1 |
IS 694 (2010) |
Polyvinyl chloride insulated unsheathed and sheathed cables/cords with rigid and flexible conductor for rated voltages up to and including 450/750 v (Fourth Revision) |
- |
30000 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
10.9(Additional ageing test (OU cables only) -HV test (at 60±3oC)) |
- |
3500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
10.4(Flammability test- Unaffected portion) |
- |
500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
10.2(HV (room temperature)) |
- |
1000 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
table 1 e) 3) (IR constant- Room temp ) |
- |
800 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
table 1 e) 3) (Volume Resistivity - Maximum temp) |
- |
800 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
table 1 e) 3) (Volume Resistivity - Room temp ) |
- |
800 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
10.1(HV (water immersion)) |
- |
1500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
10.8(Smoke density rating) |
- |
2000 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
10.6(Halogen evolution) |
- |
2000 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
10.7(Test for Temperature Index) |
- |
2500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
10.5(Oxygen Index Test) |
- |
2000 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
10.11(Per sulphate test (for tinned Cu cable only)) |
- |
1200 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
Table 1 iii) d) 6)(Hot deformation -Indentation depth - Sheath ) |
- |
800 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
Table 1 iii) c) 6)(Hot deformation - Indentation depth- Insulation) |
- |
800 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
Table 1 iii) d) 2)(Loss of mass- Sheath ) |
- |
2500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
4.1(Wrapping test (for Al)) |
- |
500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
Table 1 iii) d) 8)(Cold bend for sheath) |
- |
800 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
Table 1 iii) c) 9)(Cold impact for insulation) |
- |
800 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
Table 1 iii) c) 8)(Cold bend for insulation) |
- |
900 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
Table 1 iii) d) 7)(Thermal stability- Sheath ) |
- |
800 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
Table 1 iii) c) 7)(Thermal stability- Insulation ) |
- |
800 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
Table 1 iii) c) 2)(Loss of mass- Insulation ) |
- |
2000 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
Table 1 iii) d) 3)(Sheath- Elongation variation) |
- |
500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
Table 1 iii) d) 3)(Sheath- Elongation (After ageing)) |
- |
800 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
Table 1 iii) c) 4)(Shrinkage-Insulation) |
- |
800 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
Table 1 iii) d) 1)(Sheath- Elongation (Without ageing)) |
- |
1200 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
Table 1 iii) d) 1)(Sheath -Tensile strength (Without ageing)) |
- |
1500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
8.3(Thickness of Sheath) |
- |
500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
5.3(Thickness of Insulation) |
- |
500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
Table 1 iii) c) 3)(Elongation variation) |
- |
1500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
Table 1 iii) c) 3)(TS variation) |
- |
1200 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
Table 1 iii) c) 3)(Elongation (After ageing)) |
- |
1800 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
Table 1 iii) c) 3)(Tensile strength (After ageing)) |
- |
500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
Table 1 iii) c) 1)(Elongation (Without ageing)) |
- |
500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
Table 1 iii) c) 1)(Tensile strength (Without ageing)) |
- |
500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
8.3(Avarage thickness of Sheath) |
- |
400 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
9(Overall dimensions) |
- |
400 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
10.4(Flammability Test) |
- |
900 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
|
30 Sep, 2027 |
- - |
2 |
IS 1554 : Part 2 (1988) |
Specification for pvc insulated (Heavy Duty) electric cables: Part 2 for working voltages from 3.3 kV up to and including 11 kV (Second Revision) |
- |
25000 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
11.2(INSULATION : Thickness of Insulation) |
- |
500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
15.4(INNER SHEATH (COMMON COVERING) : Thickness of Inner Sheath) |
- |
500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
15.4.1(INNER SHEATH (COMMON COVERING) : Thickness of Inner Sheath) |
- |
500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
16.3(Armouring : Dimensions -Wire Diameter) |
- |
500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
16.3(Armouring : Dimensions -Formed wire ) |
- |
1000 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
16.5(ARMOURING : Resistance) |
- |
1000 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
13.6 a)(ARMOURING: Tensile Strength) |
- |
500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
13.6 b)(ARMOURING: Elongation ) |
- |
500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
13.6 c)(ARMOURING: Torsion Test (For round wire ) ) |
- |
500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
13.6 d)(ARMOURING: Winding Test(For formed wire)) |
- |
800 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
13.6 e)(ARMOURING: Uniformity of zinc coating) |
- |
700 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
13.6 f)(ARMOURING: Mass of zinc coating ) |
- |
1000 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
13.6 g)(ARMOURING: Resistivity) |
- |
1200 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
17.3.1(Thickness of Outer Sheath : Unarmoured Cables) |
- |
500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
17.3.2(Thickness of Outer Sheath : Armoured Cables) |
- |
500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
18.1 a) 1)(Tests on Conductor : Annealing test (for copper)) |
- |
1200 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
18.1 a) 2)(Tensile test (for aluminium) - Before stranding ) |
- |
1000 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
18.1 a) 2)(Tensile test (for aluminium) - After stranding ) |
- |
1000 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
18.1 a) 3)(Tests on Conductor : Wrapping test ( for aluminium)) |
- |
500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
18.1 a)4)(Tests on conductor : Conductor resistance test - Main conductor ) |
- |
1500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
18.1 a)4)(Resistance test - Neutral conductor ) |
- |
1500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
18.1 d) 1)(Phyaical tests for insulation : Tensile Test) |
- |
1500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
18.1 d) 1)(Phyaical tests for insulation : Elongation ) |
- |
800 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
18.1 d) 1)(Physical tests for sheath : Tensile stregth ) |
- |
1500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
18.1 d) 1)(Physical tests for sheath : Elongation ) |
- |
1000 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
18.1 d) 2)(Phyaical tests for insulation- Ageing in air Oven : Tensile Test) |
- |
1000 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
18.1 d) 2)(Phyaical tests for insulation - Ageing in air oven : Elongation ) |
- |
2500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
18.1 d) 2)(Phyaical tests for insulation - Ageing in air Oven : Tensile Variation ) |
- |
1500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
18.1 d) 2)(Phyaical tests for insulation- Ageing in air oven : Elongation Variation ) |
- |
1500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
18.1 d) 2)(Physical tests for outer sheath -Ageing in air oven : Elongation ) |
- |
1500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
18.1 d) 2)(Physical tests for outer sheath- Ageing in air oven : Tensile stregth ) |
- |
1500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
18.1 d) 3)(Phyaical tests for insulation : Shrinkage ) |
- |
1200 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
18.1 d) 3)(Phyaical tests for Sheath : Shrinkage - Crack observed ) |
- |
800 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
18.1 d) 4)(Hot deformation : Insulation ) |
- |
1200 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
18.1 d) 4)(Hot deformation : Sheath ) |
- |
1200 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
18.1 d) 5)( Loss of mass in air oven- Insulation ) |
- |
2500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
18.1 d) 5)( Loss of mass in air oven- sheath ) |
- |
2500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
18.1 d) 6)(Heat shock test- Insulation ) |
- |
700 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
18.1 d) 6)(Heat shock test- sheath ) |
- |
700 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
12.1(INSULATION SCREENING) |
- |
1200 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
18.1 d) 7)(Thermal stability- Sheath ) |
- |
500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
18.1 e)(Insulation resistance test : Volume Resistivity ) |
- |
1400 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
18.1 e)(Insulation resistance test : IR Constant ) |
- |
1400 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
19.8(Flammability test) |
- |
1200 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
19.7(High voltage test) |
- |
12000 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
19.2(Partial discharge test) |
- |
15000 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
19.5(Heating cycle test) |
- |
15000 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
19.3(Bending test) |
- |
4000 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
19.4(Dielectric power factor test) |
- |
15000 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
19.4(Dielectric power factor test) |
- |
15000 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
19.6(Impulse withstand test) |
- |
