1 |
IS 13340 : PART 1 (2024) |
Shunt Power Capacitors of the Self-Healing Type for a.c. Systems Having a Rated Voltage up to and Including 1 000 V Part 1 General - Performance, Testing and Rating - Safety Requirements - Guide for Installation and Operation (Second Revision) |
- |
618070 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
7(Capacitance measurement and output calculation) |
- |
8640 |
|
Test charges are dependant on the kvar rating of the test sample and the complete test charges applicable, will be intimated through a proforma invoice on receipt of the test request. |
8(Measurement of the tangent of the loss angle (tan δ) of the capacitor) |
- |
8640 |
|
Test charges are dependant on the kvar rating of the test sample and the complete test charges applicable, will be intimated through a proforma invoice on receipt of the test request. |
9(Voltage tests between terminals) |
- |
1280 |
|
Test charges are dependant on the kvar rating of the test sample and the complete test charges applicable, will be intimated through a proforma invoice on receipt of the test request. |
10(Voltage tests between terminals and container) |
- |
1000 |
|
Test charges are dependant on the kvar rating of the test sample and the complete test charges applicable, will be intimated through a proforma invoice on receipt of the test request. |
11(Voltage tests between terminals and container) |
- |
1000 |
|
Test charges are dependant on the kvar rating of the test sample and the complete test charges applicable, will be intimated through a proforma invoice on receipt of the test request. |
12(Sealing test) |
- |
1560 |
|
Test charges are dependant on the kvar rating of the test sample and the complete test charges applicable, will be intimated through a proforma invoice on receipt of the test request. |
13(Thermal stability test) |
- |
125710 |
|
Test charges are dependant on the kvar rating of the test sample and the complete test charges applicable, will be intimated through a proforma invoice on receipt of the test request. |
14("Measurement of the tangent of the loss angle (tan δ) of the capacitor at
elevated temperature") |
- |
6800 |
|
Test charges are dependant on the kvar rating of the test sample and the complete test charges applicable, will be intimated through a proforma invoice on receipt of the test request. |
7(Capacitance measurement and output calculation) |
- |
8640 |
|
Test charges are dependant on the kvar rating of the test sample and the complete test charges applicable, will be intimated through a proforma invoice on receipt of the test request. |
15(Lightning impulse voltage test between terminals and container) |
- |
8640 |
|
Test charges are dependant on the kvar rating of the test sample and the complete test charges applicable, will be intimated through a proforma invoice on receipt of the test request. |
16(Discharge test) |
- |
21600 |
|
Test charges are dependant on the kvar rating of the test sample and the complete test charges applicable, will be intimated through a proforma invoice on receipt of the test request. |
17(Ageing test) |
- |
278990 |
|
Test charges are dependant on the kvar rating of the test sample and the complete test charges applicable, will be intimated through a proforma invoice on receipt of the test request. |
18(Self-healing test) |
- |
5140 |
|
Test charges are dependant on the kvar rating of the test sample and the complete test charges applicable, will be intimated through a proforma invoice on receipt of the test request. |
19(Destruction test) |
- |
139610 |
|
Test charges are dependant on the kvar rating of the test sample and the complete test charges applicable, will be intimated through a proforma invoice on receipt of the test request. |
20(Maximum permissible voltage) |
- |
0 |
|
Test charges are dependant on the kvar rating of the test sample and the complete test charges applicable, will be intimated through a proforma invoice on receipt of the test request. |
20.1(Long-duration voltages) |
- |
0 |
|
Test charges are dependant on the kvar rating of the test sample and the complete test charges applicable, will be intimated through a proforma invoice on receipt of the test request. |
20.2(Long-duration voltages) |
- |
0 |
|
Test charges are dependant on the kvar rating of the test sample and the complete test charges applicable, will be intimated through a proforma invoice on receipt of the test request. |
21(Maximum permissible current) |
- |
0 |
|
Test charges are dependant on the kvar rating of the test sample and the complete test charges applicable, will be intimated through a proforma invoice on receipt of the test request. |
22(Discharge device) |
- |
820 |
|
Test charges are dependant on the kvar rating of the test sample and the complete test charges applicable, will be intimated through a proforma invoice on receipt of the test request. |
23("Container connections
") |
- |
0 |
|
Test charges are dependant on the kvar rating of the test sample and the complete test charges applicable, will be intimated through a proforma invoice on receipt of the test request. |
24(Protection of the environment) |
- |
0 |
|
Test charges are dependant on the kvar rating of the test sample and the complete test charges applicable, will be intimated through a proforma invoice on receipt of the test request. |
25(Other safety requirements) |
- |
0 |
|
Test charges are dependant on the kvar rating of the test sample and the complete test charges applicable, will be intimated through a proforma invoice on receipt of the test request. |
26(Marking of the unit) |
- |
0 |
|
Test charges are dependant on the kvar rating of the test sample and the complete test charges applicable, will be intimated through a proforma invoice on receipt of the test request. |
26.1(Rating plate) |
- |
0 |
|
Test charges are dependant on the kvar rating of the test sample and the complete test charges applicable, will be intimated through a proforma invoice on receipt of the test request. |
26.2(Standardized connection symbols) |
- |
0 |
|
Test charges are dependant on the kvar rating of the test sample and the complete test charges applicable, will be intimated through a proforma invoice on receipt of the test request. |
26.3(Warning plate) |
- |
0 |
|
Test charges are dependant on the kvar rating of the test sample and the complete test charges applicable, will be intimated through a proforma invoice on receipt of the test request. |
27(Marking of the bank) |
- |
0 |
|
Test charges are dependant on the kvar rating of the test sample and the complete test charges applicable, will be intimated through a proforma invoice on receipt of the test request. |
27.1(Instruction sheet or rating plate) |
- |
0 |
|
Test charges are dependant on the kvar rating of the test sample and the complete test charges applicable, will be intimated through a proforma invoice on receipt of the test request. |
27.2(Warning plate) |
- |
0 |
|
Test charges are dependant on the kvar rating of the test sample and the complete test charges applicable, will be intimated through a proforma invoice on receipt of the test request. |
28(General) |
- |
0 |
|
Test charges are dependant on the kvar rating of the test sample and the complete test charges applicable, will be intimated through a proforma invoice on receipt of the test request. |
29(9 Choice of the rated voltage) |
- |
0 |
|
Test charges are dependant on the kvar rating of the test sample and the complete test charges applicable, will be intimated through a proforma invoice on receipt of the test request. |
30(Operating temperature) |
- |
0 |
|
Test charges are dependant on the kvar rating of the test sample and the complete test charges applicable, will be intimated through a proforma invoice on receipt of the test request. |
31(Special service conditions) |
- |
0 |
|
Test charges are dependant on the kvar rating of the test sample and the complete test charges applicable, will be intimated through a proforma invoice on receipt of the test request. |
32(2 Overvoltages) |
- |
0 |
|
Test charges are dependant on the kvar rating of the test sample and the complete test charges applicable, will be intimated through a proforma invoice on receipt of the test request. |
33(Overload currents) |
- |
0 |
|
Test charges are dependant on the kvar rating of the test sample and the complete test charges applicable, will be intimated through a proforma invoice on receipt of the test request. |
34(Switching and protective devices and connections) |
- |
0 |
|
Test charges are dependant on the kvar rating of the test sample and the complete test charges applicable, will be intimated through a proforma invoice on receipt of the test request. |
36(Capacitors connected to systems with audio-frequency remote control) |
- |
0 |
|
Test charges are dependant on the kvar rating of the test sample and the complete test charges applicable, will be intimated through a proforma invoice on receipt of the test request. |
36(Capacitors connected to systems with audio-frequency remote control) |
- |
0 |
|
Test charges are dependant on the kvar rating of the test sample and the complete test charges applicable, will be intimated through a proforma invoice on receipt of the test request. |
37(Electromagnetic compatibility (EMC)) |
- |
0 |
|
Test charges are dependant on the kvar rating of the test sample and the complete test charges applicable, will be intimated through a proforma invoice on receipt of the test request. |
|
31 Dec, 2026 |
- Included w.e.f.03.07.2025 |
2 |
IS 2993 : Part 2 (2024) |
a.c. Motor Capacitors Part 2 Motor Start Capacitors ( Third Revision ) |
- |
2951880 View breakup
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor.
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
5.1.1.1(General) |
- |
0 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
5.1.7(Voltage test between the terminals) |
- |
6340 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
5.1.8(Voltage test between terminals and case) |
- |
11520 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
5.1.9(Capacitance measurement) |
- |
46080 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
5.1.10(Check of dimensions) |
- |
2200 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
5.1.10(Check of dimensions) |
- |
2200 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
5.1.12(Sealing test) |
- |
1380 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
5.1.13(Endurance test) |
- |
1542150 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
5.1.14(Damp heat test) |
- |
161360 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
5.1.15(Self-healing test) |
- |
62230 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
5.1.16(Destruction test) |
- |
285200 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
5.1.17.1(Ball-pressure test) |
- |
21290 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
5.1.17.2(Glow-wire test) |
- |
17940 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
5.1.17.3(Tracking test) |
- |
9660 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
5.4(Marking) |
- |
640 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
6.1.6(Voltage test between the terminals) |
- |
6340 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
6.1.7(Voltage test between terminals and case) |
- |
11520 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
6.1.9(Check of dimensions) |
- |
2200 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
6.1.11(Sealing test) |
- |
1380 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
6.1.12(Endurance test) |
- |
1542150 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
6.1.13(Damp heat test) |
- |
161360 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
6.1.15.1(Ball-pressure test) |
- |
21290 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
6.1.15.2(Glow-wire test) |
- |
17940 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
6.1.15.3(Tracking test) |
- |
9660 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
6.4(Marking) |
- |
640 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
5.1.11.1(Robustness of terminations) |
- |
35140 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
5.1.11.2(Soldering) |
- |
15720 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
5.2(Overloads) |
- |
0 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
5.3.1(Creepage distances and clearances) |
- |
0 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
5.3.2(Terminals and connecting cables) |
- |
0 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
5.3.3(Earth connections) |
- |
0 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
5.3.4(Discharge devices) |
- |
0 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
5.3.5(Pollution) |
- |
0 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
6.1.8(Capacitance and power factor measurement) |
- |
92160 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
6.1.10.1(Robustness of terminations) |
- |
35140 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
6.1.10.2(Soldering) |
- |
15720 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
6.2(Overloads) |
- |
0 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
6.3.1(Creepage distances and clearances) |
- |
0 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
6.3.2(Terminals and connecting cables) |
- |
0 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
6.3.3(Earth connections) |
- |
0 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
6.3.4(Discharge devices) |
- |
0 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
6.3.5(Pollution) |
- |
0 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
7.2.1(Measurement of working voltage) |
- |
0 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
7.2.2(Influence of capacitance) |
- |
0 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
5.1.11.3(Vibration) |
- |
35140 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
6.1.10.3(Vibration) |
- |
35140 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
7.3(Checking capacitor temperature) |
- |
0 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
7.4(Checking transients) |
- |
0 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
7.5(Storage of electrolytic capacitors) |
- |
0 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
Annex A(Test voltage) |
- |
0 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
6.1.14(Pressure relief test) |
- |
285200 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
6.1.10.4(Fixing bolt or stud (if fitted)) |
- |
0 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
6.1.10.4(Fixing bolt or stud (if fitted)) |
- |
0 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
6.1.10.5(Rapid change of temperature) |
- |
0 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
|
31 Dec, 2026 |
- Included w.e.f 30.04.2025 |
3 |
IS 2993 : Part 1 (2024) |
a.c. Motor Capacitors Part 1 General - Performance, Testing and Rating - Safety Requirements - Guidance for Installation and Operation ( Third Revision ) |
- |
2457780 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
5.12(Sealing test) |
- |
1380 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
5.7("Voltage test between terminals
") |
- |
6340 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
5.8(Voltage test between terminals and case) |
- |
11520 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
5.9(Capacitance measurement) |
- |
46080 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
5.5(Tangent of loss angle) |
- |
46080 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
8(Marking) |
- |
640 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
5.1(Check of dimensions) |
- |
2200 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
5.11(Mechanical tests) |
- |
148740 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
5.13(Endurance test) |
- |
1542150 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
5.14(Damp heat test) |
- |
161360 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
5.15(Self-healing test) |
- |
62230 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
5.16(Destruction test) |
- |
285200 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
5.17(Resistance to heat, fire and tracking) |
- |
48890 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
5.1.1(General) |
- |
0 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
5.17.1(Ball-pressure test) |
- |
21290 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
5.17.2(Glow-wire test) |
- |
17940 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
5.17.3(Tracking test) |
- |
9660 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
6.1(Maximum permissible voltage) |
- |
0 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
6.2("Maximum permissible current
") |
- |
0 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
6.3(Maximum permissible reactive output) |
- |
0 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
7(Safety requirements) |
- |
0 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
7.1(Requirements for Creepage distances and clearances) |
- |
0 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
7.2(Terminals and connecting cables) |
- |
0 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
7.3(Earth connections) |
- |
0 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
7.4(Discharge devices) |
- |
0 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
9.2.1(Measurements of working voltage) |
- |
0 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
9.2.2(Influence of capacitance) |
- |
0 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
9.3(Checking capacitor temperature) |
- |
0 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
9.4(Checking transients) |
- |
0 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
9.5(Leakage current) |
- |
0 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
5.9(Capacitance measurement) |
- |
46080 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
5.12(Sealing test) |
- |
1380 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
5.7("Voltage test between terminals
") |
- |
6340 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
5.8(Voltage test between terminals and case) |
- |
11520 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
5.9(Capacitance measurement) |
- |
46080 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
5.5(Tangent of loss angle) |
- |
46080 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
8(Marking) |
- |
640 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
5.1(Check of dimensions) |
- |
2200 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
5.11(Mechanical tests) |
- |
148740 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
5.13(Endurance test) |
- |
1542150 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
5.14(Damp heat test) |
- |
161360 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
5.15(Self-healing test) |
- |
62230 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
5.16(Destruction test) |
- |
285200 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
5.17(Resistance to heat, fire and tracking) |
- |
48890 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
5.1.1(General) |
- |
0 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
5.17.1(Ball-pressure test) |
- |
21290 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
5.17.2(Glow-wire test) |
- |
17940 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
5.17.3(Tracking test) |
- |
9660 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
6.1(Maximum permissible voltage) |
- |
0 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
6.2("Maximum permissible current
") |
- |
0 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
6.3(Maximum permissible reactive output) |
- |
0 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
7(Safety requirements) |
- |
0 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
7.1(Requirements for Creepage distances and clearances) |
- |
0 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
7.2(Terminals and connecting cables) |
- |
0 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
7.3(Earth connections) |
- |
0 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
7.4(Discharge devices) |
- |
0 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
9.2.1(Measurements of working voltage) |
- |
0 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
9.2.2(Influence of capacitance) |
- |
0 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
9.3(Checking capacitor temperature) |
- |
0 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
9.4(Checking transients) |
- |
0 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
9.5(Leakage current) |
- |
0 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
5.9(Capacitance measurement) |
- |
46080 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
|
31 Dec, 2026 |
- Included w.e.f 28.04.2025 |
4 |
IS/IEC 60947 : Part 5 : Sec 1 (2016) |
Low-Voltage Switchgear And Control Gear : Part 5-1 Control Circuit Devices And Switching Elements Electromechanical Control Circuit Devices |
- |
443980 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
5.2.1(Marking : General
") |
- |
0 |
|
NA |
5.2.2(Terminal identification and marking) |
- |
0 |
|
NA |
5.2.3(Functional markings) |
- |
0 |
|
NA |
5.2.4(Emergency stop) |
- |
0 |
|
NA |
5.2.5(Operating diagram) |
- |
0 |
|
NA |
5.2.5.1(Position indication) |
- |
0 |
|
NA |
5.2.5.2(Terminal markings for operating diagrams) |
- |
0 |
|
NA |
5.2.6(Time delay markings) |
- |
0 |
|
NA |
5.3(Instructions for installation, operation and maintenance) |
- |
0 |
|
- |
7.1.2.2(Glow-wire testing) |
- |
0 |
|
NA |
7.1.3(Current-carrying parts and their connections) |
- |
0 |
|
NA |
7.1.4(Clearances and creepage distances) |
- |
0 |
|
NA |
7.2.4.1(Making and breaking capacities) |
- |
0 |
|
NA |
7.2.4.3(Durability) |
- |
0 |
|
NA |
7.3.2.4(Electrostatic discharges) |
- |
0 |
|
NA |
7.3.2.5(Radiated radio-frequency electromagnetic fields) |
- |
0 |
|
NA |
7.3.2.6(Electrical fast transients/bursts) |
- |
0 |
|
NA |
7.3.2.7(Surges) |
- |
0 |
|
NA |
7.3.2.8(Conducted disturbances induced by radio-frequency fields) |
- |
0 |
|
NA |
7.3.2.9(Power-frequency magnetic fields) |
- |
0 |
|
NA |
7.3.2.10(Voltage dips and interruptions) |
- |
0 |
|
NA |
7.3.2.11(Harmonics in the supply) |
- |
0 |
|
NA |
7.3.3(Emission) |
- |
0 |
|
NA |
7.2.3(Dielectric properties) |
- |
0 |
|
NA |
8.1.5(Special tests) |
- |
0 |
|
NA |
8.2.1.1(Test of resistance to abnormal heat and fire) |
- |
0 |
|
NA |
8.2.1.1.1(Glow-wire test) |
- |
0 |
|
NA |
8.2.1.1.2(Flammability, hot wire ignition and arc ignition tests (on materials)) |
- |
0 |
|
NA |
8.2.3(Enclosures for equipment) |
- |
0 |
|
NA |
8.2.4(Mechanical and electrical properties of terminals) |
- |
15220 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoated is excluding GST) |
8.2.4.2(Tests of mechanical strength of terminals) |
- |
15220 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoated is excluding GST) |
8.2.4.3(Testing for damage to and accidental loosening of conductors (flexion test)) |
- |
15220 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoated is excluding GST) |
8.2.4.4(Pull-out test) |
- |
15220 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoated is excluding GST) |
8.2.4.5(Test for insertability of unprepared round copper conductors having the maximum cross-section) |
- |
15220 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoated is excluding GST) |
8.2.5(Verification of actuating force (or moment)) |
- |
1880 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoated is excluding GST) |
8.2.6(Verification of limitation of rotation (of a rotary switch)) |
- |
1880 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoated is excluding GST) |
8.2.7(Conduit pull-out test, torque test, and bending test with metallic conduits) |
- |
0 |
|
NA |
8.3.3.3(Temperature rise) |
- |
10070 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoated is excluding GST) |
8.3.3.4(Dielectric properties) |
- |
51340 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoated is excluding GST) |
8.3.3.2(Operating limits of contactor relays) |
- |
55700 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoated is excluding GST) |
8.3.3.5(Making and breaking capacities) |
- |
101720 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoated is excluding GST) |
8.3.3.5.2(Test circuits and connections) |
- |
101720 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoated is excluding GST) |
8.3.4.3(Test circuit and test quantities) |
- |
82950 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoated is excluding GST) |
8.3.4.2(Performance under conditional short-circuit current : Test procedure) |
- |
82950 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoated is excluding GST) |
8.3.4.1(General conditions for short-circuit tests) |
- |
82950 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoated is excluding GST) |
8.3.4.4 b)(Condition of the switching element after the test) |
- |
82950 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoated is excluding GST) |
8.3.4.4 a)(Condition of the switching element after the test) |
- |
82950 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoated is excluding GST) |
8.4.2.4(Surges) |
- |
0 |
|
NA |
8.3.1(Degree of protection of enclosed control circuit devices) |
- |
0 |
|
NA |
C.3(Electrical durability) |
- |
0 |
|
NA |
C.2(Mechanical durability) |
- |
0 |
|
NA |
C.1.2(Observation) |
- |
0 |
|
NA |
F 8.1.2.6("Dielectric test
after stresses") |
- |
0 |
|
NA |
F 8.1.2.4(Impact test) |
- |
0 |
|
NA |
F.8.1.2.3("Rapid change of temperature
test") |
- |
0 |
|
NA |
F.8.1.2.5(Damp heat, cyclic) |
- |
0 |
|
NA |
F.8.1.2.4(Impact test) |
- |
0 |
|
NA |
F.8.1.2.1(Dielectric tests in new conditions) |
- |
0 |
|
NA |
G.8.2.5(Bend test) |
- |
0 |
|
NA |
G.8.2.4(Push test) |
- |
0 |
|
NA |
G.8.2.3(Torque test) |
- |
0 |
|
NA |
G.8.2.2(Pull-out test) |
- |
0 |
|
NA |
H.8.7("Verification of
electromagnetic
compatibility") |
- |
0 |
|
NA |
H.8.6("Performance under short circuit current
conditions") |
- |
0 |
|
NA |
H.8.5("Making and
breaking
capacities") |
- |
0 |
|
NA |
H.8.4(OFF-state current) |
- |
0 |
|
NA |
H.8.2(Voltage drop test) |
- |
0 |
|
NA |
J.8.5("Degree of
protection for
indicating towers") |
- |
0 |
|
NA |
J.8.4.3(Indirect support mounting) |
- |
0 |
|
NA |
J.8.4.2.3(Vibration) |
- |
0 |
|
NA |
J.8.4.2.2(Shock) |
- |
0 |
|
NA |
J.8.3.4("Short Circuit test
(on built-in
transformers, if
any)") |
- |
0 |
|
NA |
J.8.3.3.3(Temp-rise tests) |
- |
0 |
|
NA |
J.8.3.3.4.3("Dielectric test
(indicator lights
with built-in
transformers)") |
- |
0 |
|
NA |
J.8.3.3.4(Dielectric test) |
- |
0 |
|
NA |
J.7.1.12(Indicator lights with built-in transformers) |
- |
0 |
|
NA |
J.7("Constructional
requirements") |
- |
0 |
|
NA |
K 8.3.4("Performance under
conditional shortcircuit current") |
- |
0 |
|
NA |
K 8.3.7(Verification of robustness of the actuating system) |
- |
0 |
|
NA |
K 8.3.5(Verification of mechanical operation of position switches at limits of temperature) |
- |
0 |
|
NA |
K.8.3.6(Verification of direct opening action) |
- |
0 |
|
NA |
L.8.4(Special test for mechanically linked contact elements) |
- |
0 |
|
NA |
N.3(Method based on durability test results) |
- |
0 |
|
NA |
L.8.4(Special test for mechanically linked contact elements) |
- |
0 |
|
NA |
K.8.3.6(Verification of direct opening action) |
- |
0 |
|
NA |
5.2.1(" Marking : General
") |
- |
0 |
|
NA |
K 8.3.5(Verification of mechanical operation of position switches at limits of temperature) |
- |
0 |
|
NA |
K 8.3.7(Verification of robustness of the actuating system) |
- |
0 |
|
NA |
K 8.3.4("Performance under
conditional shortcircuit current") |
- |
0 |
|
NA |
5.2.2(Terminal identification and marking) |
- |
0 |
|
NA |
J.7("Constructional
requirements") |
- |
0 |
|
NA |
5.2.3(Functional markings) |
- |
0 |
|
NA |
J.7.1.12(Indicator lights with built-in transformers) |
- |
0 |
|
NA |
J.8.3.3.4(Dielectric test) |
- |
0 |
|
NA |
5.2.4(Emergency stop) |
- |
0 |
|
NA |
J.8.3.3.4.3("Dielectric test
(indicator lights
with built-in
transformers)") |
- |
0 |
|
NA |
J.8.3.3.3(Temp-rise tests) |
- |
0 |
|
NA |
J.8.3.4("Short Circuit test
(on built-in
transformers, if
any)") |
- |
0 |
|
NA |
5.2.5(Operating diagram) |
- |
0 |
|
NA |
J.8.4.2.2(Shock) |
- |
0 |
|
NA |
5.2.5.1(Position indication) |
- |
0 |
|
NA |
J.8.4.2.3(Vibration) |
- |
0 |
|
NA |
J.8.4.3(Indirect support mounting) |
- |
0 |
|
NA |
5.2.5.2(Terminal markings for operating diagrams) |
- |
0 |
|
NA |
J.8.5("Degree of
protection for
indicating towers") |
- |
0 |
|
NA |
5.2.6(Time delay markings) |
- |
0 |
|
NA |
H.8.2(Voltage drop test) |
- |
0 |
|
NA |
5.3(Instructions for installation, operation and maintenance) |
- |
0 |
|
NA |
H.8.4(OFF-state current) |
- |
0 |
|
NA |
H.8.5("Making and
breaking
capacities") |
- |
0 |
|
NA |
7.1.2.2(Glow-wire testing) |
- |
0 |
|
NA |
H.8.6("Performance under short circuit current
conditions") |
- |
0 |
|
NA |
7.1.3(Current-carrying parts and their connections) |
- |
0 |
|
NA |
H.8.7("Verification of
electromagnetic
compatibility") |
- |
0 |
|
NA |
G.8.2.2(Pull-out test) |
- |
0 |
|
NA |
7.1.4 of IEC 60947-1:2007 (Sequence 6)(Measurement of Clearances and creepage distances) |
- |
0 |
|
NA |
G.8.2.3(Torque test) |
- |
0 |
|
NA |
7.2.4.1(Making and breaking capacities) |
- |
0 |
|
NA |
7.2.4.1(Making and breaking capacities) |
- |
0 |
|
NA |
G.8.2.4(Push test) |
- |
0 |
|
NA |
G.8.2.5(Bend test) |
- |
0 |
|
NA |
F.8.1.2.1(Dielectric tests in new conditions) |
- |
0 |
|
NA |
7.2.4.3(Durability) |
- |
0 |
|
NA |
F.8.1.2.4(Impact test) |
- |
0 |
|
NA |
7.3.2.4(Electrostatic discharges) |
- |
0 |
|
NA |
F.8.1.2.5(Damp heat, cyclic) |
- |
0 |
|
NA |
F.8.1.2.3("Rapid change of temperature
test") |
- |
0 |
|
NA |
7.3.2.6(Electrical fast transients/bursts) |
- |
0 |
|
NA |
F 8.1.2.4(Impact test) |
- |
0 |
|
NA |
F 8.1.2.6("Dielectric test
after stresses") |
- |
0 |
|
NA |
C.1.2(Observation) |
- |
0 |
|
NA |
7.3.2.7(Surges) |
- |
0 |
|
NA |
C.2(Mechanical durability) |
- |
0 |
|
NA |
7.3.2.8(Conducted disturbances induced by radio-frequency fields) |
- |
0 |
|
NA |
C.3(Electrical durability) |
- |
