1 |
IS 14286 : Part 1 : Sec 2 (2023) |
Terrestrial photovoltaic PV modules Design qualification and type approval Part 1-2: Special requirements for testing of thin-film Cadmium Telluride CdTe based photovoltaic PV modules Third Revision |
- |
-
|
1985000 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
Cl-8(Major visual defects) |
- |
0 |
|
- |
Cl-11.1(Visual inspection) |
- |
20000 |
|
- |
Cl-11.2(Maximum power determination) |
- |
30000 |
|
- |
Cl-11.3(Insulation tes) |
- |
15000 |
|
- |
Cl-11.4(Measurement of temperature coefficients) |
- |
60000 |
|
- |
Cl-11.5(Measurement of nominal module operating temperature) |
- |
0 |
|
- |
Cl-11.6(Performance at STC and NMOT) |
- |
30000 |
|
- |
Cl-11.7(Performance at low irradiance) |
- |
30000 |
|
- |
Cl-11.8(Outdoor exposure test) |
- |
30000 |
|
- |
Cl-11.9(Hot-spot endurance test) |
- |
200000 |
|
- |
Cl-11.10(UV preconditioning test) |
- |
150000 |
|
- |
Cl-11.11(Thermal cycling test) |
- |
250000 |
|
- |
Cl-11.12(Humidity-freeze test) |
- |
100000 |
|
- |
Cl-11.13(Damp heat test) |
- |
150000 |
|
- |
Cl-11.14(Robustness of terminations test) |
- |
15000 |
|
- |
Cl-11.15(Wet leakage current test) |
- |
20000 |
|
- |
Cl-11.16(Static mechanical load test) |
- |
40000 |
|
- |
Cl-11.17(Hail test) |
- |
20000 |
|
- |
Cl-11.18(Bypass diode testing) |
- |
80000 |
|
- |
Cl-11.19(Stabilization) |
- |
300000 |
|
- |
5(Marking and documentation) |
- |
5000 |
|
- |
11.20(Cyclic (dynamic) mechanical load test (MQT 20)) |
- |
120000 |
|
- |
11.21(Potential induced degradation test (MQT 21)) |
- |
300000 |
|
- |
11.22(Bending test (MQT 22)) |
- |
20000 |
|
- |
|
Complete
|
|
20 Jun, 2025 |
Included w.e.f.08.11.2024 |
2 |
IS 14286 : Part 1 : Sec 1 (2023) |
Terrestrial photovoltaic PV modules Design qualification and type approval Part 1-1: Special requirements for testing of crystalline silicon photovoltaic PV modules Third Revision |
- |
-
|
1835000 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
Cl-8(Major visual defects) |
- |
0 |
|
- |
Cl-11.1(Visual inspection) |
- |
20000 |
|
- |
Cl-11.2(Maximum power determination) |
- |
30000 |
|
- |
Cl-11.3(Insulation test) |
- |
15000 |
|
- |
Cl-11.4(Measurement of temperature coefficients) |
- |
60000 |
|
- |
Cl-11.5(Measurement of nominal module operating temperature) |
- |
0 |
|
- |
Cl-11.6(Performance at STC) |
- |
30000 |
|
- |
Cl-11.7(Performance at low irradiance) |
- |
30000 |
|
- |
Cl-11.8(Outdoor exposure test) |
- |
30000 |
|
- |
Cl-11.9(Hot-spot endurance test) |
- |
200000 |
|
- |
Cl-11.10(UV preconditioning test) |
- |
150000 |
|
- |
Cl-11.11(Thermal cycling test) |
- |
250000 |
|
- |
Cl-11.12(Humidity-freeze test) |
- |
100000 |
|
- |
Cl-11.13(Damp heat test) |
- |
150000 |
|
- |
Cl-11.14(Robustness of terminations test) |
- |
15000 |
|
- |
Cl-11.15(Wet leakage current tes) |
- |
20000 |
|
- |
Cl-11.16(Static mechanical load test) |
- |
40000 |
|
- |
Cl-11.17(Hail test) |
- |
20000 |
|
- |
Cl-11.18(Bypass diode thermal test) |
- |
80000 |
|
- |
Cl-11.19(Stabilization) |
- |
150000 |
|
- |
5(Marking and documentation) |
- |
5000 |
|
- |
11.20(Cyclic (dynamic) mechanical load test (MQT 20)) |
- |
120000 |
|
- |
11.21(Potential induced degradation test (MQT 21)) |
- |
300000 |
|
- |
11.22(Bending test (MQT 22)) |
- |
20000 |
|
- |
|
Complete
|
|
20 Jun, 2025 |
Included w.e.f 05.11.2024 |
3 |
IS 302 : Part 2 : Sec 21 (2024) |
Household and Similar Electrical Appliances�Safety Part 2 Particular Requirements Section 21 Storage Water Heaters |
- |
-
|
125000 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
4(General requirement) |
- |
0 |
|
- |
5(General conditions for the tests) |
- |
0 |
|
- |
6(Classification) |
- |
0 |
|
- |
7(Marking and instructions) |
- |
1000 |
|
- |
8(Protection against access to live parts) |
- |
2000 |
|
- |
10(Power input and current) |
- |
5000 |
|
- |
11(Heating) |
- |
6000 |
|
- |
13(Leakage current and electric strength at operating temperature) |
- |
3000 |
|
- |
14(Transient overvoltages) |
- |
2000 |
|
- |
15(Moisture resistance) |
- |
3000 |
|
- |
16(Leakage current and electric strength) |
- |
3000 |
|
- |
17(Overload protection of transformers and associated circuits) |
- |
2000 |
|
- |
19(Abnormal operation) |
- |
10000 |
|
Charges applicable excluding the test of Cl.19.11.4.1 to Cl.19.11.4.7. The testing charges for EMI/EMC testing (Cl.19.11.4.1 to Cl.19.11.4.7) will be applicable |
20(Stability and mechanical hazards) |
- |
1000 |
|
- |
21(Mechanical strength) |
- |
5000 |
|
- |
22(Construction) |
- |
5000 |
|
- |
23(Internal wiring) |
- |
1000 |
|
- |
24(Components) |
- |
3000 |
|
- |
25(Supply connection and external flexible cords) |
- |
3000 |
|
- |
26(Terminals for external conductors) |
- |
2000 |
|
- |
27(Provision for earthing) |
- |
2000 |
|
- |
28(Screws and connections) |
- |
1000 |
|
- |
29(Clearances, creepage distances and solid insulation) |
- |
2000 |
|
- |
30(Resistance to heat and fire) |
- |
4000 |
|
- |
31(Resistance to rusting) |
- |
1000 |
|
- |
32(Radiation, toxicity and similar hazards) |
- |
2000 |
|
Charges applicable excluding the test of Cl.12 (Charging of metal-ion batteries). In case of Battery operated water heater used then additional charges and testing time will be applicable accordingly. |
A.101(Pressure test) |
- |
1000 |
|
- |
19.11.4.1(Electrostatic discharges) |
- |
5000 |
|
if applicable |
19.11.4.2(Radiated fields) |
- |
20000 |
|
if applicable |
19.11.4.3(Fast transient bursts) |
- |
5000 |
|
if applicable |
19.11.4.4(Surge immunity test) |
- |
5000 |
|
if applicable |
19.11.4.5(Immunity to conducted discharges) |
- |
10000 |
|
if applicable |
19.11.4.6(Class 3 Voltage dips and interruptions) |
- |
5000 |
|
if applicable |
19.11.4.7(Harmonics) |
- |
5000 |
|
if applicable |
9(Starting of motor-operated appliances) |
- |
0 |
|
- |
18(Endurance) |
- |
0 |
|
- |
4(General requirement) |
- |
0 |
|
- |
5(General conditions for the tests) |
- |
0 |
|
- |
6(Classification) |
- |
0 |
|
- |
7(Marking and instructions) |
- |
0 |
|
- |
8(Protection against access to live parts) |
- |
0 |
|
- |
10(Power input and current) |
- |
0 |
|
- |
11(Heating) |
- |
0 |
|
- |
13(Leakage current and electric strength at operating temperature) |
- |
0 |
|
- |
14(Transient overvoltages) |
- |
0 |
|
- |
15(Moisture resistance) |
- |
0 |
|
- |
16(Leakage current and electric strength) |
- |
0 |
|
- |
17(Overload protection of transformers and associated circuits) |
- |
0 |
|
- |
19(Abnormal operation) |
- |
0 |
|
- |
20(Stability and mechanical hazards) |
- |
0 |
|
- |
21(Mechanical strength) |
- |
0 |
|
- |
22(Construction) |
- |
0 |
|
- |
23(Internal wiring) |
- |
0 |
|
- |
24(Components) |
- |
0 |
|
- |
25(Supply connection and external flexible cords) |
- |
0 |
|
- |
26(Terminals for external conductors) |
- |
0 |
|
- |
27(Provision for earthing) |
- |
0 |
|
- |
28(Screws and connections) |
- |
0 |
|
- |
29(Clearances, creepage distances and solid insulation) |
- |
0 |
|
- |
30(Resistance to heat and fire) |
- |
0 |
|
- |
31(Resistance to rusting) |
- |
0 |
|
- |
32(Radiation, toxicity and similar hazards) |
- |
0 |
|
- |
A.101(Pressure test) |
- |
0 |
|
- |
19.11.4.1(Electrostatic discharges) |
- |
0 |
|
- |
19.11.4.2(Radiated fields) |
- |
0 |
|
- |
19.11.4.3(Fast transient bursts) |
- |
0 |
|
- |
19.11.4.4(Surge immunity test) |
- |
0 |
|
- |
19.11.4.5(Immunity to conducted discharges) |
- |
0 |
|
- |
19.11.4.6(Class 3 Voltage dips and interruptions) |
- |
0 |
|
- |
19.11.4.7(Harmonics) |
- |
0 |
|
- |
9(Starting of motor-operated appliances) |
- |
0 |
|
- |
18(Endurance) |
- |
0 |
|
- |
|
Complete
|
|
20 Jun, 2025 |
Included w.e.f 12.11.2024
Exclusion
32 (Radiation, toxicity and similar hazards) |
4 |
IS 2993 : Part 2 (2024) |
a.c. Motor Capacitors Part 2 Motor Start Capacitors ( Third Revision ) |
- |
-
|
358250 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
5.1.1.1(General) |
- |
4000 |
|
- |
5.1.7(Voltage test between the terminals) |
- |
9000 |
|
- |
5.1.8(Voltage test between terminals and case) |
- |
9000 |
|
- |
5.1.9(Capacitance measurement) |
- |
31500 |
|
capacitance measurement charge is 13500 & Tangent of loss angle charge is 18000 |
5.1.10(Check of dimensions) |
- |
4000 |
|
- |
5.1.11.1(Robustness of terminations) |
- |
36000 |
|
- |
5.1.11.2(Soldering) |
- |
5000 |
|
- |
5.1.11.3(Vibration) |
- |
21500 |
|
Vibration charge is : 20000 & Fixing bolt charge is: 1500 |
5.1.12(Sealing test) |
- |
9000 |
|
- |
5.1.13(Endurance test) |
- |
95000 |
|
- |
5.1.14(Damp heat test) |
- |
66000 |
|
- |
5.1.15(Self-healing test) |
- |
9000 |
|
- |
5.1.16(Destruction test) |
- |
44250 |
|
- |
5.1.17.1(Ball-pressure test) |
- |
3000 |
|
- |
5.1.17.2(Glow-wire test) |
- |
3000 |
|
- |
5.1.17.3(Tracking test) |
- |
5000 |
|
- |
5.2(Overloads) |
- |
0 |
|
- |
5.3.1(Creepage distances and clearances) |
- |
0 |
|
- |
5.3.2(Terminals and connecting cables) |
- |
0 |
|
- |
5.3.3(Earth connections) |
- |
0 |
|
- |
5.3.4(Discharge devices) |
- |
0 |
|
- |
5.3.5(Pollution) |
- |
0 |
|
- |
5.4(Marking) |
- |
4000 |
|
- |
6.1.6(Voltage test between the terminals) |
- |
9000 |
|
For Electrolytic motor start capacitors |
6.1.7(Voltage test between terminals and case) |
- |
9000 |
|
For Electrolytic motor start capacitors |
6.1.8(Capacitance and power factor measurement) |
- |
15000 |
|
For Electrolytic motor start capacitors |
6.1.9(Check of dimensions) |
- |
4000 |
|
For Electrolytic motor start capacitors |
6.1.10.1(Robustness of terminations) |
- |
36000 |
|
For Electrolytic motor start capacitors |
6.1.10.2(Soldering) |
- |
5000 |
|
For Electrolytic motor start capacitors |
6.1.10.3(Vibration) |
- |
20000 |
|
For Electrolytic motor start capacitors |
6.1.10.4(Fixing bolt or stud (if fitted)) |
- |
1500 |
|
- |
6.1.10.5(Rapid change of temperature) |
- |
10000 |
|
For Electrolytic motor start capacitors |
6.1.11(Sealing test) |
- |
9000 |
|
For Electrolytic motor start capacitors |
6.1.12(Endurance test) |
- |
95000 |
|
For Electrolytic motor start capacitors |
6.1.13(Damp heat test) |
- |
66000 |
|
For Electrolytic motor start capacitors |
6.1.14(Pressure relief test) |
- |
5000 |
|
For Electrolytic motor start capacitors |
6.1.15.1(Ball-pressure test) |
- |
3000 |
|
For Electrolytic motor start capacitors |
6.1.15.2(Glow-wire test) |
- |
3000 |
|
For Electrolytic motor start capacitors |
6.1.15.3(Tracking test) |
- |
5000 |
|
For Electrolytic motor start capacitors |
6.2(Overloads) |
- |
0 |
|
- |
6.3.1(Creepage distances and clearances) |
- |
0 |
|
- |
6.3.2(Terminals and connecting cables) |
- |
0 |
|
- |
6.3.3(Earth connections) |
- |
0 |
|
- |
6.3.4(Discharge devices) |
- |
0 |
|
- |
6.3.5(Pollution) |
- |
0 |
|
- |
6.4(Marking) |
- |
4000 |
|
For Electrolytic motor start capacitors |
7.2.1(Measurement of working voltage) |
- |
0 |
|
- |
7.2.2(Influence of capacitance) |
- |
0 |
|
- |
7.3(Checking capacitor temperature) |
- |
0 |
|
- |
7.4(Checking transients) |
- |
0 |
|
- |
7.5(Storage of electrolytic capacitors) |
- |
0 |
|
- |
Annex A(Test voltage) |
- |
0 |
|
- |
5.1.10(Check of dimensions) |
- |
0 |
|
- |
6.1.10.4(Fixing bolt or stud (if fitted)) |
- |
0 |
|
- |
5.1.1.1(General) |
- |
- |
|
- |
5.1.7(Voltage test between the terminals) |
- |
- |
|
- |
5.1.8(Voltage test between terminals and case) |
- |
- |
|
- |
5.1.9(Capacitance measurement) |
- |
- |
|
- |
5.1.10(Check of dimensions) |
- |
- |
|
- |
5.1.11.1(Robustness of terminations) |
- |
- |
|
- |
5.1.11.2(Soldering) |
- |
- |
|
- |
5.1.11.3(Vibration) |
- |
- |
|
- |
5.1.12(Sealing test) |
- |
- |
|
- |
5.1.13(Endurance test) |
- |
- |
|
- |
5.1.14(Damp heat test) |
- |
- |
|
- |
5.1.15(Self-healing test) |
- |
- |
|
- |
5.1.16(Destruction test) |
- |
- |
|
- |
5.1.17.1(Ball-pressure test) |
- |
- |
|
- |
5.1.17.2(Glow-wire test) |
- |
- |
|
- |
5.1.17.3(Tracking test) |
- |
- |
|
- |
5.2(Overloads) |
- |
- |
|
- |
5.3.1(Creepage distances and clearances) |
- |
- |
|
- |
5.3.2(Terminals and connecting cables) |
- |
- |
|
- |
5.3.3(Earth connections) |
- |
- |
|
- |
5.3.4(Discharge devices) |
- |
- |
|
- |
5.3.5(Pollution) |
- |
- |
|
- |
5.4(Marking) |
- |
- |
|
- |
6.1.6(Voltage test between the terminals) |
- |
- |
|
- |
6.1.7(Voltage test between terminals and case) |
- |
- |
|
- |
6.1.8(Capacitance and power factor measurement) |
- |
- |
|
- |
6.1.9(Check of dimensions) |
- |
- |
|
- |
6.1.10.1(Robustness of terminations) |
- |
- |
|
- |
6.1.10.2(Soldering) |
- |
- |
|
- |
6.1.10.3(Vibration) |
- |
- |
|
- |
6.1.10.4(Fixing bolt or stud (if fitted)) |
- |
- |
|
- |
6.1.10.5(Rapid change of temperature) |
- |
- |
|
- |
6.1.11(Sealing test) |
- |
- |
|
- |
6.1.12(Endurance test) |
- |
- |
|
- |
6.1.13(Damp heat test) |
- |
- |
|
- |
6.1.14(Pressure relief test) |
- |
- |
|
- |
6.1.15.1(Ball-pressure test) |
- |
- |
|
- |
6.1.15.2(Glow-wire test) |
- |
- |
|
- |
6.1.15.3(Tracking test) |
- |
- |
|
- |
6.2(Overloads) |
- |
- |
|
- |
6.3.1(Creepage distances and clearances) |
- |
- |
|
- |
6.3.2(Terminals and connecting cables) |
- |
- |
|
- |
6.3.3(Earth connections) |
- |
- |
|
- |
6.3.4(Discharge devices) |
- |
- |
|
- |
6.3.5(Pollution) |
- |
- |
|
- |
6.4(Marking) |
- |
- |
|
- |
7.2.1(Measurement of working voltage) |
- |
- |
|
- |
7.2.2(Influence of capacitance) |
- |
- |
|
- |
7.3(Checking capacitor temperature) |
- |
- |
|
- |
7.4(Checking transients) |
- |
- |
|
- |
7.5(Storage of electrolytic capacitors) |
- |
- |
|
- |
Annex A(Test voltage) |
- |
- |
|
- |
5.1.10(Check of dimensions) |
- |
- |
|
- |
6.1.10.4(Fixing bolt or stud (if fitted)) |
- |
- |
|
- |
|
Complete
|
|
20 Jun, 2025 |
Included w.e.f 05.11.2024 |
5 |
IS 14286 : Part 1 : Sec 4 (2023) |
Terrestrial photovoltaic PV modules Design qualification and type approval Part 1-4: Special requirements for testing of thin-film CuInGASSe2 based photovoltaic PV modules Third Revision |
- |
-
|
1985000 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
Cl-8(Major visual defects) |
- |
0 |
|
- |
Cl-11.1(Visual inspection (MQT 01)) |
- |
20000 |
|
- |
Cl-11.2(Maximum power determination (MQT 02)) |
- |
30000 |
|
- |
Cl-11.3(Insulation test (MQT 03)) |
- |
15000 |
|
- |
Cl-11.4(Measurement of temperature coefficients (MQT 04)) |
- |
60000 |
|
- |
Cl-11.5(Measurement of nominal module operating temperature (NMOT) (MQT 05)) |
- |
0 |
|
- |
Cl-11.6(Performance at STC (MQT 06.1) and NMOT (MQT 06.2) |
- |
30000 |
|
- |
Cl-11.7(Performance at low irradiance (MQT 07)) |
- |
30000 |
|
- |
Cl-11.8(Outdoor exposure test (MQT 08)) |
- |
30000 |
|
- |
Cl-11.9(Hot-spot endurance test (MQT 09)) |
- |
200000 |
|
- |
