8.1(Design Features) |
- |
2 |
|
2% of total complete testing charge |
8.1.1(Design Features) |
- |
2 |
|
2% of total complete testing charge |
8.1.4(Design Features) |
- |
2 |
|
2% of total complete testing charge |
8.1.5(Design Features) |
- |
2 |
|
2% of total complete testing charge |
8.1.5(Design Features) |
- |
2 |
|
2% of total complete testing charge |
8.1.7(Design Features) |
- |
2 |
|
2% of total complete testing charge |
9(Efficiency) |
- |
2 |
|
2% of total complete testing charge |
10(Performance
(Cl 17.1 of IS 5120)) |
- |
2 |
|
2% of total complete testing charge |
10(Suction and Delivery Ends
(Cl 17.2 of IS 5120)) |
- |
2 |
|
2% of total complete testing charge |
10(Suction and Delivery Ends
(Cl 17.2.1 of IS 5120)) |
- |
2 |
|
2% of total complete testing charge |
10(Fluid Passages
(Cl 17.3 of IS 5120)) |
- |
2 |
|
2% of total complete testing charge |
10(Draining Plugrs
(Cl 17.4 of IS 5120)) |
- |
2 |
|
2% of total complete testing charge |
10(Lantern Ring
(Cl 17.5 of IS 5120)) |
- |
2 |
|
2% of total complete testing charge |
10(Casing
(Cl 17.6 of IS 5120)) |
- |
2 |
|
2% of total complete testing charge |
10(Impeller
(Cl 17.7 of IS 5120)) |
- |
2 |
|
2% of total complete testing charge |
10(Shaft
(Cl 17.8 of IS 5120)) |
- |
2 |
|
2% of total complete testing charge |
10(Shaft Couplings
(Cl 17.9 of IS 5120)) |
- |
2 |
|
2% of total complete testing charge |
10(Bearings
(Cl 17.10 of IS 5120)) |
- |
2 |
|
2% of total complete testing charge |
10(Bearings
(Cl 17.10.1 of IS 5120)) |
- |
2 |
|
2% of total complete testing charge |
10(Bearings
(Cl 17.10.2 of IS 5120)) |
- |
2 |
|
2% of total complete testing charge |
10( Stuffing Boxes
(Cl 17.11 of IS 5120)) |
- |
2 |
|
2% of total complete testing charge |
10(Base Plates
(Cl 17.12 of IS 5120)) |
- |
2 |
|
2% of total complete testing charge |
10(Name Plate
(Cl 17.14 of IS 5120)) |
- |
2 |
|
2% of total complete testing charge |
10(Name Plate
(Cl 17.14 of IS 5120)) |
- |
2 |
|
2% of total complete testing charge |
10(Name Plate
(Cl 17.14.1 of IS 5120)) |
- |
2 |
|
2% of total complete testing charge |
10.2(Casing) |
- |
2 |
|
2% of total complete testing charge |
10.3(Impeller) |
- |
2 |
|
2% of total complete testing charge |
10.4.1(Shaft) |
- |
2 |
|
2% of total complete testing charge |
10.4.2(Shaft) |
- |
2 |
|
2% of total complete testing charge |
10.5.1(Balancing) |
- |
2 |
|
2% of total complete testing charge |
10.5.2(Balancing) |
- |
2 |
|
2% of total complete testing charge |
10.5.3(Balancing) |
- |
2 |
|
2% of total complete testing charge |
10.5.4(Balancing) |
- |
2 |
|
2% of total complete testing charge |
10.6.1( Provision for Earthing) |
- |
2 |
|
2% of total complete testing charge |
10.6.2( Provision for Earthing) |
- |
2 |
|
2% of total complete testing charge |
10.6.3( Provision for Earthing) |
- |
2 |
|
2% of total complete testing charge |
10.6.4( Provision for Earthing) |
- |
2 |
|
2% of total complete testing charge |
10.7.1(Terminal Marking and Direction of Rotation) |
- |
2 |
|
2% of total complete testing charge |
10.7.2(Terminal Marking and Direction of Rotation) |
- |
2 |
|
2% of total complete testing charge |
10.7.3(Terminal Marking and Direction of Rotation) |
- |
2 |
|
2% of total complete testing charge |
15.2(Laboratory Tests
Cl.8 of IS 11346-2002
Rate of flow and head
Cl.8 of IS 11346-2002) |
- |
2 |
|
2% of total complete testing charge |
15.2(Laboratory Tests
Cl.8 of IS 11346-2002
Efficiency
Cl.8.3 of IS 11346-2002) |
- |
2 |
|
2% of total complete testing charge |
15.5(Hydrostatic Pressure Test) |
- |
2 |
|
2% of total complete testing charge |
16.1.1( Guarantee of Performance) |
- |
2 |
|
2% of total complete testing charge |
16.1.2( Guarantee of Performance) |
- |
2 |
|
2% of total complete testing charge |
16.1.3( Guarantee of Performance) |
- |
2 |
|
2% of total complete testing charge |