0 |
|
NA |
7.3.2.9(Power-frequency magnetic fields) |
- |
0 |
|
NA |
Annex C of IEC 60947-1:2007 (Sequence 5)(Degree of protection of enclosed control circuit devices) |
- |
0 |
|
NA |
8.4.2.4(Surges) |
- |
0 |
|
NA |
7.3.2.10(Voltage dips and interruptions) |
- |
0 |
|
NA |
8.3.4.4 a)(Condition of the switching element after the test) |
- |
0 |
|
NA |
8.3.4.4 b)(Condition of the switching element after the test) |
- |
0 |
|
NA |
7.3.2.11(Harmonics in the supply) |
- |
0 |
|
NA |
8.3.4.1(General conditions for short-circuit tests) |
- |
0 |
|
NA |
8.3.4.2(Performance under conditional short-circuit current : Test procedure) |
- |
0 |
|
NA |
8.3.4.3(Test circuit and test quantities) |
- |
0 |
|
NA |
7.3.3(Emission) |
- |
0 |
|
NA |
8.3.3.5.2(Test circuits and connections) |
- |
0 |
|
NA |
8.3.3.5(Making and breaking capacities) |
- |
0 |
|
NA |
8.3.3.2(Operating limits of contactor relays) |
- |
0 |
|
NA |
7.2.3(Dielectric properties) |
- |
0 |
|
NA |
8.3.3.4(Dielectric properties) |
- |
0 |
|
NA |
8.3.3.3(Temperature rise) |
- |
0 |
|
NA |
8.1.5(Special tests) |
- |
0 |
|
NA |
8.2.7(Conduit pull-out test, torque test and bending test with metallic conduits) |
- |
0 |
|
NA |
8.2.6 (Sequence 6)(Verification of limitation of rotation (of a rotary switch)) |
- |
0 |
|
NA |
8.2.1.1(Test of resistance to abnormal heat and fire) |
- |
0 |
|
NA |
8.2.5 (Sequence 5)(Verification of actuating force (or moment)) |
- |
0 |
|
NA |
8.2.4.5(Test for insertability of unprepared round copper conductors having the maximum cross-section) |
- |
0 |
|
NA |
8.2.1.1.1(Glow-wire test) |
- |
0 |
|
NA |
8.2.4.4(Pull-out test) |
- |
0 |
|
NA |
8.2.4.3(Testing for damage to and accidental loosening of conductors (flexion test)) |
- |
0 |
|
NA |
8.2.1.1.2(Flammability, hot wire ignition and arc ignition tests (on materials)) |
- |
0 |
|
NA |
8.2.4.2(Tests of mechanical strength of terminals) |
- |
0 |
|
NA |
8.2.4(Mechanical and electrical properties of terminals) |
- |
0 |
|
NA |
8.2.3(Enclosures for equipment) |
- |
0 |
|
NA |
|
31 Dec, 2026 |
- - |
5 |
IS/IEC 60947 : Part 4 : Sec 1 (2018) |
Low-Voltage switchgear and controlgear : Part 4-1 Contactors and motor starters electromechanical contactors and motor-Starters |
- |
434170 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
8.1.2(Materials) |
- |
0 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
8.1.2.1(General materials requirements) |
- |
0 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
8.1.2.2(Glow wire testing) |
- |
0 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
8.1.2.3(Test based on flammability category) |
- |
0 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
8.1.3(Current-carrying parts and their connections) |
- |
0 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
8.1.4(Clearances and creepage distances) |
- |
0 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
8.1.5.1(Insulation) |
- |
0 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
8.1.5.2(Direction of movement) |
- |
0 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
8.1.5.3(Mounting) |
- |
0 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
8.1.5.4(Protection) |
- |
0 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
8.1.8(Terminals) |
- |
0 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
8.1.8.1(General) |
- |
0 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
8.1.8.2(Terminal identification and marking) |
- |
0 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
8.1.9(Additional requirements for equipment provided with a neutral pole) |
- |
0 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
8.1.10(Provisions for protective earthing) |
- |
0 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
8.1.11(Enclosures for equipment) |
- |
0 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
8.1.11.1(Design) |
- |
0 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
8.1.11.2(Insulation) |
- |
0 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
8.1.12(Degrees of protection of enclosed equipment) |
- |
0 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
8.1.13(Conduit pull-out, torque and bending with metallic conduits) |
- |
0 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
8.1.14(Limited energy source) |
- |
0 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
8.1.14.1(General) |
- |
0 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
8.1.14.2(Limited energy source with galvanic separation) |
- |
0 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
8.1.14.3(Limited energy source with current limiting impedance) |
- |
0 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
8.1.15(Stored charge energy circuit) |
- |
0 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
8.1.16(Fault and abnormal conditions) |
- |
0 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
8.1.17(Short-circuit and overload protection of ports) |
- |
0 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
8.2(Performance requirements) |
- |
0 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
8.2.1(Operating conditions) |
- |
0 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
8.2.1.1.1(General conditions) |
- |
0 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
8.2.1.2(Limits of operation of contactors and power-operated starters) |
- |
0 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
8.2.1.3(Limits of operation of under-voltage relays and releases) |
- |
0 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
8.2.1.4(Limits of operation of shunt-coil operated releases (shunt trip)) |
- |
0 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
8.2.1.5(Limits of operation of current sensing relays and releases) |
- |
0 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
8.2.1.5.1(Limits of operation of time-delay overload relays when all poles are energized) |
- |
0 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
8.2.1.5.1.1(General tripping requirements of overload relays) |
- |
0 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
8.2.1.5.1.2(Thermal memory test verification) |
- |
0 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
8.2.1.5.2(Limits of operation of three-pole time-delay overload relays energized on two poles) |
- |
0 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
8.2.1.5.3(Limits of operation of instantaneous magnetic overload relays) |
- |
0 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
8.2.1.5.4(Limits of operation of under-current relays and releases for automatic change over) |
- |
0 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
8.2.1.5.4.1(Limits of operation of under-current relays) |
- |
0 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
8.2.1.5.4.2(Limits of operation of automatic change over by under-current relays) |
- |
0 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
8.2.2(Temperature-rise) |
- |
0 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
8.2.2.3(Accessible parts) |
- |
0 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
8.2.2.4(Ambient air temperature) |
- |
0 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
8.2.2.5(Main circuit) |
- |
0 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
8.2.2.6(Control circuits) |
- |
0 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
8.2.2.7.1(Uninterrupted and eight-hour duty windings) |
- |
0 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
8.2.3(Dielectric properties) |
- |
0 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
8.2.3.2(Voltage limiting components between circuits) |
- |
0 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
8.2.4.3.1(Mechanical durability) |
- |
0 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
8.2.4.3.2(Electrical durability) |
- |
0 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
8.2.4.4(Overload current withstand capability of contactors) |
- |
0 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
8.2.4.5(Coil power consumption) |
- |
0 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
8.2.4.6(Pole impedance) |
- |
0 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
8.2.4.7(Ability of a MPSD to make and break under short-circuit conditions) |
- |
0 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
8.2.5.1(Performance under short-circuit conditions) |
- |
0 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
8.2.5.3(Co-ordination test between AC-3e rated starter and associated SCPD) |
- |
0 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
8.2.5.4(Co-ordination between a MPSD and another short-circuit protective device) |
- |
0 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
8.3(Electromagnetic compatibility (EMC)) |
- |
0 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
8.3.2(Immunity) |
- |
0 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
8.3.3(Emission) |
- |
0 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
9.1.5.2(Environment tests) |
- |
0 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
9.2.2(Electrical performance of screwless-type clamping units) |
- |
0 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
9.2.3(Ageing test for screwless-type clamping unit) |
- |
0 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
9.2.4(Limited energy source test) |
- |
0 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
9.2.5(Breakdown of components) |
- |
0 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
9.2.5.2(Breakdown of components test) |
- |
0 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
9.3.3.2(Operating limits) |
- |
59690 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
9.3.3.2.1.2(Coil power consumption) |
- |
59690 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
9.3.3.2.1.3(Pole impedance) |
- |
59690 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
9.3.3.2.2(Relays and releases) |
- |
59690 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
9.3.3.3.1(Ambient air temperature) |
- |
10070 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
9.3.3.3.2(Measurement of the temperature of parts) |
- |
10070 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
9.3.3.3.3(Temperature-rise of a part) |
- |
10070 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
9.3.3.3.4(Temperature-rise of the main circuit) |
- |
10070 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
9.3.3.3.5(Temperature-rise of control circuits) |
- |
10070 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
9.3.3.3.6(Temperature-rise of coils and electromagnets) |
- |
10070 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
9.3.3.3.7(Temperature-rise of auxiliary circuits) |
- |
10070 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
9.3.3.3.8(Temperature-rise of starting resistors for rheostatic rotor starters) |
- |
10070 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
9.3.3.6(Operational performance capability) |
- |
25370 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
9.3.4.2.2(prospective current) |
- |
82950 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
9.3.4.2.3(Test at the rated conditional short-circuit current Iq) |
- |
82950 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
9.3.5(Overload current withstand capability of contactors) |
- |
82950 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
9.3.6.2(Operation and operating limits) |
- |
0 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
9.3.6.3(Dielectric tests) |
- |
0 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
9.3.6.4(Mechanical operation tests of a MPSD) |
- |
0 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
9.4.2(Immunity) |
- |
0 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
9.4.2.2(Electrostatic discharge) |
- |
0 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
9.4.2.3(Radiated radio-frequency electromagnetic field) |
- |
0 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
9.4.2.4(Conducted disturbances induced by radio-frequency fields) |
- |
0 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
9.4.2.5(Electrical fast transient/bursts) |
- |
0 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
9.4.2.6(Surges) |
- |
0 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
9.4.2.7(Power frequency magnetic field) |
- |
0 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
9.4.2.8(Voltage dips and short-time interruptions) |
- |
0 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
9.4.2.9(Harmonics in the supply) |
- |
0 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
9.4.3(Emission) |
- |
0 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
F.7.2(Tests on products in a new condition) |
- |
0 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
F.7.3(Test after conventional operational performance) |
- |
0 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
H.3(Limits of operation of control functions) |
- |
0 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
H.4(Test of the control functions) |
- |
0 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
M.8.3(Electromagnetic compatibility (EMC)) |
- |
0 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
M.9.4(Thermal cycling test) |
- |
0 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
M.9.5(Climatic test) |
- |
0 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
M.9.7(Critical load current test) |
- |
0 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
8.2.4 of IEC 60947-1:2007 (Sequence 5)(Verification of Mechanical properties of terminals) |
- |
0 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
Annex C of IEC 60947-1:2007 (Sequence 5)(Verification of Degree of protection of enclosed contactors and starters) |
- |
0 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
M.9.11(Clearance and creepage distances) |
- |
0 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
N.3.2(Touch current measurement) |
- |
0 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
P.2.3(Verification of operational performance capability) |
- |
0 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
P.2.4.2(Test voltage) |
- |
0 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
P.2.4.3(Application of the test voltage) |
- |
0 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
P.4(Test of MPSD for IT system) |
- |
0 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
Q.5.3(Selectivity determined by test) |
- |
0 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
|
31 Dec, 2026 |
- - |
6 |
IS/IEC 60947 : PART 3 (2020) |
Low-Voltage Switchgear and Controlgear: Part 3 Switches Disconnectors Switch-Disconnectors and Fuse-Combination Units |
- |
870540 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
9.3.4.2(Temperature-rise) |
- |
10070 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
9.3.4.3(Test of dielectric properties) |
- |
51340 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
9.3.4.4(Making and breaking capacities) |
- |
78400 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
9.3.4.5(Dielectric verification) |
- |
14250 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
9.3.4.6(Leakage current) |
- |
3800 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
9.3.4.7(Temperature-rise verification) |
- |
10070 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
9.3.5.2(Operational performance test) |
- |
25370 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
9.3.5.3(Dielectric verification) |
- |
14250 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
9.3.5.4(Leakage current) |
- |
3800 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
9.3.5.5(Temperature-rise verification) |
- |
10070 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
9.3.6.2(Short-time withstand current test) |
- |
82950 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
9.3.6.3(Short-circuit making capacity test) |
- |
82950 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
9.3.6.4(Dielectric verification) |
- |
14250 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
9.3.6.5(Leakage current) |
- |
3800 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
9.3.6.6(Temperature-rise verification) |
- |
10070 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
9.3.7.2(Circuit-breaker protected short-circuit withstand) |
- |
82950 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
9.3.7.4(Dielectric verification) |
- |
14250 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
9.3.7.5(Leakage current) |
- |
3800 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
9.3.7.6(Temperature-rise verification) |
- |
10070 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
9.3.8.2(Overload test) |
- |
82950 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
9.3.8.3(Dielectric verification) |
- |
14250 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
9.3.8.4(Leakage current) |
- |
3800 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
9.3.8.5(Temperature-rise verification) |
- |
10070 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
3.1(General) |
- |
0 |
|
NA |
4(Classification) |
- |
0 |
|
NA |
5.3.2(Rated voltages) |
- |
0 |
|
NA |
5.3.2.1(Rated operational voltage) |
- |
0 |
|
NA |
5.3.2.2(Rated insulation voltage) |
- |
0 |
|
NA |
5.3.2.3(Rated impulse withstand voltage) |
- |
0 |
|
NA |
5.3.3(Currents) |
- |
0 |
|
NA |
5.3.3.2(Conventional free air thermal current) |
- |
0 |
|
NA |
5.3.3.3(Conventional enclosed thermal current) |
- |
0 |
|
NA |
5.3.3.4(Rated operational current (Ie) or rated operational power) |
- |
0 |
|
NA |
5.3.3.5(Rated uninterrupted current) |
- |
0 |
|
NA |
5.3.4(Rated frequency) |
- |
0 |
|
NA |
5.3.5(Rated duty) |
- |
0 |
|
NA |
5.3.5.2(Eight-hour duty) |
- |
0 |
|
NA |
5.3.5.3(Uninterrupted duty) |
- |
0 |
|
NA |
5.3.6.1(Ability to withstand motor switching overload currents) |
- |
0 |
|
NA |
5.3.6.2(Rated making capacity) |
- |
0 |
|
NA |
5.3.6.3(Rated breaking capacity) |
- |
0 |
|
NA |
5.3.7(Short-circuit characteristics) |
- |
0 |
|
NA |
5.3.7.1(Rated short-time withstand current) |
- |
0 |
|
NA |
5.3.7.2(Rated short-circuit making capacity) |
- |
0 |
|
NA |
5.3.7.4(Rated conditional short-circuit current) |
- |
0 |
|
NA |
5.4(Utilization category) |
- |
0 |
|
NA |
5.5(Control circuits) |
- |
0 |
|
NA |
5.6(Auxiliary circuits) |
- |
0 |
|
NA |
5.7(Relays and releases) |
- |
0 |
|
NA |
5.8(Co-ordination with short-circuit protective devices (SCPD)) |
- |
0 |
|
NA |
6.2.2(Marking) |
- |
0 |
|
NA |
6.3(Instructions for installation, operation and maintenance, decommissioning and dismantling) |
- |
0 |
|
NA |
7(Normal service, mounting and transport conditions) |
- |
0 |
|
NA |
8.1.1(General) |
- |
0 |
|
NA |
8.1.2.2(Glow wire testing) |
- |
0 |
|
NA |
8.1.7.1(General) |
- |
0 |
|
NA |
8.2.1(Operating conditions) |
- |
0 |
|
NA |
8.2.1.1(General) |
- |
0 |
|
NA |
8.2.1.2(Limits of operation of power operated equipment) |
- |
0 |
|
NA |
8.2.1.3(Limits of operation of under-voltage relays and releases) |
- |
0 |
|
NA |
8.2.1.4(Limits of operation of shunt releases) |
- |
0 |
|
NA |
8.2.2(Temperature-rise) |
- |
0 |
|
NA |
8.2.3(Dielectric properties) |
- |
0 |
|
NA |
8.2.3.2(Impulse withstand voltage) |
- |
0 |
|
NA |
8.2.3.3(Power-frequency or DC withstand voltage of the main, auxiliary and control circuits) |
- |
0 |
|
NA |
8.2.4(Ability to make and break under no-load, normal load and overload conditions) |
- |
0 |
|
NA |
8.2.4.1(Making and breaking capacities) |
- |
0 |
|
NA |
8.2.4.2(Operational performance) |
- |
0 |
|
NA |
8.2.4.3(Mechanical durability) |
- |
0 |
|
NA |
8.2.4.4(Electrical durability) |
- |
0 |
|
NA |
8.2.5(Ability to make, break or withstand short-circuit currents) |
- |
0 |
|
NA |
8.2.7(Additional performance requirements for equipment suitable for isolation) |
- |
0 |
|
NA |
8.2.8(Critical load current performance: DC equipment) |
- |
0 |
|
NA |
8.2.9(Overload requirements for equipment incorporating fuses) |
- |
0 |
|
NA |
9.1.3.2(Mechanical operation test) |
- |
0 |
|
NA |
9.1.3.2(Mechanical operation test) |
- |
0 |
|
NA |
9.1.3.3(Dielectric test) |
- |
0 |
|
NA |
9.1.4(Sampling tests) |
- |
0 |
|
NA |
9.1.5Special tests(Special tests) |
- |
0 |
|
NA |
9.2(Compliance with constructional requirements) |
- |
0 |
|
NA |
9.4(Electromagnetic compatibility tests) |
- |
0 |
|
NA |
9.5.2(Mechanical durability) |
- |
0 |
|
NA |
9.5.3(Electrical durability) |
- |
0 |
|
NA |
9.5.4(Damp heat, salt mist, vibration and shock) |
- |
0 |
|
NA |
D.7.1.1(Ambient air temperature) |
- |
0 |
|
NA |
D.8.1.4(Clearances and creepage distances) |
- |
0 |
|
NA |
D.8.1.12(Degrees of protection of enclosed equipment) |
- |
0 |
|
NA |
E.9.2(Current cycling test) |
- |
0 |
|
NA |
E.9.2.4(Temperature measurements) |
- |
0 |
|
NA |
E.9.3.1(Flexion test) |
- |
0 |
|
NA |
E.9.3.2(Pull-out test) |
- |
0 |
|
NA |
8.1.7.2(Additional constructional requirements) |
- |
0 |
|
NA |
8.1.9(Additional requirements for equipment provided with a neutral pol) |
- |
0 |
|
NA |
9.3.9.2(Determination of critical load current) |
- |
177590 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
9.3.9.3(Critical load current performance) |
- |
25370 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
9.3.3.6(DC test current ripple) |
- |
0 |
|
NA |
9.3.4.4.3(Characteristics of transient recovery voltage) |
- |
0 |
|
NA |
9.3.7.3(Fuse protected short-circuit withstand) |
- |
0 |
|
NA |
D.9.3.10(Thermal cycling test) |
- |
0 |
|
NA |
D.9.3.11(Climatic test) |
- |
0 |
|
NA |
D.9.3.12(Temperature-rise verification with solar effects – Outdoor units only) |
- |
0 |
|
NA |
9.3.4.8(Strength of actuator mechanism) |
- |
1880 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
9.4.2(Immunity) |
- |
0 |
|
NA |
9.4.3(Emission) |
- |
0 |
|
NA |
9.3.4.2(Temperature-rise) |
- |
10070 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
9.3.4.3(Test of dielectric properties) |
- |
51340 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
9.3.4.4(Making and breaking capacities) |
- |
78400 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
9.3.4.5(Dielectric verification) |
- |
14250 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
9.3.4.6(Leakage current) |
- |
3800 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
9.3.4.7(Temperature-rise verification) |
- |
10070 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
9.3.5.2(Operational performance test) |
- |
25370 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
9.3.5.3(Dielectric verification) |
- |
14250 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
9.3.5.4(Leakage current) |
- |
3800 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
9.3.5.5(Temperature-rise verification) |
- |
10070 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
9.3.6.2(Short-time withstand current test) |
- |
82950 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
9.3.6.3(Short-circuit making capacity test) |
- |
82950 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
9.3.6.4(Dielectric verification) |
- |
14250 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
9.3.6.5(Leakage current) |
- |
3800 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
9.3.6.6(Temperature-rise verification) |
- |
10070 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
9.3.7.2(Circuit-breaker protected short-circuit withstand) |
- |
82950 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
9.3.7.4(Dielectric verification) |
- |
14250 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
9.3.7.5(Leakage current) |
- |
3800 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
9.3.7.6(Temperature-rise verification) |
- |
10070 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
9.3.8.2(Overload test) |
- |
82950 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
9.3.8.3(Dielectric verification) |
- |
14250 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
9.3.8.4(Leakage current) |
- |
3800 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
9.3.8.5(Temperature-rise verification) |
- |
10070 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
3.1(General) |
- |
0 |
|
NA |
4(Classification) |
- |
0 |
|
NA |
5.3.2(Rated voltages) |
- |
0 |
|
NA |
5.3.2.1(Rated operational voltage) |
- |
0 |
|
NA |
5.3.2.2(Rated insulation voltage) |
- |
0 |
|
NA |
5.3.2.3(Rated impulse withstand voltage) |
- |
0 |
|
NA |
5.3.3(Currents) |
- |
0 |
|
NA |
5.3.3.2(Conventional free air thermal current) |
- |
0 |
|
NA |
5.3.3.3(Conventional enclosed thermal current) |
- |
0 |
|
NA |
5.3.3.4(Rated operational current (Ie) or rated operational power) |
- |
0 |
|
NA |
5.3.3.5(Rated uninterrupted current) |
- |
0 |
|
NA |
5.3.4(Rated frequency) |
- |
0 |
|
NA |
5.3.5(Rated duty) |
- |
0 |
|
NA |
5.3.5.2(Eight-hour duty) |
- |
0 |
|
NA |
5.3.5.3(Uninterrupted duty) |
- |
0 |
|
NA |
5.3.6.1(Ability to withstand motor switching overload currents) |
- |
0 |
|
NA |
5.3.6.2(Rated making capacity) |
- |
0 |
|
NA |
5.3.6.3(Rated breaking capacity) |
- |
0 |
|
NA |
5.3.7(Short-circuit characteristics) |
- |
0 |
|
NA |
5.3.7.1(Rated short-time withstand current) |
- |
0 |
|
NA |
5.3.7.2(Rated short-circuit making capacity) |
- |
0 |
|
NA |
5.3.7.4(Rated conditional short-circuit current) |
- |
0 |
|
NA |
5.4(Utilization category) |
- |
0 |
|
NA |
5.5(Control circuits) |
- |
0 |
|
NA |
5.6(Auxiliary circuits) |
- |
0 |
|
NA |
5.7(Relays and releases) |
- |
0 |
|
NA |
5.8(Co-ordination with short-circuit protective devices (SCPD)) |
- |
0 |
|
NA |
6.2.2(Marking) |
- |
0 |
|
NA |
6.3(Instructions for installation, operation and maintenance, decommissioning and dismantling) |
- |
0 |
|
NA |
7(Normal service, mounting and transport conditions) |
- |
0 |
|
NA |
8.1.1(General) |
- |
0 |
|
NA |
8.1.2.2(Glow wire testing) |
- |
0 |
|
NA |
8.1.7.1(General) |
- |
0 |
|
NA |
8.2.1(Operating conditions) |
- |
0 |
|
NA |
8.2.1.1(General) |
- |
0 |
|
NA |
8.2.1.2(Limits of operation of power operated equipment) |
- |
0 |
|
NA |
8.2.1.3(Limits of operation of under-voltage relays and releases) |
- |
0 |
|
NA |
8.2.1.4(Limits of operation of shunt releases) |
- |
0 |
|
NA |
8.2.2(Temperature-rise) |
- |
0 |
|
NA |
8.2.3(Dielectric properties) |
- |
0 |
|
NA |
8.2.3.2(Impulse withstand voltage) |
- |
0 |
|
NA |
8.2.3.3(Power-frequency or DC withstand voltage of the main, auxiliary and control circuits) |
- |
0 |
|
NA |
8.2.4(Ability to make and break under no-load, normal load and overload conditions) |
- |
0 |
|
NA |
8.2.4.1(Making and breaking capacities) |
- |
0 |
|
NA |
8.2.4.2(Operational performance) |
- |
0 |
|
NA |
8.2.4.3(Mechanical durability) |
- |
0 |
|
NA |
8.2.4.4(Electrical durability) |
- |
0 |
|
NA |
8.2.5(Ability to make, break or withstand short-circuit currents) |
- |
0 |
|
NA |
8.2.7(Additional performance requirements for equipment suitable for isolation) |
- |
0 |
|
NA |
8.2.8(Critical load current performance: DC equipment) |
- |
0 |
|
NA |
8.2.9(Overload requirements for equipment incorporating fuses) |
- |
0 |
|
NA |
9.1.3.2(Mechanical operation test) |
- |
0 |
|
NA |
9.1.3.2(Mechanical operation test) |
- |
0 |
|
NA |
9.1.3.3(Dielectric test) |
- |
0 |
|
NA |
9.1.4(Sampling tests) |
- |
0 |
|
NA |
9.1.5Special tests(Special tests) |
- |
0 |
|
NA |
9.2(Compliance with constructional requirements) |
- |
0 |
|
NA |
9.4(Electromagnetic compatibility tests) |
- |
0 |
|
NA |
9.5.2(Mechanical durability) |
- |
0 |
|
NA |
9.5.3(Electrical durability) |
- |
0 |
|
NA |
9.5.4(Damp heat, salt mist, vibration and shock) |
- |
0 |
|
NA |
D.7.1.1(Ambient air temperature) |
- |
0 |
|
NA |
D.8.1.4(Clearances and creepage distances) |
- |
0 |
|
NA |
D.8.1.12(Degrees of protection of enclosed equipment) |
- |
0 |
|
NA |
E.9.2(Current cycling test) |
- |
0 |
|
NA |
E.9.2.4(Temperature measurements) |
- |
0 |
|
NA |
E.9.3.1(Flexion test) |
- |
0 |
|
NA |
E.9.3.2(Pull-out test) |
- |
0 |
|
NA |
8.1.7.2(Additional constructional requirements) |
- |
0 |
|
NA |
8.1.9(Additional requirements for equipment provided with a neutral pol) |
- |
0 |
|
NA |
9.3.9.2(Determination of critical load current) |
- |
0 |
|
NA |
9.3.9.3(Critical load current performance) |
- |
0 |
|
NA |
9.3.3.6(DC test current ripple) |
- |
0 |
|
NA |
9.3.4.4.3(Characteristics of transient recovery voltage) |
- |
0 |
|
NA |
9.3.7.3(Fuse protected short-circuit withstand) |
- |
82950 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice (Rate quoted is excluding GST) |
D.9.3.10(Thermal cycling test) |
- |
0 |
|
NA |
D.9.3.11(Climatic test) |
- |
0 |
|
NA |
D.9.3.12(Temperature-rise verification with solar effects – Outdoor units only) |
- |
0 |
|
NA |
9.3.4.8(Strength of actuator mechanism) |
- |
0 |
|
NA |
9.4.2(Immunity) |
- |
0 |
|
NA |
9.4.3(Emission) |
- |
0 |
|
NA |
|
31 Dec, 2026 |
- - |
7 |
IS 1709 (1984) |
Specification for capacitors or electric fan motors (First Revision) |
- |
407450 View breakup
Rs.374450/- for Routine & Type tests; Rs.14650/- for Routine tests; Rs.359800/- for Type tests
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
Cl. 7.2(The capcitors shall be visually examined for finish and marking) |
- |
1950 |
|
Actual test charges will be communicated via proforma Invoice based on name plate details of capacitor and number of test sample. Mentioned test charge is for 26 nos. of capacitors. |
Cl. 7.3.1(Insualtion Resistance between terminal and container) |
- |
3870 |
|
Actual test charges will be communicated via proforma Invoice based on name plate details of capacitor and number of test sample. Mentioned test charge is for 26 nos. of capacitors. |
Cl. 7.3.2(Insulation Resistance between terminals) |
- |
3870 |
|
Actual test charges will be communicated via proforma Invoice based on name plate details of capacitor and number of test sample. Mentioned test charge is for 26 nos. of capacitors. |
Cl. 7.4.1(Capacitors shall be subjected to an ac voltage test as specified in Table 2.) |
- |
3870 |
|
Actual test charges will be communicated via proforma Invoice based on name plate details of capacitor and number of test sample. Mentioned test charge is for 26 nos. of capacitors. |
Cl. 7.4.2(Capacitors shall be subjected for 10sec to a test between terminals and metal foil wrapped tightly around the surface of the container with s sinusoidal test voltages.
Test Voltage:2000Vrms for 10sec
During the test, no dielectric breakdown or flashover shall occur.