12000 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
18.1 d) 8)(Water absorption (gravimetric)(for insulation, where applicable)) |
- |
3000 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
|
30 Sep, 2027 |
- - |
3 |
IS 8783 : Part 4 : Sec 1 (1995) |
Winding wires for submersible motors - Specification: Part 4 specification for indmdual wires: Sec 1 HR PVC insulated wires (First Revision) |
- |
10000 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
Cl.5.1.1 (Dimensions) |
- |
1500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
Cl. 6(Annealing Test) |
- |
800 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
Cl 6(Resistance Test) |
- |
1000 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
Cl. 4 Table 1of IS: 8783 (part 2) (Elongation) |
- |
1000 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
Cl. 4 Table 1of IS: 8783 (part 2) (Tensile strength ) |
- |
1000 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
Cl. 4 Table 1of IS: 8783 (part 2) (Elongation at Break ) |
- |
1500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
Cl. 4 Table 1of IS: 8783 (part 2) (Tensile Strength) |
- |
1500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
Cl. 4 Table 1of IS: 8783 (part 2) (Shrinkage test ) |
- |
1000 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
Cl. 4 Table 1of IS: 8783 (part 2) (Water absorption (Gravimetric) ) |
- |
3000 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
Cl. 4 Table 1of IS: 8783 (part 2) (Hot deformation Test ) |
- |
1200 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
Cl. 4 Table 1of IS: 8783 (part 2) (Heat shock Test ) |
- |
1000 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
Cl.4.4(Overall Diameter) |
- |
500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
Cl.4.6(High Voltage Test Water Immersion ) |
- |
1500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
Cl No. 3.1(Conductor diameter) |
- |
500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
|
30 Sep, 2027 |
- - |
4 |
IS 398 : Part 4 (1994) |
Aluminium conductors for overhead transmission purposes: Part 4 aluminium alloy stranded conductors (Aluminium - Magnesium - Silicon Type) - Specification (Third Revision) |
- |
20000 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
7.1 Table-1(Dimensional measurement of wires) |
- |
2500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
9.2 Table 3(Lay Ratio of stranded conductors) |
- |
800 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
12.2 Table 1(Breaking Load Test- Before Stranding) |
- |
1500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
12.2 Table 1(Breaking Load Test- After Stranding) |
- |
1500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
12.3 Table 1(Elongation Test- Before Stranding) |
- |
1500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
12.3 Table 1(Elongation Test- After Stranding) |
- |
1500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
12.4 Table 1(Resistance of Aluminium wire) |
- |
2500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
9.2(Lay Ratio 24 wire layer) |
- |
800 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
9.2(Lay Ratio 18 wire layer) |
- |
800 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
9.2(Lay Ratio 12 wire layer) |
- |
800 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
9.2(Lay Ratio 3/6 wire layer) |
- |
800 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
Cl-7.2 (7.2.1, 7.2.2), Table-2(Stranding and Wire Dia) |
- |
1500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
Cl- 7.2 (7.2.1, 7.2.2), Table-2(Approx Overall Dia) |
- |
500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
Cl. 7.2 (7.2.1, 7.2.2), Table 2(Approx Mass) |
- |
500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
Cl- 7.2 (7.2.1, 7.2.2), Table-2(Calculated Maximum Resistance at 20°C) |
- |
1500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
Cl- 7.2 (7.2.1, 7.2.2), Table-2(Approx Calculated Breaking Load) |
- |
500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
|
30 Sep, 2027 |
- - |
5 |
IS 398 : Part 1 (1996) |
Aluminium conductors for overhead transmission purposes - Specification: Part 1 aluminium stranded conductors (Third Revision) |
- |
20000 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
12.2, Table-1(Measurement of diameter of individual aluminium wire) |
- |
1500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
12.3, Table-1(Breaking load before stranding) |
- |
900 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
12.3, Table-1(Breaking load after stranding) |
- |
2500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
12.4(Wrapping test) |
- |
500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
12.5, Table 1(Resistance test) |
- |
3000 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
9.2(Lay ratio) |
- |
500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
|
30 Sep, 2027 |
- - |
6 |
IS 9857 (1990) |
Welding cables - Specification (First Revision) |
- |
15000 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
10.1 a) 1)(Annealing test - IS 10810: Part 1) |
- |
600 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
10.1 a) 2)(Conductor resistance tes - IS 10810 : Part 5) |
- |
500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
10.1 c) 1)(Physical tests for
covering : Tensile strength ) |
- |
700 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
10.1 c) 1)(Physical tests for
covering : Elongation at break ) |
- |
700 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
10.1 c) 2)(Physical tests for
covering - Ageing in Air oven : Tensile strength variation) |
- |
1800 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
10.1 c) 2)(Physical tests for
covering -Ageing in Air oven : Elongation at break ) |
- |
1800 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
10.1 c) 2)(Physical tests for
covering - Ageing in Air oven : Tensile strength ) |
- |
1800 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
10.1 c) 2)(Physical tests for
covering -Ageing in Air oven : Elongation variation at break ) |
- |
1800 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
10.1 c) 5)(Hot set test ) |
- |
1500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
10.1 c) 5)(Permanent set ) |
- |
1500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
11.1(High Voltage Test ( Water Immersion
Test )) |
- |
1500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
11.3(Static Flexibility Test) |
- |
1000 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
11.4(Flammability Test) |
- |
1800 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
Table 2(Oil resistance - Tensile strength ) |
- |
2500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
10.1 c) 4)(Physical tests for
covering - Oil Resistance : Elongation variation at break ) |
- |
2500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
9.3(T o l e r a n c e on Thickness o f C o v e r i n g) |
- |
2000 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
|
30 Sep, 2027 |
- - |
7 |
IS 7098 : Part 2 (2011) |
Crosslinked polyethylene insulated thermoplastic sheathed cables - Specification: Part 2 for working voltages from 3.3 kV up to and including 33 kV (Second Revision) |
- |
190000 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
12.2(INSULATION : Thickness of Insulation) |
- |
600 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
12.4(Eccentricity and Ovality) |
- |
600 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
16.3(INNER SHEATH (COMMON COVERING) : Thickness of Inner Sheath) |
- |
600 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
17.2(ARMOURING : Coverage ) |
- |
1500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
17.3(ARMOURING : Dimension ) |
- |
700 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
16.4(ARMOURING : Resistance) |
- |
1500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
18.3(Thicknes of outer sheath : average ) |
- |
600 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
19.1 i) a)(Annealing test (for copper)) |
- |
1800 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
19.1 i) b)(Tensile test (for aluminium) - Before stranding ) |
- |
1200 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
19.1 i) b)(Tensile test (for aluminium) - After stranding ) |
- |
1200 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
19.1 i) c)(Wrapping test ( for aluminium)) |
- |
1200 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
19.1 i) d)(Resistance test - Main conductor ) |
- |
1600 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
19.1 i) d)(Resistance test - Neutral conductor ) |
- |
1600 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
19.1 iii) a)(Phyaical tests for insulation : Tensile Test) |
- |
1100 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
19.1 iii) a)(Phyaical tests for insulation : Elongation ) |
- |
1100 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
19.1 iii) b)(Phyaical tests for insulation - Ageing in air Oven : Tensile Variation ) |
- |
2500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
19.1 iii) b)(Phyaical tests for insulation- Ageing in air oven : Elongation Variation ) |
- |
2500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
19.1 iii) d)(Phyaical tests for insulation : Hot set ) |
- |
2500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
19.1 iii) d)(Phyaical tests for insulation : Permanent set ) |
- |
2500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
19.1 iii) e)(Phyaical tests for insulation : Shrinkage ) |
- |
2000 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
19.1 iii) f)(Insulation: Waterabsorption(gravimetric)) |
- |
3000 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
19.1 v) a)(Test for strippability of semiconducting strippable insulation screen
(when applicable)) |
- |
2500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
19.1 v) b)(Volume resistivity) |
- |
2500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
19.1 vi) a)(Physical tests for outer sheath : Tensile stregth ) |
- |
1000 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
19.1 vi) a)(Physical tests for outer sheath : Elongation ) |
- |
1000 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
19.1 vi) b)(Physical tests for outer sheath- Ageing in air oven : Tensile stregth ) |
- |
2500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
