61 |
IS 3104 : Part 1 (1982) |
Specification for density hydrometers: Part 1 requirements (First Revision) |
- |
Rs. 4800/- excluding accuracy test. View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
Cl.11.2 ( Stem diameter of the hydrometers shall be not less than 40 mm.) |
- |
|
|
|
Cl.9.1 Bulb and Stem ( — The bulb and the stem shall be made of a suitable
transparent glass, selected and processed to be as free as possible from
stress and visible defects, and having a coefficient of cubical thermal
expansion of (25 ± 2) × 10-6 (°C)-) |
- |
|
|
|
Cl.9.2 Loading Material ( — The loading material shall be fixed in the bottom of the hydrometer. After the finished hydrometer has been kept
in a horizontal position for 1 h at 80°C and subsequently cooled in that
position, the instrument shall meet the requirements of 10.3.) |
- |
|
|
|
Cl.9.3 Scale Strip ( — The strip on which the scale and inscriptions are marked shall have a smooth matt surface. The strip shall show no evidence of charring, and shall not become discoloured or distorted when the stem is exposed for 1 h to a temperature of 80°C.) |
- |
|
|
|
Cl.10.1 workmanshisp and finish ( The outer surface of the hydrometers shall be symmetrical about the main axis) |
- |
|
|
|
Cl.10.2 ( There shall be no abrupt changes in their cross section ( see Fig, 1 )) |
- |
|
|
|
Cl.10.3 ( The cross-section of the stem shall remain unchanged for at least
5 mm below the lowest graduation line on ??? scale.) |
- |
|
|
|
Cl.10.4 (The stem shall extend unchanged in diameter at least 15 mm above
the uppermost graduation line on the scale.) |
- |
|
|
|
Cl.10.5 ( The hydrometer shall float with its axis vertical to within 1.5° of
arc.) |
- |
|
|
|
Cl.10.6 (There shall be no loose material in the instrument) |
- |
|
|
|
Cl.10.7 ( The strip on which the scale and inscriptions are marked shall
remain securely fastened in place at the temperature of use ( see 9.3 ).) |
- |
|
|
|
Cl.10.8 ( The scale shall be straight and without twist.) |
- |
|
|
|
Cl.10.9 ( Appropriate means shall be incorporated for ensuring that any
displacement of the scale or of the strip bearing the scale is readily
apparent.) |
- |
|
|
|
Cl.11.1 ( The dimensions of the hydrometers shall conform to the requirements
given in Table 1.) |
- |
|
|
|
Cl.12.2
Cl.12.2.1
Graduation Lines ( The graduation lines shall be distinct and of uniform thickness
not exceeding 0 2 mm or one-fifth of the distance between the centres of
adjacent lines, whichever is less. For the SP series, the thickness of the
graduation lines shall not exceed 0.2 mm or one-sixth of the distance
between the centres of adjacent lines, whichever is less.) |
- |
|
|
|
Cl.12.2.2 (There shall be no evident local irregularities in the spacing of
the graduation lines.) |
- |
|
|
|
Cl.12.2.3 ( The graduation lines shall be perpendicular to the axis of the
hydrometer.) |
- |
|
|
|
Cl.12.2.4 (The short, medium and long scale lines shall extend, respectively,
at least one-fifth, one-third and one-half of the way round the
circumference of the stem.) |
- |
|
|
|
Cl.12.2.5 ( The highest and lowest graduation lines indicating the nominal
limits of the scale shall be long lines ( see 12.3.1, 12.3.2 and 12.3.3 ).) |
- |
|
|
|
Cl.12.2.6 ( The short, medium and long lines shall each be vertically disposed so that either the mid-points, or the right hand ends or the left hand ends of all graduation lines He on an imaginary line parallel to the axis of the instrument. In the latter two cases, the vertical line may, alternatively, be marked.) |
- |
|
|
|
Cl.12.3.1
Sequence of Graduation Lines ( On hydrometer scales whose smallest interval is 1 kg/m3 or 1 g/ml:) |
- |
|
|
|
Cl.12.3.2 ( On hydrometer scales whose smallest interval is 2 kg/m3, or
2 g/ml) |
- |
|
|
|
Cl.12.3.3 ( On hydrometer scales whose smallest interval is 5 kg/m3
or 5 g/ml:) |
- |
|
|
|
Cl.12.4 Figuring of Graduation Lines
Cl.12.4.0 ( The scale lines and inscriptions should preferably be black and shall be clearly and durably marked.) |
- |
|
|
|
Cl.12.4.1 ( The scale shall have only one set of numbers and the last digits
of the numbers shall be vertically aligned ( see Fig. 2 ).) |
- |
|
|
|
Cl.12.4.2 ( The scale shall be so figured as to enable the value corresponding
to any graduation line to be readily identified.) |
- |
|
|
|
Cl.12.4.3 ( The highest and lowest graduation lines of the nominal limits
shall be figured in full.) |
- |
|
|
|
Cl.12.4.4 ( At least every tenth line shall be figured) |
- |
|
|
|
Cl.12.4.5 ( For density values expressed in grams per cubic centimetres, the
decimal sign shall be included for numbers expressed in full, but may be
omitted from abbreviated numbers.) |
- |
|
|
|
Cl.12.5 Extension of Scale ( — The scale shall be extended beyond the nominal scale limits, as indicated in col 12 of Table 1.) |
- |
|
|
|
|
- |
- Except tests for accuracy. |
62 |
IS 3309 (2022) |
SOLUBLE COFFEE-CHICORY POWDER - SPECIFICATION (THIRD REVISION OF IS 3309) |