) |
- |
3000 |
|
Actual test charges will be communicated via proforma Invoice based on name plate details of capacitor and number of test sample. Mentioned test charge is for 26 nos. of capacitors. |
Cl. 7.7(A weight of 2kg shall be suspended freely from each one of them in turn for a period of 10 sec. There shall be no damage to the capacitor or termination after this loading.) |
- |
3280 |
|
Actual test charges will be communicated via proforma Invoice based on name plate details of capacitor and number of test sample. Mentioned test charge is for 26 nos. of capacitors. |
Cl 7.8(Each termination shall withstand two consecutive bends as specified without damage to the capacitors) |
- |
3280 |
|
Actual test charges will be communicated via proforma Invoice based on name plate details of capacitor and number of test sample. Mentioned test charge is for 26 nos. of capacitors. |
Cl 7.9(Soldering tags shall withstand two consecutive cycles of bending as specified without damage to the capacitors.) |
- |
3280 |
|
Actual test charges will be communicated via proforma Invoice based on name plate details of capacitor and number of test sample. Mentioned test charge is for 26 nos. of capacitors. |
Cl. 7.10(There shall be no damage to the capacitors when the torque is applied to the nuts and screws of threaded terminations:) |
- |
13920 |
|
Actual test charges will be communicated via proforma Invoice based on name plate details of capacitor and number of test sample. Mentioned test charge is for 26 nos. of capacitors. |
Cl. 7.11(The capacitor shall be not suffer any damage when the specified soldering iron is applied to the termination of 15 sec.) |
- |
3280 |
|
Actual test charges will be communicated via proforma Invoice based on name plate details of capacitor and number of test sample. Mentioned test charge is for 26 nos. of capacitors. |
Cl. 7.12(Unenergized capacitor units kept in a position most likely to reveal leakage and heated throughout so that all parts of the container reach the temperature 5ºC higher the maximum operating temperature value. Total heating and cooling cycle time shall be 8 hours. After the sealing test No leakage shall occure.) |
- |
1400 |
|
Actual test charges will be communicated via proforma Invoice based on name plate details of capacitor and number of test sample. Mentioned test charge is for 26 nos. of capacitors. |
Cl. 7.13(Capacitance) |
- |
10340 |
|
Actual test charges will be communicated via proforma Invoice based on name plate details of capacitor and number of test sample. Mentioned test charge is for 26 nos. of capacitors. |
Cl. 7.16(The capacitors are mounted in a air circulated test chamber as specified and capacitors are energized at test voltage 1.25UN for 500hr Continuously at 50Hz. During the test no permanent breskdown,intertuption or flashover shall occure.) |
- |
50720 |
|
Actual test charges will be communicated via proforma Invoice based on name plate details of capacitor and number of test sample. Mentioned test charge is for 26 nos. of capacitors. |
Cl.7.6(Tangent of Loss Angle measured at rated frequency and rated voltage. The maximum value of the tangent of loss angle for Self-healing MPP Type.) |
- |
5170 |
|
Actual test charges will be communicated via proforma Invoice based on name plate details of capacitor and number of test sample. Mentioned test charge is for 26 nos. of capacitors. |
Cl. 7.15(After the test Capcitance variation) |
- |
87710 |
|
Actual test charges will be communicated via proforma Invoice based on name plate details of capacitor and number of test sample. Mentioned test charge is for 26 nos. of capacitors. |
Cl. 7.14.1(Before test capacitance shall be measured. Th capacitor shall be subjected for 10 seconds to an ac voltage of 1.5 ti9mes the rated voltage. If rewer than five breakdown occure during the time, The voltage shall be increased slowly until five breakdown occured until voltage occured 3.5 times the rated voltage. voltage reduced to 0.8 times, no breakdown is permitted after decreased of voltage.) |
- |
31020 |
|
Actual test charges will be communicated via proforma Invoice based on name plate details of capacitor and number of test sample. Mentioned test charge is for 26 nos. of capacitors. |
Cl. 7.14.2(If only one or no breakdown has occurred since begning of the test when voltage has reached 3.5 times the rated voltage, the test shall be repeated on aonther identical capacitor.) |
- |
31020 |
|
Actual test charges will be communicated via proforma Invoice based on name plate details of capacitor and number of test sample. Mentioned test charge is for 26 nos. of capacitors. |
Cl.7.14.3(Before and after the test,the cpacitance shall be measured, A chage not greater than 0.3 %in its value shall be allowec.) |
- |
31020 |
|
Actual test charges will be communicated via proforma Invoice based on name plate details of capacitor and number of test sample. Mentioned test charge is for 26 nos. of capacitors. |
Cl. 7.17(The capacitor sample was mounted in a circulating air oven maintained at a temperature 10ºC above the maximum operating temperature as specified without energizing. Capacitor energized at 1.4 times rated voltage by applying test voltage between terminal for 1 h, then 1.6 times rated voltage for 1 h, then 1.8 times rated voltage for 1 h, then 2.0 times rated voltage for 1 h then switch off. Then 2.0 times the rated voltage for an 8 h period each in four cycles of 24h. After completion of the test, the capacito is consider to have passe destruction test if a) Current through it has not been interruped by the delayed action test circuit fuse or by any internal fuse. b) The currnt through it has been interrputed without any harmful effect occurring. c)Three delayed action test ciucuit fuse have cleared without any hamfu effect occurring.d) The endurance is entact at the end of test e) The test voltage between terminals and container is passed at the end of the test.) |
- |
172320 |
|
Actual test charges will be communicated via proforma Invoice based on name plate details of capacitor and number of test sample. Mentioned test charge is for 26 nos. of capacitors. |
Cl. 7.5(Capacitance measured at rated frequency and rated voltage.) |
- |
5170 |
|
Actual test charges will be communicated via proforma Invoice based on name plate details of capacitor and number of test sample. Mentioned test charge is for 26 nos. of capacitors. |
|
31 Dec, 2026 |
- - |
8 |
IS 13585 : Part 1 (2012) |
Shunt power capacitors of the non - Self - Healing type for ac systems having a rated voltage up to and including 1 000 v: Part 1 general - Performance, testing and rating - Safety requirements - Guide for installation and operation (First Revision) |
- |
757370 View breakup
Routine tests for all varieties: Rs.20360/-; Type tests: Rs.324720/- for 1 - 4 kVAR, Rs.341510/- for 5 - 10 kVAR, Rs.348100/- for 11 - 30 kVAR, Rs.368190/- for 31 - 50 kVAR, Rs.773730/- for 51 - 100 kVAR;
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
7.1(Capacitance measurement and output calculation : Measuring procedure
) |
- |
4320 |
|
As test charges are dependent on kvar rating and type of capacitor. Hence actual test charges will be communicated via proforma invoice based on nameplate details and testing requirements. Mention test charge is for 100kvar. |
7.2( Capacitance tolerances) |
- |
4320 |
|
As test charges are dependent on kvar rating and type of capacitor. Hence actual test charges will be communicated via proforma invoice based on nameplate details and testing requirements. Mention test charge is for 100kvar. |
8.1(Measurement of the tangent of the loss angle (tan S) of the capacitor) |
- |
4320 |
|
As test charges are dependent on kvar rating and type of capacitor. Hence actual test charges will be communicated via proforma invoice based on nameplate details and testing requirements. Mention test charge is for 100kvar. |
8.2(Measurement of the tangent of the loss angle (tan S) of the capacitor : Loss requirements) |
- |
4320 |
|
As test charges are dependent on kvar rating and type of capacitor. Hence actual test charges will be communicated via proforma invoice based on nameplate details and testing requirements.Mention test charge is for 100kvar. |
9.1(Voltage test between terminals (routine test)) |
- |
1280 |
|
As test charges are dependent on kvar rating and type of capacitor. Hence actual test charges will be communicated via proforma invoice based on nameplate details and testing requirements.Mention test charge is for 100kvar. |
9.2(Voltage test between terminals (type test)) |
- |
1280 |
|
As test charges are dependent on kvar rating and type of capacitor. Hence actual test charges will be communicated via proforma invoice based on nameplate details and testing requirements.Mention test charge is for 100kvar. |
10.1(Voltage test between terminals and containe (Routine test)) |
- |
1000 |
|
As test charges are dependent on kvar rating and type of capacitor. Hence actual test charges will be communicated via proforma invoice based on nameplate details and testing requirements.Mention test charge is for 100kvar. |
10.2(Voltage test between terminals and container (type test)) |
- |
1000 |
|
As test charges are dependent on kvar rating and type of capacitor. Hence actual test charges will be communicated via proforma invoice based on nameplate details and testing requirements.Mention test charge is for 100kvar. |
11(Test of internal discharge device) |
- |
820 |
|
As test charges are dependent on kvar rating and type of capacitor. Hence actual test charges will be communicated via proforma invoice based on nameplate details and testing requirements.Mention test charge is for 100kvar. |
12(Sealing test) |
- |
1560 |
|
As test charges are dependent on kvar rating and type of capacitor. Hence actual test charges will be communicated via proforma invoice based on nameplate details and testing requirements.Mention test charge is for 100kvar. |
13(Thermal stability test) |
- |
125710 |
|
As test charges are dependent on kvar rating and type of capacitor. Hence actual test charges will be communicated via proforma invoice based on nameplate details and testing requirements. Mention test charge is for 100kvar. |
14(Measurement of the tangent of the loss angle (tan 8) of the capacitor at elevated temperature) |
- |
6800 |
|
As test charges are dependent on kvar rating and type of capacitor. Hence actual test charges will be communicated via proforma invoice based on nameplate details and testing requirements. Mention test charge is for 100kvar. |
15(Lightning impulse voltage test between terminals and container () |
- |
25920 |
|
As test charges are dependent on kvar rating and type of capacitor. Hence actual test charges will be communicated via proforma invoice based on nameplate details and testing requirements. Mention test charge is for 100kvar. |
16(Discharge test) |
- |
21600 |
|
As test charges are dependent on kvar rating and type of capacitor. Hence actual test charges will be communicated via proforma invoice based on nameplate details and testing requirements. Mention test charge is for 100kvar. |
17(Ageing test) |
- |
278990 |
|
As test charges are dependent on kvar rating and type of capacitor. Hence actual test charges will be communicated via proforma invoice based on nameplate details and testing requirements. Mention test charge is for 100kvar. |
6.2 j)(Disconnecting test on internal fuses) |
- |
140590 |
|
As test charges are dependent on kvar rating and type of capacitor. Hence actual test charges will be communicated via proforma invoice based on nameplate details and testing requirements. Mention test charge is for 100kvar. |
19(Destruction test) |
- |
133540 |
|
As test charges are dependent on kvar rating and type of capacitor. Hence actual test charges will be communicated via proforma invoice based on nameplate details and testing requirements. Mention test charge is for 100kvar. |
|
31 Dec, 2026 |
- - |
9 |
IS 15884 (2010) |
Alternating current direct connected static prepayment meters for active energy (Class 1 And 2) - Specification |
Type Test |
1138210.00 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
4(General Requirements) |
- |
1110 |
|
Type Test Charges for 1 Phase meter is = Rs.11,18,530/- and
Type Test Charges for 3 Phase meter is = Rs.11,30,210/-
Proforma Invoice issued at the Time of Testing |
4.1.1(By Inspection) |
- |
1110 |
|
Proforma Invoice issued at the Time of Testing |
4.1.2(By Inspection) |
- |
1110 |
|
Proforma Invoice issued at the Time of Testing |
4.1.3(By Inspection) |
- |
1110 |
|
Proforma Invoice issued at the Time of Testing |
4.1.4(By Inspection) |
- |
1110 |
|
Proforma Invoice issued at the Time of Testing |
4.2(Mechanical Requirements) |
- |
1110 |
|
Proforma Invoice issued at the Time of Testing |
4.2.1(By Inspection) |
- |
1110 |
|
Proforma Invoice issued at the Time of Testing |
4.2.1(By Inspection) |
- |
1110 |
|
Proforma Invoice issued at the Time of Testing |
4.2.1(By Inspection) |
- |
1110 |
|
Proforma Invoice issued at the Time of Testing |
4.2.1(By Inspection) |
- |
1110 |
|
Proforma Invoice issued at the Time of Testing |
4.2.1(By Inspection) |
- |
1110 |
|
Proforma Invoice issued at the Time of Testing |
4.2.1(By Inspection) |
- |
1110 |
|
Proforma Invoice issued at the Time of Testing |
4.2.1(By Inspection) |
- |
1110 |
|
Proforma Invoice issued at the Time of Testing |
4.2.1(By Inspection) |
- |
1110 |
|
Proforma Invoice issued at the Time of Testing |
4.2.1(By Inspection) |
- |
1110 |
|
Proforma Invoice issued at the Time of Testing |
4.2.2(By Inspection) |
- |
1110 |
|
Proforma Invoice issued at the Time of Testing |
4.2.2(By Inspection) |
- |
1110 |
|
Proforma Invoice issued at the Time of Testing |
4.2.2(By Inspection) |
- |
1110 |
|
Proforma Invoice issued at the Time of Testing |
4.2.2(By Inspection) |
- |
1110 |
|
Proforma Invoice issued at the Time of Testing |
4.2.2(By Inspection) |
- |
1110 |
|
Proforma Invoice issued at the Time of Testing |
4.2.3(By Inspection) |
- |
1110 |
|
Proforma Invoice issued at the Time of Testing |
4.2.4(IS 13360 (Part 6/Sec 17) for a temperature of 135°C and a pressure of 1.8 MPa (Method A).) |
- |
5500 |
|
Proforma Invoice issued at the Time of Testing |
4.2.4(By Inspection) |
- |
1110 |
|
Proforma Invoice issued at the Time of Testing |
4.2.4(By Inspection) |
- |
1110 |
|
Proforma Invoice issued at the Time of Testing |
4.2.4(By Inspection) |
- |
1110 |
|
Proforma Invoice issued at the Time of Testing |
4.2.4(By Inspection) |
- |
1110 |
|
Proforma Invoice issued at the Time of Testing |
4.2.4(By Inspection) |
- |
1110 |
|
Proforma Invoice issued at the Time of Testing |
4.2.4(By Inspection) |
- |
1110 |
|
Proforma Invoice issued at the Time of Testing |
4.2.4(By Inspection) |
- |
1110 |
|
Proforma Invoice issued at the Time of Testing |
4.2.4(By Inspection) |
- |
1110 |
|
Proforma Invoice issued at the Time of Testing |
4.2.4(By Inspection) |
- |
1110 |
|
Proforma Invoice issued at the Time of Testing |
4.2.4(By Inspection) |
- |
1110 |
|
Proforma Invoice issued at the Time of Testing |
4.2.4(By Inspection) |
- |
1110 |
|
Proforma Invoice issued at the Time of Testing |
4.2.4(By Inspection) |
- |
1110 |
|
Proforma Invoice issued at the Time of Testing |
4.2.4(By Inspection) |
- |
1110 |
|
Proforma Invoice issued at the Time of Testing |
4.2.4(By inserting copper conductor of appropriate size) |
- |
1110 |
|
Proforma Invoice issued at the Time of Testing |
4.2.4(By Inspection) |
- |
1110 |
|
Proforma Invoice issued at the Time of Testing |
4.2.4(By Inspection) |
- |
1110 |
|
Proforma Invoice issued at the Time of Testing |
4.2.5(shall have a separate cover which can be sealed independently of the meter cover. The terminal cover shall enclose the actual terminals) |
- |
1110 |
|
Proforma Invoice issued at the Time of Testing |
4.2.5(The terminals their fixing screws, a suitable length of external insulated conductor and its insulation shall be enclosed by a cover with a provision for sealing. ) |
- |
1110 |
|
Proforma Invoice issued at the Time of Testing |
4.2.5(The fixing screws used on the terminal cover for fixing and sealing shall be held captive in the terminal cover.) |
- |
1110 |
|
Proforma Invoice issued at the Time of Testing |
4.2.5(When the meter is mounted on the meter board, no access to the terminals shall be possible without breaking the seal of the terminal cover.) |
- |
1110 |
|
Proforma Invoice issued at the Time of Testing |
4.2.6(By measurement) |
- |
1110 |
|
Proforma Invoice issued at the Time of Testing |
4.2.6(By measurement) |
- |
1110 |
|
Proforma Invoice issued at the Time of Testing |
4.2.6(By measurement) |
- |
1110 |
|
Proforma Invoice issued at the Time of Testing |
4.2.6(By measurement) |
- |
1110 |
|
Proforma Invoice issued at the Time of Testing |
4.2.7(Standard test fingure) |
- |
15100 |
|
Proforma Invoice issued at the Time of Testing |
4.2.10(Display of measured values) |
- |
1110 |
|
Proforma Invoice issued at the Time of Testing |
4.2.10.1(By inspection) |
- |
1110 |
|
Proforma Invoice issued at the Time of Testing |
4.2.10.1(By inspection) |
- |
1110 |
|
Proforma Invoice issued at the Time of Testing |
4.2.10.1(By inspection) |
- |
1110 |
|
Proforma Invoice issued at the Time of Testing |
4.2.10.2(By inspection) |
- |
1110 |
|
Proforma Invoice issued at the Time of Testing |
4.2.10.3(By measurement) |
- |
1110 |
|
Proforma Invoice issued at the Time of Testing |
4.2.10.4(By inspection) |
- |
1110 |
|
Proforma Invoice issued at the Time of Testing |
4.2.10.5(By inspection) |
- |
1110 |
|
Proforma Invoice issued at the Time of Testing |
4.2.10.5(By inspection) |
- |
1110 |
|
Proforma Invoice issued at the Time of Testing |
4.2.10.5(By inspection) |
- |
1110 |
|
Proforma Invoice issued at the Time of Testing |
4.2.10.5(By inspection) |
- |
1110 |
|
Proforma Invoice issued at the Time of Testing |
4.2.10.5(By inspection) |
- |
1110 |
|
Proforma Invoice issued at the Time of Testing |
4.2.10.5(By inspection) |
- |
1110 |
|
Proforma Invoice issued at the Time of Testing |
4.2.10.6(By inspection) |
- |
1110 |
|
Proforma Invoice issued at the Time of Testing |
4.2.10.6(By inspection) |
- |
1110 |
|
Proforma Invoice issued at the Time of Testing |
4.2.10.6(By inspection) |
- |
1110 |
|
Proforma Invoice issued at the Time of Testing |
4.2.10.7(By inspection) |
- |
1110 |
|
Proforma Invoice issued at the Time of Testing |
4.2.10.7(By inspection) |
- |
1110 |
|
Proforma Invoice issued at the Time of Testing |
4.2.10.8(Fig. 4, annexure F) |
- |
1110 |
|
Proforma Invoice issued at the Time of Testing |
4.2.10.9(Fig. 5, annexure F) |
- |
1110 |
|
Proforma Invoice issued at the Time of Testing |
4.2.10.9(Fig. 5, annexure F) |
- |
1110 |
|
Proforma Invoice issued at the Time of Testing |
4.2.11(By inspection) |
- |
1110 |
|
Proforma Invoice issued at the Time of Testing |
4.2.11.1(By inspection) |
- |
1110 |
|
Proforma Invoice issued at the Time of Testing |
4.2.11.1(By inspection) |
- |
1110 |
|
Proforma Invoice issued at the Time of Testing |
4.2.11.1(By inspection) |
- |
1110 |
|
Proforma Invoice issued at the Time of Testing |
4.2.11.1(By inspection) |
- |
1110 |
|
Proforma Invoice issued at the Time of Testing |
4.2.11.1(By inspection) |
- |
1110 |
|
Proforma Invoice issued at the Time of Testing |
4.2.11.1(By inspection) |
- |
1110 |
|
Proforma Invoice issued at the Time of Testing |
4.2.11.1(By inspection) |
- |
1110 |
|
Proforma Invoice issued at the Time of Testing |
4.2.11.1(By inspection) |
- |
1110 |
|
Proforma Invoice issued at the Time of Testing |
4.2.11.1(By inspection) |
- |
1110 |
|
Proforma Invoice issued at the Time of Testing |
4.2.11.1(By inspection) |
- |
1110 |
|
Proforma Invoice issued at the Time of Testing |
4.2.11.1(By inspection) |
- |
1110 |
|
Proforma Invoice issued at the Time of Testing |
4.2.11.1(By inspection) |
- |
1110 |
|
Proforma Invoice issued at the Time of Testing |
4.2.11.1(By inspection) |
- |
1110 |
|
Proforma Invoice issued at the Time of Testing |
4.2.11.1(By inspection) |
- |
1110 |
|
Proforma Invoice issued at the Time of Testing |
4.2.11.1(By inspection) |
- |
1110 |
|
Proforma Invoice issued at the Time of Testing |
4.2.11.1(By inspection) |
- |
1110 |
|
Proforma Invoice issued at the Time of Testing |
5.4.6(As per IS 2071 (Part1)) |
- |
17600 |
|
Proforma Invoice issued at the Time of Testing |
5.4.6.2(6 KV, As per cl 12.7.6.2 of IS 13779) |
- |
17600 |
|
Proforma Invoice issued at the Time of Testing |
5.4.6.2(12.7.6.2 of IS 13779) |
- |
17600 |
|
Proforma Invoice issued at the Time of Testing |
5.4.6.2(12.7.6.2 of IS 13779) |
- |
17600 |
|
Proforma Invoice issued at the Time of Testing |
5.4.6.3(Table 15, power source 500 VA) |
- |
2440 |
|
Proforma Invoice issued at the Time of Testing |
5.4.6.4(500±50V dc) |
- |
2440 |
|
Proforma Invoice issued at the Time of Testing |
5.6(As per cl 4.6) |
- |
20000 |
|
Proforma Invoice issued at the Time of Testing |
4.6.1(As per table 10 & 11, cl 5.6.1) |
- |
15640 |
|
Proforma Invoice issued at the Time of Testing |
5.6.5(As per cl 4.6.5) |
- |
2560 |
|
Proforma Invoice issued at the Time of Testing |
5.6.4(As per cl 4.6.3, Table 13) |
- |
132500 |
|
Proforma Invoice issued at the Time of Testing |
5.6.3(I= open circuit
V= 115% of rated voltage
test period 60 000/k minutes) |
- |
2560 |
|
Proforma Invoice issued at the Time of Testing |
5.6.7(Test shall be carried out at 0.05Ib and Ib at UPF load under reference conditions. Twenty error samples shall be taken at time-intervals of 30 minutes) |
- |
8770 |
|
Proforma Invoice issued at the Time of Testing |
4.6.2(As per table 12) |
- |
15640 |
|
Proforma Invoice issued at the Time of Testing |
5.4.1(As per 4.4.1.1) |
- |
1110 |
|
Proforma Invoice issued at the Time of Testing |
4.4.2(Table 7) |
- |
15000 |
|
Proforma Invoice issued at the Time of Testing |
5.4.2(As per 4.4.2.1) |
- |
21110 |
|
Proforma Invoice issued at the Time of Testing |
5.4.3(Table 8, as per cl4.4.3) |
- |
24540 |
|
Proforma Invoice issued at the Time of Testing |
5.4.4(Table 9, and cl 4.4.4) |
- |
17800 |
|
Proforma Invoice issued at the Time of Testing |
5.4.4(Table 9, and cl 4.4.4) |
- |
17800 |
|
Proforma Invoice issued at the Time of Testing |
5.4.5(As per cl 4.4.5) |
- |
3990 |
|
Proforma Invoice issued at the Time of Testing |
5.5(Test of electromagnetic compatibility) |
- |
255000 |
|
Proforma Invoice issued at the Time of Testing |
5.5.4(according to IS 14700
(Part 4/Sec 4)) |
- |
5960 |
|
Proforma Invoice issued at the Time of Testing |
5.5.3(Table 12 &
IS 14700 (Part 4/Sec 3)) |
- |
15600 |
|
Proforma Invoice issued at the Time of Testing |
5.5.2(the load switch shall not
operate during the tests.) |
- |
75000 |
|
Proforma Invoice issued at the Time of Testing |
5.5.2(according to IS 14700 (Part 4/Sec 2)) |
- |
5500 |
|
Proforma Invoice issued at the Time of Testing |
5.5.6(Surge Immunity Test) |
- |
17600 |
|
Proforma Invoice issued at the Time of Testing |
5.5.6(according to IEC 61000-
4-5) |
- |
17600 |
|
Proforma Invoice issued at the Time of Testing |
5.5.6(according to IEC 61000-
4-5) |
- |
17600 |
|
Proforma Invoice issued at the Time of Testing |
5.3(Tests of Climatic Influences) |
- |
35000 |
|
Proforma Invoice issued at the Time of Testing |
5.3.1(according to IS 9000
(Part 3/ Sec 1 to 5)) |
- |
8960 |
|
Proforma Invoice issued at the Time of Testing |
5.3.2(according to IS 9000
(Part 2/Sec 1 to 4)) |
- |
8960 |
|
Proforma Invoice issued at the Time of Testing |
5.3.3(according to IS 9000 (Part 5/Sec 1 and 2)) |
- |
16000 |
|
Proforma Invoice issued at the Time of Testing |
5.3.3(according to IS 9000 (Part 5/Sec 1 and 2)) |
- |
16000 |
|
Proforma Invoice issued at the Time of Testing |
5.3.3(As per cl 5.4.6) |
- |
22500 |
|
Proforma Invoice issued at the Time of Testing |
5.3.3(Visual examination) |
- |
1110 |
|
Proforma Invoice issued at the Time of Testing |
5.2(Test of mechanical requirements) |
- |
25000 |
|
Proforma Invoice issued at the Time of Testing |
5.2.3(As per IS 9000 (Part 8)) |
- |
5000 |
|
Proforma Invoice issued at the Time of Testing |
5.2.2(As per IS 9000 (Part 7/Sec 1)) |
- |
5000 |
|
Proforma Invoice issued at the Time of Testing |
5.2.1(As per cl 12.3.3 of IS 13779) |
- |
5000 |
|
Proforma Invoice issued at the Time of Testing |
5.2.5(Protection against penetration of dust (IP5X)) |
- |
15000 |
|
Proforma Invoice issued at the Time of Testing |
5.2.5(As per IS 12063) |
- |
5000 |
|
Proforma Invoice issued at the Time of Testing |
5.2.5(500 V dc) |
- |
2460 |
|
Proforma Invoice issued at the Time of Testing |
5.2.5(Protection against penetration of water (IP1X)) |
- |
15000 |
|
Proforma Invoice issued at the Time of Testing |
5.2.5(As per IS 12063) |
- |
2460 |
|
Proforma Invoice issued at the Time of Testing |
5.2.5(500 V dc) |
- |
2460 |
|
Proforma Invoice issued at the Time of Testing |
5.2.4(As per IS 11000 (Part 2 / Sec1)) |
- |
5600 |
|
Proforma Invoice issued at the Time of Testing |
4.6.3(Limits of error due to Ambient temperature Variation) |
- |
4970 |
|
Proforma Invoice issued at the Time of Testing |
4.6.6.2.2(Performance requirement for load switching Utilization category UC2
(Annex G.)) |
- |
75000 |
|
Proforma Invoice issued at the Time of Testing |
4.6.6.2.2 & G2(Normal operation) |
- |
25000 |
|
Proforma Invoice issued at the Time of Testing |
4.6.6.2.2 & G3(Electrical endurance) |
- |
75000 |
|
Proforma Invoice issued at the Time of Testing |
4.6.6.2.2 & G4(Line to load voltage surge withstand) |
- |
15000 |
|
Proforma Invoice issued at the Time of Testing |
4.6.6.2.2 & G5(Fault current making capacity) |
- |
39110 |
|
Proforma Invoice issued at the Time of Testing |
4.6.6.2.2 & G6(Short circuit current carrying capacity) |
- |
65000 |
|
Proforma Invoice issued at the Time of Testing |
4.6.6.2.2 & G7(Minimum switched current) |
- |
25370 |
|
Proforma Invoice issued at the Time of Testing |
4.6.6.2.2 & G8(Dielectric strength) |
- |
25000 |
|
Proforma Invoice issued at the Time of Testing |
3.12.6, 4.6.6.2.1 & 5.1.7(Load Switching Capability (UC1)) |
- |
76000 |
|
Proforma Invoice issued at the Time of Testing |
5.8(Test of Load Switch) |
- |
76000 |
|
Proforma Invoice issued at the Time of Testing |
5.9(Test of Consumption-Based charging function) |
- |
39970 |
|
Proforma Invoice issued at the Time of Testing |
5.10(Test of Time-Based charging function) |
- |
75000 |
|
Proforma Invoice issued at the Time of Testing |
4.2.10.8(General requirements-
Mechanical and electrical characteristics) |
- |
8800 |
|
Proforma Invoice issued at the Time of Testing |
4.2.10.9(General requirements-
Optical characteristics) |
- |
8800 |
|
Proforma Invoice issued at the Time of Testing |
4.2.12.3(Keypad Interface) |
- |
39000 |
|
Proforma Invoice issued at the Time of Testing |
Annexure A(Functional Performance) |
- |
25890 |
|
Proforma Invoice issued at the Time of Testing |
6(Functional Requirements) |
- |
39970 |
|
Proforma Invoice issued at the Time of Testing |
4.6.6.2 , annexure G -8(Performance requirements for Prepayment Meters with Load switching utilization category UC2 and UC3) |
- |
75000 |
|
Proforma Invoice issued at the Time of Testing |
4.6.6.2 , annexure G -7(Performance requirements for Prepayment Meters with Load switching utilization category UC2 and UC3) |
- |
76000 |
|
Proforma Invoice issued at the Time of Testing |
4.6.6.2 , annexure G -6(Performance requirements for Prepayment Meters with Load switching utilization category UC2 and UC3) |
- |
76000 |
|
Proforma Invoice issued at the Time of Testing |
4.6.6.2 , annexure G -5(Performance requirements for Prepayment Meters with Load switching utilization category UC2 and UC3) |
- |
75000 |
|
Proforma Invoice issued at the Time of Testing |
4.6.6.2 , annexure G -4(Performance requirements for Prepayment Meters with Load switching utilization category UC2 and UC3) |
- |
76000 |
|
Proforma Invoice issued at the Time of Testing |
4.6.6.2 , annexure G -3(Performance requirements for Prepayment Meters with Load switching utilization category UC2 and UC3) |
- |
75000 |
|
Proforma Invoice issued at the Time of Testing |
4.6.6.2 , annexure G -2(Performance requirements for Prepayment Meters with Load switching utilization category UC2 and UC3) |
- |
75000 |
|
Proforma Invoice issued at the Time of Testing |
4.6.6.2 .1(Load switching capability) |
- |
76000 |
|
Proforma Invoice issued at the Time of Testing |
4.6.6.1 , annexure D - 4.3(Test of crystal Controlled Clocks in Payment Meters) |
- |
114400 |
|
Proforma Invoice issued at the Time of Testing |
4.6.6.1 , annexure D - 4.2(Test of crystal Controlled Clocks in Payment Meters) |
- |
114400 |
|
Proforma Invoice issued at the Time of Testing |
4.6.6.1 , annexure D - 4.1(Test of crystal Controlled Clocks in Payment Meters) |
- |
114400 |
|
Proforma Invoice issued at the Time of Testing |
4.6.6.1 , annexure D - 3.2.3(Test of crystal Controlled Clocks in Payment Meters) |
- |
114400 |
|
Proforma Invoice issued at the Time of Testing |
4.6.6.1 ,annexure D - 3.2.2(Test of crystal Controlled Clocks in Payment Meters) |
- |
9570 |
|
Proforma Invoice issued at the Time of Testing |
4.6.6.1 ,annexure D - 3.2.1(Test of crystal Controlled Clocks in Payment Meters) |
- |
31240 |
|
Proforma Invoice issued at the Time of Testing |
4.2.12(Test on Token Carrier Interface) |
- |
31240 |
|
Proforma Invoice issued at the Time of Testing |
5.4(As per 5.6.1) |
- |
31240 |
|
Type Test Charges for 1 Phase meter is = Rs.11,18,530/- and
Type Test Charges for 3 Phase meter is = Rs.11,30,210/-
Proforma Invoice issued at the Time of Testing |
|
31 Dec, 2026 |
- Included w.e.f. 13.09.2024
Exclusion: 4.2.4 (Heat Deflection Test (HDT TEST)), 5.5.5 Radio Interference - Radiated Emission Test |
10 |
IS 16444 (2015) |
AC static direct connected watthour smart meter class 1 and 2 - Specification |
Type test |
942751.00 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
cl. 7.1 a) of IS 13779(MARKING OF METERS : Name Plate
) |
- |
1110 |
|
Proforma invoice issued at the time of testing.