19.1 vi) b)(Physical tests for outer sheath -Ageing in air oven : Elongation ) |
- |
2500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
19.1 vi) b)(Physical tests for outer sheath- Ageing in air oven : Tensile stregth Variation ) |
- |
2500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
19.1 vi) b)(Physical tests for outer sheath -Ageing in air oven : Elongation Variation ) |
- |
2500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
19.1 vi) c)(Phyaical tests for Sheath : Shrinkage ) |
- |
2500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
19.1 vi) d)(Sheath : Hot deformation) |
- |
2500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
19.1 vi) e)(Loss of massIn air oven) |
- |
2700 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
19.1 vi) f)(Sheath : Heat shock test) |
- |
2500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
19.1 vi) g)(Sheath : Thermalstability) |
- |
2000 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
19.1 vi) h)(Carbon black content of polythene
sheath ) |
- |
4000 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
19.1 vii)(Thermal ageing test for complete cable - Tensile stregth ) |
- |
4000 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
19.1 vii)(Thermal ageing test for complete cable- Elogation ) |
- |
4000 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
19.1 xi)(Insulation resistance test : volume resistivity ) |
- |
3000 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
19.1 vii)(Thermal ageing test for complete cable- Resistivity ) |
- |
2500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
20.2(Partial discharge test) |
- |
10000 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
20.3(Bending test) |
- |
10000 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
20.3 (a)(Partial discharge test (Bending test)) |
- |
10000 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
20.4(Dielectric power factor test : As a function of voltage) |
- |
15000 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
20.4(Dielectric power factor test : As a function of temperature) |
- |
15000 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
20.5(Heating Cycle Test) |
- |
20000 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
20.5 (a)(PD test (heating cycle test)) |
- |
10000 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
20.6(Impulse withstand test
(Rated voltage, kV 3.8/6.6
Impulse voltage, kV 60)) |
- |
12000 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
20.6(Impulse Withstand Test
(Rated voltage, kV 6.35/11
Impulse voltage, kV 75)) |
- |
17000 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
20.6(Impulse Withstand Test
(Rated voltage, kV 11/11
Impulse voltage, kV 95)) |
- |
17000 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
20.6(Impulse Withstand Test
(Rated voltage, kV 12.7/22
Impulse voltage, kV 125)) |
- |
20000 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
20.6(Impulse Withstand Test
(Rated voltage, kV 19/33
Impulse voltage, kV 170)) |
- |
20000 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
Cl-20.6(Impulse Withstand Test (Rated voltage, kv 33/33 Impulse voltage , kv 250)) |
- |
25 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
20.7(High voltage test) |
- |
20000 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
20.8(Flammability test) |
- |
2500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
20.1(Oxygen Index Test) |
- |
3000 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
20.11(Flame Retardance Test on Single Cables) |
- |
3000 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
20.12(Flame Retardance Test on Bunched Cables) |
- |
15000 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
20.13(Test for Halogen Acid Gas Evolution) |
- |
5000 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
20.14( Test for Smoke Density) |
- |
5000 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
20.15(Temperature Index) |
- |
3500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
|
30 Sep, 2027 |
- - |
8 |
IS 14255 (1995) |
Aertal bunched cables - For working voltages up to and including 1100 Volts - Specification |
- |
20000 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
10.1 a) i)(Tests on phase/street light conductor: tensile test - Test method IS10810:Part 2) |
- |
900 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
7.2( Thickness of insulation) |
- |
500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
10.1 a) ii)(Wrapping test - 10810: Part 3) |
- |
300 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
10.1 c) iv)(Shrinkage test : Shrinkage - 10810:Part 12) |
- |
500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
10.1 a) iii)(Resistance test - IS10810: Part 5) |
- |
1000 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
10.1 b) iii)(Test on messenger conductor: Resistance test - IS 10810: Part 5) |
- |
1000 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
10.1 b) ii)(Test on messenger conductor: Elongation test - Cl 11.3) |
- |
1500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
10.1 c) i)(Physical tests for XLPE Insulation:
Tensile strength - IS 10810: Part 7) |
- |
1000 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
10.1 c) i)(Physical tests for XLPE Insulation:
elongation at break - IS 10810: part 7) |
- |
1800 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
10.1 c) ii)(Ageing in air oven : Tensile strength variation - IS 10810:Part 11) |
- |
3500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
10.1 c) ii)(Ageing in air oven : Elongation variation- IS 10810: Part 11) |
- |
1500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
10.1 c) iii)(Hot set test: Elongation under load - IS 10810: Part 30) |
- |
1500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
10.1 c) iii)(Hot set test: Permanent elongation (set) after cooling - IS 10810: Part 30) |
- |
2000 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
10.1 c) v)(Water ahsorption (Gravimetric) - IS 10810: Part 33 ) |
- |
4000 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
10.1 d) i)(Physical test for PE insulation:
Tensile strength - IS 10810: Part 7 ) |
- |
1500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
10.1 d) i)(Physical test for PE insulation: elongation at break - IS 10810: Part 7) |
- |
1500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
10.1 f)(Insulation resistance (Volume resistivity) test a) volume resistivity at 27°C - IS 10810: Part 43) |
- |
2500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
10.1 f)(Insulation resistance (Volume resistivity) test b) volume resistivity at 70°C - IS 10810: Part 43) |
- |
2500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
10.1 g)(High voltage test - IS10810:Part 45) |
- |
1600 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
10.1 d) iii)(Carbon Black Content) |
- |
2000 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
11.4(Bending Test on the Completed Cable ( Optional) ) |
- |
1000 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
|
30 Sep, 2027 |
- - |
9 |
IS 398 : Part 2 (1996) |
Aluminium conductors for overhead transmission purposes - Specification: Part 2 aluminium conuuctors, galvanized steel - Reinforced (Third Revision) |
- |
20000 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
8.1.1 & 13.2 Table-1 (mech)(Diameter of Aluminium Wires Before Stranding) |
- |
500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
8.1.1 & 13.2 Table 2 (mech)(Diameter of Steel Wires Before Stranding) |
- |
500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
8.1.1 & 13.2 Table-1 (mech)(Diameter of Aluminium Wires After Stranding) |
- |
500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
8.1.1 & 13.2 Table 2 (mech)(Diameter of Steel Wires After Stranding) |
- |
500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
13.3 Table 1 (mech)(Breaking Load of Aluminium Wires Before Stranding) |
- |
900 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
13.3 Table 2 (mech)(Breaking Load of Steel Wires Before Stranding) |
- |
500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
13.3 Table 1 (mech)(Breaking Load of Aluminium Wires After Stranding) |
- |
500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
13.3 Table 2 (mech)(Breaking Load of Steel Wires After Stranding) |
- |
600 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
13.4.1 (mech)(Ductility by Torsion Test before stranding) |
- |
900 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
13.4.2 (elec)(Ductility by Elongation Test before stranding) |
- |
900 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
13.4.1 (mech)(Ductility by Torsion Test after stranding) |
- |
500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
13.4.2 (elec)(Ductility by Elongation Test after stranding) |
- |
700 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
13.5.1 (mech)(Wrapping Test Aluminium Wires Before Stranding) |
- |
700 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
13.5.2 (mech)(Wrapping Test Galvanized Steel Wires Before Stranding) |
- |
700 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
13.5.1 (mech)(Wrapping Test Aluminium Wires After Stranding) |
- |
700 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
13.5.2 (mech)(Wrapping Test Galvanized Steel Wires After Stranding) |
- |
700 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
13.6 (elec)(Resistance test-Aluminium wire before Stranding) |
- |
900 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
13.6 (elec)(Resistance test-Aluminium wire after stranding) |
- |
900 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
13.10 (elec)(Ultimate breaking load) |
- |
5000 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
13.7.2 (chem)(Mass of Zinc coating) |
- |
900 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
13.7.2 (chem)(Uniformity of Zinc coating) |
- |
400 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
13.8 Table-4 (mech)(Lay Ratio- Aluminium Wire Outermost Layer) |
- |
400 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
13.8 Table-4 (mech)(Lay Ratio- Aluminium Wire Layer Immediately Beneath Outermost Layer) |
- |
400 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
13.8 Table-4 (mech)(Lay Ratio- Aluminium Wire Innermost Layer of Conductors with 3 Aluminium Wire Layers) |
