5)) |
- |
9950 |
|
for single phase and for three phase |
5.3.2(according to IS 9000
(Part 2/Sec 1 to 4)) |
- |
9950 |
|
for single phase and for three phase |
5.3.3(according to IS 9000 (Part 5/Sec 1 and 2)) |
- |
24375 |
|
for single phase and for three phase = 28600 |
5.3.3(according to IS 9000 (Part 5/Sec 1 and 2)) |
- |
0 |
|
already inclued |
5.3.3(As per cl 5.4.6) |
- |
590 |
|
For single phase and Three phase meter |
5.3.3(Visual examination) |
- |
590 |
|
For single phase and Three phase meter |
5.2.5(As per IS 12063) |
- |
5900 |
|
For single phase and Three phase meter |
5.2.5(500 V dc) |
- |
590 |
|
For single phase and Three phase meter |
5.2.5(Protection against penetration of water (IP1X)) |
- |
5390 |
|
For single phase and Three phase meter |
5.2.5(500 V dc) |
- |
590 |
|
For single phase and Three phase meter |
5.4(As per 5.6.1) |
- |
0 |
|
For single phase and Three phase meter |
5.4.1(As per 4.4.1.1) |
- |
2320 |
|
for single phase and for three phase = 6000 |
5.4.2(As per 4.4.2.1) |
- |
17380 |
|
for single phase and for three phase = 20000 |
5.4.3(Table 8, as per cl4.4.3) |
- |
4880 |
|
for single phase and three phase |
5.4.4(Table 9, and cl 4.4.4) |
- |
2030 |
|
for single phase and for three phase = 2300 |
5.4.4(Table 9, and cl 4.4.4) |
- |
0 |
|
included |
5.4.5(As per cl 4.4.5) |
- |
2670 |
|
for single phase and for three phase =3100 |
5.4.6(As per IS 2071 (Part1)) |
- |
0 |
|
Test description |
5.4.6.2(6 KV, As per cl 12.7.6.2 of IS 13779) |
- |
4060 |
|
for single phase and for three phase = 6800 |
5.4.6.2(12.7.6.2 of IS 13779) |
- |
0 |
|
included |
5.4.6.2(12.7.6.2 of IS 13779) |
- |
0 |
|
included |
5.4.6.3(Table 15, power source 500 VA) |
- |
590 |
|
for single phase and for three phase = 550 |
5.4.6.4(500±50V dc) |
- |
590 |
|
For single phase and Three phase meter |
5.5(Test of electromagnetic compatibility) |
- |
0 |
|
included |
5.5.2(the load switch shall not
operate during the tests.) |
- |
19530 |
|
for single phase and for three phase = 20000 |
5.5.2(according to IS 14700 (Part 4/Sec 2)) |
- |
0 |
|
Already included |
5.5.3(Table 12 &
IS 14700 (Part 4/Sec 3)) |
- |
34740 |
|
For single phase and Three phase meter |
5.5.4(according to IS 14700
(Part 4/Sec 4)) |
- |
11590 |
|
for single phase and for three phase = 16000 |
5.5.5(according to IEC 62052-11) |
- |
13900 |
|
for conducted emission(150 KHz to 30 MHz) |
5.5.6(Surge Immunity Test) |
- |
0 |
|
included |
5.5.6(according to IEC 61000-
4-5) |
- |
6960 |
|
for single phase and for three phase = 18540 |
5.5.6(according to IEC 61000-
4-5) |
- |
6960 |
|
for single phase and for three phase =18540 |
4.2.10.9(Fig. 5, annexure F) |
- |
3480 |
|
For single phase and Three phase meter |
4.6.3(Limits of error due to Ambient temperature Variation) |
- |
3480 |
|
for single phase and for three phase = 5220 |
4.6.6.2.2(Performance requirement for load switching Utilization category UC2
(Annex G.)) |
- |
0 |
|
included |
4.6.6.2.2 & G2(Normal operation) |
- |
1160 |
|
for single phase and for three phase = 1860 |
4.6.6.2.2 & G3(Electrical endurance) |
- |
62000 |
|
for single phase and for three phase = 177900 |
4.6.6.2.2 & G4(Line to load voltage surge withstand) |
- |
14480 |
|
for single phase and for three phase = 28750 |
4.6.6.2.2 & G5(Fault current making capacity) |
- |
82350 |
|
for single phase and three phase |
4.6.6.2.2 & G6(Short circuit current carrying capacity) |
- |
82350 |
|
for single phase and three phase |
4.6.6.2.2 & G7(Minimum switched current) |
- |
3130 |
|
for single phase and for three phase = 4060 |
4.6.6.2.2 & G8(Dielectric strength) |
- |
4640 |
|
for single phase and for three phase = 8520 |
3.12.6, 4.6.6.2.1 & 5.1.7(Load Switching Capability (UC1)) |
- |
56000 |
|
for single phase and for three phase =163750 |
5.8(Test of Load Switch) |
- |
1400 |
|