Cl-11.10(UV preconditioning test (MQT 10)) |
- |
150000 |
|
- |
Cl-11.11(Thermal cycling test (MQT 11)) |
- |
250000 |
|
- |
Cl-11.12(As per IEC 61215-1:2016) |
- |
100000 |
|
11.12 (Humidity-freeze test (MQT 12)) |
Cl-11.13(Damp heat test (MQT 13)) |
- |
150000 |
|
- |
Cl-11.14(Robustness of terminations test (MQT 14)) |
- |
15000 |
|
- |
Cl-11.15(Robustness of terminations test (MQT 14)) |
- |
20000 |
|
11.15 (Wet leakage current test (MQT 15)) |
Cl-11.16(Static mechanical load test (MQT 16)) |
- |
40000 |
|
- |
Cl-11.17(Hail test (MQT 17)) |
- |
20000 |
|
- |
Cl-11.18(Bypass diode testing (MQT 18)) |
- |
80000 |
|
- |
Cl-11.19(Stabilization (MQT 19)) |
- |
300000 |
|
- |
Cl-8(Major visual defects) |
- |
0 |
|
- |
Cl-11.1(Visual inspection (MQT 01)) |
- |
0 |
|
- |
Cl-11.2(Maximum power determination (MQT 02)) |
- |
0 |
|
- |
Cl-11.3(Insulation test (MQT 03)) |
- |
0 |
|
- |
Cl-11.4(Measurement of temperature coefficients (MQT 04)) |
- |
0 |
|
- |
Cl-11.5(Measurement of nominal module operating temperature (NMOT) (MQT 05)) |
- |
0 |
|
- |
Cl-11.6(Performance at STC (MQT 06.1) and NMOT (MQT 06.2) |
- |
0 |
|
- |
Cl-11.7(Performance at low irradiance (MQT 07)) |
- |
0 |
|
- |
Cl-11.8(Outdoor exposure test (MQT 08)) |
- |
0 |
|
- |
Cl-11.9(Hot-spot endurance test (MQT 09)) |
- |
0 |
|
- |
Cl-11.10(UV preconditioning test (MQT 10)) |
- |
0 |
|
- |
Cl-11.11(Thermal cycling test (MQT 11)) |
- |
0 |
|
- |
Cl-11.12(As per IEC 61215-1:2016) |
- |
0 |
|
- |
Cl-11.13(Damp heat test (MQT 13)) |
- |
0 |
|
- |
Cl-11.14(Robustness of terminations test (MQT 14)) |
- |
0 |
|
- |
Cl-11.15(Robustness of terminations test (MQT 14)) |
- |
0 |
|
- |
Cl-11.16(Static mechanical load test (MQT 16)) |
- |
0 |
|
- |
Cl-11.17(Hail test (MQT 17)) |
- |
0 |
|
- |
Cl-11.18(Bypass diode testing (MQT 18)) |
- |
0 |
|
- |
Cl-11.19(Stabilization (MQT 19)) |
- |
0 |
|
- |
5(Marking and documentation) |
- |
5000 |
|
- |
11.20(Cyclic (dynamic) mechanical load test (MQT 20)) |
- |
120000 |
|
- |
11.21(Potential induced degradation test (MQT 21)) |
- |
300000 |
|
- |
11.22(Bending test (MQT 22)) |
- |
20000 |
|
- |
|
Complete
|
|
20 Jun, 2025 |
Included w.e.f 05.11.2024 |
6 |
IS 14286 : Part 1 : Sec 3 (2023) |
Terrestrial photovoltaic PV modules Design qualification and type approval Part 1-3: Special requirements for testing of thin-film amorphous silicon based photovoltaic PV modules Third Revision |
- |
-
|
1985000 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
Cl-8(Major visual defects) |
- |
0 |
|
- |
Cl-11.1(Visual inspection) |
- |
20000 |
|
- |
Cl-11.2(Maximum power determination) |
- |
30000 |
|
- |
Cl-11.3(Insulation test) |
- |
15000 |
|
- |
Cl-11.4(Measurement of temperature coefficients) |
- |
60000 |
|
- |
Cl-11.5(Measurement of nominal module operating temperature) |
- |
0 |
|
- |
Cl-11.6(Performance at STC and NMOT) |
- |
30000 |
|
- |
Cl-11.7(Performance at low irradiance) |
- |
30000 |
|
- |
Cl-11.8(Outdoor exposure test) |
- |
30000 |
|
- |
Cl-11.9(Hot-spot endurance test) |
- |
200000 |
|
- |
Cl-11.10(UV preconditioning test) |
- |
150000 |
|
- |
Cl-11.11(Thermal cycling test) |
- |
250000 |
|
- |
Cl-11.12(Humidity-freeze test) |
- |
100000 |
|
- |
Cl-11.13(Damp heat test) |
- |
150000 |
|
- |
Cl-11.14(Robustness of terminations test) |
- |
15000 |
|
- |
Cl-11.15(Wet leakage current test) |
- |
20000 |
|
- |
Cl-11.16(Static mechanical load test) |
- |
40000 |
|
- |
Cl-11.17(Hail test) |
- |
20000 |
|
- |
Cl-11.18(Bypass diode testing) |
- |
80000 |
|
- |
Cl-11.19(Stabilization) |
- |
300000 |
|
- |
Cl-8(Major visual defects) |
- |
0 |
|
- |
Cl-11.1(Visual inspection) |
- |
0 |
|
- |
Cl-11.2(Maximum power determination) |
- |
0 |
|
- |
Cl-11.3(Insulation test) |
- |
0 |
|
- |
Cl-11.4(Measurement of temperature coefficients) |
- |
0 |
|
- |
Cl-11.5(Measurement of nominal module operating temperature) |
- |
0 |
|
- |
Cl-11.6(Performance at STC and NMOT) |
- |
0 |
|
- |
Cl-11.7(Performance at low irradiance) |
- |
0 |
|
- |
Cl-11.8(Outdoor exposure test) |
- |
0 |
|
- |
Cl-11.9(Hot-spot endurance test) |
- |
0 |
|
- |
Cl-11.10(UV preconditioning test) |
- |
0 |
|
- |
Cl-11.11(Thermal cycling test) |
- |
0 |
|
- |
Cl-11.12(Humidity-freeze test) |
- |
0 |
|
- |
Cl-11.13(Damp heat test) |
- |
0 |
|
- |
Cl-11.14(Robustness of terminations test) |
- |
0 |
|
- |
Cl-11.15(Wet leakage current test) |
- |
0 |
|
- |
Cl-11.16(Static mechanical load test) |
- |
0 |
|
- |
Cl-11.17(Hail test) |
- |
0 |
|
- |
Cl-11.18(Bypass diode testing) |
- |
0 |
|
- |
Cl-11.19(Stabilization) |
- |
0 |
|
- |
5(Marking and documentation) |
- |
5000 |
|
- |
11.20(Cyclic (dynamic) mechanical load test (MQT 20)) |
- |
120000 |
|
- |
11.21(Potential induced degradation test (MQT 21)) |
- |
300000 |
|
- |
11.22(Bending test (MQT 22)) |
- |
20000 |
|
- |
|
Complete
|
|
20 Jun, 2025 |
Included w.e.f 05.11.2024 |
7 |
IS 2993 : Part 1 (2024) |
a.c. Motor Capacitors Part 1 General - Performance, Testing and Rating - Safety Requirements - Guidance for Installation and Operation ( Third Revision ) |
- |
-
|
455750 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
5.1.1(General) |
- |
4000 |
|
- |
5.5(Tangent of loss angle) |
- |
18000 |
|
- |
5.7("Voltage test between terminals
") |
- |
9000 |
|
- |
5.8(Voltage test between terminals and case) |
- |
9000 |
|
- |
5.9(Capacitance measurement) |
- |
13500 |
|
- |
5.9(Capacitance measurement) |
- |
0 |
|
- |
5.1(Check of dimensions) |
- |
4000 |
|
Actual Cl. no. is 5.10 |
5.11(Mechanical tests) |
- |
62500 |
|
- |
5.12(Sealing test) |
- |
9000 |
|
- |
5.13(Endurance test) |
- |
192500 |
|
- |
5.14(Damp heat test) |
- |
66000 |
|
- |
5.15(Self-healing test) |
- |
9000 |
|
- |
5.16(Destruction test) |
- |
44250 |
|
- |
5.17(Resistance to heat, fire and tracking) |
- |
0 |
|
- |
5.17.1(Ball-pressure test) |
- |
3000 |
|
- |
5.17.2(Glow-wire test) |
- |
3000 |
|
- |
5.17.3(Tracking test) |
- |
5000 |
|
- |
6.1(Maximum permissible voltage) |
- |
0 |
|
- |
6.2("Maximum permissible current
") |
- |
0 |
|
- |
6.3(Maximum permissible reactive output) |
- |
0 |
|
- |
7(Safety requirements) |
- |
0 |
|
- |
7.1(Requirements for Creepage distances and clearances) |
- |
0 |
|
- |
7.2(Terminals and connecting cables) |
- |
0 |
|
- |
7.3(Earth connections) |
- |
0 |
|
- |
7.4(Discharge devices) |
- |
0 |
|
- |
8(Marking) |
- |
4000 |
|
- |
9.2.1(Measurements of working voltage) |
- |
0 |
|
- |
9.2.2(Influence of capacitance) |
- |
0 |
|
- |
9.3(Checking capacitor temperature) |
- |
0 |
|
- |
9.4(Checking transients) |
- |
0 |
|
- |
9.5(Leakage current) |
- |
0 |
|
- |
5.1.1(General) |
- |
0 |
|
- |
5.5(Tangent of loss angle) |
- |
0 |
|
- |
5.7("Voltage test between terminals
") |
- |
0 |
|
- |
5.8(Voltage test between terminals and case) |
- |
0 |
|
- |
5.9(Capacitance measurement) |
- |
0 |
|
- |
5.9(Capacitance measurement) |
- |
0 |
|
- |
5.1(Check of dimensions) |
- |
0 |
|
- |
5.11(Mechanical tests) |
- |
0 |
|
- |
5.12(Sealing test) |
- |
0 |
|
- |
5.13(Endurance test) |
- |
0 |
|
- |
5.14(Damp heat test) |
- |
0 |
|
- |
5.15(Self-healing test) |
- |
0 |
|
- |
5.16(Destruction test) |
- |
0 |
|
- |
5.17(Resistance to heat, fire and tracking) |
- |
0 |
|
- |
5.17.1(Ball-pressure test) |
- |
0 |
|
- |
5.17.2(Glow-wire test) |
- |
0 |
|
- |
5.17.3(Tracking test) |
- |
0 |
|
- |
6.1(Maximum permissible voltage) |
- |
0 |
|
- |
6.2("Maximum permissible current
") |
- |
0 |
|
- |
6.3(Maximum permissible reactive output) |
- |
0 |
|
- |
7(Safety requirements) |
- |
0 |
|
- |
7.1(Requirements for Creepage distances and clearances) |
- |
0 |
|
- |
7.2(Terminals and connecting cables) |
- |
0 |
|
- |
7.3(Earth connections) |
- |
0 |
|
- |
7.4(Discharge devices) |
- |
0 |
|
- |
8(Marking) |
- |
0 |
|
- |
9.2.1(Measurements of working voltage) |
- |
0 |
|
- |
9.2.2(Influence of capacitance) |
- |
0 |
|
- |
9.3(Checking capacitor temperature) |
- |
0 |
|
- |
9.4(Checking transients) |
- |
0 |
|
- |
9.5(Leakage current) |
- |
0 |
|
- |
5.1.1(General) |
- |
0 |
|
- |
5.5(Tangent of loss angle) |
- |
0 |
|
- |
5.7("Voltage test between terminals
") |
- |
0 |
|
- |
5.8(Voltage test between terminals and case) |
- |
0 |
|
- |
5.9(Capacitance measurement) |
- |
0 |
|
- |
5.9(Capacitance measurement) |
- |
0 |
|
- |
5.1(Check of dimensions) |
- |
0 |
|
- |
5.11(Mechanical tests) |
- |
0 |
|
- |
5.12(Sealing test) |
- |
0 |
|
- |
5.13(Endurance test) |
- |
0 |
|
- |
5.14(Damp heat test) |
- |
0 |
|
- |
5.15(Self-healing test) |
- |
0 |
|
- |
5.16(Destruction test) |
- |
0 |
|
- |
5.17(Resistance to heat, fire and tracking) |
- |
0 |
|
- |
5.17.1(Ball-pressure test) |
- |
0 |
|
- |
5.17.2(Glow-wire test) |
- |
0 |
|
- |
5.17.3(Tracking test) |
- |
0 |
|
- |
6.1(Maximum permissible voltage) |
- |
0 |
|
- |
6.2("Maximum permissible current
") |
- |
0 |
|
- |
6.3(Maximum permissible reactive output) |
- |
0 |
|
- |
7(Safety requirements) |
- |
0 |
|
- |
7.1(Requirements for Creepage distances and clearances) |
- |
0 |
|
- |
7.2(Terminals and connecting cables) |
- |
0 |
|
- |
7.3(Earth connections) |
- |
0 |
|
- |
7.4(Discharge devices) |
- |
0 |
|
- |
8(Marking) |
- |
0 |
|
- |
9.2.1(Measurements of working voltage) |
- |
0 |
|
- |
9.2.2(Influence of capacitance) |
- |
0 |
|
- |
9.3(Checking capacitor temperature) |
- |
0 |
|
- |
9.4(Checking transients) |
- |
0 |
|
- |
9.5(Leakage current) |
- |
0 |
|
- |
|
Complete
|
|
20 Jun, 2025 |
Included w.e.f.08.11.2024 |
8 |
IS 3315 (2024) |
Direct Evaporative Air Cooler â Specification (Fourth Revision) |
- |
-
|
82000 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
Cl-5.1(Enclosure) |
- |
12000 |
|
- |
Cl-5.2(Filter Pads) |
- |
0 |
|
- |
Cl-5.3(Sump Tank Capacities) |
- |
5000 |
|
- |
Cl-5.4(Blower/Fan) |
- |
0 |
|
- |
Cl-5.4.3(Fan motor) |
- |
0 |
|
Compliance will be checked by pre-testing documents. In case testing is required as per IS 996 additional charges of Rs. 14334/- will be applicable. |
Cl-5.5(Pump Set) |
- |
0 |
|
Compliance will be checked by pre-testing documents. In case testing is required as per IS 11951 additional charges of Rs. 49500/- will be applicable. |
Cl-5.6.1(Electrical wiring and connection) |
- |
1000 |
|
- |
Cl-5.6.2(Suitable power cable) |
- |
1000 |
|
Length of measurement of cords |
Cl-5.7(Switches) |
- |
0 |
|
In case switch need to be tested as per Cl. 5.7 a), b), c), d). Additional Testing charges will be applicable of Rs. 10000/- |
Cl-6(Rating Requirement) |
- |
0 |
|
- |
Cl-8.1(Performance Requirement) |
- |
0 |
|
Charges given in main test clauses |
Cl-8.2(Sound Test) |
- |
10000 |
|
- |
Cl-8.3(Air Delivery (Air Flow) Test) |
- |
10000 |
|
- |
Cl-8.4(Cooling Efficiency Test) |
- |
10000 |
|
- |
Cl-8.5(Power Consumption) |
- |
5000 |
|
Including Power factor measurements |
Cl-8.6(EER Calculation Method) |
- |
1000 |
|
- |
Cl-8.7(Drop Test) |
- |
2000 |
|
- |
Cl-8.8(Air Cooler Blower/Fan Reliability Test) |
- |
15000 |
|
- |
Cl-12.2.1(General Running Tests) |
- |
1000 |
|
- |
Cl-12.2.2(Protection against Electric Shock) |
- |
2000 |
|
- |
Cl-12.2.3(High Voltage Tests) |
- |
2000 |
|
- |
Cl-12.2.4(Leakage Current) |
- |
2000 |
|
- |
Cl-12.2.5(Provision for Earthing) |
- |
2000 |
|
- |
Cl-12.2.6(Finish) |
- |
1000 |
|
- |
Cl-13(Additional Requirement for ECO-Mark) |
- |
0 |
|
- |
Cl-14(Storage) |
- |
0 |
|
- |
Cl-5.1(Enclosure) |
- |
0 |
|
- |
Cl-5.2(Filter Pads) |
- |
0 |
|
- |
Cl-5.3(Sump Tank Capacities) |
- |
0 |
|
- |
Cl-5.4(Blower/Fan) |
- |
0 |
|
- |
Cl-5.4.3(Fan motor) |
- |
0 |
|
- |
Cl-5.5(Pump Set) |
- |
0 |
|
- |
Cl-5.6.1(Electrical wiring and connection) |
- |
0 |
|
- |
Cl-5.6.2(Suitable power cable) |
- |
0 |
|
- |
Cl-5.7(Switches) |
- |
0 |
|
- |
Cl-6(Rating Requirement) |
- |
0 |
|
- |
Cl-8.1(Performance Requirement) |
- |
0 |
|
- |
Cl-8.2(Sound Test) |
- |
0 |
|
- |
Cl-8.3(Air Delivery (Air Flow) Test) |
- |
0 |
|
- |
Cl-8.4(Cooling Efficiency Test) |
- |
0 |
|
- |
Cl-8.5(Power Consumption) |
- |
0 |
|
- |
Cl-8.6(EER Calculation Method) |
- |
0 |
|
- |
Cl-8.7(Drop Test) |
- |
0 |
|
- |
Cl-8.8(Air Cooler Blower/Fan Reliability Test) |
- |
0 |
|
- |
Cl-12.2.1(General Running Tests) |
- |
0 |
|
- |
Cl-12.2.2(Protection against Electric Shock) |
- |
0 |
|
- |
Cl-12.2.3(High Voltage Tests) |
- |
0 |
|
- |
Cl-12.2.4(Leakage Current) |
- |
0 |
|
- |
Cl-12.2.5(Provision for Earthing) |
- |
0 |
|
- |
Cl-12.2.6(Finish) |
- |
0 |
|
- |
Cl-13(Additional Requirement for ECO-Mark) |
- |
0 |
|
- |
Cl-14(Storage) |
- |
0 |
|
- |
Cl-5.1(Enclosure) |
- |
0 |
|
- |
Cl-5.2(Filter Pads) |
- |
0 |
|
- |
Cl-5.3(Sump Tank Capacities) |
- |
0 |
|
- |
Cl-5.4(Blower/Fan) |
- |
0 |
|
- |
Cl-5.4.3(Fan motor) |
- |
0 |
|
- |
Cl-5.5(Pump Set) |
- |
0 |
|
- |
Cl-5.6.1(Electrical wiring and connection) |
- |
0 |
|
- |
Cl-5.6.2(Suitable power cable) |
- |
0 |
|
- |
Cl-5.7(Switches) |
- |
0 |
|
- |
Cl-6(Rating Requirement) |
- |
0 |
|
- |
Cl-8.1(Performance Requirement) |
- |
0 |
|
- |
Cl-8.2(Sound Test) |
- |
0 |
|
- |
Cl-8.3(Air Delivery (Air Flow) Test) |
- |
0 |
|
- |
Cl-8.4(Cooling Efficiency Test) |
- |
0 |
|
- |
Cl-8.5(Power Consumption) |
- |
0 |
|
- |
Cl-8.6(EER Calculation Method) |
- |
0 |
|
- |
Cl-8.7(Drop Test) |
- |
0 |
|
- |
Cl-8.8(Air Cooler Blower/Fan Reliability Test) |
- |
0 |
|
- |
Cl-12.2.1(General Running Tests) |
- |
0 |
|
- |
Cl-12.2.2(Protection against Electric Shock) |
- |
0 |
|
- |
Cl-12.2.3(High Voltage Tests) |
- |
0 |
|
- |
Cl-12.2.4(Leakage Current) |
- |
0 |
|
- |
Cl-12.2.5(Provision for Earthing) |
- |
0 |
|
- |
Cl-12.2.6(Finish) |
- |
0 |
|
- |
Cl-13(Additional Requirement for ECO-Mark) |
- |
0 |
|
- |
Cl-14(Storage) |
- |
0 |
|
- |
Cl-5.1(Enclosure) |
- |
0 |
|
- |
Cl-5.2(Filter Pads) |
- |
0 |
|
- |
Cl-5.3(Sump Tank Capacities) |
- |
0 |
|
- |
Cl-5.4(Blower/Fan) |
- |
0 |
|
- |
Cl-5.4.3(Fan motor) |
- |
0 |
|
- |
Cl-5.5(Pump Set) |
- |
0 |
|
- |
Cl-5.6.1(Electrical wiring and connection) |
- |
0 |
|
- |
Cl-5.6.2(Suitable power cable) |
- |
0 |
|
- |
Cl-5.7(Switches) |
- |
0 |
|
- |
Cl-6(Rating Requirement) |
- |
0 |
|
- |
Cl-8.1(Performance Requirement) |
- |
0 |
|
- |
Cl-8.2(Sound Test) |
- |
0 |
|
- |
Cl-8.3(Air Delivery (Air Flow) Test) |
- |
0 |
|
- |
Cl-8.4(Cooling Efficiency Test) |
- |
0 |
|
- |
Cl-8.5(Power Consumption) |
- |
0 |
|
- |
Cl-8.6(EER Calculation Method) |
- |
0 |
|
- |
Cl-8.7(Drop Test) |
- |
0 |
|
- |
Cl-8.8(Air Cooler Blower/Fan Reliability Test) |
- |
0 |
|
- |
Cl-12.2.1(General Running Tests) |
- |
0 |
|
- |
Cl-12.2.2(Protection against Electric Shock) |
- |
0 |
|
- |
Cl-12.2.3(High Voltage Tests) |
- |
0 |
|
- |
Cl-12.2.4(Leakage Current) |
- |
0 |
|
- |
Cl-12.2.5(Provision for Earthing) |
- |
0 |
|
- |