16.1.4( Guarantee of Performance) |
- |
2 |
|
2% of total complete testing charge |
16.1.5( Guarantee of Performance) |
- |
2 |
|
2% of total complete testing charge |
18.1(Marking) |
- |
2 |
|
2% of total complete testing charge |
18.1(Marking) |
- |
2 |
|
2% of total complete testing charge |
18.1(Marking) |
- |
2 |
|
2% of total complete testing charge |
18.1(Marking) |
- |
2 |
|
2% of total complete testing charge |
18.1(Marking) |
- |
2 |
|
2% of total complete testing charge |
18.1(Marking) |
- |
2 |
|
2% of total complete testing charge |
18.1(Marking) |
- |
2 |
|
2% of total complete testing charge |
18.1(Marking) |
- |
2 |
|
2% of total complete testing charge |
18.1(Marking) |
- |
2 |
|
2% of total complete testing charge |
18.1(Marking) |
- |
2 |
|
2% of total complete testing charge |
18.1(Marking) |
- |
2 |
|
2% of total complete testing charge |
18.1(Marking) |
- |
2 |
|
2% of total complete testing charge |
18.1(Marking) |
- |
2 |
|
2% of total complete testing charge |
18.1(Marking) |
- |
2 |
|
2% of total complete testing charge |
18.1(Marking) |
- |
2 |
|
2% of total complete testing charge |
18.1(Marking) |
- |
2 |
|
2% of total complete testing charge |
18.1(Marking) |
- |
2 |
|
2% of total complete testing charge |
18.1(Marking) |
- |
2 |
|
2% of total complete testing charge |
18.1(Marking) |
- |
2 |
|
2% of total complete testing charge |
18.1.3(Marking) |
- |
2 |
|
2% of total complete testing charge |
7(Constructional features) |
- |
2 |
|
2% of total complete testing charge |
7.1(It is recognized that a number of materials of construction are available to meet the needs for pumps handling clear, cold water.) |
- |
2 |
|
2% of total complete testing charge |
7.2(Gaskets, seals and packings used for clear, cold water pumps shall conform to the applicable requirements specified in 5.2 of IS 5120.) |
- |
2 |
|
2% of total complete testing charge |
7.3(The motor shall be provided with a breathing attachment like bellows, diaphragm etc; to compensate the volumetric variation of
water inside the motor due to change in the temperature.) |
- |
2 |
|
2% of total complete testing charge |
7.4(The motor shall be protected from ingress of well water, sand and other foreign matter by means of cable glands, rubber seals etc.) |
- |
2 |
|
2% of total complete testing charge |
7.5(All materials and components for the motor shall be suitable for application in respect of resistance and mechanical performance
to protect it) |
- |
2 |
|
2% of total complete testing charge |
7.6(The rotor of the wet type open well submersible motor and rotor in water filled designed motor shall be provided with suitable coating
from corrosion under water. However if suitable anticorrosion additive is added in the water, no separate protection on
rotors is necessary.) |
- |
2 |
|
2% of total complete testing charge |
8(Design Features) |
- |
2 |
|
2% of total complete testing charge |
8.1.2(The multi-stage pump shaft may be guided through bearings, the bearings may be provided in stage casing, suction housing and
discharge casing, while in case of intermediate bearings, suitable positions may be selected in the overall span.) |
- |
2 |
|
2% of total complete testing charge |
8.1.3(The pump may be equipped with replaceable bearing and wearing ring, wherever provided.) |
- |
2 |
|
2% of total complete testing charge |
8.1.4(The strainer on the suction shall offer the best compromise amongst restraining large solids from entering the pump and containing
the suction losses to the minimum.) |
- |
2 |
|
2% of total complete testing charge |
8.1.5(The pump shall be capable to give discharge without overloading the prime mover within the permissible current at rated voltage
and supply frequency at minimum +5 percent and minimum –15 percent of the guaranteed duty point head up to 30 m.
