10081 |
ECO Laboratories & Consultants Pvt Ltd
| 9134816
| IS 1011 (2002) |
Biscuits - Specification (Fourth Revision) |
- |
- View breakup
Rs.1300/-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
No Record Found
|
|
- |
- Suspended w.e.f. 10.08.2018 |
10082 |
National Dairy Research Institute, Bengaluru
| 6106512
| IS 1165 (2002) |
Milk Powder (Bi-lingual) |
- |
- View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
No Record Found
|
|
- |
- (Lab of national repute and eminence, facilities of which are being utilized by BIS.) |
10083 |
National Dairy Research Institute, Karnal
| 9102812
| IS 1165 (2002) |
Milk Powder (Bi-lingual) |
- |
- View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
No Record Found
|
|
- |
- (Lab of national repute and eminence, facilities of which are being utilized by BIS.) |
10084 |
Central Power Research Institute (CPRI), Bangalore
| 6101024
| IS 9968 : Part 2 (2002) |
Specification for elastomer - Insulated cables: Part 2 for working voltages from 3.3 kV up to and including 33 kV (First Revision) |
- |
399750 View breakup
Rs.241560/- + 18% GST for 1-core; Rs.459710/- + 18% GST for 2-core
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
4.1(CONDUCTORS: Cables for Fixed Installation) |
- |
0 |
|
The complete test charges applicable will be intimated through proforma invoice. |
4.2(CONDUCTORS:Flexible Cables) |
- |
0 |
|
The complete test charges applicable will be intimated through proforma invoice. |
5(INSULATION) |
- |
0 |
|
The complete test charges applicable will be intimated through proforma invoice. |
6(SEMICONDUCTING COMPOUND) |
- |
0 |
|
The complete test charges applicable will be intimated through proforma invoice. |
7.1(Proofed Tape) |
- |
0 |
|
The complete test charges applicable will be intimated through proforma invoice. |
7.1(Proofed Tape: Thickness) |
- |
850 |
|
The complete test charges applicable will be intimated through proforma invoice. |
7.2(Polyethylene Terephthalate ( P E T P ) or
Polypropylene Base Tape : Thickness) |
- |
850 |
|
The complete test charges applicable will be intimated through proforma invoice. |
7.3(Tape ) |
- |
0 |
|
The complete test charges applicable will be intimated through proforma invoice. |
8(SCREENING) |
- |
0 |
|
The complete test charges applicable will be intimated through proforma invoice. |
9(CENTRE AND FILLERS) |
- |
0 |
|
The complete test charges applicable will be intimated through proforma invoice. |
10(ARMOUR) |
- |
0 |
|
The complete test charges applicable will be intimated through proforma invoice. |
11.1(Inner Sheath) |
- |
0 |
|
The complete test charges applicable will be intimated through proforma invoice. |
11.2(Outer Sheath) |
- |
0 |
|
The complete test charges applicable will be intimated through proforma invoice. |
12.1(Tapes) |
- |
0 |
|
The complete test charges applicable will be intimated through proforma invoice. |
12.2(Cords and Yarns) |
- |
0 |
|
The complete test charges applicable will be intimated through proforma invoice. |
13.1 & 13.2(CONSTRUCTION:CONDUCTORS-Cables for Fixed Installations/Flexible Cables) |
- |
0 |
|
The complete test charges applicable will be intimated through proforma invoice. |
13.3(Earthing Conductor) |
- |
0 |
|
The complete test charges applicable will be intimated through proforma invoice. |
13.3.1(Earthing Conductor) |
- |
0 |
|
The complete test charges applicable will be intimated through proforma invoice. |
13.4(Separator Tape) |
- |
0 |
|
The complete test charges applicable will be intimated through proforma invoice. |
14(CONDUCTOR SCREENING) |
- |
0 |
|
The complete test charges applicable will be intimated through proforma invoice. |
15.1(INSULATION : Application) |
- |
0 |
|
The complete test charges applicable will be intimated through proforma invoice. |
15.2(Thickness of Insulation) |
- |
2300 |
|
The test charges is applicable for one core and if the number core increases, test charges will also increase proportionally.
