1 |
IS 2993 : Part 2 (2024) |
a.c. Motor Capacitors Part 2 Motor Start Capacitors ( Third Revision ) |
- |
-
|
90000 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
5.1.1.1(General) |
- |
700 |
|
For Routine Test Rs. 90,000/-
For Class D (Routine + Endurance Test) Rs.1,85,000 For Class C (Routine + Endurance Test) Rs.3,35,000 For Class B (Routine + Endurance Test) Rs.7,55,000 For Class A (Routine + Endurance Test) Rs.20,50,000 |
5.1.7(Voltage test between the terminals) |
- |
1500 |
|
For Routine Test Rs. 90,000/- For Class D (Routine + Endurance Test) Rs.1,85,000 For Class C (Routine + Endurance Test) Rs.3,35,000 For Class B (Routine + Endurance Test) Rs.7,55,000 For Class A (Routine + Endurance Test) Rs.20,50,000 |
5.1.8(Voltage test between terminals and case) |
- |
1500 |
|
For Routine Test Rs. 90,000/- For Class D (Routine + Endurance Test) Rs.1,85,000 For Class C (Routine + Endurance Test) Rs.3,35,000 For Class B (Routine + Endurance Test) Rs.7,55,000 For Class A (Routine + Endurance Test) Rs.20,50,000 |
5.1.9(Capacitance measurement) |
- |
4000 |
|
For Routine Test Rs. 90,000/- For Class D (Routine + Endurance Test) Rs.1,85,000 For Class C (Routine + Endurance Test) Rs.3,35,000 For Class B (Routine + Endurance Test) Rs.7,55,000 For Class A (Routine + Endurance Test) Rs.20,50,000 |
5.1.10(Check of dimensions) |
- |
700 |
|
For Routine Test Rs. 90,000/- For Class D (Routine + Endurance Test) Rs.1,85,000 For Class C (Routine + Endurance Test) Rs.3,35,000 For Class B (Routine + Endurance Test) Rs.7,55,000 For Class A (Routine + Endurance Test) Rs.20,50,000 |
5.1.10(Check of dimensions) |
- |
700 |
|
For Routine Test Rs. 90,000/- For Class D (Routine + Endurance Test) Rs.1,85,000 For Class C (Routine + Endurance Test) Rs.3,35,000 For Class B (Routine + Endurance Test) Rs.7,55,000 For Class A (Routine + Endurance Test) Rs.20,50,000 |
5.1.11.1(Robustness of terminations) |
- |
1500 |
|
For Routine Test Rs. 90,000/- For Class D (Routine + Endurance Test) Rs.1,85,000 For Class C (Routine + Endurance Test) Rs.3,35,000 For Class B (Routine + Endurance Test) Rs.7,55,000 For Class A (Routine + Endurance Test) Rs.20,50,000 |
5.1.11.2(Soldering) |
- |
500 |
|
For Routine Test Rs. 90,000/- For Class D (Routine + Endurance Test) Rs.1,85,000 For Class C (Routine + Endurance Test) Rs.3,35,000 For Class B (Routine + Endurance Test) Rs.7,55,000 For Class A (Routine + Endurance Test) Rs.20,50,000 |
5.1.11.3(Vibration) |
- |
4000 |
|
For Routine Test Rs. 90,000/- For Class D (Routine + Endurance Test) Rs.1,85,000 For Class C (Routine + Endurance Test) Rs.3,35,000 For Class B (Routine + Endurance Test) Rs.7,55,000 For Class A (Routine + Endurance Test) Rs.20,50,000 |
5.1.12(Sealing test) |
- |
1500 |
|
For Routine Test Rs. 90,000/- For Class D (Routine + Endurance Test) Rs.1,85,000 For Class C (Routine + Endurance Test) Rs.3,35,000 For Class B (Routine + Endurance Test) Rs.7,55,000 For Class A (Routine + Endurance Test) Rs.20,50,000 |
5.1.13(Endurance test) |
- |
95000 |
|
For Routine Test Rs. 90,000/- For Class D (Routine + Endurance Test) Rs.1,85,000 For Class C (Routine + Endurance Test) Rs.3,35,000 For Class B (Routine + Endurance Test) Rs.7,55,000 For Class A (Routine + Endurance Test) Rs.20,50,000 |
5.1.14(Damp heat test) |
- |
25000 |
|
For Routine Test Rs. 90,000/- For Class D (Routine + Endurance Test) Rs.1,85,000 For Class C (Routine + Endurance Test) Rs.3,35,000 For Class B (Routine + Endurance Test) Rs.7,55,000 For Class A (Routine + Endurance Test) Rs.20,50,000 |
5.1.15(Self-healing test) |
- |
3600 |
|
For Routine Test Rs. 90,000/- For Class D (Routine + Endurance Test) Rs.1,85,000 For Class C (Routine + Endurance Test) Rs.3,35,000 For Class B (Routine + Endurance Test) Rs.7,55,000 For Class A (Routine + Endurance Test) Rs.20,50,000 |
5.1.16(Destruction test) |
- |
18500 |
|
For Routine Test Rs. 90,000/- For Class D (Routine + Endurance Test) Rs.1,85,000 For Class C (Routine + Endurance Test) Rs.3,35,000 For Class B (Routine + Endurance Test) Rs.7,55,000 For Class A (Routine + Endurance Test) Rs.20,50,000 |
5.1.17.1(Ball-pressure test) |
- |
10000 |
|
For Routine Test Rs. 90,000/- For Class D (Routine + Endurance Test) Rs.1,85,000 For Class C (Routine + Endurance Test) Rs.3,35,000 For Class B (Routine + Endurance Test) Rs.7,55,000 For Class A (Routine + Endurance Test) Rs.20,50,000 |
5.1.17.2(Glow-wire test) |
- |
10000 |
|
For Routine Test Rs. 90,000/- For Class D (Routine + Endurance Test) Rs.1,85,000 For Class C (Routine + Endurance Test) Rs.3,35,000 For Class B (Routine + Endurance Test) Rs.7,55,000 For Class A (Routine + Endurance Test) Rs.20,50,000 |
5.1.17.3(Tracking test) |
- |
10000 |
|
For Routine Test Rs. 90,000/- For Class D (Routine + Endurance Test) Rs.1,85,000 For Class C (Routine + Endurance Test) Rs.3,35,000 For Class B (Routine + Endurance Test) Rs.7,55,000 For Class A (Routine + Endurance Test) Rs.20,50,000 |
5.2(Overloads) |
- |
5000 |
|
For Routine Test Rs. 90,000/- For Class D (Routine + Endurance Test) Rs.1,85,000 For Class C (Routine + Endurance Test) Rs.3,35,000 For Class B (Routine + Endurance Test) Rs.7,55,000 For Class A (Routine + Endurance Test) Rs.20,50,000 |
5.3.1(Creepage distances and clearances) |
- |
1500 |
|
For Routine Test Rs. 90,000/- For Class D (Routine + Endurance Test) Rs.1,85,000 For Class C (Routine + Endurance Test) Rs.3,35,000 For Class B (Routine + Endurance Test) Rs.7,55,000 For Class A (Routine + Endurance Test) Rs.20,50,000 |
5.3.2(Terminals and connecting cables) |
- |
1500 |
|
For Routine Test Rs. 90,000/- For Class D (Routine + Endurance Test) Rs.1,85,000 For Class C (Routine + Endurance Test) Rs.3,35,000 For Class B (Routine + Endurance Test) Rs.7,55,000 For Class A (Routine + Endurance Test) Rs.20,50,000 |
5.3.3(Earth connections) |
- |
500 |
|
For Routine Test Rs. 90,000/- For Class D (Routine + Endurance Test) Rs.1,85,000 For Class C (Routine + Endurance Test) Rs.3,35,000 For Class B (Routine + Endurance Test) Rs.7,55,000 For Class A (Routine + Endurance Test) Rs.20,50,000 |
5.3.4(Discharge devices) |
- |
500 |
|
For Routine Test Rs. 90,000/- For Class D (Routine + Endurance Test) Rs.1,85,000 For Class C (Routine + Endurance Test) Rs.3,35,000 For Class B (Routine + Endurance Test) Rs.7,55,000 For Class A (Routine + Endurance Test) Rs.20,50,000 |
6.3.5(Pollution) |
- |
1500 |
|
For Routine Test Rs. 90,000/- For Class D (Routine + Endurance Test) Rs.1,85,000 For Class C (Routine + Endurance Test) Rs.3,35,000 For Class B (Routine + Endurance Test) Rs.7,55,000 For Class A (Routine + Endurance Test) Rs.20,50,000 |
6.1.6(Voltage test between the terminals) |
- |
1500 |
|
For Routine Test Rs. 90,000/- For Class D (Routine + Endurance Test) Rs.1,85,000 For Class C (Routine + Endurance Test) Rs.3,35,000 For Class B (Routine + Endurance Test) Rs.7,55,000 For Class A (Routine + Endurance Test) Rs.20,50,000 |
6.1.7(Voltage test between terminals and case) |
- |
1500 |
|
For Routine Test Rs. 90,000/- For Class D (Routine + Endurance Test) Rs.1,85,000 For Class C (Routine + Endurance Test) Rs.3,35,000 For Class B (Routine + Endurance Test) Rs.7,55,000 For Class A (Routine + Endurance Test) Rs.20,50,000 |
6.1.9(Check of dimensions) |
- |
700 |
|
For Routine Test Rs. 90,000/- For Class D (Routine + Endurance Test) Rs.1,85,000 For Class C (Routine + Endurance Test) Rs.3,35,000 For Class B (Routine + Endurance Test) Rs.7,55,000 For Class A (Routine + Endurance Test) Rs.20,50,000 |
6.1.8(Capacitance and power factor measurement) |
- |
500 |
|
For Routine Test Rs. 90,000/- For Class D (Routine + Endurance Test) Rs.1,85,000 For Class C (Routine + Endurance Test) Rs.3,35,000 For Class B (Routine + Endurance Test) Rs.7,55,000 For Class A (Routine + Endurance Test) Rs.20,50,000 |
6.1.10.1(Robustness of terminations) |
- |
1500 |
|
For Routine Test Rs. 90,000/- For Class D (Routine + Endurance Test) Rs.1,85,000 For Class C (Routine + Endurance Test) Rs.3,35,000 For Class B (Routine + Endurance Test) Rs.7,55,000 For Class A (Routine + Endurance Test) Rs.20,50,000 |
6.1.10.2(Soldering) |
- |
1500 |
|
For Routine Test Rs. 90,000/- For Class D (Routine + Endurance Test) Rs.1,85,000 For Class C (Routine + Endurance Test) Rs.3,35,000 For Class B (Routine + Endurance Test) Rs.7,55,000 For Class A (Routine + Endurance Test) Rs.20,50,000 |
6.1.10.3(Vibration) |
- |
4000 |
|
For Routine Test Rs. 90,000/- For Class D (Routine + Endurance Test) Rs.1,85,000 For Class C (Routine + Endurance Test) Rs.3,35,000 For Class B (Routine + Endurance Test) Rs.7,55,000 For Class A (Routine + Endurance Test) Rs.20,50,000 |
6.1.10.4(Fixing bolt or stud (if fitted)) |
- |
700 |
|
For Routine Test Rs. 90,000/- For Class D (Routine + Endurance Test) Rs.1,85,000 For Class C (Routine + Endurance Test) Rs.3,35,000 For Class B (Routine + Endurance Test) Rs.7,55,000 For Class A (Routine + Endurance Test) Rs.20,50,000 |
6.1.10.4(Fixing bolt or stud (if fitted)) |
- |
700 |
|
For Routine Test Rs. 90,000/- For Class D (Routine + Endurance Test) Rs.1,85,000 For Class C (Routine + Endurance Test) Rs.3,35,000 For Class B (Routine + Endurance Test) Rs.7,55,000 For Class A (Routine + Endurance Test) Rs.20,50,000 |
6.1.10.5(Rapid change of temperature) |
- |
500 |
|
For Routine Test Rs. 90,000/- For Class D (Routine + Endurance Test) Rs.1,85,000 For Class C (Routine + Endurance Test) Rs.3,35,000 For Class B (Routine + Endurance Test) Rs.7,55,000 For Class A (Routine + Endurance Test) Rs.20,50,000 |
6.1.11(Sealing test) |
- |
1500 |
|
For Routine Test Rs. 90,000/- For Class D (Routine + Endurance Test) Rs.1,85,000 For Class C (Routine + Endurance Test) Rs.3,35,000 For Class B (Routine + Endurance Test) Rs.7,55,000 For Class A (Routine + Endurance Test) Rs.20,50,000 |
6.1.12(Endurance test) |
- |
95000 |
|
For Routine Test Rs. 90,000/- For Class D (Routine + Endurance Test) Rs.1,85,000 For Class C (Routine + Endurance Test) Rs.3,35,000 For Class B (Routine + Endurance Test) Rs.7,55,000 For Class A (Routine + Endurance Test) Rs.20,50,000 |
6.1.13(Damp heat test) |
- |
25000 |
|
For Routine Test Rs. 90,000/- For Class D (Routine + Endurance Test) Rs.1,85,000 For Class C (Routine + Endurance Test) Rs.3,35,000 For Class B (Routine + Endurance Test) Rs.7,55,000 For Class A (Routine + Endurance Test) Rs.20,50,000 |
6.1.14(Pressure relief test) |
- |
10000 |
|
For Routine Test Rs. 90,000/- For Class D (Routine + Endurance Test) Rs.1,85,000 For Class C (Routine + Endurance Test) Rs.3,35,000 For Class B (Routine + Endurance Test) Rs.7,55,000 For Class A (Routine + Endurance Test) Rs.20,50,000 |
6.1.15.1(Ball-pressure test) |
- |
10000 |
|
For Routine Test Rs. 90,000/- For Class D (Routine + Endurance Test) Rs.1,85,000 For Class C (Routine + Endurance Test) Rs.3,35,000 For Class B (Routine + Endurance Test) Rs.7,55,000 For Class A (Routine + Endurance Test) Rs.20,50,000 |
6.1.15.2(Glow-wire test) |
- |
25000 |
|
For Routine Test Rs. 90,000/- For Class D (Routine + Endurance Test) Rs.1,85,000 For Class C (Routine + Endurance Test) Rs.3,35,000 For Class B (Routine + Endurance Test) Rs.7,55,000 For Class A (Routine + Endurance Test) Rs.20,50,000 |
6.1.15.3(Tracking test) |
- |
10000 |
|
For Routine Test Rs. 90,000/- For Class D (Routine + Endurance Test) Rs.1,85,000 For Class C (Routine + Endurance Test) Rs.3,35,000 For Class B (Routine + Endurance Test) Rs.7,55,000 For Class A (Routine + Endurance Test) Rs.20,50,000 |
6.2(Overloads) |
- |
5000 |
|
For Routine Test Rs. 90,000/- For Class D (Routine + Endurance Test) Rs.1,85,000 For Class C (Routine + Endurance Test) Rs.3,35,000 For Class B (Routine + Endurance Test) Rs.7,55,000 For Class A (Routine + Endurance Test) Rs.20,50,000 |
6.3.1(Creepage distances and clearances) |
- |
1500 |
|
For Routine Test Rs. 90,000/- For Class D (Routine + Endurance Test) Rs.1,85,000 For Class C (Routine + Endurance Test) Rs.3,35,000 For Class B (Routine + Endurance Test) Rs.7,55,000 For Class A (Routine + Endurance Test) Rs.20,50,000 |
6.3.2(Terminals and connecting cables) |
- |
1500 |
|
For Routine Test Rs. 90,000/- For Class D (Routine + Endurance Test) Rs.1,85,000 For Class C (Routine + Endurance Test) Rs.3,35,000 For Class B (Routine + Endurance Test) Rs.7,55,000 For Class A (Routine + Endurance Test) Rs.20,50,000 |
6.3.3(Earth connections) |
- |
500 |
|
For Routine Test Rs. 90,000/- For Class D (Routine + Endurance Test) Rs.1,85,000 For Class C (Routine + Endurance Test) Rs.3,35,000 For Class B (Routine + Endurance Test) Rs.7,55,000 For Class A (Routine + Endurance Test) Rs.20,50,000 |
6.3.4(Discharge devices) |
- |
500 |
|
For Routine Test Rs. 90,000/- For Class D (Routine + Endurance Test) Rs.1,85,000 For Class C (Routine + Endurance Test) Rs.3,35,000 For Class B (Routine + Endurance Test) Rs.7,55,000 For Class A (Routine + Endurance Test) Rs.20,50,000 |
6.4(Marking) |
- |
700 |
|
For Routine Test Rs. 90,000/- For Class D (Routine + Endurance Test) Rs.1,85,000 For Class C (Routine + Endurance Test) Rs.3,35,000 For Class B (Routine + Endurance Test) Rs.7,55,000 For Class A (Routine + Endurance Test) Rs.20,50,000 |
7.2.1(Measurement of working voltage) |
- |
500 |
|
For Routine Test Rs. 90,000/- For Class D (Routine + Endurance Test) Rs.1,85,000 For Class C (Routine + Endurance Test) Rs.3,35,000 For Class B (Routine + Endurance Test) Rs.7,55,000 For Class A (Routine + Endurance Test) Rs.20,50,000 |
7.2.2(Influence of capacitance) |
- |
500 |
|
For Routine Test Rs. 90,000/- For Class D (Routine + Endurance Test) Rs.1,85,000 For Class C (Routine + Endurance Test) Rs.3,35,000 For Class B (Routine + Endurance Test) Rs.7,55,000 For Class A (Routine + Endurance Test) Rs.20,50,000 |
7.3(Checking capacitor temperature) |
- |
500 |
|
For Routine Test Rs. 90,000/- For Class D (Routine + Endurance Test) Rs.1,85,000 For Class C (Routine + Endurance Test) Rs.3,35,000 For Class B (Routine + Endurance Test) Rs.7,55,000 For Class A (Routine + Endurance Test) Rs.20,50,000 |
7.4(Checking transients) |
- |
500 |
|
For Routine Test Rs. 90,000/- For Class D (Routine + Endurance Test) Rs.1,85,000 For Class C (Routine + Endurance Test) Rs.3,35,000 For Class B (Routine + Endurance Test) Rs.7,55,000 For Class A (Routine + Endurance Test) Rs.20,50,000 |
7.5(Storage of electrolytic capacitors) |
- |
500 |
|
For Routine Test Rs. 90,000/- For Class D (Routine + Endurance Test) Rs.1,85,000 For Class C (Routine + Endurance Test) Rs.3,35,000 For Class B (Routine + Endurance Test) Rs.7,55,000 For Class A (Routine + Endurance Test) Rs.20,50,000 |
Annex A(Test voltage) |
- |
1500 |
|
For Routine Test Rs. 90,000/- For Class D (Routine + Endurance Test) Rs.1,85,000 For Class C (Routine + Endurance Test) Rs.3,35,000 For Class B (Routine + Endurance Test) Rs.7,55,000 For Class A (Routine + Endurance Test) Rs.20,50,000 |
5.3.5(Pollution) |
- |
1500 |
|
For Routine Test Rs. 90,000/- For Class D (Routine + Endurance Test) Rs.1,85,000 For Class C (Routine + Endurance Test) Rs.3,35,000 For Class B (Routine + Endurance Test) Rs.7,55,000 For Class A (Routine + Endurance Test) Rs.20,50,000 |
5.4(Marking) |
- |
700 |
|
For Routine Test Rs. 90,000/- For Class D (Routine + Endurance Test) Rs.1,85,000 For Class C (Routine + Endurance Test) Rs.3,35,000 For Class B (Routine + Endurance Test) Rs.7,55,000 For Class A (Routine + Endurance Test) Rs.20,50,000 |
5.1.1.1(General) |
- |
0 |
|
- |
5.1.7(Voltage test between the terminals) |
- |
0 |
|
- |
5.1.8(Voltage test between terminals and case) |
- |
0 |
|
- |
5.1.9(Capacitance measurement) |
- |
0 |
|
- |
5.1.10(Check of dimensions) |
- |
0 |
|
- |
5.1.10(Check of dimensions) |
- |
0 |
|
- |
5.1.11.1(Robustness of terminations) |
- |
0 |
|
- |
5.1.11.2(Soldering) |
- |
0 |
|
- |
5.1.11.3(Vibration) |
- |
0 |
|
- |
5.1.12(Sealing test) |
- |
0 |
|
- |
5.1.13(Endurance test) |
- |
0 |
|
- |
5.1.14(Damp heat test) |
- |
0 |
|
- |
5.1.15(Self-healing test) |
- |
0 |
|
- |
5.1.16(Destruction test) |
- |
0 |
|
- |
5.1.17.1(Ball-pressure test) |
- |
0 |
|
- |
5.1.17.2(Glow-wire test) |
- |
0 |
|
- |
5.1.17.3(Tracking test) |
- |
0 |
|
- |
5.2(Overloads) |
- |
0 |
|
- |
5.3.1(Creepage distances and clearances) |
- |
0 |
|
- |
5.3.2(Terminals and connecting cables) |
- |
0 |
|
- |
5.3.3(Earth connections) |
- |
0 |
|
- |
5.3.4(Discharge devices) |
- |
0 |
|
- |
6.3.5(Pollution) |
- |
0 |
|
- |
6.1.6(Voltage test between the terminals) |
- |
0 |
|
- |
6.1.7(Voltage test between terminals and case) |
- |
0 |
|
- |
6.1.9(Check of dimensions) |
- |
0 |
|
- |
6.1.8(Capacitance and power factor measurement) |
- |
0 |
|
- |
6.1.10.1(Robustness of terminations) |
- |
0 |
|
- |
6.1.10.2(Soldering) |
- |
0 |
|
- |
6.1.10.3(Vibration) |
- |
0 |
|
- |
6.1.10.4(Fixing bolt or stud (if fitted)) |
- |
0 |
|
- |
6.1.10.4(Fixing bolt or stud (if fitted)) |
- |
0 |
|
- |
6.1.10.5(Rapid change of temperature) |
- |
0 |
|
- |
6.1.11(Sealing test) |
- |
0 |
|
- |
6.1.12(Endurance test) |
- |
0 |
|
- |
6.1.13(Damp heat test) |
- |
0 |
|
- |
6.1.14(Pressure relief test) |
- |
0 |
|
- |
6.1.15.1(Ball-pressure test) |
- |
0 |
|
- |
6.1.15.2(Glow-wire test) |
- |
0 |
|
- |
6.1.15.3(Tracking test) |
- |
0 |
|
- |
6.2(Overloads) |
- |
0 |
|
- |
6.3.1(Creepage distances and clearances) |
- |
0 |
|
- |
6.3.2(Terminals and connecting cables) |
- |
0 |
|
- |
6.3.3(Earth connections) |
- |
0 |
|
- |
6.3.4(Discharge devices) |
- |
0 |
|
- |
6.4(Marking) |
- |
0 |
|
- |
7.2.1(Measurement of working voltage) |
- |
0 |
|
- |
7.2.2(Influence of capacitance) |
- |
0 |
|
- |
7.3(Checking capacitor temperature) |
- |
0 |
|
- |
7.4(Checking transients) |
- |
0 |
|
- |
7.5(Storage of electrolytic capacitors) |