- |
400 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
13.8 Table-4 (mech)(Lay Ratio- Steel Core (6 Wire Layer)) |
- |
600 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
13.11 (elec)(Stress-strain test) |
- |
10000 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
13.9 (elec)(Surface condition test) |
- |
4000 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
|
30 Sep, 2027 |
- - |
10 |
IS 1554 : Part 1 (1988) |
Specification for pvc insulated (Heavy Duty) electric cables: Part 1 for working voltages up to and including 1100 v (Third Revision) |
- |
25000 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
9.2(INSULATION : Thickness of Insulation) |
- |
500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
12.3.1(INNER SHEATH :Thickness of Inner Sheath) |
- |
500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
13.6 c)(ARMOURING: Torsion Test (For round wire ) ) |
- |
500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
13.6 d)(ARMOURING: Winding Test(For formed wire)) |
- |
500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
13.6 e)(ARMOURING: Uniformity of zinc coating) |
- |
500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
13.6 f)(ARMOURING: Mass of zinc coating ) |
- |
700 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
13.6 g)(ARMOURING: Resistivity) |
- |
500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
14.4.1(Thickness of Outer Sheath : Unarmowed Cables) |
- |
500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
15.1 a) 4)(Tests on conductor : Conductor resistance test) |
- |
1000 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
15.1 a) 1)(Tests on conductor : Annealing test ( for copper )) |
- |
700 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
13.3(Armouring : Dimensions -Formed wire ) |
- |
500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
15.1 e)(Insulation resistance test : Volume Resistivity ) |
- |
800 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
15.1 e)(Insulation resistance test : IR Constant ) |
- |
500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
15.1 f)(High voltage test ( water immersion test )) |
- |
1000 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
15.1 d)3)(Phyaical tests for Sheath : Shrinkage ) |
- |
500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
15.1 d)3)(Phyaical tests for insulation : Shrinkage ) |
- |
500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
15.1 d)6)(Heat shock test- sheath ) |
- |
500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
15.1 d)4)(Hot deformation : Sheath ) |
- |
1000 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
15.4 a)(Cold bend test- Sheath ( Optional test)) |
- |
800 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
15.1 d)4)(Hot deformation : Insulation ) |
- |
1200 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
15.1 d)5)( Loss of mass in air oven- Insulation ) |
- |
2000 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
16.3.2(High Voltage Test ( Water Immersion Test ) : d.c. Test) |
- |
2000 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
Cl No. 16.10(Smoke density test) |
- |
1500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
16.7(Flame Retardance Test on Bunched Cables) |
- |
500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
16.6(Flame Retardance Test on Single Cables) |
- |
1500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
16.9(Test for Halogen Acid Gas Evolution) |
- |
1000 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
15.1 d)1)(Physical tests for sheath : Tensile stregth ) |
- |
900 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
15.1 d)1)(Physical tests for sheath : Elongation ) |
- |
900 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
15.1 d)1)(Phyaical tests for insulation : Tensile Test) |
- |
1500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
15.1 d)1)(Phyaical tests for insulation : Elongation ) |
- |
1500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
13.1.2(Armouring: Coverage ) |
- |
800 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
15.4 c)(Armour resistance test ( for other than mining cables ).- Optional test ) |
- |
1000 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
15.1 d)7)(Thermal stability- Sheath ) |
- |
800 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
16.4(Flammability Test) |
- |
2000 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
|
30 Sep, 2027 |
- - |
11 |
IS 7098 : Part 1 (1988) |
Specification for crosslinked polyethylene insulated pvc sheathed cables: Part 1 for working voltages up to and including 1100 volts (First Revision) |
- |
25000 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
9.2(Thickness of Insulation - Average) |
- |
1000 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
9.3(Thickness of Insulation - Minimum) |
- |
1000 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
15.1 a) i)(Annealing Test ( For copper wire ) ) |
- |
500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
15.1 a) iv)(Resistance test - Main conductor) |
- |
1000 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
13.3(Armouring : Dimensions -Wire Diameter) |
- |
500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
13.3(Armouring : Dimensions -Formed wire ) |
- |
500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
13.6 a)(ARMOURING: Tensile Strength) |
- |
500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
13.6 b)(ARMOURING: Elongation ) |
- |
500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
13.6 f)(ARMOURING: Mass of zinc coating ) |
- |
1000 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
13.6 e)(ARMOURING: Uniformity of zinc coating) |
- |
1000 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
13.6 c)(ARMOURING: Torsion Test (For round wire ) ) |
- |
700 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
15.1 d) iii) (Phyaical tests for insulation : Hot set ) |
- |
1000 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
15.1 d) iii) (Phyaical tests for insulation : Permanent set ) |
- |
1000 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
16.14(Temperature Index) |
- |
1500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
16.9(Oxygen Index Test) |
- |
2500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
16.13(Test for Halogen Acid Gas Evolution) |
- |
3000 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
16.2(HIGH VOLTAGE TEST ) |
- |
1500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
15.1 e) vii) (Sheath : Thermalstability) |
- |
1000 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
15.4 (b)(Cold impact) |
- |
800 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
15.4 (a)(Cold bend) |
- |
800 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
15.1 e) v) (Sheath : Hot deformation) |
- |
700 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
15.1 e) iv) (Phyaical tests for Sheath : Shrinkage ) |
- |
500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
15.1 d) iv) (Phyaical tests for insulation : Shrinkage ) |
- |
500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
13.1.2(Armouring: Coverage ) |
- |
1000 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
15.1 d) i) (Phyaical tests for insulation : Tensile Test) |
- |
500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
15.1 d) i) (Phyaical tests for insulation : Elongation) |
- |
500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
15.1 e) i) (Physical tests for outer sheath : Elongation) |
- |
500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
16.3(FLAMMABILITY TEST : Period of Burning ) |
- |
500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
16.3(FLAMMABILITY TEST : Unaffected length ) |
- |
500 |
|
GST @ 18% will be charged extra as applicable presently any change by the Govt either increase or decrease will be charged extra |
|
30 Sep, 2027 |
- - |
12 |
IS 191 (2007) |
Copper - Specification (Fourth Revision) |
- |
5500 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
7.1 - Table 4(Copper (any Silver present to be counted as copper)-IS440) |
- |
1000 |
|
GST Extra |
7.1 - Table 4(Bismuth-IS 440) |
- |
1000 |
|
GST Extra |
7.1 - Table 4(Lead IS 440) |
- |
1000 |
|
GST Extra |
7.1 - Table 4(Oxygen IS 440) |
- |
1500 |
|
GST Extra |
7.1 - Table 4(Total Impurities- IS 440) |
- |
800 |
|
GST Extra |
|
30 Sep, 2027 |
- - |
13 |
IS 2062 (2011) |
Hot rolled medium and high tensile structural steel - Specification (Seventh Revision) |
All Grades with Quality A |
15650.00 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
Cl 15(Length, Width & Thickness) |
- |
0 |
|
Gst extra |
Cl 10.3(UTM) |
- |
0 |
|
Gst extra |
Cl 12(Sudden Load Applied) |
- |
0 |
|
Gst extra |
Cl 7(Workmanship) |
- |
0 |
|
Gst extra |
Cl 18(Weight) |
- |
0 |
|
Gst extra |
Cl 15(Length, Width & Thickness) |
- |
0 |
|
Gst extra |
Cl. 15 (Cl. 15 Channel Section: Sweep) |
- |
0 |
|
Gst extra |
Cl. 15(Cl. 15 Channel Section: Camber) |
- |
0 |
|
Gst extra |
Cl. 15(Cl. 15 Channel Section: Flatness of Web (Concavity)) |
- |
0 |
|
Gst extra |
Cl. 15(Cl. 15 Channel Section: Flange Out of Square) |
- |
0 |
|
Gst extra |
Cl. 15(Cl. 15 Channel Section: Width of Flange) |
- |
0 |
|
Gst extra |
Cl. 15(Cl. 15 Channel Section: Depth) |
- |
0 |
|
Gst extra |
Cl. 15(Cl. 15 Square Bar: Out of Square) |
- |
0 |
|
Gst extra |
Cl. 15(Cl. 15 Square Bar: Side Width: Minimum) |
- |
0 |
|
Gst extra |
Cl. 15(Cl. 15 Square Bar: Side Width: Maximum) |
- |
0 |
|
Gst extra |
Cl. 15(Cl. 15 Round Bar: Out of Shape) |
- |
0 |
|
Gst extra |
Cl. 15(Cl. 15 Round Bar: Diameter Minimum) |
- |
0 |
|
Gst extra |
Cl. 15(Cl. 15 Round Bar: Diameter Maximum) |
- |
0 |
|
Gst extra |
Cl. 10.3 (Cl. 10.3 (Elongation %)) |
- |
0 |
|
Gst extra |
Cl. 10.3 (Cl. 10.3 (Yield Stress)) |
- |
0 |
|
Gst extra |
Cl. 10.3 (Cl. 10.3 (Tensile Strength)) |
- |
0 |
|
Gst extra |
Cl 11.3(Press) |
- |
0 |
|
Gst extra |
Clause - 5, 8.1 & 8.2(E650, ALUMINIUM) |
- |
0 |
|
Gst extra |
Clause - 5, 8.1 & 8.2(E650, SILICON) |
- |
0 |
|
Gst extra |
Clause - 5, 8.1 & 8.2(E650, NITROGEN) |
- |
0 |
|
Gst extra |
Clause - 5, 8.1 & 8.2(E650 ,MANGANESE) |
- |
0 |
|
Gst extra |
Clause - 5, 8.1 & 8.2(E650, PHOSPHURS) |
- |
0 |
|
Gst extra |
Clause - 5, 8.1 & 8.2(E650, SULPHUR) |
- |
0 |
|
Gst extra |
Clause - 5, 8.1 & 8.2(E650, CARBON) |