for single phase and for three phase = 2100 |
5.9(Test of Consumption-Based charging function) |
- |
1400 |
|
for single phase and for three phase = 2100 |
5.10(Test of Time-Based charging function) |
- |
1400 |
|
for single phase and for three phase = 2100 |
4.2.10.8(General requirements-
Mechanical and electrical characteristics) |
- |
1750 |
|
for single phase and three phase |
4.2.10.9(General requirements-
Optical characteristics) |
- |
1750 |
|
for single phase and three phase |
4.2.12.3(Keypad Interface) |
- |
11600 |
|
for single phase and three phase |
|
Complete
|
|
30 Jun, 2027 |
- |
14 |
IS/IEC 60898 : PART 1 (2015) |
Electrical accessories - Circuit - Breakers for overcurrent protection for household and similar installations: Part 1 circuit - Breakers for a.c. operation (First Revision) |
- |
-
|
1631347.00 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
9.12(Short- Circuit tests, IS 60898-1) |
- |
1018517.00 |
|
Estimated tests charges do include GST. Final charges will include GST at the prevailing rates.
Pole wise charges for one rating are given below in Rs
SP 6,61,213.00, SPN 7,61,041.00, DP 7,46,999.00
TP 9,36,743.00, TPN 10,18,517.00, FP 10,18,517.00 |
6(Marking and other product information, IS 60898-1) |
- |
990 |
|
Estimated tests charges donot include GST. Final charges will include GST at the prevailing rates. |
8.1.1(General, IS 60898-1) |
- |
0 |
|
Estimated tests charges donot include GST. Final charges will include GST at the prevailing rates. |
8.1.2(Mechanism, IS 60898-1) |
- |
50400 |
|
Estimated tests charges donot include GST. Final charges will include GST at the prevailing rates.Charges for one rating
SP ₹18080
SPN ₹24810
DP ₹25600
TP ₹40900
TPN ₹47600
FP ₹50400 |
9.3(Test of indelibility of marking, IS 60898-1) |
- |
1000 |
|
Estimated tests charges donot include GST. Final charges will include GST at the prevailing rates. |
8.1.3(Clearances and creepage distances, IS 60898-1) |
- |
3350 |
|
Estimated tests charges donot include GST. Final charges will include GST at the prevailing rates. |
9.4(Test of reliability of screws, current-carrying parts and connections, IS 60898-1) |
- |
7880 |
|
Estimated tests charges donot include GST. Final charges will include GST at the prevailing rates.Charges for one rating
SP ₹1970
SPN ₹3940
DP ₹3940
TP ₹5910
TPN ₹7880
FP ₹7880 |
9.5.1(Tests of reliability of screw-type terminals for external copper conductors, IS 60898-1) |
- |
7880 |
|
Estimated tests charges donot include GST. Final charges will include GST at the prevailing rates.Charges for one rating
SP ₹1970
SPN ₹3940
DP ₹3940
TP ₹5910
TPN ₹7880
FP ₹7880 |
9.5.2(Tests of reliability of screw-type terminals for external copper conductors, IS 60898-1) |
- |
7880 |
|
Estimated tests charges donot include GST. Final charges will include GST at the prevailing rates.Charges for one rating
SP ₹1970
SPN ₹3940
DP ₹3940
TP ₹5910
TPN ₹7880
FP ₹7880 |
9.6(Test of protection against electric shock, IS 60898-1) |
- |
1160 |
|
Estimated tests charges donot include GST. Final charges will include GST at the prevailing rates. |
9.14.1(Test of resistance to heat, IS 60898-1) |
- |
1970 |
|
Estimated tests charges donot include GST. Final charges will include GST at the prevailing rates. |
9.14.2(Test of resistance to heat, IS 60898-1) |
- |
1970 |
|
Estimated tests charges donot include GST. Final charges will include GST at the prevailing rates. |
9.14.3(Test of resistance to heat, IS 60898-1) |
- |
1970 |
|
Estimated tests charges donot include GST. Final charges will include GST at the prevailing rates. |
9.16(Test of resistance to rusting) |
- |
1970 |
|
Estimated tests charges donot include GST. Final charges will include GST at the prevailing rates. |
9.15(Resistance to abnormal heat and to fire) |
- |
18520 |
|
Estimated tests charges donot include GST. Final charges will include GST at the prevailing rates. |