The complete test charges applicable will be intimated through proforma invoice. |
15.3(Tolerance on Thickness of Insulation) |
- |
0 |
|
The complete test charges applicable will be intimated through proforma invoice. |
16.1(INSULATION SCREENING : Application) |
- |
0 |
|
The complete test charges applicable will be intimated through proforma invoice. |
16.2(INSULATION SCREENING : Parts ) |
- |
0 |
|
The complete test charges applicable will be intimated through proforma invoice. |
16.3(INSULATION SCREENING : Non Metallic Parts ) |
- |
0 |
|
The complete test charges applicable will be intimated through proforma invoice. |
16.4(INSULATION SCREENING : Metallic Parts ) |
- |
0 |
|
The complete test charges applicable will be intimated through proforma invoice. |
17(CORE IDENTIFICATION) |
- |
0 |
|
The complete test charges applicable will be intimated through proforma invoice. |
17(CORE IDENTIFICATION: Unscreed cable ) |
- |
0 |
|
The complete test charges applicable will be intimated through proforma invoice. |
18.1(LAYING UP OF CORES) |
- |
0 |
|
The complete test charges applicable will be intimated through proforma invoice. |
18.2(LAYING UP OF CORES : Flexible cable) |
- |
0 |
|
The complete test charges applicable will be intimated through proforma invoice. |
18.3(LAYING UP OF CORES : Binder Tape) |
- |
0 |
|
The complete test charges applicable will be intimated through proforma invoice. |
19.1(Inner Sheath : Application) |
- |
0 |
|
The complete test charges applicable will be intimated through proforma invoice. |
19.2(Thickness of Inner Sheath) |
- |
2300 |
|
The complete test charges applicable will be intimated through proforma invoice. |
19.3(Inner Sheath : proofed tape) |
- |
0 |
|
The complete test charges applicable will be intimated through proforma invoice. |
20.1(ARMOURING: Application) |
- |
0 |
|
The complete test charges applicable will be intimated through proforma invoice. |
20.2(Type of Armour) |
- |
0 |
|
The complete test charges applicable will be intimated through proforma invoice. |
20.2 1.2(Direction of lay of armour) |
- |
0 |
|
The complete test charges applicable will be intimated through proforma invoice. |
20.2 1.3(Joint in armour) |
- |
0 |
|
The complete test charges applicable will be intimated through proforma invoice. |
20.2.2(Diameter of braiding) |
- |
850 |
|
The complete test charges applicable will be intimated through proforma invoice. |
20.2.2.1(Braiding material) |
- |
0 |
|
The complete test charges applicable will be intimated through proforma invoice. |
20.3(Substitution of the galvanized steel wires/formed) |
- |
0 |
|
The complete test charges applicable will be intimated through proforma invoice. |
21.1(OUTER SHEATH) |
- |
0 |
|
The complete test charges applicable will be intimated through proforma invoice. |
21.2(Coulor of Outer sheath) |
- |
0 |
|
The complete test charges applicable will be intimated through proforma invoice. |
21.3(Thickness of Outer Sheat: Average) |
- |
2300 |
|
The complete test charges applicable will be intimated through proforma invoice. |
21.3(Thickness of Outer Sheat: Minimum) |
- |
0 |
|
The complete test charges applicable will be intimated through proforma invoice. |
22.1 a)1)(Annealing test
(for copper) - IS 10810: Part 1) |
- |
1450 |
|
The test charges is applicable for one core and if the number core increases, test charges will also increase proportionally.
The complete test charges applicable will be intimated through proforma invoice. |
22.1 a)2)(Tensile test
(for aluminium) -IS 10810: Part 2) |
- |
5300 |
|
The test charges is applicable for one core and if the number core increases, test charges will also increase proportionally.
The complete test charges applicable will be intimated through proforma invoice. |
22.1 a)3)(Wrapping Test
(for aluminium) - IS 10810: Part 3) |
- |
500 |
|
The test charges is applicable for one core and if the number core increases, test charges will also increase proportionally.
The complete test charges applicable will be intimated through proforma invoice. |
22.1 a)4)(Conductor resistance
test) |
- |
2300 |
|
The test charges is applicable for one core and if the number core increases, test charges will also increase proportionally.