- |
0 |
|
Gst extra |
Clause - 5, 8.1 & 8.2(E600, ALUMINIUM) |
- |
0 |
|
Gst extra |
Clause - 5, 8.1 & 8.2(E600, SILICON) |
- |
0 |
|
Gst extra |
Clause - 5, 8.1 & 8.2(E600, NITROGEN) |
- |
0 |
|
Gst extra |
Clause - 5, 8.1 & 8.2(E600 ,MANGANESE) |
- |
0 |
|
Gst extra |
Clause - 5, 8.1 & 8.2(E600, PHOSPHURS) |
- |
0 |
|
Gst extra |
Clause - 5, 8.1 & 8.2(E600, SULPHUR) |
- |
0 |
|
Gst extra |
Clause - 5, 8.1 & 8.2(E600, CARBON) |
- |
0 |
|
Gst extra |
Clause - 5, 8.1 & 8.2(E550, ALUMINIUM) |
- |
0 |
|
Gst extra |
Clause - 5, 8.1 & 8.2(E550, SILICON) |
- |
0 |
|
Gst extra |
Clause - 5, 8.1 & 8.2(E550, NITROGEN) |
- |
0 |
|
Gst extra |
Clause - 5, 8.1 & 8.2(E550 ,MANGANESE) |
- |
0 |
|
Gst extra |
Clause - 5, 8.1 & 8.2(E550, PHOSPHURS) |
- |
0 |
|
Gst extra |
Clause - 5, 8.1 & 8.2(E550, SULPHUR) |
- |
0 |
|
Gst extra |
Clause - 5, 8.1 & 8.2(E550, CARBON) |
- |
0 |
|
Gst extra |
Clause - 5, 8.1 & 8.2(E450, ALUMINIUM) |
- |
0 |
|
Gst extra |
Clause - 5, 8.1 & 8.2(E450, SILICON) |
- |
0 |
|
Gst extra |
Clause - 5, 8.1 & 8.2(E450, NITROGEN) |
- |
0 |
|
Gst extra |
Clause - 5, 8.1 & 8.2(E450 ,MANGANESE) |
- |
0 |
|
Gst extra |
Clause - 5, 8.1 & 8.2(E450, PHOSPHURS) |
- |
0 |
|
Gst extra |
Clause - 5, 8.1 & 8.2(E450, SULPHUR) |
- |
0 |
|
Gst extra |
Clause - 5, 8.1 & 8.2(E450, CARBON) |
- |
0 |
|
Gst extra |
Clause - 5, 8.1 & 8.2(E410, ALUMINIUM) |
- |
0 |
|
Gst extra |
Clause - 5, 8.1 & 8.2(E410, SILICON) |
- |
0 |
|
Gst extra |
Clause - 5, 8.1 & 8.2(E410, NITROGEN) |
- |
0 |
|
Gst extra |
Clause - 5, 8.1 & 8.2(E410 ,MANGANESE) |
- |
0 |
|
Gst extra |
Clause - 5, 8.1 & 8.2(E410, PHOSPHURS) |
- |
0 |
|
Gst extra |
Clause - 5, 8.1 & 8.2(E410, SULPHUR) |
- |
0 |
|
Gst extra |
Clause - 5, 8.1 & 8.2(E410, CARBON) |
- |
0 |
|
Gst extra |
Clause - 5, 8.1 & 8.2(E350, ALUMINIUM) |
- |
0 |
|
Gst extra |
Clause - 5, 8.1 & 8.2(E350, SILICON) |
- |
0 |
|
Gst extra |
Clause - 5, 8.1 & 8.2(E350, NITROGEN) |
- |
0 |
|
Gst extra |
Clause - 5, 8.1 & 8.2(E350 ,MANGANESE) |
- |
0 |
|
Gst extra |
Clause - 5, 8.1 & 8.2(E350, PHOSPHURS) |
- |
0 |
|
Gst extra |
Clause - 5, 8.1 & 8.2(E350, SULPHUR) |
- |
0 |
|
Gst extra |
Clause - 5, 8.1 & 8.2(E350, CARBON) |
- |
0 |
|
Gst extra |
Clause - 5, 8.1 & 8.2(E300, ALUMINIUM) |
- |
0 |
|
Gst extra |
Clause - 5, 8.1 & 8.2(E300, SILICON) |
- |
0 |
|
Gst extra |
Clause - 5, 8.1 & 8.2(E300, NITROGEN) |
- |
0 |
|
Gst extra |
Clause - 5, 8.1 & 8.2(E300 ,MANGANESE) |
- |
0 |
|
Gst extra |
Clause - 5, 8.1 & 8.2(E300, PHOSPHURS) |
- |
0 |
|
Gst extra |
Clause - 5, 8.1 & 8.2(E300, SULPHUR) |
- |
0 |
|
Gst extra |
Clause - 5, 8.1 & 8.2(E300, CARBON) |
- |
0 |
|
Gst extra |
Clause - 5, 8.1 & 8.2(E275, ALUMINIUM) |
- |
0 |
|
Gst extra |
Clause - 5, 8.1 & 8.2(E275, SILICON) |
- |
0 |
|
Gst extra |
Clause - 5, 8.1 & 8.2(E275, NITROGEN) |
- |
0 |
|
Gst extra |
Clause - 5, 8.1 & 8.2(E275 ,MANGANESE) |
- |
0 |
|
Gst extra |
Clause - 5, 8.1 & 8.2(E275, PHOSPHURS) |
- |
0 |
|
Gst extra |
Clause - 5, 8.1 & 8.2(E275, SULPHUR) |
- |
0 |
|
Gst extra |
Clause - 5, 8.1 & 8.2(E275, CARBON) |
- |
0 |
|
Gst extra |
Clause - 5, 8.1 & 8.2(E250, ALUMINIUM) |
- |
0 |
|
Gst extra |
Clause - 5, 8.1 & 8.2(E250, SILICON) |
- |
0 |
|
Gst extra |
Clause - 5, 8.1 & 8.2(E250, NITROGEN) |
- |
0 |
|
Gst extra |
Clause - 5, 8.1 & 8.2(E250 ,MANGANESE) |
- |
0 |
|
Gst extra |
Clause - 5, 8.1 & 8.2(E250, PHOSPHURS) |
- |
0 |
|
Gst extra |
Clause - 5, 8.1 & 8.2(E250, SULPHUR) |
- |
0 |
|
Gst extra |
Clause - 5, 8.1 & 8.2(E250, CARBON) |
- |
0 |
|
Gst extra |
Clause - 5, 8.1 & 8.2(E650, CARBON +EQUIVELENT ) |
- |
0 |
|
Gst extra |
Clause - 5, 8.1 & 8.2(E600, CARBON +EQUIVELENT ) |
- |
0 |
|
Gst extra |
Clause - 5, 8.1 & 8.2(E550, CARBON +EQUIVELENT ) |
- |
0 |
|
Gst extra |
Clause - 5, 8.1 & 8.2(E450, CARBON +EQUIVELENT ) |
- |
0 |
|
Gst extra |
Clause - 5, 8.1 & 8.2(E410, CARBON +EQUIVELENT ) |
- |
0 |
|
Gst extra |
Clause - 5, 8.1 & 8.2(E350, CARBON +EQUIVELENT ) |
- |
0 |
|
Gst extra |
Clause - 5, 8.1 & 8.2(E300, CARBON +EQUIVELENT ) |
- |
0 |
|
Gst extra |
|
30 Sep, 2027 |
- - |
14 |
IS 1786 (2008) |
High strength deformed steel bars and wires for concretere inforcement - Specification (Fourth Revision) |
All Grades as per IS |
21050.00 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
Cl 9.3(Load In One Direction) |
- |
1000.00 |
|
For Physical testing with Pull Out test Rs 13600.00, Without Pull Out Rs 6500.00, For Chemical Testing Rs 5950.00 with Nitrogen, Without Nitrogen Rs 2950.00
For Chemical Elemental Analysis by Optical Emission Spectrometer Rs 1500.00 |
Cl 9.4(Load In Other Direction From Bend) |
- |
1000.00 |
|
G S T 18% extra as applicable presently any change by Govt either increase or decrease will be charged extra at the time of placement of order |
Cl 8.1(UTM) |
- |
0 |
|
G S T 18% extra as applicable presently any change by Govt either increase or decrease will be charged extra at the time of placement of order |
Cl 7.2(Weight) |
- |
0 |
|
G S T 18% extra as applicable presently any change by Govt either increase or decrease will be charged extra at the time of placement of order |
Cl 6.1(Length, Width & Thickness) |
- |
600.00 |
|
G S T 18% extra as applicable presently any change by Govt either increase or decrease will be charged extra at the time of placement of order |
Cl 5(Deformations and Surface Characteristics) |
- |
6500.00 |
|
G S T 18% extra as applicable presently any change by Govt either increase or decrease will be charged extra at the time of placement of order |
4.1(Sulphur and phosphorous) |
- |
350.00 |
|
G S T 18% extra as applicable presently any change by Govt either increase or decrease will be charged extra at the time of placement of order |
4.1( Nitrogen%) |
- |
3000.00 |
|
G S T 18% extra as applicable presently any change by Govt either increase or decrease will be charged extra at the time of placement of order |
4.1(Ni) |
- |
300.00 |
|
G S T 18% extra as applicable presently any change by Govt either increase or decrease will be charged extra at the time of placement of order |
4.1(Mo) |
- |
300.00 |
|
G S T 18% extra as applicable presently any change by Govt either increase or decrease will be charged extra at the time of placement of order |
4.1(Cr) |
- |
300.00 |
|
G S T 18% extra as applicable presently any change by Govt either increase or decrease will be charged extra at the time of placement of order |
4.1(V) |
- |
300.00 |
|
G S T 18% extra as applicable presently any change by Govt either increase or decrease will be charged extra at the time of placement of order |
4.1( Copper %) |
- |
300.00 |
|
G S T 18% extra as applicable presently any change by Govt either increase or decrease will be charged extra at the time of placement of order |
4.1(Sulphur %) |
- |
350.00 |
|
G S T 18% extra as applicable presently any change by Govt either increase or decrease will be charged extra at the time of placement of order |
4.1(Phosphorus %) |
- |
400.00 |
|
G S T 18% extra as applicable presently any change by Govt either increase or decrease will be charged extra at the time of placement of order |
4.1(Manganese %) |
- |
350.00 |
|
G S T 18% extra as applicable presently any change by Govt either increase or decrease will be charged extra at the time of placement of order |
4.1(Carbon %) |
- |
350.00 |
|
G S T 18% extra as applicable presently any change by Govt either increase or decrease will be charged extra at the time of placement of order |
Cl.9.4 & Cl. 9.4.1(Rebend test) |
- |
1000.00 |
|
G S T 18% extra as applicable presently any change by Govt either increase or decrease will be charged extra at the time of placement of order |
Cl. 9.3, Table 4(Bend Test ) |
- |
1000.00 |
|
G S T 18% extra as applicable presently any change by Govt either increase or decrease will be charged extra at the time of placement of order |
Cl. 8.1 Table 3(Elongation, percentage) |
- |
600.00 |
|
G S T 18% extra as applicable presently any change by Govt either increase or decrease will be charged extra at the time of placement of order |
Cl. 8.1 Table 3(TS/YS ratio) |
- |
500.00 |
|
G S T 18% extra as applicable presently any change by Govt either increase or decrease will be charged extra at the time of placement of order |
Cl. 8.1 Table 3(Tensile Strength (TS)) |
- |
1000.00 |
|
G S T 18% extra as applicable presently any change by Govt either increase or decrease will be charged extra at the time of placement of order |
Cl. 8.1 Table 3(Yield Stress (YS)) |
- |
500.00 |
|
G S T 18% extra as applicable presently any change by Govt either increase or decrease will be charged extra at the time of placement of order |
Cl. 7.2 Table -2 (Nominal Mass) |
- |
800.00 |
|
G S T 18% extra as applicable presently any change by Govt either increase or decrease will be charged extra at the time of placement of order |
Cl. 6.1(Nominal Size) |
- |
600.00 |
|
G S T 18% extra as applicable presently any change by Govt either increase or decrease will be charged extra at the time of placement of order |
Cl. 5 (Cl. 5 - Mean projected area of transverse ribs (1/3 of Ar)) |
- |
600.00 |
|
G S T 18% extra as applicable presently any change by Govt either increase or decrease will be charged extra at the time of placement of order |
Cl. 5 (Cl.5 Mean area of ribs/unit length (Ar), ) |
- |
600.00 |
|
G S T 18% extra as applicable presently any change by Govt either increase or decrease will be charged extra at the time of placement of order |
4.1(CE) |
- |
1500.00 |
|
G S T 18% extra as applicable presently any change by Govt either increase or decrease will be charged extra at the time of placement of order
Note: Carbon Equivalent by Optical Emission Spectrometer |
|
30 Sep, 2027 |
- - |
15 |
IS 1489 : Part 2 (2015) |
Portland - Pozzolana cement - Specification: Part 2 calcined clay based |
Calcined Clay Based |
9300.00 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
7 -Table 2- ii- a(Expansion by Le Chatelier- 4031 Part 3) |
- |
300.00 |
|
For Physical and Chemical Tests Rs 9300.00, Compressive Strength for 168 Hrs and 672 Hrs Rs 1600.00 extra |
7 -Table 2- ii- a(Expansion by Le Chatelier- 4031 Part 3) |
- |
0 |
|
GST @ 18% extra as applicable presently any change by Govt either increase or decrease will be applicable extra at the time of placement of order |
7 -Table 2- ii- b(Expansion by Autoclave- 4031 Part 3) |
- |
500.00 |
|