- |
0 |
|
- |
Annex A(Test voltage) |
- |
0 |
|
- |
5.3.5(Pollution) |
- |
0 |
|
- |
5.4(Marking) |
- |
0 |
|
- |
5.1.1.1(General) |
- |
0 |
|
- |
5.1.7(Voltage test between the terminals) |
- |
0 |
|
- |
5.1.8(Voltage test between terminals and case) |
- |
0 |
|
- |
5.1.9(Capacitance measurement) |
- |
0 |
|
- |
5.1.10(Check of dimensions) |
- |
0 |
|
- |
5.1.10(Check of dimensions) |
- |
0 |
|
- |
5.1.11.1(Robustness of terminations) |
- |
0 |
|
- |
5.1.11.2(Soldering) |
- |
0 |
|
- |
5.1.11.3(Vibration) |
- |
0 |
|
- |
5.1.12(Sealing test) |
- |
0 |
|
- |
5.1.13(Endurance test) |
- |
0 |
|
- |
5.1.14(Damp heat test) |
- |
0 |
|
- |
5.1.15(Self-healing test) |
- |
0 |
|
- |
5.1.16(Destruction test) |
- |
0 |
|
- |
5.1.17.1(Ball-pressure test) |
- |
0 |
|
- |
5.1.17.2(Glow-wire test) |
- |
0 |
|
- |
5.1.17.3(Tracking test) |
- |
0 |
|
- |
5.2(Overloads) |
- |
0 |
|
- |
5.3.1(Creepage distances and clearances) |
- |
0 |
|
- |
5.3.2(Terminals and connecting cables) |
- |
0 |
|
- |
5.3.3(Earth connections) |
- |
0 |
|
- |
5.3.4(Discharge devices) |
- |
0 |
|
- |
6.3.5(Pollution) |
- |
0 |
|
- |
6.1.6(Voltage test between the terminals) |
- |
0 |
|
- |
6.1.7(Voltage test between terminals and case) |
- |
0 |
|
- |
6.1.9(Check of dimensions) |
- |
0 |
|
- |
6.1.8(Capacitance and power factor measurement) |
- |
0 |
|
- |
6.1.10.1(Robustness of terminations) |
- |
0 |
|
- |
6.1.10.2(Soldering) |
- |
0 |
|
- |
6.1.10.3(Vibration) |
- |
0 |
|
- |
6.1.10.4(Fixing bolt or stud (if fitted)) |
- |
0 |
|
- |
6.1.10.4(Fixing bolt or stud (if fitted)) |
- |
0 |
|
- |
6.1.10.5(Rapid change of temperature) |
- |
0 |
|
- |
6.1.11(Sealing test) |
- |
0 |
|
- |
6.1.12(Endurance test) |
- |
0 |
|
- |
6.1.13(Damp heat test) |
- |
0 |
|
- |
6.1.14(Pressure relief test) |
- |
0 |
|
- |
6.1.15.1(Ball-pressure test) |
- |
0 |
|
- |
6.1.15.2(Glow-wire test) |
- |
0 |
|
- |
6.1.15.3(Tracking test) |
- |
0 |
|
- |
6.2(Overloads) |
- |
0 |
|
- |
6.3.1(Creepage distances and clearances) |
- |
0 |
|
- |
6.3.2(Terminals and connecting cables) |
- |
0 |
|
- |
6.3.3(Earth connections) |
- |
0 |
|
- |
6.3.4(Discharge devices) |
- |
0 |
|
- |
6.4(Marking) |
- |
0 |
|
- |
7.2.1(Measurement of working voltage) |
- |
0 |
|
- |
7.2.2(Influence of capacitance) |
- |
0 |
|
- |
7.3(Checking capacitor temperature) |
- |
0 |
|
- |
7.4(Checking transients) |
- |
0 |
|
- |
7.5(Storage of electrolytic capacitors) |
- |
0 |
|
- |
Annex A(Test voltage) |
- |
0 |
|
- |
5.3.5(Pollution) |
- |
0 |
|
- |
5.4(Marking) |
- |
0 |
|
- |
|
Complete
|
|
31 May, 2025 |
- Included.w.e.f.15.01.2025 |
2 |
IS 2993 : Part 1 (2024) |
a.c. Motor Capacitors Part 1 General - Performance, Testing and Rating - Safety Requirements - Guidance for Installation and Operation ( Third Revision ) |
- |
-
|
90000 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
5.1.1(General) |
- |
700 |
|
For Routine Test Rs. 90,000/-
For Class D (Routine + Endurance Test) Rs.1,85,000
For Class C (Routine + Endurance Test) Rs.3,35,000
For Class B (Routine + Endurance Test) Rs.7,55,000
For Class A (Routine + Endurance Test) Rs.20,50,000 |
5.5(Tangent of loss angle) |
- |
4000 |
|
For Routine Test Rs. 90,000/-
For Class D (Routine + Endurance Test) Rs.1,85,000
For Class C (Routine + Endurance Test) Rs.3,35,000
For Class B (Routine + Endurance Test) Rs.7,55,000
For Class A (Routine + Endurance Test) Rs.20,50,000 |
5.7("Voltage test between terminals
") |
- |
1500 |
|
For Routine Test Rs. 90,000/-
For Class D (Routine + Endurance Test) Rs.1,85,000
For Class C (Routine + Endurance Test) Rs.3,35,000
For Class B (Routine + Endurance Test) Rs.7,55,000
For Class A (Routine + Endurance Test) Rs.20,50,000 |
5.8(Voltage test between terminals and case) |
- |
1500 |
|
For Routine Test Rs. 90,000/-
For Class D (Routine + Endurance Test) Rs.1,85,000
For Class C (Routine + Endurance Test) Rs.3,35,000
For Class B (Routine + Endurance Test) Rs.7,55,000
For Class A (Routine + Endurance Test) Rs.20,50,000 |
5.9(Capacitance measurement) |
- |
4000 |
|
For Routine Test Rs. 90,000/-
For Class D (Routine + Endurance Test) Rs.1,85,000
For Class C (Routine + Endurance Test) Rs.3,35,000
For Class B (Routine + Endurance Test) Rs.7,55,000
For Class A (Routine + Endurance Test) Rs.20,50,000 |
5.9(Capacitance measurement) |
- |
4000 |
|
For Routine Test Rs. 90,000/-
For Class D (Routine + Endurance Test) Rs.1,85,000
For Class C (Routine + Endurance Test) Rs.3,35,000
For Class B (Routine + Endurance Test) Rs.7,55,000
For Class A (Routine + Endurance Test) Rs.20,50,000 |
5.1(Check of dimensions) |
- |
700 |
|
For Routine Test Rs. 90,000/-
For Class D (Routine + Endurance Test) Rs.1,85,000
For Class C (Routine + Endurance Test) Rs.3,35,000
For Class B (Routine + Endurance Test) Rs.7,55,000
For Class A (Routine + Endurance Test) Rs.20,50,000 |
5.11(Mechanical tests) |
- |
1500 |
|
For Routine Test Rs. 90,000/-
For Class D (Routine + Endurance Test) Rs.1,85,000
For Class C (Routine + Endurance Test) Rs.3,35,000
For Class B (Routine + Endurance Test) Rs.7,55,000
For Class A (Routine + Endurance Test) Rs.20,50,000 |
5.12(Sealing test) |
- |
1500 |
|
For Routine Test Rs. 90,000/-
For Class D (Routine + Endurance Test) Rs.1,85,000
For Class C (Routine + Endurance Test) Rs.3,35,000
For Class B (Routine + Endurance Test) Rs.7,55,000
For Class A (Routine + Endurance Test) Rs.20,50,000 |
5.13(Endurance test) |
- |
95000 |
|
For Routine Test Rs. 90,000/-
For Class D (Routine + Endurance Test) Rs.1,85,000
For Class C (Routine + Endurance Test) Rs.3,35,000
For Class B (Routine + Endurance Test) Rs.7,55,000
For Class A (Routine + Endurance Test) Rs.20,50,000 |
5.14(Damp heat test) |
- |
25000 |
|
For Routine Test Rs. 90,000/-
For Class D (Routine + Endurance Test) Rs.1,85,000
For Class C (Routine + Endurance Test) Rs.3,35,000
For Class B (Routine + Endurance Test) Rs.7,55,000
For Class A (Routine + Endurance Test) Rs.20,50,000 |
5.15(Self-healing test) |
- |
3600 |
|
For Routine Test Rs. 90,000/-
For Class D (Routine + Endurance Test) Rs.1,85,000
For Class C (Routine + Endurance Test) Rs.3,35,000
For Class B (Routine + Endurance Test) Rs.7,55,000
For Class A (Routine + Endurance Test) Rs.20,50,000 |
5.16(Destruction test) |
- |
18500 |
|
For Routine Test Rs. 90,000/-
For Class D (Routine + Endurance Test) Rs.1,85,000
For Class C (Routine + Endurance Test) Rs.3,35,000
For Class B (Routine + Endurance Test) Rs.7,55,000
For Class A (Routine + Endurance Test) Rs.20,50,000 |
5.17(Resistance to heat, fire and tracking) |
- |
1500 |
|
For Routine Test Rs. 90,000/-
For Class D (Routine + Endurance Test) Rs.1,85,000
For Class C (Routine + Endurance Test) Rs.3,35,000
For Class B (Routine + Endurance Test) Rs.7,55,000
For Class A (Routine + Endurance Test) Rs.20,50,000 |
5.17.1(Ball-pressure test) |
- |
10000 |
|
For Routine Test Rs. 90,000/-
For Class D (Routine + Endurance Test) Rs.1,85,000
For Class C (Routine + Endurance Test) Rs.3,35,000
For Class B (Routine + Endurance Test) Rs.7,55,000
For Class A (Routine + Endurance Test) Rs.20,50,000 |
5.17.2(Glow-wire test) |
- |
10000 |
|
For Routine Test Rs. 90,000/-
For Class D (Routine + Endurance Test) Rs.1,85,000
For Class C (Routine + Endurance Test) Rs.3,35,000
For Class B (Routine + Endurance Test) Rs.7,55,000
For Class A (Routine + Endurance Test) Rs.20,50,000 |
5.17.3(Tracking test) |
- |
10000 |
|
For Routine Test Rs. 90,000/-
For Class D (Routine + Endurance Test) Rs.1,85,000
For Class C (Routine + Endurance Test) Rs.3,35,000
For Class B (Routine + Endurance Test) Rs.7,55,000
For Class A (Routine + Endurance Test) Rs.20,50,000 |
6.1(Maximum permissible voltage) |
- |
1500 |
|
For Routine Test Rs. 90,000/-
For Class D (Routine + Endurance Test) Rs.1,85,000
For Class C (Routine + Endurance Test) Rs.3,35,000
For Class B (Routine + Endurance Test) Rs.7,55,000
For Class A (Routine + Endurance Test) Rs.20,50,000 |
6.2("Maximum permissible current
") |
- |
1500 |
|
For Routine Test Rs. 90,000/-
For Class D (Routine + Endurance Test) Rs.1,85,000
For Class C (Routine + Endurance Test) Rs.3,35,000
For Class B (Routine + Endurance Test) Rs.7,55,000
For Class A (Routine + Endurance Test) Rs.20,50,000 |
6.3(Maximum permissible reactive output) |
- |
1500 |
|
For Routine Test Rs. 90,000/-
For Class D (Routine + Endurance Test) Rs.1,85,000
For Class C (Routine + Endurance Test) Rs.3,35,000
For Class B (Routine + Endurance Test) Rs.7,55,000
For Class A (Routine + Endurance Test) Rs.20,50,000 |
7(Safety requirements) |
- |
1500 |
|
For Routine Test Rs. 90,000/-
For Class D (Routine + Endurance Test) Rs.1,85,000
For Class C (Routine + Endurance Test) Rs.3,35,000
For Class B (Routine + Endurance Test) Rs.7,55,000
For Class A (Routine + Endurance Test) Rs.20,50,000 |
7.1(Requirements for Creepage distances and clearances) |
- |
1500 |
|
For Routine Test Rs. 90,000/-
For Class D (Routine + Endurance Test) Rs.1,85,000
For Class C (Routine + Endurance Test) Rs.3,35,000
For Class B (Routine + Endurance Test) Rs.7,55,000
For Class A (Routine + Endurance Test) Rs.20,50,000 |
7.2(Terminals and connecting cables) |
- |
1500 |
|
For Routine Test Rs. 90,000/-
For Class D (Routine + Endurance Test) Rs.1,85,000
For Class C (Routine + Endurance Test) Rs.3,35,000
For Class B (Routine + Endurance Test) Rs.7,55,000
For Class A (Routine + Endurance Test) Rs.20,50,000 |
7.3(Earth connections) |
- |
500 |
|
For Routine Test Rs. 90,000/-
For Class D (Routine + Endurance Test) Rs.1,85,000
For Class C (Routine + Endurance Test) Rs.3,35,000
For Class B (Routine + Endurance Test) Rs.7,55,000
For Class A (Routine + Endurance Test) Rs.20,50,000 |
7.4(Discharge devices) |
- |
500 |
|
For Routine Test Rs. 90,000/-
For Class D (Routine + Endurance Test) Rs.1,85,000
For Class C (Routine + Endurance Test) Rs.3,35,000
For Class B (Routine + Endurance Test) Rs.7,55,000
For Class A (Routine + Endurance Test) Rs.20,50,000 |
8(Marking) |
- |
700 |
|
For Routine Test Rs. 90,000/-
For Class D (Routine + Endurance Test) Rs.1,85,000
For Class C (Routine + Endurance Test) Rs.3,35,000
For Class B (Routine + Endurance Test) Rs.7,55,000
For Class A (Routine + Endurance Test) Rs.20,50,000 |
9.2.1(Measurements of working voltage) |
- |
500 |
|
For Routine Test Rs. 90,000/-
For Class D (Routine + Endurance Test) Rs.1,85,000
For Class C (Routine + Endurance Test) Rs.3,35,000
For Class B (Routine + Endurance Test) Rs.7,55,000
For Class A (Routine + Endurance Test) Rs.20,50,000 |
9.2.2(Influence of capacitance) |
- |
500 |
|
For Routine Test Rs. 90,000/-
For Class D (Routine + Endurance Test) Rs.1,85,000
For Class C (Routine + Endurance Test) Rs.3,35,000
For Class B (Routine + Endurance Test) Rs.7,55,000
For Class A (Routine + Endurance Test) Rs.20,50,000 |
9.3(Checking capacitor temperature) |
- |
500 |
|
For Routine Test Rs. 90,000/-
For Class D (Routine + Endurance Test) Rs.1,85,000
For Class C (Routine + Endurance Test) Rs.3,35,000
For Class B (Routine + Endurance Test) Rs.7,55,000
For Class A (Routine + Endurance Test) Rs.20,50,000 |
9.4(Checking transients) |
- |
500 |
|
For Routine Test Rs. 90,000/-
For Class D (Routine + Endurance Test) Rs.1,85,000
For Class C (Routine + Endurance Test) Rs.3,35,000
For Class B (Routine + Endurance Test) Rs.7,55,000
For Class A (Routine + Endurance Test) Rs.20,50,000 |
9.5(Leakage current) |
- |
750 |
|
For Routine Test Rs. 90,000/-
For Class D (Routine + Endurance Test) Rs.1,85,000
For Class C (Routine + Endurance Test) Rs.3,35,000
For Class B (Routine + Endurance Test) Rs.7,55,000
For Class A (Routine + Endurance Test) Rs.20,50,000 |
5.1.1(General) |
- |
0 |
|
- |
5.5(Tangent of loss angle) |
- |
0 |
|
- |
5.7("Voltage test between terminals
") |
- |
0 |
|
- |
5.8(Voltage test between terminals and case) |
- |
0 |
|
- |
5.9(Capacitance measurement) |
- |
0 |
|
- |
5.9(Capacitance measurement) |
- |
0 |
|
- |
5.1(Check of dimensions) |
- |
0 |
|
- |
5.11(Mechanical tests) |
- |
0 |
|
- |
5.12(Sealing test) |
- |
0 |
|
- |
5.13(Endurance test) |
- |
0 |
|
- |
5.14(Damp heat test) |
- |
0 |
|
- |
5.15(Self-healing test) |
- |
0 |
|
- |
5.16(Destruction test) |
- |
0 |
|
- |
5.17(Resistance to heat, fire and tracking) |
- |
0 |
|
- |
5.17.1(Ball-pressure test) |
- |
0 |
|
- |
5.17.2(Glow-wire test) |
- |
0 |
|
- |
5.17.3(Tracking test) |
- |
0 |
|
- |
6.1(Maximum permissible voltage) |
- |
0 |
|
- |
6.2("Maximum permissible current
") |
- |
0 |
|
- |
6.3(Maximum permissible reactive output) |
- |
0 |
|
- |
7(Safety requirements) |
- |
0 |
|
- |
7.1(Requirements for Creepage distances and clearances) |
- |
0 |
|
- |
7.2(Terminals and connecting cables) |
- |
0 |
|
- |
7.3(Earth connections) |
- |
0 |
|
- |
7.4(Discharge devices) |
- |
0 |
|
- |
8(Marking) |
- |
0 |
|
- |
9.2.1(Measurements of working voltage) |
- |
0 |
|
- |
9.2.2(Influence of capacitance) |
- |
0 |
|
- |
9.3(Checking capacitor temperature) |
- |
0 |
|
- |
9.4(Checking transients) |
- |
0 |
|
- |
9.5(Leakage current) |
- |
0 |
|
- |
5.1.1(General) |
- |
0 |
|
- |
5.5(Tangent of loss angle) |
- |
0 |
|
- |
5.7("Voltage test between terminals
") |
- |
0 |
|
- |
5.8(Voltage test between terminals and case) |
- |
0 |
|
- |
5.9(Capacitance measurement) |
- |
0 |
|
- |
5.9(Capacitance measurement) |
- |
0 |
|
- |
5.1(Check of dimensions) |
- |
0 |
|
- |
5.11(Mechanical tests) |
- |
0 |
|
- |
5.12(Sealing test) |
- |
0 |
|
- |
5.13(Endurance test) |
- |
0 |
|
- |
5.14(Damp heat test) |
- |
0 |
|
- |
5.15(Self-healing test) |
- |
0 |
|
- |
5.16(Destruction test) |
- |
0 |
|
- |
5.17(Resistance to heat, fire and tracking) |
- |
0 |
|
- |
5.17.1(Ball-pressure test) |
- |
0 |
|
- |
5.17.2(Glow-wire test) |
- |
0 |
|
- |
5.17.3(Tracking test) |
- |
0 |
|
- |
6.1(Maximum permissible voltage) |
- |
0 |
|
- |
6.2("Maximum permissible current
") |
- |
0 |
|
- |
6.3(Maximum permissible reactive output) |
- |
0 |
|
- |
7(Safety requirements) |
- |
0 |
|
- |
7.1(Requirements for Creepage distances and clearances) |
- |
0 |
|
- |
7.2(Terminals and connecting cables) |
- |
0 |
|
- |
7.3(Earth connections) |
- |
0 |
|
- |
7.4(Discharge devices) |
- |
0 |
|
- |
8(Marking) |
- |
0 |
|
- |
9.2.1(Measurements of working voltage) |
- |
0 |
|
- |
9.2.2(Influence of capacitance) |
- |
0 |
|
- |
9.3(Checking capacitor temperature) |
- |
0 |
|
- |
9.4(Checking transients) |
- |
0 |
|
- |
9.5(Leakage current) |
- |
0 |
|
- |
5.1.1(General) |
- |
0 |
|
- |
5.5(Tangent of loss angle) |
- |
0 |
|
- |
5.7("Voltage test between terminals
") |
- |
0 |
|
- |
5.8(Voltage test between terminals and case) |
- |
0 |
|
- |
5.9(Capacitance measurement) |
- |
0 |
|
- |
5.9(Capacitance measurement) |
- |
0 |
|
- |
5.1(Check of dimensions) |
- |
0 |
|
- |
5.11(Mechanical tests) |
- |
0 |
|
- |
5.12(Sealing test) |
- |
0 |
|
- |
5.13(Endurance test) |
- |
0 |
|
- |
5.14(Damp heat test) |
- |
0 |
|
- |
5.15(Self-healing test) |
- |
0 |
|
- |
5.16(Destruction test) |
- |
0 |
|
- |
5.17(Resistance to heat, fire and tracking) |
- |
0 |
|
- |
5.17.1(Ball-pressure test) |
- |
0 |
|
- |
5.17.2(Glow-wire test) |
- |
0 |
|
- |
5.17.3(Tracking test) |
- |
0 |
|
- |
6.1(Maximum permissible voltage) |
- |
0 |
|
- |
6.2("Maximum permissible current
") |
- |
0 |
|
- |
6.3(Maximum permissible reactive output) |
- |
0 |
|
- |
7(Safety requirements) |
- |
0 |
|
- |
7.1(Requirements for Creepage distances and clearances) |
- |
0 |
|
- |
7.2(Terminals and connecting cables) |
- |
0 |
|
- |
7.3(Earth connections) |
- |
0 |
|
- |
7.4(Discharge devices) |
- |
0 |
|
- |
8(Marking) |
- |
0 |
|
- |
9.2.1(Measurements of working voltage) |
- |
0 |
|
- |
9.2.2(Influence of capacitance) |
- |
0 |
|
- |
9.3(Checking capacitor temperature) |
- |
0 |
|
- |
9.4(Checking transients) |
- |
0 |
|
- |
9.5(Leakage current) |
- |
0 |
|
- |
|
Complete
|
|
31 May, 2025 |
- Included.w.e.f.08.01.2025 |
3 |
IS 2347 (2023) |
DOMESTIC PRESSURE COOKER � SPECIFICATION |
- |
-
|
32500 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
4.1(Gross capacity) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
4.2(Body Capacity) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
6(Construction) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
7(Workmanship and Finish ) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
8.1(Air Pressure Test ) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
8.2(Proof Pressure Test ) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
8.3(Operating Test for Pressure Regulating Device ) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
8.4(Test for Safety Relief Device ) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
8.5(Bursting Pressure Test ) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
8.6(Test for Removal of Lid under Pressure ) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
8.7(Test for Spring Loaded Mechanism ) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
8.9(Aluminium induction compatible Base ) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
8.11(External Coating) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
8.12(Internal Coating ) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
8.14(Ply construction cooker Body ) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
8.15.1(Fragmentation Test ) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
8.15.2(Ball Drop Test ) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
8.15.3(Thermal Shock Test ) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
8.15.4(Free Fall Test) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
8.17(Test for Effectiveness for Induction Bottom) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
11(Marking ) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