The complete test charges applicable will be intimated through proforma invoice. |
22.1 a)5)(Persulphate test
(tinned copper
conductor)- IS 10810: Part 4) |
- |
2300 |
|
The test charges is applicable for one core and if the number core increases, test charges will also increase proportionally.
The complete test charges applicable will be intimated through proforma invoice. |
22.1 b)1)(Test for Galvanized Steel
Wires/Formed Wires
1) Dimensions -IS 10810: Part 36) |
- |
850 |
|
The complete test charges applicable will be intimated through proforma invoice. |
22.1 b)2)i)(Test for Galvanized Steel
Wires/Formed Wires
2) Tensile Strentgh -IS 10810: Part 37) |
- |
5200 |
|
The complete test charges applicable will be intimated through proforma invoice. |
22.1 b)2)ii)(Test for Galvanized Steel
Wires/Formed Wires
2) Elongation at break -IS 10810: Part 37) |
- |
5200 |
|
The complete test charges applicable will be intimated through proforma invoice. |
22.1 b)2)iii)(Test for Galvanized Steel
Wires/Formed Wires
3) Torsion (for round
wires only) -IS 10810: Part 38) |
- |
500 |
|
The complete test charges applicable will be intimated through proforma invoice. |
22.1 b)2)iv)(Test for Galvanized Steel
Wires/Formed Wires
4) Winding (for strips
only) -IS 10810: Part 39) |
- |
500 |
|
The complete test charges applicable will be intimated through proforma invoice. |
22.1 b)2)v)(Test for Galvanized Steel
Wires/Formed Wires
5) Zinc coating : Uniformity-IS 10810: Part 40) |
- |
700 |
|
The complete test charges applicable will be intimated through proforma invoice. |
22.1 b)2)vi)(Test for Galvanized Steel
Wires/Formed Wires
5) Zinc coating : Mass -IS 10810: Part 41) |
- |
700 |
|
The complete test charges applicable will be intimated through proforma invoice. |
22.1 b)2) vii) (Resistivity - IS 10810: Part 42) |
- |
2300 |
|
The complete test charges applicable will be intimated through proforma invoice. |
22.1 c)2)(Physical Tests for
Insulation : Tensile Strenth - IS 10810: Part 7) |
- |
5200 |
|
The test charges is applicable for one core and if the number core increases, test charges will also increase proportionally.
The complete test charges applicable will be intimated through proforma invoice. |
22.1 c)2)(Physical Tests for
Insulation : Elongation - IS 10810: Part 7) |
- |
5200 |
|
The test charges is applicable for one core and if the number core increases, test charges will also increase proportionally.
The complete test charges applicable will be intimated through proforma invoice. |
22.1 c)2)(Physical Tests for
Sheath : Tensile Strenth - IS 10810: Part 7) |
- |
5200 |
|
The complete test charges applicable will be intimated through proforma invoice. |
22.1 c)2)(Physical Tests for
Sheath : Elongation - IS 10810: Part 7) |
- |
5200 |
|
The complete test charges applicable will be intimated through proforma invoice. |
22.1 c)3)(Physical Tests for
Insulation ( Ageing in air oven): Tensile Strenth - IS 10810: Part 11) |
- |
5300 |
|
The complete test charges applicable will be intimated through proforma invoice. |
22.1 c)3)(Physical Tests for
Insulation ( Ageing in air oven): Tensile Strenth Variation - IS 10810: Part 12) |
- |
5300 |
|
The complete test charges applicable will be intimated through proforma invoice. |
22.1 c)3)(Physical Tests for
Insulation( Ageing in air oven) : Elongation - IS 10810: Part 11) |
- |
5200 |
|
The test charges is applicable for one core and if the number core increases, test charges will also increase proportionally.
The complete test charges applicable will be intimated through proforma invoice. |
22.1 c)3)(Physical Tests for
Insulation( Ageing in air oven) : Elongation variation - IS 10810: Part 12) |
- |
5200 |
|
The test charges is applicable for one core and if the number core increases, test charges will also increase proportionally.