9.7.5.4(Test of protection against electric shock, IS 60898-1) |
- |
24950 |
|
Estimated tests charges donot include GST. Final charges will include GST at the prevailing rates.Charges for one rating
SP ₹16640
SPN ₹24950
DP ₹16640
TP ₹16640
TPN ₹24950 |
9.7.1(Test of protection against electric shock, IS 60898-1) |
- |
5550 |
|
Estimated tests charges donot include GST. Final charges will include GST at the prevailing rates. |
9.7.2(Test of protection against electric shock, IS 60898-1) |
- |
26730 |
|
Estimated tests charges donot include GST. Final charges will include GST at the prevailing rates. |
9.7.3(Test of protection against electric shock, IS 60898-1) |
- |
26730 |
|
Estimated tests charges donot include GST. Final charges will include GST at the prevailing rates. |
9.7.4(Test of protection against electric shock, IS 60898-1) |
- |
3960 |
|
Estimated tests charges donot include GST. Final charges will include GST at the prevailing rates. |
9.7.5.2(Test of protection against electric shock, IS 60898-1) |
- |
41580 |
|
Estimated tests charges donot include GST. Final charges will include GST at the prevailing rates.Charges for one rating
SP ₹8320
SPN ₹16640
DP ₹16640
TP ₹33270
TPN ₹41580
FP ₹41580 |
9.8(Test of temperature-rise and measurement of power loss, IS 60898-1) |
- |
32670 |
|
Estimated tests charges donot include GST. Final charges will include GST at the prevailing rates. Charges for one rating
SP ₹22230
SPN ₹25710
DP ₹25710
TP ₹29190
TPN ₹32670
FP ₹32670 |
9.9(28- day test, IS 60898-1) |
- |
109400 |
|
Estimated tests charges donot include GST. Final charges will include GST at the prevailing rates. |
9.11(Verification of mechanical and electrical endurance, IS 60898-1) |
- |
116000 |
|
Estimated tests charges donot include GST. Final charges will include GST at the prevailing rates.Charges for one rating
SP ₹95210
SPN /DP ₹101150
TP ₹110060
FP/TPN ₹116000 |
9.10.2(Test of tripping characteristic, IS 60898-1) |
- |
17720 |
|
Estimated tests charges donot include GST. Final charges will include GST at the prevailing rates. |
9.10.3(Test of tripping characteristic, IS 60898-1) |
- |
39180 |
|
Estimated tests charges donot include GST. Final charges will include GST at the prevailing rates. Charges for one rating
SP/SPN ₹14230
DP ₹22540
TP/TPN ₹30860
FP ₹39180 |
9.10.4(Test of tripping characteristic, IS 60898-1) |
- |
11820 |
|
Estimated tests charges donot include GST. Final charges will include GST at the prevailing rates. |
9.10.5(Test of tripping characteristic, IS 60898-1) |
- |
22350 |
|
Estimated tests charges donot include GST. Final charges will include GST at the prevailing rates. |
9.13.1(Mechanical Stress, IS 60898-1) |
- |
5550 |
|
Estimated tests charges donot include GST. Final charges will include GST at the prevailing rates. |
9.13.2.2(Mechanical Stress, IS 60898-1) |
- |
5550 |
|
Estimated tests charges donot include GST. Final charges will include GST at the prevailing rates. |
9.13.2.3(Mechanical Stress, IS 60898-1) |
- |
5550 |
|
Estimated tests charges donot include GST. Final charges will include GST at the prevailing rates. |
9.13.2.4(Mechanical Stress, IS 60898-1) |
- |
5550 |
|
Estimated tests charges donot include GST. Final charges will include GST at the prevailing rates. |
9.13.2.5(Mechanical Stress, IS 60898-1) |
- |
5550 |
|
Estimated tests charges donot include GST. Final charges will include GST at the prevailing rates. |
|
Complete
|
|
30 Jun, 2027 |
REVISED 2015
VERSION included
w.e.f. 26/09/2019. |
15 |
IS 13779 (1999) |
AC static watihour meters, class 1 and 2 - Specification (First Revision) |
A C Static Watthour Meter |
-
|
204100 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
12.7.6.2(Impulse voltage test) |
- |
4050 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates.