12(Packing ) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
4(Capacity) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
4.2(Body Capacity) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
5.1.1(Body, Lid, Containers and Grid) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
5.1.2(Body, Lid, Containers and Grid) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
5.1.3(Body, Lid, Containers and Grid) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
5.1.4(Body, Lid, Containers and Grid) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
5.1.5(Body, Lid, Containers and Grid) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
5.2.1(Destructive Type Safety Relief Device) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
5.2.2(Resettable Type Safety Relief Device) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
5.3(Gasket) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
5.4(Handles and Knobs) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
5.5(Pressure Regulating Device) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
5.6(Vent Seal Pin for Pressure Regulating Device) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
5.7(Vent Pipe) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
5.8(Vent Pipe Nut) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
5.9(Spring) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
5.10(Spring) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
5.11(Visual Pressure Indicator) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
5.12(Gasket Release System) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
6(CONSTRUCTION) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
6.1(Pressure Regulating Device) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
6.1.1(Pressure Regulating Device) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
6.1.2(Pressure Regulating Device) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
6.1.1(Minimum Inside diameter of Vent Pipe.) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
6.1.3(Pressure Regulating Device) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
6.1.4(Pressure Regulating Device) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
6.1.5(Pressure Regulating Device) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
6.1.6(Pressure Regulating Device) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
6.2(Safety Relief Device) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
6.2.1(Safety Relief Device) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
6.2.2(Safety Relief Device) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
6.2.3(Safety Relief Device) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
6.3.1(Temperature Responsive Safety Relief Device) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
6.3.2(Temperature Responsive Safety Relief Device) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
6.3.3(Temperature Responsive Safety Relief Device) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
6.4.1(Handles and Knobs) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
6.4.1.1(Handles and Knobs) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
6.4.2(Handles and Knobs) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
6.4.2.1(Handles and Knobs) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
6.5(CONSTRUCTION) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
6.6(CONSTRUCTION) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
6.7(Internal Level Marking) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
6.8(Internal Level Marking) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
7.1(WORKMANSHIP AND FINISH) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
7.2(WORKMANSHIP AND FINISH) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
8.17(Test for Effectiveness for Induction Bottom) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
8.16(PRD with chain) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
8.15.4.2(Glass lid without rim) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
8.15.4.1("Free Fall Test ( Glass lid with rim)
") |
- |
0 |
|
Complete Testing charges Rs.32500/- |
8.15.3(Thermal Shock Test on Tempered Glass lid) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
8.15.2(Ball Drop Test on Tempered Glass lid) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
8.15.1(Fragmentation Test on Tempered Glass lid) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
8.14(3 ply construction cooker body) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
8.13(Pressure cooker with integral electrical heating) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
8.12(Internal Coating) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
7.3(WORKMANSHIP AND FINISH) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
7.4(WORKMANSHIP AND FINISH) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
8.1(Air Pressure Test) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
8.2(Proof Pressure Test) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
8.3.1(Operating Test for Pressure Regulating Device) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
8.4.1(Test for Safety Relief Device) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
8.4.2(Test for Safety Relief Device) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
8.4.2 NOTE(Test for Safety Relief Device) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
8.5(Bursting Pressure Test) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
8.6.1(Tests for Removal of Lid under Pressure For Outer Lid Cooker) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
8.6.2(Tests for Removal of Lid under Pressure For inner Lid Cooker) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
8.6.3(Tests for Removal of Lid under Pressure: For Cooker Fastened by Screw Clamps or Any Other Locking Device) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
8.6.4(Tests for Removal of Lid under Pressure in case of electrical pressure cooker) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
8.7(Test for Spring Loaded Mechanism) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
8.8(Test for stainless steel cookers) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
8.9("For stainless steel, aluminium induction
compatible base and 3 ply cooker") |
- |
0 |
|
Complete Testing charges Rs.32500/- |
8.10(Testing of Handles of the cooker) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
8.10 Note 3(Testing of Handles of the cooker) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
8.10 Note 4(Testing of Handles of the cooker) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
8.10 Note 5(Testing of Handles of the cooker) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
8.10 Note 6(Testing of Handles of the cooker) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
8.10.1(Testing of Handles of the cooker) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
8.11.1(External Coating) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
8.8(Composite Cooker Base ) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
8.1(Handles of cooker ) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
8.13(Integral electrical heating) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
5.1(Body, Lid, Containers and Grid) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
5.1.2(Body and Lid ) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
5.1.3(Stainless steel pressure cooker) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
5.1.4(Aluminium cooker ) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
5.2(Safety Relief Device) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
5.3(Gasket) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
5.4(Handles and Knobs) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
5.5(Pressure Regulating Device ) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
5.6(Vent Seal Pin for Pressure Regulating Device ) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
5.7(Vent Pipe ) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
5.8(Vent Pipe Nut ) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
5.9(Spring ) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
5.1(Material of Rim ) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
5.11(Visual Pressure Indicator) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
5.12(Gasket Release System) |
- |
0 |
|
Complete Testing charges Rs.32500/- |
|
Complete
|
|
31 May, 2025 |
- Included w.e.f.19.12.2024 |
4 |
IS 10805 (2022) |
Foot-Valves, Reflux Valves or NonReturn Valves and Bore Valves to be Used in Suction Lines of Agricultural Pumping Systems ― Specification ( Second Revision ) |
- |
-
|
3800 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
4(Materials) |
- |
350 |
|
Rs. 3000 Upto 50 mm
Rs. 3800/- above 50 mm & Upto 150 mm |
6(Coatings) |
- |
350 |
|
Rs. 3000 Upto 50 mm
Rs. 3800/- above 50 mm & Upto 150 mm |
3(Dimensions) |
- |
350 |
|
Rs. 3000 Upto 50 mm
Rs. 3800/- above 50 mm & Upto 150 mm |
5.2(Screwed ends) |
- |
350 |
|
Rs. 3000 Upto 50 mm
Rs. 3800/- above 50 mm & Upto 150 mm |
5.3(Flange Dimensions) |
- |
350 |
|
Rs. 3000 Upto 50 mm
Rs. 3800/- above 50 mm & Upto 150 mm |
7.1.1(Seat Test) |
- |
100 |
|
Rs. 3000 Upto 50 mm
Rs. 3800/- above 50 mm & Upto 150 mm |
7.1.2(Housing Test) |
- |
100 |
|
Rs. 3000 Upto 50 mm
Rs. 3800/- above 50 mm & Upto 150 mm |
7.2(K- Value Test) |
- |
1850 |
|
Rs. 3000 Upto 50 mm
Rs. 3800/- above 50 mm & Upto 150 mm |
4(Materials) |
- |
0 |
|
- |
6(Coatings) |
- |
0 |
|
- |
3(Dimensions) |
- |
0 |
|
- |
5.2(Screwed ends) |
- |
0 |
|
- |
5.3(Flange Dimensions) |
- |
0 |
|
- |
7.1.1(Seat Test) |
- |
0 |
|
- |
7.1.2(Housing Test) |
- |
0 |
|
- |
7.2(K- Value Test) |
- |
0 |
|
- |
|
Complete
|
|
31 May, 2025 |
- Included.w.e.f.13.01.2025 |
5 |
IS 617 (2024) |
Aluminium and Aluminium Alloys Ingots for Remelting and Castings for General Engineering Purposes — Specification (Fourth Revision) |
- |
-
|
9750 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
Cl-6.1, Table-1(Si) |
- |
30 |
|
- |
Cl-6.1, Table-1(Fe) |
- |
30 |
|
- |
Cl-6.1, Table-1(Cu) |
- |
30 |
|
- |
Cl-6.1, Table-1(Mn) |
- |
30 |
|
- |
Cl-6.1, Table-1(Mg) |
- |
30 |
|
- |
Cl-6.1, Table-1(Cr) |
- |
30 |
|
- |
Cl-6.1, Table-1(Ni) |
- |
30 |
|
- |
Cl-6.1, Table-1(Zn) |
- |
30 |
|
- |
Cl-6.1, Table-1(Pb) |
- |
30 |
|
- |
Cl-6.1, Table-1(Sn) |
- |
30 |
|
- |
Cl-6.1, Table-1(Ti) |
- |
30 |
|
- |
Cl-6.1, Table-1(Others elements Each) |
- |
30 |
|
- |
Cl-6.1, Table-1(Others elements Total) |
- |
30 |
|
- |
Cl-6.1, Table-1(Aluminium) |
- |
30 |
|
- |
Cl-6.2(The chemical analysis) |
- |
20 |
|
- |
Cl-7.1, Table-2(Sand-Cast Alloys- Tensile Strength) |
- |
400 |
|
- |
Cl-7.1, Table-2(Sand-Cast Alloys- Proof Stress) |
- |
2500 |
|
- |
Cl-7.1, Table-2(Sand-Cast Alloys- Elongation) |
- |
400 |
|
- |
Cl-7.1, Table-2(Sand-Cast Alloys- Brinell Hardness HBW) |
- |
200 |
|
- |
Cl-7.1, Table-3(Chill Cast Alloys- Tensile Strength) |
- |
400 |
|
- |
Cl-7.1, Table-3(Chill Cast Alloys- Proof Stress) |
- |
2500 |
|
- |
Cl-7.1, Table-3(Chill Cast Alloys- Elongation) |
- |
400 |
|
- |
Cl-7.1, Table-3(Chill Cast Alloys- Brinell Hardness HBW) |
- |
200 |
|
- |
Cl-7.1, Table-4(Investment-Cast Alloys- Tensile Strength) |
- |
400 |
|
- |
Cl-7.1, Table-4(Investment-Cast Alloys- Proof Stress) |
- |
2500 |
|
- |
Cl-7.1, Table-4(Investment-Cast Alloys- Elongation) |
- |
400 |
|
- |
Cl-7.1, Table-4(Investment-Cast Alloys-Brinell Hardness) |
- |
200 |
|
- |
Cl-7.2(Tensile Tests) |
- |
400 |
|
- |
Cl-7.4(Hardness) |
- |
200 |
|
- |
Cl-8(Freedom from Defects) |
- |
3000 |
|
- |
Cl-11(RETEST) |
- |
9750 |
|
- |
10(Pressure Test) |
- |
1000 |
|
- |
Cl-13(Marking) |
- |
500 |
|
- |
Cl-7.3(Test Pieces) |
- |
1500 |
|
- |
Cl. 6(Silicon) |
- |
0 |
|
- |
Cl. 6(Iron) |
- |
0 |
|
- |
Cl. 6(Copper) |
- |
0 |
|
- |
Cl. 6(Manganese) |
- |
0 |
|
- |
Cl. 6(Magnesium) |
- |
0 |
|
- |
Cl. 6(Chromium) |
- |
0 |
|
- |
Cl. 6(Nickel) |
- |
0 |
|
- |
Cl. 6(Zinc) |
- |
0 |
|
- |
Cl. 6(Lead) |
- |
0 |
|
- |
Cl. 6(Tin) |
- |
0 |
|
- |
Cl. 6(Titanium) |
- |
0 |
|
- |
Cl. 6(Others Element Each) |
- |
0 |
|
- |
Cl. 6(Others Element Total) |
- |
0 |
|
- |
Cl. 6(Aluminium) |
- |
0 |
|
- |
Cl. 6(Silver) |
- |
30 |
|
- |
Cl. 6(Zirconium) |
- |
30 |
|
- |
Cl. 6(Titanium+Zirconium) |
- |
30 |
|
- |
Cl. 6(Antimony) |
- |
30 |
|
- |
Cl. 6(Cobalt) |
- |
30 |
|
- |
Cl. 6(Antimony+Cobalt) |
- |
30 |
|
- |
Cl. 6(Beryllium) |
- |
30 |
|
- |
Cl-6.1, Table-1(Si) |
- |
0 |
|
- |
Cl-6.1, Table-1(Fe) |
- |
0 |
|
- |
Cl-6.1, Table-1(Cu) |
- |
0 |
|
- |
Cl-6.1, Table-1(Mn) |
- |
0 |
|
- |
Cl-6.1, Table-1(Mg) |
- |
0 |
|
- |
Cl-6.1, Table-1(Cr) |
- |
0 |
|
- |
Cl-6.1, Table-1(Ni) |
- |
0 |
|
- |
Cl-6.1, Table-1(Zn) |
- |
0 |
|
- |
Cl-6.1, Table-1(Pb) |
- |
0 |
|
- |
Cl-6.1, Table-1(Sn) |
- |
0 |
|
- |
Cl-6.1, Table-1(Ti) |
- |
0 |
|
- |
Cl-6.1, Table-1(Others elements Each) |
- |
0 |
|
- |
Cl-6.1, Table-1(Others elements Total) |
- |
0 |
|
- |
Cl-6.1, Table-1(Aluminium) |
- |
0 |
|
- |
Cl-6.2(The chemical analysis) |
- |
0 |
|
- |
Cl-7.1, Table-2(Sand-Cast Alloys- Tensile Strength) |
- |
0 |
|
- |
Cl-7.1, Table-2(Sand-Cast Alloys- Proof Stress) |
- |
0 |
|
- |
Cl-7.1, Table-2(Sand-Cast Alloys- Elongation) |
- |
0 |
|
- |
Cl-7.1, Table-2(Sand-Cast Alloys- Brinell Hardness HBW) |
- |
0 |
|
- |
Cl-7.1, Table-3(Chill Cast Alloys- Tensile Strength) |
- |
0 |
|
- |
Cl-7.1, Table-3(Chill Cast Alloys- Proof Stress) |
- |
0 |
|
- |
Cl-7.1, Table-3(Chill Cast Alloys- Elongation) |
- |
0 |
|
- |
Cl-7.1, Table-3(Chill Cast Alloys- Brinell Hardness HBW) |
- |
0 |
|
- |
Cl-7.1, Table-4(Investment-Cast Alloys- Tensile Strength) |
- |
0 |
|
- |
Cl-7.1, Table-4(Investment-Cast Alloys- Proof Stress) |
- |
0 |
|
- |
Cl-7.1, Table-4(Investment-Cast Alloys- Elongation) |
- |
0 |
|
- |
Cl-7.1, Table-4(Investment-Cast Alloys-Brinell Hardness) |
- |
0 |
|
- |
Cl-7.2(Tensile Tests) |
- |
0 |
|
- |
Cl-7.4(Hardness) |
- |
0 |
|
- |
Cl-8(Freedom from Defects) |
- |
0 |
|
- |
Cl-11(RETEST) |
- |
0 |
|
- |
10(Pressure Test) |
- |
0 |
|
- |
Cl-13(Marking) |
- |
0 |
|
- |
Cl-7.3(Test Pieces) |
- |
0 |
|
- |
Cl. 6(Silicon) |
- |
0 |
|
- |
Cl. 6(Iron) |
- |
0 |
|
- |
Cl. 6(Copper) |
- |
0 |
|
- |
Cl. 6(Manganese) |
- |
0 |
|
- |
Cl. 6(Magnesium) |
- |
0 |
|
- |
Cl. 6(Chromium) |
- |
0 |
|
- |
Cl. 6(Nickel) |
- |
0 |
|
- |
Cl. 6(Zinc) |
- |
0 |
|
- |
Cl. 6(Lead) |
- |
0 |
|
- |
Cl. 6(Tin) |
- |
0 |
|
- |
Cl. 6(Titanium) |
- |
0 |
|
- |
Cl. 6(Others Element Each) |
- |
0 |
|
- |
Cl. 6(Others Element Total) |
- |
0 |
|
- |
Cl. 6(Aluminium) |
- |
0 |
|
- |
Cl. 6(Silver) |
- |
0 |
|
- |
Cl. 6(Zirconium) |
- |
0 |
|
- |
Cl. 6(Titanium+Zirconium) |
- |
0 |
|
- |
Cl. 6(Antimony) |
- |
0 |
|
- |
Cl. 6(Cobalt) |
- |
0 |
|
- |
Cl. 6(Antimony+Cobalt) |
- |
0 |
|
- |
Cl. 6(Beryllium) |
- |
0 |
|
- |
|
Complete
|
|
31 May, 2025 |
- Included w.e.f.10.12.2024 |
6 |
IS 14543 (2024) |
Packaged Drinking Water Other than Packaged Natural Mineral Water Specification Third Revision |
- |
-
|
20000 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
5.3(Appearance) |
- |
50 |
|
Total testing fees Rs.20000/-
Microbiological requirements Rs. 6100/-
Organoleptic and physical parameters is Rs. 9350/-
Pesticide residues is Rs. 6050/- |
5.4/Annex D/i(P,P-DDT) |
- |
120 |
|
Total testing fees Rs.20000/-
Microbiological requirements Rs. 6100/-
Organoleptic and physical parameters is Rs. 9350/-
Pesticide residues is Rs. 6050/- |
5.4/Annex D/ii(Lindane) |
- |
120 |
|
Total testing fees Rs.20000/-
Microbiological requirements Rs. 6100/-
Organoleptic and physical parameters is Rs. 9350/-
Pesticide residues is Rs. 6050/- |
5.4/Annex D/iv(b-Endosulfan) |
- |
120 |
|
Total testing fees Rs.20000/-
Microbiological requirements Rs. 6100/-
Organoleptic and physical parameters is Rs. 9350/-
Pesticide residues is Rs. 6050/- |
5.4/Annex D/xvi(Dieldrin) |
- |
100 |
|
Total testing fees Rs.20000/-
Microbiological requirements Rs. 6100/-
Organoleptic and physical parameters is Rs. 9350/-
Pesticide residues is Rs. 6050/- |
5.4/Annex D/xvi(Aldrin) |
- |
100 |
|
Total testing fees Rs.20000/-
Microbiological requirements Rs. 6100/-
Organoleptic and physical parameters is Rs. 9350/-
Pesticide residues is Rs. 6050/- |
5.4/Annex D/i(O,P-DDT) |
- |
100 |
|
Total testing fees Rs.20000/-
Microbiological requirements Rs. 6100/-
Organoleptic and physical parameters is Rs. 9350/-
Pesticide residues is Rs. 6050/- |
5.4/Annex D/iv(a-Endosulfan) |
- |
100 |
|
Total testing fees Rs.20000/-
Microbiological requirements Rs. 6100/-
Organoleptic and physical parameters is Rs. 9350/-
Pesticide residues is Rs. 6050/- |
5.4/Annex D/iii(d-HCH) |
- |
100 |
|
Total testing fees Rs.20000/-
Microbiological requirements Rs. 6100/-
Organoleptic and physical parameters is Rs. 9350/-
Pesticide residues is Rs. 6050/- |
5.4/Annex D/i(O,P-DDD) |
- |
100 |
|
Total testing fees Rs.20000/-
Microbiological requirements Rs. 6100/-
Organoleptic and physical parameters is Rs. 9350/-
Pesticide residues is Rs. 6050/- |
5.4/Annex D/i(P,P-DDE) |
- |
100 |
|
Total testing fees Rs.20000/-
Microbiological requirements Rs. 6100/-
Organoleptic and physical parameters is Rs. 9350/-
Pesticide residues is Rs. 6050/- |
5.4/Annex D/i(O,P-DDE) |
- |
100 |
|
Total testing fees Rs.20000/-
Microbiological requirements Rs. 6100/-
Organoleptic and physical parameters is Rs. 9350/-
Pesticide residues is Rs. 6050/- |
5.4/Annex D/iii(a-HCH) |
- |
100 |
|
Total testing fees Rs.20000/-
Microbiological requirements Rs. 6100/-
Organoleptic and physical parameters is Rs. 9350/-
Pesticide residues is Rs. 6050/- |