The complete test charges applicable will be intimated through proforma invoice. |
22.1 c)3)(Physical Tests for
Sheath( Ageing in air oven) : Tensile Strenth - IS 10810: Part 11) |
- |
5300 |
|
The complete test charges applicable will be intimated through proforma invoice. |
22.1 c)3)(Physical Tests for
Sheath( Ageing in air oven) : Tensile Strenth variation - IS 10810: Part 12) |
- |
5200 |
|
The complete test charges applicable will be intimated through proforma invoice. |
22.1 c)3)(Physical Tests for
Sheath ( Ageing in air oven): Elongation - IS 10810: Part 11) |
- |
5200 |
|
The complete test charges applicable will be intimated through proforma invoice. |
22.1 c)3)(Physical Tests for
Sheath ( Ageing in air oven): Elongation variation - IS 10810: Part 12) |
- |
0 |
|
The complete test charges applicable will be intimated through proforma invoice. |
22.1 c)4)(Physical Tests for
Insulation ( Ageing in air bomb): Tensile Strenth variation - IS 10810: Part 56) |
- |
15500 |
|
The complete test charges applicable will be intimated through proforma invoice. |
22.1 c)4)(Physical Tests for
Insulation( Ageing in air bomb) : Elongation variation - IS 10810: Part 56) |
- |
5200 |
|
The test charges is applicable for one core and if the number core increases, test charges will also increase proportionally.
The complete test charges applicable will be intimated through proforma invoice. |
22.1 c)4)(Physical Tests for
Sheath(Ageing in air bomb) : Tensile Strenth variation - IS 10810: Part 56) |
- |
5200 |
|
The complete test charges applicable will be intimated through proforma invoice. |
22.1 c)4)(Physical Tests for
Sheath ( Ageing in air bomb): Elongation variation - IS 10810: Part 56) |
- |
5200 |
|
The complete test charges applicable will be intimated through proforma invoice. |
22.1 c)5)(Physical Tests for
Insulation :Hot set Elongation - IS 10810: Part 30) |
- |
2300 |
|
The test charges is applicable for one core and if the number core increases, test charges will also increase proportionally.
The complete test charges applicable will be intimated through proforma invoice. |
22.1 c)5)(Physical Tests for
Insulation :Permanent set - IS 10810: Part 30) |
- |
0 |
|
The complete test charges applicable will be intimated through proforma invoice. |
22.1 c)5)(Physical Tests for
Sheath :Hot set Elongation - IS 10810: Part 30) |
- |
2300 |
|
The complete test charges applicable will be intimated through proforma invoice. |
22.1 c)5)(Physical Tests for
Sheath :Permanent set - IS 10810: Part 30) |
- |
0 |
|
The complete test charges applicable will be intimated through proforma invoice. |
22.1 c)6)(Physical Tests for
Sheath(Oil resistance test) : Tensile Strenth Variation - IS 10810: Part 31) |
- |
11500 |
|
The complete test charges applicable will be intimated through proforma invoice. |
22.1 c)6)(Physical Tests for
Sheath ( Oil resistance test): Elongation Variation - IS 10810: Part 31) |
- |
11500 |
|
The complete test charges applicable will be intimated through proforma invoice. |
22.1 c)7)(Tear Resistance test - IS 10810: Part 17) |
- |
5300 |
|
The complete test charges applicable will be intimated through proforma invoice. |
22.1 c)8)(Shrinkage : Insulation - IS 10810: Part 12) |
- |
1000 |
|
The test charges is applicable for one core and if the number core increases, test charges will also increase proportionally.
The complete test charges applicable will be intimated through proforma invoice. |
22.1 c)8)(Shrinkage test- Crack observed : Insulation - IS 10810: Part 13) |
- |
0 |
|
The complete test charges applicable will be intimated through proforma invoice. |
22.1 c)8)(Shrinkage test : Sheath - IS 10810: Part 12) |
- |
1000 |
|
The complete test charges applicable will be intimated through proforma invoice. |
22.1 c)8)(Shrinkage test - Crack oberved : Sheath - IS 10810: Part 13) |
- |
0 |
|
The complete test charges applicable will be intimated through proforma invoice. |
22.1 c)9)(Hot deformation test : Insulation - IS 10810: Part 15) |
- |
2200 |
|
The test charges is applicable for one core and if the number core increases, test charges will also increase proportionally.