Cl-12.2.6(Finish) |
- |
0 |
|
- |
Cl-13(Additional Requirement for ECO-Mark) |
- |
0 |
|
- |
Cl-14(Storage) |
- |
0 |
|
- |
Cl-5.1(Enclosure) |
- |
0 |
|
- |
Cl-5.2(Filter Pads) |
- |
0 |
|
- |
Cl-5.3(Sump Tank Capacities) |
- |
0 |
|
- |
Cl-5.4(Blower/Fan) |
- |
0 |
|
- |
Cl-5.4.3(Fan motor) |
- |
0 |
|
- |
Cl-5.5(Pump Set) |
- |
0 |
|
- |
Cl-5.6.1(Electrical wiring and connection) |
- |
0 |
|
- |
Cl-5.6.2(Suitable power cable) |
- |
0 |
|
- |
Cl-5.7(Switches) |
- |
0 |
|
- |
Cl-6(Rating Requirement) |
- |
0 |
|
- |
Cl-8.1(Performance Requirement) |
- |
0 |
|
- |
Cl-8.2(Sound Test) |
- |
0 |
|
- |
Cl-8.3(Air Delivery (Air Flow) Test) |
- |
0 |
|
- |
Cl-8.4(Cooling Efficiency Test) |
- |
0 |
|
- |
Cl-8.5(Power Consumption) |
- |
0 |
|
- |
Cl-8.6(EER Calculation Method) |
- |
0 |
|
- |
Cl-8.7(Drop Test) |
- |
0 |
|
- |
Cl-8.8(Air Cooler Blower/Fan Reliability Test) |
- |
0 |
|
- |
Cl-12.2.1(General Running Tests) |
- |
0 |
|
- |
Cl-12.2.2(Protection against Electric Shock) |
- |
0 |
|
- |
Cl-12.2.3(High Voltage Tests) |
- |
0 |
|
- |
Cl-12.2.4(Leakage Current) |
- |
0 |
|
- |
Cl-12.2.5(Provision for Earthing) |
- |
0 |
|
- |
Cl-12.2.6(Finish) |
- |
0 |
|
- |
Cl-13(Additional Requirement for ECO-Mark) |
- |
0 |
|
- |
Cl-14(Storage) |
- |
0 |
|
- |
|
Complete
|
|
20 Jun, 2025 |
Included w.e.f. 05.11.2024 |
9 |
IS 11951 (2024) |
PUMPSET FOR DIRECT EVAPORATIVE AIR COOLER — SPECIFICATION (Second Revision) |
- |
-
|
49500 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
5.1.1(Non-Submersible Pumpset) |
- |
1000 |
|
- |
5.1.2(Submersible Pumpset) |
- |
1000 |
|
- |
6.1, 7.3, 9.1, 9.4.2, Table-1(Discharge Head, m) |
- |
2500 |
|
- |
6.1, 7.3, 9.1, 9.4.2,Table-1(Minimum Discharge, l/min) |
- |
2500 |
|
- |
6.1, 7.3, 9.1, 9.4.2, Table-1(Type 1 Motor Wattage) |
- |
1000 |
|
- |
6.1, 7.3, 9.1, 9.4.2, Table-1(Type 2 Motor Wattage) |
- |
1000 |
|
- |
6.1, 7.3, 9.1, 9.4.2, Table-2(Motor Wattage) |
- |
1000 |
|
- |
6.1, 7.3, 9.1,9.4.2, Table-2(Minimum Discharge Head, Hd) |
- |
2500 |
|
- |
6.1, 7.3, 9.1, 9.4.2,Table-2(Discharge Measurement Height, h) |
- |
2500 |
|
- |
6.1, 7.3, 9.1, 9.4.2, Table-2(Minimum, Discharge*) |
- |
2500 |
|
- |
8(GENERAL REQUIREMENTS) |
- |
6000 |
|
For Vibration Test |
9.2(Tests on motor) |
- |
5000 |
|
For Insulation resistance and Temp rise Test |
9.3(Water Requirement) |
- |
0 |
|
- |
9.4.1(Reliability Tests) |
- |
12000 |
|
- |
9.4.3(Ingress protection test) |
- |
5000 |
|
- |
9.4.6(Dry Run Test) |
- |
2000 |
|
- |
9.5(Routine Test) |
- |
5000 |
|
- |
9.6(Type Test) |
- |
0 |
|
Charges already given in clauses |
9.7(Leakage current and electric strength at operating temperature) |
- |
2000 |
|
Before Moisture Resistance |
9.7(Moisture resistance) |
- |
4000 |
|
- |
9.7(Leakage current and electric strength) |
- |
2000 |
|
After Moisture Resistance,
Charges for clause 31=2000 |
5.1.1(Non-Submersible Pumpset) |
- |
0 |
|
- |
5.1.2(Submersible Pumpset) |
- |
0 |
|
- |
6.1, 7.3, 9.1, 9.4.2, Table-1(Discharge Head, m) |
- |
0 |
|
- |
6.1, 7.3, 9.1, 9.4.2,Table-1(Minimum Discharge, l/min) |
- |
0 |
|
- |
6.1, 7.3, 9.1, 9.4.2, Table-1(Type 1 Motor Wattage) |
- |
0 |
|
- |
6.1, 7.3, 9.1, 9.4.2, Table-1(Type 2 Motor Wattage) |
- |
0 |
|
- |
6.1, 7.3, 9.1, 9.4.2, Table-2(Motor Wattage) |
- |
0 |
|
- |
6.1, 7.3, 9.1,9.4.2, Table-2(Minimum Discharge Head, Hd) |
- |
0 |
|
- |
6.1, 7.3, 9.1, 9.4.2,Table-2(Discharge Measurement Height, h) |
- |
0 |
|
- |
6.1, 7.3, 9.1, 9.4.2, Table-2(Minimum, Discharge*) |
- |
0 |
|
- |
8(GENERAL REQUIREMENTS) |
- |
0 |
|
- |
9.2(Tests on motor) |
- |
0 |
|
- |
9.3(Water Requirement) |
- |
0 |
|
- |
9.4.1(Reliability Tests) |
- |
0 |
|
- |
9.4.3(Ingress protection test) |
- |
0 |
|
- |
9.4.6(Dry Run Test) |
- |
0 |
|
- |
9.5(Routine Test) |
- |
0 |
|
- |
9.6(Type Test) |
- |
0 |
|
- |
9.7(Leakage current and electric strength at operating temperature) |
- |
0 |
|
- |
9.7(Moisture resistance) |
- |
0 |
|
- |
9.7(Leakage current and electric strength) |
- |
0 |
|
- |
|
Complete
|
|
20 Jun, 2025 |
Included w.e.f 02.09.2024 |
10 |
IS 16270 (2023) |
Secondary cells and batteries for solar photovoltaic application - General requirements and methods of test |
upto 120V/200A, upto 18V/500A |
-
|
2320000 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
Cl-4.1(Photovoltaic Energy System) |
- |
0 |
|
- |
Cl-4.2(Secondary Cells and Batteries) |
- |
0 |
|
- |
Cl-4.3(General Operating Conditions) |
- |
0 |
|
- |
Cl-4.3.8(Storage) |
- |
0 |
|
- |
Cl-4.3.9(Operating Temperature) |
- |
0 |
|
- |
Cl-5.1(Mechanical Endurance) |
- |
0 |
|
- |
Cl-5.2(Charge Efficiency) |
- |
0 |
|
- |
Cl-5.3(Deep Discharge Protection) |
- |
0 |
|
- |
Cl-5.4(Marking) |
- |
5000 |
|
- |
Cl-5.5(Safety) |
- |
2500 |
|
- |
Cl-5.6(Documentation) |
- |
2500 |
|
- |
Cl-6(Functional characteristice) |
- |
0 |
|
- |
Cl-7(General test conditions) |
- |
0 |
|
- |
Cl-8.1(Capacity Test) |
- |
80000 |
|
Rs. 40000/ for upto 250AH, Rs.50000 for > 250 to 500AH, Rs. 60000 for > 500 to 1000AH, Rs. 80000 for > 1000 to 2500AH |
Cl-8.2(Endurance Test) |
- |
630000 |
|
Rs. 315000/ for upto 250AH, Rs.383750 for > 250 to 500AH, Rs. 472500 for > 500 to 1000AH, Rs. 630000 for > 1000 to 2500AH |
Cl-8.3(Charge Retention Test) |
- |
200000 |
|
Rs. 100000/ for upto 250AH, Rs.125000 for > 250 to 500AH, Rs. 150000 for > 500 to 1000AH, Rs. 200000 for > 1000 to 2500AH |
Cl-8.4(Cycle Endurance in Photovoltaic Application (Extreme Conditions)) |
- |
1200000 |
|
Rs. 600000/ for upto 250AH, Rs.750000 for > 250 to 500AH, Rs. 900000 for > 500 to 1000AH, Rs. 1200000 for > 1000 to 2500AH |
Cl-8.5(Sulphation Test (Applicable for Lead Acid Batteries only)) |
- |
60000 |
|
Rs. 30000/ for upto 250AH, Rs.40000 for > 250 to 500AH, Rs. 45000 for > 500 to 1000AH, Rs. 60000 for > 1000 to 2500AH |
Cl-8.6(Water Loss Test (Valid for Flooded Lead Acid Batteries only)) |
- |
140000 |
|
Rs. 70000/ for upto 250AH, Rs. 87500 for > 250 to 500AH, Rs. 105000 for > 500 to 1000AH, Rs. 140000 for > 1000 to 2500AH |
Cl-9.1(Type Tests) |
- |
2320000 |
|
Only for type test as per cl. 9.1 |
Cl-9.2(Acceptance Test) |
- |
85000 |
|
Only for acceptance test as per cl .9.2 |
Cl-4.1(Photovoltaic Energy System) |
- |
0 |
|
- |
Cl-4.2(Secondary Cells and Batteries) |
- |
0 |
|
- |
Cl-4.3(General Operating Conditions) |
- |
0 |
|
- |
Cl-4.3.8(Storage) |
- |
0 |
|
- |
Cl-4.3.9(Operating Temperature) |
- |
0 |
|
- |
Cl-5.1(Mechanical Endurance) |
- |
0 |
|
- |
Cl-5.2(Charge Efficiency) |
- |
0 |
|
- |
Cl-5.3(Deep Discharge Protection) |
- |
0 |
|
- |
Cl-5.4(Marking) |
- |
0 |
|
- |
Cl-5.5(Safety) |
- |
0 |
|
- |
Cl-5.6(Documentation) |
- |
0 |
|
- |
Cl-6(Functional characteristice) |
- |
0 |
|
- |
Cl-7(General test conditions) |
- |
0 |
|
- |
Cl-8.1(Capacity Test) |
- |
0 |
|
- |
Cl-8.2(Endurance Test) |
- |
0 |
|
- |
Cl-8.3(Charge Retention Test) |
- |
0 |
|
- |
Cl-8.4(Cycle Endurance in Photovoltaic Application (Extreme Conditions)) |
- |
0 |
|
- |
Cl-8.5(Sulphation Test (Applicable for Lead Acid Batteries only)) |
- |
0 |
|
- |
Cl-8.6(Water Loss Test (Valid for Flooded Lead Acid Batteries only)) |
- |
0 |
|
- |
Cl-9.1(Type Tests) |
- |
0 |
|
- |
Cl-9.2(Acceptance Test) |
- |
0 |
|
- |
|
Complete
|
|
20 Jun, 2025 |
Included w.e.f. 27.08.2024 |
11 |
IS 302 : Part 2 : Sec 7 (2024) |
Safety of Household And Similar Electrical Appliances Part 2 Particular Requirements Section 7: Domestic Electric Clothes Washing Machines |
- |
-
|
130000 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
4(GENERAL REQUIREMENT) |
- |
0 |
|
- |
6(CLASSIFICATION) |
- |
0 |
|
- |
7(MARKING AND INSTRUCTIONS) |
- |
1000 |
|
- |
8(PROTECTION AGAINST ACCESS TO LIVE PARTS) |
- |
2000 |
|
- |
10(POWER INPUT AND CURRENT) |
- |
5000 |
|
- |
11(HEATING) |
- |
5000 |
|
- |
13(LEAKAGE CURRENT AND ELECTRIC STRENGTH AT OPERATING TEMPERATURE) |
- |
3000 |
|
- |
14(TRANSIENT OVERVOLTAGES) |
- |
2000 |
|
- |
15(MOISTURE RESISTANCE) |
- |
6000 |
|
- |
16(LEAKAGE CURRENT AND ELECTRIC STRENGTH) |
- |
3000 |
|
- |
17("OVERLOAD PROTECTION OF
TRANSFORMERS AND ASSOCIATED CIRCUITS ") |
- |
2000 |
|
- |
17("OVERLOAD PROTECTION OF
TRANSFORMERS AND ASSOCIATED CIRCUITS ") |
- |
0 |
|
- |
18(ENDURANCE) |
- |
10000 |
|
- |
19(ABNORMAL OPERATION) |
- |
5000 |
|
- |
19.11.4.1(Electrostatic discharges) |
- |
5000 |
|
- |
19.11.4.2(Radiated fields) |
- |
20000 |
|
- |
19.11.4.3(Fast transient bursts) |
- |
5000 |
|
- |
19.11.4.4(Surge immunity test) |
- |
5000 |
|
- |
19.11.4.5(Immunity to conducted discharges) |
- |
10000 |
|
- |
19.11.4.6(Class 3 Voltage dips and interruptions) |
- |
5000 |
|
- |
19.11.4.7(Harmonics) |
- |
5000 |
|
- |
20(STABILITY AND MECHANICAL HAZARDS) |
- |
1000 |
|
- |
21(MECHANICAL STRENGTH) |
- |
5000 |
|
- |
22(CONSTRUCTION) |
- |
5000 |
|
- |
23(INTERNAL WIRING) |
- |
1000 |
|
- |
24(COMPONENTS) |
- |
5000 |
|
- |
25(SUPPLY CONNECTION AND EXTERNAL FLEXIBLE CORDS) |
- |
2000 |
|
- |
26(TERMINALS FOR EXTERNAL CONDUCTORS) |
- |
2000 |
|
- |
27(PROVISION FOR EARTHING) |
- |
2000 |
|
- |
28(SCREWS AND CONNECTIONS) |
- |
1000 |
|
- |
29(CLEARANCES, CREEPAGE DISTANCES AND SOLID INSULATION) |
- |
2000 |
|
- |
30(RESISTANCE TO HEAT AND FIRE) |
- |
3000 |
|
- |
31(RESISTANCE TO RUSTING) |
- |
2000 |
|
- |
4(GENERAL REQUIREMENT) |
- |
0 |
|
- |
6(CLASSIFICATION) |
- |
0 |
|
- |
7(MARKING AND INSTRUCTIONS) |
- |
0 |
|
- |
8(PROTECTION AGAINST ACCESS TO LIVE PARTS) |
- |
0 |
|
- |
10(POWER INPUT AND CURRENT) |
- |
0 |
|
- |
11(HEATING) |
- |
0 |
|
- |
13(LEAKAGE CURRENT AND ELECTRIC STRENGTH AT OPERATING TEMPERATURE) |
- |
0 |
|
- |
14(TRANSIENT OVERVOLTAGES) |
- |
0 |
|
- |
15(MOISTURE RESISTANCE) |
- |
0 |
|
- |
16(LEAKAGE CURRENT AND ELECTRIC STRENGTH) |
- |
0 |
|
- |
17("OVERLOAD PROTECTION OF
TRANSFORMERS AND ASSOCIATED CIRCUITS ") |
- |
0 |
|
- |
17("OVERLOAD PROTECTION OF
TRANSFORMERS AND ASSOCIATED CIRCUITS ") |
- |
0 |
|
- |
18(ENDURANCE) |
- |
0 |
|
- |
19(ABNORMAL OPERATION) |
- |
0 |
|
- |
19.11.4.1(Electrostatic discharges) |
- |
0 |
|
- |
19.11.4.2(Radiated fields) |
- |
0 |
|
- |
19.11.4.3(Fast transient bursts) |
- |
0 |
|
- |
19.11.4.4(Surge immunity test) |
- |
0 |
|
- |
19.11.4.5(Immunity to conducted discharges) |
- |
0 |
|
- |
19.11.4.6(Class 3 Voltage dips and interruptions) |
- |
0 |
|
- |
19.11.4.7(Harmonics) |
- |
0 |
|
- |
20(STABILITY AND MECHANICAL HAZARDS) |
- |
0 |
|
- |
21(MECHANICAL STRENGTH) |
- |
0 |
|
- |
22(CONSTRUCTION) |
- |
0 |
|
- |
23(INTERNAL WIRING) |
- |
0 |
|
- |
24(COMPONENTS) |
- |
0 |
|
- |
25(SUPPLY CONNECTION AND EXTERNAL FLEXIBLE CORDS) |
- |
0 |
|
- |
26(TERMINALS FOR EXTERNAL CONDUCTORS) |
- |
0 |
|
- |
27(PROVISION FOR EARTHING) |
- |
0 |
|
- |
28(SCREWS AND CONNECTIONS) |
- |
0 |
|
- |
29(CLEARANCES, CREEPAGE DISTANCES AND SOLID INSULATION) |
- |
0 |
|
- |
30(RESISTANCE TO HEAT AND FIRE) |
- |
0 |
|
- |
31(RESISTANCE TO RUSTING) |
- |
0 |
|
- |
4(GENERAL REQUIREMENT) |
- |
0 |
|
- |
6(CLASSIFICATION) |
- |
0 |
|
- |
7(MARKING AND INSTRUCTIONS) |
- |
0 |
|
- |
8(PROTECTION AGAINST ACCESS TO LIVE PARTS) |
- |
0 |
|
- |
10(POWER INPUT AND CURRENT) |
- |
0 |
|
- |
11(HEATING) |
- |
0 |
|
- |
13(LEAKAGE CURRENT AND ELECTRIC STRENGTH AT OPERATING TEMPERATURE) |
- |
0 |
|
- |
14(TRANSIENT OVERVOLTAGES) |
- |
0 |
|
- |
15(MOISTURE RESISTANCE) |
- |
0 |
|
- |
16(LEAKAGE CURRENT AND ELECTRIC STRENGTH) |
- |
0 |
|
- |
17("OVERLOAD PROTECTION OF
TRANSFORMERS AND ASSOCIATED CIRCUITS ") |
- |
0 |
|
- |
17("OVERLOAD PROTECTION OF
TRANSFORMERS AND ASSOCIATED CIRCUITS ") |
- |
0 |
|
- |
18(ENDURANCE) |
- |
0 |
|
- |
19(ABNORMAL OPERATION) |
- |
0 |
|
- |
19.11.4.1(Electrostatic discharges) |
- |
0 |
|
- |
19.11.4.2(Radiated fields) |
- |
0 |
|
- |
19.11.4.3(Fast transient bursts) |
- |
0 |
|
- |
19.11.4.4(Surge immunity test) |
- |
0 |
|
- |
19.11.4.5(Immunity to conducted discharges) |
- |
0 |
|
- |
19.11.4.6(Class 3 Voltage dips and interruptions) |
- |
0 |
|
- |
19.11.4.7(Harmonics) |
- |
0 |
|
- |
20(STABILITY AND MECHANICAL HAZARDS) |
- |
0 |
|
- |
21(MECHANICAL STRENGTH) |
- |
0 |
|
- |
22(CONSTRUCTION) |
- |
0 |
|
- |
23(INTERNAL WIRING) |
- |
0 |
|
- |
24(COMPONENTS) |
- |
0 |
|
- |
25(SUPPLY CONNECTION AND EXTERNAL FLEXIBLE CORDS) |
- |
0 |
|
- |
26(TERMINALS FOR EXTERNAL CONDUCTORS) |
- |
0 |
|
- |
27(PROVISION FOR EARTHING) |
- |
0 |
|
- |
28(SCREWS AND CONNECTIONS) |
- |
0 |
|
- |
29(CLEARANCES, CREEPAGE DISTANCES AND SOLID INSULATION) |
- |
0 |
|
- |
30(RESISTANCE TO HEAT AND FIRE) |
- |
0 |
|
- |
31(RESISTANCE TO RUSTING) |
- |
0 |
|
- |
19.13(ABNORMAL OPERATION) |
- |
0 |
|
- |
19.101(Abnormal Operation) |
- |
0 |
|
- |
19.102(Abnormal Operation) |
- |
0 |
|
- |
|
Complete
|
|
20 Jun, 2025 |
Included w.e.f. 03.05.2024
Exclusion: CL.24 (COMPONENTS) |
12 |
IS 17681 (2022) |
Specification for Bottled water dispensers |
- |
-
|
240000 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
4(Construction) |
- |
0 |
|
Charges added subcluases |
4.1(General Design) |
- |
500 |
|
- |
4.3(Finish) |
- |
500 |
|
- |
4.4(Thermal Insulation) |
- |
500 |
|
- |
4.5(Hardware) |
- |
500 |
|
- |
4.6(Disposal of Waste Water) |
- |
500 |
|
- |
4.7(Hot Water Tank) |
- |
500 |
|
- |
4.8(Hermetically Sealed Compressor) |
- |
500 |
|
- |
4.9(Protective Guards) |
- |
500 |
|
- |
5(Refrigeration System) |
- |
0 |
|
Charges added subcluases |
5.1(Pipes and Connections/Fitting) |
- |
500 |
|
- |
5.2(Control of Operation) |
- |
500 |
|
- |
6.1(General) |
- |
1000 |
|
- |
6.1(Protection against electric shock (Cl. 8 of IS 302-2-24)) |
- |
3000 |
|
- |
6.1(Power Input & Current (Cl. 10 of IS 302-2-24)) |
- |
5000 |
|
- |
6.1(Temperature Rise/ Heating (Cl. 11 of IS 302-2-24)) |
- |
6000 |
|
- |
6.1("Insulation Resistance and Electric Strength/ Leakage Current and Electric Strength
(Cl. 13 of IS 302-2-24)") |
- |
5000 |
|
- |
6.1("Moisture Resistance
(Cl. 15 of IS 302-2-24)") |
- |
12000 |
|
- |
6.1("Insulation resistance and electric strength
(After humidity treatment)
(Cl. 16 of IS 302-2-24)") |
- |
5000 |
|
- |
6.1("Provision For Earthing
(Cl. 27 of IS 302-2-24)") |
- |
3000 |
|
- |
6.1("Screws & Connections
(Cl. 28 of IS 302-2-24)") |
- |
3000 |
|
- |
6.2(Electrical Accessories) |
- |
1000 |
|
- |
6.3(Salt Mist Test) |
- |
25000 |
|
- |
7(Sound pressure level) |
- |
15000 |
|
- |
10.1(Cooling Capacity Test) |
- |
20000 |
|
- |
10.2(Maximum Operating Condition Test (Environmental)) |
- |
15000 |
|
- |
10.3(Maximum Operating Condition Test (Voltage)) |
- |
15000 |
|
- |
10.4(Heating Capacity Test) |
- |
20000 |
|
- |
10.5(Annual Energy Consumption Test) |
- |
30000 |
|
- |
10.6(Freeze-up Test) |
- |
20000 |
|
- |
10.7(Door Opening and Closing Test) |
- |
10000 |
|
- |
10.8(Door Seal Test) |