5.4/Annex D/iii(β- HCH) |
- |
100 |
|
Total testing fees Rs.20000/-
Microbiological requirements Rs. 6100/-
Organoleptic and physical parameters is Rs. 9350/-
Pesticide residues is Rs. 6050/- |
5.4/Annex D/iv(Endosulfan sulfate) |
- |
100 |
|
Total testing fees Rs.20000/-
Microbiological requirements Rs. 6100/-
Organoleptic and physical parameters is Rs. 9350/-
Pesticide residues is Rs. 6050/- |
5.4/Annex D/i(P,P-DDD) |
- |
120 |
|
Total testing fees Rs.20000/-
Microbiological requirements Rs. 6100/-
Organoleptic and physical parameters is Rs. 9350/-
Pesticide residues is Rs. 6050/- |
5.4/Annex D/xii(Alachlor) |
- |
100 |
|
Total testing fees Rs.20000/-
Microbiological requirements Rs. 6100/-
Organoleptic and physical parameters is Rs. 9350/-
Pesticide residues is Rs. 6050/- |
5.4/Annex D/vii(Chlorpyrifos) |
- |
114 |
|
Total testing fees Rs.20000/-
Microbiological requirements Rs. 6100/-
Organoleptic and physical parameters is Rs. 9350/-
Pesticide residues is Rs. 6050/- |
5.4/Annex D/x(Butachlor) |
- |
100 |
|
Total testing fees Rs.20000/-
Microbiological requirements Rs. 6100/-
Organoleptic and physical parameters is Rs. 9350/-
Pesticide residues is Rs. 6050/- |
5.4/Annex D/vi(Ethion) |
- |
100 |
|
Total testing fees Rs.20000/-
Microbiological requirements Rs. 6100/-
Organoleptic and physical parameters is Rs. 9350/-
Pesticide residues is Rs. 6050/- |
5.4/Annex D/xiv(Methyl parathion) |
- |
100 |
|
Total testing fees Rs.20000/-
Microbiological requirements Rs. 6100/-
Organoleptic and physical parameters is Rs. 9350/-
Pesticide residues is Rs. 6050/- |
5.4/Annex D/xv(Malathion) |
- |
100 |
|
Total testing fees Rs.20000/-
Microbiological requirements Rs. 6100/-
Organoleptic and physical parameters is Rs. 9350/-
Pesticide residues is Rs. 6050/- |
5.4/Annex D/viii(Phorate) |
- |
100 |
|
Total testing fees Rs.20000/-
Microbiological requirements Rs. 6100/-
Organoleptic and physical parameters is Rs. 9350/-
Pesticide residues is Rs. 6050/- |
5.4/Annex D/v(Monochrotophos) |
- |
100 |
|
Total testing fees Rs.20000/-
Microbiological requirements Rs. 6100/-
Organoleptic and physical parameters is Rs. 9350/-
Pesticide residues is Rs. 6050/- |
5.4/Annex D/xiii(Atrazine) |
- |
100 |
|
Total testing fees Rs.20000/-
Microbiological requirements Rs. 6100/-
Organoleptic and physical parameters is Rs. 9350/-
Pesticide residues is Rs. 6050/- |
5.4/Annex D/viii(Phorate sulphoxide) |
- |
100 |
|
Total testing fees Rs.20000/-
Microbiological requirements Rs. 6100/-
Organoleptic and physical parameters is Rs. 9350/-
Pesticide residues is Rs. 6050/- |
5.4/Annex D/viii(Phorate sulfone) |
- |
100 |
|
Total testing fees Rs.20000/-
Microbiological requirements Rs. 6100/-
Organoleptic and physical parameters is Rs. 9350/-
Pesticide residues is Rs. 6050/- |
5.4/Annex D/xxvii(Methyl paraoxon) |
- |
100 |
|
Total testing fees Rs.20000/-
Microbiological requirements Rs. 6100/-
Organoleptic and physical parameters is Rs. 9350/-
Pesticide residues is Rs. 6050/- |
5.4/Annex D/xxviii(Malaoxon) |
- |
100 |
|
Total testing fees Rs.20000/-
Microbiological requirements Rs. 6100/-
Organoleptic and physical parameters is Rs. 9350/-
Pesticide residues is Rs. 6050/- |
5.4/Annex D/xi(Isoproturon) |
- |
1175 |
|
Total testing fees Rs.20000/-
Microbiological requirements Rs. 6100/-
Organoleptic and physical parameters is Rs. 9350/-
Pesticide residues is Rs. 6050/- |
5.4/Annex D/ix(2,4 –D) |
- |
1175 |
|
Total testing fees Rs.20000/-
Microbiological requirements Rs. 6100/-
Organoleptic and physical parameters is Rs. 9350/-
Pesticide residues is Rs. 6050/- |
Cl-5.1(General Requirements) |
- |
0 |
|
Total testing fees Rs.20000/-
Microbiological requirements Rs. 6100/-
Organoleptic and physical parameters is Rs. 9350/-
Pesticide residues is Rs. 6050/- |
Cl-5.2.1(Escherichia coli or thermotolerant bacteria) |
- |
425 |
|
Total testing fees Rs.20000/-
Microbiological requirements Rs. 6100/-
Organoleptic and physical parameters is Rs. 9350/-
Pesticide residues is Rs. 6050/- |
Cl-5.2.2(Coliform) |
- |
425 |
|
Total testing fees Rs.20000/-
Microbiological requirements Rs. 6100/-
Organoleptic and physical parameters is Rs. 9350/-
Pesticide residues is Rs. 6050/- |
Cl-5.2.3(Staphylococcus aureus) |
- |
450 |
|
Total testing fees Rs.20000/-
Microbiological requirements Rs. 6100/-
Organoleptic and physical parameters is Rs. 9350/-
Pesticide residues is Rs. 6050/- |
Cl-5.2.4(Sulphite Reducing Anaerobes) |
- |
400 |
|
Total testing fees Rs.20000/-
Microbiological requirements Rs. 6100/-
Organoleptic and physical parameters is Rs. 9350/-
Pesticide residues is Rs. 6050/- |
Cl-5.2.5(Pseudomonas Aeruginosa) |
- |
500 |
|
Total testing fees Rs.20000/-
Microbiological requirements Rs. 6100/-
Organoleptic and physical parameters is Rs. 9350/-
Pesticide residues is Rs. 6050/- |
Cl-5.2.6(Aerobic Microbial Count @ 37 deg C) |
- |
200 |
|
Total testing fees Rs.20000/-
Microbiological requirements Rs. 6100/-
Organoleptic and physical parameters is Rs. 9350/-
Pesticide residues is Rs. 6050/- |
Cl-5.2.7(Yeast and mould) |
- |
450 |
|
Total testing fees Rs.20000/-
Microbiological requirements Rs. 6100/-
Organoleptic and physical parameters is Rs. 9350/-
Pesticide residues is Rs. 6050/- |
Cl-5.2.8(Salmonella) |
- |
600 |
|
Total testing fees Rs.20000/-
Microbiological requirements Rs. 6100/-
Organoleptic and physical parameters is Rs. 9350/-
Pesticide residues is Rs. 6050/- |
Cl-5.2.9(Vibrio cholera) |
- |
550 |
|
Total testing fees Rs.20000/-
Microbiological requirements Rs. 6100/-
Organoleptic and physical parameters is Rs. 9350/-
Pesticide residues is Rs. 6050/- |
Cl-5.3, Table-1 (i)(Colour, true colour units, Max) |
- |
150 |
|
Total testing fees Rs.20000/-
Microbiological requirements Rs. 6100/-
Organoleptic and physical parameters is Rs. 9350/-
Pesticide residues is Rs. 6050/- |
Cl-5.3, Table-1 (ii)(Odour) |
- |
110 |
|
Total testing fees Rs.20000/-
Microbiological requirements Rs. 6100/-
Organoleptic and physical parameters is Rs. 9350/-
Pesticide residues is Rs. 6050/- |
Cl-5.3, Table-1 (iii)(Taste) |
- |
150 |
|
Total testing fees Rs.20000/-
Microbiological requirements Rs. 6100/-
Organoleptic and physical parameters is Rs. 9350/-
Pesticide residues is Rs. 6050/- |
Cl-5.3, Table-1 (iv)(Turbidity, nephelometric turbidity unit (NTU), Max) |
- |
150 |
|
Total testing fees Rs.20000/-
Microbiological requirements Rs. 6100/-
Organoleptic and physical parameters is Rs. 9350/-
Pesticide residues is Rs. 6050/- |
Cl-5.3, Table-1 (v)(Total dissolved solids, mg/l, Max) |
- |
225 |
|
Total testing fees Rs.20000/-
Microbiological requirements Rs. 6100/-
Organoleptic and physical parameters is Rs. 9350/-
Pesticide residues is Rs. 6050/- |
Cl-5.3, Table-1 (vi)(pH) |
- |
150 |
|
Total testing fees Rs.20000/-
Microbiological requirements Rs. 6100/-
Organoleptic and physical parameters is Rs. 9350/-
Pesticide residues is Rs. 6050/- |
Cl-5.3, Table-2 (i)(Barium (as Ba)) |
- |
110 |
|
Total testing fees Rs.20000/-
Microbiological requirements Rs. 6100/-
Organoleptic and physical parameters is Rs. 9350/-
Pesticide residues is Rs. 6050/- |
Cl-5.3, Table-2 (ii)(Copper (as Cu)) |
- |
110 |
|
Total testing fees Rs.20000/-
Microbiological requirements Rs. 6100/-
Organoleptic and physical parameters is Rs. 9350/-
Pesticide residues is Rs. 6050/- |
Cl-5.3, Table-2 (iii)(Iron (as Fe)) |
- |
110 |
|
Total testing fees Rs.20000/-
Microbiological requirements Rs. 6100/-
Organoleptic and physical parameters is Rs. 9350/-
Pesticide residues is Rs. 6050/- |
Cl-5.3, Table-2 (iv)(Manganese (as Mn)) |
- |
110 |
|
Total testing fees Rs.20000/-
Microbiological requirements Rs. 6100/-
Organoleptic and physical parameters is Rs. 9350/-
Pesticide residues is Rs. 6050/- |
Cl-5.3, Table-2 (v)(Nitrate (as NO3 )) |
- |
200 |
|
Total testing fees Rs.20000/-
Microbiological requirements Rs. 6100/-
Organoleptic and physical parameters is Rs. 9350/-
Pesticide residues is Rs. 6050/- |
Cl-5.3, Table-2 (vi)(Nitrite (as NO2 )) |
- |
200 |
|
Total testing fees Rs.20000/-
Microbiological requirements Rs. 6100/-
Organoleptic and physical parameters is Rs. 9350/-
Pesticide residues is Rs. 6050/- |
Cl-5.3, Table-2 (vii)(Fluoride (as F)) |
- |
190 |
|
Total testing fees Rs.20000/-
Microbiological requirements Rs. 6100/-
Organoleptic and physical parameters is Rs. 9350/-
Pesticide residues is Rs. 6050/- |
Cl-5.3, Table-2 (viii)(Zinc (as Zn)) |
- |
110 |
|
Total testing fees Rs.20000/-
Microbiological requirements Rs. 6100/-
Organoleptic and physical parameters is Rs. 9350/-
Pesticide residues is Rs. 6050/- |
Cl-5.3, Table-2 (ix)(Silver (as Ag)) |
- |
110 |
|
Total testing fees Rs.20000/-
Microbiological requirements Rs. 6100/-
Organoleptic and physical parameters is Rs. 9350/-
Pesticide residues is Rs. 6050/- |
Cl-5.3, Table-2 (x)(Aluminium (as A1)) |
- |
110 |
|
Total testing fees Rs.20000/-
Microbiological requirements Rs. 6100/-
Organoleptic and physical parameters is Rs. 9350/-
Pesticide residues is Rs. 6050/- |
Cl-5.3, Table-2 (xi)(Chloride (as Cl)) |
- |
200 |
|
Total testing fees Rs.20000/-
Microbiological requirements Rs. 6100/-
Organoleptic and physical parameters is Rs. 9350/-
Pesticide residues is Rs. 6050/- |
Cl-5.3, Table-2 (xii)(Selenium (as Se)) |
- |
140 |
|
Total testing fees Rs.20000/-
Microbiological requirements Rs. 6100/-
Organoleptic and physical parameters is Rs. 9350/-
Pesticide residues is Rs. 6050/- |
Cl-5.3, Table-2 (xiii)(Sulphate (as SO4 )) |
- |
210 |
|
Total testing fees Rs.20000/-
Microbiological requirements Rs. 6100/-
Organoleptic and physical parameters is Rs. 9350/-
Pesticide residues is Rs. 6050/- |
Cl-5.3, Table-2 (xiv)(Alkalinity (as HCO3 )) |
- |
190 |
|
Total testing fees Rs.20000/-
Microbiological requirements Rs. 6100/-
Organoleptic and physical parameters is Rs. 9350/-
Pesticide residues is Rs. 6050/- |
Cl-5.3, Table-2 (xv)(Calcium (as Ca)) |
- |
110 |
|
Total testing fees Rs.20000/-
Microbiological requirements Rs. 6100/-
Organoleptic and physical parameters is Rs. 9350/-
Pesticide residues is Rs. 6050/- |
Cl-5.3, Table-2 (xvi)(Magnesium (as Mg)) |
- |
110 |
|
Total testing fees Rs.20000/-
Microbiological requirements Rs. 6100/-
Organoleptic and physical parameters is Rs. 9350/-
Pesticide residues is Rs. 6050/- |
Cl-5.3, Table-2 (xvii)(Sodium (as Na)) |
- |
110 |
|
Total testing fees Rs.20000/-
Microbiological requirements Rs. 6100/-
Organoleptic and physical parameters is Rs. 9350/-
Pesticide residues is Rs. 6050/- |
Cl-5.3, Table-2 (xviii)(Residual free chlorine) |
- |
240 |
|
Total testing fees Rs.20000/-
Microbiological requirements Rs. 6100/-
Organoleptic and physical parameters is Rs. 9350/-
Pesticide residues is Rs. 6050/- |
Cl-5.3, Table-2 (xix)(Phenolic compounds (as C6H5OH)) |
- |
375 |
|
Total testing fees Rs.20000/-
Microbiological requirements Rs. 6100/-
Organoleptic and physical parameters is Rs. 9350/-
Pesticide residues is Rs. 6050/- |
Cl-5.3, Table-2 (xx)(Mineral oil) |
- |
475 |
|
Total testing fees Rs.20000/-
Microbiological requirements Rs. 6100/-
Organoleptic and physical parameters is Rs. 9350/-
Pesticide residues is Rs. 6050/- |
Cl-5.3, Table-2 (xxi)(Anionic surface active agents) |
- |
525 |
|
Total testing fees Rs.20000/-
Microbiological requirements Rs. 6100/-
Organoleptic and physical parameters is Rs. 9350/-
Pesticide residues is Rs. 6050/- |
Cl-5.3, Table-2 (xxii)(Sulphide) |
- |
190 |
|
Total testing fees Rs.20000/-
Microbiological requirements Rs. 6100/-
Organoleptic and physical parameters is Rs. 9350/-
Pesticide residues is Rs. 6050/- |
Cl-5.3, Table-2 (xxiii)(Antimony (as Sb)) |
- |
125 |
|
Total testing fees Rs.20000/-
Microbiological requirements Rs. 6100/-
Organoleptic and physical parameters is Rs. 9350/-
Pesticide residues is Rs. 6050/- |
Cl-5.3, Table-2 (xxiv)(Borates (as B)) |
- |
225 |
|
Total testing fees Rs.20000/-
Microbiological requirements Rs. 6100/-
Organoleptic and physical parameters is Rs. 9350/-
Pesticide residues is Rs. 6050/- |
Cl-5.3, Table-2 (xxv)(Bromates (as BrO3 )) |
- |
325 |
|
Total testing fees Rs.20000/-
Microbiological requirements Rs. 6100/-
Organoleptic and physical parameters is Rs. 9350/-
Pesticide residues is Rs. 6050/- |
Cl-5.3, Table-3 (i)(Mercury (as Hg)) |
- |
125 |
|
Total testing fees Rs.20000/-
Microbiological requirements Rs. 6100/-
Organoleptic and physical parameters is Rs. 9350/-
Pesticide residues is Rs. 6050/- |
Cl-5.3, Table-3 (ii)(Cadmium (as Cd)) |
- |
110 |
|
Total testing fees Rs.20000/-
Microbiological requirements Rs. 6100/-
Organoleptic and physical parameters is Rs. 9350/-
Pesticide residues is Rs. 6050/- |
Cl-5.3, Table-3 (iii)(Arsenic (as As)) |
- |
121 |
|
Total testing fees Rs.20000/-
Microbiological requirements Rs. 6100/-
Organoleptic and physical parameters is Rs. 9350/-
Pesticide residues is Rs. 6050/- |
Cl-5.3, Table-3 (iv)(Cyanide (as CN)) |
- |
400 |
|
Total testing fees Rs.20000/-
Microbiological requirements Rs. 6100/-
Organoleptic and physical parameters is Rs. 9350/-
Pesticide residues is Rs. 6050/- |
Cl-5.3, Table-3 (v)(Lead (as Pb)) |
- |
110 |
|
Total testing fees Rs.20000/-
Microbiological requirements Rs. 6100/-
Organoleptic and physical parameters is Rs. 9350/-
Pesticide residues is Rs. 6050/- |
Cl-5.3, Table-3 (vi)(Chromium (as Cr)) |
- |
110 |
|
Total testing fees Rs.20000/-
Microbiological requirements Rs. 6100/-
Organoleptic and physical parameters is Rs. 9350/-
Pesticide residues is Rs. 6050/- |
Cl-5.3, Table-3 (vii)(Nickel (as Ni)) |
- |
110 |
|
Total testing fees Rs.20000/-
Microbiological requirements Rs. 6100/-
Organoleptic and physical parameters is Rs. 9350/-
Pesticide residues is Rs. 6050/- |
Cl-5.3, Table-3 (viii)(Polychlorinated biphenyl (PCB)) |
- |
800 |
|
Total testing fees Rs.20000/-
Microbiological requirements Rs. 6100/-
Organoleptic and physical parameters is Rs. 9350/-
Pesticide residues is Rs. 6050/- |
Cl-5.3, Table-3 (ix)(Polynuclear aromatic hydrocarbons) |
- |
1100 |
|
Total testing fees Rs.20000/-
Microbiological requirements Rs. 6100/-
Organoleptic and physical parameters is Rs. 9350/-
Pesticide residues is Rs. 6050/- |
Cl-5.4 (i)(Pesticide residues considered individually) |
- |
6050 |
|
Total testing fees Rs.20000/-
Microbiological requirements Rs. 6100/-
Organoleptic and physical parameters is Rs. 9350/-
Pesticide residues is Rs. 6050/- |
Cl-5.4 (ii)(Total pesticide residue) |
- |
6050 |
|
Total testing fees Rs.20000/-
Microbiological requirements Rs. 6100/-
Organoleptic and physical parameters is Rs. 9350/-
Pesticide residues is Rs. 6050/- |
Cl-5.2.3(Faecal streptococci) |
- |
450 |
|
Total testing fees Rs.20000/-
Microbiological requirements Rs. 6100/-
Organoleptic and physical parameters is Rs. 9350/-
Pesticide residues is Rs. 6050/- |
Cl-5.2.8(shigella) |
- |
675 |
|
Total testing fees Rs.20000/-
Microbiological requirements Rs. 6100/-
Organoleptic and physical parameters is Rs. 9350/-
Pesticide residues is Rs. 6050/- |
Cl-5.2.9(V.parahaemolyticus) |
- |
550 |
|
Total testing fees Rs.20000/-
Microbiological requirements Rs. 6100/-
Organoleptic and physical parameters is Rs. 9350/-
Pesticide residues is Rs. 6050/- |
5.2.6(Aerobic Microbial Count @ 20 to 22 deg C) |
- |
200 |
|
Total testing fees Rs.20000/-
Microbiological requirements Rs. 6100/-
Organoleptic and physical parameters is Rs. 9350/-
Pesticide residues is Rs. 6050/- |
5.4 i)(Dieldrin) |
- |
0 |
|
- |
5.4 i)(Aldrin) |
- |
0 |
|
- |
5.4 i)(Malathion) |
- |
0 |
|
- |
5.4, i)("oxygen analogue of Malathion (Malaoxon)") |
- |
0 |
|
- |
5.4 i)(Methyl Paraoxon) |
- |
0 |
|
- |
5.4 i)(Methyl Parathion) |
- |
0 |
|
- |
5.4 i)(Atrazine) |
- |
0 |
|
- |
5.4 i)(Alachlor) |
- |
0 |
|
- |
5.4 i)(Isoproturon) |
- |
0 |
|
- |
5.4 i)(Butachlor) |
- |
0 |
|
- |
5.4 i)(2,4-D) |
- |
0 |
|
- |
5.4 i)(Phorate sulphone) |
- |
0 |
|
- |
5.4 i)(Phorate sulphoxide) |
- |
0 |
|
- |
5.4 i)(Phorate) |
- |
0 |
|
- |
5.4 i)(Chlorpyrifos) |
- |
0 |
|
- |
5.4 i)(Ethion) |
- |
0 |
|
- |
5.4 i)(Monocrotophos) |
- |
0 |
|
- |
5.4 i)(Endosulfan Sulphate) |
- |
0 |
|
- |
5.4 i)(beta-Endosulfan) |
- |
0 |
|
- |
5.4 i)(alpha-Endosulfan) |
- |
0 |
|
- |
5.4 i)(Delta-HCH) |
- |
0 |
|
- |
5.4 i)(beta-HCH) |
- |
0 |
|
- |
5.4 i)(alpha-HCH) |
- |
0 |
|
- |
5.4 i)(Gamma-HCH (Lindane)) |
- |
0 |
|
- |
5.4 i)(p,p DDD) |
- |
0 |
|
- |
5.4 i)(o,p DDD) |
- |
0 |
|
- |
5.4 i)(p,p DDE) |
- |
0 |
|
- |
5.4, i)(o,p DDE) |
- |
0 |
|
- |
5.4 i)(p,p DDT) |
- |
0 |
|
- |
5.4 i)(o,p DDT) |
- |
0 |
|
- |
|
Complete
|
|
31 May, 2025 |
- included.w.e.f.17.10.2024
Exclusion
Cl-5.3, Table-4 (i) (Alpha emitters
Cl-5.3, Table-4 (ii) (Beta emitters, |
7 |
IS 617 (1994) |
Cast aluminium and its alloys - Ingots and castings for general engineering purposes - Specification (Third Revision) |
- |
-
|
7450 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
Table-1, Clause - 5.1(Copper) |
- |
0 |
|
- |
Table-1, Clause - 5.1(Iron) |
- |
0 |
|
- |
Table-1, Clause - 5.1(Magnesium) |
- |
0 |
|
- |
Table-1, Clause - 5.1(Manganese) |
- |
0 |
|
- |
Table-1, Clause - 5.1(Tin) |
- |
0 |
|
- |
Table-1, Clause - 5.1(Silicon) |
- |
0 |
|
- |
Table-1, Clause - 5.1(Nickel) |
- |
0 |
|
- |
Table-1, Clause - 5.1(Zinc) |
- |
0 |
|
- |
Table-1, Clause - 5.1(Other elements (each)) |
- |
0 |
|
- |
Table-1, Clause - 5.1(Other elements (Total)) |
- |
0 |
|
- |
Table-1, Clause - 5.1(Aluminium) |
- |
0 |
|
- |
Table-1, Clause - 5.1(Titanium) |
- |
0 |
|
- |
Table-1, Clause - 5.1(Lead) |
- |
0 |
|
- |
5, Table 1.(Chemical Composition) |
- |
650 |
|
- |
9(TOLERANCES ON DIMENSIONS OF CASTINGS) |
- |
1500 |
|
- |
7(FREEDOM FROM DEFECTS) |
- |
3000 |
|
- |
6.2(Hardness) |
- |
400 |
|
- |
6, Table 2.(MECHANICAL PROPERTIES OF CASTINGS) |
- |
