Electrical Research and Development Association, gujurat

ERDA Road, GIDC, Makarpura, Vadodara, VADODARA, Vadodara, Gujarat, 390010
9987940924 nirav.taunk@erda.org
Scope List
Reset
165 Results
S.No. Indian Standard No. Product Grade / Type / Size / Designation etc. Testing Charges (Excl. Of Taxes) Validity Date Remark
151 IS 398 : Part 5 (1992) Aluminium conductor for overhead transmission purposes - Specification: Part 5 aluminium conductors - Galvanized steel - Reinforced for extra high voltage (400 KV And Above) (First Revision) - 178960 View breakup
-
30 Nov, 2028 -
-
152 IS 398 : Part 4 (1994) Aluminium conductors for overhead transmission purposes: Part 4 aluminium alloy stranded conductors (Aluminium - Magnesium - Silicon Type) - Specification (Third Revision) - 73250 View breakup
-
30 Nov, 2028 -
-
153 IS 398 : Part 2 (1996) Aluminium conductors for overhead transmission purposes - Specification: Part 2 aluminium conuuctors, galvanized steel - Reinforced (Third Revision) - 166060 View breakup
-
30 Nov, 2028 -
-
154 IS 398 : Part 1 (1996) Aluminium conductors for overhead transmission purposes - Specification: Part 1 aluminium stranded conductors (Third Revision) - 33780 View breakup
-
30 Nov, 2028 -
-
155 IS 1180 : Part 1 (2014) Outdoor Type Oil Immersed Distribution Transformers Upto and Including 2 500 kVA, 33kV - Specification Part 1 Mineral Oil Immersed (Fourth Revision) DISTRIBUTON TRANSFORMER 394926 View breakup
-
30 Nov, 2028 -
-
156 IS 14286 (2010) Crystalline silicon terrestrial photovoltaic (PV) modules - Design qualification and type approval (First Revision) - 963359 View breakup
-
30 Nov, 2028 -
-
157 IS 648 (2022) Cold rolled non-oriented electrical steel sheet and strip - Fully processed type - Specification Sixth Revision All Grades as Per Table-1 36535 View breakup
-
30 Nov, 2028 -
-
158 IS 16221 : Part 1 (2016) Safety of Power Converters for use in Photovoltaic Power Systems Part 1 General Requirements Upto 250 kVA 979000 View breakup
-
30 Nov, 2028 -
Included w.e.f. 23.01.2026
159 IS 16169 (2019) Utility - Interconnected photovoltaic inverters - Test procedure of islanding prevention measures (First Revision) Upto 250 kVA 305000 View breakup
-
30 Nov, 2028 -
Included w.e.f.10.09.2025
160 IS/IEC 61727 (2004) Photovoltaic PV Systems ” Characteristics of the Utility Interface Upto 250 kVA 618000 View breakup
-
30 Nov, 2028 -
Included w.e.f 04.09.2025
161 IS 17980 (2022) Maximum Power Point Tracking Efficiency of Grid Connected Photovoltaic Inverters (First Revision) Upto 250 kVA 198000 View breakup
-
30 Nov, 2028 -
Included w.e.f. 18.08.2025
162 IS/IEC 61683 (1999) Photovoltaic systems - Power conditioners - Procedure for measuring efficiency 250 kVA Grid connected and Stand alone 144000 View breakup
-
30 Nov, 2028 -
Included w.e.f.11.09.2025
163 IS 302 : Part 2 : Sec 80 (2017) Household and similar electrical appliances - Safety: Part 2 - 80 particular requirements for fans (First Revision) Ceiling fan, Duct fan, Partition fan, pedestal fan, Table fan 24340 View breakup
-
30 Nov, 2028 -
Included w.e.f 19.06.2025 Exclusion: Cl 19.11.4.7 (Harmonics)
164 IS 16270 (2023) Secondary cells and batteries for solar photovoltaic application - General requirements and methods of test For Lead acid cells/batteries (Vented/monobloc/VRLA), Nickel batteries, Lithium batteries rating up to and including 800 Ah 1737300 View breakup
-
30 Nov, 2028 -
Included w.e.f 16.07.2025
165 IS 13340 : PART 1 (2024) Shunt Power Capacitors of the Self-Healing Type for a.c. Systems Having a Rated Voltage up to and Including 1 000 V Part 1 General - Performance, Testing and Rating - Safety Requirements - Guide for Installation and Operation (Second Revision) - 267790 View breakup
-
30 Nov, 2028 -
-

Designed, Developed and Maintained by:

Arohatech IT Services (P) Ltd.

Contact for any query/support: supportlims@bis.gov.in