- |
3000 |
|
- |
10.9(Pull-down Test) |
- |
15000 |
|
- |
11(Marking and instruction) |
- |
2000 |
|
- |
4.2(Materials) |
- |
1000 |
|
- |
|
Complete
|
|
20 Jun, 2025 |
Included w.e.f. 19.03.2024 |
13 |
IS 1475 : Part 1 (2001) |
Self - Contained drinking water coolers - Specification: Part 1 energy consumption and performance (Third Revision) |
- |
-
|
24700 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
6.1(COMPONENTS AND THEIR MATERIALS) |
- |
100 |
|
- |
6.2(COMPONENTS AND THEIR MATERIALS) |
- |
100 |
|
- |
6.3(COMPONENTS AND THEIR MATERIALS) |
- |
100 |
|
- |
6.4(COMPONENTS AND THEIR MATERIALS) |
- |
100 |
|
- |
6.5(COMPONENTS AND THEIR MATERIALS) |
- |
100 |
|
- |
6.6(COMPONENTS AND THEIR MATERIALS) |
- |
100 |
|
- |
6.7(COMPONENTS AND THEIR MATERIALS) |
- |
100 |
|
- |
6.8(COMPONENTS AND THEIR MATERIALS) |
- |
100 |
|
- |
6.9(COMPONENTS AND THEIR MATERIALS) |
- |
100 |
|
- |
6.1(COMPONENTS AND THEIR MATERIALS) |
- |
100 |
|
- |
6.11(COMPONENTS AND THEIR MATERIALS) |
- |
100 |
|
- |
6.12(COMPONENTS AND THEIR MATERIALS) |
- |
100 |
|
- |
6.13(COMPONENTS AND THEIR MATERIALS) |
- |
100 |
|
- |
6.14(COMPONENTS AND THEIR MATERIALS) |
- |
100 |
|
- |
6.15(COMPONENTS AND THEIR MATERIALS) |
- |
100 |
|
- |
6.16(COMPONENTS AND THEIR MATERIALS) |
- |
100 |
|
- |
6.17(COMPONENTS AND THEIR MATERIALS) |
- |
100 |
|
- |
7.7.1(Insulation Resistance) |
- |
1000 |
|
- |
7.7.2(High Voltage Test) |
- |
1000 |
|
- |
7.7.3(Cooling capacity rating test) |
- |
8000 |
|
- |
7.7.4(Maximum operating conditions) |
- |
5000 |
|
- |
7.8.2(Performance test) |
- |
8000 |
|
- |
6.1(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
6.2(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
6.3(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
6.4(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
6.5(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
6.6(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
6.7(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
6.8(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
6.9(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
6.1(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
6.11(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
6.12(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
6.13(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
6.14(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
6.15(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
6.16(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
6.17(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
7.7.1(Insulation Resistance) |
- |
0 |
|
- |
7.7.2(High Voltage Test) |
- |
0 |
|
- |
7.7.3(Cooling capacity rating test) |
- |
0 |
|
- |
7.7.4(Maximum operating conditions) |
- |
0 |
|
- |
7.8.2(Performance test) |
- |
0 |
|
- |
6.1(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
6.2(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
6.3(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
6.4(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
6.5(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
6.6(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
6.7(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
6.8(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
6.9(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
6.1(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
6.11(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
6.12(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
6.13(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
6.14(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
6.15(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
6.16(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
6.17(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
7.7.1(Insulation Resistance) |
- |
0 |
|
- |
7.7.2(High Voltage Test) |
- |
0 |
|
- |
7.7.3(Cooling capacity rating test) |
- |
0 |
|
- |
7.7.4(Maximum operating conditions) |
- |
0 |
|
- |
7.8.2(Performance test) |
- |
0 |
|
- |
6.1(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
6.2(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
6.3(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
6.4(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
6.5(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
6.6(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
6.7(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
6.8(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
6.9(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
6.1(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
6.11(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
6.12(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
6.13(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
6.14(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
6.15(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
6.16(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
6.17(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
7.7.1(Insulation Resistance) |
- |
0 |
|
- |
7.7.2(High Voltage Test) |
- |
0 |
|
- |
7.7.3(Cooling capacity rating test) |
- |
0 |
|
- |
7.7.4(Maximum operating conditions) |
- |
0 |
|
- |
7.8.2(Performance test) |
- |
0 |
|
- |
|
Complete
|
|
20 Jun, 2025 |
Included w.e.f. 19.03.2024 |
14 |
IS 16333 : Part 3 (2022) |
Mobile phone handsets: Part 3 Indian language support for mobile phone handsets - Specific requirements(Second Revision) |
- |
-
|
40000 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
5.1(Inputting of text) |
- |
0 |
|
Included in clause 5 |
5.2(Message Readability) |
- |
0 |
|
Included in clause 5 |
6(Marking) |
- |
5000 |
|
- |
"Cl.6.1 "(Marking) |
- |
0 |
|
Included in clause 6 |
"Cl.6.2 "(BIS Certification Marking) |
- |
0 |
|
Included in clause 6 |
4(Requirements) |
- |
0 |
|
- |
5(Tests) |
- |
35000 |
|
- |
6(Marking) |
- |
0 |
|
- |
|
Complete
|
|
20 Jun, 2025 |
Included w.e.f. 19.03.2024 |
15 |
IS 302 : Part 2 : Sec 7 (2010) |
Safety of household and similar electrical appliances: Part 2 particular requirements: Sec 7 domestic electric clothes washing machines (First Revision) |
- |
-
|
130000 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
4(GENERAL REQUIREMENTS) |
- |
0 |
|
- |
5(GENERAL CONDITIONS FOR THE TESTS) |
- |
0 |
|
- |
6(Classification) |
- |
0 |
|
- |
7(Marking) |
- |
1000 |
|
- |
8(Protection against access to live parts) |
- |
2000 |
|
- |
9(Starting of Motor operated appliances) |
- |
0 |
|
Not applicable |
10(Power Input
& Current
) |
- |
5000 |
|
- |
11(Temperature Rise/ Heating) |
- |
5000 |
|
- |
13(Leakage Current and Electric Strength at Operating Temperature) |
- |
3000 |
|
- |
14(Transient Over Voltage) |
- |
2000 |
|
- |
15(Moisture Resistance) |
- |
6000 |
|
- |
16(Leakage Current and Electric Strength) |
- |
3000 |
|
- |
17(Overload Protection/ Overload Protection of Transformers & Associated Circuits) |
- |
2000 |
|
- |
18(Endurance) |
- |
10000 |
|
- |
19(Abnormal Operation) |
- |
5000 |
|
- |
20(Stability & Mechanical Hazards) |
- |
1000 |
|
- |
21(Mechanical strength) |
- |
5000 |
|
- |
22(Construction) |
- |
5000 |
|
- |
23(Internal wiring) |
- |
1000 |
|
- |
24(Components) |
- |
5000 |
|
- |
25(Supply Connection & External Flexible Cords) |
- |
2000 |
|
- |
26(Terminals For External Conductors) |
- |
2000 |
|
- |
27(Provision For Earthing) |
- |
2000 |
|
- |
28(Screws & Connections) |
- |
1000 |
|
- |
29(Clearances, Creepage Distances & Solid Insulation) |
- |
2000 |
|
- |
30(Resistance to Heat & Fire) |
- |
3000 |
|
- |
31(Resistance to Rusting) |
- |
1000 |
|
- |
32(Radiation ,Toxicity and similar hazards) |
- |
1000 |
|
- |
19.11.4.1(Electrostatic discharges) |
- |
5000 |
|
- |
19.11.4.2(Radiated fields) |
- |
20000 |
|
- |
19.11.4.3(Fast transient bursts) |
- |
5000 |
|
- |
19.11.4.4(Surge immunity test) |
- |
5000 |
|
- |
19.11.4.5(Immunity to conducted discharges) |
- |
10000 |
|
- |
19.11.4.6(Voltage dips and interruptions) |
- |
5000 |
|
- |
19.11.4.7(Harmonics) |
- |
5000 |
|
- |
|
Complete
|
|
20 Jun, 2025 |
Included w.e.f. 19.03.2024
Exclusion: CL.24 (COMPONENTS), Cl.19.11.4.1 (Electrostatic discharges), Cl.19.11.4.2 (Radiated fields), Cl.19.11.4.3 (Fast transient bursts), Cl.19.11.4.4 (Surge immunity test), Cl.19.11.4.5 (Immunity to conducted discharges), Cl.19.11.4.6 (Class 3 Voltage dips and interruptions), Cl.19.11.4.7 (Harmonics) |
16 |
IS 1391 : Part 2 (2023) |
Room Air Conditioners Specification Part 2 Split Air Conditioners Fourth Revision |
Upto 20kW |
-
|
650000 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
5(Construction )("The air conditioner and its parts shall be
constructed with the strength and rigidity adequate
for normal conditions of handling, transport, and
usage.") |
- |
1000 |
|
For Clause 5.1 only |
5.2((Electrically Charged Parts)) |
- |
1000 |
|
- |
5.3((Refrigerant Circuit)) |
- |
1000 |
|
- |
5.4((Provision for Earthing)) |
- |
1000 |
|
- |
5.5((Air Filter)) |
- |
3000 |
|
- |
5.6((Temperature Sensing Controls)) |
- |
1000 |
|
- |
5.7((Hermetic Compressors)) |
- |
1000 |
|
- |
5.8((Heat Exchanger)) |
- |
1000 |
|
- |
5.9((Motors)) |
- |
10000 |
|
This Testing charges is appilcable for the test specified in this clause only (Input and speed test). For other test as per IS 996 additional charges will be applicable, if required. |
6((RATING REQUIREMENTS)) |
- |
0 |
|
- |
7(RATINGS BASED ON FUNCTION) |
- |
0 |
|
- |
8(RATING AND TEST CONDITIONS) |
- |
0 |
|
- |
8.1(Cooling Test) |
- |
0 |
|
- |
8.1.2((Maximum Operating Test Conditions)) |
- |
0 |
|
- |
8.1.3((Freeze-Up Test Conditions)) |
- |
0 |
|
- |
8.1.4((Enclosure Sweat Test Conditions)) |
- |
0 |
|
- |
8.2((Heating Test)) |
- |
0 |
|
- |
8.2.1((Heating Capacity Test Conditions)) |
- |
0 |
|
- |
"8.2.2((Heating by Heat Pump Overload Rating Test Conditions (Maximum Heating Performance Test))") |
- |
0 |
|
- |
"8.3((Method of Measurement of Indian Seasonal
Energy Efficiency Ratio (ISEER))") |
- |
0 |
|
- |
9((PERFORMANCE REQUIREMENTS)) |
- |
0 |
|
- |
9.1((Variations Allowed in Performance Test Conditions)) |
- |
0 |
|
- |
9.2((Safety)) |
- |
0 |
|
Charges included in clasue 12.3.3 |
9.3((Power Factor Test)) |
- |
10000 |
|
- |
9.4((Maximum Operating Conditions Test)) |
- |
80000 |
|
- |
9.5((Freeze-Up Tests)) |
- |
0 |
|
Charges included in clause 9.5.3&9.5.4 |
9.5.3((Air Blockage Test)) |
- |
30000 |
|
- |
9.5.4(( Drip Test)) |
- |
30000 |
|
- |
9.6((Enclosure Sweat Test)) |
- |
30000 |
|
- |
9.7((Power Consumption Test for Cooling)) |
- |
20000 |
|
- |
9.8((Power Consumption Test for Heating by Heat Pump)) |
- |
20000 |
|
- |
9.9(( Cooling Capacity Test)) |
- |
110000 |
|
- |
9.10((Heating Capacity Test)) |
- |
110000 |
|
- |
"9.11((Method of Measurement of Indian Seasonal
Energy Efficiency Ratio (ISEER))") |
- |
45000 |
|
- |
9.12((Maximum Heating Performance Test)) |
- |
80000 |
|
- |
9.13((Sound Pressure Test)) |
- |
40000 |
|
- |
10((CALCULATIONS)) |
- |
0 |
|
- |
11((INSTRUMENTS)) |
- |
0 |
|
- |
12.1((Classification of Tests)) |
- |
0 |
|
- |
12.2.1((General Running Test)) |
- |
10000 |
|
- |
12.2.2(( Leakage Test)) |
- |
10000 |
|
- |
12.2.3((High Voltage Test)) |
- |
10000 |
|
- |
12.2.4(Leakage Current Test)) |
- |
10000 |
|
- |
"12.2.5(Provisions for Earthing (Earth Resistance
Test)") |
- |
10000 |
|
- |
12.3.3(Safety Tests) |
- |
20000 |
|
- |
12.4(Acceptance Test) |
- |
0 |
|
Testing charges will be applicable as given for type or routine test, if required. |
12.4.1(Performance Test) |
- |
0 |
|
Testing charges will be applicable as given for type or routine test, if required. |
12.4.2(Pressure Test or Leakage Test) |
- |
0 |
|
Testing charges will be applicable as given for type or routine test, if required. |
12.4.3(Leakage Current Test) |
- |
0 |
|
Testing charges will be applicable as given for type or routine test, if required. |
13(MARKING) |
- |
5000 |
|
- |
|
Complete
|
|
20 Jun, 2025 |
- |
17 |
IS 1391 : Part 1 (2023) |
Room Air Conditioners Specification Part 1 Unitary Air Conditioners Fourth Revision |
Capacity upto 20kW |
-
|
550000 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
5((CONSTRUCTION )) |
- |
1000 |
|
For cl. 5.1 only |
5.2((Electrically Charged Parts)) |
- |
1000 |
|
- |
5.3((Refrigerant Circuit)) |
- |
1000 |
|
- |
5.4((Provision for Earthing)) |
- |
1000 |
|
- |
5.5((Air Filter)) |
- |
2000 |
|
- |
5.6((Temperature Sensing Controls)) |
- |
1000 |
|
- |
5.7((Hermetic Compressors)) |
- |
1000 |
|
- |
5.8((Heat Exchanger)) |
- |
1000 |
|
- |
5.9((Motors)) |
- |
10000 |
|
This testing charges is applicable for the Test specified in this clause (Input power and speed test). For other test as per IS 996 separate charges will be applicable. |
5.10(Drain Plug) |
- |
1000 |
|
- |
6(RATING REQUIREMENTS) |
- |
0 |
|
- |
7(RATINGS BASED ON FUNCTION) |
- |
0 |
|
- |
8(RATING AND TEST CONDITIONS) |
- |
0 |
|
- |
8.1(Cooling Test) |
- |
0 |
|
- |
8.1.2((Maximum Operating Test Conditions)) |
- |
0 |
|
- |
8.1.3((Freeze-Up Test Conditions)) |
- |
0 |
|
- |
8.1.4((Enclosure Sweat Test Conditions)) |
- |
0 |
|
- |
8.1.5((Condensate Disposal Test Conditions)) |
- |
0 |
|
- |
8.2((Heating Test)) |
- |
0 |
|
- |
8.2.1((Heating Capacity Test Conditions)) |
- |
0 |
|
- |
"8.2.2((Heating by Heat Pump Overload Rating Test Conditions (Maximum Heating Performance Test))") |
- |
0 |
|
- |
"8.3((Method of Measurement of Indian Seasonal Energy Efficiency Ratio (ISEER))") |
- |
0 |
|
- |
9((PERFORMANCE REQUIREMENTS)) |
- |
0 |
|
- |
9.1(Variations Allowed in Performance Test Conditions) |
- |
0 |
|
- |
9.2(Safety) |
- |
0 |
|
Testing charges included in clasue 12.3.3 |
9.3(Power Factor Test) |
- |
10000 |
|
- |
9.4(Maximum Operating Conditions Test) |
- |
50000 |
|
- |
9.5(Freeze-Up Tests) |
- |
0 |
|
Testing charges included in clause 9.5.3 & 9.5.4. |
9.5.3(Air Blockage Test) |
- |
30000 |
|
- |
9.5.4(Drip Test) |
- |
30000 |
|
- |
9.6(Enclosure Sweat Test) |
- |
30000 |
|
- |
9.7(Condensate Disposal Test) |
- |
40000 |
|
- |
9.8(Power Consumption Test for Cooling) |
- |
20000 |
|
- |
9.9(Power Consumption Test for Heating by Heat Pump) |
- |
20000 |
|
- |
9.10(Cooling Capacity Test) |
- |
75000 |
|
- |
9.11(Heating Capacity Test) |
- |
75000 |
|
- |
"9.12(Method of Measurement of Indian Seasonal Energy Efficiency Ratio (ISEER)") |
- |
45000 |
|
- |
9.13(Maximum Heating Performance Test) |
- |
50000 |
|
- |
9.14(Sound Pressure Test) |
- |
30000 |
|
- |
10(CALCULATIONS) |
- |
0 |
|
- |
11(INSTRUMENTS) |
- |
0 |
|
- |
12.1(Classification of Tests) |
- |
0 |
|
- |
12.2.1(General Running Test) |