The complete test charges applicable will be intimated through proforma invoice. |
22.1 c)9)(Hot deformation test : Sheath - IS 10810: Part 15) |
- |
2200 |
|
The complete test charges applicable will be intimated through proforma invoice. |
22.1 c)10)(Loss of mass in air
oven : Insulation - IS 10810: Part 10) |
- |
5300 |
|
The test charges is applicable for one core and if the number core increases, test charges will also increase proportionally.
The complete test charges applicable will be intimated through proforma invoice. |
22.1 c)10)(Loss of mass in air
oven : Sheath - IS 10810: Part 10) |
- |
5300 |
|
The test charges is applicable for one core and if the number core increases, test charges will also increase proportionally.
The complete test charges applicable will be intimated through proforma invoice. |
22.1 c)11)(Heat shock : Insulation - IS 10810: Part 14) |
- |
1000 |
|
The test charges is applicable for one core and if the number core increases, test charges will also increase proportionally.
The complete test charges applicable will be intimated through proforma invoice. |
22.1 c)11)(Heat shock : Sheath - IS 10810: Part 14) |
- |
1000 |
|
The complete test charges applicable will be intimated through proforma invoice. |
22.1 c)12)(Thermal stability : Insulation - IS 10810: Part 60) |
- |
3000 |
|
The test charges is applicable for one core and if the number core increases, test charges will also increase proportionally.
The complete test charges applicable will be intimated through proforma invoice. |
22.1 c)12)(Thermal stability : Sheath - IS 10810: Part 60) |
- |
3000 |
|
The complete test charges applicable will be intimated through proforma invoice. |
22.1 d)(Insulation Resistance Test: Volume resistivity ) |
- |
2700 |
|
The test charges is applicable for one core and if the number core increases, test charges will also increase proportionally.
The complete test charges applicable will be intimated through proforma invoice. |
22.1 d)(Insulation Resistance Test: Insulation resistance constant ) |
- |
2700 |
|
The test charges is applicable for one core and if the number core increases, test charges will also increase proportionally.
The complete test charges applicable will be intimated through proforma invoice. |
22.1 e)(Partial Discharge Test) |
- |
4000 |
|
The test charges is applicable for one core and if the number core increases, test charges will also increase proportionally.
The complete test charges applicable will be intimated through proforma invoice. |
22.1 f)(Bending Test Followed by
Partial Discharge Test) |
- |
9700 |
|
The test charges is applicable for one core and if the number core increases, test charges will also increase proportionally.
The complete test charges applicable will be intimated through proforma invoice. |
22.1 g)(Dielectric Power Factor
Test
1) As a function of Voltage) |
- |
2300 |
|
The test charges is applicable for one core and if the number core increases, test charges will also increase proportionally.
The complete test charges applicable will be intimated through proforma invoice. |
22.1 g)(Dielectric Power Factor
Test
1) As a function of
temperature) |
- |
3750 |
|
The test charges is applicable for one core and if the number core increases, test charges will also increase proportionally.
The complete test charges applicable will be intimated through proforma invoice. |
22.1 h)(Heating Cycle Test) |
- |
2000 |
|
The testing charges is for one cycle and it proportionally increases with number of cycles.
The complete test charges applicable will be intimated through proforma invoice. |
22.1 j)(Impulse Withstand Test) |
- |
19750 |
|
The test charges is applicable for one core and if the number core increases, test charges will also increase proportionally.
The complete test charges applicable will be intimated through proforma invoice. |
22.1 k)(High Voltage Test
for Four Hours) |
- |
5200 |
|
The test charges is applicable for one core and if the number core increases, test charges will also increase proportionally.
