Matrix Test Labs

PLOT NO 28 BADLI INDUSTRIAL AREA, delhi, New Delhi, Delhi, 110042
9560422022 matrixtestlab@gmail.com
Scope List
Reset
33 Results
S.No. Indian Standard No. Product Grade / Type / Size / Designation etc. Testing Charges (Excl. Of Taxes) Validity Date Remark
31 IS 16242 : Part 1 (2014) Uninterruptible power systems (UPS): Part 1 general and safety requirements for UPS - 125000 View breakup
Rs.1,25,000/- UPS/ Invertors Up to 5 kVA) [10% discount to BIS]
31 Dec, 2026 -
Following Additional Test Facility included w.e.f. 18.09.2018: Protection against ingress of foreign objects (IPX7 & IPX8 only) (Cl.1.2 & AnnexH). Excluding: Non-linear loads (Cl.3.3), Components (Cl.4.5 / RD 1.5), Protection of Personnel-Safety Interlocks (Cl. 5.6/ RD Cl.2.8.5, Cl.2.8.7.1 to Cl.2.8.7.3), Semiconductor devices (Cl.2.10.5.4 of RD) and Insulation in wound components (Cl.2.10.5.11 of RD).
32 IS 10322 : Part 5 : Sec 1 (2012) Luminaires: Part 5 particular requirements: Sec 1 fixed general purpose luminaires (First Revision) - 80000 View breakup
-
31 Dec, 2026 -
Following Additional Test Facility included w.e.f. 18.09.2018: Resistance to dust, solid objects & moisture for IPX7 & IPX8 (Cl.9.2.8 & Cl.9.2.9) as per (RD) IS 10322(Part-1):2014. Excluding: Electromechanical Contact System (Cl.4.11.6), UV Radiation (Cl.4.24, Annex-P), Short circuit protection (Cl. 4.26.2) as per (RD) IS 10322(Part-1):2014 and Photometric test (Cl.17).
33 IS 16046 : Part 1 (2018) Secondary Cells and Batteries Containing Alkaline or Other Non-Acid Electrolytes ” Safety Requirements for Portable Sealed Secondary Cells and for Batteries Made from Them for Use in Portable Applications Part 1 Nickel Systems ( Second Revision ) - 180000 View breakup
-
31 Dec, 2026 -
REVISED VERSION Included w.e.f. 14.01.2019.

Designed, Developed and Maintained by:

Arohatech IT Services (P) Ltd.

Contact for any query/support: supportlims@bis.gov.in