- |
10000 |
|
- |
12.2.2(Leakage Test) |
- |
10000 |
|
- |
12.2.3(High Voltage Test) |
- |
10000 |
|
- |
12.2.4(Leakage Current Test) |
- |
10000 |
|
- |
"12.2.5(Provisions for Earthing (Earth Resistance Test)") |
- |
10000 |
|
- |
12.3.3(Safety Tests) |
- |
20000 |
|
- |
12.4(Acceptance Test) |
- |
0 |
|
- |
12.4.1(Performance Test) |
- |
0 |
|
Testing charges will be applicable as given for Type or routine test, if required. |
12.4.2(Pressure Test or Leakage Test) |
- |
0 |
|
Testing charges will be applicable as given for Type or routine test, if required. |
12.4.3(Leakage Current Test) |
- |
0 |
|
Testing charges will be applicable as given for Type or routine test, if required. |
13(MARKING) |
- |
5000 |
|
- |
5.9 (Motors)() |
- |
0 |
|
- |
|
Complete
|
|
20 Jun, 2025 |
Included w.e.f. 08.02.2024 upto 20kW |
18 |
IS 302 : Part 2 : Sec 15 (2009) |
Safety of household and similar electrical appliances: Part 2 particular requirements: Sec 15 appliances for heating liquids (First Revision) |
- |
-
|
71237 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
6.0(Classification) |
- |
0 |
|
- |
7(Marking and instructions) |
- |
2000 |
|
- |
8(Protection against live parts) |
- |
2000 |
|
- |
10(POWER INPUT AND CURRENT) |
- |
2000 |
|
- |
11(HEATING) |
- |
4000 |
|
- |
13(LEAKAGE CURRENT AND ELECTRIC STRENGTH AT OPERATING TEMPERATURE) |
- |
3000 |
|
- |
14(TRANSIENT OVERVOLTAGES) |
- |
2000 |
|
- |
15(MOISTURE RESISTANCE) |
- |
3000 |
|
- |
16(LEAKAGE CURRENT AND ELECTRIC STRENGTH) |
- |
3000 |
|
- |
17(OVERLOAD PROTECTION OF TRANSFORMERS AND ASSOCIATED CIRCUITS) |
- |
5000 |
|
- |
19(ABNORMAL OPERATION) |
- |
6000 |
|
Charges applicable excluding the test of Cl.19.11.4.1 to Cl.19.11.4.7. The testing charges for EMI/EMC Testing (Cl.19.11.4.1 to Cl.19.11.4.7) will be charged extra. |
20(STABILITY AND MECHANICAL HAZARDS) |
- |
2000 |
|
- |
21(MECHANICAL STRENGTH) |
- |
2000 |
|
- |
22(CONSTRUCTION) |
- |
5000 |
|
- |
23(INTERNAL WIRING) |
- |
2000 |
|
- |
24(COMPONENTS) |
- |
3000 |
|
Above charges applicable excluding the test of clauses mentioned in the list of exclusions. |
25(SUPPLY CONNECTION AND EXTERNAL FLEXIBLE CORDS) |
- |
2000 |
|
- |
26(TERMINALS FOR EXTERNAL CONDUCTORS) |
- |
1000 |
|
- |
27(PROVISION FOR EARTHING) |
- |
2000 |
|
- |
28(SCREWS AND CONNECTIONS) |
- |
1000 |
|
- |
29(CLEARANCES, CREEPAGE DISTANCES AND SOLID INSULATION) |
- |
2000 |
|
- |
30(RESISTANCE TO HEAT AND FIRE) |
- |
3000 |
|
- |
31(RESISTANCE TO RUSTING) |
- |
1000 |
|
- |
32(RADIATION, TOXICITY AND SIMILAR HAZARDS) |
- |
1000 |
|
- |
19.11.4.1(Electrostatic discharges) |
- |
5000 |
|
-- |
19.11.4.2(Radiated fields) |
- |
20000 |
|
-- |
19.11.4.3(Fast transient bursts) |
- |
5000 |
|
-- |
19.11.4.4(Surge immunity test) |
- |
5000 |
|
-- |
19.11.4.5(Injected currents) |
- |
10000 |
|
-- |
19.11.4.6(Class 3 Voltage dips and interruptions) |
- |
5000 |
|
-- |
19.11.4.7(Harmonics) |
- |
5000 |
|
-- |
|
Complete
|
|
20 Jun, 2025 |
Excluding following tests: EMC Tests (ESD, Radiated Fields, EFT, Surge, Conducted Immunity, Dips & Interruption, Harmonics & Interharmonics) (Cl. 19.11.4.1 to 19.11.4.7), Capacitor Test (Cl. 24.1.1), Switching Cycle Operation Test (Cl. 24.1.3), Automatic Control Cycle Operation Test (Cl. 24.1.4), Appliance Coupler and Interconnection Coupler Test (Cl. 24.1.5), Lamp Holder Test (Cl. 24.1.6), Capacitor in Auxiliary Winding of Motor Test (Cl. 24.5), and Motors Basic Insulation Test (Cl. 24.6). |
19 |
IS 302 : Part 2 : Sec 21 (2018) |
Safety of household and similar electrical appliances: Part 2 particular requirements: Sec 21 stationary storage type electric water heaters (Second Revision) |
- |
-
|
71875 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
7.0(Marking and Instructions) |
- |
1000 |
|
- |
6.0(Classification) |
- |
0 |
|
- |
8.0(Protection against access to live parts) |
- |
2000 |
|
- |
10.0(Input and Current) |
- |
5000 |
|
- |
11.0(Heating) |
- |
6000 |
|
- |
13.0(Leakage Current and electric strength at operating temperature) |
- |
3000 |
|
- |
14.0(Transient Overvoltage) |
- |
2000 |
|
- |
15.0(Moisture resistance) |
- |
3000 |
|
- |
16.0(Leakage current and Electric strength (After Humidity (Environmental) Treatment)) |
- |
3000 |
|
- |
17.0(Overload Protection of transformer and associated circuit) |
- |
2000 |
|
- |
19.0(Abnormal Operation) |
- |
10000 |
|
Charges applicable excluding the test of Cl.19.11.4.1 to Cl.19.11.4.7. The testing charges for EMI/EMC Testing (Cl.19.11.4.1 to Cl.19.11.4.7) will be charged extra. |
20.0(Stability and mechanical hazards) |
- |
1000 |
|
- |
21.0(Mechanical Strength) |
- |
5000 |
|
- |
22.0(Construction) |
- |
5000 |
|
- |
23.0(Internal Wiring) |
- |
1000 |
|
- |
25.0(Supply Connection and External Flexible Cords) |
- |
3000 |
|
- |
26.0(Terminals for external conductors) |
- |
2000 |
|
- |
27.0(Provision For Earthing) |
- |
2000 |
|
- |
28.0(Screws and Connections) |
- |
1000 |
|
- |
29.0(Creepage Distances and Clearances) |
- |
2000 |
|
- |
30.0(Resistance To Heat and Fire) |
- |
4000 |
|
- |
31.0(Resistance To Rusting) |
- |
1000 |
|
- |
19.11.4.1(Electrostatic discharges) |
- |
5000 |
|
-- |
19.11.4.2(Radiated fields) |
- |
20000 |
|
-- |
19.11.4.3(Fast transient bursts) |
- |
5000 |
|
-- |
19.11.4.4(Surge immunity test) |
- |
5000 |
|
-- |
19.11.4.5(Immunity to conducted discharges) |
- |
10000 |
|
-- |
19.11.4.6(Class 3 Voltage dips and interruptions) |
- |
5000 |
|
-- |
19.11.4.7(Harmonics) |
- |
5000 |
|
-- |
|
Complete
|
|
20 Jun, 2025 |
INCLUDED W.E.F. 7-7-2021. Exclusion: EMI/EMC (Cl.19.11.4.1 to 19.11.4.7), capacitor test (Cl.24.1.1), switching cycle operation test (Cl.24.1.3), automatic control cycle operation (Cl.24.1.4), Appliance coupler and interconnection coupler test (Cl.24.1.5), Lamp holder test (Cl.24.1.6), capacitor in auxiliary winding of motor test (cl.24.5), motors basic insulation test (Cl.24.6) |
20 |
IS 302 : Part 2 : Sec 9 (2009) |
Safety of household and similar electrical appliances: Part 2 particular requirements: Sec 9 toasters, grills, roasters and similar appliances (First Revision) |
- |
-
|
72617 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
7.1 to 7.13, 7.15, 7.16(Marking) |
- |
1000 |
|
- |
7.14(Legibility & Durability of Markings test) |
- |
0 |
|
Testing charges already included in 7.1 |
8.1, 8.1.1 & 8.2(Protection against access to live parts) |
- |
2000 |
|
- |
8.1.2(Protection against access to live parts) |
- |
0 |
|
Testing charges already included in 8.1 |
8.1.3(Protection against access to live parts) |
- |
0 |
|
Testing charges already included in 8.1 |
8.1.4(Protection against access to live parts) |
- |
0 |
|
Testing charges already included in 8.1 |
8.1.5(Protection against access to live parts) |
- |
0 |
|
Testing charges already included in 8.1 |
10.1 & 10.2 -Table No. 1, Table No. 2(Power Input and Current) |
- |
5000 |
|
- |
11.1 to 11.8, Table No.-3(Heating) |
- |
6000 |
|
- |
11.101(Heating) |
- |
0 |
|
Testing charges already included in 11.1 |
13.1, 13.2(Leakage current test) |
- |
3000 |
|
- |
13.1, 13.2(Leakage current test) |
- |
0 |
|
Testing charges already included in 13.1 |
13.3 and Table No.- 4(Electric strength test) |
- |
0 |
|
Testing charges already included in 13.1 |
14, Table No.- 6 & Table No.-16(Transient over voltages) |
- |
2000 |
|
- |
15.1(Moisture resistance) |
- |
3000 |
|
- |
15.2(Moisture resistance) |
- |
0 |
|
Testing charges already included in 15.1 |
15.2(Moisture resistance) |
- |
0 |
|
Testing charges already included in 15.1 |
15.2(Moisture resistance) |
- |
0 |
|
Testing charges already included in 15.1 |
15.2(Moisture resistance) |
- |
0 |
|
Testing charges already included in 15.1 |
15.3(Moisture resistance) |
- |
0 |
|
Testing charges already included in 15.1 |
15.3(Moisture resistance) |
- |
0 |
|
Testing charges already included in 15.1 |
15.3(Moisture resistance) |
- |
0 |
|
Testing charges already included in 15.1 |
16.1 & 16.2(Leakage current test) |
- |
3000 |
|
- |
16.3(Electric strength test) |
- |
0 |
|
Testing charges already included in 16.1 |
16.3(Insulation resistance test) |
- |
0 |
|
Testing charges already included in 16.1 |
17(Overload protection of transformers and associated circuits) |
- |
2000 |
|
- |
19.1 to 19.13, Table No. - 9(ABNORMAL OPERATION) |
- |
10000 |
|
Charges applicable excluding the test of Cl.19.11.4.1 to Cl.19.11.4.7. The testing charges for EMI/EMC Testing (Cl.19.11.4.1 to Cl.19.11.4.7) will be charged extra. |
19.101(ABNORMAL OPERATION) |
- |
0 |
|
Testing charges already included in 19.1 |
19.102(ABNORMAL OPERATION) |
- |
0 |
|
Testing charges already included in 19.1 |
19.103(ABNORMAL OPERATION) |
- |
0 |
|
Testing charges already included in 19.1 |
19.104(ABNORMAL OPERATION) |
- |
0 |
|
Testing charges already included in 19.1 |
20.1(Stability and mechanical hazards) |
- |
1000 |
|
- |
20.2(Stability and mechanical hazards) |
- |
0 |
|
Testing charges already included in 20.1 |
21.1(MECHANICAL STRENGTH) |
- |
5000 |
|
- |
21.2(MECHANICAL STRENGTH) |
- |
0 |
|
Testing charges already included in 21.1 |
21.101(MECHANICAL STRENGTH) |
- |
0 |
|
Testing charges already included in 21.1 |
21.101(MECHANICAL STRENGTH) |
- |
0 |
|
Testing charges already included in 21.1 |
22.1(Constructions) |
- |
5000 |
|
- |
22.2(Constructions) |
- |
0 |
|
Testing charges already included in 22.1 |
22.3(Constructions) |
- |
0 |
|
Testing charges already included in 22.1 |
22.4(Constructions) |
- |
0 |
|
Testing charges already included in 22.1 |
22.5(Constructions) |
- |
0 |
|
Testing charges already included in 22.1 |
22.6(Constructions) |
- |
0 |
|
Testing charges already included in 22.1 |
22.7 to 22.10(Constructions) |
- |
0 |
|
Testing charges already included in 22.1 |
22.11(Constructions) |
- |
0 |
|
Testing charges already included in 22.1 |
22.12(Constructions) |
- |
0 |
|
Testing charges already included in 22.1 |
22.13 to 22.48(Constructions) |
- |
0 |
|
Testing charges already included in 22.1 |
22.101 to 22.107(Constructions) |
- |
0 |
|
Testing charges already included in 22.1 |
22.108(Constructions) |
- |
0 |
|
Testing charges already included in 22.1 |
22.109(Constructions) |
- |
0 |
|
Testing charges already included in 22.1 |
22.11o(Constructions) |
- |
0 |
|
Testing charges already included in 22.1 |
22.111(Constructions) |
- |
0 |
|
Testing charges already included in 22.1 |
22.111(Constructions) |
- |
0 |
|
Testing charges already included in 22.1 |
23.1 & 23.2(Internal wiring) |
- |
1000 |
|
- |
23.3(Internal wiring) |
- |
0 |
|
Testing charges already included in 23.1 |
23.4(Internal wiring) |
- |
0 |
|
Testing charges already included in 23.1 |
23.5(Internal wiring) |
- |
0 |
|
Testing charges already included in 23.1 |
23.6 to 23.10(Internal wiring) |
- |
0 |
|
Testing charges already included in 23.1 |
24.1(Components) |
- |
10000 |
|
- |
24.2 to 24.6(Components) |
- |
0 |
|
Testing charges already included in 24.1 |
24.101(Components) |
- |
0 |
|
Testing charges already included in 24.1 |
24.101(Components) |
- |
0 |
|
Testing charges already included in 24.1 |
25.1(Supply connection and external flexible cords) |
- |
3000 |
|
- |
25.2(Supply connection and external flexible cords) |
- |
0 |
|
Testing charges already included in 25.1 |
25.3(Supply connection and external flexible cords) |
- |
0 |
|
Testing charges already included in 25.1 |
25.4(Supply connection and external flexible cords) |
- |
0 |
|
Testing charges already included in 25.1 |
25.5 to 25.7(Supply connection and external flexible cords) |
- |
0 |
|
Testing charges already included in 25.1 |
25.8, Table No.-11(Supply connection and external flexible cords) |
- |
0 |
|
Testing charges already included in 25.1 |
25.9 to 25.13(Supply connection and external flexible cords) |
- |
0 |
|
Testing charges already included in 25.1 |
25.14(Supply connection and external flexible cords) |
- |
0 |
|
Testing charges already included in 25.1 |
25.14(Supply connection and external flexible cords) |
- |
0 |
|
Testing charges already included in 25.1 |
25.15(Supply connection and external flexible cords) |
- |
0 |
|
Testing charges already included in 25.1 |
25.16 to 25.25(Supply connection and external flexible cords) |
- |
0 |
|
Testing charges already included in 25.1 |
26.1 to 26.8(Terminals for external conductors) |
- |
2000 |
|
- |
26.9(Terminals for external conductors) |
- |
0 |
|
Testing charges already included in 26.1 |
26.10 & 26.11(Terminals for external conductors) |
- |
0 |
|
Testing charges already included in 26.1 |
27.1 to 27.4(Provision for earthing) |
- |
2000 |
|
- |
27.5(Provision for earthing) |
- |
0 |
|
Testing charges already included in 27.1 |
27.6(Provision for earthing) |
- |
0 |
|
Testing charges already included in 27.1 |
28.1, Table No.-14(Screws and connections) |
- |
1000 |
|
- |
28.2 to 28.4(Screws and connections) |
- |
0 |
|
Testing charges already included in 28.1 |
29.1, Table No.- 16, Table No.- 17 & Table No.18(Clearances, creepage distances and solid insulation) |
- |
2000 |
|
- |
29.1, Table No.- 16, Table No.- 17 & Table No.18(Clearances, creepage distances and solid insulation) |
- |
0 |
|
Testing charges already included in 29.1 |
29.2(Clearances, creepage distances and solid insulation) |
- |
0 |
|
Testing charges already included in 29.1 |
29.2(Clearances, creepage distances and solid insulation) |
- |
0 |
|
Testing charges already included in 29.1 |
29.3(Clearances, creepage distances and solid insulation) |
- |
0 |
|
Testing charges already included in 29.1 |
30.1(Resistance to heat and fire) |
- |
4000 |
|
- |
30.2(Resistance to heat and fire) |
- |
0 |
|
Testing charges already included in 30.1 |
30.2.4(Resistance to heat and fire) |
- |
0 |
|
Testing charges already included in 30.1 |
31(Resistance to rusting) |
- |
1000 |
|
- |
31(Resistance to rusting) |
- |
0 |
|
Testing charges already included in 31 |
32(Radiation, toxicity and similar hazards) |
- |
1000 |
|
- |
19(Abnormal Operation) |
- |
55000 |
|
For EMI/EMC Testing (Cl.19.11.4.1 to Cl.19.11.4.7) |
|
Complete
|
|
20 Jun, 2025 |
Exclusion: EMI/EMC (Cl.19.11.4.1 to 19.11.4.7), capacitor test (Cl.24.1.1), switching cycle operation test (Cl.24.1.3), automatic control cycle operation (Cl.24.1.4), Appliance coupler and interconnection coupler test (Cl.24.1.5), Lamp holder test (Cl.24.1.6), capacitor in auxiliary winding of motor test (cl.24.5), motors basic insulation test (Cl.24.6) |
21 |
IS 302 : Part 2 : Sec 23 (2009) |
Safety of household and similar electrical appliances: Part 2 particular requirements: Sec 23 appliances for skin or hair care (First Revision) |