400 |
|
- |
17(Marking) |
- |
500 |
|
- |
11() |
- |
0 |
|
- |
11(Pressure Test) |
- |
1000 |
|
- |
17(Marking) |
- |
0 |
|
- |
11(Pressure Test) |
- |
0 |
|
- |
11(Pressure Test - IS 617) |
- |
0 |
|
- |
13(Marking) |
- |
0 |
|
- |
Table-1, Clause - 5.1(Copper) |
- |
0 |
|
- |
Table-1, Clause - 5.1(Iron) |
- |
0 |
|
- |
Table-1, Clause - 5.1(Magnesium) |
- |
0 |
|
- |
Table-1, Clause - 5.1(Manganese) |
- |
0 |
|
- |
Table-1, Clause - 5.1(Tin) |
- |
0 |
|
- |
Table-1, Clause - 5.1(Silicon) |
- |
0 |
|
- |
Table-1, Clause - 5.1(Nickel) |
- |
0 |
|
- |
Table-1, Clause - 5.1(Zinc) |
- |
0 |
|
- |
Table-1, Clause - 5.1(Other elements (each)) |
- |
0 |
|
- |
Table-1, Clause - 5.1(Other elements (Total)) |
- |
0 |
|
- |
Table-1, Clause - 5.1(Aluminium) |
- |
0 |
|
- |
Table-1, Clause - 5.1(Titanium) |
- |
0 |
|
- |
Table-1, Clause - 5.1(Lead) |
- |
0 |
|
- |
5, Table 1.(Chemical Composition) |
- |
0 |
|
- |
9(TOLERANCES ON DIMENSIONS OF CASTINGS) |
- |
0 |
|
- |
7(FREEDOM FROM DEFECTS) |
- |
0 |
|
- |
6.2(Hardness) |
- |
0 |
|
- |
6, Table 2.(MECHANICAL PROPERTIES OF CASTINGS) |
- |
0 |
|
- |
17(Marking) |
- |
0 |
|
- |
11() |
- |
0 |
|
- |
11(Pressure Test) |
- |
0 |
|
- |
17(Marking) |
- |
0 |
|
- |
11(Pressure Test) |
- |
0 |
|
- |
11(Pressure Test - IS 617) |
- |
0 |
|
- |
13(Marking) |
- |
0 |
|
- |
|
Complete
|
|
31 May, 2025 |
- Included w.e.f. 25.04.2024 |
8 |
IS 210 (2009) |
Grey iron castings - Specification (First Revision) |
- |
-
|
5575 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
6(Chemical Composition(chemical
composition shall be as agreed to between the
purchaser and the manufacturer.)) |
- |
650 |
|
- |
7.1(WORKMANSHIP AND FINISH) |
- |
100 |
|
- |
10.1(FREEDOM FROM DEFECTS) |
- |
125 |
|
- |
10.2(FREEDOM FROM DEFECTS) |
- |
125 |
|
- |
13(SIZE OF TEST BARS-Diameter) |
- |
50 |
|
- |
13(SIZE OF TEST BARS-Length) |
- |
50 |
|
- |
15, Table 3(TENSIL.E TEST- IS 1608 Part1 ) |
- |
400 |
|
- |
16, Table 3(Hardness Test) |
- |
400 |
|
- |
17,Annex B(TRANSVERSE TEST) |
- |
900 |
|
- |
18(HYDROSTATIC TEST) |
- |
1000 |
|
- |
6(Chemical Composition(chemical
composition shall be as agreed to between the
purchaser and the manufacturer.)) |
- |
0 |
|
- |
7.1(WORKMANSHIP AND FINISH) |
- |
0 |
|
- |
10.1(FREEDOM FROM DEFECTS) |
- |
0 |
|
- |
10.2(FREEDOM FROM DEFECTS) |
- |
0 |
|
- |
13(SIZE OF TEST BARS-Diameter) |
- |
0 |
|
- |
13(SIZE OF TEST BARS-Length) |
- |
0 |
|
- |
15, Table 3(TENSIL.E TEST- IS 1608 Part1 ) |
- |
0 |
|
- |
16, Table 3(Hardness Test) |
- |
0 |
|
- |
17,Annex B(TRANSVERSE TEST) |
- |
0 |
|
- |
18(HYDROSTATIC TEST) |
- |
0 |
|
- |
9(IS 7754) |
- |
0 |
|
- |
9(IS 7754) |
- |
0 |
|
- |
9(Microstructure) |
- |
1500 |
|
- |
21(Marking) |
- |
275 |
|
- |
9(Microstructure) |
- |
0 |
|
- |
6(Chemical Composition(chemical
composition shall be as agreed to between the
purchaser and the manufacturer.)) |
- |
0 |
|
- |
7.1(WORKMANSHIP AND FINISH) |
- |
0 |
|
- |
10.1(FREEDOM FROM DEFECTS) |
- |
0 |
|
- |
10.2(FREEDOM FROM DEFECTS) |
- |
0 |
|
- |
13(SIZE OF TEST BARS-Diameter) |
- |
0 |
|
- |
13(SIZE OF TEST BARS-Length) |
- |
0 |
|
- |
15, Table 3(TENSIL.E TEST- IS 1608 Part1 ) |
- |
0 |
|
- |
16, Table 3(Hardness Test) |
- |
0 |
|
- |
17,Annex B(TRANSVERSE TEST) |
- |
0 |
|
- |
18(HYDROSTATIC TEST) |
- |
0 |
|
- |
6(Chemical Composition(chemical
composition shall be as agreed to between the
purchaser and the manufacturer.)) |
- |
0 |
|
- |
7.1(WORKMANSHIP AND FINISH) |
- |
0 |
|
- |
10.1(FREEDOM FROM DEFECTS) |
- |
0 |
|
- |
10.2(FREEDOM FROM DEFECTS) |
- |
0 |
|
- |
13(SIZE OF TEST BARS-Diameter) |
- |
0 |
|
- |
13(SIZE OF TEST BARS-Length) |
- |
0 |
|
- |
15, Table 3(TENSIL.E TEST- IS 1608 Part1 ) |
- |
0 |
|
- |
16, Table 3(Hardness Test) |
- |
0 |
|
- |
17,Annex B(TRANSVERSE TEST) |
- |
0 |
|
- |
18(HYDROSTATIC TEST) |
- |
0 |
|
- |
9(IS 7754) |
- |
0 |
|
- |
9(IS 7754) |
- |
0 |
|
- |
9(Microstructure) |
- |
0 |
|
- |
21(Marking) |
- |
0 |
|
- |
9(Microstructure) |
- |
0 |
|
- |
6(Chemical Composition(chemical
composition shall be as agreed to between the
purchaser and the manufacturer.)) |
- |
0 |
|
- |
7.1(WORKMANSHIP AND FINISH) |
- |
0 |
|
- |
10.1(FREEDOM FROM DEFECTS) |
- |
0 |
|
- |
10.2(FREEDOM FROM DEFECTS) |
- |
0 |
|
- |
13(SIZE OF TEST BARS-Diameter) |
- |
0 |
|
- |
13(SIZE OF TEST BARS-Length) |
- |
0 |
|
- |
15, Table 3(TENSIL.E TEST- IS 1608 Part1 ) |
- |
0 |
|
- |
16, Table 3(Hardness Test) |
- |
0 |
|
- |
17,Annex B(TRANSVERSE TEST) |
- |
0 |
|
- |
18(HYDROSTATIC TEST) |
- |
0 |
|
- |
6(Chemical Composition(chemical
composition shall be as agreed to between the
purchaser and the manufacturer.)) |
- |
0 |
|
- |
7.1(WORKMANSHIP AND FINISH) |
- |
0 |
|
- |
10.1(FREEDOM FROM DEFECTS) |
- |
0 |
|
- |
10.2(FREEDOM FROM DEFECTS) |
- |
0 |
|
- |
13(SIZE OF TEST BARS-Diameter) |
- |
0 |
|
- |
13(SIZE OF TEST BARS-Length) |
- |
0 |
|
- |
15, Table 3(TENSIL.E TEST- IS 1608 Part1 ) |
- |
0 |
|
- |
16, Table 3(Hardness Test) |
- |
0 |
|
- |
17,Annex B(TRANSVERSE TEST) |
- |
0 |
|
- |
18(HYDROSTATIC TEST) |
- |
0 |
|
- |
9(IS 7754) |
- |
0 |
|
- |
9(IS 7754) |
- |
0 |
|
- |
9(Microstructure) |
- |
0 |
|
- |
21(Marking) |
- |
0 |
|
- |
9(Microstructure) |
- |
0 |
|
- |
|
Complete
|
|
31 May, 2025 |
- Included w.e.f. 25.04.2024
Exclusion: Cl.9 (Microstructure) |
9 |
IS 2993 (1998) |
A.C. motor capacitors (Second Revision) |
- |
-
|
125500 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
2.6(Visual Examination) |
- |
0 |
|
- |
5.1(Check marking) |
- |
0 |
|
- |
2.1(Check of dimensions) |
- |
0 |
|
- |
2.9(Capacitance measurement) |
- |
0 |
|
- |
2.11.1(Robustness of terminations) |
- |
0 |
|
- |
2.11.1.1(Tensile) |
- |
0 |
|
- |
2.11.1.2(Bending (half cf the terminations)) |
- |
0 |
|
- |
2.11 .1.3(Torsion (other half of the terminations)) |
- |
0 |
|
- |
2.11.1.4(Torque (screw terminals)) |
- |
0 |
|
- |
2.11.1.5(Visual Examination) |
- |
0 |
|
- |
2.11.2(Soldering) |
- |
0 |
|
- |
2.11.3(Vibration) |
- |
0 |
|
- |
2.11.4(fixing bolt or stud (if fitted)) |
- |
0 |
|
- |
2.12(Sealing Test) |
- |
0 |
|
- |
2.13(Endurance test) |
- |
0 |
|
- |
2.13.1(Endurance test :Testing in air with forced circulation) |
- |
0 |
|
- |
2.13.3(Endurance test : Conditions of compliance) |
- |
0 |
|
- |
2.14(Damping heat test) |
- |
0 |
|
- |
2.7(Voltage test between terminals) |
- |
0 |
|
- |
2.8(Voltage test between terminals and case) |
- |
0 |
|
- |
2.15(Self-healing test (if applicable)) |
- |
0 |
|
- |
2.16.3(Destruction test : Test procedure) |
- |
0 |
|
- |
2.16.3.1(Destruction test : Test procedure - Preparation and pre-conditioning ) |
- |
0 |
|
- |
2.16.3.2(Destruction test : Test procedure : DC conditioning) |
- |
0 |
|
- |
2.16.3.3(Destruction test : Test procedure : AC destruction test) |
- |
0 |
|
- |
2.5(Tangent of loss angle) |
- |
0 |
|
- |
2.16.4(Destruction tes: Evaluation of the failure ) |
- |
0 |
|
- |
2.10(Check of dimensions) |
- |
0 |
|
- |
2.11.1.1(Test Ua - Tensile) |
- |
0 |
|
- |
2.11.1.2(Test Ub - Bending (half of the terminations)) |
- |
0 |
|
- |
2.11.1.3(Test UC - Torsion (other half of the terminations)) |
- |
0 |
|
- |
2.11.1.4(Test Ud - Torque (screw terminals)) |
- |
0 |
|
- |
2.11.1.5(Visual examination) |
- |
0 |
|
- |
2.11.2(Soldering) |
- |
0 |
|
- |
2.11.3(Vibration) |
- |
0 |
|
- |
2.11.4(Fixing bolt or stud (if fitted)) |
- |
0 |
|
- |
4.1(Creepage distances and clearances) |
- |
0 |
|
- |
4.2(Terminals and connecting cables) |
- |
0 |
|
- |
4.3(Earth connections) |
- |
0 |
|
- |
4.4(Discharge devices) |
- |
0 |
|
- |
2.10 (Elec)(Check of dimensions) |
- |
0 |
|
- |
2.11.1 (Elec)(Robustness of terminations) |
- |
0 |
|
- |
2.11.1.1 (Elec)(Tensile) |
- |
0 |
|
- |
2.11.1.2 (Elec)(Bending (half cf the terminations)) |
- |
0 |
|
- |
2.11.1.3 (Elec)(Torsion (other half of the terminations)) |
- |
0 |
|
- |
2.11.1.4 (Elec)(Torque (screw terminals)) |
- |
0 |
|
- |
2.11.1.5 (Elec)(Visual Examination) |
- |
0 |
|
- |
2.11.2 (Elec)(Soldering) |
- |
0 |
|
- |
2.11.3 (Elec)(Vibration) |
- |
0 |
|
- |
2.11.4 (Elec)(fixing bolt or stud (if fitted)) |
- |
0 |
|
- |
2.6(Visual Examination) |
- |
0 |
|
- |
5.1(Check marking) |
- |
0 |
|
- |
2.1(Check of dimensions) |
- |
0 |
|
- |
2.9(Capacitance measurement) |
- |
0 |
|
- |
2.11.1(Robustness of terminations) |
- |
0 |
|
- |
2.11.1.1(Tensile) |
- |
0 |
|
- |
2.11.1.2(Bending (half cf the terminations)) |
- |
0 |
|
- |
2.11 .1.3(Torsion (other half of the terminations)) |
- |
0 |
|
- |
2.11.1.4(Torque (screw terminals)) |
- |
0 |
|
- |
2.11.1.5(Visual Examination) |
- |
0 |
|
- |
2.11.2(Soldering) |
- |
0 |
|
- |
2.11.3(Vibration) |
- |
0 |
|
- |
2.11.4(fixing bolt or stud (if fitted)) |
- |
0 |
|
- |
2.12(Sealing Test) |
- |
0 |
|
- |
2.13(Endurance test) |
- |
0 |
|
- |
2.13.1(Endurance test :Testing in air with forced circulation) |
- |
0 |
|
- |
2.13.3(Endurance test : Conditions of compliance) |
- |
0 |
|
- |
2.14(Damping heat test) |
- |
0 |
|
- |
2.7(Voltage test between terminals) |
- |
0 |
|
- |
2.8(Voltage test between terminals and case) |
- |
0 |
|
- |
2.15(Self-healing test (if applicable)) |
- |
0 |
|
- |
2.16.3(Destruction test : Test procedure) |
- |
0 |
|
- |
2.16.3.1(Destruction test : Test procedure - Preparation and pre-conditioning ) |
- |
0 |
|
- |
2.16.3.2(Destruction test : Test procedure : DC conditioning) |
- |
0 |
|
- |
2.16.3.3(Destruction test : Test procedure : AC destruction test) |
- |
0 |
|
- |
2.5(Tangent of loss angle) |
- |
0 |
|
- |
2.16.4(Destruction tes: Evaluation of the failure ) |
- |
0 |
|
- |
2.10(Check of dimensions) |
- |
0 |
|
- |
2.11.1.1(Test Ua - Tensile) |
- |
0 |
|
- |
2.11.1.2(Test Ub - Bending (half of the terminations)) |
- |
0 |
|
- |
2.11.1.3(Test UC - Torsion (other half of the terminations)) |
- |
0 |
|
- |
2.11.1.4(Test Ud - Torque (screw terminals)) |
- |
0 |
|
- |
2.11.1.5(Visual examination) |
- |
0 |
|
- |
2.11.2(Soldering) |
- |
0 |
|
- |
2.11.3(Vibration) |
- |
0 |
|
- |
2.11.4(Fixing bolt or stud (if fitted)) |
- |
0 |
|
- |
4.1(Creepage distances and clearances) |
- |
0 |
|
- |
4.2(Terminals and connecting cables) |
- |
0 |
|
- |
4.3(Earth connections) |
- |
0 |
|
- |
4.4(Discharge devices) |
- |
0 |
|
- |
2.10 (Elec)(Check of dimensions) |
- |
0 |
|
- |
2.11.1 (Elec)(Robustness of terminations) |
- |
0 |
|
- |
2.11.1.1 (Elec)(Tensile) |
- |
0 |
|
- |
2.11.1.2 (Elec)(Bending (half cf the terminations)) |
- |
0 |
|
- |
2.11.1.3 (Elec)(Torsion (other half of the terminations)) |
- |
0 |
|
- |
2.11.1.4 (Elec)(Torque (screw terminals)) |
- |
0 |
|
- |
2.11.1.5 (Elec)(Visual Examination) |
- |
0 |
|
- |
2.11.2 (Elec)(Soldering) |
- |
0 |
|
- |
2.11.3 (Elec)(Vibration) |
- |
0 |
|
- |
2.11.4 (Elec)(fixing bolt or stud (if fitted)) |
- |
0 |
|
- |
2.6(Visual Examination) |
- |
0 |
|
- |
5.1(Check marking) |
- |
0 |
|
- |
2.1(Check of dimensions) |
- |
0 |
|
- |
2.9(Capacitance measurement) |
- |
0 |
|
- |
2.11.1(Robustness of terminations) |
- |
0 |
|
- |
2.11.1.1(Tensile) |
- |
0 |
|
- |
2.11.1.2(Bending (half cf the terminations)) |
- |
0 |
|
- |
2.11 .1.3(Torsion (other half of the terminations)) |
- |
0 |
|
- |
2.11.1.4(Torque (screw terminals)) |
- |
0 |
|
- |
2.11.1.5(Visual Examination) |
- |
0 |
|
- |
2.11.2(Soldering) |
- |
0 |
|
- |
2.11.3(Vibration) |
- |
0 |
|
- |
2.11.4(fixing bolt or stud (if fitted)) |
- |
0 |
|
- |
2.12(Sealing Test) |
- |
0 |
|
- |
2.13(Endurance test) |
- |
0 |
|
- |
2.13.1(Endurance test :Testing in air with forced circulation) |
- |
0 |
|
- |
2.13.3(Endurance test : Conditions of compliance) |
- |
0 |
|
- |
2.14(Damping heat test) |
- |
0 |
|
- |
2.7(Voltage test between terminals) |
- |
0 |
|
- |
2.8(Voltage test between terminals and case) |
- |
0 |
|
- |
2.15(Self-healing test (if applicable)) |
- |
0 |
|
- |
2.16.3(Destruction test : Test procedure) |
- |
0 |
|
- |
2.16.3.1(Destruction test : Test procedure - Preparation and pre-conditioning ) |
- |
0 |
|
- |
2.16.3.2(Destruction test : Test procedure : DC conditioning) |
- |
0 |
|
- |
2.16.3.3(Destruction test : Test procedure : AC destruction test) |
- |
0 |
|
- |
2.5(Tangent of loss angle) |
- |
0 |
|
- |
2.16.4(Destruction tes: Evaluation of the failure ) |
- |
0 |
|
- |
2.10(Check of dimensions) |
- |
0 |
|
- |
2.11.1.1(Test Ua - Tensile) |
- |
0 |
|
- |
2.11.1.2(Test Ub - Bending (half of the terminations)) |
- |
0 |
|
- |
2.11.1.3(Test UC - Torsion (other half of the terminations)) |
- |
0 |
|
- |
2.11.1.4(Test Ud - Torque (screw terminals)) |
- |
0 |
|
- |
2.11.1.5(Visual examination) |
- |
0 |
|
- |
2.11.2(Soldering) |
- |
0 |
|
- |
2.11.3(Vibration) |
- |
0 |
|
- |
2.11.4(Fixing bolt or stud (if fitted)) |
- |
0 |
|
- |
4.1(Creepage distances and clearances) |
- |
0 |
|
- |
4.2(Terminals and connecting cables) |
- |
0 |
|
- |
4.3(Earth connections) |
- |
0 |
|
- |
4.4(Discharge devices) |
- |
0 |
|
- |
2.10 (Elec)(Check of dimensions) |
- |
0 |
|
- |
2.11.1 (Elec)(Robustness of terminations) |
- |
0 |
|
- |
2.11.1.1 (Elec)(Tensile) |
- |
0 |
|
- |
2.11.1.2 (Elec)(Bending (half cf the terminations)) |
- |
0 |
|
- |
2.11.1.3 (Elec)(Torsion (other half of the terminations)) |
- |
0 |
|
- |
2.11.1.4 (Elec)(Torque (screw terminals)) |
- |
0 |
|
- |
2.11.1.5 (Elec)(Visual Examination) |
- |
0 |
|
- |
2.11.2 (Elec)(Soldering) |
- |
0 |
|
- |
2.11.3 (Elec)(Vibration) |
- |
0 |
|
- |
2.11.4 (Elec)(fixing bolt or stud (if fitted)) |
- |
0 |
|
- |
2.6(Visual Examination) |
- |
0 |
|
- |
5.1(Check marking) |
- |
0 |
|
- |
2.1(Check of dimensions) |
- |
0 |
|
- |
2.9(Capacitance measurement) |
- |
0 |
|
- |
2.11.1(Robustness of terminations) |
- |
0 |
|
- |
2.11.1.1(Tensile) |
- |
0 |
|
- |
2.11.1.2(Bending (half cf the terminations)) |
- |
0 |
|
- |
2.11 .1.3(Torsion (other half of the terminations)) |
- |
0 |
|
- |
2.11.1.4(Torque (screw terminals)) |
- |
0 |
|
- |
2.11.1.5(Visual Examination) |
- |
0 |
|
- |
2.11.2(Soldering) |
- |
0 |
|
- |
2.11.3(Vibration) |
- |
0 |
|
- |
2.11.4(fixing bolt or stud (if fitted)) |
- |
0 |
|
- |
2.12(Sealing Test) |
- |
0 |
|
- |
2.13(Endurance test) |
- |
0 |
|
- |
2.13.1(Endurance test :Testing in air with forced circulation) |
- |
0 |
|
- |
2.13.3(Endurance test : Conditions of compliance) |
- |
0 |
|
- |
2.14(Damping heat test) |
- |
0 |
|
- |
2.7(Voltage test between terminals) |
- |
0 |
|
- |
2.8(Voltage test between terminals and case) |
- |
0 |
|
- |
2.15(Self-healing test (if applicable)) |
- |
0 |
|
- |
2.16.3(Destruction test : Test procedure) |
- |
0 |
|
- |
2.16.3.1(Destruction test : Test procedure - Preparation and pre-conditioning ) |
- |
0 |
|
- |
2.16.3.2(Destruction test : Test procedure : DC conditioning) |
- |
0 |
|
- |
2.16.3.3(Destruction test : Test procedure : AC destruction test) |
- |
0 |
|
- |
2.5(Tangent of loss angle) |
- |
0 |
|
- |
2.16.4(Destruction tes: Evaluation of the failure ) |
- |
0 |
|
- |
2.10(Check of dimensions) |
- |
0 |
|
- |
2.11.1.1(Test Ua - Tensile) |
- |
0 |
|
- |
2.11.1.2(Test Ub - Bending (half of the terminations)) |
- |
0 |
|
- |
2.11.1.3(Test UC - Torsion (other half of the terminations)) |
- |
0 |
|
- |
2.11.1.4(Test Ud - Torque (screw terminals)) |
- |
0 |
|
- |
2.11.1.5(Visual examination) |
- |
0 |
|
- |
2.11.2(Soldering) |
- |
0 |
|
- |
2.11.3(Vibration) |
- |
0 |
|
- |
2.11.4(Fixing bolt or stud (if fitted)) |
- |
0 |
|
- |
4.1(Creepage distances and clearances) |
- |
0 |
|
- |
4.2(Terminals and connecting cables) |
- |
0 |
|
- |
4.3(Earth connections) |
- |
0 |
|
- |
4.4(Discharge devices) |
- |
0 |
|
- |
2.10 (Elec)(Check of dimensions) |
- |
0 |
|
- |
2.11.1 (Elec)(Robustness of terminations) |
- |
0 |
|
- |
2.11.1.1 (Elec)(Tensile) |
- |
0 |
|
- |
2.11.1.2 (Elec)(Bending (half cf the terminations)) |
- |
0 |
|
- |
2.11.1.3 (Elec)(Torsion (other half of the terminations)) |
- |
0 |
|
- |
2.11.1.4 (Elec)(Torque (screw terminals)) |
- |
0 |
|
- |
2.11.1.5 (Elec)(Visual Examination) |
- |
0 |
|
- |
2.11.2 (Elec)(Soldering) |
- |
0 |
|
- |
2.11.3 (Elec)(Vibration) |
- |
0 |
|
- |
2.11.4 (Elec)(fixing bolt or stud (if fitted)) |
- |
0 |
|
- |
2.6(Visual Examination) |
- |
- |
|
- |
5.1(Check marking) |
- |
- |
|
- |
2.1(Check of dimensions) |
- |
- |
|
- |
2.9(Capacitance measurement) |
- |
- |
|
- |
2.11.1(Robustness of terminations) |
- |
- |
|
- |
2.11.1.1(Tensile) |
- |
- |
|
- |
2.11.1.2(Bending (half cf the terminations)) |
- |
- |
|
- |
2.11 .1.3(Torsion (other half of the terminations)) |
- |
- |
|
- |
2.11.1.4(Torque (screw terminals)) |
- |
- |
|
- |
2.11.1.5(Visual Examination) |
- |
- |
|
- |
2.11.2(Soldering) |
- |
- |
|
- |
2.11.3(Vibration) |
- |
- |
|
- |
2.11.4(fixing bolt or stud (if fitted)) |
- |
- |
|
- |
2.12(Sealing Test) |
- |
- |
|
- |
2.13(Endurance test) |
- |
- |
|
- |
2.13.1(Endurance test :Testing in air with forced circulation) |
- |
- |
|
- |
2.13.3(Endurance test : Conditions of compliance) |
- |
- |
|
- |
2.14(Damping heat test) |
- |
- |
|
- |
2.7(Voltage test between terminals) |
- |
- |
|
- |
2.8(Voltage test between terminals and case) |
- |
- |
|
- |
2.15(Self-healing test (if applicable)) |
- |
- |
|
- |
2.16.3(Destruction test : Test procedure) |
- |
- |
|
- |
2.16.3.1(Destruction test : Test procedure - Preparation and pre-conditioning ) |
- |
- |
|
- |
2.16.3.2(Destruction test : Test procedure : DC conditioning) |
- |
- |
|
- |
2.16.3.3(Destruction test : Test procedure : AC destruction test) |
- |
- |
|
- |
2.5(Tangent of loss angle) |
- |
- |
|
- |
2.16.4(Destruction tes: Evaluation of the failure ) |
- |
- |
|
- |
2.10(Check of dimensions) |
- |
- |
|
- |
2.11.1.1(Test Ua - Tensile) |
- |
- |
|
- |
2.11.1.2(Test Ub - Bending (half of the terminations)) |
- |
- |
|
- |