GST @ 18% extra as applicable presently any change by Govt either increase or decrease will be applicable extra at the time of placement of order |
7 -Table 2- i(Fineness 4031 Part 2) |
- |
300.00 |
|
GST @ 18% extra as applicable presently any change by Govt either increase or decrease will be applicable extra at the time of placement of order |
7 -Table 2- iii- a(Setting Time Initial- 4031 Part 5) |
- |
300.00 |
|
GST @ 18% extra as applicable presently any change by Govt either increase or decrease will be applicable extra at the time of placement of order |
7 -Table 2-iii- b(Setting Time Final- 4031 Part 5) |
- |
300.00 |
|
GST @ 18% extra as applicable presently any change by Govt either increase or decrease will be applicable extra at the time of placement of order |
7 -Table 2- iv- a(Compressive Strength At 72 hrs ± 1 hr - IS 4031 Part 6) |
- |
800.00 |
|
GST @ 18% extra as applicable presently any change by Govt either increase or decrease will be applicable extra at the time of placement of order |
7 -Table 2- iv- b(Compressive Strength At 168 hrs ± 2 hr - IS 4031 Part 6) |
- |
800.00 |
|
GST @ 18% extra as applicable presently any change by Govt either increase or decrease will be applicable extra at the time of placement of order |
7 -Table 2- iv- c(Compressive Strength At 672 hrs ± 4 hr - IS 4031 Part 6) |
- |
800.00 |
|
GST @ 18% extra as applicable presently any change by Govt either increase or decrease will be applicable extra at the time of placement of order |
7 -Table 2- vi(Drying Shrinkage- IS 4031 Part 10) |
- |
3500.00 |
|
GST @ 18% extra as applicable presently any change by Govt either increase or decrease will be applicable extra at the time of placement of order |
6 - Table - 1 i(Insoluble residue - Cl 7.4 of IS 4032:1985) |
- |
300.00 |
|
GST @ 18% extra as applicable presently any change by Govt either increase or decrease will be applicable extra at the time of placement of order |
6 - Table - 1 ii(Magnesia - Cl 7.2 of IS 4032:1985) |
- |
300.00 |
|
GST @ 18% extra as applicable presently any change by Govt either increase or decrease will be applicable extra at the time of placement of order |
6 - Table - 1 iii(Total Sulphur Content calculated as Sulphuric Anhydride (SO3) - Cl 7.3 of IS 4032:1985) |
- |
300.00 |
|
GST @ 18% extra as applicable presently any change by Govt either increase or decrease will be applicable extra at the time of placement of order |
6 - Table - 1 iv(Loss on ignition - Cl 7.1 of IS 4032:1985) |
- |
300.00 |
|
GST @ 18% extra as applicable presently any change by Govt either increase or decrease will be applicable extra at the time of placement of order |
7 -Table 2- v(Transverse Strength - IS 4031 Part 8 (Optional)) |
- |
1500 |
|
GST @ 18% extra as applicable presently any change by Govt either increase or decrease will be applicable extra at the time of placement of order |
6 - Table - 1 v(Chloride content - Cl 4.13 of IS 4032:1985) |
- |
300 |
|
GST @ 18% extra as applicable presently any change by Govt either increase or decrease will be applicable extra at the time of placement of order |
6 - Table - 1 vi( Alkali content as (Na2O + 0.658 K2O) - Cl 4.11 of IS 4032:1985) |
- |
300 |
|
GST @ 18% extra as applicable presently any change by Govt either increase or decrease will be applicable extra at the time of placement of order |
|
30 Sep, 2027 |
- - |
16 |
IS 1489 (Part 1) (2015) |
Portland pozzolana cement - Specification: Part 1 fly Ash Based |
- |
10900.00 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
7 -Table 2- vi(Drying Shrinkage- IS 4031 Part 10) |
- |
3500 |
|
G S T @ 18% extra as applicable at presently any change in GST by Govt either increase or decrtease will be charged extra at the time of placment of order |
7 -Table 2- iv- c(Compressive Strength At 672 hrs ± 4 hr - IS 4031 Part 6) |
- |
800.00 |
|
G S T @ 18% extra as applicable at presently any change in GST by Govt either increase or decrtease will be charged extra at the time of placment of order |
7 -Table 2- iv- b(Compressive Strength At 168 hrs ± 2 hr - IS 4031 Part 6) |
- |
800.00 |
|
G S T @ 18% extra as applicable at presently any change in GST by Govt either increase or decrtease will be charged extra at the time of placment of order |
7 -Table 2- iv- a(Compressive Strength At 72 hrs ± 1 hr - IS 4031 Part 6) |
- |
800.00 |
|
G S T @ 18% extra as applicable at presently any change in GST by Govt either increase or decrtease will be charged extra at the time of placment of order |
7 -Table 2-iii- b(Setting Time Final- 4031 Part 5) |
- |
300.00 |
|
G S T @ 18% extra as applicable at presently any change in GST by Govt either increase or decrtease will be charged extra at the time of placment of order |
7 -Table 2- iii- a(Setting Time Initial- 4031 Part 5) |
- |
300.00 |
|
G S T @ 18% extra as applicable at presently any change in GST by Govt either increase or decrtease will be charged extra at the time of placment of order |
7 -Table 2- ii- b(Expansion by Autoclave- 4031 Part 3) |
- |
500.00 |
|
G S T @ 18% extra as applicable at presently any change in GST by Govt either increase or decrtease will be charged extra at the time of placment of order |
7 -Table 2- ii- a(Expansion by Le Chatelier- 4031 Part 3) |
- |
300.00 |
|
G S T @ 18% extra as applicable at presently any change in GST by Govt either increase or decrtease will be charged extra at the time of placment of order |
7 -Table 2- i(Fineness 4031 Part 2) |
- |
300.00 |
|
G S T @ 18% extra as applicable at presently any change in GST by Govt either increase or decrtease will be charged extra at the time of placment of order |
6 - Table - 1 iv(Loss on ignition - Cl 7.1 of IS 4032:1985) |
- |
300.00 |
|
G S T @ 18% extra as applicable at presently any change in GST by Govt either increase or decrtease will be charged extra at the time of placment of order |
6 - Table - 1 iv(Loss on ignition - Cl 7.1 of IS 4032:1985) |
- |
0 |
|
G S T @ 18% extra as applicable at present |
6 - Table - 1 ii(Magnesia - Cl 7.2 of IS 4032:1985) |
- |
300.00 |
|
G S T @ 18% extra as applicable at presently any change in GST by Govt either increase or decrtease will be charged extra at the time of placment of order |
6 - Table - 1 iii(Total Sulphur Content calculated as Sulphuric Anhydride (SO3) - Cl 7.3 of IS 4032:1985) |
- |
300.00 |
|
G S T @ 18% extra as applicable at presently any change in GST by Govt either increase or decrtease will be charged extra at the time of placment of order |
6 - Table - 1 i(Insoluble residue - Cl 7.4 of IS 4032:1985) |
- |
300.00 |
|
G S T @ 18% extra as applicable at presently any change in GST by Govt either increase or decrtease will be charged extra at the time of placment of order |
6 - Table - 1 i(Insoluble residue - Cl 7.4 of IS 4032:1985) |
- |
0 |
|
G S T @ 18% extra as applicable at present |
6 - Table - 1 iv(Loss on ignition - Cl 7.1 of IS 4032:1985) |
- |
0 |
|
0 |
6 - Table - 1 i(Insoluble residue - Cl 7.4 of IS 4032:1985) |
- |
0 |
|
0 |
6 - Table - 1 vi( Alkali content as (Na2O + 0.658 K2O) - Cl 4.11 of IS 4032:1985) |
- |
300.00 |
|
G S T @ 18% extra as applicable at presently any change in GST by Govt either increase or decrtease will be charged extra at the time of placment of order |
7 -Table 2- v(Transverse Strength - IS 4031 Part 8 (Optional)) |
- |
1500 |
|
G S T @ 18% extra as applicable at presently any change in GST by Govt either increase or decrtease will be charged extra at the time of placment of order |
6 - Table - 1 vi( Alkali content as (Na2O + 0.658 K2O) - Cl 4.11 of IS 4032:1985) |
- |
0 |
|
G S T @ 18% extra as applicable at presently any change in GST by Govt either increase or decrtease will be charged extra at the time of placment of order |
6 - Table - 1 v(Chloride content - Cl 4.13 of IS 4032:1985) |
- |
300.00 |
|
G S T @ 18% extra as applicable at presently any change in GST by Govt either increase or decrtease will be charged extra at the time of placment of order |
|
30 Sep, 2027 |
- - |
17 |
IS 1659 (2004) |
Block boards - Specification (Fourth Revision) |
BWP-DEC, BWP-COM, MR-DEC, MR-COM |
16228 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
9.2.5(Modulus of elasticity - MINIMUM INDIVIDUAL - Annexure K) |
- |
2000 |
|
GST @ 18% will be charged extra as applicable presently any change in GST by Govt either increase or decrease will bve charged extra at the time of placement of order |
9.2.5(Modulus of elasticity - AVERAGE - Annexure K) |
- |
2000 |
|
GST @ 18% will be charged extra as applicable presently any change in GST by Govt either increase or decrease will bve charged extra at the time of placement of order |
9.2.5(Modulus of rupture - MINIMUM INDIVIDUAL - Annexure K) |
- |
2000 |
|
GST @ 18% will be charged extra as applicable presently any change in GST by Govt either increase or decrease will bve charged extra at the time of placement of order |
9.2.5(Modulus of rupture - AVERAGE - Annexure K) |
- |
2000 |
|
GST @ 18% will be charged extra as applicable presently any change in GST by Govt either increase or decrease will bve charged extra at the time of placement of order |
9.2.4(Mycological Test [for MR grade only] - Annexure J) |
- |
2500 |
|
GST @ 18% will be charged extra as applicable presently any change in GST by Govt either increase or decrease will bve charged extra at the time of placement of order |
9.2.3(Adhesion of Plies - Annexure H) |
- |
800 |
|
GST @ 18% will be charged extra as applicable presently any change in GST by Govt either increase or decrease will bve charged extra at the time of placement of order |
9.2.2 (Resistance to water - Annexure G, Annexure H [For MR Grade]) |
- |
1500 |
|
GST @ 18% will be charged extra as applicable presently any change in GST by Govt either increase or decrease will bve charged extra at the time of placement of order |
9.2.2 (Resistance to water - Annexure G, Annexure H [For BWP grade]) |
- |
1500 |
|
GST @ 18% will be charged extra as applicable presently any change in GST by Govt either increase or decrease will bve charged extra at the time of placement of order |
9.2.1(Dimensional Changes caused by humidity Change in local planeness - Annexure F) |
- |
1000 |
|
GST @ 18% will be charged extra as applicable presently any change in GST by Govt either increase or decrease will bve charged extra at the time of placement of order |