Above 30 m, the pump shall be capable to give discharge without overloading the prime mover within the permissible current at rated
voltage and supply frequency at minimum +10 percent and minimum –25 percent of the guaranteed duty point head.) |
- |
2 |
|
2% of total complete testing charge |
12(Cable) |
- |
2 |
|
2% of total complete testing charge |
12.1(Flat/Round cables as per IS694 shall be used) |
- |
2 |
|
2% of total complete testing charge |
12.1.2(The size of the conductor shall be adequate and suitable for contineous use under water and in air.
the length of the cable shall be minimum 2 m externallly unless otherwise specified by the customer) |
- |
2 |
|
2% of total complete testing charge |
12.1.3(The size and of the cable should be suitably selected so that the voltage drop between control panel and the mptor terminal does
not exeed three percent of the rated voltage) |
- |
2 |
|
2% of total complete testing charge |
12.1.4(In case a joint is required to be made between the lead cable supplied with the motor and the user’s cable, a detailed procedure to
make water tight joining shall be supplied by the motor manufacturer.) |
- |
2 |
|
2% of total complete testing charge |
12.1.5(If four core cable is used, the fourth core is to be used for earthing.) |
- |
2 |
|
2% of total complete testing charge |
14.10.1(Type test) |
- |
2 |
|
2% of total complete testing charge |
14.10.1(a)(Insulation Resistance test) |
- |
2 |
|
2% of total complete testing charge |
14.10.1(b)(High Voltage test) |
- |
2 |
|
2% of total complete testing charge |
14.10.1(c)(Measurement of stator resistance) |
- |
2 |
|
2% of total complete testing charge |
14.10.1(d)(No load test at rated voltage) |
- |
2 |
|
2% of total complete testing charge |
14.10.1(e)(Reduced voltage running up test at no load) |
- |
2 |
|
2% of total complete testing charge |
14.10.1(f)(Locked rotor) |
- |
2 |
|
2% of total complete testing charge |
14.10.1(g)(Breakaway (starting) torque) |
- |
2 |
|
2% of total complete testing charge |
14.10.1(h)(Leakage current test;) |
- |
2 |
|
2% of total complete testing charge |
14.10.1(j)(Temperature rise test at rated voltage) |
- |
2 |
|
2% of total complete testing charge |
14.10.1(k)(Temperature rise test at reduced voltage) |
- |
2 |
|
2% of total complete testing charge |
16.1(Guarntee of Performance) |
- |
2 |
|
2% of total complete testing charge |
16.1.1(The pumpset shall be guaranteed for their performance of the nominal volume rate of flow and the nominal head at the guaranteed
duty point. The overall efficiency of the pumpset shall be guaranteed at the declared duty point only.) |
- |
2 |
|
2% of total complete testing charge |
16.1.2(The guarantee shall be deemed to have been met with, if the measured values of head, volume rate of flow and overall efficiency
are within the indicated in IS 11346 limits) |
- |
2 |
|
2% of total complete testing charge |
16.1.3(Open well submersible motor shall not get overloaded in the specified operating head range at rated voltage and supply frequency.) |
- |
2 |
|
2% of total complete testing charge |
16.1.4(The pump shall be tested for the operating head range as per 8.1.5.) |
- |
2 |
|
2% of total complete testing charge |
16.1.5(The overloading of motor is that condition when maximum current drawn by the motor exceeds the limit of 1.07 times of the rated
motor current) |
- |
2 |
|
2% of total complete testing charge |
16.1.6(The tolerance shall apply to guaranteed duty point only.) |
- |
2 |
|
2% of total complete testing charge |
16.1.7(Performance at rated voltage and supply frequency is actual performance of the set. This is better than performance at rated speed,
since in the entire operating head range speed of motor is higher than rated speed, as motor is running in under loaded condition.) |
- |
2 |
|
2% of total complete testing charge |
16.1.8(The manufacturer shall specify the minimum submergence of pump unit at duty point.) |
- |
2 |
|
2% of total complete testing charge |