2.11.1.3(Test UC - Torsion (other half of the terminations)) |
- |
- |
|
- |
2.11.1.4(Test Ud - Torque (screw terminals)) |
- |
- |
|
- |
2.11.1.5(Visual examination) |
- |
- |
|
- |
2.11.2(Soldering) |
- |
- |
|
- |
2.11.3(Vibration) |
- |
- |
|
- |
2.11.4(Fixing bolt or stud (if fitted)) |
- |
- |
|
- |
4.1(Creepage distances and clearances) |
- |
- |
|
- |
4.2(Terminals and connecting cables) |
- |
- |
|
- |
4.3(Earth connections) |
- |
- |
|
- |
4.4(Discharge devices) |
- |
- |
|
- |
2.10 (Elec)(Check of dimensions) |
- |
- |
|
- |
2.11.1 (Elec)(Robustness of terminations) |
- |
- |
|
- |
2.11.1.1 (Elec)(Tensile) |
- |
- |
|
- |
2.11.1.2 (Elec)(Bending (half cf the terminations)) |
- |
- |
|
- |
2.11.1.3 (Elec)(Torsion (other half of the terminations)) |
- |
- |
|
- |
2.11.1.4 (Elec)(Torque (screw terminals)) |
- |
- |
|
- |
2.11.1.5 (Elec)(Visual Examination) |
- |
- |
|
- |
2.11.2 (Elec)(Soldering) |
- |
- |
|
- |
2.11.3 (Elec)(Vibration) |
- |
- |
|
- |
2.11.4 (Elec)(fixing bolt or stud (if fitted)) |
- |
- |
|
- |
|
Complete
|
|
31 May, 2025 |
- Included w.e.f. 06.12.2023 |
10 |
IS 2347 (2017) |
Domestic pressure cooker - Specification (Sixth Revision) |
2023 |
-
|
32500 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
4.1(Capacity) |
- |
0 |
|
- |
8.1(Air Pressure Test) |
- |
0 |
|
- |
8.2(Proof Pressure Test) |
- |
0 |
|
- |
8.3(Operating Test for Pressure Regulating Device) |
- |
0 |
|
- |
8.4(Test for Safety Pressure Relief Device) |
- |
0 |
|
- |
8.5(Bursting Pressure Test) |
- |
0 |
|
- |
8.6.1(Tests for Removal of Lid under Pressure For Outer Lid Cooker) |
- |
0 |
|
- |
8.6.2(Tests for Removal of Lid under Pressure For inner Lid Cooker) |
- |
0 |
|
- |
8.10 (a)(Handles of the cooker- Resistance to Burning) |
- |
0 |
|
- |
8.10 (b)(Handles of the cooker- Heat Resistance) |
- |
0 |
|
- |
8.10 (c)(Handles of the cooker- Torque Strength) |
- |
0 |
|
- |
8.10 (d)(Handles of the cooker- Bending Strength) |
- |
0 |
|
- |
8.10 (e)(Handles of the cooker- Fatigue Resistance) |
- |
0 |
|
- |
8.10 (f)(Handles of the cooker- Thermal Insualtion Test) |
- |
0 |
|
- |
6(CONSTRUCTION) |
- |
0 |
|
- |
11(Marking) |
- |
0 |
|
- |
7.1(WORKMANSHIP AND FINISH) |
- |
0 |
|
- |
4.1(Capacity ) |
- |
0 |
|
- |
7.2(WORKMANSHIP AND FINISH) |
- |
0 |
|
- |
7.3(WORKMANSHIP AND FINISH) |
- |
0 |
|
- |
7.4(WORKMANSHIP AND FINISH) |
- |
0 |
|
- |
6.3.1(Temperature Responsive Pressure Relief Device) |
- |
0 |
|
- |
6.3.1(Temperature Responsive Pressure Relief Device) |
- |
0 |
|
- |
6.1.1(Pressure Regulating Device) |
- |
0 |
|
- |
6.2(Safety Relief Device) |
- |
0 |
|
- |
8.7(Test for Spring Loaded Mechanism) |
- |
0 |
|
- |
11(Marking) |
- |
0 |
|
- |
11(Marking) |
- |
0 |
|
- |
11(Marking) |
- |
0 |
|
- |
6.1.2(Pressure Regulating Device) |
- |
0 |
|
- |
6.1.3(Pressure Regulating Device) |
- |
0 |
|
- |
6.1.4(Pressure Regulating Device) |
- |
0 |
|
- |
6.1.5(Pressure Regulating Device) |
- |
0 |
|
- |
6.2.1(Safety Relief Device) |
- |
0 |
|
- |
6.2.2(Safety Relief Device) |
- |
0 |
|
- |
6.3.1(A separate temperature responsive pressure relief device shall be provided which shall satisfy the test given in Annex C.) |
- |
0 |
|
- |
6.3.2(The cooker shall satisfy the type test prescribed in Annex D.) |
- |
0 |
|
- |
6.4.1.1(Handles and Knobs) |
- |
0 |
|
- |
5.7(Vent Pipe) |
- |
0 |
|
- |
5.1.4(Body, Lid, Containers and Grid) |
- |
0 |
|
- |
6.1(Pressure Regulating Device) |
- |
0 |
|
- |
5.9(Spring) |
- |
0 |
|
- |
5.8(Vent Pipe Nut) |
- |
0 |
|
- |
5.2(Safety Relief Device) |
- |
0 |
|
- |
5.3(Gasket) |
- |
0 |
|
- |
5.4(Handles and Knobs) |
- |
0 |
|
- |
5.5(Pressure Regulating Device) |
- |
0 |
|
- |
5.6(Vent Seal Pin for Pressure Regulating Device) |
- |
0 |
|
- |
5.1.1(Body, Lid, Containers and Grid) |
- |
0 |
|
- |
5.1.2(Body, Lid, Containers and Grid) |
- |
0 |
|
- |
5.1.3(Body, Lid, Containers and Grid) |
- |
0 |
|
- |
8.11(External Coating ) |
- |
0 |
|
- |
8.12(Internal Coating) |
- |
0 |
|
- |
11(Marking) |
- |
0 |
|
- |
|
Complete
|
|
31 May, 2025 |
- Included w.e.f. 06.12.2023 |
11 |
IS 14582 (2021) |
Single-phase small ac electric motors for centrifugal pumps for agricultural applications |
- |
-
|
3800 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
9(Dimension) |
- |
0 |
|
. |
12.6(High Voltage Test - Voltage) |
- |
0 |
|
. |
12.6(High Voltage Test - Current) |
- |
0 |
|
. |
14(Direction of rotation) |
- |
0 |
|
. |
12.5(Insulation Resistance Test) |
- |
0 |
|
. |
13 & 16.2 e(Load Test - Current) |
- |
0 |
|
. |
13 & 16.2 e(Load Test - Efficiency) |
- |
0 |
|
. |
13 & 16.2 e(Load Test - Frquency) |
- |
0 |
|
. |
13 & 16.2 e(Load Test - Input Power) |
- |
0 |
|
. |
13 & 16.2 e(Load Test - Load Torque) |
- |
0 |
|
. |
13 & 16.2 e(Load Test - Power Factor) |
- |
0 |
|
. |
13 & 16.2 e(Load Test - Speed) |
- |
0 |
|
. |
13 & 16.2 e(Load Test - Voltage) |
- |
0 |
|
. |
16.2.d(Locked Rotor Test - Current) |
- |
0 |
|
. |
16.2.d(Locked Rotor Test - Torque) |
- |
0 |
|
. |
12.2.2(Momentary Over Load Test - Torque) |
- |
0 |
|
. |
16.2 b(No Load Test - Current) |
- |
0 |
|
. |
16.2 b(No Load Test - Frequency) |
- |
0 |
|
. |
16.2 b(No Load Test - Input Power) |
- |
0 |
|
. |
16.2 b(No Load Test - Speed) |
- |
0 |
|
. |
16.2 b(No Load Test - Voltage) |
- |
0 |
|
. |
16.2 a(Resistance of Winding - Resistance) |
- |
0 |
|
. |
12.3(Temperature Rise Test - Temperature) |
- |
0 |
|
. |
12.4(Temperature Rise at reduced Voltage - Temperature) |
- |
0 |
|
. |
14(Terminal Marking) |
- |
0 |
|
. |
|
Complete
|
|
31 May, 2025 |
- - |
12 |
IS 17018 : Part 1 (2018) |
Solar photovoltaic water pumping systems: Part 1 centrifugal pumps - Specification |
- |
-
|
52500 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
10.3(Whole day Performance (with Sun simulator)) |
- |
105000 |
|
0.75kW/1.0HP - Rs. 80000
1.50kW/2.0HP - Rs. 80000
2.20kW/3.0HP - Rs. 80000
3.70kW/5.0HP - Rs. 80000
5.50kW/7.50HP - Rs. 80000
7.50kW/10.0HP - Rs. 80000 |
10.3(Whole day Performance (real condition testing)) |
- |
53250 |
|
0.75kW/1.0HP - Rs. 23150
1.50kW/2.0HP - Rs. 24350
2.20kW/3.0HP - Rs. 27500
3.70kW/5.0HP - Rs. 36550
5.50kW/7.50HP - Rs. 42500
7.50kW/10.0HP - Rs. 53250 |
|
Complete
|
|
31 May, 2025 |
- - |
13 |
IS 9283 (2013) |
Motors for submersible pumpsets - Specification (Second Revision) |
- |
-
|
17500 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
13(Terminal Markings, IS 9283) |
- |
0 |
|
- |
17.1(Performance values, IS 9283) |
- |
0 |
|
- |
17.1(Performance values, IS 9283) |
- |
0 |
|
- |
17.1(Performance values, IS 9283) |
- |
0 |
|
- |
17.1(Performance values, IS 9283) |
- |
0 |
|
- |
18.1(Overload test, IS 9283) |
- |
0 |
|
- |
19(Temperature rise test, IS 9283) |
- |
0 |
|
- |
19(Temperature rise test, IS 9283) |
- |
0 |
|
- |
20(High Voltage test, IS 9283) |
- |
0 |
|
- |
21(Insulation Resistance test, IS 9283) |
- |
0 |
|
- |
22(Speed, IS 9283) |
- |
0 |
|
- |
23(Leakage Current test, IS 9283) |
- |
0 |
|
- |
|
Complete
|
|
31 May, 2025 |
- - |
14 |
IS 6595 : Part 1 (2018) |
Horizontal centrifugal pumps for clear, cold water - Specification: Part 1 agricultural and rural water supply purposes (Fourth Revision) |
- |
-
|
7250 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
10.1(Pump Test
Verification of the Guarantee
Cl.9.4 of IS 9137:2019
Cl. 9.4.1 Curves QH and Qη) |
- |
0 |
|
- |
10.1(Pump Test
Verification of the Guarantee
Cl.9.4 of IS 9137:2019
9.4.2 Efficiency) |
- |
0 |
|
- |
10.1(Pump Test
Verification of the Guarantee
Cl.9.4 of IS 9137:2019
9.4.3 Pump Power Input) |
- |
0 |
|
- |
8.1(Design Features
Head Restrictions) |
- |
0 |
|
- |
8.2
As per fig 1 & 2(Design Features
Minimum efficiency
) |
- |
0 |
|
- |
8.3(Design Features
Shaft ) |
- |
0 |
|
- |
9.1(General Requirements
Volute Casing) |
- |
0 |
|
- |
9.2(General Requirements
Impeller) |
- |
0 |
|
- |
10(Pump Test
Verification of guarante
Cl.8 of IS 11346-2002
Rate of flow and head
Cl.8 of IS 11346-2002) |
- |
0 |
|
- |
10(Pump Test
Verification of guarante
Cl.8 of IS 11346-2002
Efficiency
Cl.8.3 of IS 11346-2002) |
- |
0 |
|
- |
12.2.2(Pump Power Input
) |
- |
0 |
|
- |
12.2.5(Vibrations ) |
- |
0 |
|
- |
12.2.5(Noise level) |
- |
0 |
|
- |
|
Complete
|
|
31 May, 2025 |
- - |
15 |
IS 8472 (2019) |
Centrifugal regenerative pumps for clear, cold water - Specification (Second Revision) |
- |
-
|
6200 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
16.1(Marking) |
- |
0 |
|
- |
16.1(Marking) |
- |
0 |
|
- |
16.1(Marking) |
- |
0 |
|
- |
16.1(Marking) |
- |
0 |
|
- |
16.1(Marking) |
- |
0 |
|
- |
16.1(Marking) |
- |
0 |
|
- |
16.1(Marking) |
- |
0 |
|
- |
16.1(Marking) |
- |
0 |
|
- |
16.1(Marking) |
- |
0 |
|
- |
16.1(Marking) |
- |
0 |
|
- |
16.1(Marking) |
- |
0 |
|
- |
16.1(Marking) |
- |
0 |
|
- |
16.1(Marking) |
- |
0 |
|
- |
16.1(Marking) |
- |
0 |
|
- |
16.1(Marking) |
- |
0 |
|
- |
16.1(Marking) |
- |
0 |
|
- |
16.1(Marking) |
- |
0 |
|
- |
16.1(Marking) |
- |
0 |
|
- |
16.1(Marking) |
- |
0 |
|
- |
16.1(Marking) |
- |
0 |
|
- |
12.1(Pump Tests
Cl.8 of IS 11346-2002
Rate of flow and head
Cl.8 of IS 11346-2002) |
- |
0 |
|
- |
12.1(Pump Tests
Cl.8 of IS 11346-2002
Efficiency
Cl.8.3 of IS 11346-2002) |
- |
0 |
|
- |
12.3(Hydrostatic Pressure Test) |
- |
0 |
|
- |
12.3.1(Hydrostatic Pressure Test) |
- |
0 |
|
- |
12.4(Pump tests) |
- |
0 |
|
- |
12.5(Self-Priming Test for Self-Priming Pumps) |
- |
0 |
|
- |
13.1.2(No Load Test at Rated Voltage) |
- |
0 |
|
- |
13.1.2.1.1(Temperature Rise Test at Rated Voltage) |
- |
0 |
|
- |
13.1.2.1.2(Temperature Rise Test at Reduced Voltage) |
- |
0 |
|
- |
13.1.2(Break away torque Pull up torque) |
- |
0 |
|
- |
13.1.2(High Voltage test) |
- |
0 |
|
- |
13.1.2(Insulation Resistance) |
- |
0 |
|
- |
8(Direction of Rotation) |
- |
0 |
|
- |
7(Material of Constructional) |
- |
0 |
|
- |
11.1(General Requirements) |
- |
0 |
|
- |
13.1.2(Measurement of stator resistance) |
- |
0 |
|
- |
13.1(Single phase monoset pumps) |
- |
0 |
|
- |
13.1.2(Locked rotor test(cl.6.2(d) of IS 14582)) |
- |
0 |
|
- |
13(Tests for Electrical Performance) |
- |
0 |
|
- |
7(Materials of Construction ( Casing/Chamber)) |
- |
0 |
|
- |
7(Materials of Construction ( Impeller)) |
- |
0 |
|
- |
7(Materials of Construction ( Shaft)) |
- |
0 |
|
- |
8.1, 8.2(The direction of rotation of pumps) |
- |
0 |
|
- |
8.3(The direction of inlet and outlet flow passages) |
- |
0 |
|
- |
10.1(Design Features) |
- |
0 |
|
- |
10.1(a)(Design Features(Voltage Rangings)) |
- |
0 |
|
- |
10.1(b)(Design Features(Frequency Rangings)) |
- |
0 |
|
- |
10.1(c)(Design Features(Combination of Voltage and frequency variation)) |
- |
0 |
|
- |
11(General Requirements) |
- |
0 |
|
- |
11.1(The pump shaft should be of adequate size to transmit the required power over the entire head range.) |
- |
0 |
|
- |
11.2(The pump casing should be of robust construction and shall be tested to withstand hydrostatic pressure as specified in 12.3.) |
- |
0 |
|
- |
11.3(The nominal size of suction and delivery pipe of the pump shall be as specified in IS 1239 (Part 1),IS 4984, IS 4985 and IS 12231) |
- |
0 |
|
- |
13.2(Three phase monoset pumps) |
- |
0 |
|
- |
13.2.2(Measurement of stator resistance test (cl.22.3.1(b) of IS 7538)) |
- |
0 |
|
- |
13.2.2(No load test (cl.22.3.1cb) of IS 7538)) |
- |
0 |
|
- |
13.2.2(Reduced voltage running test (cl.22.3.1(d) of IS 7538)) |
- |
0 |
|
- |
13.2.2(Locked Rotor test (cl.22.3.1(e) of IS 7538)) |
- |
0 |
|
- |
13.2.2(Insulation Resistance test (cl.22.3.1(m) of IS 7538)) |
- |
0 |
|
- |
13.2.2(High Voltage test (cl.22.3.1(n) of IS 7538)) |
- |
0 |
|
- |
15.2.1(Monoset pumps) |
- |
0 |
|
- |
15.2.1(a)(Discharge, total head, current and input power at the Guarnteed duty point) |
- |
0 |
|
- |
15.2.1(b)(Non overloading of the prime-mover I the declared operating head range) |
- |
0 |
|
- |
15.2.1(c)(Rated output of motor) |
- |
0 |
|
- |
15.2.1(d)(Full load speed of motor) |
- |
0 |
|
- |
15.2.2(Bare pumps) |
- |
0 |
|
- |
15.2.1(e)(Overall efficiency of pumpset) |
- |
0 |
|
- |
15.2.1(f)(Max.self.priming time) |
- |
0 |
|
- |
15.2.2(a)(Discharge, total head as per Guarnteed duty point at rated voltage and speed) |
- |
0 |
|
- |
15.2.2(b)(Non overloading of the prime-mover I the declared operating head range) |
- |
0 |
|
- |
15.2.2(c)(Non-over-rated prime mover recommended by the manufacturer) |
- |
0 |
|
- |
15.2.2(d)(Max.self.priming time) |
- |
0 |
|
- |
|
Complete
|
|
31 May, 2025 |
- Revised version IS 8472:2019 included w.e.f. 11.03.2020 |
16 |
IS 14220 (2018) |
Openwell submersible pumpsets - Specification (First Revision) |
- |
-
|
9350 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
8.1(Design Features) |
- |
0 |
|
- |
8.1.1(Design Features) |
- |
0 |
|
- |
8.1.4(Design Features) |
- |
0 |
|
- |
8.1.5(Design Features) |
- |
0 |
|
- |
8.1.5(Design Features) |
- |
0 |
|
- |
9(Efficiency) |
- |
0 |
|
- |
10(Performance
(Cl 17.1 of IS 5120)) |
- |
0 |
|
- |
10(Suction and Delivery Ends
(Cl 17.2 of IS 5120)) |
- |
0 |
|
- |
10(Suction and Delivery Ends
(Cl 17.2.1 of IS 5120)) |
- |
0 |
|
- |
10(Fluid Passages
(Cl 17.3 of IS 5120)) |
- |
0 |
|
- |
10(Draining Plugrs
(Cl 17.4 of IS 5120)) |
- |
0 |
|
- |
10(Lantern Ring
(Cl 17.5 of IS 5120)) |
- |
0 |
|
- |
10(Casing
(Cl 17.6 of IS 5120)) |
- |
0 |
|
- |
10(Impeller
(Cl 17.7 of IS 5120)) |
- |
0 |
|
- |
10(Shaft
(Cl 17.8 of IS 5120)) |
- |
0 |
|
- |
10(Shaft Couplings
(Cl 17.9 of IS 5120)) |
- |
0 |
|
- |
10(Bearings
(Cl 17.10 of IS 5120)) |
- |
0 |
|
- |
10(Bearings
(Cl 17.10.1 of IS 5120)) |
- |
0 |
|
- |
10(Bearings
(Cl 17.10.2 of IS 5120)) |
- |
0 |
|
- |
10( Stuffing Boxes
(Cl 17.11 of IS 5120)) |
- |
0 |
|
- |
10(Base Plates
(Cl 17.12 of IS 5120)) |
- |
0 |
|
- |
10(Prime Mover
(Cl 17.13 of IS 5120)) |
- |
0 |
|
- |
10(Name Plate
(Cl 17.14 of IS 5120)) |
- |
0 |
|
- |
10(Name Plate
(Cl 17.14 of IS 5120)) |
- |
0 |
|
- |
10(Name Plate
(Cl 17.14.1 of IS 5120)) |
- |
0 |
|
- |
10.2(Casing) |
- |
0 |
|
- |
10.3(Impeller) |
- |
0 |
|
- |
10.4.1(Shaft) |
- |
0 |
|
- |
10.4.2(Shaft) |
- |
0 |
|
- |
10.5.1(Balancing) |
- |
0 |
|
- |
10.5.2(Balancing) |
- |
0 |
|
- |
10.5.3(Balancing) |
- |
0 |
|
- |
10.5.4(Balancing) |
- |
0 |
|
- |
10.6.1( Provision for Earthing) |
- |
0 |
|
- |
10.6.2( Provision for Earthing) |
- |
0 |
|
- |
10.6.3( Provision for Earthing) |
- |
0 |
|
- |
10.6.4( Provision for Earthing) |
- |
0 |
|
- |
10.7.1(Terminal Marking and Direction of Rotation) |
- |
0 |
|
- |
10.7.2(Terminal Marking and Direction of Rotation) |
- |
0 |
|
- |
10.7.3(Terminal Marking and Direction of Rotation) |
- |
0 |
|
- |
15.2(Laboratory Tests
Cl.8 of IS 11346-2002
Rate of flow and head
Cl.8 of IS 11346-2002) |
- |
0 |
|
- |
15.2(Laboratory Tests
Cl.8 of IS 11346-2002
Efficiency
Cl.8.3 of IS 11346-2002) |
- |
0 |
|
- |
15.5(Hydrostatic Pressure Test) |
- |
0 |
|
- |
16.1.1( Guarantee of Performance) |
- |
0 |
|
- |
16.1.2( Guarantee of Performance) |
- |
0 |
|
- |
16.1.3( Guarantee of Performance) |
- |
0 |
|
- |
16.1.4( Guarantee of Performance) |
- |
0 |
|
- |
16.1.5( Guarantee of Performance) |
- |
0 |
|
- |
18.1(Marking) |
- |
0 |
|
- |
18.1(Marking) |
- |
0 |
|
- |
18.1(Marking) |
- |
0 |
|
- |
18.1(Marking) |
- |
0 |
|
- |
18.1(Marking) |
- |
0 |
|
- |
18.1(Marking) |
- |
0 |
|
- |
18.1(Marking) |
- |
0 |
|
- |
18.1(Marking) |
- |
0 |
|
- |
18.1(Marking) |
- |
0 |
|
- |
18.1(Marking) |
- |
0 |
|
- |
18.1(Marking) |
- |
0 |
|
- |
18.1(Marking) |
- |
0 |
|
- |
18.1(Marking) |
- |
0 |
|
- |
18.1(Marking) |
- |
0 |
|
- |
18.1(Marking) |
- |
0 |
|
- |
18.1(Marking) |
- |
0 |
|
- |
18.1(Marking) |
- |
0 |
|
- |
18.1(Marking) |
- |
0 |
|
- |
18.1(Marking) |
- |
0 |
|
- |
18.1.3(Marking) |
- |
0 |
|
- |
7(Constructional features) |
- |
0 |
|
- |
7.1(It is recognized that a number of materials of construction are available to meet the needs for pumps handling clear, cold water.) |
- |
0 |
|
- |
7.2(Gaskets, seals and packings used for clear, cold water pumps shall conform to the applicable requirements specified in 5.2 of IS 5120.) |
- |
0 |
|
- |
7.3(The motor shall be provided with a breathing attachment like bellows, diaphragm etc; to compensate the volumetric variation of
water inside the motor due to change in the temperature.) |
- |
0 |
|
- |
7.4(The motor shall be protected from ingress of well water, sand and other foreign matter by means of cable glands, rubber seals etc.) |
- |
0 |
|
- |
7.5(All materials and components for the motor shall be suitable for application in respect of resistance and mechanical performance
to protect it) |
- |
0 |
|
- |
7.6(The rotor of the wet type open well submersible motor and rotor in water filled designed motor shall be provided with suitable coating
from corrosion under water. However if suitable anticorrosion additive is added in the water, no separate protection on
rotors is necessary.) |
- |
0 |
|
- |
8(Design Features) |
- |
0 |
|
- |
8.1.2(The multi-stage pump shaft may be guided through bearings, the bearings may be provided in stage casing, suction housing and
discharge casing, while in case of intermediate bearings, suitable positions may be selected in the overall span.) |
- |
0 |
|
- |
8.1.3(The pump may be equipped with replaceable bearing and wearing ring, wherever provided.) |
- |
0 |
|
- |
8.1.4(The strainer on the suction shall offer the best compromise amongst restraining large solids from entering the pump and containing
the suction losses to the minimum.) |
- |
0 |
|
- |
8.1.5(The pump shall be capable to give discharge without overloading the prime mover within the permissible current at rated voltage
and supply frequency at minimum +5 percent and minimum –15 percent of the guaranteed duty point head up to 30 m.