UC1 TYPE TESTING = Rs.7,42,350/-
UC2 / UC3 TYPE TESTING = Rs.9,42,751/- |
cl. 7.1 b) of IS 13779(MARKING OF METERS : Name Plate
) |
- |
1110 |
|
Proforma invoice issued at the time of testing. |
cl. 7.1 c) of IS 13779(MARKING OF METERS : Name Plate
) |
- |
1110 |
|
Proforma invoice issued at the time of testing. |
cl. 7.1 d) of IS 13779(MARKING OF METERS : Name Plate
) |
- |
1110 |
|
Proforma invoice issued at the time of testing. |
cl. 7.1 e) of of IS 13779(MARKING OF METERS : Name Plate
) |
- |
1110 |
|
Proforma invoice issued at the time of testing. |
cl. 7.1 f) of IS 13779(MARKING OF METERS : Name Plate
) |
- |
1110 |
|
Proforma invoice issued at the time of testing. |
cl. 7.1 g) of IS 13779(MARKING OF METERS : Name Plate
) |
- |
1110 |
|
Proforma invoice issued at the time of testing. |
cl. 7.1 h) of IS 13779(MARKING OF METERS : Name Plate
) |
- |
1110 |
|
Proforma invoice issued at the time of testing. |
cl. 7.1 j) of IS 13779(MARKING OF METERS : Name Plate
) |
- |
1110 |
|
Proforma invoice issued at the time of testing. |
cl. 7.1 k) of IS 13779(MARKING OF METERS : Name Plate
) |
- |
1110 |
|
Proforma invoice issued at the time of testing. |
cl. 7.1 m) of IS 13779(MARKING OF METERS : Name Plate
) |
- |
1110 |
|
Proforma invoice issued at the time of testing. |
cl. 7.1 p) of IS 13779(MARKING OF METERS : Name Plate
) |
- |
1110 |
|
Proforma invoice issued at the time of testing. |
cl. 7.1 n) of IS 13779(MARKING OF METERS : Name Plate
) |
- |
1110 |
|
Proforma invoice issued at the time of testing. |
cl. 12.7.6.2 of IS 13779(Impulse voltage test) |
- |
17600 |
|
Proforma invoice issued at the time of testing. |
cl. 12.7.6.3 of IS 13779(ac Voltage test) |
- |
2440 |
|
Proforma invoice issued at the time of testing. |
cl. 12.7.6.4 of IS 13779(Insulation resistance test) |
- |
6720 |
|
Proforma invoice issued at the time of testing. |
cl. 11.1 of IS 13779(Limits of Error Due to Variation of tile Current) |
- |
15640 |
|
Proforma invoice issued at the time of testing. |
cl. 11.2 of IS 13779(Limits of Error Due to Other Influence Quantities (Voltage-Variation, Frequency Variation,
Phase-Sequence, Wave Form, Voltage-Unba.ance)) |
- |
19550 |
|
Proforma invoice issued at the time of testing. |
cl. 11.3 of IS 13779(Limits of Error Due to Ambien! Temperature
Variation
) |
- |
4970 |
|
Proforma invoice issued at the time of testing. |
cl. 11.4 of IS 13779(Starting and Running w'th No-Load) |
- |
2560 |
|
Proforma invoice issued at the time of testing. |
cl. 11.5 of IS 13779(Starting Current) |
- |
2560 |
|
Proforma invoice issued at the time of testing. |
cl. 11.6 of IS 13779(Meter Constant) |
- |
2560 |
|
Proforma invoice issued at the time of testing. |
12.10.1 a) of IS 13779(Testof Accuracy Requirements : General Test Conditions
) |
- |
15640 |
|
Proforma invoice issued at the time of testing. |
12.10.1 b) of IS 13779(Testof Accuracy Requirements : General Test Conditions
) |
- |
15640 |
|
Proforma invoice issued at the time of testing. |
12.10.1 c) of IS 13779(Testof Accuracy Requirements : General Test Conditions
) |
- |
15640 |
|
Proforma invoice issued at the time of testing. |
12.10.1 d) of IS 13779(Testof Accuracy Requirements : General Test Conditions
) |
- |
15640 |
|
Proforma invoice issued at the time of testing. |
12.10.1 e) of IS 13779(Testof Accuracy Requirements : General Test Conditions
) |
- |
15640 |
|
Proforma invoice issued at the time of testing. |
12.10.1 f) of IS 13779(Testof Accuracy Requirements : General Test Conditions
) |
- |
15640 |
|
Proforma invoice issued at the time of testing. |
cl 11.1 of IS 13779(Limits of Error and Interpretation or Test Results) |
- |
19550 |
|
Proforma invoice issued at the time of testing. |
12.16 a) of IS 13779(Limits of Error and Interpretation or Test
Results) |
- |
19550 |
|
Proforma invoice issued at the time of testing. |
12.16 b) of IS 13779(Limits of Error and Interpretation or Test
Results) |
- |
19550 |
|
Proforma invoice issued at the time of testing. |
12.16 c) of IS 13779(Limits of Error and Interpretation or Test
Results) |
- |
19550 |
|
Proforma invoice issued at the time of testing.2560 |
12.15 of IS 13779(Test of Meter Constant/Registration) |
- |
2560 |
|
Proforma invoice issued at the time of testing. |
12.14 of IS 13779(Test of Starting Conditions) |
- |
2560 |
|
Proforma invoice issued at the time of testing. |
12.13 of IS 13779(Test of No-Load Condition) |
- |
2560 |
|
Proforma invoice issued at the time of testing. |
12.12 of IS 13779(Test ofAmbient Temperature Influence) |
- |
4970 |
|
Proforma invoice issued at the time of testing. |
12.17 of IS 13779(Repeatability of Error Test
) |
- |
8770 |
|
Proforma invoice issued at the time of testing. |
12.11 of IS 13779(Test of Iniluence Quantities) |
- |
32670 |
|
Proforma invoice issued at the time of testing. |
12.7.1 of IS 13779(Test of Power Consumption) |
- |
9450 |
|
Proforma invoice issued at the time of testing. |
12.7.2 of IS 13779(Test of Influence of Supply Voltage) |
- |
5640 |
|
Proforma invoice issued at the time of testing. |
12.7.3 of IS 13779( Test of Influence of Short-time Overcurrents) |
- |
19520 |
|
Proforma invoice issued at the time of testing. |
12.7.4 of IS 13779(Test of Influence of Self-Heating) |
- |
5080 |
|
Proforma invoice issued at the time of testing. |
12.7.5 of IS 13779(Test of Influence of Heating) |
- |
3960 |
|
Proforma invoice issued at the time of testing. |
12.8 of IS 13779(TestorImmunity to Earth Fault) |
- |
5940 |
|
Proforma invoice issued at the time of testing. |
12.9.2 of IS 13779(Test for Immunity to Electrostatic Discharge
(ESD)) |
- |
5510 |
|
Proforma invoice issued at the time of testing. |
12.9.3 of IS 13779(Test for Immunity to EIectromagnetic HF Fields) |
- |
5510 |
|
Proforma invoice issued at the time of testing. |
12.9.4 of IS 13779(FastTransient BurstTest) |
- |
5960 |
|
Proforma invoice issued at the time of testing. |
12.9.5 of IS 13779(Radio Interference Measurement) |
- |
15330 |
|
Proforma invoice issued at the time of testing. |
12.6.1 of IS 13779(Dry Heat Test) |
- |
8940 |
|
Proforma invoice issued at the time of testing. |
12.6.2 of IS 13779(Cold Test) |
- |
8940 |
|
Proforma invoice issued at the time of testing. |
12.6.3 of IS 13779( Damp Heat Cycle Test) |
- |
17710 |
|
Proforma invoice issued at the time of testing. |
12.3.1 of IS 13779(Shock Test) |
- |
1430 |
|
Proforma invoice issued at the time of testing. |
12.3.2 of IS 13779(Vibration Test) |
- |
3300 |
|
Proforma invoice issued at the time of testing. |
12.3.3 of IS 13779( Spring Hammer Test) |
- |
670 |
|
Proforma invoice issued at the time of testing. |
12.5 a) of IS 13779(Test of Protection Against Penetration of Dust
and Water) |
- |
13310 |
|
Proforma invoice issued at the time of testing. |
12.5 b) of IS 13779(Test of Protection Against Penetration of Dust
and Water) |
- |
13310 |
|
Proforma invoice issued at the time of testing. |
12.4 of IS 13779(Testof Resistance to Heat and Fire
) |
- |
5520 |
|
Proforma invoice issued at the time of testing. |
4.4.2.1 of IS 15844(Voltage range) |
- |
1110 |
|
Proforma invoice issued at the time of testing. |
4.4.2.2 of IS 15844( Specified operating range
) |
- |
1110 |
|
Proforma invoice issued at the time of testing. |
4.4.2.3 of IS 15844(Extended operating range) |
- |
1110 |
|
Proforma invoice issued at the time of testing. |
4.4.2.4 of IS 15844( Limit range of operation) |
- |
1110 |
|
Proforma invoice issued at the time of testing. |
4.4.2.5 of IS 15844(Withstand range) |
- |
1110 |
|
Proforma invoice issued at the time of testing. |
4.4.2.6 of IS 15844(Abnormal voltage conditions) |
- |
1440 |
|
Proforma invoice issued at the time of testing. |
4.4.2.7 of IS 15844(Voltage dips and short interruptions) |
- |
17600 |
|
Proforma invoice issued at the time of testing. |
4.4.3 of IS 15844(Influence of Short-Time Overcurrents) |
- |
19520 |
|
Proforma invoice issued at the time of testing. |
4.4.4 of IS 15844(Influence of Self-Heating) |
- |
5080 |
|
Proforma invoice issued at the time of testing. |
4.4.5 of IS 15844(Influence of Heating) |
- |
3960 |
|
Proforma invoice issued at the time of testing. |
4.4.6 of IS 15844(Insulation) |
- |
6720 |
|
Proforma invoice issued at the time of testing. |
6.8(BIS Standard Mark) |
- |
1110 |
|
Proforma invoice issued at the time of testing. |
6.8(Marking of smart meters
Name plate) |
- |
1110 |
|
Proforma invoice issued at the time of testing. |
6.3(Clearance and creepage distances) |
- |
1110 |
|
Proforma invoice issued at the time of testing. |
11.0(Smart meter functional requirements) |
- |
33000 |
|
Proforma invoice issued at the time of testing. |
9, 10.6(Test of Smart Meter Communicability) |
- |
33000 |
|
Proforma invoice issued at the time of testing. |
10.3(Test of Display) |
- |
1110 |
|
Proforma invoice issued at the time of testing. |
8.0(Data Exchange for Electricity Meter Reading,
Tariff and Load Control Companion Specification (Verification up to two Port)) |
- |
110000 |
|
Proforma invoice issued at the time of testing. |
7.2, 10.4(Performance Requirements for Load Switching (UC1)) |
- |
1110 |
|
Proforma invoice issued at the time of testing. |
7.2, 10.4(Dielectric strength (G-8)) |
- |
24673 |
|
Proforma invoice issued at the time of testing. |
7.2, 10.4(Minimum switched current (G-7)) |
- |
50740 |
|
Proforma invoice issued at the time of testing. |
7.2, 10.4(Short circuit current carrying capacity (G-6)) |
- |
78220 |
|
Proforma invoice issued at the time of testing. |
7.2, 10.4(Fault current making capacity (G-5)) |
- |
50740 |
|
Proforma invoice issued at the time of testing. |
7.2, 10.4(Line to load voltage surge withstand (G-4)) |
- |
17600 |
|
- |
7.2, 10.4(Electrical endurance (G-3)) |
- |
50720 |
|
Proforma invoice issued at the time of testing. |
7.2, 10.4(Normal operation (G-2)) |
- |
13200 |
|
Proforma invoice issued at the time of testing. |
6.5(Test of resistance to heat and fire) |
- |
5520 |
|
Proforma invoice issued at the time of testing. |
Note 1c of Table 1(Remote disconnect/connect) |
- |
1760 |
|
Proforma invoice issued at the time of testing. |
Note 1b of Table 1(Access and data read test) |
- |
1760 |
|
Proforma invoice issued at the time of testing. |
Note 1a of Table 1(Accuracy of the meter at pre-defined points) |
- |
1760 |
|
Proforma invoice issued at the time of testing. |
6.5(Protection against penetration of dust and water) |
- |
13310 |
|
Proforma invoice issued at the time of testing. |
6.5(Spring Hammer test) |
- |
670 |
|
Proforma invoice issued at the time of testing. |
6.5(Shock test) |
- |
1430 |
|
Proforma invoice issued at the time of testing. |
6.5(Vibration test) |
- |
3300 |
|
Proforma invoice issued at the time of testing. |
6.9(Damp heat cyclic test) |
- |
17710 |
|
Proforma invoice issued at the time of testing. |
6.9(Cold test) |
- |
8940 |
|
Proforma invoice issued at the time of testing. |
6.9(Dry heat test) |
- |
8940 |
|
Proforma invoice issued at the time of testing. |
6.11(Surge Immunity test) |
- |
17600 |
|
Proforma invoice issued at the time of testing. |
6.11(Test of immunity to electromagnetic HF field) |
- |
16530 |
|
Proforma invoice issued at the time of testing. |
6.11(Test of immunity to electrostatic discharge) |
- |
5510 |
|
Proforma invoice issued at the time of testing. |
6.11(Fast transient burst test) |
- |
5960 |
|
Proforma invoice issued at the time of testing. |
6.10.7(Test of influence of immunity to earth fault) |
- |
5940 |
|
Proforma invoice issued at the time of testing. |
6.10.5(Test of influence of heating) |
- |
3960 |
|
Proforma invoice issued at the time of testing. |
6.10.4(Test of influence of self-heating) |
- |
5080 |
|
Proforma invoice issued at the time of testing. |
6.10.1(Test of influence of short time over currents) |
- |
19520 |
|
Proforma invoice issued at the time of testing. |
6.10.1(Test of influence of supply voltage) |
- |
5640 |
|
Proforma invoice issued at the time of testing. |
6.10.1(Test of power consumption) |
- |
9450 |
|
Proforma invoice issued at the time of testing. |
6.12(Operation of Accessories) |
- |
1110 |
|
Proforma invoice issued at the time of testing. |
6.12(Abnormal Magnetic Induction of External Origin 10mT) |
- |
4310 |
|
Proforma invoice issued at the time of testing. |
6.12(Magnetic induction of External Origin 0.5mT) |
- |
4310 |
|
Proforma invoice issued at the time of testing. |
6.12(Continuous Magnetic Induction of External Origin 0.2 Tesla) |
- |
1440 |
|
Proforma invoice issued at the time of testing. |
6.12(Continuous Magnetic Induction of External Origin 67 milli Tesla) |
- |
1440 |
|
Proforma invoice issued at the time of testing. |
6.12(DC & Even Harmonics in the ac current circuit) |
- |
5500 |
|
Proforma invoice issued at the time of testing. |
6.12(Voltage Unbalanced) |
- |
1440 |
|
Proforma invoice issued at the time of testing. |
6.12(Reversed Phase Sequence) |
- |
2540 |
|
Proforma invoice issued at the time of testing. |
6.12(Waveform 10% of 3rd Harmonics) |
- |
7890 |
|
Proforma invoice issued at the time of testing. |
6.12(Frequency Variation) |
- |
2880 |
|
Proforma invoice issued at the time of testing. |
6.12(Voltage Variation) |
- |
15360 |
|
Proforma invoice issued at the time of testing. |
6.12(Test of influence quantities) |
- |
32670 |
|
Proforma invoice issued at the time of testing. |
6.12(Test of repeatability of error ) |
- |
8770 |
|
Proforma invoice issued at the time of testing. |
6.12(Test of ambient temperature influence) |
- |
4970 |
|
Proforma invoice issued at the time of testing. |
6.12(Test of no-load condition) |
- |
2560 |
|
Proforma invoice issued at the time of testing. |
6.12(Test of starting condition) |
- |
2560 |
|
Proforma invoice issued at the time of testing. |
6.12(Test of meter constant) |
- |
2560 |
|
Proforma invoice issued at the time of testing. |
6.12(Test on limits of error due to variation of the current) |
- |
15640 |
|
Proforma invoice issued at the time of testing. |
6.10.6(Insulation resistance test) |
- |
6720 |
|
Proforma invoice issued at the time of testing. |
6.10.6(ac high voltage test) |
- |
2440 |
|
Proforma invoice issued at the time of testing. |
6.10.6(Impulse voltage test) |
- |
17600 |
|
Proforma invoice issued at the time of testing. |
6.8.1(Additional information) |
- |
1110 |
|
Proforma invoice issued at the time of testing. |
6.8(Connection diagrams and terminal marking) |
- |
1110 |
|
Proforma invoice issued at the time of testing. |
6.7(Output device) |
- |
1110 |
|
Proforma invoice issued at the time of testing. |
6.6(Display of measured values) |
- |
1110 |
|
Proforma invoice issued at the time of testing. |
6.2.2(Insulating encased meter) |
- |
1110 |
|
Proforma invoice issued at the time of testing. |
6.2.2(Terminal Cover(s)) |
- |
1110 |
|
Proforma invoice issued at the time of testing. |
6.2.1(Terminals, terminal block and protective earth ter-minal) |
- |
1110 |
|
Proforma invoice issued at the time of testing. |
6.2(Communication module
Load switch) |
- |
1110 |
|
Proforma invoice issued at the time of testing. |
6.2(Window) |
- |
1110 |
|
Proforma invoice issued at the time of testing. |
6.2(Meter case) |
- |
1110 |
|
Proforma invoice issued at the time of testing. |
6.2(General and constructional requirements) |
- |
8800 |
|
Proforma invoice issued at the time of testing. |
Table 1 (Note 1)(Schedule of type tests) |
- |
942751 |
|
Proforma invoice issued at the time of testing.
UC1 TYPE TESTING = Rs.7,42,350/-
UC2 / UC3 TYPE TESTING = Rs.9,42,751/- |
Table 1 (Note 1)(Schedule of type tests) |
- |
942751 |
|
Proforma invoice issued at the time of testing.
UC1 TYPE TESTING = Rs.7,42,350/-
UC2 / UC3 TYPE TESTING = Rs.9,42,751/- |
6.11(Electromagnetic Compatibility) |
- |
56530 |
|
Proforma invoice issued at the time of testing. |
6.11(Electromagnetic Compatibility) |
- |
56530 |
|
Proforma invoice issued at the time of testing. |
6.11(Electromagnetic Compatibility) |
- |
56530 |
|
Proforma invoice issued at the time of testing. |
6.11(Electromagnetic Compatibility) |
- |
56530 |
|
Proforma invoice issued at the time of testing. |
6.11(Electromagnetic Compatibility) |
- |
56530 |
|
Proforma invoice issued at the time of testing. |
6.11(Electromagnetic Compatibility) |
- |
56530 |
|
Proforma invoice issued at the time of testing. |
11(Smart Meter Functional Requirement) |
- |
1110 |
|
Proforma invoice issued at the time of testing. |
10.6.2(Test for Smart meter communicability ) |
- |
33000 |
|
Proforma invoice issued at the time of testing. |
10.5(Test for Data Exchange Protocol) |
- |
110000 |
|
Proforma invoice issued at the time of testing. |
10.4(Test for Load Switch) |
- |
50720 |
|
Proforma invoice issued at the time of testing. |
10.3(Inspection) |
- |
1110 |
|
Proforma invoice issued at the time of testing. |
6.8(Inspection) |
- |
1110 |
|
Proforma invoice issued at the time of testing. |
6.8(Inspection) |
- |
1110 |
|
Proforma invoice issued at the time of testing. |
6.7(Inspection) |
- |
1110 |
|
Proforma invoice issued at the time of testing. |
6.7(Inspection) |
- |
1110 |
|
Proforma invoice issued at the time of testing. |
6.6(Inspection) |
- |
1110 |
|
Proforma invoice issued at the time of testing. |
6.3(Measurement) |
- |
1110 |
|
Proforma invoice issued at the time of testing. |
6.2(General constructional Requirement) |
- |
8800 |
|
Proforma invoice issued at the time of testing. |
6.2(General constructional Requirement) |
- |
8800 |
|
Proforma invoice issued at the time of testing. |
6.11(Radio interference measurement) |
- |
150000 |
|
Proforma invoice issued at the time of testing. |
6.2.1(Heat Deflection Test) |
- |
3500 |
|
Proforma invoice issued at the time of testing.