9.2.1(Dimensional Changes caused by humidity - Delamination - Annexure F) |
- |
1000 |
|
GST @ 18% will be charged extra as applicable presently any change in GST by Govt either increase or decrease will bve charged extra at the time of placement of order |
9.2.1(Dimensional Changes caused by humidity - Change in thickness - at 40% RH - Annexure F) |
- |
1000 |
|
GST @ 18% will be charged extra as applicable presently any change in GST by Govt either increase or decrease will bve charged extra at the time of placement of order |
9.2.1(Dimensional Changes caused by humidity - Change in Thickness - at 90% RH - Annexure F) |
- |
1000 |
|
GST @ 18% will be charged extra as applicable presently any change in GST by Govt either increase or decrease will bve charged extra at the time of placement of order |
9.2.1(Dimensional Changes caused by humidity - Change in Length - at 40% RH - Annexure F) |
- |
1000 |
|
GST @ 18% will be charged extra as applicable presently any change in GST by Govt either increase or decrease will bve charged extra at the time of placement of order |
9.2.1(Dimensional Changes caused by humidity - Change in Length - at 90% RH - Annexure F) |
- |
1000 |
|
GST @ 18% will be charged extra as applicable presently any change in GST by Govt either increase or decrease will bve charged extra at the time of placement of order |
7.3(Dimensional Requirements - Variation in thickness - Annexure E) |
- |
1000 |
|
GST @ 18% will be charged extra as applicable presently any change in GST by Govt either increase or decrease will bve charged extra at the time of placement of order |
7.3(Dimensional Requirements - Squareness - Annexure D) |
- |
1000 |
|
GST @ 18% will be charged extra as applicable presently any change in GST by Govt either increase or decrease will bve charged extra at the time of placement of order |
7.3(Dimensional Requirements - Edge Straightness - Annexure D) |
- |
1000 |
|
GST @ 18% will be charged extra as applicable presently any change in GST by Govt either increase or decrease will bve charged extra at the time of placement of order |
7.3(Dimensional Requirements - Thickness - Annexure E) |
- |
1000 |
|
GST @ 18% will be charged extra as applicable presently any change in GST by Govt either increase or decrease will bve charged extra at the time of placement of order |
7.3(Dimensional Requirements - Width - 8.1.4) |
- |
1000 |
|
GST @ 18% will be charged extra as applicable presently any change in GST by Govt either increase or decrease will bve charged extra at the time of placement of order |
7.3(Dimensional Requirements - Length - 8.1.4) |
- |
1000 |
|
GST @ 18% will be charged extra as applicable presently any change in GST by Govt either increase or decrease will bve charged extra at the time of placement of order |
8.1.3, 6.3.3, IS 1328(Visual Inspection - Permissible Defects - IS 1328 [test method for DECORATIVE type]) |
- |
600 |
|
GST @ 18% will be charged extra as applicable presently any change in GST by Govt either increase or decrease will bve charged extra at the time of placement of order |
8.1.3, 6.3.3, IS 303(Visual Inspection - Permissible Defects - IS 303 [test method for COMMERCIAL type]) |
- |
600.00 |
|
GST @ 18% will be charged extra as applicable presently any change in GST by Govt either increase or decrease will bve charged extra at the time of placement of order |
9.2.6(Spot test - Annexure L) |
- |
900.00 |
|
GST @ 18% will be charged extra as applicable presently any change in GST by Govt either increase or decrease will bve charged extra at the time of placement of order |
|
30 Sep, 2027 |
- - |
18 |
IS 1161 (2014) |
Steel tubes for structural purposes - Specification (Fifth Revision) |
15 NB to 350 NB |
9300.00 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
Cl 6(Outer Diameter, Thickness & Mass) |
- |
1000 |
|
For Physical Testing Rs 4700.00, For Chemical testing Rs 4600.00 with Nitrogen, Withouit Nitrogen Rs 1600.00, For Elemental Anaylsis by Optical Emmission Spectrometer
Rs 1500.00 |
Cl 11(Tensile Test, Flattening Test & Cold Bend Test) |
- |
3700.00 |
|
GST @ 18% will be charged extra as applicable presently any change in GST by Govt either increase or decrease will bve charged extra at the time of placement of order |
8 AND AS PER IS 4736(UNIFORMITY OF ZINC COATING) |
- |
800.00 |
|
GST @ 18% will be charged extra as applicable presently any change in GST by Govt either increase or decrease will bve charged extra at the time of placement of order |
8 AND AS PER IS 4736(MASS OF ZINC COATING) |
- |
800.00 |
|
GST @ 18% will be charged extra as applicable presently any change in GST by Govt either increase or decrease will bve charged extra at the time of placement of order |
5 AND AS PER IS 10748(COPPER) |
- |
500.00 |
|
GST @ 18% will be charged extra as applicable presently any change in GST by Govt either increase or decrease will bve charged extra at the time of placement of order |
5 AND AS PER IS 10748(MICRO ALLOY) |
- |
0 |
|
GST @ 18% will be charged extra as applicable presently any change in GST by Govt either increase or decrease will bve charged extra at the time of placement of order |
5 AND AS PER IS 10748(CARBON EQUIVALENT) |
- |
1500.00 |
|
GST @ 18% will be charged extra as applicable presently any change in GST by Govt either increase or decrease will bve charged extra at the time of placement of order |
5 AND AS PER IS 10748(CARBON) |
- |
0 |
|
GST @ 18% will be charged extra as applicable presently any change in GST by Govt either increase or decrease will bve charged extra at the time of placement of order |
Clause - 5.1, Table-3( ALUMINIUM) |
- |
0 |
|
GST @ 18% will be charged extra as applicable presently any change in GST by Govt either increase or decrease will bve charged extra at the time of placement of order |
Clause - 5.1, Table-3(SILICON) |
- |
0 |
|
GST @ 18% will be charged extra as applicable presently any change in GST by Govt either increase or decrease will bve charged extra at the time of placement of order |
Clause - 5.1, Table-3(NITROGEN) |
- |
3000.00 |
|
GST @ 18% will be charged extra as applicable presently any change in GST by Govt either increase or decrease will bve charged extra at the time of placement of order |
Clause - 5.1, Table-3(MANGANESE) |
- |
0 |
|
GST @ 18% will be charged extra as applicable presently any change in GST by Govt either increase or decrease will bve charged extra at the time of placement of order |
Clause - 5.1, Table-3(PHOSPHURS) |
- |
0 |
|
GST @ 18% will be charged extra as applicable presently any change in GST by Govt either increase or decrease will bve charged extra at the time of placement of order |
Clause - 5.1, Table-3(SULPHUR) |
- |
0 |
|
GST @ 18% will be charged extra as applicable presently any change in GST by Govt either increase or decrease will bve charged extra at the time of placement of order |
Clause - 5.1, Table-3( CARBON) |
- |
0 |
|
GST @ 18% extra as applicable presently any change by Govt in taxes etc will be charged extra |
|
30 Sep, 2027 |
- Scope restricted to 15 NB to 350 NB, Upto 25 mm nominal size and above 50 mm nominal size only |
19 |
IS 10748 (2004) |
Hot - Rolled steel strip for welded tubes and pipes - Specification (Second Revision) |
Welded Tubes and Pipes |
7950.00 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
Cl 9(Press) |
- |
1000.00 |
|
For Physical Testing Rs 3100.00, For Chemical Testing Rs 3350.00, Elemental Analysis by IOptical Emission Spectrometr Rs 1500.00 |
Cl 12 & 13(Length, Width & Thickness) |
- |
600.00 |
|
GST@18% extra as applicable presently any change by Govt either increase or decrease will be charged extra at the time of placement of order |
Cl 8 & Table 3(UTM) |
- |
1500.00 |
|
GST@18% extra as applicable presently any change by Govt either increase or decrease will be charged extra at the time of placement of order |
7.1(Carbon %) |
- |
350.00 |
|
GST@18% extra as applicable presently any change by Govt in taxes etc will be charged extra |
7.1(Manganese %) |
- |
350.00 |
|
GST@18% extra as applicable presently any change by Govt in taxes etc will be charged extra |
7.1(Phosphorus %) |
- |
400.00 |
|
GST@18% extra as applicable presently any change by Govt in taxes etc will be charged extra |
7.1(Sulphur %) |
- |
350.00 |
|
GST@18% extra as applicable presently any change by Govt in taxes etc will be charged extra |
7.1(Silicon %) |
- |
400.00 |
|
GST@18% extra as applicable presently any change by Govt in taxes etc will be charged extra |
7.1( Copper %) |
- |
200.00 |
|
GST@18% extra as applicable presently any change by Govt in taxes etc will be charged extra |
7.1( Aluminium %) |
- |
200.00 |
|
GST@18% extra as applicable presently any change by Govt in taxes etc will be charged extra |
7.1( Nb) |
- |
0 |
|
GST@18% extra as applicable presently any change by Govt in taxes etc will be charged extra |
7.1(V) |
- |
0 |
|
GST@18% extra as applicable presently any change by Govt in taxes etc will be charged extra |
7.1( Ti) |
- |
0 |
|
GST@18% extra as applicable presently any change by Govt in taxes etc will be charged extra |
7.1(Cr) |
- |
0 |
|
GST@18% extra as applicable presently any change by Govt in taxes etc will be charged extra |
7.1(Mo) |
- |
0 |
|
GST@18% extra as applicable presently any change by Govt in taxes etc will be charged extra |
7.1(Ni) |
- |
0 |
|
GST@18% extra as applicable presently any change by Govt in taxes etc will be charged extra |
7.1( Nitrogen%) |
- |
3000.00 |
|
GST@18% extra as applicable presently any change by Govt in taxes etc will be charged extra for Nitrogen Rs 2800.00 Extra |
Table 1 ( Clauses 7.1 ,7.2 )(TITANIUM) |
- |
200.00 |
|
GST@18% extra as applicable presently any change by Govt in taxes etc will be charged extra |
Table 1 ( Clauses 7.1 ,7.2 )(VANADIUM) |
- |
200.00 |
|
GST@18% extra as applicable presently any change by Govt in taxes etc will be charged extra |
Table 1 ( Clauses 7.1 ,7.2 )(NIOBIUM) |
- |
100.00 |
|
GST@18% extra as applicable presently any change by Govt in taxes etc will be charged extra |
Table 1 ( Clauses 7.1 ,7.2 )(Molybdenum) |
- |
200.00 |
|
GST@18% extra as applicable presently any change by Govt in taxes etc will be charged extra |
Table 1 ( Clauses 7.1 ,7.2 )(Chromium) |
- |
200.00 |
|
GST@18% extra as applicable presently any change by Govt in taxes etc will be charged extra |