for single phase, Three phase: Rs.14820 |
12.7.6.3(ac Voltage test) |
- |
590 |
|
for single phase, Three phase: Rs.640 |
12.7.6.4(Insulation resistance test) |
- |
590 |
|
for single phase and Three phase |
12.10.1 a)(Testof Accuracy Requirements : General Test Conditions
) |
- |
0.00 |
|
TEST DISCRIPTION |
12.10.1 b)(Testof Accuracy Requirements : General Test Conditions
) |
- |
0.00 |
|
TEST DISCRIPTION |
12.10.1 c)(Testof Accuracy Requirements : General Test Conditions
) |
- |
0.00 |
|
TEST DISCRIPTION |
12.10.1 d)(Testof Accuracy Requirements : General Test Conditions
) |
- |
0.00 |
|
TEST DISCRIPTION |
12.10.1 e)(Testof Accuracy Requirements : General Test Conditions
) |
- |
0.00 |
|
TEST DISCRIPTION |
12.10.1 f)(Testof Accuracy Requirements : General Test Conditions
) |
- |
0.00 |
|
TEST DISCRIPTION |
11.1(Limits of Error and Interpretation or Test Results) |
- |
2780 |
|
for single phase, Three phase: Rs.8220 |
12.16 a)(Limits of Error and Interpretation or Test
Results) |
- |
2780 |
|
for single phase, Three phase: Rs 8220 |
12.16 b)(Limits of Error and Interpretation or Test
Results) |
- |
0.00 |
|
TEST DISCRIPTION |
12.16 c)(Limits of Error and Interpretation or Test
Results) |
- |
0.00 |
|
TEST DISCRIPTION |
12.15(Test of Meter Constant/Registration) |
- |
1050 |
|
for single phase, Three phase: Rs 1330 |
12.14(Test of Starting Conditions) |
- |
1050 |
|
for single phase, Three phase: Rs 1330 |
12.13(Test of No-Load Condition) |
- |
1050 |
|
for single phase, Three phase: Rs 1330 |
12.12(Test ofAmbient Temperature Influence) |
- |
3480 |
|
for single phase, Three phase: Rs 5220 |
12.17(Repeatability of Error Test
) |
- |
8770 |
|
for single phase and Three phase |
12.11(Test of Iniluence Quantities) |
- |
64870 |
|
for single phase, Three phase: Rs 68810 |
12.7.1(Test of Power Consumption) |
- |
2320 |
|
for single phase, Three phase: Rs 6950 |
12.7.2(Test of Influence of Supply Voltage) |
- |
2780 |
|
for single phase, Three phase: Rs 4810. |
12.7.3( Test of Influence of Short-time Overcurrents) |
- |
3070 |
|
for single phase, Three phase: Rs 8450 |
12.7.4(Test of Influence of Self-Heating) |
- |
2030 |
|
for single phase, Three phase: Rs 2670 |
12.7.5(Test of Influence of Heating) |
- |
1390 |
|
for single phase, Three phase: Rs 2080 |
12.8(TestorImmunity to Earth Fault) |
- |
0.00 |
|
for single phase, Three phase: Rs 6200.00 |
12.9.2(Test for Immunity to Electrostatic Discharge
(ESD)) |
- |
5220 |
|
for single phase, Three phase: Rs 6710 |
12.9.3(Test for Immunity to EIectromagnetic HF Fields) |
- |
13890 |
|
for single phase and Three phase. |
12.9.4(FastTransient BurstTest) |
- |
5790 |
|
for single phase, Three phase: Rs 9260 |
12.9.5(Radio Interference Measurement) |
- |
13890 |
|
for single phase and Three phase |
12.6.1(Dry Heat Test) |
- |
9950 |
|