- |
- View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
Cl-3.4,Table 1,sl.no-i (Moisture) |
- |
|
|
|
Cl-3.4,Table 1,sl.no-iii (Total ash(on dry basis)) |
- |
|
|
|
Cl-3.5 (Copper content) |
- |
|
|
|
3.1 (Description-IS 3309) |
- |
|
|
|
Cl-3.4,Table 1,sl.no-iv (Solubility in boiling water) |
- |
|
|
|
Cl-3.4,Table 1,sl.no-v (Solubility in cold water) |
- |
|
|
|
3.3 (Cup Test-2791) |
- |
|
|
|
|
- |
- Exclusion
i) Caffeine (anhydrous) |
63 |
IS 2791 (1992) |
Soluble coffee powder - Specification (Third Revision) |
- |
- View breakup
Rs. 4126/- excluding copper content and pesticide residues
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
3.4 Table 1 (Moisture content) |
- |
|
|
|
3.4 Table 1 (Total ash) |
- |
|
|
|
3.1 (Description ) |
- |
|
|
|
3.4 Table 1 (Solubility in boiling) |
- |
|
|
|
3.4 Table 1 (Solubility in cold water) |
- |
|
|
|
|
- |
- Exclusion
i) Caffeine content |
64 |
IS 4964 (2013) |
Textiles – Vests, cotton, plain (Single jersey) knitted – Specification (fifth revision) |
- |
testing charges for the product are Rs 6400/- View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
4/4.1 (MANUFACTURE AND FINISH- Fabric-see IS 9469) |
- |
|
|
|
4/4.1/4.1.1 (MANUFACTURE AND FINISH- Fabric-The mass of the vest-method given in B-5.) |
- |
|
|
|
4/4.1/4.1.2 (MANUFACTURE AND FINISH- Fabric-) |
- |
|
|
|
4/4.1/4.1.3 (MANUFACTURE AND FINISH- Fabric-) |
- |
|
|
|
4/4.2-Fig. 1A, Fig. 1B, Fig. 2A, Fig. 2B, Fig. 3. (MANUFACTURE AND FINISH) |
- |
|
|
|
4/4.2/4.2.1 (MANUFACTURE AND FINISH) |
- |
|
|
|
4/4.3/4.3.1-see IS 11161, see IS 10789, Table 1. (MANUFACTURE AND FINISH-Seams and Stitches) |
- |
|
|
|
4/4.3/4.3.2-according to B-4 (MANUFACTURE AND FINISH-Seams and Stitches-Dimension) |
- |
|
|
|
4/4.3/4.3.3 (MANUFACTURE AND FINISH-Seams and Stitches) |
- |
|
|
|
4/4.4 (MANUFACTURE AND FINISH) |
- |
|
|
|
4/4.6 (MANUFACTURE AND FINISH-Freedom from Defects) |
- |
|
|
|
5/5.1-Tables 2 and 3 (REQUIREMENTS-Dimensions-method
prescribed in Annex B.) |
- |
|
|
|
5/5.2-Tables 4 (REQUIREMENTS-Other Requirements-Dimension) |
- |
|
|
|
5/5.3 (REQUIREMENTS-Sealed Sample) |
- |
|
|
|
5.2 Table 4 (i) b (Other Requirements - Dimensional change due to relaxation - Courses) |
- |
|
|
|
5.2 Table 4 (i) a (Other Requirements - Dimensional change due to relaxation - Wales) |
- |
|
|
|
5.1 Tables 3 (Neck Opening - Depth at Front 'J') |
- |
|
|
|
5.1 Tables 3 (Neck Opening - Depth at Back 'H') |
- |
|
|
|
5.1 Tables 3 (Width at Sleeve End 'G') |
- |
|
|
|
5.1 Tables 3 (Width of Armhole 'F') |
- |
|
|
|
5.1 Tables 3 (Length of Sleeves Including Welting 'E') |
- |
|
|
|
5.1 Tables 2 and 3 (VN/ VNS - Depth of Neck Opening 'F') |
- |
|
|
|
5.1 Tables 2 and 3 (VN/ VNS - Width of Neck Opening 'E') |
- |
|
|
|
5.1 Tables 2 and 3 (RN - Width of Shoulder Strap 'G') |
- |
|
|
|
5.1 Tables 2 and 3 (RN - Opening Back 'F1') |
- |
|
|
|
5.1 Tables 2 and 3 (RN - Depth of Neck Front 'F') |
- |
|
|
|
5.1 Tables 2 and 3 (Round Neck Opening RNS 'E') |
- |
|
|
|
5.1 Tables 2 and 3 (Length of Armhole RN/RNS VN/VNS 'D') |
- |
|
|
|
5.1 Tables 2 and 3 (Length of Sleeves RNS/VNS 'C') |
- |
|
|
|
5.1 Tables 2 and 3 (Length of Vest 'B') |
- |
|
|
|
5.1 Tables 2 and 3 (Width Across Chest 'A') |
- |
|
|
|
5.1 NOTE (Requirements - Size of Vest) |
- |
|
|
|
4.5 (The tailored vest may also be screen or transfer printed with motifs or designs as agreed to between the buyer and the manufacturer.) |
- |
|
|
|
4.3.2 (Width of tape/welt at neck opening for VN/VNS vest and at armhole opening for VN vests) |
- |
|
|
|
4.3.2 (Width of tape/welt at bottom for all vests and at sleeves for RNS/ VNS/ RNW vest) |
- |
|
|
|
4.3.2 (Depth of hem at bottom for all vest and at sleeves for RNS/ VNS/ RNW vest) |
- |
|
|
|
4.3.2 (Width of folding at bottom for all vest and at sleeves for
RNS/VNS vest) |
- |
|
|
|
4.3.2 (Depth of hem or width of folding at neck opening for RNS vest) |
- |
|
|
|
4.3.2 (Depth of hem or width of folding at neck and armhole opening for RN vest) |
- |
|
|
|
4.3.1-Table 1 (iv) (Seams and Stitches - Folding at armhole) |
- |
|
|
|
4.3.1-Table 1 (iv) (Seams and Stitches - Folding at armhole) |
- |
|
|
|
4.3.1-Table 1 (iv) (Seams and Stitches - Folding at neck opening) |
- |
|
|
|
4.3.1-Table 1 (iv) (Seams and Stitches - Folding at neck opening) |
- |
|
|
|
4.3.1-Table 1 (iv) (Seams and Stitches - Folding at sleeve) |
- |
|
|
|
4.3.1-Table 1 (iv) (Seams and Stitches - Folding at sleeve) |
- |
|
|
|
4.3.1-Table 1 (iii) (Seams and Stitches - Hemming at armholes) |
- |
|
|
|
4.3.1-Table 1 (iii) (Seams and Stitches - Hemming at armholes) |
- |
|
|
|
4.3.1-Table 1 (iii) (Seams and Stitches - Hemming at sleeves) |
- |
|
|
|
4.3.1-Table 1 (iii) (Seams and Stitches - Hemming at sleeves) |
- |
|
|
|
4.3.1-Table 1 (ii) (Seams and Stitches - Hemming at elbow ends of sleeves) |
- |
|
|
|
4.3.1-Table 1 (ii) (Seams and Stitches - Hemming at elbow ends of sleeves) |
- |
|
|
|
4.3.1-Table 1 (ii) (Seams and Stitches - Hemming at the bottom) |