- |
-
|
130000 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
7(Marking/ Marking & Instructions) |
- |
1000 |
|
- |
8(Protection against Electric Shock/ Protection against Access to Live Parts) |
- |
2000 |
|
- |
10(Power Input
& Current) |
- |
5000 |
|
- |
11(Temperature Rise/Heating) |
- |
6000 |
|
- |
13(Leakage Current and Electric Strength at Operating Temperature) |
- |
3000 |
|
- |
14(Transient Over Voltage) |
- |
2000 |
|
- |
15(Moisture Resistance) |
- |
3000 |
|
- |
16(Leakage Current and Electric Strength) |
- |
3000 |
|
- |
17(Overload Protection/ Overload Protection of Transformers & Associated Circuits) |
- |
2000 |
|
- |
19(Abnormal Operation) |
- |
10000 |
|
Charges applicable including the test of Cl.19.11.4.1 to Cl.19.11.4.7. The testing charges for EMI/EMC Testing (Cl.19.11.4.1 to Cl.19.11.4.7) will be charged extra 55000. |
20(Stability & Mechanical Hazards) |
- |
1000 |
|
- |
21(Mechanical strength) |
- |
5000 |
|
- |
22(Construction) |
- |
5000 |
|
- |
23(Internal wiring) |
- |
1000 |
|
- |
24(Component) |
- |
10000 |
|
- |
25(Supply Connection & External Flexible Cables and Cords) |
- |
3000 |
|
- |
26(Terminals For External Conductors) |
- |
2000 |
|
- |
27(Provision For Earthing) |
- |
2000 |
|
- |
28(Screws & Connection) |
- |
1000 |
|
- |
29(Clearances, Creepage Distances & Solid Insulation) |
- |
2000 |
|
- |
30(Resistance to Heat & Fire) |
- |
4000 |
|
- |
31(Resistance to Rusting) |
- |
1000 |
|
- |
32(Radiation ,Toxicity and similar hazards) |
- |
1000 |
|
- |
|
Complete
|
|
20 Jun, 2025 |
Exclusion: EMI/EMC (Cl.19.11.4.1 to 19.11.4.7), capacitor test (Cl.24.1.1), switching cycle operation test (Cl.24.1.3), automatic control cycle operation (Cl.24.1.4), Appliance coupler and interconnection coupler test (Cl.24.1.5), Lamp holder test (Cl.24.1.6), capacitor in auxiliary winding of motor test (cl.24.5), motors basic insulation test (Cl.24.6) |
22 |
IS 302 : Part 2 : Sec 75 (2018) |
Safety of Household and Similar Electrical Appliances Part 2 Particular Requirements Section 75 Commercial Dispensing Appliances and Vending Machines |
- |
-
|
130000 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
7.1 to 7.13, 7.15, 7.16(Marking) |
- |
1000 |
|
Testing charges are for Cl 7. |
7.14(Legibility & Durability of Markings test) |
- |
0 |
|
Testing charges are included in Cl 7.1,to 7.13, 7.15, 7.16. |
8.1, 8.1.1 & 8.2(Protection against access to live parts) |
- |
2000 |
|
Testing charges are for Cl 8. |
8.1.2(Protection against access to live parts) |
- |
0 |
|
Testing charges are included in Cl 8.1, 8.1.1 & 8.2. |
8.1.3(Protection against access to live parts) |
- |
0 |
|
Testing charges are included in Cl 8.1, 8.1.1 & 8.2. |
8.1.4(Protection against access to live parts) |
- |
0 |
|
Testing charges are included in Cl 8.1, 8.1.1 & 8.2. |
8.1.5(Protection against access to live parts) |
- |
0 |
|
Testing charges are included in Cl 8.1, 8.1.1 & 8.2. |
10.1 & 10.2 -Table No. 1, Table No. 2(Power Input and Current) |
- |
5000 |
|
- |
11.1 to 11.8, Table No.-3(Heating) |
- |
6000 |
|
- |
13.1, 13.2(Leakage current test) |
- |
3000 |
|
Testing charges are for Cl 13. |
13.3 and Table No.- 4(Electric strength test) |
- |
0 |
|
Testing charges are included in Cl 13.1, 13.2. |
14, Table No.- 6 & Table No.-16(Transient over voltages) |
- |
2000 |
|
- |
15.1(Moisture resistance) |
- |
3000 |
|
Testing charges are for Cl 15. |
15.2(Moisture resistance) |
- |
0 |
|
Testing charges are included in Cl 15.1. |
15.3(Moisture resistance) |
- |
0 |
|
Testing charges are included in Cl 15.1. |
15.101(Moisture resistance) |
- |
0 |
|
Testing charges are included in Cl 15.1. |
15.102(Moisture resistance) |
- |
0 |
|
Testing charges are included in Cl 15.1. |
16.1 & 16.2(Leakage current test) |
- |
3000 |
|
Testing charges are for Cl 16. |
16.3(Electric strength test) |
- |
0 |
|
Testing charges are included in Cl 16.1 & 16.2. |
16.3(Insulation resistance test) |
- |
0 |
|
Testing charges are included in Cl 16.1 & 16.2. |
17(Overload protection of transformers and associated circuits) |
- |
2000 |
|
- |
19.1 to 19.13, Table No. - 9(ABNORMAL OPERATION) |
- |
10000 |
|
Charges applicable excluding the test of Cl.19.11.4.1 to Cl.19.11.4.7. The testing charges for EMI/EMC Testing (Cl.19.11.4.1 to Cl.19.11.4.7) will be charged extra. |
19.101 and 19.102(ABNORMAL OPERATION) |
- |
0 |
|
Testing charges are included in Cl 19.1 to 19.13. |
20.1(Stability and mechanical hazards) |
- |
1000 |
|
Testing charges are for Cl 20 |
20.2(Stability and mechanical hazards) |
- |
0 |
|
Testing charges are included in Cl 20.1. |
21.1(MECHANICAL STRENGTH) |
- |
5000 |
|
Testing charges are for Cl 21 |
21.2(MECHANICAL STRENGTH) |
- |
0 |
|
Testing charges are included in Cl 21.1 |
22.1(Constructions) |
- |
5000 |
|
Testing charges are for Cl 22 |
22.2(Constructions) |
- |
0 |
|
Testing charges are included in Cl 22.1 |
22.3(Constructions) |
- |
0 |
|
Testing charges are included in Cl 22.1 |
22.4(Constructions) |
- |
0 |
|
Testing charges are included in Cl 22.1 |
22.5(Constructions) |
- |
0 |
|
Testing charges are included in Cl 22.1 |
22.6(Constructions) |
- |
0 |
|
Testing charges are included in Cl 22.1 |
22.7 to 22.10(Constructions) |
- |
0 |
|
Testing charges are included in Cl 22.1 |
22.11(Constructions) |
- |
0 |
|
Testing charges are included in Cl 22.1 |
22.11(Constructions) |
- |
0 |
|
Testing charges are included in Cl 22.1 |
22.12(Constructions) |
- |
0 |
|
Testing charges are included in Cl 22.1 |
22.13 to 22.48(Constructions) |
- |
0 |
|
Testing charges are included in Cl 22.1 |
22.101 to 22.114(Constructions) |
- |
0 |
|
Testing charges are included in Cl 22.1 |
23.1 & 23.2(Internal wiring) |
- |
1000 |
|
Testing charges are for Cl 23 |
23.3(Internal wiring) |
- |
0 |
|
Testing charges are included in Cl 23.1 & 23.2 |
23.4(Internal wiring) |
- |
0 |
|
Testing charges are included in Cl 23.1 & 23.2 |
23.5(Internal wiring) |
- |
0 |
|
Testing charges are included in Cl 23.1 & 23.2 |
23.6 to 23.10(Internal wiring) |
- |
0 |
|
Testing charges are included in Cl 23.1 & 23.2 |
23.101 to 23.102(Internal wiring) |
- |
0 |
|
Testing charges are included in Cl 23.1 & 23.2 |
24.1(Components) |
- |
10000 |
|
Testing charges are for Cl 24. |
24.2 to 24.6(Components) |
- |
0 |
|
Testing charges are included in Cl 24.1 |
24.101 to 24.103(Components) |
- |
0 |
|
Testing charges are included in Cl 24.1 |
25.1(Supply connection and external flexible cords) |
- |
3000 |
|
Testing charges are for Cl 25. |
25.2(Supply connection and external flexible cords) |
- |
0 |
|
Testing charges are included in Cl 25.1 |
25.3(Supply connection and external flexible cords) |
- |
0 |
|
Testing charges are included in Cl 25.1 |
25.4(Supply connection and external flexible cords) |
- |
0 |
|
Testing charges are included in Cl 25.1 |
25.5 to 25.7(Supply connection and external flexible cords) |
- |
0 |
|
Testing charges are included in Cl 25.1 |
25.8, Table No.-11(Supply connection and external flexible cords) |
- |
0 |
|
Testing charges are included in Cl 25.1 |
25.9 to 25.13(Supply connection and external flexible cords) |
- |
0 |
|
Testing charges are included in Cl 25.1 |
25.14(Supply connection and external flexible cords) |
- |
0 |
|
Testing charges are included in Cl 25.1 |
25.16 to 25.25(Supply connection and external flexible cords) |
- |
0 |
|
Testing charges are included in Cl 25.1 |
26.1 to 26.8(Terminals for external conductors) |
- |
2000 |
|
Testing charges are for Cl 26. |
26.9(Terminals for external conductors) |
- |
0 |
|
Testing charges are included in Cl 26.1 |
26.10 & 26.11(Terminals for external conductors) |
- |
0 |
|
Testing charges are included in Cl 26.1 |
27.1 to 27.4(Provision for earthing) |
- |
2000 |
|
Testing charges are for Cl 27. |
27.5(Provision for earthing) |
- |
0 |
|
Testing charges are included in Cl 27.1 |
27.6(Provision for earthing) |
- |
0 |
|
Testing charges are included in Cl 27.1. |
28.1, Table No.-14(Screws and connections) |
- |
1000 |
|
Testing charges are for Cl 28. |
28.2 to 28.4(Screws and connections) |
- |
0 |
|
Testing charges are included in Cl 28.1. |
29.1, Table No.- 16, Table No.- 17 & Table No.18(Clearances, creepage distances and solid insulation) |
- |
2000 |
|
Testing charges are for Cl 29. |
29.1, Table No.- 16, Table No.- 17 & Table No.18(Clearances, creepage distances and solid insulation) |
- |
0 |
|
Testing charges are included in Cl 29.1. |
29.2(Clearances, creepage distances and solid insulation) |
- |
0 |
|
Testing charges are included in Cl 29.1. |
29.3(Clearances, creepage distances and solid insulation) |
- |
0 |
|
Testing charges are included in Cl 29.1. |
30.1(Resistance to heat and fire) |
- |
4000 |
|
Testing charges are for Cl 30.1. |
30.2(Resistance to heat and fire) |
- |
0 |
|
Testing charges are included in Cl 30.1. |
30.2.4(Resistance to heat and fire) |
- |
0 |
|
Testing charges are included in Cl 30.1. |
31(Resistance to rusting) |
- |
1000 |
|
- |
32(Radiation, toxicity and similar hazards) |
- |
1000 |
|
- |
19.1 to 19.13, Table No. - 9(ABNORMAL OPERATION) |
- |
55000 |
|
Charges applicable for the test of EMI/EMC Testing Cl.19.11.4.1 to Cl.19.11.4.7. |
|
Complete
|
|
20 Jun, 2025 |
. Exclusion: EMI/EMC (Cl.19.11.4.1 to 19.11.4.7), capacitor test (Cl.24.1.1), switching cycle operation test (Cl.24.1.3), automatic control cycle operation (Cl.24.1.4), Appliance coupler and interconnection coupler test (Cl.24.1.5), Lamp holder test (Cl.24.1.6), capacitor in auxiliary winding of motor test (cl.24.5), motors basic insulation test (Cl.24.6) |
23 |
IS 302 : Part 2 : Sec 201 (2008) |
Safety of household and similar electrical appliances: Part 2 particular requirements: Sec 201 electric immersion water heaters (First Revision) |
- |
-
|
65350 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
Cl.7 of IS 302-2-201:2008(Marking and Instruction ) |
- |
1000 |
|
- |
Cl.8 of IS 302‐2-201: 2008(Protection Against Access to Live Parts) |
- |
2000 |
|
- |
Cl.10 of IS 302‐2‐201:2008(Power Input and Current ) |
- |
5000 |
|
- |
Cl.11 of IS 302-2201: 2008(Heating) |
- |
6000 |
|
- |
Cl.13 of IS 302-2-201: 2008(Leakage Current & Electric Strength at Operating Temperature) |
- |
3000 |
|
- |
Cl.14 of IS 302‐2-201:2008(Transient Over Voltages ) |
- |
2000 |
|
- |
Cl.15 of IS 302-2-201:2008(Moisture Resistance ) |
- |
3000 |
|
- |
Cl.16 of IS 302-2-201:2008(Leakage Current & Electric Strength) |
- |
3000 |
|
- |
Cl.17 of IS 302‐2-201: 2008(Overload Protection of Transformers & Associated Circuits) |
- |
2000 |
|
- |
Cl.19 of IS 302‐2-201: 2008(Abnormal Operation ) |
- |
10000 |
|
Charges applicable excluding the test of Cl.19.11.4.1 to Cl.19.11.4.7. The testing charges for EMI/EMC Testing (Cl.19.11.4.1 to Cl.19.11.4.7) will be charged extra. |
Cl.20 of IS 302-2-201: 2008(Stability & Mechanical Hazards) |
- |
1000 |
|
- |
Cl.21 of IS 302-2-201: 2008(Mechanical Strength ) |
- |
5000 |
|
- |
Cl.22 of IS 302-2-201: 2008(Construction) |
- |
6000 |
|
- |
Cl.23 of 302-2-201:2008(Internal Wiring ) |
- |
1000 |
|
- |
Cl.24 of IS 302-2-201: 2008(Component) |
- |
10000 |
|
- |
Cl.25 of IS 302-2-201: 2008(Supply Connection and External Flexible Cords) |
- |
3000 |
|
- |
Cl.26 of IS 302-2-201: 2008(Terminals for External Conductors) |
- |
2000 |
|
- |
Cl.27 of IS 302-2-201: 2008(Provision for Earthing ) |
- |
2000 |
|
- |
Cl.28 of IS 302-2-201: 2008(Screws & Connections ) |
- |
1000 |
|
- |
Cl.29 of IS 302-2‐201:2008(Clearances, Creepage Distances and Solid Insulation ) |
- |
2000 |
|
- |
Cl.30 of IS 302-2‐201:2008(Resistance to Heat and Fire ) |
- |
4000 |
|
- |
Cl.31 of IS 302-2-201:2008(Resistance of Rusting ) |
- |
1000 |
|
- |
Cl.32 of IS 302-2-201:2008(Radiation, Toxicity and Similar Hazards) |
- |
0 |
|
- |
19.11.4.1(Electrostatic discharges) |
- |
5000 |
|
-- |
19.11.4.2(Radiated fields) |
- |
20000 |
|
- |
19.11.4.3(Fast transient bursts) |
- |
5000 |
|
- |
19.11.4.4(Surge immunity test) |
- |
5000 |
|
- |
19.11.4.5(Immunity to conducted discharges) |
- |
10000 |
|
- |
19.11.4.6(Class 3 Voltage dips and interruptions) |
- |
5000 |
|
- |
19.11.4.7(Harmonics) |
- |
5000 |
|
- |
|
Complete
|
|
20 Jun, 2025 |
Exclusion:EMI/EMC (Cl.19.11.4.1 to 19.11.4.7), capacitor test (Cl.24.1.1), switching cycle operation test (Cl.24.1.3), automatic control cycle operation (Cl.24.1.4), Appliance coupler and interconnection coupler test (Cl.24.1.5), Lamp holder test (Cl.24.1.6), capacitor in auxiliary winding of motor test (cl.24.5), motors basic insulation test (Cl.24.6) |
24 |
IS 302 : Part 2 : Sec 25 (2014) |
Safety of household and similar electrical appliances: Part 2 Particular requirements: Section 25 Microwave ovens |
- |
-
|
220375 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
6.0(Classification) |
- |
0 |
|
- |
7(Marking and instructions) |
- |
1000 |
|
- |
8(Protection against live parts) |
- |
2000 |
|
- |
10(POWER INPUT AND CURRENT) |
- |
8000 |
|
- |
13(LEAKAGE CURRENT AND ELECTRIC STRENGTH AT OPERATING TEMPERATURE) |
- |
3000 |
|
- |
14(IMPULSE VOLTAGE TEST) |
- |
2000 |
|
- |
15(HUMIDITY TREATMENT TEST) |
- |
3000 |
|
- |
16(LEAKAGE CURRENT AND ELECTRIC STRENGTH) |
- |
3000 |
|
- |
17(OVERLOAD PROTECTION OF TRANSFORMERS AND ASSOCIATED CIRCUITS) |
- |
2000 |
|
- |
18(ENDURANCE) |
- |
40000 |
|
- |
19(ABNORMAL OPERATION) |
- |
10000 |
|
Charges applicable excluding the test of Cl.19.11.4.1 to Cl.19.11.4.7. The testing charges for EMI/EMC Testing (Cl.19.11.4.1 to Cl.19.11.4.7) will be charged extra 55000. |
20(STABILITY AND MECHANICAL HAZARDS) |
- |
2000 |
|
- |
21(MECHANICAL STRENGTH) |
- |
5000 |
|
- |
22(CONSTRUCTION) |
- |
10000 |
|
- |
23(INTERNAL WIRING) |
- |
1000 |
|
- |
24(COMPONENTS) |
- |
20000 |
|
Additional testing charges will be applicable for other components testing ,if required . Excluding for testing charges of components |
25(SUPPLY CONNECTION AND EXTERNAL FLEXIBLE CORDS) |
- |
3000 |
|
- |
26(TERMINALS FOR EXTERNAL CONDUCTORS) |
- |
2000 |
|
- |
27(PROVISION FOR EARTHING) |
- |
2000 |
|
- |
28(SCREWS AND CONNECTIONS) |
- |
1000 |
|
- |
29(CLEARANCES, CREEPAGE DISTANCES AND SOLID INSULATION) |
- |
2000 |
|
- |
30(RESISTANCE TO HEAT AND FIRE) |
- |
4000 |
|
- |
31(RESISTANCE TO RUSTING) |
- |
1000 |
|
- |
32(RADIATION, TOXICITY AND SIMILAR HAZARDS) |
- |
3000 |
|
- |
11(HEATING) |
- |
10000 |
|
- |
|
Complete
|
|
20 Jun, 2025 |
Excluding following
tests: EMI/EMC (ESD,
Radiated fields, EFT
Surge, Conducted
Immunity, Dips &
Interruptions,
Harmonics &
Interharmonics)
(Cl.19.11.4.1 to
19.11.4.7), Capacitor Test (Cl.