for single phase and Three phase |
12.6.2(Cold Test) |
- |
9950 |
|
for single phase and Three phase |
12.6.3( Damp Heat Cycle Test) |
- |
19160 |
|
for single phase and Three phase |
12.3.1(Shock Test) |
- |
3070 |
|
for single phase, Three phase: Rs 4120 |
12.3.2(Vibration Test) |
- |
6700 |
|
for single phase, Three phase: Rs 8850 |
12.3.3( Spring Hammer Test) |
- |
1280 |
|
for single phase and Three phase |
12.5 a)(Test of Protection Against Penetration of Dust
and Water) |
- |
14850 |
|
for single phase and Three phase |
12.5 b)(Test of Protection Against Penetration of Dust
and Water) |
- |
14850 |
|
for single phase and Three phase |
12.4(Testof Resistance to Heat and Fire
) |
- |
6950 |
|
for single phase and Three phase |
12.7.6.1( Test of insulation Properties : General test conditions
) |
- |
0.00 |
|
TEST DISCRIPTION |
7.1 a)(MARKING OF METERS : Name Plate
) |
- |
17400 |
|
for cl. no. 6.0 and 7.0 |
7.1 b)(MARKING OF METERS : Name Plate
) |
- |
0.00 |
|
TEST DISCRIPTION |
7.1 c)(MARKING OF METERS : Name Plate
) |
- |
0.00 |
|
TEST DISCRIPTION |
7.1 d)(MARKING OF METERS : Name Plate
) |
- |
0.00 |
|
TEST DISCRIPTION |
7.1 e)(MARKING OF METERS : Name Plate
) |
- |
0.00 |
|
TEST DISCRIPTION |
7.1 f)(MARKING OF METERS : Name Plate
) |
- |
0.00 |
|
TEST DISCRIPTION |
7.1 g)(MARKING OF METERS : Name Plate
) |
- |
0.00 |
|
TEST DISCRIPTION |
7.1 h)(MARKING OF METERS : Name Plate
) |
- |
0.00 |
|
TEST DISCRIPTION |
7.1 j)(MARKING OF METERS : Name Plate
) |
- |
0.00 |
|
TEST DISCRIPTION |
7.1 k)(MARKING OF METERS : Name Plate
) |
- |
0.00 |
|
TEST DISCRIPTION |
7.1 m)(MARKING OF METERS : Name Plate
) |
- |
0.00 |
|
TEST DISCRIPTION |
7.1 p)(MARKING OF METERS : Name Plate
) |
- |
0.00 |
|
TEST DISCRIPTION |
7.1 n)(MARKING OF METERS : Name Plate
) |
- |
0.00 |
|
TEST DISCRIPTION |
6(General and constructional requirements) |
- |
17400 |
|
for complete General and construction requirement , cl.no. 6.0 and 7.0 |
6.2(Meter case) |
- |
0 |
|
included in cl.no.6.0 |
6.3(Window) |
- |
0 |
|
included in cl.no.6.0 |
6.4(Terminals, terminal block and protective earth terminal) |
- |
0 |
|
included in cl.no.6.0 |
6.5(Terminal Cover(s)) |
- |
0 |
|
included in cl.no.6.0 |
6.6(Clearance and creepage dis¬t¬ances) |
- |
0 |
|
included in cl.no.6.0 |
6.10(Display of measured values) |
- |
0 |
|
included in cl.no.6.0 |
6.7(Insulating encased meter) |
- |
0 |
|
included in cl.no.6.0 |
6.11(Output device) |
- |
0 |
|
included in cl.no.6.0 |
7.1.1(BIS Standard Mark) |
- |
0 |
|
included in cl.no.6.0 |
7.2(Connection diagrams and terminal marking) |
- |
0 |
|
included in cl.no.6.0 |
Cl 6.4(material Test as per ISO 75-2 for a temperature of 135℃ and a presure of 1.8 MPa (Method A)) |
- |
5800 |
|
For single phase and Three phase meter |
|
Complete
|
|
30 Jun, 2027 |
- |
16 |
IS 14697 (1999) |