Above 30 m, the pump shall be capable to give discharge without overloading the prime mover within the permissible current at rated
voltage and supply frequency at minimum +10 percent and minimum –25 percent of the guaranteed duty point head.) |
- |
0 |
|
- |
12(Cable) |
- |
0 |
|
- |
12.1(Flat/Round cables as per IS694 shall be used) |
- |
0 |
|
- |
12.1.2(The size of the conductor shall be adequate and suitable for contineous use under water and in air.
the length of the cable shall be minimum 2 m externallly unless otherwise specified by the customer) |
- |
0 |
|
- |
12.1.3(The size and of the cable should be suitably selected so that the voltage drop between control panel and the mptor terminal does
not exeed three percent of the rated voltage) |
- |
0 |
|
- |
12.1.4(In case a joint is required to be made between the lead cable supplied with the motor and the user’s cable, a detailed procedure to
make water tight joining shall be supplied by the motor manufacturer.) |
- |
0 |
|
- |
12.1.5(If four core cable is used, the fourth core is to be used for earthing.) |
- |
0 |
|
- |
14.10.1(Type test) |
- |
0 |
|
- |
14.10.1(a)(Insulation Resistance test) |
- |
0 |
|
- |
14.10.1(b)(High Voltage test) |
- |
0 |
|
- |
14.10.1(c)(Measurement of stator resistance) |
- |
0 |
|
- |
14.10.1(d)(No load test at rated voltage) |
- |
0 |
|
- |
14.10.1(e)(Reduced voltage running up test at no load) |
- |
0 |
|
- |
14.10.1(f)(Locked rotor) |
- |
0 |
|
- |
14.10.1(g)(Breakaway (starting) torque) |
- |
0 |
|
- |
14.10.1(h)(Leakage current test;) |
- |
0 |
|
- |
14.10.1(j)(Temperature rise test at rated voltage) |
- |
0 |
|
- |
14.10.1(k)(Temperature rise test at reduced voltage) |
- |
0 |
|
- |
16.1(Guarntee of Performance) |
- |
0 |
|
- |
16.1.1(The pumpset shall be guaranteed for their performance of the nominal volume rate of flow and the nominal head at the guaranteed
duty point. The overall efficiency of the pumpset shall be guaranteed at the declared duty point only.) |
- |
0 |
|
- |
16.1.2(The guarantee shall be deemed to have been met with, if the measured values of head, volume rate of flow and overall efficiency
are within the indicated in IS 11346 limits) |
- |
0 |
|
- |
16.1.3(Open well submersible motor shall not get overloaded in the specified operating head range at rated voltage and supply frequency.) |
- |
0 |
|
- |
16.1.4(The pump shall be tested for the operating head range as per 8.1.5.) |
- |
0 |
|
- |
16.1.5(The overloading of motor is that condition when maximum current drawn by the motor exceeds the limit of 1.07 times of the rated
motor current) |
- |
0 |
|
- |
16.1.6(The tolerance shall apply to guaranteed duty point only.) |
- |
0 |
|
- |
16.1.7(Performance at rated voltage and supply frequency is actual performance of the set. This is better than performance at rated speed,
since in the entire operating head range speed of motor is higher than rated speed, as motor is running in under loaded condition.) |
- |
0 |
|
- |
16.1.8(The manufacturer shall specify the minimum submergence of pump unit at duty point.) |
- |
0 |
|
- |
|
Complete
|
|
31 May, 2025 |
- - |
17 |
IS 14543 (2016) |
Packaged drinking water (Other Than Packaged Natural Mineral Water) - Specification (Second Revision) |
- |
-
|
20000 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
5.3 Table-1 i(Colour) |
- |
100 |
|
- |
5.3 Table-1 ii(Odour) |
- |
25 |
|
- |
5.3 Table-1 iii(Taste) |
- |
75 |
|
- |
5.3 Table-1 iv(Turbidity) |
- |
75 |
|
- |
5.3 Table-1 v(Total dissolved solids) |
- |
150 |
|
- |
5.3 Table-1vi(pH) |
- |
75 |
|
- |
5.3 Table-2 i(Barium (as Ba)) |
- |
25 |
|
- |
5.3 Table-2 ii(Copper (as Cu)) |
- |
25 |
|
- |
5.3 Table-2 iii(Iron (as Fe),) |
- |
25 |
|
- |
5.3 Table-2 iv(Manganese (as Mn)) |
- |
25 |
|
- |
5.3 Table-2 v(Nitrate (as NO3)) |
- |
125 |
|
- |
5.3 Table-2 vi(Nitrite (as NO2)) |
- |
125 |
|
- |
5.3 Table-2vii(Fluoride (as F)) |
- |
100 |
|
- |
5.3 Table-2 viii(Zinc (as Zn)) |
- |
25 |
|
- |
5.3 Table-2 ix(Silver (as Ag)) |
- |
25 |
|
- |
5.3 Table-2 x(Aluminium (as Al)) |
- |
25 |
|
- |
5.3 Table-2 xi(Chloride (as Cl)) |
- |
125 |
|
- |
5.3 Table-2 xii(Selenium (as Se),) |
- |
50 |
|
- |
5.3 Table-2 xiii(Sulphate (as SO4),) |
- |
125 |
|
- |
5.3 Table-2 xiv(Alkaliniity (as HCO3)) |
- |
100 |
|
- |
5.3 Table-2 xv(Calcium (as Ca),) |
- |
25 |
|
- |
5.3 Table-2 xvi(Magnesium (as Mg)) |
- |
25 |
|
- |
5.3 Table-2 xvii(Sodium (as Na)) |
- |
25 |
|
- |
5.3 Table-2 xviii(Residual free chlorine) |
- |
150 |
|
- |
5.3 Table-2 xix
(Phenolic compounds (as C6H5OH)) |
- |
300 |
|
- |
5.3 Table-2 xx(Mineral oil) |
- |
400 |
|
- |
5.3 Table-2 xxi
(Anionic surface active agents (as MBAS)) |
- |
450 |
|
- |
5.3 Table-2 xxii(Sulphide (as H2S)) |
- |
100 |
|
- |
5.3 Table-2 xxiii(Antimony (as Sb)) |
- |
50 |
|
- |
5.3 Table-2 xxiv(Borates (as B)) |
- |
150 |
|
- |
5.3 Table-2 xxv(Bromates (as BrO3),) |
- |
250 |
|
- |
5.3 Table-3 i(Mercury (as Hg)) |
- |
50 |
|
- |
5.3 Table-3 ii(Cadmium (as Cd)) |
- |
25 |
|
- |
5.3 Table-3 iii(Arsenic (as As)) |
- |
50 |
|
- |
5.3 Table-3 iv
(Cyanide (as CN)) |
- |
350 |
|
- |
5.3 Table-3 v(Lead (as Pb)) |
- |
25 |
|
- |
5.3 Table-3 vi(Chromium (as Cr)) |
- |
25 |
|
- |
5.3 Table-3 vii(Nickel (as Ni)) |
- |
25 |
|
- |
5.3 Table-3 viii
(Polychlorinated biphenyle (PCB)) |
- |
1050 |
|
- |
5.3 Table-3 ix
(Polynuclear aromatic hydrocarbons) |
- |
750 |
|
- |
5.4 i)(o,p DDT) |
- |
900 |
|
- |
5.4 i)(p,p DDT) |
- |
0 |
|
- |
5.4 i)(o,p DDE) |
- |
0 |
|
- |
5.4 i)(p,p DDE) |
- |
0 |
|
- |
5.4 i)(o,p DDD) |
- |
0 |
|
- |
5.4 i)(p,p DDD) |
- |
0 |
|
- |
5.4 i)(Gamma-HCH (Lindane)) |
- |
0 |
|
- |
5.4 i)(alpha-HCH) |
- |
900 |
|
- |
5.4 i)(beta-HCH) |
- |
0 |
|
- |
5.4 i)(Delta-HCH) |
- |
0 |
|
- |
5.4 i)(alpha-Endosulfan) |
- |
0 |
|
- |
5.4 i)(beta-Endosulfan) |
- |
0 |
|
- |
5.4 i)(Endosulfan Sulphate) |
- |
0 |
|
- |
5.4 i)(Monocrotophos) |
- |
0 |
|
- |
5.4 i)(Ethion) |
- |
0 |
|
- |
5.4 i)(Chlorpyrifos) |
- |
0 |
|
- |
5.4 i)(Phorate) |
- |
0 |
|
- |
5.4 i)(Phorate sulphoxide) |
- |
0 |
|
- |
5.4 i)(phorate sulphone) |
- |
2 |
|
- |
5.4 i)(2,4-D) |
- |
750 |
|
- |
5.4 i)(Butachlor) |
- |
0 |
|
- |
5.4 i)(Isoproturon) |
- |
750 |
|
- |
5.4 i)(Alachlor) |
- |
0 |
|
- |
5.4 i)(Atrazine) |
- |
0 |
|
- |
5.4 i)(Methyl Parathion) |
- |
0 |
|
- |
5.4 i)(Methyl Paraoxon) |
- |
0 |
|
- |
5.4 i)(Malathion) |
- |
0 |
|
- |
5.4 i)(Malaoxon) |
- |
0 |
|
- |
5.4 i)(Aldrin) |
- |
0 |
|
- |
5.4 i)(Dieldrin) |
- |
0 |
|
- |
5.4 ii)(Total pesticied residue) |
- |
0 |
|
- |
5.2.1(Escherichia coli (or thermotolerant bacteria)) |
- |
225 |
|
- |
5.2.2(Coliform) |
- |
175 |
|
- |
5.2.3(Faecal Streptococci) |
- |
175 |
|
- |
5.2.3(Staphylococcus Aureus) |
- |
225 |
|
- |
5.2.4(Sulphite Reducing Anaerobes) |
- |
175 |
|
- |
5.2.5(Pseudomonas Aeruginosa) |
- |
250 |
|
- |
5.2.6(Aerobic Microbial Count at 37°C) |
- |
125 |
|
- |
5.2.6(Aerobic Microbial Count at 20-22°C) |
- |
125 |
|
- |
5.2.7(Yeast and Mould) |
- |
175 |
|
- |
5.2.8(Salmonella) |
- |
400 |
|
- |
5.2.8(Shigella) |
- |
325 |
|
- |
5.2.9(Vibrio cholera) |
- |
275 |
|
- |
5.2.9(Vibrio parahaemolyticus) |
- |
275 |
|
- |
|
Complete
|
|
31 May, 2025 |
- - |
18 |
IS 996 (2009) |
Single phase a.c. induction motors for general purpose (Third Revision) |
- |
-
|
4600 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
16.1(Marking and Diagram of connenctions) |
- |
0 |
|
- |
16.1(Marking and Diagram of connenctions) |
- |
0 |
|
- |
16.1(Marking and Diagram of connenctions) |
- |
0 |
|
- |
16.1(Marking and Diagram of connenctions) |
- |
0 |
|
- |
16.1(Marking and Diagram of connenctions) |
- |
0 |
|
- |
16.1(Marking and Diagram of connenctions) |
- |
0 |
|
- |
16.1(Marking and Diagram of connenctions) |
- |
0 |
|
- |
16.1(Marking and Diagram of connenctions) |
- |
0 |
|
- |
16.1(Marking and Diagram of connenctions) |
- |
0 |
|
- |
16.1(Marking and Diagram of connenctions) |
- |
0 |
|
- |
16.1(Marking and Diagram of connenctions) |
- |
0 |
|
- |
16.1(Marking and Diagram of connenctions) |
- |
0 |
|
- |
16.1(Marking and Diagram of connenctions) |
- |
0 |
|
- |
16.1(Marking and Diagram of connenctions) |
- |
0 |
|
- |
16.1(Marking and Diagram of connenctions) |
- |
0 |
|
- |
16.1(Marking and Diagram of connenctions) |
- |
0 |
|
- |
10(Type of enclosures) |
- |
0 |
|
- |
11(Methods of cooling) |
- |
0 |
|
- |
9.1(General construction (as per Cl. 9 & F-3)) |
- |
0 |
|
- |
9(General construction (as per Cl. 9 & F-3)) |
- |
0 |
|
- |
9.4.11(General construction (as per Cl. 9 & F-3)) |
- |
0 |
|
- |
9(General construction (as per Cl. 9 & F-3)) |
- |
0 |
|
- |
9.4.11(General construction (as per Cl. 9 & F-3)) |
- |
0 |
|
- |
9.4.13(General construction (as per Cl. 9 & F-3)) |
- |
0 |
|
- |
4.1(Rated Voltage) |
- |
0 |
|
- |
4.2(Rated Frequency) |
- |
0 |
|
- |
4.3(Rated Output) |
- |
0 |
|
- |
4.4(Rated Speed) |
- |
0 |
|
- |
7(Dimensions (Cl.App.F-4)) |
- |
0 |
|
- |
9.5(Earthing) |
- |
0 |
|
- |
9.5(Earthing) |
- |
0 |
|
- |
9.5(Earthing) |
- |
0 |
|
- |
17.3 (a)(No load test at rated voltage and frequency ) |
- |
0 |
|
- |
17.3 (a)(No load test at rated voltage and frequency) |
- |
0 |
|
- |
17.3 (a)(No load test at rated voltage and frequency) |
- |
0 |
|
- |
12.1.1(Test for torques at rated voltage and frequency (Cl.12.1.1 & F-6.2 )) |
- |
0 |
|
- |
12.1.1(Test for torques at rated voltage and frequency (Cl.12.1.1 & F-6.2 )) |
- |
0 |
|
- |
12.1.1(Test for torques at rated voltage and frequency (Cl.12.1.1 & F-6.2 )) |
- |
0 |
|
- |
12.1.1(Test for Breakaway starting current at rated voltage and frequency (Cl.12.1.1 & Cl. 12.5)) |
- |
0 |
|
- |
12.5.1(Full load performance at rated voltage and frequency (Cl.12.5 & F-6.2.4 )) |
- |
0 |
|
- |
12.5.1(Full load performance at rated voltage and frequency (Cl.12.5 & F-6.2.4 )) |
- |
0 |
|
- |
12.5.1(Full load performance at rated voltage and frequency (Cl.12.5 & F-6.2.4 )) |
- |
0 |
|
- |
12.5.1(Full load performance at rated voltage and frequency (Cl.12.5 & F-6.2.4 )) |
- |
0 |
|
- |
12.2(Temperature-rise test (Cl.12.2 & Cl.F-6.2.5)) |
- |
0 |
|
- |
12.2(Temperature-rise test (Cl.12.2 & Cl.F-6.2.5)) |
- |
0 |
|
- |
12.2(Temperature-rise test (Cl.12.2 & Cl.F-6.2.5)) |
- |
0 |
|
- |
12.7(Insulation resistance test) |
- |
0 |
|
- |
13.1(High voltage test) |
- |
0 |
|
- |
13.2(Moisture proofness) |
- |
0 |
|
- |
13.2(Moisture proofness) |
- |
0 |
|
- |
13.3(Leakage current test) |
- |
0 |
|
- |
12.6(Vibration Severity) |
- |
0 |
|
- |
15.2(Specific Requirements) |
- |
0 |
|
- |
9.0(Observation) |
- |
0 |
|
- |
7.2(Dimensions) |
- |
0 |
|
- |
11.0(Observation) |
- |
0 |
|
- |
17.3 (j)(Observation) |
- |
0 |
|
- |
9.5(Observation) |
- |
0 |
|
- |
14.0(Observation) |
- |
0 |
|
- |
16.0(Observation) |
- |
0 |
|
- |
17.4 & 9.4.6.1(Observation) |
- |
0 |
|
- |
17.3 (k)(Current) |
- |
0 |
|
- |
17.3 (m)(Vibration) |
- |
0 |
|
- |
17.3 (g)(Insulation Resistance) |
- |
0 |
|
- |
17.3 (h)(Voltage) |
- |
0 |
|
- |
17.3 (b)(Temperature) |
- |
0 |
|
- |
17.3 (e)(Temperature) |
- |
0 |
|
- |
17.3 (f)(Torque) |
- |
0 |
|
- |
17.3 (c)(Current, Torque) |
- |
0 |
|
- |
17.3 (d)(Voltage, Current, Power, Frequency, Speed, Efficiency, Power factor, Slip) |
- |
0 |
|
- |
17.3 (a)(Voltage, Current, Power, Frequency, Speed) |
- |
0 |
|
- |
|
Complete
|
|
31 May, 2025 |
- - |
19 |
IS 13730 : Part 3 (2012) |
Specifications for particular types of winding wires: Part 3 polyester enamelled round copper wire, class 155 (First Revision) |
- |
-
|
11500 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
4(Nominal Conductor diameter) |
- |
0 |
|
- |
4(Conductor tollerance ) |
- |
0 |
|
- |
4(Minimum increase
due to the insulation) |
- |
0 |
|
- |
4(Maximum overall
diameter) |
- |
0 |
|
- |
5(Electrical resistance) |
- |
0 |
|
- |
6(Elongation) |
- |
0 |
|
- |
7(Springiness) |
- |
0 |
|
- |
8(Stretching test (nominal conductor diameters over 1,600 mm)) |
- |
0 |
|
- |
8(Jerk test (nominal conductor diameters up to and including 1,000 mm)) |
- |
0 |
|
- |
8(Peel test (nominal conductor diameters over 1,000 mm)) |
- |
0 |
|
- |
9( Heat shock) |
- |
0 |
|
- |
10( Cut-through) |
- |
0 |
|
- |
11(Resistance to abrasion :Minimum average force to failure
) |
- |
0 |
|
- |
11(Resistance to abrasion :Minimum force to failure of each measurement
) |
- |
0 |
|
- |
12(Resistance to solvents) |
- |
0 |
|
- |
13(Breakdown voltage ) |
- |
0 |
|
- |
14(Continuity of insulation ) |
- |
0 |
|
- |
15(Temperature index) |
- |
85000 |
|
- |
3.2(Appearance) |
- |
0 |
|
- |
8(Flexibility and adherence) |
- |
0 |
|
- |
|
Complete
|
|
31 May, 2025 |
- - |
20 |
IS 8034 (2018) |
Submersible pumpsets - Specification (Third Revision) |
- |
-
|
9350 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
14(Marking) |
- |
0 |
|
- |
14(Marking) |
- |
0 |
|
- |
14(Marking) |
- |
0 |
|
- |
14(Marking) |
- |
0 |
|
- |
14(Marking) |
- |
0 |
|
- |
14(Marking) |
- |
0 |
|
- |
14(Marking) |
- |
0 |
|
- |
14(Marking) |
- |
0 |
|
- |
14(Marking) |
- |
0 |
|
- |
14(Marking) |
- |
0 |
|
- |
14(Marking) |
- |
0 |
|
- |
14(Marking) |
- |
0 |
|
- |
14(Marking) |
- |
0 |
|
- |
14(Marking) |
- |
0 |
|
- |
14(Marking) |
- |
0 |
|
- |
14(Marking) |
- |
0 |
|
- |
14(Marking) |
- |
0 |
|
- |
14(Marking) |
- |
0 |
|
- |
14(Marking) |
- |
0 |
|
- |
6.1 (a)(Constructional Features) |
- |
0 |
|
- |
6.1 (b)(Constructional Features) |
- |
0 |
|
- |
6.1 (c)(Constructional Features) |
- |
0 |
|
- |
6.1 (d)(Constructional Features) |
- |
0 |
|
- |
6.1 (e)(Constructional Features) |
- |
0 |
|
- |
6.1 (f)(Constructional Features) |
- |
0 |
|
- |
6.2 (a)(Material of construction Part Sub Assembly
Shaft Sleeve) |
- |
0 |
|
- |
6.2 (b)(Material of construction Part Sub Assembly
Casing wear ring
(if provided)) |
- |
0 |
|
- |
6.2 (c)(Material of construction Part Sub Assembly
Bush) |
- |
0 |
|
- |
6.2 (d)(Material of construction Part Sub Assembly
Discharge casing
(if provided)) |
- |
0 |
|
- |
6.2 (e)(Material of construction Part Sub Assembly
Impeller) |
- |
0 |
|
- |
6.2 (f)(Material of construction Part Sub Assembly
Pump Bowl/Diffuser) |
- |
0 |
|
- |
6.2 (g)(Material of construction Part Sub Assembly
Pump Shaft) |
- |
0 |
|
- |
6.2 (h)(Material of construction Part Sub Assembly
Suction Casing) |
- |
0 |
|
- |
6.2.2.1(Gaskets, Seals and Packings) |
- |
0 |
|
- |
6.2.2.2(Gaskets, Seals and Packings) |
- |
0 |
|
- |
6.2.3(Gaskets, Seals and Packings) |
- |
0 |
|
- |
6.2.4(Gaskets, Seals and Packings) |
- |
0 |
|
- |
6.2.5(Gaskets, Seals and Packings) |
- |
0 |
|
- |
7.1.1(Design features:
Typical design features 0f components of pump) |
- |
0 |
|
- |
7.1.2(Design features:
Typical design features 0f components of pump) |
- |
0 |
|
- |
7.1.3(Design features:
Typical design features 0f components of pump) |
- |
0 |
|
- |
7.1.4(Design features:
Typical design features 0f components of pump) |
- |
0 |
|
- |
7.1.5(Design features:
Typical design features 0f components of pump) |
- |
0 |
|
- |
7.1.6(Design features:
Typical design features 0f components of pump) |
- |
0 |
|
- |
8.1(General Requirements) |
- |
0 |
|
- |
8.2(Casing) |
- |
0 |
|
- |
8.3(Impeller) |
- |
0 |
|
- |
8.4.1(Shaft) |
- |
0 |
|
- |
8.4.2(Shaft) |
- |
0 |
|
- |
8.5.1(Balancing) |
- |
0 |
|
- |
8.5.2(Balancing) |
- |
0 |
|
- |
8.7.1(Direction of Rotation) |
- |
0 |
|
- |
8.7.2(Direction of Rotation) |
- |
0 |
|
- |
8.8(Terminal Marking) |
- |
0 |
|
- |
8.9.1(Typical Installation) |
- |
0 |
|
- |
8.9.3(Typical Installation) |
- |
0 |
|
- |
10.2(Laboratory Tests
Cl.8 of IS 11346-2002
Rate of flow and head
Cl.8 of IS 11346-2002) |
- |
0 |
|
- |
10.2(Laboratory Tests
Cl.8 of IS 11346-2002
Rate of flow and head
Cl.8 of IS 11346-2002) |
- |
0 |
|
- |
10.2(Laboratory Tests
Cl.8 of IS 11346-2002
Efficiency
Cl.8.3 of IS 11346-2002) |
- |
0 |
|
- |
10.3(Hydrostatic Pressure Test) |
- |
0 |
|
- |
11.1.1(Guarantee of Performance) |
- |
8650 |
|
- |
11.1.2(Guarantee of Performance) |
- |
0 |
|
- |
11.1.3(Guarantee of Performance) |
- |
0 |
|
- |
11.1.4(Guarantee of Performance) |
- |
0 |
|
- |
11.1.5(Guarantee of Performance) |
- |
0 |
|
- |
8.9(Typical installation) |
- |
0 |
|
- |
8.5(Balancing of rotor) |
- |
0 |
|
- |
8.6(Submersible cable) |
- |
0 |
|
- |
8.7(Direction of Rotation) |
- |
0 |
|
- |
7(Design features) |
- |
0 |
|
- |
7.1.10(Voltage & Frequency variation) |
- |
0 |
|
- |
6(Measurement of shaft extension) |