24.1.1), Switching
Cycle Operation Test
(Cl. 24.1.3), Automatic
Control Cycle Operation
Test (Cl. 24.1.4),
Appliance Coupler and
Interconnection (Cl.
24.1.5), Lamp Holder
Test (Cl. 24.1.6),
Microwave Ovens for
Board Ships (Annex BB)
and Environmental
Testing – Test Kb: Salt
Mist, Cyclic (Sodium
Chloride Solution).
(ANNEX CC) |
25 |
IS 16242 : Part 1 (2014) |
Uninterruptible power systems (UPS): Part 1 general and safety requirements for UPS |
- |
-
|
190000 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
4.6(Power interface) |
- |
15000 |
|
- |
4.7(Marking & instructions) |
- |
3000 |
|
- |
5.1(Protection against shock and energy hazards) |
- |
5000 |
|
- |
5.2(Requirement of auxiliary circuits) |
- |
10000 |
|
- |
5.3(Protective earthing and bonding) |
- |
5000 |
|
- |
5.4(AC and DC power isolation) |
- |
3000 |
|
- |
5.5(Over current and earth fault condition) |
- |
5000 |
|
- |
5.6(Safety interlocks) |
- |
5000 |
|
- |
5.7(CLEARANCES, CREEPAGE DISTANCES AND SOLID INSULATION) |
- |
5000 |
|
- |
6.1(Wiring, connections and supply) |
- |
3000 |
|
- |
6.2(Connection to power) |
- |
5000 |
|
- |
6.3(Wiring terminals for external power conductors) |
- |
5000 |
|
- |
7.1(Enclosure) |
- |
5000 |
|
- |
7.2(STABILITY) |
- |
5000 |
|
- |
7.3(MECHANICAL STRENGTH) |
- |
5000 |
|
- |
7.4(Construction details) |
- |
5000 |
|
- |
7.5(Resistance to fire) |
- |
5000 |
|
- |
7.6(Battery location) |
- |
8000 |
|
- |
7.7(Temperature rise) |
- |
5000 |
|
- |
8.1(General procision for earth leakage) |
- |
5000 |
|
- |
8.2(Electric Strength) |
- |
3000 |
|
- |
8.3(Abnormal operating and fault conditions) |
- |
5000 |
|
- |
9.0(Connection to telecommunication networks) |
- |
10000 |
|
- |
4.5(Components) |
- |
5000 |
|
- |
Annex I.5(Solid-state backfeed protection) |
- |
55000 |
|
Charges applicable for Cl. I.5 Solid state back feed protection (ESD tests, Radio frequency electromagnetic field test, Fast transient burst test, Surge test, conducted radio frequency commen mode test, Immunity to power frequency magnetic field test) |
|
Complete
|
|
20 Jun, 2025 |
Excluding following
tests: Thermal Controls
Test (Cl. 4.5 (Cl. 1.5.3
of RD)), Capacitor
Bridging Insulation (Cl.
4.5 (Cl. 1.5.6 of RD)),
Components in
Equipment for IT Power
Distribution Systems
(Cl. 4.5 (Cl. 1.5.8 of
RD)), Safety Interlocks
(Cl. 5.6 (Cl. 2.8.5, Cl.
2.8.7 of RD)),
Semiconductor Devices
(Only Opto-coupler
tests as per IEC 60747-
5-5) (Cl. 5.7 (Cl.
2.10.5.4 of RD)),
Construction of Printed
Boards (Except
Dimensional
Measurement) (Cl. 5.7
(Cl. 2.10.6 of RD)),
Component External
Terminations (Except
Dimensional
Measurement) (Cl. 5.7
(Cl. 2.10.7 of RD)),
Tests on Coated Printed
Boards and Coated
Components (Except
Dimension
Measurement) (Cl.
5.7(Cl. 2.10.8 of RD)),
AC Power Supply Cords
(Except Cross
Sectional area of cable
/cords) (Cl. 6.2.2 (Cl.
3.2.5.1 of RD)),
Cathode Ray Tube (Cl.
7.3 (Cl. 4.2.8 RD)),
Solid state back feed protection (ESD tests, Radio frequency electromagnetic field test, Fast transient burst test, Surge test, conducted radio frequency commen mode test, Immunity to low frequency signal test, Immunity to power frequency magnetic field test), Insulating
Winding Wire for use
without Interleaved
Insulation (Annex U of
RD) and Evaluation of
Integrated Circuit (IC)
Current Limiter (Annex
CC of RD). |
26 |
IS 16444 (2015) |
AC static direct connected watthour smart meter class 1 and 2 - Specification |
Single Phase and Three Phase |
-
|
600000 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
6.8(Marking of smart meters
Name plate) |
- |
1000 |
|
- |
6.3(Clearance and creepage distances) |
- |
1000 |
|
- |
11.0(Smart meter functional requirements) |
- |
5000 |
|
- |
9, 10.6(Test of Smart Meter Communicability) |
- |
10000 |
|
- |
10.3(Test of Display) |
- |
2000 |
|
- |
10.5(Test for Data Exchange Protocol) |
- |
80000 |
|
- |
7.2, 10.4(Performance Requirements for Load Switching (UC1)) |
- |
185000 |
|
For Three Phase and Rs-95000/- for Single Phase |
7.2, 10.4(Dielectric strength (G-8)) |
- |
7500 |
|
- |
7.2, 10.4(Minimum switched current (G-7)) |
- |
7500 |
|
- |
7.2, 10.4(Short circuit current carrying capacity (G-6)) |
- |
35000 |
|
For Three Phase and Rs-30000/- for Single Phase |
7.2, 10.4(Line to load voltage surge withstand (G-4)) |
- |
10000 |
|
- |
7.2, 10.4(Electrical endurance (G-3)) |
- |
130000 |
|
For Three Phase and Rs-105000/- for Single Phase |
7.2, 10.4(Normal operation (G-2)) |
- |
10000 |
|
- |
6.5(Test of resistance to heat and fire) |
- |
3000 |
|
- |
6.5(Protection against penetration of dust and water) |
- |
5000 |
|
- |
6.5(Spring Hammer test) |
- |
1000 |
|
- |
6.5(Shock test) |
- |
8000 |
|
- |
6.5(Vibration test) |
- |
10000 |
|
- |
6.9(Damp heat cyclic test) |
- |
10000 |
|
- |
6.9(Cold test) |
- |
10000 |
|
- |
6.9(Dry heat test) |
- |
8000 |
|
- |
6.11(Surge Immunity test) |
- |
10000 |
|
- |
6.11(Test of immunity to electromagnetic HF field) |
- |
48000 |
|
- |
6.11(Test of immunity to electrostatic discharge) |
- |
10000 |
|
- |
6.11(Fast transient burst test) |
- |
12000 |
|
- |
6.11(Radio interference measurement) |
- |
55000 |
|
For Three Phase and Rs-52000/- for Single Phase |
6.10.7(Test of influence of immunity to earth fault) |
- |
5000 |
|
- |
6.10.5(Test of influence of heating) |
- |
2000 |
|
- |
6.10.4(Test of influence of self-heating) |
- |
3000 |
|
- |
6.10.1(Test of influence of short time over currents) |
- |
8000 |
|
- |
6.10.1(Test of influence of supply voltage) |
- |
2000 |
|
- |
6.10.1(Test of power consumption) |
- |
1000 |
|
- |
6.12(Test of influence quantities) |
- |
20000 |
|
- |
6.12(Test of repeatability of error ) |
- |
3000 |
|
- |
6.12(Test of ambient temperature influence) |
- |
2000 |
|
- |
6.12(Test of no-load condition) |
- |
2000 |
|
- |
6.12(Test of starting condition) |
- |
2000 |
|
- |
6.12(Test of meter constant) |
- |
3000 |
|
For Three Phase and Rs-2000/- for Single Phase |
6.12(Test on limits of error due to variation of the current) |
- |
4000 |
|
For Three Phase and Rs-3000/- for Single Phase |
6.10.6(Insulation resistance test) |
- |
1000 |
|
- |
6.10.6(ac high voltage test) |
- |
2000 |
|
- |
6.10.6(Impulse voltage test) |
- |
5000 |
|
- |
6.2(General and constructional requirements) |
- |
6000 |
|
- |
6.6(Display of measured values) |
- |
1000 |
|
- |
6.7(Output device) |
- |
3000 |
|
- |
cl 11.1 of IS 13779(Limits of Error and Interpretation or Test Results) |
- |
1000 |
|
- |
7.2, 10.4(Fault current making capacity (G-5)) |
- |
35000 |
|
For Three Phase and Rs-30000/- for Single Phase |
|
Complete
|
|
20 Jun, 2025 |
Included w.e.f. 02.08.2023. Exclusion: 1. Cl.10.5 (Data exchange protocol (Granted for only six months up to 02.08.2024))
2. Cl.11 (Functional requirements (Granted for only six months up to 02.08.2024))
3. Cl.10.6.1 (The modules for WAN/NAN/HD
4. Cl.10.6.2 (Tests for smart meter communicability (Granted for only six months up to 02.08.2024)) |
27 |
IS 16444 : Part 2 (2017) |
AC static transformer operated watthour and var - Hour smart meters, class 0.2 S, 0.5 S and 1.0 S: Part 2 specification transformer operated smart meters |
Single Phase and Three Phase |
-
|
300000 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
6.8(Marking of meters
Name plate) |
- |
1000 |
|
For Single and Three Phase |
6.3(Clearance and creepage distances) |
- |
1000 |
|
For Single and Three Phase |
10.0(Smart Meter Functional Requirements) |
- |
5000 |
|
For Single and Three Phase |
8, 9.5(Smart Meter Communicability) |
- |
10000 |
|
For Single and Three Phase |
9.3(Test of Display) |
- |
1000 |
|
For Single and Three Phase |
7, 9.4(Data Exchange for Electricity Meter Reading, Tariff and Load Control Companion Specification
(The requirement as per IS 15959 : Part 1 & Part 3 shall apply)) |
- |
80000 |
|
For Single and Three Phase |
6.4(Test of resistance to heat and fire) |
- |
2000 |
|
For Single and Three Phase |
6.5(Test of protection against penetration of dust and water) |
- |
5000 |
|
For Single and Three Phase |
6.5(Spring hammer test) |
- |
1000 |
|
For Single and Three Phase |
6.5(Shock test) |
- |
7500 |
|
For Single and Three Phase |
6.5(Vibration test) |
- |
9500 |
|
For Single and Three Phase |
6.9(Damp heat cyclic test) |
- |
10000 |
|
For Single and Three Phase |
6.9(Cold test) |
- |
10000 |
|
For Single and Three Phase |
6.9(Dry heat test) |
- |
8000 |
|
For Single and Three Phase |
6.11(Surge Immunity test) |
- |
8000 |
|
For Single and Three Phase |
6.11(Test of immunity to electromagnetic HF field) |
- |
35000 |
|
For Single and Three Phase |
6.11(Test of immunity to electrostatic discharge) |
- |
10000 |
|
For Single and Three Phase |
6.11(Fast transient burst test) |
- |
10000 |
|
For Single and Three Phase |
6.11(Radio interference measurement) |
- |
35000 |
|
for Three Phase and Rs-30000 for Single Phase |
6.10.7(Test of immunity to earth/phase fault) |
- |
4000 |
|
For Single and Three Phase |
6.10.5(Test of influence of heating) |
- |
2000 |
|
For Single and Three Phase |
6.10.4(Test of influence of self-heating) |
- |
3000 |
|
For Single and Three Phase |
6.10.3(Test of influence of short time over currents) |
- |
3000 |
|
For Single and Three Phase |
6.10.2(Test of influence of supply voltage) |
- |
2000 |
|
For Single and Three Phase |
6.10.1(Test of power consumption) |
- |
1000 |
|
For Single and Three Phase |
6.12(Test of influence quantities) |
- |
8000 |
|
For Single and Three Phase |
6.12(Test of repeatability of error) |
- |
4000 |
|
For Single and Three Phase |
6.12(Test of ambient temperature influence) |
- |
2000 |
|
For Single and Three Phase |
6.12(Test of no-load condition) |
- |
2000 |
|
for Three Phase and Rs-1500 for Single Phase |
6.12(Test of starting condition) |
- |
2000 |
|
for Three Phase and Rs-1500 for Single Phase |
6.12(Test of meter constant) |
- |
2000 |
|
For Single and Three Phase |
6.12(Test on limits of error) |
- |
3000 |
|
For Single and Three Phase |
6.10.6(Insulation test) |
- |
1000 |
|
For Single and Three Phase |
6.10.6(ac high voltage test) |
- |
1000 |
|
For Single and Three Phase |
6.10.6(Impulse voltage test) |
- |
3000 |
|
For Single and Three Phase |
6.7(Output device) |
- |
3000 |
|
For Single and Three Phase |
6.6(Display of measured values) |
- |
1000 |
|
For Single and Three Phase |
6.2.2(Terminal Cover(s)) |
- |
1000 |
|
For Single and Three Phase |
6.2(General Constructional requirements) |
- |
0 |
|
Already included |
6.2.1(Terminals, terminal block and protective earth terminal) |
- |
2000 |
|
For Single and Three Phase |
6.1(Electrical Requirments) |
- |
1000 |
|
For Single and Three Phase |
6.8(Marking of meters
Name plate) |
- |
- |
|
- |
6.3(Clearance and creepage distances) |
- |
- |
|
- |
6.1(Electrical Requirments) |
- |
- |
|
- |
|
Complete
|
|
20 Jun, 2025 |
Included w.e.f. 02.08.2023. Exclusion: Cl.9.4 (Data exchange protocol (Granted for only six months up to 02.08.2024))
2. Cl.10 (Functional requirements (Granted for only six months up to 02.08.2024))
3. Cl.9.5.1 (The modules for WAN/NAN/HD
4 Cl.9.5.2 (Test for smart meter communicability (Granted for only six months up to 02.08.2024)) |
28 |
IS 15884 (2010) |
Alternating current direct connected static prepayment meters for active energy (Class 1 And 2) - Specification |
single Phase and Three Phase |
-
|
700000 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
4(General Requirements) |
- |
1000 |
|
Single and Three Phase Meters |
4.2(Mechanical Requirements) |
- |
20000 |
|
For Three Phase Meters and Rs-15000 for Single phase meter |
4.2.11(By inspection) |
- |
1000 |
|
Single and Three Phase Meters |
4.2.12(Test on Token Carrier Interface) |
- |
12000 |
|
Single and Three Phase Meters |
5.5.5(according to IEC 62052-11) |
- |
55000 |
|
For Three Phase Meters and Rs-52000 for single Phase |
4.6.3(Limits of error due to Ambient temperature Variation) |
- |
6000 |
|
Single and Three Phase Meters |
5.9(Test of Consumption-Based charging function) |
- |
5000 |
|
Single and Three Phase Meters |
5.10(Test of Time-Based charging function) |
- |
5000 |
|
Single and Three Phase Meters |
5.8(Test of Load Switch) |
- |
2000 |
|
Single and Three Phase Meters |
4.6.6.2 .1(Load switching capability) |
- |
188000 |
|
For Three Phase UC1 Rs-188000 & For Single Phase UC1 Rs-158000. |
4.6.6.2.2(Performance requirement for load switching Utilization category UC2
(Annex G.)) |
- |
288000 |
|
For Three Phase Meters UC2 & UC3, For Single Phase UC2 & UC3 Rs-258000. |
6(Functional Requirements) |
- |
20000 |
|
Single and Three Phase Meters |
5.2.4(As per IS 11000 (Part 2 / Sec1)) |
- |
3000 |
|
Single and Three Phase Meters |
5.2.2(As per IS 9000 (Part 7/Sec 1)) |
- |
8000 |
|
Single and Three Phase Meters |
5.2.3(As per IS 9000 (Part 8)) |
- |
10000 |
|
Single and Three Phase Meters |
5.2.5(As per IS 12063) |
- |
5000 |
|
