| 9.9(( Cooling Capacity Test)) |
- |
110000 |
|
- |
| 9.6((Enclosure Sweat Test)) |
- |
30000 |
|
- |
| 9.5((Freeze-Up Tests)) |
- |
30000 |
|
- |
| 12.2.1((General Running Test)) |
- |
10000 |
|
- |
| 9.10((Heating Capacity Test)) |
- |
110000 |
|
- |
| 12.2.2(( Leakage Test)) |
- |
10000 |
|
- |
| 9.12((Maximum Heating Performance Test)) |
- |
80000 |
|
- |
| 9.4((Maximum Operating Conditions Test)) |
- |
80000 |
|
- |
| 9.7((Power Consumption Test for Cooling)) |
- |
20000 |
|
- |
| 9.8((Power Consumption Test for Heating by Heat Pump)) |
- |
20000 |
|
- |
| 9.3((Power Factor Test)) |
- |
10000 |
|
- |
| 9.13((Sound Pressure Test)) |
- |
40000 |
|
- |
| 5.2((Electrically Charged Parts)) |
- |
1000 |
|
- |
| 5.3((Refrigerant Circuit)) |
- |
1000 |
|
- |
| 5.6((Temperature Sensing Controls)) |
- |
1000 |
|
- |
| 5.7((Hermetic Compressors)) |
- |
1000 |
|
- |
| 5.8((Heat Exchanger)) |
- |
1000 |
|
- |
| 5.9((Motors)) |
- |
10000 |
|
This Testing charges is applicable for the test specified in this clause only (Input and speed test). |
| "8.3((Method of Measurement of Indian Seasonal
Energy Efficiency Ratio (ISEER))") |
- |
0 |
|
- |
| 9((PERFORMANCE REQUIREMENTS)) |
- |
0 |
|
- |
| 9.2((Safety)) |
- |
0 |
|
- |
| 9.5.3((Air Blockage Test)) |
- |
30000 |
|
- |
| "12.2.5(Provisions for Earthing (Earth Resistance
Test)") |
- |
10000 |
|
- |
| 12.2.3((High Voltage Test)) |
- |
10000 |
|
- |
| 5(Construction )("The air conditioner and its parts shall be
constructed with the strength and rigidity adequate
for normal conditions of handling, transport, and
usage.") |
- |
1000 |
|
For Clause 5.1 only |
| 5.4((Provision for Earthing)) |
- |
1000 |
|
- |
| 5.5((Air Filter)) |
- |
3000 |
|
- |
| 6((RATING REQUIREMENTS)) |
- |
0 |
|
- |
| 7(RATINGS BASED ON FUNCTION) |
- |
0 |
|
- |
| 8(RATING AND TEST CONDITIONS) |
- |
0 |
|
- |
| 8.1(Cooling Test) |
- |
0 |
|
- |
| 8.1.2((Maximum Operating Test Conditions)) |
- |
0 |
|
- |
| 8.1.3((Freeze-Up Test Conditions)) |
- |
0 |
|
- |
| 8.1.4((Enclosure Sweat Test Conditions)) |
- |
0 |
|
- |
| 8.2((Heating Test)) |
- |
0 |
|
- |
| 8.2.1((Heating Capacity Test Conditions)) |
- |
0 |
|
- |
| "8.2.2((Heating by Heat Pump Overload Rating Test Conditions (Maximum Heating Performance Test))") |
- |
0 |
|
- |
| 9.1((Variations Allowed in Performance Test Conditions)) |
- |
0 |
|
- |
| 13(MARKING) |
- |
5000 |
|
- |
| 9.5.4(( Drip Test)) |
- |
30000 |
|
- |
| 12.4.3(Leakage Current Test) |
- |
0 |
|
- |
| 12.4.2(Pressure Test or Leakage Test) |
- |
0 |
|
- |
| 12.4.1(Performance Test) |
- |
0 |
|
- |
| 12.4(Acceptance Test) |
- |
0 |
|
- |
| "9.11((Method of Measurement of Indian Seasonal
Energy Efficiency Ratio (ISEER))") |
- |
45000 |
|
- |
| 12.3.3(Safety Tests) |
- |
20000 |
|
- |
| 10((CALCULATIONS)) |
- |
0 |
|
- |
| 12.2.4(Leakage Current Test)) |
- |
10000 |
|
- |
| 11((INSTRUMENTS)) |
- |
0 |
|
- |
| 12.1((Classification of Tests)) |
- |
0 |
|
- |