- |
|
|
|
4.3.1-Table 1 (ii) (Seams and Stitches - Hemming at the bottom) |
- |
|
|
|
4.3.1-Table 1 (i) (Seams and Stitches - Tape/ welt sewn to neck-opening armholes, sleeves and bottom.) |
- |
|
|
|
4.3.1-Table 1 (i) (Seams and Stitches - Tape/ welt sewn to neck-opening armholes, sleeves and bottom.) |
- |
|
|
|
4.3.1-Table 1 (i) (Seams and Stitches - Sleeves to the vest and underarms) |
- |
|
|
|
4.3.1-Table 1 (i) (Seams and Stitches - Sleeves to the vest and underarms) |
- |
|
|
|
4.3.1-Table 1 (i) (Seams and Stitches - Shoulder pieces ) |
- |
|
|
|
4.3.1-Table 1 (i) (Seams and Stitches - Shoulder pieces ) |
- |
|
|
|
4.2 (Design and Shape of Vest) |
- |
|
|
|
4.1 (Fine/ Super fine/ Extra super fine) |
- |
|
|
|
4.1 (Manufacture and Finish - Fabric) |
- |
|
|
|
|
- |
- Chemical- test facility available for pH only. Mechanical-complete |
65 |
IS 10322 : Part 5 : Sec 8 (2013) |
Luminaires: Part 5 particular requirements: Sec 8 emergency lighting |
- |
- View breakup
Rs. 63,600/- excluding vibration test, UV radiation test, Needle flame test, Functional safety, Changeover operation and high temperature operation.
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
4 (General Test Requireements) |
- |
|
|
|
5 (Classification of Luminaires') |
- |
|
|
|
6.0 (Marking) |
- |
|
|
|
7.0 (Construction) |
- |
|
|
|
8.0 (Creepage Distance and Clearances) |
- |
|
|
|
9.0 (Provision for earthing) |
- |
|
|
|
10.0 (Terminals) |
- |
|
|
|
11.0 (External & Internal Wiring) |
- |
|
|
|
12.0 (Protection against electric shock) |
- |
|
|
|
13.0 (Endurance Tests and Thermal Tests) |
- |
|
|
|
14.0 (Resistance to Dust & Moisture) |
- |
|
|
|
15.0 (Insulation Resistance and Electric Strength) |
- |
|
|
|
16.0 (Resistance to Heat , fire and tracking) |
- |
|
|
|
|
- |
- Excluding
(i) Construction (Cl.7) - Vibration test
(ii) Construction (Cl.7) - Photobiological hazard: UV radiation, retinal blue light hazard
(iii) Functional Safety (Cl.17)
(iv) Changeover Operation (Cl.18)
(v) High Temperature Operation (Cl.19) |
66 |
IS 10322 : Part 5 : Sec 7 (2017) |
Luminaires: Part 5 particular requirements: Sec 7 lighting chains (First Revision) |
- |
- View breakup
Rs. 42900/- excluding vibration test, UV radiation test, needle flame test and Photometric test.
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
20.4 (General Test Requireements) |
- |
|
|
|
20.5 (Classification of Luminaires') |
- |
|
|
|
20.6 (Marking) |
- |
|
|
|
20.7 (Construction) |
- |
|
|
|
20.8 (Creepage Distance and Clearances) |
- |
|
|
|
20.9 (Provision for earthing) |
- |
|
|
|
20.10 (Terminals) |
- |
|
|
|
20.11 (External & Internal Wiring) |
- |
|
|
|
20.12 (Protection against electric shock) |
- |
|
|
|
20.13 (Endurance Tests and Thermal Tests) |
- |
|
|
|
20.14 (Resistance to Dust & Moisture) |
- |
|
|
|
20.15 (Insulation Resistance and Electric Strength) |
- |
|
|
|
20.16 (Resistance to Heat , fire and tracking) |
- |
|
|
|
|
- |
- Excluding
(i) Construction (Cl.7) - Vibration test
(ii) Construction (Cl.7) - Photobiological hazard: UV radiation, retinal blue light hazard |
67 |
IS 10322 : Part 5 : Sec 6 (2013) |
Luminaires: Part 5 particular requirements: Sec 6 handlamps |
- |
- View breakup
Rs. 42900/- excluding vibration test, UV radiation test, needle flame test and Photometric test.
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
4 (General Test Requireements) |
- |
|
|
|
5 (Classification of Luminaires') |
- |
|
|
|
6.0 (Marking) |
- |
|
|
|
7.0 (Construction) |
- |
|
|
|
8.0 (Creepage Distance and Clearances) |
- |
|
|
|
9.0 (Provision for earthing) |
- |
|
|
|
10.0 (Terminals) |
- |
|
|
|
11.0 (External & Internal Wiring) |
- |
|
|
|
12.0 (Protection against electric shock) |
- |
|
|
|
13.0 (Endurance Tests and Thermal Tests) |
- |
|
|
|
14.0 (Resistance to Dust & Moisture) |
- |
|
|
|
15.0 (Insulation Resistance and Electric Strength) |
- |
|
|
|
16.0 (Resistance to Heat , fire and tracking) |
- |
|
|
|
|
- |
- Excluding
(i) Construction (Cl.7) - Vibration test
(ii) Construction (Cl.7) - Photobiological hazard: UV radiation, retinal blue light hazard |
68 |
IS 208 (1996) |
Door Handles - Specification ( Sixth Revision ) |
- |
- View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
5.1 (MANUFACTURE- General) |
- |
|
|
|
6.1 Table2A & 2B and Fig 1,2,3,4 (DIMENSIONS - Size (A,B,C,D,E,F,G,H,I)) |
- |
|
|
|
6.1 Table2A & 2B and Fig 1,2,3,4 (DIMENSIONS - Size 1. No. in each Lug 2. No. in a plate when a continious plate is used 3. Size Designation of Counter-sunk Head Wood Screws
(as per IS 6760: 1972)) |
- |
|
|
|
6.2 (Tolerance) |
- |
|
|
|
3 (TYPES-Doors handle shall be of the following types according to the materials used:) |
- |
|
|
|
|
- |
- Excluding material testing |
69 |
IS 10322 : Part 5 : Sec 5 (2013) |
Luminaires: Part 5 particular requirements: Sec 5 floodlights (First Revision) |
- |
- View breakup
Rs. 42900/- excluding vibration test, UV radiation test, needle flame test and Photometric test.
