REACT COMPLIANCE AND TESTING LABORATORIES LLP

#3411, 3rd floor, Service Road, Vijayanagar, BENGALURU, Bengaluru Urban, Karnataka, 560040
9845716746 info@react-labs.com
Scope List
Reset
9 Results
S.No. Indian Standard No. Product Grade / Type / Size / Designation etc. Exclusion Testing Charges (Excl. Of Taxes) Facility Type Effective Date Validity Date Remark
1 IS 16270 (2014) Secondary cells and batteries for solar photovoltaic application - General requirements and methods of test - - 400000 View breakup
-
Complete 10 Mar, 2027 -
2 IS 16046 : Part 2 (2018) Secondary Cells and Batteries Containing Alkaline or Other Non-Acid Electrolytes ” Safety Requirements for Portable Sealed Secondary Cells and for Batteries Made from Them for Use in Portable Applications Part 2 Lithium Systems ( Second Revision ) - - 60000 View breakup
-
Complete 10 Mar, 2027 -
3 IS 16169 (2014) Utility - Interconnected photovoltaic inverters - Test procedure of islanding prevention measures - - 100000 View breakup
-
Complete 10 Mar, 2027 -
4 IS 16221 : Part 1 (2016) Safety of Power Converters for use in Photovoltaic Power Systems Part 1 General Requirements - - 270000 View breakup
-
Complete 10 Mar, 2027 -
5 IS 16221 : Part 2 (2015) Safety of power converters for use in photovoltaic power systems: Part 2 particular requirements for inverters - - 170000 View breakup
-
Complete 10 Mar, 2027 -
6 IS 616 (2017) Audio, video and similar electronic apparatus - Safety requirements (Fifth Revision) - - 65000 View breakup
-
Complete 10 Mar, 2027 -
7 IS 16169 (2019) Utility - Interconnected photovoltaic inverters - Test procedure of islanding prevention measures (First Revision) - - 100000 View breakup
-
Complete 10 Mar, 2027 IS Included w.e.f. 07-09-2020
8 IS 13252 : Part 1 (2010) Information technology equipment - Safety: Part 1 general requirements (Second Revision) - - 65000 View breakup
-
Complete 10 Mar, 2027 -
9 IS 16242 : Part 1 (2014) Uninterruptible power systems (UPS): Part 1 general and safety requirements for UPS - - 65000 View breakup
-
Complete 10 Mar, 2027 IS Included w.e.f. 13/3/2018 Excluding following tests: Components (cl.4.5/RD 1.5); Moving parts (cl.5.6/RD 2.8.5); Overload test (cl.5.6/RD 2.8.7.2); Endurance test (cl.5.6/RD 2.8.7.3); Semi-conductor devices (cl.5.7/RD 2.10.5.4); Insulation in wound components (cl.5.7/RD 2.10.5.11); Construction of printed circuit boards (cl.5.7/RD/ 2.10.6); Test on coated printed boards and coated components (cl.5.7/RD 2.10.8); Thermal cycling (cl.5.7/ RD 2.10.9); Test for pollution degree 1 environment and for insulating components (cl.5.7/RD 2.10.10); Enclosed sealing parts (cl.5.7/RD 2.10.12); Resistance to fire-Flammability test (cl.7.5, Annex A); Ventilation (cl. 7.6.7 & Annex M)

Designed, Developed and Maintained by:

Arohatech IT Services (P) Ltd.

Contact for any query/support: supportlims@bis.gov.in