UC1 TYPE TESTING = Rs.7,42,350/-
UC2 / UC3 TYPE TESTING = Rs.9,42,751/- |
|
31 Dec, 2026 |
- Included w.e.f. 13.09.2024
Exclusion: Cl.12.4 of IS 13779 (Testof Resistance to Heat and Fire ), Cl.6.11 (Radio interference measurement) |
11 |
IS 16444 : Part 2 (2017) |
AC static transformer operated watthour and var - Hour smart meters, class 0.2 S, 0.5 S and 1.0 S: Part 2 specification transformer operated smart meters |
TYPE TEST |
587400.00 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
6.8.1(Additional information) |
- |
1110 |
|
Proforma invoice issued at the time of testing |
6.8(Connection diagrams and terminal marking) |
- |
1110 |
|
Proforma invoice issued at the time of testing |
6.8(BIS Standard Mark) |
- |
1110 |
|
Proforma invoice issued at the time of testing |
6.8(Marking of meters
Name plate) |
- |
1110 |
|
Proforma invoice issued at the time of testing |
6.3(Clearance and creepage distances) |
- |
1110 |
|
Proforma invoice issued at the time of testing |
10.0(Smart Meter Functional Requirements) |
- |
33000 |
|
Proforma invoice issued at the time of testing |
8, 9.5(Smart Meter Communicability) |
- |
33000 |
|
Proforma invoice issued at the time of testing |
9.3(Test of Display) |
- |
1110 |
|
Proforma invoice issued at the time of testing |
7, 9.4(Data Exchange for Electricity Meter Reading, Tariff and Load Control Companion Specification
(The requirement as per IS 15959 : Part 1 & Part 3 shall apply)) |
- |
1110 |
|
Proforma invoice issued at the time of testing |
6.4(Test of resistance to heat and fire) |
- |
5520 |
|
Proforma invoice issued at the time of testing |
Note b of Table 1(Access and data read test) |
- |
880 |
|
Proforma invoice issued at the time of testing |
Note a of Table 1(Accuracy of the meter at pre-defined points) |
- |
1110 |
|
Proforma invoice issued at the time of testing |
6.5(Test of protection against penetration of dust and water) |
- |
13310 |
|
Proforma invoice issued at the time of testing |
6.5(Spring hammer test) |
- |
670 |
|
Proforma invoice issued at the time of testing |
6.5(Shock test) |
- |
1430 |
|
Proforma invoice issued at the time of testing |
6.5(Vibration test) |
- |
3300 |
|
Proforma invoice issued at the time of testing |
6.9(Damp heat cyclic test) |
- |
17710 |
|
Proforma invoice issued at the time of testing |
6.9(Cold test) |
- |
8940 |
|
Proforma invoice issued at the time of testing |
6.9(Dry heat test) |
- |
8940 |
|
Proforma invoice issued at the time of testing |
6.11(Surge Immunity test) |
- |
17600 |
|
Proforma invoice issued at the time of testing |
6.11(Test of immunity to electromagnetic HF field) |
- |
16530 |
|
Proforma invoice issued at the time of testing |
6.11(Test of immunity to electrostatic discharge) |
- |
5510 |
|
Proforma invoice issued at the time of testing |
6.11(Fast transient burst test) |
- |
5960 |
|
Proforma invoice issued at the time of testing |
6.11(Radio interference measurement) |
- |
15330 |
|
Proforma invoice issued at the time of testing |
6.10.7(Test of immunity to earth/phase fault) |
- |
5510 |
|
Proforma invoice issued at the time of testing |
6.10.5(Test of influence of heating) |
- |
1990 |
|
Proforma invoice issued at the time of testing |
6.10.4(Test of influence of self-heating) |
- |
4230 |
|
Proforma invoice issued at the time of testing |
6.10.3(Test of influence of short time over currents) |
- |
29630 |
|
Proforma invoice issued at the time of testing |
6.10.2(Test of influence of supply voltage) |
- |
5640 |
|
Proforma invoice issued at the time of testing |
6.10.1(Test of power consumption) |
- |
9450 |
|
Proforma invoice issued at the time of testing |
6.12(Operation of Accessories) |
- |
1110 |
|
Proforma invoice issued at the time of testing |
6.12(Abnormal Magnetic Induction of External Origin 10mT) |
- |
4310 |
|
Proforma invoice issued at the time of testing |
6.12(Magnetic induction of External Origin 0.5mT) |
- |
4310 |
|
Proforma invoice issued at the time of testing |
6.12(Continuous Magnetic Induction of External Origin 0.2 Tesla) |
- |
1440 |
|
Proforma invoice issued at the time of testing |
6.12(Continuous Magnetic Induction of External Origin 67 milli Tesla) |
- |
1440 |
|
Proforma invoice issued at the time of testing |
6.12(Voltage Unbalanced) |
- |
1440 |
|
Proforma invoice issued at the time of testing |
6.12(Reversed Phase Sequence) |
- |
2260 |
|
Proforma invoice issued at the time of testing |
6.12(Waveform 10% of 3rd Harmonics) |
- |
7890 |
|
Proforma invoice issued at the time of testing |
6.12(Frequency Variation) |
- |
5760 |
|
Proforma invoice issued at the time of testing |
6.12(Voltage Variation) |
- |
15360 |
|
Proforma invoice issued at the time of testing |
6.12(Test of influence quantities) |
- |
32670 |
|
Proforma invoice issued at the time of testing |
6.12(Test of repeatability of error) |
- |
17540 |
|
Proforma invoice issued at the time of testing |
6.12(Test of ambient temperature influence) |
- |
9940 |
|
Proforma invoice issued at the time of testing |
6.12(Test of no-load condition) |
- |
1280 |
|
Proforma invoice issued at the time of testing |
6.12(Test of starting condition) |
- |
5120 |
|
Proforma invoice issued at the time of testing |
6.12(Test of meter constant) |
- |
2560 |
|
Proforma invoice issued at the time of testing |
6.12(Test on limits of error) |
- |
31360 |
|
Proforma invoice issued at the time of testing |
6.10.6(Insulation test) |
- |
6720 |
|
Proforma invoice issued at the time of testing |
6.10.6(ac high voltage test) |
- |
2440 |
|
Proforma invoice issued at the time of testing |
6.10.6(Impulse voltage test) |
- |
17600 |
|
Proforma invoice issued at the time of testing |
6.7(Output device) |
- |
1110 |
|
Proforma invoice issued at the time of testing |
6.6(Display of measured values) |
- |
1110 |
|
Proforma invoice issued at the time of testing |
6.2.2(Insulating encased meter) |
- |
1110 |
|
Proforma invoice issued at the time of testing |
6.2.2(Terminal Cover(s)) |
- |
1110 |
|
Proforma invoice issued at the time of testing |
6.2.1(Terminals, terminal block and protective earth terminal) |
- |
1110 |
|
Proforma invoice issued at the time of testing |
6.2(Communication module) |
- |
1110 |
|
Proforma invoice issued at the time of testing |
6.2(Window) |
- |
1110 |
|
Proforma invoice issued at the time of testing |
6.2(Meter case) |
- |
1110 |
|
Proforma invoice issued at the time of testing |
6.2(General Constructional requirements) |
- |
8800 |
|
Proforma invoice issued at the time of testing |
10(Smart Meter Functional Requirement) |
- |
33000 |
|
Proforma invoice issued at the time of testing |
9.5(Test for Smart meter communicability ) |
- |
33000 |
|
Proforma invoice issued at the time of testing |
9.4(Test for Data Exchange Protocol) |
- |
110000 |
|
- |
6.5(Mechanical Requirement) |
- |
1110 |
|
Proforma invoice issued at the time of testing |
6.5(Mechanical Requirement) |
- |
1110 |
|
Proforma invoice issued at the time of testing |
6.5(Mechanical Requirement) |
- |
1110 |
|
Proforma invoice issued at the time of testing |
6.5(Mechanical Requirement) |
- |
1110 |
|
Proforma invoice issued at the time of testing |
6.5(Mechanical Requirement) |
- |
1110 |
|
Proforma invoice issued at the time of testing |
6.9(Climatic Codition) |
- |
42310 |
|
Proforma invoice issued at the time of testing |
6.9(Climatic Codition) |
- |
42310 |
|
Proforma invoice issued at the time of testing |
6.9(Climatic Codition) |
- |
42310 |
|
Proforma invoice issued at the time of testing |
6.9(Climatic Codition) |
- |
42310 |
|
Proforma invoice issued at the time of testing |
6.11(Electromagnetic Compatibility) |
- |
56530 |
|
Proforma invoice issued at the time of testing |
6.11(Electromagnetic Compatibility) |
- |
56530 |
|
Proforma invoice issued at the time of testing |
6.11(Electromagnetic Compatibility) |
- |
56530 |
|
Proforma invoice issued at the time of testing |
6.11(Electromagnetic Compatibility) |
- |
56530 |
|
Proforma invoice issued at the time of testing |
6.11(Electromagnetic Compatibility) |
- |
56530 |
|
Proforma invoice issued at the time of testing |
6.1(Electrical Requirments) |
- |
42150 |
|
Proforma invoice issued at the time of testing |
6.1(Electrical Requirments) |
- |
42150 |
|
Proforma invoice issued at the time of testing |
6.1(Electrical Requirments) |
- |
42150 |
|
Proforma invoice issued at the time of testing |
6.1(Electrical Requirments) |
- |
42150 |
|
Proforma invoice issued at the time of testing |
6.1(Electrical Requirments) |
- |
42150 |
|
Proforma invoice issued at the time of testing |
6.12((11 of IS 14697 ) Accuracy Requirement ) |
- |
143400 |
|
Proforma invoice issued at the time of testing |
6.12((11 of IS 14697 ) Accuracy Requirement ) |
- |
143400 |
|
Proforma invoice issued at the time of testing |
6.12((11 of IS 14697 ) Accuracy Requirement ) |
- |
143400 |
|
Proforma invoice issued at the time of testing |
6.12((11 of IS 14697 ) Accuracy Requirement ) |
- |
143400 |
|
Proforma invoice issued at the time of testing |
6.12((11 of IS 14697 ) Accuracy Requirement ) |
- |
143400 |
|
Proforma invoice issued at the time of testing |
6.12((11 of IS 14697 ) Accuracy Requirement ) |
- |
143400 |
|
Proforma invoice issued at the time of testing |
6.12((11 of IS 14697 ) Accuracy Requirement ) |
- |
143400 |
|
Proforma invoice issued at the time of testing |
6.12((11 of IS 14697 ) Accuracy Requirement ) |
- |
143400 |
|
Proforma invoice issued at the time of testing |
6.10.7((9.6 of IS 14697 ) Insulation Rtequirement ) |
- |
26760 |
|
Proforma invoice issued at the time of testing |
6.10.6((9.5 of IS 14697 ) Insulation Requirement ) |
- |
26760 |
|
Proforma invoice issued at the time of testing |
6.10.6((9.5 of IS 14697 ) Insulation Rtequirement ) |
- |
26760 |
|
Proforma invoice issued at the time of testing |
6.10.6((9.5 of IS 14697 ) Insulation Rtequirement ) |
- |
26760 |
|
Proforma invoice issued at the time of testing |
6.10.6((9.5 of IS 14697 ) Insulation Rtequirement ) |
- |
26760 |
|
Proforma invoice issued at the time of testing |
9.3(Measurement) |
- |
1110 |
|
Proforma invoice issued at the time of testing |
6.8(Inspection ) |
- |
1110 |
|
Proforma invoice issued at the time of testing |
6.8(Inspection ( 7 of IS 14697) ) |
- |
1110 |
|
Proforma invoice issued at the time of testing |
6.7(Inspection ( 6.11 of IS 14697)) |
- |
1110 |
|
Proforma invoice issued at the time of testing |
6.6(Inspection ( 6.10 of IS 14697)) |
- |
1110 |
|
Proforma invoice issued at the time of testing |
6.3(Measurement ( 6.6 of IS 14697)) |
- |
1110 |
|
Proforma invoice issued at the time of testing |
6.2(General constructional Requirement) |
- |
8800 |
|
Proforma invoice issued at the time of testing |
6.2(General constructional Requirement) |
- |
8800 |
|
Proforma invoice issued at the time of testing |
|
31 Dec, 2026 |
- Included w.e.f. 13.09.2024
Exclusion: Cl.6.2.1 (Heat Deflection Test) |
12 |
IS 17048 (2018) |
Halogen free flame retardant (HFFR) cables for working voltages up to and including 1 100 Volts - Specification |
- |
167970 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
4.1.1 a) (Conductor : Material ) |
- |
0 |
|
- |
4.1.1 b) (Material : Seperator tape ) |
- |
0 |
|
- |
4.1.1 d) , 11.1, 12.1, 13.1,14.1(Class of conductor ) |
- |
0 |
|
- |
4.1.1 e) (Shape of conductor ) |
- |
0 |
|
- |
4.1.1 f) (Nominal size of conductor ) |
- |
0 |
|
- |
4.2.1, 11.2, 12.2, 13.2, 14.2(Insulation : Material ) |
- |
0 |
|
- |
4.2.2, 11.2, 12.2, 13.2, 14.2(Insulation : Application ) |
- |
0 |
|
- |
4.2.3,11.2, 12.2, 13.2(Thickness of insulation - Avearge : IS 10810 ( Part 6 )) |
- |
1860 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of cores are more proportionally the charges will increase. The complete test charges applicable, will be intimated through proforma invoice. |
4.2.3, 11.2, 12.2, 13.2, 14.2(Thickness of insulation - miniumum : IS 10810 ( Part 6 )) |
- |
1860 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of cores are more proportionally the charges will increase. The complete test charges applicable, will be intimated through proforma invoice. |
4.2.4(Insulation : Tensile stregth ( Before ageing)-IS 10810 (Part 7) ) |
- |
3610 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of cores are more proportionally the charges will increase. The complete test charges applicable, will be intimated through proforma invoice. |
4.2.4(Insulation : Elongation ( Before ageing) -IS 10810 (Part 7)) |
- |
3610 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of cores are more proportionally the charges will increase. The complete test charges applicable, will be intimated through proforma invoice. |
4.2.4(Insulation : Tensile stregth ( After ageing) - IS 10810 (Part 7) ) |
- |
3610 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of cores are more proportionally the charges will increase. The complete test charges applicable, will be intimated through proforma invoice. |
4.2.5(Insulation : Tensile stregth variation ( After ageing) - IS 10810 (Part 7) ) |
- |
3610 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of cores are more proportionally the charges will increase. The complete test charges applicable, will be intimated through proforma invoice. |
4.2.4(Insulation : Elongation (after ageing) - IS 10810 (Part 7) ) |
- |
3610 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of cores are more proportionally the charges will increase. The complete test charges applicable, will be intimated through proforma invoice. |
4.2.5(Insulation : Elongation variation (after ageing) - IS 10810 (Part 7) ) |
- |
3610 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of cores are more proportionally the charges will increase. The complete test charges applicable, will be intimated through proforma invoice. |
4.3(Fillers) |
- |
0 |
|
- |
4.4(Binder Tape) |
- |
0 |
|
- |
4.5.1,13.4, 14.4(Sheath : Compound ) |
- |
0 |
|
- |
4.5.2, 13.4, 14.4(Sheath : Application) |
- |
0 |
|
- |
4.5.3,13.4, 14.4(Thickness of sheath - Average : IS 10810 (Part 6)) |
- |
1860 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of cores are more proportionally the charges will increase. The complete test charges applicable, will be intimated through proforma invoice. |
4.5.3,13.4, 14.4(Thickness of sheath - Minimum : IS 10810 (Part 6)) |
- |
1860 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of cores are more proportionally the charges will increase. The complete test charges applicable, will be intimated through proforma invoice. |
4.5.4, 13.4(Sheath : Tensile stregth ( Before ageing)-IS 10810 (Part 7) ) |
- |
3610 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of cores are more proportionally the charges will increase. The complete test charges applicable, will be intimated through proforma invoice. |
4.5.4,13.4(Sheath : Elongation ( Before ageing) -IS 10810 (Part 7)) |
- |
3610 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of cores are more proportionally the charges will increase. The complete test charges applicable, will be intimated through proforma invoice. |
4.5.4, 13.4, 14.4(Sheath : Tensile stregth ( After ageing) - IS 10810 (Part 7) ) |
- |
3610 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of cores are more proportionally the charges will increase. The complete test charges applicable, will be intimated through proforma invoice. |
4.5.5, 13.4, 14.4(Sheath : Tensile stregth variation ( After ageing) - IS 10810 (Part 7) ) |
- |
3610 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of cores are more proportionally the charges will increase. The complete test charges applicable, will be intimated through proforma invoice. |
4.5.4, 13.4, 14.4(Sheath : Elongation (after ageing) - IS 10810 (Part 7) ) |
- |
3610 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of cores are more proportionally the charges will increase. The complete test charges applicable, will be intimated through proforma invoice. |
4.5.5, 13.4,14.4(Sheath : Elongation variation (after ageing) - IS 10810 (Part 7) ) |
- |
3610 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of cores are more proportionally the charges will increase. The complete test charges applicable, will be intimated through proforma invoice. |
4.5.5, 11.3, 12.3, 13.6, 14.6(Overall Dimensions) |
- |
1000 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of cores are more proportionally the charges will increase. The complete test charges applicable, will be intimated through proforma invoice. |
4.5.5.1, 11.3, 12.3,13.5, 14.5(Ovality) |
- |
0 |
|
- |
4.5.6, 13.4(Colour of Sheath) |
- |
0 |
|
- |
5.1(High Voltage Test (at Room Temperature)) |
- |
1520 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of cores are more proportionally the charges will increase. The complete test charges applicable, will be intimated through proforma invoice. |
5.2(Spark Test (Routine Test)) |
- |
1520 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of cores are more proportionally the charges will increase. The complete test charges applicable, will be intimated through proforma invoice. |
5.3(Flammability Test- IS 10810 (Part 53).) |
- |
1860 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of cores are more proportionally the charges will increase. The complete test charges applicable, will be intimated through proforma invoice. |
5.4(Oxygen Index Test- IS 10810 (Part 58)) |
- |
9850 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of cores are more proportionally the charges will increase. The complete test charges applicable, will be intimated through proforma invoice. |
5.5(Temperature Index-IS 10810 (Part 64).) |
- |
11390 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of cores are more proportionally the charges will increase. The complete test charges applicable, will be intimated through proforma invoice. |
5.6(Smoke Density-IS 10810 (Part 63).) |
- |
12520 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of cores are more proportionally the charges will increase. The complete test charges applicable, will be intimated through proforma invoice. |
5.7(Assessment of Halogen- Table 1 of Annex D) |
- |
9900 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of cores are more proportionally the charges will increase. The complete test charges applicable, will be intimated through proforma invoice. |
5.1(Persulphate Test- IS 10810 (Part 4).) |
- |
3310 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of cores are more proportionally the charges will increase. The complete test charges applicable, will be intimated through proforma invoice. |
5.11(Flame Retardant Test- IS 10810 (Part 61),) |
- |
2680 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of cores are more proportionally the charges will increase. The complete test charges applicable, will be intimated through proforma invoice. |
5.12(Hot Set Test- IS 10810 (Part 30).) |
- |
2680 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of cores are more proportionally the charges will increase. The complete test charges applicable, will be intimated through proforma invoice. |
5.12(Permanent Set - IS 10810 (Part 30).) |
- |
2680 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of cores are more proportionally the charges will increase. The complete test charges applicable, will be intimated through proforma invoice. |
5.13(Water Immersion Test (Effect of Water on Sheath) : Tensile strength -IS 10810 (Part 7).) |
- |
6150 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of cores are more proportionally the charges will increase. The complete test charges applicable, will be intimated through proforma invoice. |
5.13(Water Immersion Test (Effect of Water on Sheath) : Elogation -IS 10810 (Part 7).) |
- |
6150 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of cores are more proportionally the charges will increase. The complete test charges applicable, will be intimated through proforma invoice. |
5.14(Ozone Resistance Test -IS 10810 (Part 13 )) |
- |
25000 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of cores are more proportionally the charges will increase. The complete test charges applicable, will be intimated through proforma invoice. |
5.15(Cold Bend Test-IS 10810 (Part 20).) |
- |
6610 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of cores are more proportionally the charges will increase. The complete test charges applicable, will be intimated through proforma invoice. |
5.16(Cold Impact Test- IS 10810 (Part 21).) |
- |
7420 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of cores are more proportionally the charges will increase. The complete test charges applicable, will be intimated through proforma invoice. |
6.1, Table 1(CORE IDENTIFICATION) |
- |
0 |
|
- |
6.2(Core Identification by Numbers) |
- |
0 |
|
- |
6.2.1(Preferred Arrangement of Marking) |
- |
0 |
|
- |
6.2.2(Durability) |
- |
0 |
|
- |
7.0(CABLE CODE) |
- |
0 |
|
- |
9.0( IDENTIFICATION) |
- |
0 |
|
- |
10.1(Packing ) |
- |
0 |
|
- |
10.2(marking) |
- |
0 |
|
- |
10.2.1(Standards marking) |
- |
0 |
|
- |
13.3, 14.3(assembly of cores ) |
- |
0 |
|
- |
6.1(General Requirements) |
- |
0 |
|
- |
6.1.1(Colour Combination Green Yellow) |
- |
0 |
|
- |
12.1(Conductor) |
- |
0 |
|
- |
12.2, Table 4(insulation) |
- |
0 |
|
- |
Table 4(Copper Purity test) |
- |
2680 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of cores are more proportionally the charges will increase. The complete test charges applicable, will be intimated through proforma invoice. |
4.3.1 (e)(Fluorine content test (Fillers)) |
- |
22050 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of cores are more proportionally the charges will increase. The complete test charges applicable, will be intimated through proforma invoice. |
4.3.1 (d)(Presence of fluorine test (Fillers)) |
- |
22050 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of cores are more proportionally the charges will increase. The complete test charges applicable, will be intimated through proforma invoice. |
4.3.1 (c)(Conductivity test (Fillers)) |
- |
8040 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of cores are more proportionally the charges will increase. The complete test charges applicable, will be intimated through proforma invoice. |
4.3.1 (b)(pH test (Fillers)) |
- |
8040 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of cores are more proportionally the charges will increase. The complete test charges applicable, will be intimated through proforma invoice. |
4.3.1 (a)(HCl test (Fillers)) |
- |
9900 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of cores are more proportionally the charges will increase. The complete test charges applicable, will be intimated through proforma invoice. |
5.7 (a)(HCl test (Assessment of halogen test)) |
- |
9900 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of cores are more proportionally the charges will increase. The complete test charges applicable, will be intimated through proforma invoice. |
5.7 (b)(pH test (Assessment of halogen test)) |
- |
8040 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of cores are more proportionally the charges will increase. The complete test charges applicable, will be intimated through proforma invoice. |
5.7 (c)(Conductivity test (Assessment of halogen test)) |
- |
8040 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of cores are more proportionally the charges will increase. The complete test charges applicable, will be intimated through proforma invoice. |
5.7 (d)(Presence of fluorine test (Assessment of halogen test)) |
- |
0 |
|
- |
5.7 (e)(Fluorine content test (Assessment of halogen test)) |
- |
22050 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of cores are more proportionally the charges will increase. The complete test charges applicable, will be intimated through proforma invoice. |
Table 2 ,( Clause 11.4, 12.4, 13.7 14.7 and 15.7 )(Insulation Resistance) |
- |
1770 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of cores are more proportionally the charges will increase. The complete test charges applicable, will be intimated through proforma invoice. |
"Table 2 ( Clause 11.4, 12.4, 13.7 14.7 and 15.7 )"(Conductor Resistance) |
- |
2680 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of cores are more proportionally the charges will increase. The complete test charges applicable, will be intimated through proforma invoice. |
Table 2 , Clause .5.13(Water immersion test (Effect of water on sheath) - TS Variation of Sheath) |
- |
6150 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of cores are more proportionally the charges will increase. The complete test charges applicable, will be intimated through proforma invoice. |
Table 2 , Clause 5.13(Water immersion test (Effect of water on sheath) - Elongation Variation of Sheath) |
- |
6150 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of cores are more proportionally the charges will increase. The complete test charges applicable, will be intimated through proforma invoice. |
"Table 2 ( Clause 11.4, 12.4, 13.7 14.7 and 15.7 )"(Hot Deformation) |
- |
2560 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of cores are more proportionally the charges will increase. The complete test charges applicable, will be intimated through proforma invoice. |
Table 2, III.a.ii(Annealing test (for Cu,
before stranding)) |
- |
6150 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of cores are more proportionally the charges will increase. The complete test charges applicable, will be intimated through proforma invoice. |
Table 2, II.a, b(Wrapping test before
stranding (for Al)) |
- |
590 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of cores are more proportionally the charges will increase. The complete test charges applicable, will be intimated through proforma invoice. |
|
31 Dec, 2026 |
- Included w.e.f. 13.09.2024 |
13 |
IS 17505 : Part 1 (2021) |
Specification for Thermosetting Insulated Fire Survival Cables for Fixed Installation having Low Emission of Smoke and Corrosive Gases when Affected by Fire for Working Voltages upto and including 1100 Vac and 1500 Vdc |
- |
281660 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
Cl. 7.3, Table 1 to 5 of IS 8130:2013 & IS:10810 (Part 5)-1984(Conductor Resistance Test) |
- |
2680 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Cl. 7.1.2 of IS 8130 : 2013 & IS:10810 (Part 1)-1984(Annealing Test (for copper)) |
- |
6150 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Cl. 7.1.1 of IS 8130:2013 & IS:10810 (Part 4)-1984(Persulphate Test for tinned copper) |
- |
3310 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
IS 191:2007 & IS 440(Copper purity test) |
- |
0 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Cl. 11,14,16, Table 4 and Table 6 of IS 17505 & IS:10810 (Part 6)-1984(Test for overall dimensions and thickness of insulation and sheath) |
- |
42170 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Table 7 of IS 17505-1:2021, IS 3975:1999 & IS:10810 (Part 36)-1984(Diameter of armour Wire) |
- |
6150 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Table 7 of IS 17505-1:2021, IS 3975:1999 & IS:10810 (Part 37)-1984(Tensile strength and elongation at break) |
- |
6150 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Table 7 of IS 17505-1:2021, IS 3975:1999 & IS:10810 (Part 38)-1984(Torsion Test on galvanised steel wire for armouring) |
- |
6150 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Table 7 of IS 17505-1:2021, IS 3975:1999 & IS:10810 (Part 39)-1984(Winding Test for Formed Wires) |
- |
560 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Table 7 of IS 17505-1:2021, IS 3975:1999 & IS:10810 (Part 40)-1984(Uniformity of Zinc coating on Round Steel Wires and Formed Steel Wires (Strips)) |
- |
3310 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Table 7 of IS 17505-1:2021, IS 3975:1999 & IS:10810 (Part 41)-1984(Mass of Zinc coating on Round Steel Wires and Formed Steel Wires (Strips)) |
- |
780 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Table 7 of IS 17505-1:2021, IS 3975:1999 & IS:10810 (Part 42)-1984(Resistivity test) |
- |
2680 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Table 1 and Table 2 of IS 17505 -1: 2021, IS:10810 (Part 7)-1984 & IS:10810 (Part 11)-1984(Tensile Strength and elongation at break before and after ageing.) |
- |
3600 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Cl 18.2 of IS 17505-1:2021 & IS:10810 (Part 45)-1984(High voltage test) |
- |
1770 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Table 1 of IS 17505-1 :2021 & IS:10810 (Part 43)-1984(Insulation Resistance) |
- |
3940 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Cl. 18.6 of IS 17505-1:2021 & IS:10810 (Part 58)-1998(Oxygen index) |
- |
9850 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Cl. 18.7 of IS 17505-1:2021 & IS:10810 (Part 64)-2003(Temperature Index) |
- |
11390 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Table-1 & Table-2 of IS 17505-1:2021 & IS:10810 (Part 11)-1984(Ageing in air oven.) |
- |
6150 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Specification for thermosetting insulated fire survival cables for fixed installation having low emission of smoke and corrosive gases when affected by fire for working voltages upto and including 1100 V A.C. and 1500 V D.C(Hot deformation) |
- |
29990 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Table-1 & Annex-F (F.1, F.2, F.3 F.4) of IS 17505-1 :2021(pH) |
- |
22050 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Table-1 & Annex-F (F.1, F.2, F.3 F.4) of IS 17505-1 :2021(Conductivity) |
- |
22050 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Table-1 & Annex-F (F.1, F.2, F.3 F.4) of IS 17505-1 :2021(HCl and HBr) |
- |
22050 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Table-1 & Annex-F (F.1, F.2, F.3 F.4) of IS 17505-1 :2021(Presence of Fluorine / Fluorine Content (if required)) |
- |
22050 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Table 1 of IS 17505-1: 2021 & IS:10810 (Part 21)-1984(Cold impact test) |
- |
1390 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Table 1 & 2 of IS 17505-1: 2021 & IS:10810 (Part 30)-1984(Hot set test) |
- |
2550 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Table 1 & 2 of IS 17505-1: 2021 & IS:10810 (Part 13)-1984(Ozone Resistance test) |