Single and Three Phase Meters |
5.2.1(As per cl 12.3.3 of IS 13779) |
- |
1000 |
|
Single and Three Phase Meters |
5.3.1(according to IS 9000
(Part 3/ Sec 1 to 5)) |
- |
8000 |
|
Single and Three Phase Meters |
5.3.2(according to IS 9000
(Part 2/Sec 1 to 4)) |
- |
10000 |
|
Single and Three Phase Meters |
5.3.3(according to IS 9000 (Part 5/Sec 1 and 2)) |
- |
10000 |
|
Single and Three Phase Meters |
5.4.1(As per 4.4.1.1) |
- |
3000 |
|
Single and Three Phase Meters |
5.4.2(As per 4.4.2.1) |
- |
4000 |
|
Single and Three Phase Meters |
5.4.3(Table 8, as per cl4.4.3) |
- |
15000 |
|
Single and Three Phase Meters |
5.4.4(Table 9, and cl 4.4.4) |
- |
4000 |
|
Single and Three Phase Meters |
5.4.5(As per cl 4.4.5) |
- |
3000 |
|
Single and Three Phase Meters |
5.4.6.2(12.7.6.2 of IS 13779) |
- |
5000 |
|
Single and Three Phase Meters |
5.4.6.3(Table 15, power source 500 VA) |
- |
2000 |
|
Single and Three Phase Meters |
5.4.6.4(500±50V dc) |
- |
1000 |
|
Single and Three Phase Meters |
5.5.2(according to IS 14700 (Part 4/Sec 2)) |
- |
10000 |
|
Single and Three Phase Meters |
5.5.3(Table 12 &
IS 14700 (Part 4/Sec 3)) |
- |
48000 |
|
Single and Three Phase Meters |
5.5.4(according to IS 14700
(Part 4/Sec 4)) |
- |
12000 |
|
Single and Three Phase Meters |
5.5.6(Surge Immunity Test) |
- |
10000 |
|
Single and Three Phase Meters |
4.6.1(As per table 10 & 11, cl 5.6.1) |
- |
14000 |
|
For Three Phase, Rs-12000 for Single Phase Meters |
4.6.2(As per table 12) |
- |
30000 |
|
For Three Phase, Rs-25000 for Single Phase Meters |
5.6.3(I= open circuit
V= 115% of rated voltage
test period 60 000/k minutes) |
- |
3000 |
|
For Three Phase, Rs-2000 for Single Phase Meters |
5.6.4(As per cl 4.6.3, Table 13) |
- |
3000 |
|
For Three Phase, Rs-2000 for Single Phase Meters |
5.6.5(As per cl 4.6.5) |
- |
3000 |
|
For Three Phase, Rs-2000 for Single Phase Meters |
5.6.7(Test shall be carried out at 0.05Ib and Ib at UPF load under reference conditions. Twenty error samples shall be taken at time-intervals of 30 minutes) |
- |
10000 |
|
For Three Phase, Rs-8000 for Single Phase Meters |
4.6.6.1 ,annexure D - 3.2.1(Test of crystal Controlled Clocks in Payment Meters) |
- |
10000 |
|
Single and Three Phase Meters |
4.6.6.1 ,annexure D - 3.2.2(Test of crystal Controlled Clocks in Payment Meters) |
- |
15000 |
|
Single and Three Phase Meters |
4.6.6.1 , annexure D - 3.2.3(Test of crystal Controlled Clocks in Payment Meters) |
- |
25000 |
|
Single and Three Phase Meters |
4(General Requirements) |
- |
- |
|
- |
4.2(Mechanical Requirements) |
- |
- |
|
- |
4.2.11(By inspection) |
- |
- |
|
- |
4.2.12(Test on Token Carrier Interface) |
- |
- |
|
- |
5.5.5(according to IEC 62052-11) |
- |
- |
|
- |
4.6.3(Limits of error due to Ambient temperature Variation) |
- |
- |
|
- |
5.9(Test of Consumption-Based charging function) |
- |
- |
|
- |
5.10(Test of Time-Based charging function) |
- |
- |
|
- |
5.8(Test of Load Switch) |
- |
- |
|
- |
4.6.6.2 .1(Load switching capability) |
- |
- |
|
- |
4.6.6.2.2(Performance requirement for load switching Utilization category UC2
(Annex G.)) |
- |
- |
|
- |
6(Functional Requirements) |
- |
- |
|
- |
5.2.4(As per IS 11000 (Part 2 / Sec1)) |
- |
- |
|
- |
5.2.2(As per IS 9000 (Part 7/Sec 1)) |
- |
- |
|
- |
5.2.3(As per IS 9000 (Part 8)) |
- |
- |
|
- |
5.2.5(As per IS 12063) |
- |
- |
|
- |
5.2.1(As per cl 12.3.3 of IS 13779) |
- |
- |
|
- |
5.3.1(according to IS 9000
(Part 3/ Sec 1 to 5)) |
- |
- |
|
- |
5.3.2(according to IS 9000
(Part 2/Sec 1 to 4)) |
- |
- |
|
- |
5.3.3(according to IS 9000 (Part 5/Sec 1 and 2)) |
- |
- |
|
- |
5.4.1(As per 4.4.1.1) |
- |
- |
|
- |
5.4.2(As per 4.4.2.1) |
- |
- |
|
- |
5.4.3(Table 8, as per cl4.4.3) |
- |
- |
|
- |
5.4.4(Table 9, and cl 4.4.4) |
- |
- |
|
- |
5.4.5(As per cl 4.4.5) |
- |
- |
|
- |
5.4.6.2(12.7.6.2 of IS 13779) |
- |
- |
|
- |
5.4.6.3(Table 15, power source 500 VA) |
- |
- |
|
- |
5.4.6.4(500±50V dc) |
- |
- |
|
- |
5.5.2(according to IS 14700 (Part 4/Sec 2)) |
- |
- |
|
- |
5.5.3(Table 12 &
IS 14700 (Part 4/Sec 3)) |
- |
- |
|
- |
5.5.4(according to IS 14700
(Part 4/Sec 4)) |
- |
- |
|
- |
5.5.6(Surge Immunity Test) |
- |
- |
|
- |
4.6.1(As per table 10 & 11, cl 5.6.1) |
- |
- |
|
- |
4.6.2(As per table 12) |
- |
- |
|
- |
5.6.3(I= open circuit
V= 115% of rated voltage
test period 60 000/k minutes) |
- |
- |
|
- |
5.6.4(As per cl 4.6.3, Table 13) |
- |
- |
|
- |
5.6.5(As per cl 4.6.5) |
- |
- |
|
- |
5.6.7(Test shall be carried out at 0.05Ib and Ib at UPF load under reference conditions. Twenty error samples shall be taken at time-intervals of 30 minutes) |
- |
- |
|
- |
4.6.6.1 ,annexure D - 3.2.1(Test of crystal Controlled Clocks in Payment Meters) |
- |
- |
|
- |
4.6.6.1 ,annexure D - 3.2.2(Test of crystal Controlled Clocks in Payment Meters) |
- |
- |
|
- |
4.6.6.1 , annexure D - 3.2.3(Test of crystal Controlled Clocks in Payment Meters) |
- |
- |
|
- |
|
Complete
|
|
20 Jun, 2025 |
Included w.e.f. 02.08.2023 |
29 |
IS 14697 (2021) |
ac STATIC TRANSFORMER OPERATED WATTHOUR METERS CLASS 02 S AND 05 S AND VAR-HOUR METERS CLASS 02 S 05 S AND 10 S - SPECIFICATION First Revision |
1 Phase and 3 Phase |
-
|
170000 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
"12.8.6(Radio Interference Measurement) |
- |
25000 |
|
For Three phase and Rs-20000 for single phase |
"12.8.5(Surge Immunity Test) |
- |
8000 |
|
For Three phase and single phase |
6.1(General) |
- |
100 |
|
For Three phase and single phase |
"12.8.4(Fast Transient Burst Test) |
- |
10000 |
|
For Three phase and single phase |
"12.8.3(Test for Immunity to Electromagnetic HF Fields) |
- |
25000 |
|
For Three phase and single phase |
6.2(Meter Case) |
- |
100 |
|
For Three phase and single phase |
"12.8.2("Test for Immunity to Electrostatic Discharge (ESD)
") |
- |
8000 |
|
For Three phase and single phase |
6.3(Window) |
- |
100 |
|
For Three phase and single phase |
12.4(Test of resistance to heat and fire) |
- |
2000 |
|
For Three phase and single phase |
6.4(Terminals, Terminals Block(s) and Protective Earth Terminal) |
- |
1000 |
|
For Three phase and single phase |
12.5(Protection against penetration of dust and water) |
- |
5000 |
|
For Three phase and single phase |
12.3.3(Spring hammer test) |
- |
500 |
|
For Three phase and single phase |
6.5(Terminal Cover(s)) |
- |
100 |
|
For Three phase and single phase |
12.3.1(Shock test) |
- |
7000 |
|
For Three phase and single phase |
12.3.2(Vibration test) |
- |
9000 |
|
For Three phase and single phase |
6.6(Clearance and Creepage Distance) |
- |
400 |
|
For Three phase and single phase |
12.6.3(Damp Heat Cycle Test) |
- |
8500 |
|
For Three phase and single phase |
12.6.2(Cold Test) |
- |
8500 |
|
For Three phase and single phase |
6.7(Insulating Encased Meter) |
- |
100 |
|
For Three phase and single phase |
12.6.1(Dry heat test) |
- |
7000 |
|
For Three phase and single phase |
6.10(Display of Measured Values) |
- |
100 |
|
For Three phase and single phase |
9.6 & 12.17(Immunity to Earth/Phase Fault) |
- |
5000 |
|
For Three phase and single phase |
6.11(Output Device) |
- |
500 |
|
For Three phase and single phase |
9.4 & 12.7.5(Influence of Heating) |
- |
2000 |
|
For Three phase and single phase |
9.3 & 12.7.4(Influence of Self-heating) |
- |
2000 |
|
For Three phase and single phase |
9.2.3 & 12.7.3(Short Time Over Current) |
- |
2000 |
|
For Three phase and single phase |
7.1(Name Plate) |
- |
500 |
|
For Three phase and single phase |
9.2.2 & 12.7.2(Influence of Supply Voltage) |
- |
1000 |
|
For Three phase and single phase |
9.1 & 12.7.1(Power Consumption) |
- |
1000 |
|
For Three phase and single phase |
7.2(Connections, Diagrams and Terminal Marking) |
- |
0 |
|
For Three phase and single phase (Already included) |
9.5 & 12.7.6.2(Impulse voltage test) |
- |
2000 |
|
For Three phase and single phase |
9.5 & 12.7.6.3(a.c. voltage test) |
- |
1000 |
|
For Three phase and single phase |
12.7.6.4(Insulation resistance test) |
- |
1000 |
|
For Three phase and single phase |
11.7 & 12.16(Repeatability of Error Test) |
- |
4000 |
|
For Three phase and single phase |
11.3 & 12.11(Limits of Error Due to Ambient Temperature Variation) |
- |
3000 |
|
For Three phase and single phase |
12.13 & 11.5(Starting Current) |
- |
2000 |
|
For Three phase and single phase |
11.6 & 12.14(Meter Constant) |
- |
2500 |
|
For Three phase and single phase |
11.4.2 & 12.12(Running with No-Load) |
- |
2000 |
|
For Three phase and single phase |
12.15(Interpretation of Test Results) |
- |
1000 |
|
For Three phase and single phase |
11.1(Limits of Error Due to Variation of the Current) |
- |
4000 |
|
For Three phase and single phase |
12.10, 11.2(Test of Influence Quantities) |
- |
8000 |
|
For Three phase and single phase |
|
Complete
|
|
20 Jun, 2025 |
Included w.e.f. 02.08.2023 |
30 |
IS 13779 (2020) |
ac STATIC WATTHOUR METERS CLASS 1 AND 2-Specefication |
1 Phase & 3 Phase |
-
|
160000 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
4(Classification) |
- |
100 |
|
For Single and Three Phase |
5.1(Standard Reference Voltages) |
- |
100 |
|
For Single and Three Phase |
5.2(Standard Basic Currents) |
- |
100 |
|
For Single and Three Phase |
5.3(Rated Maximum Current) |
- |
100 |
|
For Single and Three Phase |
5.4(Standard Frequency) |
- |
100 |
|
For Single and Three Phase |
6.1(General) |
- |
100 |
|
For Single and Three Phase |
6.2(Meter Case) |
- |
100 |
|
For Single and Three Phase |
6.3(Window) |
- |
100 |
|
For Single and Three Phase |
6.4(Terminals, terminal block and protective earth terminal) |
- |
500 |
|
For Single and Three Phase |
6.5(Terminals covers and Extended Terminal Cover) |
- |
100 |
|
For Single and Three Phase |
6.6(Clearance and creepage distances) |
- |
400 |
|
For Single and Three Phase |
12.15 & 11.6(Test of meter constant) |
- |
1000 |
|
For Single and Three Phase |
6.7(Insulating encased meter) |
- |
100 |
|
For Single and Three Phase |
6.10(Display of measured values) |
- |
100 |
|
For Single and Three Phase |
6.11(Output device) |
- |
500 |
|
For Single and Three Phase |
7.1(Name Plate) |
- |
500 |
|
For Single and Three Phase (Including 7.2) |
7.2(Connection diagrams and terminal marking) |
- |
0 |
|
For Single and Three Phase |
12.3.1(Shock test) |
- |
7000 |
|
For Single and Three Phase |
12.14 & 11.5(Test of starting condition) |
- |
1000 |
|
For Single and Three Phase |
12.3.2(Vibration test) |
- |
9000 |
|
For Single and Three Phase |
12.13 & 11.4(Test of no-load condition) |
- |
1000 |
|
For Single and Three Phase |
12.3.3(Spring hammer test) |
- |
500 |
|
For Single and Three Phase |
12.4(Test of resistance to heat and fire) |
- |
2000 |
|
For Single and Three Phase |
12.12 & 11.3(Test of ambient temperature influence) |
- |
2000 |
|
For Single and Three Phase |
12.5(Test of protection against penetration of dust and water) |
- |
5000 |
|
For Single and Three Phase |
11.2(Test on limits of error due to other influence quantities) |
- |
7000 |
|
For Single and Three Phase |
12.6.1(Dry heat test) |
- |
7000 |
|
For Single and Three Phase |
12.6.2(Cold test) |
- |
8500 |
|
For Single and Three Phase |
11.1(Test on limits of error due to variation of current) |
- |
2000 |
|
For Single and Three Phase |
12.6.3(Damp heat cyclic test) |
- |
8500 |
|
For Single and Three Phase |
12.9.5(Surge Immunity Test) |
- |
8000 |
|
For Single and Three Phase |
12.7.1(Test of power consumption) |
- |
1000 |
|
For Single and Three Phase |
12.9.6(Radio Interference Measurement) |
- |
25000 |
|
For Single (20000) and Three Phase (25000) |
12.7.1(Test of power consumption) |
- |
0 |
|
Already included |
12.9.4(Fast transient burst test) |
- |
10000 |
|
For Single and Three Phase |
12.7.2(Test of influence of supply voltage) |
- |
1000 |
|
For Single and Three Phase |
12.7.2(Voltage interruptions of Vref=100% Interruption time: 1sec Number of interruptions: 3 Restoring time between interruptions: 50msec.) |
- |
0 |
|
Already included |
12.9.3(Test of Immunity to electromagnetic HF field) |
- |
25000 |
|
For Single and Three Phase |
12.9.2(Test of Immunity to electrostatic discharge) |
- |
8000 |
|
For Single and Three Phase |
12.8(Test of immunity to earth/phase fault) |
- |
5000 |
|
Three Phase only |
12.7.3(Test of influence of short time over currents) |
- |
2000 |
|
For Single and Three Phase |
12.7.6.4(Insulation resistance test) |
- |
1000 |
|
For Single and Three Phase |
12.7.4(Test of Influence of self heating) |
- |
2000 |
|
For Single and Three Phase |
12.7.5(Test of influence of heating) |
- |
2000 |
|
For Single and Three Phase |
12.7.6.2(Impulse voltage test) |
- |
2000 |
|
For Single and Three Phase |
12.7.6.3(ac high voltage test) |
- |
1000 |
|
For Single and Three Phase |
12.16(Limits of Error and Interpretation or Test Results) |
- |
2500 |
|
For Single and Three Phase |
|
Complete
|
|
20 Jun, 2025 |
Included w.e.f. 02.08.2023 |