- |
0 |
|
- |
6(Constructional Features) |
- |
0 |
|
- |
11(Guarantee of Performance) |
- |
0 |
|
- |
10(Pump Performance test) |
- |
0 |
|
- |
9.1(General) |
- |
0 |
|
- |
9.10 (a)(Insulation Resistance test) |
- |
0 |
|
- |
9.10 (b)(High Voltage test) |
- |
0 |
|
- |
9.10 (c)(Measurement of Stator Resistance) |
- |
0 |
|
- |
9.10 (d)(No Load Test at Rated Voltage) |
- |
0 |
|
- |
9.10 (e)(Reduced voltage Running up test) |
- |
0 |
|
- |
9.10 (f) & (g)(Locked Rotor Test) |
- |
0 |
|
- |
9.10 (h)(Leakage current test) |
- |
0 |
|
- |
9.10 (j)(Temperature Rise Test at Rated Voltage) |
- |
0 |
|
- |
9.10 (k)(Temperature rise test at reduced voltage) |
- |
0 |
|
- |
|
Complete
|
|
31 May, 2025 |
- Revised version of IS 8034:2018 included w.e.f. 21.01.2019. |
21 |
IS 9079 (2018) |
Monoset pumps for clear, cold water for agricultural and water supply purposes - Specification (Third Revision) |
- |
-
|
7600 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
10.1(GENERAL REQUIREMENTS
Casing) |
- |
0 |
|
- |
10.2(GENERAL REQUIREMENTS
Impeller) |
- |
0 |
|
- |
10.3(GENERAL REQUIREMENTS
Shaft) |
- |
0 |
|
- |
7.1(DIRECTION OF ROTATION (Cl 7)) |
- |
0 |
|
- |
7.2(DIRECTION OF ROTATION (Cl 7)) |
- |
0 |
|
- |
9.1(DESIGN
FEATURES (Cl 9)) |
- |
0 |
|
- |
9.2(DESIGN
FEATURES (Cl 9)) |
- |
0 |
|
- |
13.1(Guarantee and tolerances on Pump Performance (Cl 13)) |
- |
0 |
|
- |
13.2(Guarantee and tolerances on Pump Performance (Cl 13)) |
- |
0 |
|
- |
8.2 IS 11346 : 2002(Verification of Guarantee
Rate of flow and head
(Cl.8.2 IS 11346 : 2002)) |
- |
0 |
|
- |
8.2 IS 11346 : 2002(Verification of Guarantee
Rate of flow and head
(Cl.8.2 IS 11346 : 2002)) |
- |
0 |
|
- |
12.5(Efficiency) |
- |
0 |
|
- |
Cl.8.3 b IS 11346 : 2002(Overall efficiency) |
- |
0 |
|
- |
Cl13.2.3 IS 9079:2002(Current consumption) |
- |
0 |
|
- |
9.2(DESIGN
FEATURES (Cl 9)) |
- |
0 |
|
- |
13.1(Guarantee and tolerances on Pump Performance (Cl 13)) |
- |
0 |
|
- |
13.2(Guarantee and tolerances on Pump Performance (Cl 13)) |
- |
0 |
|
- |
13.1.1 (8.2 of IS 11346 : 2002)(Verification of Guarantee
Rate of flow and head
(Cl.8.2 IS 11346 : 2002)) |
- |
0 |
|
- |
13.1.1 (8.2 of IS 11346 : 2002)(Verification of Guarantee
Rate of flow and head
(Cl.8.2 IS 11346 : 2002)) |
- |
0 |
|
- |
12.5(Efficiency) |
- |
0 |
|
- |
Cl.8.3 b IS 11346 : 2002(Overall efficiency) |
- |
0 |
|
- |
Cl13.2.3 IS 9079:2002(Current consumption) |
- |
0 |
|
- |
10(General Requirements) |
- |
0 |
|
- |
10.4.1, 10.4.2, 10.4.3, 10.4.4(General Requirements(Balancing)) |
- |
0 |
|
- |
10.5(Provision of Earthing) |
- |
0 |
|
- |
10.6.1(Terminal Marking) |
- |
0 |
|
- |
10.6.2, 10.6.3(Direction of Rotation) |
- |
0 |
|
- |
11.8(Type test) |
- |
0 |
|
- |
11.8.1(a)(Measurement of stator resistance) |
- |
0 |
|
- |
11.8.1(b)(High Voltage test) |
- |
0 |
|
- |
11.8.1(c)(Insulation Resistance test) |
- |
0 |
|
- |
11.8.1(d)(No load test at rated voltage) |
- |
0 |
|
- |
11.8.1(e)(Locked rotor) |
- |
0 |
|
- |
11.8.1(f)(Breakaway (starting) torque) |
- |
0 |
|
- |
11.8.1(g)(Reduced voltage running up test at no load) |
- |
0 |
|
- |
11.8.1(h)(Temperature rise test at rated voltage) |
- |
0 |
|
- |
11.8.1(j)(Temperature rise test at reduced voltage) |
- |
0 |
|
- |
13.1.2(The guarantee shall be deemed to have been met with, if the measured values of head, volume rate of flow and overall efficiency
are within the limits indicated in clause 8 of IS 11346. However, after applying the tolerance, overall efficiency value shall not be
less than that derived from Fig. 3 to 6.) |
- |
0 |
|
- |
13.1.3(Monoset motor shall not get overloaded in the specified operating head range at rated voltage and supply frequency.) |
- |
0 |
|
- |
13.1.4(The tolerance shall apply to guaranteed duty point only.) |
- |
0 |
|
- |
8.6.5(If four core cable is used, the fourth core is to be used for earthing.) |
- |
0 |
|
- |
|
Complete
|
|
31 May, 2025 |
- Revised version of IS 9079:2018 is included w.e.f. 21.01.2019. |
22 |
IS 12615 (2018) |
Line operated three phase AC motors (IE Code) "Efficiency classes and performance specification" (Third Revision) |
- |
-
|
4950 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
15.2(Rating) |
- |
0 |
|
- |
18.3(BIS Certification Marking
) |
- |
0 |
|
- |
15.3.2(Marking) |
- |
0 |
|
- |
8.0(Earthing) |
- |
0 |
|
- |
9.0(Terminal Marking) |
- |
0 |
|
- |
11.0(DUTY AND RATING) |
- |
0 |
|
- |
18.3(Marking) |
- |
0 |
|
- |
16.2.1(Dimensions) |
- |
0 |
|
- |
16.1.1(Insulation Resistance Test) |
- |
0 |
|
- |
16.1.2(Measurement of Resistance of Windings of Stator) |
- |
0 |
|
- |
16.1.3(No Load Test) |
- |
0 |
|
- |
16.1.4(Locked Rotor Readings of Voltage, Current and Power Input at a Suitable Reduced Voltage) |
- |
0 |
|
- |
16.1.5(5 Reduced Voltage Running up Test at no-load (for squirrel cage motor up to 37 kW only)) |
- |
0 |
|
- |
16.1.6(High Voltage Test) |
- |
0 |
|
- |
16.2.2(Locked Rotor Test) |
- |
0 |
|
- |
16.2.2.1(Locked Rotor Test) |
- |
0 |
|
- |
16.2.2.2(Locked Rotor Test) |
- |
0 |
|
- |
16.2.2.2.1(Locked Rotor Test) |
- |
0 |
|
- |
16.2.2.3(Determination of starting characteristics
-locked rotor current) |
- |
0 |
|
- |
16.2.2.3.1(Direct proportion method) |
- |
0 |
|
- |
16.2.3(Full Load Test to Determine Efficiency, Power Factor and Slip) |
- |
0 |
|
- |
16.2.4(Temperature Rise Test) |
- |
0 |
|
- |
16.2.5(Momentary Overload Test) |
- |
0 |
|
- |
16.3.1( Test for Vibration Severity of Motor) |
- |
2400 |
|
- |
16.3.2( Test for Noise Levels of Motor) |
- |
1100 |
|
- |
16.3.3( Test for Degree of Protection by Enclosure) |
- |
10000 |
|
- |
16.3.4(Over Speed Test) |
- |
2400 |
|
- |
16.3.5( Temperature Rise Test at Limiting Values of
Voltage and Frequency Variation) |
- |
2400 |
|
- |
|
Complete
|
|
31 May, 2025 |
- Revised version of IS 12615:2018 is included in w.e.f. 21.01.2019. |
23 |
IS 10805 (1986) |
Specification for foot - Valves, reflux valves or non - Return valves and bore valves to be used in suction lines of agricultural pumping systems (First Revision) |
- |
-
|
3800 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
6.1.2(Housing test) |
- |
0 |
|
- |
(Cl. 2 Table 1)(Dimensions) |
- |
0 |
|
- |
(Cl. 5)(Coating) |
- |
0 |
|
- |
(Cl. 2 Table 1)(Nominal Size) |
- |
0 |
|
- |
6.1.1(Seat test) |
- |
0 |
|
- |
|
Complete
|
|
31 May, 2025 |
- - |
24 |
IS 779 (1994) |
Water meters (Domestic Type) - Specification (Sixth Revision) |
- |
-
|
27400 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
7(Construction) |
- |
0 |
|
- |
7.2(i) Body) |
- |
0 |
|
- |
7.3(Registration Box) |
- |
0 |
|
- |
7.4(Cap) |
- |
0 |
|
- |
7.5(Connections ) |
- |
0 |
|
- |
7.6(Strainers) |
- |
0 |
|
- |
7.7(Impeller and pistons) |
- |
0 |
|
- |
7.8(Impeller, Chamber and Measuring Chamber ) |
- |
0 |
|
- |
7.9(Gears & Pinions ) |
- |
0 |
|
- |
7.1(Bearings) |
- |
0 |
|
- |
7.11(Counter) |
- |
0 |
|
- |
7.12(Dial) |
- |
0 |
|
- |
7.13(Regulator) |
- |
0 |
|
- |
7.14(Sealing) |
- |
0 |
|
- |
7.15(Frost protection device) |
- |
0 |
|
- |
8.1 & 8.2(Indicating device) |
- |
0 |
|
- |
8.3(Value of verification Scale division ) |
- |
0 |
|
- |
8.4(Acceleration Device) |
- |
0 |
|
- |
9.1, table 2(i)Threads ) |
- |
0 |
|
- |
9.1, table 3(ii)Thread Length ‘a’ ) |
- |
0 |
|
- |
9.1, table 4( ‘b’ ) |
- |
0 |
|
- |
9.1, table 5(iii) Overall Length (with nipple)) |
- |
0 |
|
- |
9.1, table 6(iv)Overall Width ) |
- |
0 |
|
- |
9.1, table 7(v)Overall Height H1) |
- |
0 |
|
- |
9.1, table 8( H2 ) |
- |
0 |
|
- |
10.1(Pressure tightness) |
- |
0 |
|
- |
10.2(Loss of pressure) |
- |
0 |
|
- |
11.1(Metering Accuracy) |
- |
0 |
|
- |
11.2(Min. Starting flow) |
- |
0 |
|
- |
10.3(Temp. suitability ) |
- |
0 |
|
- |
10.2(Loss of pressure) |
- |
0 |
|
- |
10.2(Loss of pressure) |
- |
0 |
|
- |
11.1(Metering Accuracy) |
- |
0 |
|
- |
12.4.2(Construction) |
- |
0 |
|
- |
|
Complete
|
|
31 May, 2025 |
- - |
25 |
IS 8783 : Part 4 : Sec 1 (1995) |
Winding wires for submersible motors - Specification: Part 4 specification for indmdual wires: Sec 1 HR PVC insulated wires (First Revision) |
- |
-
|
13800 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
Cl.3.1 (Conductor) |
- |
0 |
|
- |
Cl.5.1.1 (Dimensions) |
- |
0 |
|
- |
Cl.4(Material) |
- |
0 |
|
- |
Cl. 6(Annealing Test) |
- |
0 |
|
- |
Cl 6(Resistance Test) |
- |
0 |
|
- |
Cl 4.1.2 (Visual examination) |
- |
0 |
|
- |
Cl. 4 Table 1of IS: 8783 (part 2) (Volume resistivity) |
- |
0 |
|
- |
Cl. 4 Table 1of IS: 8783 (part 2) (Volume resistivity) |
- |
0 |
|
- |
Cl. 4 Table 1of IS: 8783 (part 2) (Tensile strength ) |
- |
0 |
|
- |
Cl. 4 Table 1of IS: 8783 (part 2) (Elongation) |
- |
0 |
|
- |
Cl. 4 Table 1of IS: 8783 (part 2) (Tensile Strength) |
- |
0 |
|
- |
Cl. 4 Table 1of IS: 8783 (part 2) (Variation) |
- |
0 |
|
- |
Cl. 4 Table 1of IS: 8783 (part 2) (Elongation at Break ) |
- |
0 |
|
- |
Cl. 4 Table 1of IS: 8783 (part 2) (Variation) |
- |
0 |
|
- |
Cl. 4 Table 1of IS: 8783 (part 2) (Shrinkage test ) |
- |
0 |
|
- |
Cl. 4 Table 1of IS: 8783 (part 2) (Shrinkage test ) |
- |
0 |
|
- |
Cl. 4 Table 1of IS: 8783 (part 2) (Water absorption (Gravimetric) ) |
- |
0 |
|
- |
Cl. 4 Table 1of IS: 8783 (part 2) (Hot deformation Test ) |
- |
0 |
|
- |
Cl. 4 Table 1of IS: 8783 (part 2) (Heat shock Test ) |
- |
0 |
|
- |
Cl.4.1(Insulation ) |
- |
0 |
|
- |
Cl.4.2(Application) |
- |
0 |
|
- |
Cl.4.4(Overall Diameter) |
- |
0 |
|
- |
Cl.4.5(Finish) |
- |
0 |
|
- |
Cl.4.6(High Voltage Test Water Immersion ) |
- |
0 |
|
- |
|
Complete
|
|
31 May, 2025 |
- - |
26 |
IS 8783 : Part 4 : Sec 3 (1995) |
Winding wires for submersible motors - Specification: Part 4 specification for individual wires: Sec 3 polyester and polypropylene insulated winding wires (First Revision) |
- |
-
|
13050 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
4(i) Material) |
- |
0 |
|
- |
5(ii) Diameter [mm] Seperate wire:) |
- |
0 |
|
- |
5(ii) Diameter [mm] Wire taken from cable:) |
- |
0 |
|
- |
5(iii) Annealing test [Percentage] on Seperate wire:) |
- |
0 |
|
- |
5(iii) Annealing test [Percentage] on Wire taken from cable:) |
- |
0 |
|
- |
5(d) Resistance test [Ohm/km corrected to 20°c) |
- |
0 |
|
- |
4.1, table 1 & 2(a) Thickness of Polyster (mm)) |
- |
0 |
|
- |
4.1, table 1 & 3(b) Thickness of Polypropylene (mm)) |
- |
0 |
|
- |
4.2(Application of insulation) |
- |
0 |
|
- |
4.3(Colour of Insuation) |
- |
0 |
|
- |
4.4(Overall diameter (mm)) |
- |
0 |
|
- |
4(Before ageing Tensile strength [N/mm²]) |
- |
0 |
|
- |
4(Before ageing Elongation at break [Percentage]) |
- |
0 |
|
- |
4(After ageing Tensile strength [N/mm²]) |
- |
0 |
|
- |
4(Variation on tensile strangth [Percentage]) |
- |
0 |
|
- |
4(After ageing Elongation at break [Percentage]) |
- |
0 |
|
- |
4(Variation on elongation at break [Percentage]) |
- |
0 |
|
- |
4(Shrinkage test [Percentage]) |
- |
0 |
|
- |
4(After Shrinkage Cracks found.) |
- |
0 |
|
- |
4.1(Water absorption test [Gravimetric] [mg/cm²]) |
- |
0 |
|
- |
4.1(Heat Shock Test - No cracks found) |
- |
0 |
|
- |
4.5(High Voltage test [Water Immersion test] 3 KV for 1 Minute) |
- |
0 |
|
- |
|
Complete
|
|
31 May, 2025 |
- - |
27 |
IS 7538 (1996) |
Three - Phase squirrel cage induction motors for centrifugal pumps for agricultural application - Specification (First Revision) |
- |
-
|
4150 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
5(ENCLOSURES) |
- |
0 |
|
- |
8.1(Rated Voltage) |
- |
0 |
|
- |
8.2(Rated Frequency) |
- |
0 |
|
- |
8.3(Rated Outputs) |
- |
0 |
|
- |
9(DIMENSIONS- H : Nominal ) |
- |
0 |
|
- |
9(DIMENSIONS- H : Deviation ) |
- |
0 |
|
- |
9(DIMENSIONS- A) |
- |
0 |
|
- |
9(DIMENSIONS- B) |
- |
0 |
|
- |
9(DIMENSIONS- C) |
- |
0 |
|
- |
9(DIMENSIONS- K+ : Nominal ) |
- |
0 |
|
- |
9(DIMENSIONS- K+ : Tolerance ) |
- |
0 |
|
- |
9(DIMENSIONS- Bolt or Screw) |
- |
0 |
|
- |
9(DIMENSIONS- M) |
- |
0 |
|
- |
9(DIMENSIONS- N) |
- |
0 |
|
- |
9(DIMENSIONS- P) |
- |
0 |
|
- |
9(DIMENSIONS- S) |
- |
0 |
|
- |
9(DIMENSIONS- T) |
- |
0 |
|
- |
9(DIMENSIONS- LA) |
- |
0 |
|
- |
9(DIMENSIONS- Depth of tapped Hole) |
- |
0 |
|
- |
11(PROVISION FOR EARTHING) |
- |
0 |
|
- |
12.1, Table 1 to Table 6(Minimum full load speed) |
- |
0 |
|
- |
12.1, Table 1 to Table 6(maximum full load
current) |
- |
0 |
|
- |
12.1, Table 1 to Table 6(minimum starting torque/ breakaway torque ) |
- |
0 |
|
- |
12.1, Table 1 to Table 6(nominal efficiency) |
- |
0 |
|
- |
12.1, Table 1 to Table 6(nominal efficiency at 75% rated load) |
- |
0 |
|
- |
13.1(OVERLOAD:Momentary Excess Torque) |
- |
0 |
|
- |
14(LIMITS OF TEMPERATURES AND
TEMPERATURE-RISE) |
- |
0 |
|
- |
15(LIMITS OF VIBRATION SEVERITY) |
- |
0 |
|
- |
16(LIMITS OF NOISE LEVELS) |
- |
0 |
|
- |
17.1(Efficiency) |
- |
0 |
|
- |
17.2(Power Factor) |
- |
0 |
|
- |
18(TOLERANCES) |
- |
0 |
|
- |
19.1(TERMINAL BOX) |
- |
0 |
|
- |
19.1.1(TERMINAL
MARKINGS) |
- |
0 |
|
- |
22.3.1 b)(Measurement of stator resistance) |
- |
0 |
|
- |
23.1(TEMPERATURE-RISE TEST : Test at Rated Voltage) |
- |
0 |
|
- |
23.2(TEMPERATURE-RISE TEST: Test at Reduced Voltage) |
- |
0 |
|
- |
24.1(No-load running of motor and reading of
' voltage) |
- |
0 |
|
- |
24.1(No-load running of motor and reading of
' current ) |
- |
0 |
|
- |
24.1(No-load running of motor and reading of
' power input ) |
- |
0 |
|
- |
24.1(No-load running of motor and reading of
' speed ) |
- |
0 |
|
- |
24.3(Locked Rotor Test:The readings of the breakaway rotor torque) |
- |
0 |
|
- |
24.4(Full Load Test : voltage) |
- |
0 |
|
- |
24.4(Full Load Test : Power input ) |
- |
0 |
|
- |
24.4(Full Load Test : current ) |
- |
0 |
|
- |
24.4(Full Load Test : speed) |
- |
0 |
|
- |
24.5(Test for efficiency at reduced load) |
- |
0 |
|
- |
25(HIGH-VOLTAGE TEST) |
- |
0 |
|
- |
26(INSULATION-RESISTANCE TEST) |
- |
0 |
|
- |
27(OVERSPEED TEST) |
- |
0 |
|
- |
24.3(Locked Rotor Test:The readings of the input
current) |
- |
0 |
|
- |
24.3(Locked Rotor Test:The readings of the input
power) |
- |
0 |
|
- |
|
Complete
|
|
31 May, 2025 |
- - |
28 |
IS 12225 (1997) |
Centrifugal jet pump - Specification (First Revision) |
- |
-
|
6200 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
8.1( PERFORMANCE CHARACTERISTICS
Factor Affecting Performance) |
- |
0 |
|
- |
8.2( PERFORMANCE CHARACTERISTICS
Performance Curves) |
- |
0 |
|
- |
9 table 2(testing ) |
- |
0 |
|
- |
9.3(Pressure Testing) |
- |
0 |
|
- |
10(TOLERANCES) |
- |
0 |
|
- |
4.1(Twin type) |
- |
0 |
|
- |
4.2(Duplex type) |
- |
0 |
|
- |
4.3(Packer type) |
- |
0 |
|
- |
5.2(Prime Movers) |
- |
0 |
|
- |
5.2.1(Motor Drives) |
- |
0 |
|
- |
5.2.1(Measurement of stator resistance) |
- |
0 |
|
- |
5.2.1(High Voltage test) |
- |
0 |
|
- |
5.2.1(Insulation Resistance test) |
- |
0 |
|
- |
5.2.1(No load test at rated voltage) |
- |
0 |
|
- |
5.2.1(Locked rotor) |
- |
0 |
|
- |
5.2.1(Breakaway (starting) torque) |
- |
0 |
|
- |
5.2.1(Reduced voltage running up test at no load) |
- |
0 |
|
- |
5.2.1(Temperature rise test at rated voltage) |
- |
0 |
|
- |
5.2.1(Temperature rise test at reduced voltage) |
- |
0 |
|
- |
6(Material of Construction) |
- |
0 |
|
- |
12(Marking) |
- |
0 |
|
- |
12.1(a)(DLWL) |
- |
0 |
|
- |
12.1(b)(Discharge) |
- |
0 |
|
- |
12.1(c)(Submergence) |
- |
0 |
|
- |
12.1(d) i(Pipe sizes - For Duplex/Packer type) |
- |
0 |
|
- |
12.1(d) ii(Pipe sizes - For Twin type) |
- |
0 |
|
- |
12.1(e)(DLWL-Range) |
- |
0 |
|
- |
12.1(f)(Total Head) |
- |
0 |
|
- |
12.1(g)(Rated Speed) |
- |
0 |
|
- |
12.1(i)(Maximum Current) |
- |
0 |
|
- |
|
Complete
|
|
31 May, 2025 |
- - |
29 |
IS 8418 (1999) |
Pumps - Centrifugal self priming - Specification (First Revision) |
- |
-
|
7600 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
7.0(DIRECTION OF ROTATION) |
- |
0 |
|
- |
12.2(Performance Test
Verification of guarante
Cl.8 of IS 11346-2002
Rate of flow and head
Cl.8 of IS 11346-2002) |
- |
0 |
|
- |
12.2(Performance Test
Verification of guarante
Cl.8 of IS 11346-2002
Efficiency
Cl.8.3 of IS 11346-2002) |
- |
0 |
|
- |
12.3(Primimg Test) |
- |
0 |
|
- |
17.1(Marking) |
- |
0 |
|
- |
|
Complete
|
|
31 May, 2025 |
- - |
30 |
IS 13730 : Part 45 (1999) |
Specifications for particular types of winding wires: Part 45 polyester enamelled round copper wire, class 130 |
- |
-
|
13900 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
4(Dimensions) |
- |
13900 |
|
. |
|
Complete
|
|
31 May, 2025 |
- - |