- |
25000 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Cl 18.5.1 of IS 17505-1 :2021 & IS:10810 (Part 61)-1988(Flame test on single cable) |
- |
1960 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Table 1 of IS 17505-1:2021 & IS:10810 (Part 12)-1984(Shrinkage test) |
- |
1170 |
|
TThe test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Cl 7 & Annex-F (F.1, F.2, F.3 F.4) of IS 17505-1 :2021(pH) |
- |
22050 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Cl 7 & Annex-F (F.1, F.2, F.3 F.4) of IS 17505-1 :2021(Conductivity) |
- |
22050 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Cl 7 & Annex-F (F.1, F.2, F.3 F.4) of IS 17505-1 :2021(HCl and HBr) |
- |
22050 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Cl 7 & Annex-F (F.1, F.2, F.3 F.4) of IS 17505-1 :2021(Presence of Fluorine / Fluorine Content (if required)) |
- |
22050 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Tabel 1 and 2 of IS 17505-1:2021 & IS:10810 (Part 7)-1984(Tensile strength and elongation at break.) |
- |
3600 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Tabel 1 and 2 of IS 17505-1:2021 & IS:10810 (Part 11)-1984(Ageing in air oven.) |
- |
6150 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Cl 18.6 of IS 17505-1: 2021 & IS:10810 (Part 58)-1998(Oxygen Index.) |
- |
9850 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Cl 18.8 of IS 17505-1:2021 & IS:10810 (Part 64)-2003(Temperature Index) |
- |
11390 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Table 1 & 2 of IS 17505-1: 2021 & IS:10810 (Part 13)-1984(Ozone resistance test) |
- |
25000 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Table 2 of IS 17505-1:2021 & IS:10810 (Part 15)-1984(Hot deformation) |
- |
2550 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Cl 7 & Annex-F (F.1, F.2, F.3 F.4) of IS 17505-1 :2021(pH) |
- |
22050 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Cl 7 & Annex-F (F.1, F.2, F.3 F.4) of IS 17505-1 :2021(Conductivity) |
- |
22050 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Cl 7 & Annex-F (F.1, F.2, F.3 F.4) of IS 17505-1 :2021(HCl and HBr) |
- |
22050 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Cl 7 & Annex-F (F.1, F.2, F.3 F.4) of IS 17505-1 :2021(Presence of Fluorine / Fluorine Content (if required)) |
- |
22050 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Table 1 of IS 17505-1:2021 & IS:10810 (Part 12)-1984(Shrinkage test) |
- |
1170 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Cl 18.2of IS 17505-1:2021 & IS:10810 (Part 45)-1984.(High Voltage test.) |
- |
1770 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Cl 18.5of IS 17505-1:2021 & IS:10810 (Part 53)-1984(Flammability Test) |
- |
1960 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Table-2 of IS 17505-1:2021 & IS:10810 (Part 20)-1984(Cold bend test) |
- |
6600 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Table-2 of IS 17505-1:2021 & IS:10810 (Part 21)-1984(Cold impact test) |
- |
1390 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Cl 18.5 of IS 17505-1:2021 & IS:10810 (Part 61)-1988(Flammability Test) |
- |
1960 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Cl 18.9 of IS 17505-1:2021(Water immersion test ( effect of water on sheath of cable)) |
- |
0 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Cl 18.8 of IS 17505-1:2021& IS:10810 (Part 63)-1993(Smoke density test) |
- |
12490 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Cl. 3.5, 18.4 & Annex-E of IS 17505-1:2021(Circuit integrity test under fire) |
- |
29990 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Cl. 17.1 Table 9 (iv) e(Heat Shock) |
- |
1170 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Cl. 17.1 Table 9 (iv) h(Water absorption (Gravimetric)) |
- |
18610 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Cl. 17.1 Table 9 (vii) b(Flame test on bunched cable) |
- |
42170 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Cl. 17.1 Table 9 (ix)(Abrasion resistance test) |
- |
6150 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Cl. 7.3, Table 1 to 5 of IS 8130:2013 & IS:10810 (Part 5)-1984(Conductor Resistance Test) |
- |
2680 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Cl. 7.1.2 of IS 8130 : 2013 & IS:10810 (Part 1)-1984(Annealing Test (for copper)) |
- |
6150 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Cl. 7.1.1 of IS 8130:2013 & IS:10810 (Part 4)-1984(Persulphate Test for tinned copper) |
- |
3310 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
IS 191:2007 & IS 440(Copper purity test) |
- |
0 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Cl. 11,14,16, Table 4 and Table 6 of IS 17505 & IS:10810 (Part 6)-1984(Test for overall dimensions and thickness of insulation and sheath) |
- |
1850 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Table 7 of IS 17505-1:2021, IS 3975:1999 & IS:10810 (Part 36)-1984(Diameter of armour Wire) |
- |
1000 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Table 7 of IS 17505-1:2021, IS 3975:1999 & IS:10810 (Part 37)-1984(Tensile strength and elongation at break) |
- |
12300 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Table 7 of IS 17505-1:2021, IS 3975:1999 & IS:10810 (Part 38)-1984(Torsion Test on galvanised steel wire for armouring) |
- |
6150 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Table 7 of IS 17505-1:2021, IS 3975:1999 & IS:10810 (Part 39)-1984(Winding Test for Formed Wires) |
- |
560 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Table 7 of IS 17505-1:2021, IS 3975:1999 & IS:10810 (Part 40)-1984(Uniformity of Zinc coating on Round Steel Wires and Formed Steel Wires (Strips)) |
- |
3310 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Table 7 of IS 17505-1:2021, IS 3975:1999 & IS:10810 (Part 41)-1984(Mass of Zinc coating on Round Steel Wires and Formed Steel Wires (Strips)) |
- |
780 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Table 7 of IS 17505-1:2021, IS 3975:1999 & IS:10810 (Part 42)-1984(Resistivity test) |
- |
2680 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Table 1 and Table 2 of IS 17505 -1: 2021, IS:10810 (Part 7)-1984 & IS:10810 (Part 11)-1984(Tensile Strength and elongation at break before and after ageing.) |
- |
3600 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Cl 18.2 of IS 17505-1:2021 & IS:10810 (Part 45)-1984(High voltage test) |
- |
1770 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Table 1 of IS 17505-1 :2021 & IS:10810 (Part 43)-1984(Insulation Resistance) |
- |
3110 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Cl. 18.6 of IS 17505-1:2021 & IS:10810 (Part 58)-1998(Oxygen index) |
- |
9850 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Cl. 18.7 of IS 17505-1:2021 & IS:10810 (Part 64)-2003(Temperature Index) |
- |
11390 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Table-1 & Table-2 of IS 17505-1:2021 & IS:10810 (Part 11)-1984(Ageing in air oven.) |
- |
6150 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Specification for thermosetting insulated fire survival cables for fixed installation having low emission of smoke and corrosive gases when affected by fire for working voltages upto and including 1100 V A.C. and 1500 V D.C(Hot deformation) |
- |
29990 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Table-1 & Annex-F (F.1, F.2, F.3 F.4) of IS 17505-1 :2021(pH) |
- |
22050 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Table-1 & Annex-F (F.1, F.2, F.3 F.4) of IS 17505-1 :2021(Conductivity) |
- |
22050 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Table-1 & Annex-F (F.1, F.2, F.3 F.4) of IS 17505-1 :2021(HCl and HBr) |
- |
22050 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Table-1 & Annex-F (F.1, F.2, F.3 F.4) of IS 17505-1 :2021(Presence of Fluorine / Fluorine Content (if required)) |
- |
22050 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Table 1 of IS 17505-1: 2021 & IS:10810 (Part 21)-1984(Cold impact test) |
- |
1390 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Table 1 & 2 of IS 17505-1: 2021 & IS:10810 (Part 30)-1984(Hot set test) |
- |
2550 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Table 1 & 2 of IS 17505-1: 2021 & IS:10810 (Part 13)-1984(Ozone Resistance test) |
- |
25000 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Cl 18.5.1 of IS 17505-1 :2021 & IS:10810 (Part 61)-1988(Flame test on single cable) |
- |
1960 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Table 1 of IS 17505-1:2021 & IS:10810 (Part 12)-1984(Shrinkage test) |
- |
1170 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Cl 7 & Annex-F (F.1, F.2, F.3 F.4) of IS 17505-1 :2021(pH) |
- |
22050 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Cl 7 & Annex-F (F.1, F.2, F.3 F.4) of IS 17505-1 :2021(Conductivity) |
- |
22050 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Cl 7 & Annex-F (F.1, F.2, F.3 F.4) of IS 17505-1 :2021(HCl and HBr) |
- |
22050 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Cl 7 & Annex-F (F.1, F.2, F.3 F.4) of IS 17505-1 :2021(Presence of Fluorine / Fluorine Content (if required)) |
- |
22050 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Tabel 1 and 2 of IS 17505-1:2021 & IS:10810 (Part 7)-1984(Tensile strength and elongation at break.) |
- |
3600 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Tabel 1 and 2 of IS 17505-1:2021 & IS:10810 (Part 11)-1984(Ageing in air oven.) |
- |
6150 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Cl 18.6 of IS 17505-1: 2021 & IS:10810 (Part 58)-1998(Oxygen Index.) |
- |
11340 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Cl 18.8 of IS 17505-1:2021 & IS:10810 (Part 64)-2003(Temperature Index) |
- |
11390 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Table 1 & 2 of IS 17505-1: 2021 & IS:10810 (Part 13)-1984(Ozone resistance test) |
- |
25000 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Table 2 of IS 17505-1:2021 & IS:10810 (Part 15)-1984(Hot deformation) |
- |
2550 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Cl 7 & Annex-F (F.1, F.2, F.3 F.4) of IS 17505-1 :2021(pH) |
- |
22050 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Cl 7 & Annex-F (F.1, F.2, F.3 F.4) of IS 17505-1 :2021(Conductivity) |
- |
22050 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Cl 7 & Annex-F (F.1, F.2, F.3 F.4) of IS 17505-1 :2021(HCl and HBr) |
- |
22050 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Cl 7 & Annex-F (F.1, F.2, F.3 F.4) of IS 17505-1 :2021(Presence of Fluorine / Fluorine Content (if required)) |
- |
22050 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Table 1 of IS 17505-1:2021 & IS:10810 (Part 12)-1984(Shrinkage test) |
- |
1170 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Cl 18.2of IS 17505-1:2021 & IS:10810 (Part 45)-1984.(High Voltage test.) |
- |
1770 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Cl 18.5of IS 17505-1:2021 & IS:10810 (Part 53)-1984(Flammability Test) |
- |
1960 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Table-2 of IS 17505-1:2021 & IS:10810 (Part 20)-1984(Cold bend test) |
- |
6600 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Table-2 of IS 17505-1:2021 & IS:10810 (Part 21)-1984(Cold impact test) |
- |
1390 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Cl 18.5 of IS 17505-1:2021 & IS:10810 (Part 61)-1988(Flammability Test) |
- |
1960 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Cl 18.9 of IS 17505-1:2021(Water immersion test ( effect of water on sheath of cable)) |
- |
0 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Cl 18.8 of IS 17505-1:2021& IS:10810 (Part 63)-1993(Smoke density test) |
- |
12490 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Cl. 3.5, 18.4 & Annex-E of IS 17505-1:2021(Circuit integrity test under fire) |
- |
29990 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Cl. 17.1 Table 9 (iv) e(Heat Shock) |
- |
1170 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Cl. 17.1 Table 9 (iv) h(Water absorption (Gravimetric)) |
- |
18610 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Cl. 17.1 Table 9 (vii) b(Flame test on bunched cable) |
- |
42170 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
Cl. 17.1 Table 9 (ix)(Abrasion resistance test) |
- |
6150 |
|
The test charges indicated is applicable for single core 1.1 kV Cable .if the number of
cores are more proportionally the charges will increase. The complete test
charges applicable, will be intimated through proforma invoice. |
|
31 Dec, 2026 |
- Included w.e.f 08.11.2024 |
14 |
IS 1180 : Part 3 (2021) |
Outdoor/Indoor Type Liquid Immersed Distribution Transformers Up to and Including 2 500 kVA, 33 kV — Specification Part 3 Natural/Synthetic Organic Ester Liquid Immersed |
- |
302090 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
21.2 a(Measurement of winding resistance
[IS 2026 (Part 1)].) |
- |
5700 |
|
Test charges will vary depending on the rating of the sample. The applicable test charges will be intimated through a proforma invoice. |
21.2 b(Measurement of voltage ratio and check of phase
displacement [IS 2026 (Part 1)].) |
- |
3800 |
|
Test charges will vary depending on the rating of the sample. The applicable test charges will be intimated through a proforma invoice. |
21.2 c(Measurement of short-circuit impedance
(principal tapping, when applicable) and load
loss at 50 percent and 100 percent load
[IS 2026 (Part 1)].) |
- |
10260 |
|
Test charges will vary depending on the rating of the sample. The applicable test charges will be intimated through a proforma invoice. |
21.2 d(Measurement of no-load loss and current
[IS 2026 (Part 1)].) |
- |
1900 |
|
Test charges will vary depending on the rating of the sample. The applicable test charges will be intimated through a proforma invoice. |
21.2 e(Measurement of insulation resistance
[IS 2026 (Part 1)].) |
- |
2850 |
|
Test charges will vary depending on the rating of the sample. The applicable test charges will be intimated through a proforma invoice. |
21.2 f(Induced over-voltage withstand test
[IS 2026 (Part 3)].) |
- |
3530 |
|
Test charges will vary depending on the rating of the sample. The applicable test charges will be intimated through a proforma invoice. |
21.2 g(Separate-source voltage withstand test
[IS 2026 (Part 3)]) |
- |
1900 |
|
Test charges will vary depending on the rating of the sample. The applicable test charges will be intimated through a proforma invoice. |
21.3 a(Lightning impulse test [IS 2026 (Part 3)].) |
- |
64290 |
|
Test charges will vary depending on the rating of the sample. The applicable test charges will be intimated through a proforma invoice. |
21.3 b(Temperature-rise test [IS 2026 (Part 2)].) |
- |
45870 |
|
Test charges will vary depending on the rating of the sample. The applicable test charges will be intimated through a proforma invoice. |
21.3 c(Short-circuit withstand test [IS 2026 (Part 5)]
(up to 200 kVA) and) |
- |
93120 |
|
Test charges will vary depending on the rating of the sample. The applicable test charges will be intimated through a proforma invoice. |
21.4 a(Determination of sound levels [IS 2026 (Part 10)];) |
- |
31760 |
|
Test charges will vary depending on the rating of the sample. The applicable test charges will be intimated through a proforma invoice. |
21.4 b(Short-circuit withstand test [IS 2026 (Part 5)]
(above 200 kVA);) |
- |
123040 |
|
Test charges will vary depending on the rating of the sample. The applicable test charges will be intimated through a proforma invoice. |
21.4 c(No load current at 112.5 percent voltage
(see 6.9.2, 7.9.2, 8.9.2);) |
- |
1900 |
|
Test charges will vary depending on the rating of the sample. The applicable test charges will be intimated through a proforma invoice. |
21.4 d(Paint adhesion test — The test is performed as
per ASTM D3359 (Standard Test Methods for
measuring adhesion by tape test).) |
- |
2650 |
|
Test charges will vary depending on the rating of the sample. The applicable test charges will be intimated through a proforma invoice. |
21.4 e(BDV and Moisture content of liquid in the
transformer (IS 16081, IS 16099, IS 16899 or
IS 16659, whichever is applicable).) |
- |
3310 |
|
Test charges will vary depending on the rating of the sample. The applicable test charges will be intimated through a proforma invoice. |
21.5(Pressure and Ester Liquid Leakage Test) |
- |
12130 |
|
Test charges will vary depending on the rating of the sample. The applicable test charges will be intimated through a proforma invoice. |
21.3 d(Pressure test) |
- |
12130 |
|
Test charges will vary depending on the rating of the sample. The applicable test charges will be intimated through a proforma invoice. |
6.2, 7.2, 8.2(Rated Frequency) |
- |
0 |
|
Test charges will vary depending on the rating of the sample. The applicable test charges will be intimated through a proforma invoice. |
6.3, 7.3(Nominal System Voltage) |
- |
0 |
|
Test charges will vary depending on the rating of the sample. The applicable test charges will be intimated through a proforma invoice. |
6.4(Table 2 Minimum Basic Insulation Level) |
- |
0 |
|
Test charges will vary depending on the rating of the sample. The applicable test charges will be intimated through a proforma invoice. |
6.5, 7.5(No-Load Voltage Ratios) |
- |
0 |
|
Test charges will vary depending on the rating of the sample. The applicable test charges will be intimated through a proforma invoice. |
6.6, 7.6(Winding Connections and Phase Displacement) |
- |
0 |
|
Test charges will vary depending on the rating of the sample. The applicable test charges will be intimated through a proforma invoice. |
6.7(Tapping Range and Tapping Methods) |
- |
0 |
|
Test charges will vary depending on the rating of the sample. The applicable test charges will be intimated through a proforma invoice. |
6.8(Table 3 Losses and Impedance Values) |
- |
0 |
|
Test charges will vary depending on the rating of the sample. The applicable test charges will be intimated through a proforma invoice. |
6.9(Permissible Flux Density and Over Fluxing) |
- |
0 |
|
Test charges will vary depending on the rating of the sample. The applicable test charges will be intimated through a proforma invoice. |
6.10(Limits of Temperature-rise) |
- |
0 |
|
Test charges will vary depending on the rating of the sample. The applicable test charges will be intimated through a proforma invoice. |
7.1(Table 4 Standard Ratings) |
- |
0 |
|
Test charges will vary depending on the rating of the sample. The applicable test charges will be intimated through a proforma invoice. |
7.4(Table 5 Minimum Basic Insulation Level) |
- |
0 |
|
Test charges will vary depending on the rating of the sample. The applicable test charges will be intimated through a proforma invoice. |
7.7(Tapping Ranges and Tapping Methods) |
- |
0 |
|
Test charges will vary depending on the rating of the sample. The applicable test charges will be intimated through a proforma invoice. |
7.8(Losses and Impedance Values) |
- |
0 |
|
Test charges will vary depending on the rating of the sample. The applicable test charges will be intimated through a proforma invoice. |
7.9(Permissible Flux Density and Overfluxing) |
- |
0 |
|
Test charges will vary depending on the rating of the sample. The applicable test charges will be intimated through a proforma invoice. |
7.10(Limits of Temperature Rise) |
- |
0 |
|
Test charges will vary depending on the rating of the sample. The applicable test charges will be intimated through a proforma invoice. |
8.1 Table 7(Standard Ratings) |
- |
0 |
|
Test charges will vary depending on the rating of the sample. The applicable test charges will be intimated through a proforma invoice. |
8.3(Nominal System Voltage) |
- |
0 |
|
Test charges will vary depending on the rating of the sample. The applicable test charges will be intimated through a proforma invoice. |
8.5(No Load Voltage Ratio) |
- |
0 |
|
Test charges will vary depending on the rating of the sample. The applicable test charges will be intimated through a proforma invoice. |
8.6(Number of Phases and Polarity) |
- |
0 |
|
Test charges will vary depending on the rating of the sample. The applicable test charges will be intimated through a proforma invoice. |
8.4(Table 8 Minimum Basic Insulation Level) |
- |
0 |
|
Test charges will vary depending on the rating of the sample. The applicable test charges will be intimated through a proforma invoice. |
8.8(Losses and Impedance Values) |
- |
0 |
|
Test charges will vary depending on the rating of the sample. The applicable test charges will be intimated through a proforma invoice. |
8.9(Permissible Flux Density and Overfluxing) |
- |
0 |
|
Test charges will vary depending on the rating of the sample. The applicable test charges will be intimated through a proforma invoice. |
8.10(Limits of Temperature Rise) |
- |
0 |
|
Test charges will vary depending on the rating of the sample. The applicable test charges will be intimated through a proforma invoice. |
9(Standard Materials) |
- |
0 |
|
Test charges will vary depending on the rating of the sample. The applicable test charges will be intimated through a proforma invoice. |
10(Terminal Arrangement) |
- |
0 |
|
Test charges will vary depending on the rating of the sample. The applicable test charges will be intimated through a proforma invoice. |
11(Minimum clearances in air) |
- |
0 |
|
Test charges will vary depending on the rating of the sample. The applicable test charges will be intimated through a proforma invoice. |
12(Connectors (Applicable for bare bushing terminations only)) |
- |
0 |
|
Test charges will vary depending on the rating of the sample. The applicable test charges will be intimated through a proforma invoice. |
13(Marking) |
- |
0 |
|
Test charges will vary depending on the rating of the sample. The applicable test charges will be intimated through a proforma invoice. |
14(Mounting Arrangement) |
- |
0 |
|
Test charges will vary depending on the rating of the sample. The applicable test charges will be intimated through a proforma invoice. |
15(Transformer Tank) |
- |
0 |
|
Test charges will vary depending on the rating of the sample. The applicable test charges will be intimated through a proforma invoice. |
16(Conservator for non-sealed typetransformers) |
- |
0 |
|
Test charges will vary depending on the rating of the sample. The applicable test charges will be intimated through a proforma invoice. |
17(Ability of Transformers to withstand external short circuit) |
- |
0 |
|
Test charges will vary depending on the rating of the sample. The applicable test charges will be intimated through a proforma invoice. |
18(Efficiency and regulation) |
- |
0 |
|
Test charges will vary depending on the rating of the sample. The applicable test charges will be intimated through a proforma invoice. |
19(Tolerances) |
- |
0 |
|
Test charges will vary depending on the rating of the sample. The applicable test charges will be intimated through a proforma invoice. |
20(Fittings) |
- |
0 |
|
Test charges will vary depending on the rating of the sample. The applicable test charges will be intimated through a proforma invoice. |
4(SERVICE CONDITIONS) |
- |
0 |
|
Test charges will vary depending on the rating of the sample. The applicable test charges will be intimated through a proforma invoice. |
5(General) |
- |
0 |
|
Test charges will vary depending on the rating of the sample. The applicable test charges will be intimated through a proforma invoice. |
6.1(Rating) |
- |
0 |
|
Test charges will vary depending on the rating of the sample. The applicable test charges will be intimated through a proforma invoice. |
6.2(Rated Frequceny) |
- |
0 |
|
Test charges will vary depending on the rating of the sample. The applicable test charges will be intimated through a proforma invoice. |
6.3(Nominal System Voltage) |
- |
0 |
|
Test charges will vary depending on the rating of the sample. The applicable test charges will be intimated through a proforma invoice. |
6.4(Basic Insulation Level) |
- |
0 |
|
Test charges will vary depending on the rating of the sample. The applicable test charges will be intimated through a proforma invoice. |
6.5(No-Load Voltage Ratios) |
- |
0 |
|
Test charges will vary depending on the rating of the sample. The applicable test charges will be intimated through a proforma invoice. |
6.6(Winding connection and phase displacement) |
- |
0 |
|
Test charges will vary depending on the rating of the sample. The applicable test charges will be intimated through a proforma invoice. |
6.7(Tapping range and tapping methods) |
- |
0 |
|
Test charges will vary depending on the rating of the sample. The applicable test charges will be intimated through a proforma invoice. |
6.8(Losses and Impedance Value) |
- |
0 |
|
Test charges will vary depending on the rating of the sample. The applicable test charges will be intimated through a proforma invoice. |
6.9(Permissible flux density and over fluxing) |
- |
0 |
|
Test charges will vary depending on the rating of the sample. The applicable test charges will be intimated through a proforma invoice. |
6.10(Limits of temperature-rise) |
- |
0 |
|
Test charges will vary depending on the rating of the sample. The applicable test charges will be intimated through a proforma invoice. |
7("Technical parameters of three phase distribution
transformers higher ") |
- |
0 |
|
Test charges will vary depending on the rating of the sample. The applicable test charges will be intimated through a proforma invoice. |
8(Technical parameter of single phase distribution transformers) |
- |
0 |
|
Test charges will vary depending on the rating of the sample. The applicable test charges will be intimated through a proforma invoice. |
9(Standard Materials) |
- |
0 |
|
Test charges will vary depending on the rating of the sample. The applicable test charges will be intimated through a proforma invoice. |
10(Terminal Arrangement) |
- |
0 |
|
Test charges will vary depending on the rating of the sample. The applicable test charges will be intimated through a proforma invoice. |
12(Connectors for bare bushing terminations) |
- |
0 |
|
Test charges will vary depending on the rating of the sample. The applicable test charges will be intimated through a proforma invoice. |
13(Marking) |
- |
0 |
|
Test charges will vary depending on the rating of the sample. The applicable test charges will be intimated through a proforma invoice. |
14(Mounting Arrangement) |
- |
0 |
|
Test charges will vary depending on the rating of the sample. The applicable test charges will be intimated through a proforma invoice. |
15(Trasnformer tank) |
- |
0 |
|
Test charges will vary depending on the rating of the sample. The applicable test charges will be intimated through a proforma invoice. |
16(Conservator for non-sealed type transformers) |
- |
0 |
|
Test charges will vary depending on the rating of the sample. The applicable test charges will be intimated through a proforma invoice. |
17(Ability of transformers to whitstand external short circuit) |
- |
0 |
|
Test charges will vary depending on the rating of the sample. The applicable test charges will be intimated through a proforma invoice. |
18(Efficiency and regulations) |
- |
0 |
|
Test charges will vary depending on the rating of the sample. The applicable test charges will be intimated through a proforma invoice. |
19(Tolerances) |
- |
0 |
|
Test charges will vary depending on the rating of the sample. The applicable test charges will be intimated through a proforma invoice. |
20(Fittings) |
- |
0 |
|
Test charges will vary depending on the rating of the sample. The applicable test charges will be intimated through a proforma invoice. |
21.1(General) |
- |
0 |
|
Test charges will vary depending on the rating of the sample. The applicable test charges will be intimated through a proforma invoice. |
21.2(Routine Tests) |
- |
0 |
|
Test charges will vary depending on the rating of the sample. The applicable test charges will be intimated through a proforma invoice. |
21.3(Types test) |
- |
0 |
|
Test charges will vary depending on the rating of the sample. The applicable test charges will be intimated through a proforma invoice. |
21.4(Special Test) |
- |
0 |
|
Test charges will vary depending on the rating of the sample. The applicable test charges will be intimated through a proforma invoice. |
21.5(Pressure and Ester Liquid Leakage Test) |
- |
0 |
|
Test charges will vary depending on the rating of the sample. The applicable test charges will be intimated through a proforma invoice. |
22(Information required with enquiry and order) |
- |
0 |
|
Test charges will vary depending on the rating of the sample. The applicable test charges will be intimated through a proforma invoice. |
6.1 Table 1(Standard Ratings) |
- |
0 |
|
Test charges will vary depending on the rating of the sample. The applicable test charges will be intimated through a proforma invoice. |
11(Minimum clearances in air) |
- |
0 |
|
Test charges will vary depending on the rating of the sample. The applicable test charges will be intimated through a proforma invoice. |
|
31 Dec, 2026 |
- Included w.e.f. 13.09.2024 |
15 |
IS 12615 (2018) |
Line operated three phase AC motors (IE Code) "Efficiency classes and performance specification" (Third Revision) |
- |
39060 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
15.2(Rating) |
- |
0 |
|
Individual test charge not available |
18.3(BIS Certification Marking
) |
- |
0 |
|
Individual test charge not available |
15.3.2(Marking) |
- |
0 |
|
Individual test charge not available |
8.0(Earthing) |
- |
0 |
|
Individual test charge not available |
9.0(Terminal Marking) |
- |
0 |
|
Individual test charge not available |
11.0(DUTY AND RATING) |
- |
0 |
|
Individual test charge not available |
18.3(Marking) |
- |
0 |
|
Individual test charge not available |
16.2.1(Dimensions) |
- |
0 |
|
Individual test charge not available |
16.1.1(Insulation Resistance Test) |
- |
0 |
|
Individual test charge not available |
16.1.2(Measurement of Resistance of Windings of Stator) |
- |
0 |
|
Individual test charge not available |
16.1.3(No Load Test) |
- |
0 |
|
Individual test charge not available |
16.1.4(Locked Rotor Readings of Voltage, Current and Power Input at a Suitable Reduced Voltage) |
- |
0 |
|
Individual test charge not available |
16.1.5(5 Reduced Voltage Running up Test at no-load (for squirrel cage motor up to 37 kW only)) |