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
4 (General Test Requireements) |
- |
|
|
|
5 (Classification of Luminaires') |
- |
|
|
|
6.0 (Marking) |
- |
|
|
|
7.0 (Construction) |
- |
|
|
|
8.0 (Creepage Distance and Clearances) |
- |
|
|
|
9.0 (Provision for earthing) |
- |
|
|
|
10.0 (Terminals) |
- |
|
|
|
11.0 (External & Internal Wiring) |
- |
|
|
|
12.0 (Protection against electric shock) |
- |
|
|
|
13.0 (Endurance Tests and Thermal Tests) |
- |
|
|
|
14.0 (Resistance to Dust & Moisture) |
- |
|
|
|
15.0 (Insulation Resistance and Electric Strength) |
- |
|
|
|
16.0 (Resistance to Heat , fire and tracking) |
- |
|
|
|
|
- |
- Excluding
(i) Construction (Cl.7) - Vibration test
(ii) Construction (Cl.7) - Photobiological hazard: UV radiation, retinal blue light hazard
(iii) Photometric Test (cL.17) |
70 |
IS 10322 : PART 5 : SEC 3 (2012) |
Luminaires: Part 5 particular requirements: Sec 3 luminaires for road and street lighting (First Revision) |
- |
- View breakup
Rs. 62,700/- excluding vibration test, UV radiation test, needle flame test and photometric test.
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
4 (General Test Requireements) |
- |
|
|
|
5 (Classification of Luminaires') |
- |
|
|
|
6.0 (Marking) |
- |
|
|
|
7.0 (Construction) |
- |
|
|
|
8.0 (Creepage Distance and Clearances) |
- |
|
|
|
9.0 (Provision for earthing) |
- |
|
|
|
10.0 (Terminals) |
- |
|
|
|
7.0 (Construction) |
- |
|
|
|
11.0 (External & Internal Wiring) |
- |
|
|
|
12.0 (Protection against electric shock) |
- |
|
|
|
13.0 (Endurance Tests and Thermal Tests) |
- |
|
|
|
14.0 (Resistance to Dust & Moisture) |
- |
|
|
|
15.0 (Insulation Resistance and Electric Strength) |
- |
|
|
|
16.0 (Resistance to Heat , fire and tracking) |
- |
|
|
|
|
- |
- Excluding
(i) Construction (Cl.7) - Vibration test
(ii) Construction (Cl.7) - Photobiological hazard: UV radiation, retinal blue light hazard
(iii) Photometric Test (cL.17) |
71 |
IS 10322 : Part 5 : Sec 2 (2012) |
Luminaires: Part 5 particular requirements: Sec 2 recessed luminaires (First Revision) |
- |
- View breakup
Rs. 59,100/- excluding vibration test, UV radiation test, needle flame test and photometric test.
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
4 (General Test Requireements) |
- |
|
|
|
5 (Classification of Luminaires') |
- |
|
|
|
6 (Marking) |
- |
|
|
|
7 (Construction) |
- |
|
|
|
8 (Creepage Distance and Clearances) |
- |
|
|
|
9 (Provision for earthing) |
- |
|
|
|
10 (Terminals) |
- |
|
|
|
11 (External & Internal Wiring) |
- |
|
|
|
12 (Protection against electric shock) |
- |
|
|
|
13 (Endurance Tests and Thermal Tests) |
- |
|
|
|
14 (Resistance to Dust and Moisture) |
- |
|
|
|
15 (Insulation Resistance and Electric Strength) |
- |
|
|
|
16 (Resistance to Heat , fire and tracking) |
- |
|
|
|
|
- |
- Excluding
(i) Construction (Cl.7) - Vibration test
(ii) Construction (Cl.7) - Photobiological hazard: UV radiation, retinal blue light hazard
(iii) Photometric Test (cL.17) |
72 |
IS 10322 : Part 5 : Sec 1 (2012) |
Luminaires: Part 5 particular requirements: Sec 1 fixed general purpose luminaires (First Revision) |
- |
Rs. 60,000.00 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
4 (General Test Requireements) |
- |
|
|
|
5 (Classification of Luminaires') |
- |
|
|
|
6.0 (Marking) |
- |
|
|
|
7.0 (Construction) |
- |
|
|
|
8.0 (Creepage Distance and Clearances) |
- |
|
|
|
9.0 (Provision for earthing) |
- |
|
|
|
10.0 (Terminals) |
- |
|
|
|
11.0 (External & Internal Wiring) |
- |
|
|
|
12.0 (Protection against electric shock) |
- |
|
|
|
13.0 (Endurance Tests and Thermal Tests) |
- |
|
|
|
14.0 (Resistance to Dust & Moisture) |
- |
|
|
|
15.0 (Insulation Resistance and Electric Strength) |
- |
|
|
|
16.0 (Resistance to Heat , fire and tracking) |
- |
|
|
|
|
- |
- Excluding
(i) Construction (Cl.7) - Vibration test
(ii) Construction (Cl.7) - Photobiological hazard: UV radiation, retinal blue light hazard
(iii) Photometric Test (cL.17) |
73 |
IS 15885 : Part 2 : Sec 13 (2012) |
Safety of lamp controlgear: Part 2 particular requirements: Sec 13 d.c. or a.c. supplied electronic controlgear for led modules |
- |
Rs. 42900/ View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
7 (Marking) |
- |
|
|
|
8 (Protection against accidental contact with live parts) |
- |
|
|
|
9 (Terminals) |
- |
|
|
|
10 (PROVISION FOR EARTHING) |
- |
|
|
|
11 (MOISTURE RESISTANCE) |