Table 1 ( Clauses 7.1 ,7.2 )(Nickel) |
- |
200.00 |
|
GST@18% extra as applicable presently any change by Govt in taxes etc will be charged extra |
Table 1 ( Clauses 7.1 ,7.2 )( ALUMINIUM) |
- |
0 |
|
GST@18% extra as applicable presently any change by Govt in taxes etc will be charged extra |
Table 1 ( Clauses 7.1 ,7.2 )(SILICON) |
- |
0 |
|
GST@18% extra as applicable presently any change by Govt in taxes etc will be charged extra |
Table 1 ( Clauses 7.1 ,7.2 )(NITROGEN) |
- |
0 |
|
GST@18% extra as applicable presently any change by Govt in taxes etc will be charged extra For Nitrogen Rs 2800.00 extra |
Table 1 ( Clauses 7.1 ,7.2 )(MANGANESE) |
- |
0 |
|
GST@18% extra as applicable presently any change by Govt in taxes etc will be charged extra |
Table 1 ( Clauses 7.1 ,7.2 )(PHOSPHURS) |
- |
0 |
|
GST@18% extra as applicable presently any change by Govt in taxes etc will be charged extra |
Table 1 ( Clauses 7.1 ,7.2 )(SULPHUR) |
- |
0 |
|
GST@18% extra as applicable presently any change by Govt in taxes etc will be charged extra |
Table 1 ( Clauses 7.1 ,7.2 )( CARBON) |
- |
0 |
|
GST@18% extra as applicable presently any change by Govt in taxes etc will be charged extra |
7.1( Copper %) |
- |
0 |
|
GST@18% extra as applicable presently any change by Govt in taxes etc will be charged extra |
|
30 Sep, 2027 |
- - |
20 |
IS 303 (1989) |
Plywood for General Purposes - |
BWR & MR/AA, AB, BB/Decorative and Commercial |
29100.00 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
8(Dimensions & Tolerances - Length - Cl. 8) |
- |
800 |
|
For Physical and Chemical Testing complete testing charges Rs 29100.00 |
8(Dimensions & Tolerances - Width - Cl. 8) |
- |
800 |
|
GST@18% extra as applicable presently any change by Govt either increase or decrease will be charged extra at the time of placement of order |
8(Dimensions & Tolerances - Thickness - Cl. 8) |
- |
800 |
|
GST@18% extra as applicable presently any change by Govt either increase or decrease will be charged extra at the time of placement of order |
8(Dimensions & Tolerances - Squareness - Annexure C) |
- |
800 |
|
GST@18% extra as applicable presently any change by Govt either increase or decrease will be charged extra at the time of placement of order |
8(Dimensions & Tolerances - Edge Straightness - Annexure C) |
- |
800 |
|
GST@18% extra as applicable presently any change by Govt either increase or decrease will be charged extra at the time of placement of order |
11.2.2(Glue Adhesion - Mycological test - 11.2.2, Part 7 of IS 1734 [for MR Garde only]) |
- |
2500 |
|
GST @ 18% extra as applicable at present |
11.2.1(Glue Adhesion - Water resistance test - 11.2.1.1 [for MR Grade]) |
- |
1500 |
|
GST@18% extra as applicable presently any change by Govt either increase or decrease will be charged extra at the time of placement of order |
11.2.1(Glue Adhesion - Water resistance test - 11.2.1.1 [for BWR Grade]) |
- |
1500 |
|
GST@18% extra as applicable presently any change by Govt either increase or decrease will be charged extra at the time of placement of order |
11.3(Moisture Content - Part 1 of IS 1734) |
- |
2000 |
|
GST@18% extra as applicable presently any change by Govt either increase or decrease will be charged extra at the time of placement of order |
11.4, Table 4(Static Bending Strength - Modulus of Rupture - Across the Face Grain - Minimum Individual) |
- |
2000 |
|
GST@18% extra as applicable presently any change by Govt either increase or decrease will be charged extra at the time of placement of order |
11.4, Table 4(Static Bending Strength - Modulus of Rupture - Across the Face Grain - Average) |
- |
2000 |
|
GST@18% extra as applicable presently any change by Govt either increase or decrease will be charged extra at the time of placement of order |
11.4, Table 4(Static Bending Strength - Modulus of Rupture - Along the Face Grain - Minimum Individual) |
- |
2000 |
|
GST@18% extra as applicable presently any change by Govt either increase or decrease will be charged extra at the time of placement of order |
11.4, Table 4(Static Bending Strength - Modulus of Rupture - Along the Face Grain - Average) |
- |
2000 |
|
GST@18% extra as applicable presently any change by Govt either increase or decrease will be charged extra at the time of placement of order |
11.4, Table 4(Static Bending Strength - Modulus of Elasticity - Across the Face Grain - Minimum Individual) |
- |
1500.00 |
|
GST@18% extra as applicable presently any change by Govt either increase or decrease will be charged extra at the time of placement of order |
11.4, Table 4(Static Bending Strength - Modulus of Elasticity - Across the Face Grain - Average) |
- |
1500 |
|
GST@18% extra as applicable presently any change by Govt either increase or decrease will be charged extra at the time of placement of order |
11.4, Table 4(Static Bending Strength - Modulus of Elasticity - Along the Face Grain - Minimum Individual) |
- |
2000 |
|
GST@18% extra as applicable presently any change by Govt either increase or decrease will be charged extra at the time of placement of order |
11.4, Table 4(Static Bending Strength - Modulus of Elasticity - Along the Face Grain - Average) |
- |
2000 |
|
GST@18% extra as applicable presently any change by Govt either increase or decrease will be charged extra at the time of placement of order |
9(Workmanship and Finish - Cl.9, 8.3, Annexure C) |
- |
600 |
|
GST@18% extra as applicable presently any change by Govt either increase or decrease will be charged extra at the time of placement of order |
|
30 Sep, 2027 |
- - |
21 |
IS 269 (2015) |
Ordinary portland cement - Specification (Sixth Revision) |
33, 43, 43-S ,53-S |
17100 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
7 Table-3 i.(Fineness) |
- |
300.00 |
|
For Physical Testing Rs 4000.00 For Chemical Testing Rs 3300.00 For Transverse Strength Rs 1500.00 |
7 Table-3 ii a(Expansion by Le Chatelier) |
- |
300.00 |
|
GST @ 18% extra as applicable presently any change by the Govt either increase or decrease in GST will be applicable at the time of placement of order |
7 Table-3 ii b(Expansion by Autoclave) |
- |
500.00 |
|
GST @ 18% extra as applicable presently any change by the Govt either increase or decrease in GST will be applicable at the time of placement of order |
7 Table-3 iii a(Setting Time Initial) |
- |
300.00 |
|
GST @ 18% extra as applicable presently any change by the Govt either increase or decrease in GST will be applicable at the time of placement of order |
7 Table-3 iii b(Setting Time Final) |
- |
300.00 |
|
GST @ 18% extra as applicable presently any change by the Govt either increase or decrease in GST will be applicable at the time of placement of order |
7 Table-3 iv a(Compressive Strength At 72 hrs ± 1 hr - IS 4031 Part 6) |
- |
800.00 |
|
GST @ 18% extra as applicable presently any change by the Govt either increase or decrease in GST will be applicable at the time of placement of order |
7 Table-3 iv b(Compressive Strength At 168 hrs ± 2 hr - IS 4031 Part 6) |
- |
800.00 |
|
GST @ 18% extra as applicable presently any change by the Govt either increase or decrease in GST will be applicable at the time of placement of order |
7 Table-3 iv c(Compressive Strength At 672 hrs ± 4 hr - IS 4031 Part 6) |
- |
800.00 |
|
GST @ 18% extra as applicable presently any change by the Govt either increase or decrease in GST will be applicable at the time of placement of order |
7 Table-3 iv c(Compressive Strength At 672 hrs ± 4 hr - IS 4031 Part 6) |
- |
0 |
|
GST @ 18% extra as applicable presently |
7 Table-3 iv c(Compressive Strength At 672 hrs ± 4 hr - IS 4031 Part 6) |
- |
0 |
|
GST @ 18% extra as applicable presently |
6 - Table - 1 i(Ratio of percentage of lime to percentages of silica, alumina and iron oxide - Cl 4 of IS 4032:1985) |
- |
300.00 |
|
GST @ 18% extra as applicable presently any change by the Govt either increase or decrease in GST will be applicable at the time of placement of order |
6.1 Table-2 i.(Ratio of percentage of lime to percentage of silica, alumina and iron oxide) |
- |
300.00 |
|
GST @ 18% extra as applicable presently any change by the Govt either increase or decrease in GST will be applicable at the time of placement of order |
6.1 Table-2 viii(Alkali content) |
- |
300.00 |
|
GST @ 18% extra as applicable presently any change by the Govt either increase or decrease in GST will be applicable at the time of placement of order |
6.1 Table-2 vii(Chloride content) |
- |
300.00 |
|
GST @ 18% extra as applicable presently any change by the Govt either increase or decrease in GST will be applicable at the time of placement of order |
6.1 Table-2 vi(Loss on ignition) |
- |
300.00 |
|
GST @ 18% extra as applicable presently any change by the Govt either increase or decrease in GST will be applicable at the time of placement of order |
6.1 Table-2 v(Total Sulphur Content calculated as Sulphuric Anhydride) |
- |
300.00 |
|
GST @ 18% extra as applicable presently any change by the Govt either increase or decrease in GST will be applicable at the time of placement of order |
6.1 Table-2 iv(Magnesia) |
- |
300.00 |
|
GST @ 18% extra as applicable presently any change by the Govt either increase or decrease in GST will be applicable at the time of placement of order |
6.1 Table-2 iii.(Insoluble residue) |
- |
300.00 |
|
GST @ 18% extra as applicable presently any change by the Govt either increase or decrease in GST will be applicable at the time of placement of order |
6.1 Table-2 ii.(Ratio of percentage of alumina to that of iron oxide) |
- |
300.00 |
|
GST @ 18% extra as applicable presently any change by the Govt either increase or decrease in GST will be applicable at the time of placement of order |
6.1 Table-2 viii(Alkali content) |
- |
0 |
|
GST @ 18% extra as applicable presently |
6 - Table - 1 i(Ratio of percentage of lime to percentages of silica, alumina and iron oxide - Cl 4 of IS 4032:1985) |
- |
300.00 |
|
GST @ 18% extra as applicable presently |
7 Table-3 v(Transverse Strength - IS 4031 Part 8 (Optional)) |
- |
1500 |
|
GST @ 18% extra as applicable presently any change by the Govt either increase or decrease in GST will be applicable at the time of placement of order |
7 Table-3 v(Transverse Strength - IS 4031 Part 8 (Optional)) |
- |
0 |
|
- |
|
30 Sep, 2027 |
- - |