- |
0 |
|
Individual test charge not available |
16.1.6(High Voltage Test) |
- |
0 |
|
Individual test charge not available |
16.2.2(Locked Rotor Test) |
- |
0 |
|
Individual test charge not available |
16.2.2.1(Locked Rotor Test) |
- |
0 |
|
Individual test charge not available |
16.2.2.2(Locked Rotor Test) |
- |
0 |
|
Individual test charge not available |
16.2.2.2.1(Locked Rotor Test) |
- |
0 |
|
- |
16.2.2.3(Determination of starting characteristics
-locked rotor current) |
- |
0 |
|
Individual test charge not available |
16.2.2.3.1(Direct proportion method) |
- |
0 |
|
Individual test charge not available |
16.2.3(Full Load Test to Determine Efficiency, Power Factor and Slip) |
- |
0 |
|
Individual test charge not available |
16.2.4(Temperature Rise Test) |
- |
0 |
|
Individual test charge not available |
16.2.5(Momentary Overload Test) |
- |
0 |
|
Individual test charge not available |
16.3.1( Test for Vibration Severity of Motor) |
- |
0 |
|
Individual test charge not available |
16.3.2( Test for Noise Levels of Motor) |
- |
0 |
|
Individual test charge not available |
16.3.3( Test for Degree of Protection by Enclosure) |
- |
0 |
|
Individual test charge not available |
16.3.4(Over Speed Test) |
- |
0 |
|
Individual test charge not available |
16.3.5( Temperature Rise Test at Limiting Values of
Voltage and Frequency Variation) |
- |
0 |
|
Individual test charge not available |
15.2(Rating) |
- |
0 |
|
Individual test charge not available |
18.3(BIS Certification Marking
) |
- |
0 |
|
Individual test charge not available |
15.3.2(Marking) |
- |
0 |
|
Individual test charge not available |
8.0(Earthing) |
- |
0 |
|
Individual test charge not available |
9.0(Terminal Marking) |
- |
0 |
|
Individual test charge not available |
11.0(DUTY AND RATING) |
- |
0 |
|
Individual test charge not available |
18.3(Marking) |
- |
0 |
|
Individual test charge not available |
16.2.1(Dimensions) |
- |
0 |
|
Individual test charge not available |
16.1.1(Insulation Resistance Test) |
- |
0 |
|
Individual test charge not available |
16.1.2(Measurement of Resistance of Windings of Stator) |
- |
0 |
|
Individual test charge not available |
16.1.3(No Load Test) |
- |
0 |
|
Individual test charge not available |
16.1.4(Locked Rotor Readings of Voltage, Current and Power Input at a Suitable Reduced Voltage) |
- |
0 |
|
Individual test charge not available |
16.1.5(5 Reduced Voltage Running up Test at no-load (for squirrel cage motor up to 37 kW only)) |
- |
0 |
|
Individual test charge not available |
16.1.6(High Voltage Test) |
- |
0 |
|
Individual test charge not available |
16.2.2(Locked Rotor Test) |
- |
0 |
|
Individual test charge not available |
16.2.2.1(Locked Rotor Test) |
- |
0 |
|
Individual test charge not available |
16.2.2.2(Locked Rotor Test) |
- |
0 |
|
Individual test charge not available |
16.2.2.2.1(Locked Rotor Test) |
- |
0 |
|
Individual test charge not available |
16.2.2.3(Determination of starting characteristics
-locked rotor current) |
- |
0 |
|
Individual test charge not available |
16.2.2.3.1(Direct proportion method) |
- |
0 |
|
Individual test charge not available |
16.2.3(Full Load Test to Determine Efficiency, Power Factor and Slip) |
- |
0 |
|
Individual test charge not available |
16.2.4(Temperature Rise Test) |
- |
0 |
|
Individual test charge not available |
16.2.5(Momentary Overload Test) |
- |
0 |
|
Individual test charge not available |
16.3.1( Test for Vibration Severity of Motor) |
- |
0 |
|
Individual test charge not available |
16.3.2( Test for Noise Levels of Motor) |
- |
0 |
|
Individual test charge not available |
16.3.3( Test for Degree of Protection by Enclosure) |
- |
0 |
|
Individual test charge not available |
16.3.4(Over Speed Test) |
- |
0 |
|
Individual test charge not available |
16.3.5( Temperature Rise Test at Limiting Values of
Voltage and Frequency Variation) |
- |
0 |
|
Individual test charge not available |
12.2(Pull up torque) |
- |
0 |
|
Individual test charge not available |
6(Method of cooling) |
- |
0 |
|
Individual test charge not available |
Cl. 16.3.5(Temperature rise test at limiting values of voltage and frequnancy variation) |
- |
0 |
|
Individual test charge not available |
Cl. 16.3.4(Over Speed test) |
- |
0 |
|
Individual test charge not available |
Cl. 16.3.3(Test for degree of protection by enclosure) |
- |
0 |
|
Individual test charge not available |
Cl. 16.3.2(Noise) |
- |
0 |
|
Individual test charge not available |
Cl. 16.3.1(Vibration test) |
- |
0 |
|
Individual test charge not available |
Cl. 11(Duty and Rating) |
- |
0 |
|
Individual test charge not available |
Cl. 16.2.1(Dimensions) |
- |
0 |
|
Individual test charge not available |
Cl. 16.1.6(High Voltage Test) |
- |
0 |
|
Individual test charge not available |
Cl. 16.1.1(Insulation Resistance test) |
- |
0 |
|
Individual test charge not available |
Cl. 16.2.5(Momentary overload test) |
- |
0 |
|
Individual test charge not available |
Cl. 8(Earthing) |
- |
0 |
|
Individual test charge not available |
Cl. 6(Method of cooling) |
- |
0 |
|
Individual test charge not available |
Cl. 9(Terminal marking) |
- |
0 |
|
Individual test charge not available |
Cl. 16.2.4(Temperature rise test ) |
- |
0 |
|
Individual test charge not available |
Cl. 16.2.3(Full load test) |
- |
0 |
|
Individual test charge not available |
Cl. 12.2(Pull up test) |
- |
0 |
|
Individual test charge not available |
Cl. 16.1.4 & 16.2.2(Locked rotor readings) |
- |
0 |
|
Individual test charge not available |
Cl. 16.1.5(Reduced voltage running test) |
- |
0 |
|
Individual test charge not available |
Cl. 16.1.3(No load at rated voltage) |
- |
0 |
|
Individual test charge not available |
Cl. 16.1.2(Measurment of stator resistance) |
- |
0 |
|
Individual test charge not available |
Cl. 18.3(BIS Certification Marking) |
- |
0 |
|
Individual test charge not available |
Cl. 15.2(rating) |
- |
0 |
|
Individual test charge not available |
Cl. 18.2(Marking and labelling) |
- |
0 |
|
Individual test charge not available |
Cl. 18.1(Marking and labelling) |
- |
0 |
|
Individual test charge not available |
Cl-12.1(Momentary Excess Torque) |
- |
0 |
|
Individual test charge not available |
Cl-12.2(Pull-up-Torque) |
- |
0 |
|
Individual test charge not available |
Cl-12.3(Sustained Overloads) |
- |
0 |
|
Individual test charge not available |
Cl-13(Temperature Rise) |
- |
0 |
|
Individual test charge not available |
Cl-14(Performance Values) |
- |
0 |
|
Individual test charge not available |
Cl-15(Efficiency) |
- |
0 |
|
Individual test charge not available |
12.2(Pull up torque) |
- |
0 |
|
Individual test charge not available |
6(Method of cooling) |
- |
0 |
|
Individual test charge not available |
Cl. 16.3.5(Temperature rise test at limiting values of voltage and frequnancy variation) |
- |
0 |
|
Individual test charge not available |
Cl. 16.3.4(Over Speed test) |
- |
0 |
|
Individual test charge not available |
Cl. 16.3.3(Test for degree of protection by enclosure) |
- |
0 |
|
Individual test charge not available |
Cl. 16.3.2(Noise) |
- |
0 |
|
Individual test charge not available |
Cl. 16.3.1(Vibration test) |
- |
0 |
|
Individual test charge not available |
Cl. 11(Duty and Rating) |
- |
0 |
|
Individual test charge not available |
Cl. 16.2.1(Dimensions) |
- |
0 |
|
Individual test charge not available |
Cl. 16.1.6(High Voltage Test) |
- |
0 |
|
Individual test charge not available |
Cl. 16.1.1(Insulation Resistance test) |
- |
0 |
|
Individual test charge not available |
Cl. 16.2.5(Momentary overload test) |
- |
0 |
|
Individual test charge not available |
Cl. 8(Earthing) |
- |
0 |
|
Individual test charge not available |
Cl. 6(Method of cooling) |
- |
0 |
|
Individual test charge not available |
Cl. 9(Terminal marking) |
- |
0 |
|
Individual test charge not available |
Cl. 16.2.4(Temperature rise test ) |
- |
0 |
|
Individual test charge not available |
Cl. 16.2.3(Full load test) |
- |
0 |
|
Individual test charge not available |
Cl. 12.2(Pull up test) |
- |
0 |
|
Individual test charge not available |
Cl. 16.1.4 & 16.2.2(Locked rotor readings) |
- |
0 |
|
Individual test charge not available |
Cl. 16.1.5(Reduced voltage running test) |
- |
0 |
|
Individual test charge not available |
Cl. 16.1.3(No load at rated voltage) |
- |
0 |
|
Individual test charge not available |
Cl. 16.1.2(Measurment of stator resistance) |
- |
0 |
|
Individual test charge not available |
Cl. 18.3(BIS Certification Marking) |
- |
0 |
|
Individual test charge not available |
Cl. 15.2(rating) |
- |
0 |
|
Individual test charge not available |
Cl. 18.2(Marking and labelling) |
- |
0 |
|
Individual test charge not available |
Cl. 18.1(Marking and labelling) |
- |
0 |
|
Individual test charge not available |
Cl-12.1(Momentary Excess Torque) |
- |
0 |
|
Individual test charge not available |
Cl-12.2(Pull-up-Torque) |
- |
0 |
|
Individual test charge not available |
Cl-12.3(Sustained Overloads) |
- |
0 |
|
Individual test charge not available |
Cl-13(Temperature Rise) |
- |
0 |
|
Individual test charge not available |
Cl-14(Performance Values) |
- |
0 |
|
Individual test charge not available |
Cl-15(Efficiency) |
- |
0 |
|
Individual test charge not available |
12.2(Pull up torque) |
- |
0 |
|
Individual test charge not available |
6(Method of cooling) |
- |
0 |
|
Individual test charge not available |
Cl. 16.3.5(Temperature rise test at limiting values of voltage and frequnancy variation) |
- |
0 |
|
Individual test charge not available |
Cl. 16.3.4(Over Speed test) |
- |
0 |
|
Individual test charge not available |
Cl. 16.3.3(Test for degree of protection by enclosure) |
- |
0 |
|
Individual test charge not available |
Cl. 16.3.2(Noise) |
- |
0 |
|
Individual test charge not available |
Cl. 16.3.1(Vibration test) |
- |
0 |
|
Individual test charge not available |
Cl. 11(Duty and Rating) |
- |
0 |
|
Individual test charge not available |
Cl. 16.2.1(Dimensions) |
- |
0 |
|
Individual test charge not available |
Cl. 16.1.6(High Voltage Test) |
- |
0 |
|
Individual test charge not available |
Cl. 16.1.1(Insulation Resistance test) |
- |
0 |
|
Individual test charge not available |
Cl. 16.2.5(Momentary overload test) |
- |
0 |
|
Individual test charge not available |
Cl. 8(Earthing) |
- |
0 |
|
Individual test charge not available |
Cl. 6(Method of cooling) |
- |
0 |
|
Individual test charge not available |
Cl. 9(Terminal marking) |
- |
0 |
|
Individual test charge not available |
Cl. 16.2.4(Temperature rise test ) |
- |
0 |
|
Individual test charge not available |
Cl. 16.2.3(Full load test) |
- |
0 |
|
Individual test charge not available |
Cl. 12.2(Pull up test) |
- |
0 |
|
Individual test charge not available |
Cl. 16.1.4 & 16.2.2(Locked rotor readings) |
- |
0 |
|
Individual test charge not available |
Cl. 16.1.5(Reduced voltage running test) |
- |
0 |
|
Individual test charge not available |
Cl. 16.1.3(No load at rated voltage) |
- |
0 |
|
Individual test charge not available |
Cl. 16.1.2(Measurment of stator resistance) |
- |
0 |
|
Individual test charge not available |
Cl. 18.3(BIS Certification Marking) |
- |
0 |
|
Individual test charge not available |
Cl. 15.2(rating) |
- |
0 |
|
Individual test charge not available |
Cl. 18.2(Marking and labelling) |
- |
0 |
|
Individual test charge not available |
Cl. 18.1(Marking and labelling) |
- |
0 |
|
Individual test charge not available |
Cl-12.1(Momentary Excess Torque) |
- |
0 |
|
Individual test charge not available |
Cl-12.2(Pull-up-Torque) |
- |
0 |
|
Individual test charge not available |
Cl-12.3(Sustained Overloads) |
- |
0 |
|
Individual test charge not available |
Cl-13(Temperature Rise) |
- |
0 |
|
Individual test charge not available |
Cl-14(Performance Values) |
- |
0 |
|
Individual test charge not available |
Cl-15(Efficiency) |
- |
0 |
|
Individual test charge not available |
12.2(Pull up torque) |
- |
0 |
|
Individual test charge not available |
6(Method of cooling) |
- |
0 |
|
Individual test charge not available |
Cl. 16.3.5(Temperature rise test at limiting values of voltage and frequnancy variation) |
- |
0 |
|
Individual test charge not available |
Cl. 16.3.4(Over Speed test) |
- |
0 |
|
Individual test charge not available |
Cl. 16.3.3(Test for degree of protection by enclosure) |
- |
0 |
|
Individual test charge not available |
Cl. 16.3.2(Noise) |
- |
0 |
|
Individual test charge not available |
Cl. 16.3.1(Vibration test) |
- |
0 |
|
Individual test charge not available |
Cl. 11(Duty and Rating) |
- |
0 |
|
Individual test charge not available |
Cl. 16.2.1(Dimensions) |
- |
0 |
|
Individual test charge not available |
Cl. 16.1.6(High Voltage Test) |
- |
0 |
|
Individual test charge not available |
Cl. 16.1.1(Insulation Resistance test) |
- |
0 |
|
Individual test charge not available |
Cl. 16.2.5(Momentary overload test) |
- |
0 |
|
Individual test charge not available |
Cl. 8(Earthing) |
- |
0 |
|
Individual test charge not available |
Cl. 6(Method of cooling) |
- |
0 |
|
Individual test charge not available |
Cl. 9(Terminal marking) |
- |
0 |
|
Individual test charge not available |
Cl. 16.2.4(Temperature rise test ) |
- |
0 |
|
Individual test charge not available |
Cl. 16.2.3(Full load test) |
- |
0 |
|
Individual test charge not available |
Cl. 12.2(Pull up test) |
- |
0 |
|
Individual test charge not available |
Cl. 16.1.4 & 16.2.2(Locked rotor readings) |
- |
0 |
|
Individual test charge not available |
Cl. 16.1.5(Reduced voltage running test) |
- |
0 |
|
Individual test charge not available |
Cl. 16.1.3(No load at rated voltage) |
- |
0 |
|
Individual test charge not available |
Cl. 16.1.2(Measurment of stator resistance) |
- |
0 |
|
Individual test charge not available |
Cl. 18.3(BIS Certification Marking) |
- |
0 |
|
Individual test charge not available |
Cl. 15.2(rating) |
- |
0 |
|
Individual test charge not available |
Cl. 18.2(Marking and labelling) |
- |
0 |
|
Individual test charge not available |
Cl. 18.1(Marking and labelling) |
- |
0 |
|
Individual test charge not available |
Cl-12.1(Momentary Excess Torque) |
- |
0 |
|
Individual test charge not available |
Cl-12.2(Pull-up-Torque) |
- |
0 |
|
Individual test charge not available |
Cl-12.3(Sustained Overloads) |
- |
0 |
|
Individual test charge not available |
Cl-13(Temperature Rise) |
- |
0 |
|
Individual test charge not available |
Cl-14(Performance Values) |
- |
0 |
|
Individual test charge not available |
Cl-15(Efficiency) |
- |
0 |
|
Individual test charge not available |
|
31 Dec, 2026 |
- Included w.e.f 19.05.2025 |
16 |
IS 10322 : PART 5 : SEC 3 (2012) |
Luminaires: Part 5 particular requirements: Sec 3 luminaires for road and street lighting (First Revision) |
- |
104500 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
4(General Test Requireements) |
- |
0 |
|
Clause wise test charges not available |
5(Classification of Luminaires') |
- |
0 |
|
Clause wise test charges not available |
6.0(Marking) |
- |
0 |
|
Clause wise test charges not available |
7.0(Construction) |
- |
0 |
|
Clause wise test charges not available |
8.0(Creepage Distance and Clearances) |
- |
0 |
|
Clause wise test charges not available |
9.0(Provision for earthing) |
- |
0 |
|
Clause wise test charges not available |
10.0(Terminals) |
- |
0 |
|
Clause wise test charges not available |
11.0(External & Internal Wiring) |
- |
0 |
|
Clause wise test charges not available |
12.0(Protection against electric shock) |
- |
0 |
|
Clause wise test charges not available |
13.0(Endurance Tests and Thermal Tests) |
- |
0 |
|
Clause wise test charges not available |
14.0(Resistance to Dust & Moisture) |
- |
0 |
|
Clause wise test charges not available |
15.0(Insulation Resistance and Electric Strength) |
- |
0 |
|
Clause wise test charges not available |
16.0(Resistance to Heat , fire and tracking) |
- |
0 |
|
Clause wise test charges not available |
17.0(Photometric Test) |
- |
0 |
|
Clause wise test charges not available |
|
31 Dec, 2026 |
- Included w.e.f. 13.09.2024 |
17 |
IS 10322 : Part 5 : Sec 1 (2012) |
Luminaires: Part 5 particular requirements: Sec 1 fixed general purpose luminaires (First Revision) |
- |
88000 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
4(General Test Requireements) |
- |
0 |
|
Clause wise test charges not available |
5(Classification of Luminaires') |
- |
0 |
|
Clause wise test charges not available |
6.0(Marking) |
- |
0 |
|
Clause wise test charges not available |
7.0(Construction) |
- |
0 |
|
Clause wise test charges not available |
8.0(Creepage Distance and Clearances) |
- |
0 |
|
Clause wise test charges not available |
9.0(Provision for earthing) |
- |
0 |
|
Clause wise test charges not available |
10.0(Terminals) |
- |
0 |
|
Clause wise test charges not available |
11.0(External & Internal Wiring) |
- |
0 |
|
Clause wise test charges not available |
12.0(Protection against electric shock) |
- |
0 |
|
Clause wise test charges not available |
13.0(Endurance Tests and Thermal Tests) |
- |
0 |
|
Clause wise test charges not available |
14.0(Resistance to Dust & Moisture) |
- |
0 |
|
Clause wise test charges not available |
15.0(Insulation Resistance and Electric Strength) |
- |
0 |
|
Clause wise test charges not available |
16.0(Resistance to Heat , fire and tracking) |
- |
0 |
|
Clause wise test charges not available |
17.0(Photometric Test) |
- |
0 |
|
Clause wise test charges not available |
|
31 Dec, 2026 |
- Included w.e.f. 13.09.2024 |
18 |
IS 10322 : Part 1 (2014) |
Luminaires: Part 1 general requirements and tests (First Revision) |
- |
165000 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
0.4(GENERAL TEST REQUIREMENTS AND
VERIFICATION) |
- |
0 |
|
Clause wise test charges not available |
|
31 Dec, 2026 |
- Included w.e.f 08.11.2024 |
19 |
IS 16103 : Part 1 (2012) |
Led modules for general lighting: Part 1 safety requirements |
- |
71500 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
7(Marking) |
- |
0 |
|
Clause wise test charges are not available |
8(Terminals) |
- |
0 |
|
Clause wise test charges are not available |
9(PROVISION FOR EARTHING) |
- |
0 |
|
Clause wise test charges are not available |
10(Protection against accidental contact with live parts) |
- |
0 |
|
Clause wise test charges are not available |
11(Mositure Resistance and Insulation) |
- |
0 |
|
Clause wise test charges are not available |
12(Electric Strength) |
- |
0 |
|
Clause wise test charges are not available |
13(Fault conditions) |
- |
0 |
|
Clause wise test charges are not available |
15(Construction) |
- |
0 |
|
Clause wise test charges are not available |
16(Creepage distance and clearances) |
- |
0 |
|
Clause wise test charges are not available |
17(Screws, current carrying parts and connections) |
- |
0 |
|
Clause wise test charges are not available |
18(Resistance to heat, fire and tracking) |
- |
0 |
|
Clause wise test charges are not available |
19(Resistance to corrosion) |
- |
0 |
|
Clause wise test charges are not available |
21(Heat management) |
- |
0 |
|
Clause wise test charges are not available |
|
31 Dec, 2026 |
- Included w.e.f. 13.09.2024 |
20 |
IS 16103 : Part 2 (2012) |
Led modules for general lighting: Part 2 performance requirements |
- |
308000 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
6(Dimensions) |
- |
0 |
|
Clause wise test charges are not available |
7(Module Power) |
- |
0 |
|
Clause wise test charges are not available |
8(Light Output) |
- |
0 |
|
Clause wise test charges are not available |
9(Chromaticity
Coordinates,
Correlated colour
temperature and
colour rendering) |
- |
0 |
|
Clause wise test charges are not available |
10(LED Module Life) |
- |
0 |
|
Clause wise test charges are not available |
12(Information for
Luminaire design) |
- |
0 |
|
Clause wise test charges are not available |
13(Test for Emission
(Radiated and Conducted)
of radio frequency
distribution) |
- |
0 |
|
Clause wise test charges are not available |
|
31 Dec, 2026 |
- Included w.e.f. 13.09.2024 |
21 |
IS 10322 : Part 5 : Sec 5 (2013) |
Luminaires: Part 5 particular requirements: Sec 5 floodlights (First Revision) |
- |
100255 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
4(General Test Requireements) |
- |
104740 |
|
Test Charges applicable for Complete standard |
5(Classification of Luminaires') |
- |
100255 |
|
Test Charges applicable for Complete standard |
6.0(Marking) |
- |
100255 |
|
Test Charges applicable for Complete standard |
7.0(Construction) |
- |
100255 |
|
Test Charges applicable for Complete standard |
8.0(Creepage Distance and Clearances) |
- |
100255 |
|
Test Charges applicable for Complete standard |
9.0(Provision for earthing) |
- |
100255 |
|
Test Charges applicable for Complete standard |
10.0(Terminals) |
- |
100255 |
|
Test Charges applicable for Complete standard |
11.0(External & Internal Wiring) |
- |
100255 |
|
Test Charges applicable for Complete standard |
12.0(Protection against electric shock) |
- |
100255 |
|
Test Charges applicable for Complete standard. |
13.0(Endurance Tests and Thermal Tests) |
- |
100255 |
|
Test Charges applicable for Complete standard. |
14.0(Resistance to Dust & Moisture) |
- |
100255 |
|
Test Charges applicable for Complete standard. |
15.0(Insulation Resistance and Electric Strength) |
- |
100255 |
|
Test Charges applicable for Complete standard |
16.0(Resistance to Heat , fire and tracking) |
- |
100255 |
|
Test Charges applicable for Complete standard |
17.0(Photometric Test) |
- |
100255 |
|
Test Charges applicable for Complete standard |
|
31 Dec, 2026 |
- Included w.e.f 19.05.2025 |
22 |
IS 14697 (2021) |
ac STATIC TRANSFORMER OPERATED WATTHOUR METERS CLASS 02 S AND 05 S AND VAR-HOUR METERS CLASS 02 S 05 S AND 10 S - SPECIFICATION First Revision |
Type test |
36750 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
9.5 & 12.7.6.3(a.c. voltage test) |
- |
2320 |
|
only Acceptance test |
9.5, 12.7.6.4() |
- |
2120 |
|
Insulation test |
11.1(Limits of Error Due to Variation of the Current) |
- |
14920 |
|
Both LOE balance and Unbalance mode |
12.15(Interpretation of Test Results) |
- |
0 |
|
NA |
11.6 & 12.14(Meter Constant) |
- |
2420 |
|
- |
12.13 & 11.5(Starting Current) |
- |
2420 |
|
Star up test also included |
11.4, 12.12(Test of No-Load Condition) |
- |
1210 |
|
- |
11.7, 12.16(Repeatability of Error Test) |
- |
5040 |
|
- |
9.1, 12.7.1(Test of Power Consumption) |
- |
6300 |
|
Both Voltage &Current circuit included |
|
31 Dec, 2026 |
- Included w.e.f 16.05.2024 |
23 |
IS 13779 (2020) |
ac STATIC WATTHOUR METERS CLASS 1 AND 2-Specefication |
type test |
11050 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
12.7.6.3(ac high voltage test) |
- |
530 |
|
Only acceptance test-1Phase |
12.7.6.3(ac high voltage test) |
- |
580 |
|
3-Phase |
12.7.6.4(Insulation resistance test) |
- |
530 |
|
- |
11.1(Limits of error due to variation of the current) |
- |
2520 |
|
- |
11.6, 12.15(Meter Constant) |
- |
950 |
|
- |
11.5, 12.14(Test of Starting Conditions) |
- |
950 |
|
- |
12.13, 11.4(Test of No-Load Condition) |
- |
950 |
|
- |
12.17, 11.7(Repeatability of Error Test) |
- |
2520 |
|
- |
12.7.1, 9.1(Test of Power Consumption) |
- |
2100 |
|
- |
12.7.6.3(ac high voltage test) |
- |
580 |
|
3-Phase |
12.7.6.4(Insulation resistance test) |
- |
550 |
|
3-Phase |
11.1(Limits of error due to variation of the current) |
- |
3730 |
|
3-Phase |
11.6, 12.15(Meter Constant) |
- |
1210 |
|
3-Phase |
11.5, 12.14(Test of Starting Conditions) |
- |
1210 |
|
3-phase |
12.13, 11.4(Test of No-Load Condition) |
- |
1210 |
|
3-Phase |
12.17, 11.7(Repeatability of Error Test) |
- |
2520 |
|
3-Phase |
12.7.1, 9.1(Test of Power Consumption) |
- |
6300 |
|
3-Phase |
11.1(Test on limits of error due to variation of current) |
- |
7460 |
|
3-Phase |
12.7.6.3(ac high voltage test) |
- |
- |
|
- |
12.7.6.4(Insulation resistance test) |
- |
- |
|
- |
11.1(Limits of error due to variation of the current) |
- |
- |
|
- |
11.6, 12.15(Meter Constant) |
- |
- |
|
- |
11.5, 12.14(Test of Starting Conditions) |
- |
- |
|
- |
12.13, 11.4(Test of No-Load Condition) |
- |
- |
|
- |
12.17, 11.7(Repeatability of Error Test) |
- |
- |
|
- |
12.7.1, 9.1(Test of Power Consumption) |
- |
- |
|
- |
11.1(Test on limits of error due to variation of current) |
- |
- |
|
- |
|
31 Dec, 2026 |
- Included w.e.f 16.05.2024 |
24 |
IS/IEC 60947 : Part 2 (2016) |
Low - Voltage switchgear and controlgear: Part 2 circuit - Breakers (First Revision) |
- |
579250 View breakup
For all test sequences Rs.579250/-;
Test Sequence I: Rs.188550/-;
Test Sequence II: Rs.94850/-;
Test Sequence III: Rs.64350/-;
Test Sequence IV: Rs.110650/-;
Test Sequence V: Rs.120850/-;
Combined test Sequence : Rs.143900/-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
8.3.3.4(Mechanical operation and operational performance capability) |
- |
33850 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice |
8.3.3.2(Tripping limits and characteristics) |
- |
48150 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice |
8.3.3.3(Test of dielectric properties) |
- |
47250 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice |
8.3.3.5(Overload performance) |
- |
35550 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice |
8.3.3.6(Verification of dielectric withstand) |
- |
10200 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice |
8.3.3.7(Verification of temperature-rise) |
- |
9150 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice |
8.3.3.8(Verification of Overload releases) |
- |
1700 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice |
8.3.3.9(Verification of undervoltage and shunt releases) |
- |
1700 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice |
8.3.3.10(Verification of main contact position) |
- |
2700 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice |
8.3.4.2(Test of service short circuit breaking capacity) |
- |
43950 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice |
8.3.4.3(verification of operational performance capability (sequence II)) |
- |
23050 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice |
8.3.4.4(Verification of dielectric withstand) |
- |
10200 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice |
8.3.4.5(Verifiation of temperature-rise) |
- |
9150 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice |
8.3.4.6(Verification of Overload releases) |
- |
1700 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice |
8.3.5.2(Verification of Overload releases) |
- |
1700 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice |
8.3.5.3(Rated ultimate short-circuit breaking capacity) |
- |
43950 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice |
8.3.5.4(Verification of dielectric withstand) |
- |
10200 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice |
8.3.5.5(verification of overload releases (sequence III)) |
- |
1700 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice |
8.3.6.2(Verification of Overload releases) |
- |
1700 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice |
8.3.6.3(Rated short-time withstand current) |
- |
43950 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice |
8.3.6.4(verification of temperature-rise (sequence IV)) |
- |
9150 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice |
8.3.6.5(short circuit breaking capacity at maximum short time withstand current (sequence IV)) |
- |
43950 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice |
8.3.6.6(verification of dielectric withstand (sequence IV)) |
- |
10200 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice |
8.3.3.2(Tripping limits and characteristics) |
- |
48150 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice |
8.3.3.3(Test of dielectric properties) |
- |
47250 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice |
8.3.3.4(Mechanical operation and operational performance capability) |
- |
33850 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice |
8.3.3.5(Overload performance) |
- |
35550 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice |
8.3.3.6(Verification of dielectric withstand) |
- |
10200 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice |
8.3.3.7(Verification of temperature-rise) |
- |
9150 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice |
8.3.3.8(Verification of Overload releases) |
- |
1700 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice |
8.3.3.9(Verification of undervoltage and shunt releases) |
- |
1700 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice |
8.3.3.10(Verification of main contact position) |
- |
2700 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice |
8.3.4.2(Test of service short circuit breaking capacity) |
- |
43950 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice |
8.3.4.3(verification of operational performance capability (sequence II)) |
- |
23050 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice |
8.3.4.4(Verification of dielectric withstand) |
- |
10200 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice |
8.3.4.5(Verifiation of temperature-rise) |
- |
9150 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice |
8.3.4.6(Verification of Overload releases) |
- |
1700 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice |
8.3.5.2(Verification of Overload releases) |
- |
1700 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice |
8.3.5.3(Rated ultimate short-circuit breaking capacity) |
- |
43950 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice |
8.3.5.4(Verification of dielectric withstand) |
- |
10200 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice |
8.3.5.5(verification of overload releases (sequence III)) |
- |
1700 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice |
8.3.6.2(Verification of Overload releases) |
- |
1700 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice |
8.3.6.3(Rated short-time withstand current) |
- |
43950 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice |
8.3.6.4(verification of temperature-rise (sequence IV)) |
- |
9150 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice |
8.3.6.5(short circuit breaking capacity at maximum short time withstand current (sequence IV)) |
- |
43950 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice |
8.3.6.6(verification of dielectric withstand (sequence IV)) |
- |
10200 |
|
Test Charges will vary depending on the rating of the sample Test charge applicable will be intimated through a proforma invoice |