- |
|
|
|
12 (Electric Strength) |
- |
|
|
|
14 (Fault conditions) |
- |
|
|
|
15 (Transformer heating) |
- |
|
|
|
16 (Construction) |
- |
|
|
|
17 (Creepage distance and clearances) |
- |
|
|
|
18 (Screws, current carrying parts and connections) |
- |
|
|
|
19 (Resistance to heat, fire and tracking) |
- |
|
|
|
20 (Resistance to corrosion) |
- |
|
|
|
|
- |
- - |
74 |
IS 16102 : Part 1 (2012) |
Self - Ballasted led lamps for general lighting services: Part 1 safety requirements |
upto 60W , upto 250V, B22d, E14&E27 |
Rs.29250.00 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
5 (Marking) |
- |
|
|
|
6 (Interchangeability) |
- |
|
|
|
7 (Protection against accidental contact with live parts) |
- |
|
|
|
8 (Insulation Resistance and Electric Strength) |
- |
|
|
|
9 (MECHANICAL STRENGTH) |
- |
|
|
|
10 (cap temperature) |
- |
|
|
|
11 (Resistance to Heat) |
- |
|
|
|
12 (Resistance to Flame and Ignition) |
- |
|
|
|
13 (Fault conditions) |
- |
|
|
|
14 (Creepage distance and clearances) |
- |
|
|
|
|
- |
- - |
75 |
IS 1374 (2007) |
Poultry feeds - Specification |
- |
- View breakup
Rs. 9500/- (For all in Table-1; Ca, Total P & available P in Table-2; Mn, I, Fe, Zn, Cu & Se in Table-3)
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
No Record Found
|
|
- |
- Test facility not available for Available phosphorus, Lysine., Methionine + Cystine, Methionine , Metabolizable energy, Vitamins, Aflatoxin B1, Linoleic acid, Castor, Free gossypol, Hydrocyanic acid |
76 |
IS 8229 (1986) |
Specification for oil - Well cement (First Revision) |
- |
- View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
4.1 - Table - 1 i (Magnesium Oxide (MgO) - Cl 4.8 of IS 4032:1985) |
- |
|
|
|
4.1 - Table - 1 ii (Sulphur Trioxide(SO3) - Cl 4.9 of IS 4032:1985) |
- |
|
|
|
4.1 - Table - 1 iii (Loss on ignition - Cl 4.2 of IS 4032:1985) |
- |
|
|
|
4.1 - Table - 1 iv (Insoluble residue - Cl 4.10 of IS 4032:1985) |
- |
|
|
|
4.1 - Table - 1 v (Tricalcium aluminate (3CaO.Al2O3) - Cl 4 of IS 4032:1985) |
- |
|
|
|
4.1 - Table - 1 x (Tricalcium Silicate (3CaO.SiO2) - Cl 4 of IS 4032:1985) |
- |
|
|
|
4.1 - Table - 1 xii (Total alkali content, expressed as Sodium Oxide (Na2O) equivalent - Cl 4.11 of IS 4032:1985) |
- |
|
|
|
4.1 - Table - 1 xix (Tetracalcium aluminoferrite (4CaO.Al2O3.Fe2O3) plus twice the tricalcium aluminate (3CaO.Al2O3) - Cl 4 of IS 4032:1985) |
- |
|
|
|
|
- |
- Chemical- complete facility Mechanical-Facility not available |
77 |
IS 8043 (1991) |
Specification for hydrophobic Portland cement |
- |
- View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
5.1 (ref. 6 - Table - 1 i of IS 269:2015) (Ratio of percentage of lime to percentages of silica, alumina and iron oxide - Cl 4 of IS 4032:1985) |
- |
|
|
|
5.1 (ref. 6 - Table - 1 ii of IS 269:2015) (Ratio of percentage of alumina to that of iron oxide - Cl 4 of IS 4032:1985) |
- |
|
|
|
5.1 (ref. 6 - Table - 1 iii of IS 269:2015) (Insoluble residue - Cl 4.10 of IS 4032:1985) |
- |
|
|
|
5.1 (ref. 6 - Table - 1 iv of IS 269:2015) (Magnesia - Cl 4.8 of IS 4032:1985) |
- |
|
|
|
5.1 (ref. 6 - Table - 1 v of IS 269:2015) (Total Sulphur Content calculated as Sulphuric Anhydride (SO3) - Cl 4.9 of IS 4032:1985) |
- |
|
|
|
5.1 (ref. 6 - Table - 1 vi of IS 269:2015) (Loss on ignition - Cl 4.2 of IS 4032:1985) |
- |
|
|
|
5.1 (ref. 6 - Table - 1 vii of IS 269:2015) (Chloride content - Cl 4.13 of IS 4032:1985) |
- |
|
|
|
5.1 (ref. 6 - Table - 1 viii of IS 269:2015) ( Alkali content as (Na2O + 0.658 K2O) - Cl 4.11 of IS 4032:1985) |
- |
|
|
|
|
- |
- Chemical- complete facility Mechanical-Facility not available |
78 |
IS 8041 (1990) |
Rapid hardening portland cement - Specific4tion (Second Revision) |
- |
- View breakup
Testing charges for the product are: Including Transverse Strength (optional test) test 9,100.00 Excluding Transverse Strength (optional test) test 7,900.00 -Testing charges for only chemical test report: 4,300.00 -Testing charges for only physical test report including optional tests: 4,800.00 -Testing charges for only physical test report excluding optional tests: 3,600.00
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
5.1 - Table - 1 i (Ratio of percentage of lime to percentages of silica, alumina and iron oxide - Cl 4 of IS 4032:1985) |
- |
|
|
|
5.1 - Table - 1 ii (Ratio of percentage of alumina to that of iron oxide - Cl 4 of IS 4032:1985) |
- |