AC static transformer operated , watthour and var - Hour meters, class 0.2 S and 0.5 S - Specification |
Transformer operated meters |
-
|
255030 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
7.1 a)( MARKING OF METERS: Name Plate ) |
- |
17380 |
|
Test charges for Cl. no. 6.0 and 7.0
Test charges are excluding GST, GST will be applicable as per prevailing rate on Test charges |
7.1 b)( MARKING OF METERS: Name Plate ) |
- |
0 |
|
already included |
7.1 c)( MARKING OF METERS: Name Plate ) |
- |
0 |
|
already included |
7.1 d)( MARKING OF METERS: Name Plate ) |
- |
0 |
|
already included |
7.1 e)( MARKING OF METERS: Name Plate ) |
- |
0 |
|
already included |
7.1 f)( MARKING OF METERS: Name Plate ) |
- |
0 |
|
already included |
7.1 g)( MARKING OF METERS: Name Plate ) |
- |
0 |
|
already included |
7.1 h)( MARKING OF METERS: Name Plate ) |
- |
0 |
|
already included |
7.1 j)( MARKING OF METERS: Name Plate ) |
- |
0 |
|
already included |
7.1 k)( MARKING OF METERS: Name Plate ) |
- |
0 |
|
already included |
7.1 n)( MARKING OF METERS: Name Plate ) |
- |
0 |
|
already included |
7.1 m)( MARKING OF METERS: Name Plate ) |
- |
0 |
|
already included |
7.1.1(Bis marking) |
- |
0 |
|
already included |
7.2(Connection Diagrams and Terminal Marking) |
- |
0 |
|
already included |
12.7.6.2(Impulse voltage test ) |
- |
20370 |
|
Nil |
12.7.6.3(ac Voltage test) |
- |
1280 |
|
Nil |
12.7.6.4(Insulation resistance test) |
- |
1160 |
|
Nil |
12.9.1 a)( General Test Conditions) |
- |
1750 |
|
Nil |
12.9.1 b)( General Test Conditions) |
- |
0 |
|
already included |
12.9.1 c)( General Test Conditions) |
- |
0 |
|
already included |
12.9.1 b)( General Test Conditions) |
- |
0 |
|
already included |
11.1(Limits of Error Due to Variation of the Current) |
- |
16640 |
|
nil |
12.15 a)(Limits of error and Interpretation of Test
Results ) |
- |
690 |
|
Nil |
12.15 b)(Limits of error and Interpretation of Test
Results ) |
- |
0 |
|
already included |
12.15 c)(Limits of error and Interpretation of Test
Results ) |
- |
0 |
|
already included |
12.14(Test of Meter Constant/ Registration) |
- |
2670 |
|
Nil |
12.13(Test of Starting Conditions) |
- |
2670 |
|
Nil |
12.12(Test of No-Load Condition) |
- |
1300 |
|
Nil |
12.11(Test of Ambient Temperature Influence) |
- |
10420 |
|
Nil |
12.16(Repeatability of Error Test) |
- |
18440 |
|
Nil |
12.1(Test of Influence Quantities) |
- |
78090 |
|
Nil |
12.7.1(Test of Power Consumption ) |
- |
6950 |
|
Nil |
12.7.2(Test of Influence of Supply Voltage) |
- |
4810 |
|
Nil |
12.7.3(Test of Influence of Short-Time Over Currents) |
- |
8450 |
|
Nil |
12.7.4(Test of influence of self-heating) |
- |
5320 |
|
Nil |
12.7.5(Test of Influence of Heating ) |
- |
2080 |
|
Nil |
12.8.2(Test for Immunity to Electrostatic Discharge (ESD)) |
- |
8340 |
|
Nil |
12.8.3(Test for Immunity to Electromagnetic HF
Fields ) |