8.3.3.2(Tripping limits and characteristics) |
- |
- |
|
- |
8.3.3.3(Test of dielectric properties) |
- |
- |
|
- |
8.3.3.4(Mechanical operation and operational performance capability) |
- |
- |
|
- |
8.3.3.5(Overload performance) |
- |
- |
|
- |
8.3.3.6(Verification of dielectric withstand) |
- |
- |
|
- |
8.3.3.7(Verification of temperature-rise) |
- |
- |
|
- |
8.3.3.8(Verification of Overload releases) |
- |
- |
|
- |
8.3.3.9(Verification of undervoltage and shunt releases) |
- |
- |
|
- |
8.3.3.10(Verification of main contact position) |
- |
- |
|
- |
8.3.4.2(Test of service short circuit breaking capacity) |
- |
- |
|
- |
8.3.4.3(verification of operational performance capability (sequence II)) |
- |
- |
|
- |
8.3.4.4(Verification of dielectric withstand) |
- |
- |
|
- |
8.3.4.5(Verifiation of temperature-rise) |
- |
- |
|
- |
8.3.4.6(Verification of Overload releases) |
- |
- |
|
- |
8.3.5.2(Verification of Overload releases) |
- |
- |
|
- |
8.3.5.3(Rated ultimate short-circuit breaking capacity) |
- |
- |
|
- |
8.3.5.4(Verification of dielectric withstand) |
- |
- |
|
- |
8.3.5.5(verification of overload releases (sequence III)) |
- |
- |
|
- |
8.3.6.2(Verification of Overload releases) |
- |
- |
|
- |
8.3.6.3(Rated short-time withstand current) |
- |
- |
|
- |
8.3.6.4(verification of temperature-rise (sequence IV)) |
- |
- |
|
- |
8.3.6.5(short circuit breaking capacity at maximum short time withstand current (sequence IV)) |
- |
- |
|
- |
8.3.6.6(verification of dielectric withstand (sequence IV)) |
- |
- |
|
- |
|
31 Dec, 2026 |
- REVISED VERSION OF IS 60947(PART-2):2016 INCLUDED W.E.F. 10-06-2021. |
25 |
IS 16636 (2017) |
Automatic power factor correction (APFC) panels for voltage rating up to and including 1000 V |
- |
726660 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
5.3(Verification of Output) |
- |
820 |
|
This test charge is per measurement. Test charges are dependent on the number of measurements to be carried out on the APFC panel. Hence, full-detail drawings of the construction and rating of the APFC panel are to be submitted for a proforma invoice. |
5.4(Dielectric Tests) |
- |
7880 |
|
This test charge is per measurement. Test charges are dependent on the number of measurements to be carried out on the APFC panel. Hence, full-detail drawings of the construction and rating of the APFC panel are to be submitted for a proforma invoice. |
5.5(Insulation Resistance Test) |
- |
1290 |
|
This test charge is per measurement. Test charges are dependent on the number of measurements to be carried out on the APFC panel. Hence, full-detail drawings of the construction and rating of the APFC panel are to be submitted for a proforma invoice. |
5.6(Power Frequency Withstand Voltage Test) |
- |
1000 |
|
This test charge is per measurement. Test charges are dependent on the number of measurements to be carried out on the APFC panel. Hence, full-detail drawings of the construction and rating of the APFC panel are to be submitted for a proforma invoice. |
5.7(Voltage Withstand Test between Phases) |
- |
1290 |
|
This test charge is per measurement. Test charges are dependent on the number of measurements to be carried out on the APFC panel. Hence, full-detail drawings of the construction and rating of the APFC panel are to be submitted for a proforma invoice. |
5.8(Lightning Impulse Voltage Withstand Test) |
- |
4350 |
|
This test charge is per measurement. Test charges are dependent on the number of measurements to be carried out on the APFC panel. Hence, full-detail drawings of the construction and rating of the APFC panel are to be submitted for a proforma invoice. |
5.9(Temperature Rise Test) |
- |
335950 |
|
This test charge is per measurement. Test charges are dependent on the number of measurements to be carried out on the APFC panel. Hence, full-detail drawings of the construction and rating of the APFC panel are to be submitted for a proforma invoice. |
5.10,(Verification of the Effectiveness of Protective Circuit) |
- |
138870 |
|
This test charge is per measurement. Test charges are dependent on the number of measurements to be carried out on the APFC panel. Hence, full-detail drawings of the construction and rating of the APFC panel are to be submitted for a proforma invoice. |
5.11(Short- Circuit Withstand Test) |
- |
118090 |
|
This test charge is per measurement. Test charges are dependent on the number of measurements to be carried out on the APFC panel. Hence, full-detail drawings of the construction and rating of the APFC panel are to be submitted for a proforma invoice. |
5.12(Verification of Clearances) |
- |
1700 |
|
This test charge is per measurement. Test charges are dependent on the number of measurements to be carried out on the APFC panel. Hence, full-detail drawings of the construction and rating of the APFC panel are to be submitted for a proforma invoice. |
5.13(Verification of Mechanical Operation) |
- |
9030 |
|
This test charge is per measurement. Test charges are dependent on the number of measurements to be carried out on the APFC panel. Hence, full-detail drawings of the construction and rating of the APFC panel are to be submitted for a proforma invoice. |
5.14(Verification of the Degree of Protection of Enclosure) |
- |
58580 |
|
This test charge is per measurement. Test charges are dependent on the number of measurements to be carried out on the APFC panel. Hence, full-detail drawings of the construction and rating of the APFC panel are to be submitted for a proforma invoice. |
5.15(Verification of the Effectiveness of Automatic PF Correction) |
- |
34390 |
|
This test charge is per measurement. Test charges are dependent on the number of measurements to be carried out on the APFC panel. Hence, full-detail drawings of the construction and rating of the APFC panel are to be submitted for a proforma invoice. |
5.16(Measurement of Transient over Currents Due To Capacitor Switching) |
- |
10260 |
|
This test charge is per measurement. Test charges are dependent on the number of measurements to be carried out on the APFC panel. Hence, full-detail drawings of the construction and rating of the APFC panel are to be submitted for a proforma invoice. |
5.17(Inspection of the Panel Including Inspection of Wiring) |
- |
1580 |
|
This test charge is per measurement. Test charges are dependent on the number of measurements to be carried out on the APFC panel. Hence, full-detail drawings of the construction and rating of the APFC panel are to be submitted for a proforma invoice. |
5.18(Test for Checking Functional Operation) |
- |
1580 |
|
This test charge is per measurement. Test charges are dependent on the number of measurements to be carried out on the APFC panel. Hence, full-detail drawings of the construction and rating of the APFC panel are to be submitted for a proforma invoice. |
4(MARKING) |
- |
0 |
|
This is a standard guideline not a test. |
5.1(Test Requirements) |
- |
0 |
|
This is a standard guideline not a test. |
|
31 Dec, 2026 |
- Included w.e.f 16.05.2024 |
26 |
IS 16270 (2014) |
Secondary cells and batteries for solar photovoltaic application - General requirements and methods of test |
- |
413700 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
8.1(Capacity test) |
- |
26400 |
|
The test charge for capacity test for 6 batteries is 19,200rs and battery charging for 8 batteries for 7,200rs. The total amount is 26,400rs . |
5.4(Marking) |
- |
4400 |
|
The test charge for Marking test for 8 batteries is 4,400rs. |
8.2(Endurance test) |
- |
170300 |
|
The test charge for Endurance test for 2 batteries is 1,70,300rs. |
8.3(Charge retention test) |
- |
24000 |
|
The test charge for Charge retention test for 2 batteries is 24,000rs. |
8.4(Cycle endurance in Photovoltaic application) |
- |
161200 |
|
The test charge for Cycle endurance test for 2 batteries is 1,61,200rs. |
8.5(Sulphation Test) |
- |
11700 |
|
The test charge for Sulphation test for 2 batteries is 11,700rs. |
8.6(Water loss test) |
- |
15700 |
|
The test charge for Water loss test for 2 batteries is 15,700rs. |
8.7(Non spillability) |
- |
0 |
|
The test is not applicable |
|
31 Dec, 2026 |
- Included w.e.f 16.05.2024 |
27 |
IS/IEC 61730 : PART 2 (2016) |
Photovoltaic (PV) module safety qualification: Part 2 requirements for testing (First Revision) |
- |
1323000 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
10.2
IS/IEC 61730-2( Visual inspection MST01) |
- |
0 |
|
Individual test charge not available |
10.3
IS/IEC 61730-2(Performance at STC MST 02) |
- |
0 |
|
Individual test charge not available |
10.4
IS/IEC 61730-2(Maximum power determination MST 03) |
- |
0 |
|
Individual test charge not available |
10.5
IS/IEC 61730-2(Insulation thickness test MST 04) |
- |
0 |
|
Individual test charge not available |
10.6
IS/IEC 61730-2(Durability of marking MST 05) |
- |
0 |
|
Individual test charge not available |
10.7
IS/IEC 61730-2(Sharp edge test MST 06) |
- |
0 |
|
Individual test charge not available |
10.8
IS/IEC 61730-2(Bypass diode functionality test MST 07) |
- |
0 |
|
Individual test charge not available |
10.9
IS/IEC 61730-2(Accessibility test MST 11) |
- |
0 |
|
Individual test charge not available |
10.10
IS/IEC 61730-2(Cut susceptibility test MST 12) |
- |
0 |
|
Individual test charge not available |
10.11
IS/IEC 61730-2(Continuity test of equipotential bonding MST 13) |
- |
0 |
|
Individual test charge not available |
10.12
IS/IEC 61730-2(Impulse voltage test MST 14) |
- |
0 |
|
Individual test charge not available |
10.13
IS/IEC 61730-2( Insulation test MST 16) |
- |
0 |
|
Individual test charge not available |
10.14
IS/IEC 61730-2( Wet leakage current test MST 17) |
- |
0 |
|
Individual test charge not available |
10.15
IS/IEC 61730-2( Temperature test MST 21) |
- |
0 |
|
Individual test charge not available |
10.16
IS/IEC 61730-2(Hot-spot endurance test MST 22) |
- |
0 |
|
Individual test charge not available |
10.17
IS/IEC 61730-2( Fire test MST 23) |
- |
0 |
|
Individual test charge not available |
10.18
IS/IEC 61730-2(Ignitability test MST 24) |
- |
0 |
|
Individual test charge not available |
10.19
IS/IEC 61730-2( Bypass diode thermal test MST 25) |
- |
0 |
|
Individual test charge not available |
10.20
IS/IEC 61730-2( Reverse current overload test MST 25) |
- |
0 |
|
Individual test charge not available |
10.21
IS/IEC 61730-2( Module breakage test MST 32) |
- |
0 |
|
Individual test charge not available |
10.22
IS/IEC 61730-2(Screw connections test MST 33) |
- |
0 |
|
Individual test charge not available |
10.23
IS/IEC 61730-2( Static Mechanical load test MST 34) |
- |
0 |
|
Individual test charge not available |
10.24
IS/IEC 61730-2( Peel test MST 35) |
- |
0 |
|
Individual test charge not available |
10.25
IS/IEC 61730-2( Lap shear strength test MST 36) |
- |
0 |
|
Individual test charge not available |
10.26
IS/IEC 61730-2(Materials creep test MST 37) |
- |
0 |
|
- |
10.27
IS/IEC 61730-2( Robutness of terminations test MST 42) |
- |
0 |
|
Individual test charge not available |
10.28
IS/IEC 61730-2(Thermal cycling test MST 51) |
- |
0 |
|
Individual test charge not available |
10.29
IS/IEC 61730-2( Humidity-freeze test MST 52) |
- |
0 |
|
Individual test charge not available |
10.30
IS/IEC 61730-2( Damp heat test MST 53) |
- |
0 |
|
Individual test charge not available |
10.31
IS/IEC 61730-2(UV test MST 54) |
- |
0 |
|
Individual test charge not available |
10.32
IS/IEC 61730-2( Cold conditioning MST 55) |
- |
0 |
|
Individual test charge not available |
10.33
IS/IEC 61730-2( Dry heat conditioning MST 56) |
- |
0 |
|
Individual test charge not available |
4.1(General) |
- |
0 |
|
Individual test charge not available |
4.2(Thermal Cycling (TC50)) |
- |
0 |
|
Individual test charge not available |
4.2(Thermal Cycling (TC200)) |
- |
0 |
|
Individual test charge not available |
4.2(Humidity Freeze (HF10)) |
- |
0 |
|
Individual test charge not available |
4.2(Damp Heat (DH1000)) |
- |
0 |
|
Individual test charge not available |
4.2(UV Preconditioning) |
- |
0 |
|
Individual test charge not available |
4.2(Cold Conditioning) |
- |
0 |
|
Individual test charge not available |
4.2(Dry Hot Conditioning) |
- |
0 |
|
Individual test charge not available |
4.3(Visual inspection) |
- |
0 |
|
Individual test charge not available |
4.3(Performance at STC) |
- |
0 |
|
Individual test charge not available |
4.3(Maximum power determination) |
- |
0 |
|
Individual test charge not available |
4.3(Insulation thickness) |
- |
0 |
|
Individual test charge not available |
4.3(Durability of markings) |
- |
0 |
|
Individual test charge not available |
4.3(Sharp edge test) |
- |
0 |
|
Individual test charge not available |
4.3(Bypass diode functionality test) |
- |
0 |
|
Individual test charge not available |
4.4(Accessibility test) |
- |
0 |
|
Individual test charge not available |
4.4(Cut susceptibility test) |
- |
0 |
|
Individual test charge not available |
4.4(Continuity test for equipotential bonding) |
- |
0 |
|
Individual test charge not available |
4.4(Impulse voltage test) |
- |
0 |
|
Individual test charge not available |
4.4(Insulation test) |
- |
0 |
|
Individual test charge not available |
4.4(Wet leakage current test) |
- |
0 |
|
Individual test charge not available |
4.4(Robustness of terminations test) |
- |
0 |
|
Individual test charge not available |
4.5(Temperature test) |
- |
0 |
|
Individual test charge not available |
4.5(Hot-spot endurance test) |
- |
0 |
|
Individual test charge not available |
4.5(Fire test) |
- |
0 |
|
Individual test charge not available |
4.5(Ignitability test) |
- |
0 |
|
Individual test charge not available |
4.5(Bypass diode thermal test) |
- |
0 |
|
Individual test charge not available |
4.5(Reverse current overload test) |
- |
0 |
|
Individual test charge not available |
4.6(Module breakage test) |
- |
0 |
|
Individual test charge not available |
4.6(Screw connection test) |
- |
0 |
|
Individual test charge not available |
4.6(Mechanical load test) |
- |
0 |
|
Individual test charge not available |
4.6(Peel test) |
- |
0 |
|
Individual test charge not available |
4.6(Lap shear strength test) |
- |
0 |
|
Individual test charge not available |
4.6(Robustness of terminations test) |
- |
0 |
|
Individual test charge not available |
CL. 4,4.1(61730-2) |
- |
0 |
|
Individual test charge not available |
CL. 4.2, 10.27, 10.28, 10.29, 10.30, 10.31, 10.32, 10.32.1, 10.32.2, 10.32.3, 10.32.4(61730-2) |
- |
0 |
|
Individual test charge not available |
CL. 4.3(61730-2) |
- |
0 |
|
Individual test charge not available |
CL. 4.4(61730-2) |
- |
0 |
|
Individual test charge not available |
CL. 4.5(61730-2) |
- |
0 |
|
Individual test charge not available |
CL. 4.6(61730-2) |
- |
0 |
|
Individual test charge not available |
CL. 5(Table 6)(61730-2) |
- |
0 |
|
Individual test charge not available |
CL. 7(61730-2) |
- |
0 |
|
Individual test charge not available |
CL. 8(61730-2) |
- |
0 |
|
Individual test charge not available |
CL. 9(61730-2) |
- |
0 |
|
Individual test charge not available |
CL. 10, 10.1(61730-2) |
- |
0 |
|
Individual test charge not available |
CL. 10.2, 10.2.1, 10.2.2, 10.2.3(61730-2) |
- |
0 |
|
Individual test charge not available |
CL. 10.3, 10.3.1, 10.3.2, 10.3.3(61730-2) |
- |
0 |
|
Individual test charge not available |
CL. 10.4, 10.4.1, 10.4.2, 10.4.3(61730-2) |
- |
0 |
|
Individual test charge not available |
CL. 10.5, 10.5.1, 10.5.2, 10.5.3(61730-2) |
- |
0 |
|
Individual test charge not available |
CL. 10.10, 10.10.1, 10.10.2, 10.10.3, 10.10.4, 10.10.5(61730-2) |
- |
0 |
|
Individual test charge not available |
CL. 10.6(61730-2) |
- |
0 |
|
Individual test charge not available |
CL. 10.7(61730-2) |
- |
0 |
|
Individual test charge not available |
CL. 10.8,10.8.1,10.8.2,10.8.3(61730-2) |
- |
0 |
|
Individual test charge not available |
CL. 10.9, 10.9.1, 10.9.2, 10.9.3,10.9.4,10.9.5(61730-2) |
- |
0 |
|
Individual test charge not available |
CL. 10.11, 10.11.1, 10.11.2, 10.11.3, 10.11.4, 10.11.5(61730-2) |
- |
0 |
|
Individual test charge not available |
CL. 10.12, 10.12.1, 10.12.2, 10.12.3, 10.12.4, 10.12.5(61730-2) |
- |
0 |
|
Individual test charge not available |
CL. 10.13, 10.13.1, 10.13.2, 10.13.3(61730-2) |
- |
0 |
|
Individual test charge not available |
CL. 10.14(61730-2) |
- |
0 |
|
Individual test charge not available |
CL. 10.15, 10.15.1, 10.15.2, 10.15.2.1, 10.15.2.2, 10.15.3, 10.15.3.1, 10.15.3.2, 10.15.4(61730-2) |
- |
0 |
|
Individual test charge not available |
CL. 10.16(61730-2) |
- |
0 |
|
Individual test charge not available |
CL. 10.17, 10.17.1(61730-2) |
- |
0 |
|
Individual test charge not available |
CL. 10.18, 10.18.1, 10.18.2, 10.18.2.1,10.18.2.2, 10.18.2.3, 10.18.2.4, 10.18.3, 10.18.3.1, 10.18.3.2,10.18.3.3, 10.18.4, 10.18.5, 10.18.5.1, 10.18.5.2, 10.18.5.3, 10.18.6, 10.18.7, 10.18.8(61730-2) |
- |
0 |
|
Individual test charge not available |
CL. 10.19(61730-2) |
- |
0 |
|
Individual test charge not available |
CL. 10.20, 10.20.1, 10.20.2, 10.20.3(61730-2) |
- |
0 |
|
Individual test charge not available |
CL. 10.21, 10.21.1, 10.21.2, 10.21.3, 10.21.4(61730-2) |
- |
0 |
|
Individual test charge not available |
CL. 10.22, 10.22.1, 10.22.1.1, 10.22.1.2, 10.22.2, 10.22.2.1, 10.22.2.2(61730-2) |
- |
0 |
|
Individual test charge not available |
CL. 10.23, 10.23.1(61730-2) |
- |
0 |
|
Individual test charge not available |
CL. 10.24, 10.24.1, 10.24.2 , 10.24.3,10.24.4 , 10.24.5(61730-2) |
- |
0 |
|
Individual test charge not available |
CL. 10.25, 10.25.1, 10.25.2 , 10.25.3 , 10.25.4 , 10.25.5(61730-2) |
- |
0 |
|
Individual test charge not available |
CL 10.26, 10.26.1, 10.26.2, 10.26.3 , 10.26.4, 10.26.5(61730-2) |
- |
0 |
|
Individual test charge not available |
CL 10.27(61730-2) |
- |
0 |
|
Individual test charge not available |
CL 10.28(61730-2) |
- |
0 |
|
Individual test charge not available |
CL 10.28(61730-2) |
- |
0 |
|
Individual test charge not available |
CL 10.30(61730-2) |
- |
0 |
|
Individual test charge not available |
CL 10.31(61730-2) |
- |
0 |
|
Individual test charge not available |
CL 10.32, 10.32.1, 10.32.2, 10.32.3, 10.32.4(61730-2) |
- |
0 |
|
Individual test charge not available |
CL 10.33, 10.33.1, 10.33.2, 10.33.3, 10.33.4(61730-2) |
- |
0 |
|
Individual test charge not available |
Annexure B.1, B.2,B.2.1,B.2.2, B.2.3,B.3(61730-2) |
- |
0 |
|
Individual test charge not available |
Annexure A.1, A.2,A.3,A.4,A.5,A.6(61730-2) |
- |
0 |
|
Individual test charge not available |
4.6(Materials creep test) |
- |
0 |
|
Individual test charge not available |
|
31 Dec, 2026 |
- Included w.e.f 16.05.2024 |
28 |
IS/IEC 61730 : PART 1 (2016) |
Photovoltaic (PV) Module Safety Qualification Part 1 Requirements for Construction ( First Revision ) |
- |
1323000 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
4 IS/IEC 61730-1(Classification, Application and Inteded Use) |
- |
0 |
|
Individual test charge not available |
5.2(Marking and documentation) |
- |
0 |
|
Individual test charge not available |
5.3(Electrical components and insulation) |
- |
0 |
|
Individual test charge not available |
5.4(Mechanical and electromechanical connections) |
- |
0 |
|
Individual test charge not available |
5.5(Materials) |
- |
0 |
|
Individual test charge not available |
5.6(Protection against electric shock) |
- |
0 |
|
Individual test charge not available |
3.0(Application Classes) |
- |
0 |
|
Individual test charge not available |
6.0(Internal Wiring and Current Carrying Parts) |
- |
0 |
|
Individual test charge not available |
7.0(Connections) |
- |
0 |
|
Individual test charge not available |
8.0(Bonding and Grounding) |
- |
0 |
|
Individual test charge not available |
9.0(Creepage and clearance distances) |
- |
0 |
|
Individual test charge not available |
10.0(Field Wiring Compartments with covers) |
- |
0 |
|
Individual test charge not available |
11.0(Marking) |
- |
0 |
|
Individual test charge not available |
12.0(Requirements of Supplied documents) |
- |
0 |
|
Individual test charge not available |
5.0(Polymeric Materials) |
- |
0 |
|
Individual test charge not available |
5.6.4 IS/IEC 61730-1(Distance through Insulation) |
- |
0 |
|
Individual test charge not available |
5.6.3 IS/IEC 61730-1(Insulation Coordination) |
- |
0 |
|
Individual test charge not available |
5.6.2 IS/IEC 61730-1(Protection Agianst accessibility to hazardeous live parts) |
- |
0 |
|
Individual test charge not available |
5.6, 5.6.1 IS/IEC 61730-1(Protection Agianst Electric Shock) |
- |
0 |
|
Individual test charge not available |
5.5.4 IS/IEC 61730-1(Adhesives) |
- |
0 |
|
Individual test charge not available |
5.5.3.2 IS/IEC 61730-1(Current Carrying Parts) |
- |
0 |
|
Individual test charge not available |
5.5.3, 5.5.3.1 IS/IEC 61730-1(Metallic materials) |
- |
0 |
|
Individual test charge not available |
5.5.2.4 IS/IEC 61730-1(Polymeric Meterial used for Mechanical functions) |
- |
0 |
|
Individual test charge not available |
5.5.2.3.5 IS/IEC 61730-1(Polymeric Insulating Parts supporting live Parts) |
- |
0 |
|
Individual test charge not available |
5.5.2.3.4 IS/IEC 61730-1(Polymeric Insulating materials used as external Parts) |
- |
0 |
|
Individual test charge not available |
5.5.2.3.3 IS/IEC 61730-1(Endurance to thermal stress-RTE (RTI) or TI) |
- |
0 |
|
Individual test charge not available |
5.5.2.3.2 IS/IEC 61730-1(Endurance to Electrical Stress) |
- |
0 |
|
Individual test charge not available |
5.5.2 IS/IEC 61730-1(Polymeric Materials) |
- |
0 |
|
Individual test charge not available |
5.5, 5.5.1 IS/IEC 61730-1(Materials) |
- |
0 |
|
Individual test charge not available |
5.4.7 IS/IEC 61730-1(Other Connections) |
- |
0 |
|
Individual test charge not available |
5.4.6 IS/IEC 61730-1(Connections by adhesives) |
- |
0 |
|
Individual test charge not available |
5.4.5 IS/IEC 61730-1(Form/Press/Tight/Fit) |
- |
0 |
|
Individual test charge not available |
5.4.4 IS/IEC 61730-1(Thread Cutting Screws) |
- |
0 |
|
Individual test charge not available |
5.4.3 IS/IEC 61730-1(Rivets) |
- |
0 |
|
Individual test charge not available |
5.4.2 IS/IEC 61730-1(Screw Connctions) |
- |
0 |
|
Individual test charge not available |
5.4, 5.4.1 IS/IEC 61730-1(Mechanical and Electromechanical connections) |
- |
0 |
|
Individual test charge not available |
5.3.10 IS/IEC 61730-1(Bypass Diodes) |
- |
0 |
|
Individual test charge not available |
5.3.9 IS/IEC 61730-1(Encapsulants) |
- |
0 |
|
Individual test charge not available |
5.3.8 IS/IEC 61730-1(Electrical Connections) |
- |
0 |
|
Individual test charge not available |
5.3.7 IS/IEC 61730-1(Insulation Barrier) |
- |
0 |
|
Individual test charge not available |
5.3.6 IS/IEC 61730-1(Front sheet and back Sheet) |
- |
0 |
|
Individual test charge not available |
5.3.5 IS/IEC 61730-1(Junction Box for PV modules) |
- |
0 |
|
Individual test charge not available |
5.3.4 IS/IEC 61730-1(Connectors) |
- |
0 |
|
Individual test charge not available |
5.3.3 IS/IEC 61730-1(External Wirings and cables) |
- |
0 |
|
Individual test charge not available |
5.3.2 IS/IEC 61730-1(Internal Wiring) |
- |
0 |
|
Individual test charge not available |
5.3, 5.3.1 IS/IEC 61730-1(Electrical Components and Insualtion) |
- |
0 |
|
Individual test charge not available |
5.2 IS/IEC 61730-1(Marking and Documentation) |
- |
0 |
|
Individual test charge not available |
5, 5.1 IS/IEC 61730-1(Requirements for design and Construction) |
- |
0 |
|
Individual test charge not available |
4 IS/IEC 61730-1(Classification, Application and Inteded Use) |
- |
0 |
|
Individual test charge not available |
5.3.2(Internal wiring) |
- |
0 |
|
Individual test charge not available |
5.3.4(Connectors) |
- |
0 |
|
Individual test charge not available |
5.5.2, 5.3.7(Polymeric materials) |
- |
0 |
|
Individual test charge not available |
5.6.3.4(Clearances and creepage distances) |
- |
0 |
|
Individual test charge not available |
5.3.9 IS/IEC 61730-1(Encapsulants) |
- |
0 |
|
Individual test charge not available |
5.6.4 IS/IEC 61730-1(Distance through Insulation) |
- |
0 |
|
Individual test charge not available |
5.6.3 IS/IEC 61730-1(Insulation Coordination) |
- |
0 |
|
Individual test charge not available |
5.6.2 IS/IEC 61730-1(Protection Agianst accessibility to hazardeous live parts) |
- |
0 |
|
Individual test charge not available |
5.6, 5.6.1 IS/IEC 61730-1(Protection Agianst Electric Shock) |
- |
0 |
|
Individual test charge not available |
5.5.4 IS/IEC 61730-1(Adhesives) |
- |
0 |
|
Individual test charge not available |
5.5.3.2 IS/IEC 61730-1(Current Carrying Parts) |
- |
0 |
|
Individual test charge not available |
5.5.3, 5.5.3.1 IS/IEC 61730-1(Metallic materials) |
- |
0 |
|
Individual test charge not available |
5.5.2.4 IS/IEC 61730-1(Polymeric Meterial used for Mechanical functions) |
- |
0 |
|
Individual test charge not available |
5.5.2.3.5 IS/IEC 61730-1(Polymeric Insulating Parts supporting live Parts) |
- |
0 |
|
Individual test charge not available |
5.5.2.3.4 IS/IEC 61730-1(Polymeric Insulating materials used as external Parts) |
- |
0 |
|
Individual test charge not available |
5.5.2.3.3 IS/IEC 61730-1(Endurance to thermal stress-RTE (RTI) or TI) |
- |
0 |
|
Individual test charge not available |
5.5.2.3.2 IS/IEC 61730-1(Endurance to Electrical Stress) |
- |
0 |
|
Individual test charge not available |
5.5.2 IS/IEC 61730-1(Polymeric Materials) |
- |
0 |
|
Individual test charge not available |
5.5, 5.5.1 IS/IEC 61730-1(Materials) |
- |
0 |
|
Individual test charge not available |
5.4.7 IS/IEC 61730-1(Other Connections) |
- |
0 |
|
Individual test charge not available |
5.4.6 IS/IEC 61730-1(Connections by adhesives) |
- |
0 |
|
Individual test charge not available |
5.4.5 IS/IEC 61730-1(Form/Press/Tight/Fit) |
- |
0 |
|
Individual test charge not available |
5.4.4 IS/IEC 61730-1(Thread Cutting Screws) |
- |
0 |
|
Individual test charge not available |
5.4.3 IS/IEC 61730-1(Rivets) |
- |
0 |
|
Individual test charge not available |
5.4.2 IS/IEC 61730-1(Screw Connctions) |
- |
0 |
|
Individual test charge not available |
5.4, 5.4.1 IS/IEC 61730-1(Mechanical and Electromechanical connections) |
- |
0 |
|
Individual test charge not available |
5.3.10 IS/IEC 61730-1(Bypass Diodes) |
- |
0 |
|
Individual test charge not available |
5.3.8 IS/IEC 61730-1(Electrical Connections) |
- |
0 |
|
Individual test charge not available |
5.3.7 IS/IEC 61730-1(Insulation Barrier) |
- |
0 |
|
Individual test charge not available |
5.3.6 IS/IEC 61730-1(Front sheet and back Sheet) |
- |
0 |
|
Individual test charge not available |
5.3.5 IS/IEC 61730-1(Junction Box for PV modules) |
- |
0 |
|
Individual test charge not available |
5.3.4 IS/IEC 61730-1(Connectors) |
- |
0 |
|
Individual test charge not available |
5.3.3 IS/IEC 61730-1(External Wirings and cables) |
- |
0 |
|
Individual test charge not available |
5.3.2 IS/IEC 61730-1(Internal Wiring) |
- |
0 |
|
Individual test charge not available |
5.3, 5.3.1 IS/IEC 61730-1(Electrical Components and Insualtion) |
- |
0 |
|
Individual test charge not available |
4(Classification, applications and intended use) |
- |
0 |
|
Individual test charge not available |
5.2 IS/IEC 61730-1(Marking and Documentation) |
- |
0 |
|
Individual test charge not available |
5, 5.1 IS/IEC 61730-1(Requirements for design and Construction) |
- |
0 |
|
Individual test charge not available |
4.0(Construction Requirements) |
- |
0 |
|
Individual test charge not available |
|
31 Dec, 2026 |
- Included w.e.f 16.05.2024 |
29 |
IS 14286 : Part 1 : Sec 1 (2019) |
Terrestrial photovoltaic (PV) modules - Design qualification and type approval: Part 1 test requirements: Sec 1 special requirements for testing of crystalline silicon photovoltaic (Pv) modules (Second Revision) |
- |
1295440 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
11.1(Visual inspection (MQT 01)) |
- |
0 |
|
Individual charge not available |
11.2(Maximum power determination (MQT 02)) |
- |
0 |
|
Individual charge not available |
11.3(Insulation test (MQT 03)) |
- |
0 |
|
Individual charge not available |
11.4(Measurement of temperature coefficients (MQT 04)) |
- |
0 |
|
Individual charge not available |
11.5(Measurement of nominal module operating temperature (NMOT)
(MQT 05)) |
- |
0 |
|
Individual charge not available |
11.6(Performance at STC and NMOT
(MQT 06)) |
- |
0 |
|
Individual charge not available |
11.7(Performance at low irradiance
(MQT 07)) |
- |
0 |
|
Individual charge not available |
11.8(Outdoor exposure test (MQT 08)) |
- |
0 |
|
Individual charge not available |
11.9(Hot-spot endurance test (MQT 09)) |
- |
0 |
|
Individual charge not available |
11.1(UV preconditioning test
(MQT 10)) |
- |
0 |
|
Individual charge not available |
11.11(Thermal cycling test (MQT 11)) |
- |
0 |
|
Individual charge not available |
11.12(Humidity-freeze test (MQT 12)) |
- |
0 |
|
Individual charge not available |
11.13(Damp heat test (MQT 13)) |
- |
0 |
|
Individual charge not available |
11.14(Robustness of terminations
(MQT 14)) |
- |
0 |
|
Individual charge not available |
11.15(Wet leakage current test (MQT 15)) |
- |
0 |
|
Individual charge not available |
11.16(Static mechanical load test
(MQT 16)) |
- |
0 |
|
Individual charge not available |
11.17(Hail test (MQT 17)) |
- |
0 |
|
Individual charge not available |
11.18(Bypass diode thermal test (MQT 18)) |
- |
0 |
|
Individual charge not available |
11.19(Stabilization (MQT 19)) |
- |
0 |
|
Individual charge not available |
5(Marking and documentation) |
- |
0 |
|
Individual charge not available |
8(Major visual defects) |
- |
0 |
|
Individual charge not available |
|
31 Dec, 2026 |
- Included w.e.f 16.05.2024 |
30 |
IS 3024 (2015) |
Grain oriented electrical steel sheet and strip (Third Revision) |
- |
20100 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
Cl 11.5(Flatness) |
- |
1100 |
|
- |
Cl 11.1(Thickness) |
- |
1100 |
|
- |
Cl 11.2(Width) |
- |
1100 |
|
- |
Cl 11.3(Length) |
- |
1100 |
|
- |
Cl 11.4(Edge Camber) |
- |
1100 |
|
- |
Cl 11.6(Burr Height) |
- |
1100 |
|
- |
Cl. No. 10.2.2(Bends) |
- |
1500 |
|
- |
Cl. No. 8.1 & Table-1 or Table-2(Loss in W/kg) |
- |
3500 |
|
- |
Cl. No. 8.1 & Table-1 or Table-2(Loss in W/kg) |
- |
3500 |
|
- |
Cl. No. 8.2 & Table-1 or Table-2(Polarization in Tesla) |
- |
3500 |
|
- |
Cl. No. 9.0 & Table-3(SIR in Ω-cm2/lamination) |
- |
2500 |
|
- |
Cl. No. 10.1 & Table-4(SF in %) |
- |
2500 |
|
- |
Cl 7.4(Surface Condition) |
- |
2500 |
|
- |
|
31 Dec, 2026 |
- - |