|
|
|
5.1 - Table - 1 iii (Insoluble residue - Cl 4.10 of IS 4032:1985) |
- |
|
|
|
5.1 - Table - 1 iv (Magnesia - Cl 4.8 of IS 4032:1985) |
- |
|
|
|
5.1 - Table - 1 v (Total Sulphur Content calculated as Sulphuric Anhydride (SO3) - Cl 4.9 of IS 4032:1985) |
- |
|
|
|
5.1 - Table - 1 vi (Total loss on ignition - Cl 4.2 of IS 4032:1985) |
- |
|
|
|
6.1 (Fineness 4031 Part 2) |
- |
|
|
|
6.2.1 (Expansion by Le Chatelier- 4031 Part 3) |
- |
|
|
|
6.2.1 (Expansion by Autoclave- 4031 Part 3) |
- |
|
|
|
6.4 a) (Compressive Strength At 24 hrs ± 30 minutes - IS 4031 Part 6) |
- |
|
|
|
6.4 b) (Compressive Strength At 72 hrs ± 1 hr - IS 4031 Part 6) |
- |
|
|
|
6.3 a) (Setting Time Initial- 4031 Part 5) |
- |
|
|
|
6.3 b) (Setting Time Final- 4031 Part 5) |
- |
|
|
|
|
- |
- Chemical- complete facility Mechanical-Facility not available |
79 |
IS 6909 (1990) |
Supersulphated cement ? specification |
- |
- View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
5.1 (Insoluble residue - Cl 4.10 of IS 4032:1985) |
- |
|
|
|
5.1 (Magnesium Oxide - Cl 4.8 of IS 4032:1985) |
- |
|
|
|
5.1 (Insoluble residue - Cl 4.10 of IS 4032:1985) |
- |
|
|
|
5.1 (Sulphuric anhydride - Cl 4.9 of IS 4032:1985) |
- |
|
|
|
5.1 (Sulphide sulphur - Cl 6.12 of IS 4032:1985) |
- |
|
|
|
|
- |
- Chemical- complete facility Mechanical-Facility not available |
80 |
IS 6452 (1989) |
High alumina cement for structural use - specification (First Revision) |
- |
Testing charges for the product are: 3,700.00 Testing View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
4.1 (Total alumina content (Al2O3) - Cl 4.6 of IS 4032:1985) |
- |
|
|
|
|
- |
- Chemical- complete facility Mechanical-Facility not available |
81 |
IS 2052 (2009) |
Compounded feeds for cattle - Specification (Fourth Revision) |
- |
Rs. 9210/- View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
4.1 (Description - The feed shall be free from harmful constituents, metallic pieces and adulterants. The feed shall also be free from fungal growth and insect infestation. And from fermented . musty, rancid or any other objectionable odour) |
- |
|
|
|
4.3 - Table 1 - i (Moisture - Cl 4 of IS 7874 (Part 1)) |
- |
|
|
|
4.3 - Table 1 - ii (Crude protein (N x 6.25) - Cl 5 of IS 7874 (Part 1)) |
- |
|
|
|
4.3 - Table 1 - iii (Crude fat - Cl 7 of IS 7874 (Part 1)) |
- |
|
|
|
4.3 - Table 1 - iv (Crude fibre - Cl 8 of IS 7874 (Part 1)) |
- |
|
|
|
4.3 - Table 1 - v (Acid insoluble ash - Cl 10 of IS 7874 (Part 1)) |
- |
|
|
|
4.3 - Table 2 - i (Salt (as NaCl) - Cl 4 of IS 7874 (Part 2)) |
- |
|
|
|
4.3 - Table 2 - ii (Calcium (as Ca) - IS 13433 (Part 1 / Part 2)) |
- |
|
|
|
4.3 - Table 2 - iii (Total Phosphorus - IS 14828) |
- |
|
|
|
Cl-7.1,Table-1,Sl.No.xv (Cadmium) |
- |
|
|
|
|
- |
- Excluding Vitamin A, Vitamin D3, Vitamin E, Aflatoxin,Urea,Available phosphorous |
82 |
IS 6701 (1985) |
Specification for tungsten filament miscellaneous electric lamps (First Revision) |
Lamp Ref: NL, 15 W Max., 230/240/250 V, B22/25X26 |
Rs 21780.00 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
Cl 5 of IS 6701:1985 (MARKING) |
- |
|
|
|
Cl 3 of IS 6701:1985 (REQUIREMENTS FOR MECHANICAL AND PHYSICAL
CHARACTERISTICS) |
- |
|
|
|
6.2.1 (Wattage) |
- |
|
|
|
6.2.1 (Lumens) |
- |
|
|
|
6.2.2 (Average Life) |
- |
|
|
|
7.2 (Mechanical, physical and
marking requirements
) |
- |
|
|
|
7.3 (Initial Ratings ) |
- |
|
|
|
7.4 (Life Performance) |
- |
|
|
|
|
- |
- - |
83 |
IS 15111 : Part 2 (2002) |
Self ballasted lamps for general lighting services: Part 2 performance requirements |
Up to 26 W, Up to 250 V, B22d/E27/E14 Cap |
Rs.96730/-[ including Rs.55530/- for life test (Exclud View breakup
Rs.96730/-[ including Rs.55530/- for life test (Excluding emission RFD test)]
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
6 (DIMENSIONS) |
- |
|
|
|
8.1 (STARTING AND RUN-UP) |
- |
|
|
|
8.2 (STARTING AND RUN-UP) |
- |
|
|
|
9 (Lamp Wattage) |
- |
|
|
|
10 (Luminous Flux) |
- |
|
|
|
11 (Colour) |
- |
|
|
|
12 (LUMEN MAINTENANCE) |
- |
|
|
|
13.1 (Life) |
- |
|
|
|
13.2 (Life) |
- |
|
|
|
14 (Harmonics) |
- |
|
|
|
15 (Lamp Efficacy) |
- |
|
|
|
16 (Power factor) |
- |
|
|
|
18.1 (Marking) |
- |
|
|
|
|
- |
- - |
84 |
IS 15111 : PART 1 AND PART 2 (2002) |
Self ballasted lamps for general lighting services: Part 1 safety requirements |
Up to 26 W, Up to 250 V, B22d/E27/E14 cap |
Rs.39410/- View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