The complete test charges applicable will be intimated through proforma invoice. |
22.1 m)(Water Absorption Test - IS 10810: Part 28) |
- |
16100 |
|
The complete test charges applicable will be intimated through proforma invoice. |
22.1 n)(Flammability) |
- |
1600 |
|
The complete test charges applicable will be intimated through proforma invoice. |
24.1(Manufacturer's Identification) |
- |
0 |
|
The complete test charges applicable will be intimated through proforma invoice. |
24.2(Voltage Identification) |
- |
0 |
|
The complete test charges applicable will be intimated through proforma invoice. |
24.3(Cable Code) |
- |
0 |
|
The complete test charges applicable will be intimated through proforma invoice. |
25.2.1(Marking on drum ) |
- |
0 |
|
The complete test charges applicable will be intimated through proforma invoice. |
25.2.2(BIS Certification Marking) |
- |
0 |
|
The complete test charges applicable will be intimated through proforma invoice. |
15.4 (b)(Cold impact) |
- |
7600 |
|
The complete test charges applicable will be intimated through proforma invoice. |
|
31 Dec, 2026 |
- - |
10085 |
MSME Testing Centre, New Delhi
| 8101204
| IS 12592 (2002) |
Precast concrete manhole cover and frame - Specification (First Revision) |
- |
11957 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
5.2(Dimensions of cover- Diameter) |
- |
5198 |
|
- |
3(Grade) |
- |
520 |
|
Marking |
3(Type/Shape of Cover) |
- |
520 |
|
Visual Examination, Shape and Finishing |
7.4.1(Edge Protection and Finishing - Frame) |
- |
1271 |
|
- |
7.4.2(Edge Protection and Finishing - Cover) |
- |
520 |
|
- |
8(LIFTING HOOKS) |
- |
520 |
|
- |
9.1(General) |
- |
520 |
|
- |
9.3 and Table and
Annex C(Load Test) |
- |
2888 |
|
- |
5.2 and Table 1(Dimensions of Frame - A) |
- |
520 |
|
- |
5.2 and Table 1(Dimensions of Frame - B) |
- |
520 |
|
- |
5.2 and Table 1(Dimensions of Frame - C) |
- |
520 |
|
- |
5.2 and Table 1(Dimensions of Frame - D) |
- |
520 |
|
- |
5.2 and Table 1(Dimensions of Frame - E) |
- |
520 |
|
- |
5.2 and Table 1(Dimensions of Frame - F) |
- |
520 |
|
- |
5.2(Clearance at top between the frame and the cover all round the periphery) |
- |
520 |
|
- |
5.2(Top surface ofthe frame and cover is in level) |
- |
520 |
|
- |
5.2(Suitable taper matching with taper given for the frame shall be provided to the periphery of the cover) |
- |
520 |
|
- |
5.2 and Fig 1(Clear cover to reinforcement) |
- |
520 |
|
- |
Clause No. 7.4.4(Compatitbilty of Seating of cover and frame) |
- |
520 |
|
- |
|
31 Dec, 2026 |
- - |
10086 |
CIPET:CSTS Amritsar
| 9120034
| IS 15225 (2002) |
Chlorinated polyvinyl chloride compounds used for pipes and fittings - Specifications |
CPVC for Pipes and Fittings |
17475 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
8.1.1(Resin k-value) |
- |
1100 |
|
- |
8.1.2(Resin chlorine content) |
- |
4300 |
|
- |
8.1.3(Form) |
- |
250 |
|
- |
8.1.4(Compound chlorine content) |
- |
4300 |
|
- |
8.1.5(Appearance) |
- |
300 |
|
- |
8.2.1(Vicat softening temperature) |
- |
1100 |
|
- |
8.2.2(Charpy impact strength) |
- |
1725 |
|
Charpy impact strength - Rs. 1100 + 625 Specimen |
8.2.3(Tensile strength) |
- |
1725 |
|
Tensile strength - Rs. 1100 + 625 Specimen |
8.2.4(Tensile modulus) |
- |
1725 |
|
Tensile modulus - Rs. 1100 + 625 Specimen |
8.3(Ash content) |
- |
950 |
|
- |
|
06 Jan, 2027 |
- Included w.e.f. 20.08.2024 |
10087 |
NATIONAL SUGAR INSTITUTE, KANPUR
| 9164114
| IS 1151 (2003) |
Refined sugar - Specification (Second Revision) |
- |
- View breakup
Colour in ICUMSA Units-Rs.1250/-, Conductivity Ash-Rs.1000/-, Moisture-Rs.500/-, Reducing sugar-Rs.500/-, Sulhite/Sulphur dioxide-Rs.500/-, Polarization-Rs.500/-, lead-Rs.500/-, Cr (Chromium)-Rs.500/-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