- |
13890 |
|
Nil |
12.8.4(Fast Transient Burst Tes) |
- |
18530 |
|
Nil |
12.8.5(Radio interference measurement) |
- |
13890 |
|
Nil |
12.6(Test for Climatic Influences) |
- |
0 |
|
already included |
12.6.1(dry heat test) |
- |
11240 |
|
Nil |
12.6.2(cold test) |
- |
11240 |
|
Nil |
12.6.3(Damp Heat Cycle Test ) |
- |
21010 |
|
Nil |
12.3.3(Spring Hammer Test) |
- |
2550 |
|
Nil |
12.3.1(Shock Test) |
- |
4120 |
|
Nil |
12.3.2(Vibration Test) |
- |
8850 |
|
Nil |
12.5 a)(Test of Protection Against Penetration of Dust
) |
- |
17140 |
|
Nil |
12.5 b)( Protection against penetration of water) |
- |
0 |
|
Nil |
12.4(Test of Resistance to Heat and Fire) |
- |
8570 |
|
Nil |
6.11(Output device) |
- |
0 |
|
included in general and constructional requirements ,Cl. no. 6.0 |
6.10(Display of measured values) |
- |
0 |
|
included in general and constructional requirements ,Cl. no. 6.0 |
6.7(Insulating encased meter) |
- |
0 |
|
included in general and constructional requirements ,Cl. no. 6.0 |
6.6(Clearance and creepage distances) |
- |
0 |
|
included in general and constructional requirements ,Cl. no. 6.0 |
6.5(Terminal Cover(s)) |
- |
0 |
|
included in general and constructional requirements ,Cl. no. 6.0 |
6.3(Terminals, terminal block and protective earth terminal) |
- |
0 |
|
included in general and constructional requirements ,Cl. no. 6.0 |
6.2(Meter case) |
- |
0 |
|
included in general and constructional requirements ,Cl. no. 6.0 |
6.1(General) |
- |
0 |
|
included in general and constructional requirements ,Cl. no. 6.0 |
6(General and constructional requirements) |
- |
17380 |
|
Charges for complete general and constructional requirements ,Cl. no. 6.0 |
12.1(Abnormal Magnetic Induction of External Origin 10mT) |
- |
9030 |
|
Nil |
12.1(Magnetic induction of External Origin 0.5mT) |
- |
9030 |
|
Nil |
12.1(Continuous Magnetic Induction of External Origin 0.2 Tesla) |
- |
6020 |
|
Nil |
12.1(Continuous Magnetic Induction of External Origin 67 milli Tesla) |
- |
6020 |
|
Nil |
12.1(Phase of Auxiliary Voltage) |
- |
2670 |
|
Nil |
12.1(Voltage Unbalanced) |
- |
3010 |
|
Nil |
12.1(Reversed Phase Sequence) |
- |
2670 |
|
Nil |
12.1(Waveform 10% of 3rd Harmonics) |
- |
8280 |
|
Nil |
12.1(Frequency Variation) |
- |
18060 |
|
Nil |
12.1(Voltage Variation) |
- |
15970 |
|
Nil |
12.17(Test of immunity to earth/phase fault) |
- |
9950 |
|
Nil |
6.4(Heat Deflection Test) |
- |
5800 |
|
Nil |
|
Complete
|
|
30 Jun, 2027 |
- |
17 |
IS 1180 : Part 1 (2014) |
Outdoor Type Oil Immersed Distribution Transformers Upto and Including 2 500 kVA, 33kV - Specification Part 1 Mineral Oil Immersed (Fourth Revision) |
- |
-
|
1147580 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
17( ABILITY OF TRANSFORMERS TO
WITHSTAND EXTERNAL SHORT CIRCUIT
) |
- |
163400 |
|
Estimated tests charges do not include GST.