6.1 (Marking) |
- |
|
|
|
6.2 (Marking) |
- |
|
|
|
6.3 (Marking) |
- |
|
|
|
6.4 (BIS Certification Marking) |
- |
|
|
|
7 (Interchangeability
) |
- |
|
|
|
8 (Protection against electric shock) |
- |
|
|
|
9.1 (INSULATION RESISTANCE AND ELECTRIC
STRENGTH After HUMIDIT’Y TREATMENT) |
- |
|
|
|
9.2 (Insulation Resistance) |
- |
|
|
|
9.3 (Electric Strength) |
- |
|
|
|
10 (Mechanical strength test
) |
- |
|
|
|
11 (Cap Temperature rise test
) |
- |
|
|
|
12 (Resistance to heat) |
- |
|
|
|
13 (Resistance to Flame and Ignition) |
- |
|
|
|
14 (Fault Conditions) |
- |
|
|
|
|
- |
- - |
85 |
IS 11673 : Part 2 (2019) |
Sodium hypochlorite solution - Specification: Part 2 water treatment use (Second Revision) |
- |
Rs.18022/ View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
Cl. 4.3, Table-1, Sr.no. 1 (Relative density (at 25o/25oC)) |
- |
|
|
|
Cl. 4.3, Table-1, Sr.no. 2 (Available Chlorine(as Cl2)) |
- |
|
|
|
Cl. 4.3, Table-1, Sr.no. 3 (Total Chlorine(as Cl2)) |
- |
|
|
|
Cl. 4.3, Table-1, Sr.no. 4 (Free alkali( as NaOH),) |
- |
|
|
|
Cl. 4.3, Table-1, Sr.no. 5 (Free Sodium Carbonate (as Na2CO3)) |
- |
|
|
|
Cl. 4.3, Table-1, Sr.no. 6 (Iron (as Fe)) |
- |
|
|
|
Cl. 4.3, Table-1, Sr.no. 7 (Sodium Chlorate ( as NaClO3),) |
- |
|
|
|
Cl. 4.3, Table-1, Sr.no. 8 (Lead (as Pb)) |
- |
|
|
|
Cl. 4.3, Table-1, Sr.no. 9 (Arsenic (as As)) |
- |
|
|
|
Cl. 4.3, Table-1, Sr.no. 11 (Manganese (as Mn)) |
- |
|
|
|
Cl. 4.3, Table-1, Sr.no. 12 (Total chromium (as Cr)) |
- |
|
|
|
Cl. 4.3, Table-1, Sr.no. 11 (Manganese (as Mn)) |
- |
|
|
|
Cl. 4.3, Table-1, Sr.no. 12 (Total chromium (as Cr)) |
- |
|
|
|
Cl. 4.3, Table-1, Sr.no. 13 (Cadmium (as Cd)) |
- |
|
|
|
Cl. 4.3, Table-1, Sr.no. 14 (Selenium (as Se)) |
- |
|
|
|
Cl. 4.3, Table-1, Sr.no. 10 (Mercury (as Hg)) |
- |
|
|
|
|
- |
- - |
86 |
IS 418 (2004) |
Tungsten filament lamps for domestic and similar general lighting purposes (Fourth Revision) |
Up to 100 W, 230V,240V,250 V, B22d / E27 Cap |
- View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
6 (Marking, IS 418) |
- |
|
|
|
7.1 (Lamp Dimensions, IS 418:2004) |
- |
|
|
|
7.2 (Lamp Dimensions, IS 418:2004) |
- |
|
|
|
8.1 (Wattage, IS 418) |
- |
|
|
|
8.2.1 (Luminous Flux Initial, IS 418) |
- |
|
|
|
8.2.2 (Luminous Flux Initial, IS 418) |
- |
|
|
|
9 (Lumen Maintenance, IS 418) |
- |
|
|
|
10.1 (Life Test Requirements, IS 418) |
- |
|
|
|
10.2 (Life Test Requirements, IS 418) |
- |
|
|
|
7.2 (Lamp Dimensions, IS 418:2004) |
- |
|
|
|
8.1 (Wattage, IS 418) |
- |
|
|
|
8.2.1 (Luminous Flux Initial, IS 418) |
- |
|
|
|
8.2.2 (Luminous Flux Initial, IS 418) |
- |
|
|
|
9 (Lumen Maintenance, IS 418) |
- |
|
|
|
10.1 (Life Test Requirements, IS 418) |
- |
|
|
|
10.2 (Life Test Requirements, IS 418) |
- |
|
|
|
|
- |
- Test facility available for lamps having rated wattage up to and including 200 W with B22d, E14 and E27 caps. Test facility not available for Induced failure test. |
87 |
IS 398 : Part 4 (1994) |
Aluminium conductors for overhead transmission purposes: Part 4 aluminium alloy stranded conductors (Aluminium - Magnesium - Silicon Type) - Specification (Third Revision) |
- |
Rs 825/- upto 7 wires, Rs 1425/- upto 19 wires View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
6.1 (Freedom from Defects) |
- |
|
|
|
7.1 Table-1 (Dimensional measurement of wires) |
- |
|
|
|
7.2.2 Table-2, Table-4 (Calculated resistance of Stranded Conductor) |
- |
|
|
|
8.1 (Joints in wires-Conductors Containing Seven Wires) |
- |
|
|
|
8.2 (Joints in wires-Conductors Containing More Than Seven Wires) |
- |
|
|
|
9.1 (Stranding) |
- |
|
|
|
9.2 Table 3 (Lay Ratio of stranded conductors) |
- |
|
|
|
9.3 (Direction of Lay) |
- |
|
|
|
9.4 (Multiple layers of wires) |
- |
|
|
|
11 (Packing and Marking) |
- |
|
|
|
12.2 Table 1 (Breaking Load Test- Before Stranding) |
- |
|
|
|
12.2 Table 1 (Breaking Load Test- After Stranding) |
- |
|
|
|
12.3 Table 1 (Elongation Test- Before Stranding) |
- |
|
|
|
12.3 Table 1 (Elongation Test- After Stranding) |
- |
|
|
|
12.4 Table 1 (Resistance of Aluminium wire) |
- |
|
|
|
|
- |
- - |
88 |
IS 398 : Part 2 (1996) |
Aluminium conductors for overhead transmission purposes - Specification: Part 2 aluminium conuuctors, galvanized steel - Reinforced (Third Revision) |
Up to 100 sq. mm |
- View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
8.1.1 & 13.2 Table-1 (mech) (Diameter of Aluminium Wires Before Stranding) |
- |
|
|
|
8.1.1 & 13.2 Table 2 (mech) (Diameter of Steel Wires Before Stranding) |
- |
|
|
|
8.1.1 & 13.2 Table-1 (mech) (Diameter of Aluminium Wires After Stranding) |
- |
|
|
|
8.1.1 & 13.2 Table 2 (mech) (Diameter of Steel Wires After Stranding) |
- |
|
|
|
10 (elec) (Stranding) |
- |
|
|
|
10 (elec) (Stranding) |
- |
|
|
|
10 (elec) (Stranding) |
- |
|
|
|
10 (mech) (Stranding) |
- |
|
|
|
13.3 Table 1 (mech) (Breaking Load of Aluminium Wires Before Stranding) |
- |
|
|
|
13.3 Table 2 (mech) (Breaking Load of Steel Wires Before Stranding) |
- |
|
|
|
13.3 Table 1 (mech) (Breaking Load of Aluminium Wires After Stranding) |
- |
|
|
|
13.3 Table 2 (mech) (Breaking Load of Steel Wires After Stranding) |
- |
|
|
|
13.4.1 (mech) (Ductility by Torsion Test before stranding) |
- |
|
|
|
13.4.1 (mech) (Ductility by Torsion Test before stranding) |
- |
|
|
|
13.4.1 (mech) (Ductility by Torsion Test after stranding) |
- |
|
|
|
13.4.1 (mech) (Ductility by Torsion Test after stranding) |
- |
|
|
|
13.4.2 (elec) (Ductility by Elongation Test before stranding) |
- |
|
|
|
13.4.2 (elec) (Ductility by Elongation Test after stranding) |
- |
|
|
|
13.5.1 (mech) (Wrapping Test Aluminium Wires Before Stranding) |
- |
|
|
|
13.5.1 (mech) (Wrapping Test Aluminium Wires After Stranding) |
- |
|
|
|
13.5.2 (mech) (Wrapping Test Galvanized Steel Wires Before Stranding) |
- |
|
|
|
13.5.2 (mech) (Wrapping Test Galvanized Steel Wires After Stranding) |
- |
|
|
|
13.6 (elec) (Resistance test-Aluminium wire before Stranding) |
- |
|
|
|
13.6 (elec) (Resistance test-Aluminium wire after stranding) |
- |
|
|
|
13.7.2 (chem) (Mass of Zinc coating) |
- |
|
|
|
13.7.2 (chem) (Uniformity of Zinc coating) |
- |
|
|
|
13.8 Table-4 (mech) (Lay Ratio- Aluminium Wire Outermost Layer) |
- |
|
|
|
13.8 Table-4 (mech) (Lay Ratio- Aluminium Wire Layer Immediately Beneath Outermost Layer) |
- |
|
|
|
13.8 Table-4 (mech) (Lay Ratio- Aluminium Wire Innermost Layer of Conductors with 3 Aluminium Wire Layers) |
- |
|
|
|
13.8 Table-4 (mech) (Lay Ratio- Steel Core (6 Wire Layer)) |
- |
|
|
|
13.9 (elec) (Surface condition test) |
- |
|
|
|
|
- |
- Test facility is Complete for conductor up to 100 sq. mm only.Test facility for Stress-strain test, Surface conditioning test, ultimate breaking load on stranded conductor not available for conductors above 100 sq. mm |
89 |
IS 13334 : Part 2 (2014) |
Skimmed milk powder - Specification: Part 2 extra grade (First Revision) |
- |
Rs 10430/- View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
Table 1 (ix) (Bacterial count (IS 5402)) |
- |
|
|
|
Table 1 (x) (Coliform count (IS 5401 - Part 1)) |
- |
|
|
|
Table 1 (xi) (Escherichia coli (IS 5887 - Part 1)) |
- |
|
|
|
Table 1 (xii) (Coagulase positive Staphylococcus aureus (IS 5887 - Part 2)) |
- |
|
|
|
Table 1 (xiii) (Salmonella (IS 5887 - Part 3)) |
- |
|
|
|
Table 1 (xiv)(a) (Spore Count: a)Aerobic (Bacillus cereus) Type m (IS 5887 - Part 6)) |
- |
|
|
|
Table 1 (xiv)(b) (Spore Count: b) Anaerobic (Sulfite reducing Clostridia) Type m (ISO 15213 : 2003)) |
- |
|
|
|
Table 1 (xv) (Listeria monocytogenes (IS 14988 - Part 2 : 2001)) |
- |
|
|
|
Table 1 (xiv)(a) (Spore Count: a)Aerobic (Bacillus cereus) Type m (IS 5887 - Part 6)) |
- |
|
|
|
Table 1 (xiv)(b) (Spore Count: b) Anaerobic (Sulfite reducing Clostridia) Type m (ISO 15213 : 2003)) |
- |
|
|
|
Table 1 (i) (Moisture (IS 116231or 16072)) |
- |
|
|
|
Table 1 (ii) (Milk protein in milk solids not fat (IS 72192)) |
- |
|
|
|
Table 1 (iii) (Milk fat (IS 117213) or Annex B) |
- |
|
|
|
Table 1 (iv) (Insolubility index (IS 12759)) |
- |
|
|
|
Table 1 (v) (Total ash (on dry basis), Annex B of IS 14433) |
- |
|
|
|
Table 1 (vi) (Titratable acidity (IS 11766)) |
- |
|
|
|
Table 1 (viii) (Scorched particles (equivalent to Disc B) (IS 13500)) |
- |
|
|
|
Cl 4.0 (Description) |
- |
|
|
|
Cl.5.4 (Flavour & Taste) |
- |
|
|
|
Clause no 5.2 (freedom from extraneous matter) |
- |
|
|
|
|
- |
- Test facility not available for Lactate content. |
90 |
IS 3466 (1988) |
Specification For Masonry Cement |
- |
- View breakup
Rs. 7350/- excluding chemical tests.
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
4 ( water soluble alkali content - Cl 9 of IS 4032:1985) |
- |
|
|
|
4.1 (STAINING
IS 4032:1985) |
- |
|
|
|
4.1 (STAINING
IS 4032:1985) |
- |
|
|
|
|
- |
- Only Chemical testing facility available. |