Final charges will include GST
Charges up to 250 kVA and 11kV
Without tap -105400
4 tap- 145600
5 tap-151400
7 Tap-163400 |
21.3(c)(Short-circuit withstand test) |
- |
179200 |
|
Estimated tests charges do not include GST. Final charges will include GST
Charges up to 250 kVA (<=11kV),Without Tap-105400, 5 Tap-151400, 7 Tap-163400
Charges up to 250 kVA (>11kV),Without Tap-121200, 5 Tap-167200, 7 Tap-179200 |
21.4 b(Short-circuit withstand test IS 2026 (Part 5) (above 200 kVA)) |
- |
588750 |
|
Estimated tests charges do not include GST.
251 kVA to 500 kVA (<=11kV) 5 tap-184200, 7 Tap-196200
251 kVA to 500 kVA (>11kV) 5 tap-226700, 7 Tap-238700
501 kVA to 1600 kVA, 5 tap-465300, 9 Tap- 489300
1600 kVA to 2500 kVA, 5 tap-564800,9 Tap- 588750 |
21.2 a)(Measurement of winding resistance ) |
- |
23600 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates.
Without tap -11800
With tap- 23600 |
21.2 b)( Measurement of voltage ratio and check of
phase displacemen) |
- |
41000 |
|
Estimated tests charges do not include GST. Final charges will include GST
Without tap -5900
4 tap- 23500
5 tap-29400
7 Tap-41000 |
21.2 c)( Measurement of short-circuit impedance
(principal tapping, when applicable) and load
loss at 50 percent and 100 percent load) |
- |
6900 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates.
Without tap -4900
With tap-6900 |
21.2 d)(Measurement of no-load loss and current) |
- |
4000 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates. |
21.2 e)(Measurement of insulation resistance) |
- |
5900 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates. |
21.2 f)(Induced over-voltage withstand test) |
- |
7400 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates. |
21.5.3.3(Oil leakage test) |
- |
6400 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates. |
21.5.1.1(Pressure test-Type test (For Transformers up to 200 kVA
)) |
- |
25300 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates. |
21.5.1.2(Pressure test-routine test (For Transformers up to 200 kVA
)) |
- |
25300 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates. |
21.5.2.1(Type test : For Transformers Above 200 kVA and Up to Including 2 500 kVA) |
- |
25300 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates. |
21.5.2.2(routine test :For Transformers Above 200 kVA and Up to Including 2 500 kVA) |
- |
25300 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates. |
21.5.2.3( Oil leakage test (routine test)) |
- |
6400 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates. |
21.5.3.1(For Single Phase Distribution Transformers Up to Including 25 kVA : pressure test (type test)) |
- |
19000 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates. |
21.5.3.2(For Single Phase Distribution Transformers Up to Including 25 kVA : pressure test (routine test)) |
- |
19000 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates. |
21.5.3.3(Oil leakage test (routine test)) |
- |
6400 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates. |
21.4 c(No load current at 112.5 percent voltage.) |
- |
2680 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates. |
21.4 d(Paint adhesion tests) |
- |
2520 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates. |
21.4 a)( Determination of sound levels) |
- |
61780 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates.
5 kVA to 630 kVA- 33350
631 kVA to 1600 kVA- 42320
1600 kVA to 2500 kVA- 61780 |
21.2 g)( Separate-source voltage withstand test) |
- |
3910 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates. |
21.3(a )(Lightning impulse test) |
- |
112040 |
|
Estimated tests charges do not include GST. Final charges will include GST at the prevailing rates.
UPTO 500 KVA-₹64130/-
above 500 KVA TO 2 MVA-₹74090/-
above2 MVA TO 2.5 MVA- ₹112040/- |
21.3(b)(Temperature-rise test) |
- |
154000 |
|
Estimated tests charges do not include GST. Final charges will include GST a
63 KVA-₹23540/-
63 KVA TO 500KVA-₹35530/-
500 KVA TO 1000KVA-₹44000/-
500 KVA TO 1 MVA-₹74090/-
1 MVA TO 2.5 MVA ₹1,54,000/ |
|
Complete
|
|
30 Jun, 2027 |
- |