No Record Found
|
|
- |
- (Lab of national repute and eminence, facilities of which are being utilized by BIS.) Except test for Lead. |
10088 |
NATIONAL SUGAR INSTITUTE, KANPUR
| 9164114
| IS 1152 (2003) |
Icing sugar - Specification (Second Revision) |
- |
- View breakup
Colour in ICUMSA units-Rs.1250/-, Conductivity ash-Rs.1000/-, Loss on drying-Rs.500/-, Reducing sugar/invert sugars-Rs.500/-, Sulphite/Sulphur dioxide-Rs.500/-, Total of sucrose and starch-Rs.1250/-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
No Record Found
|
|
- |
- (Lab of national repute and eminence, facilities of which are being utilized by BIS.) Except particle size and test for Lead. |
10089 |
NATIONAL SUGAR INSTITUTE, KANPUR
| 9164114
| IS 5982 (2003) |
Plantation white sugar - Specification (First Revision) |
- |
- View breakup
Colour in ICUMSA Units-Rs.1250/-, Conductivity Ash-Rs.1000/-, Moisture-Rs.500/-, Reducing sugar-Rs.500/-, Sulhite/Sulphur dioxide-Rs.500/-, Polarization-Rs.500/-, lead-Rs.500/-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
No Record Found
|
|
- |
- (Lab of national repute and eminence, facilities of which are being utilized by BIS.). Except test for Lead. |
10090 |
DELHI TEST HOUSE, Azadhpur
| 8131406
| IS 1659 (2004) |
Block boards - Specification (Fourth Revision) |
- |
9500 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
7.3(Dimensional Requirements - Length - 8.1.4) |
- |
100 |
|
For BIS samples: 1.5 times of BIS testing charges |
7.3(Dimensional Requirements - Width - 8.1.4) |
- |
100 |
|
For BIS samples: 1.5 times of BIS testing charges |
7.3(Dimensional Requirements - Thickness - Annexure E) |
- |
100 |
|
For BIS samples: 1.5 times of BIS testing charges |
7.3(Dimensional Requirements - Edge Straightness - Annexure D) |
- |
100 |
|
For BIS samples: 1.5 times of BIS testing charges |
7.3(Dimensional Requirements - Squareness - Annexure D) |
- |
100 |
|
For BIS samples: 1.5 times of BIS testing charges |
7.3(Dimensional Requirements - Variation in thickness - Annexure E) |
- |
100 |
|
For BIS samples: 1.5 times of BIS testing charges |
9.2.1(Dimensional Changes caused by humidity - Change in Length - at 90% RH - Annexure F) |
- |
500 |
|
For BIS samples: 1.5 times of BIS testing charges |
9.2.1(Dimensional Changes caused by humidity - Change in Length - at 40% RH - Annexure F) |
- |
500 |
|
For BIS samples: 1.5 times of BIS testing charges |
9.2.1(Dimensional Changes caused by humidity - Change in Thickness - at 90% RH - Annexure F) |
- |
500 |
|
For BIS samples: 1.5 times of BIS testing charges |
9.2.1(Dimensional Changes caused by humidity - Change in thickness - at 40% RH - Annexure F) |
- |
500 |
|
For BIS samples: 1.5 times of BIS testing charges |
9.2.1(Dimensional Changes caused by humidity - Delamination - Annexure F) |
- |
500 |
|
For BIS samples: 1.5 times of BIS testing charges |
9.2.1(Dimensional Changes caused by humidity Change in local planeness - Annexure F) |
- |
500 |
|
For BIS samples: 1.5 times of BIS testing charges |
9.2.2 (Resistance to water - Annexure G, Annexure H [For BWP grade]) |
- |
1000 |
|
For BIS samples: 1.5 times of BIS testing charges |
9.2.2 (Resistance to water - Annexure G, Annexure H [For MR Grade]) |
- |
1000 |
|
For BIS samples: 1.5 times of BIS testing charges |
9.2.3(Adhesion of Plies - Annexure H) |
- |
500 |
|
For BIS samples: 1.5 times of BIS testing charges |
9.2.4(Mycological Test [for MR grade only] - Annexure J) |
- |
3000 |
|
For BIS samples: 1.5 times of BIS testing charges |
9.2.5(Modulus of rupture - AVERAGE - Annexure K) |
- |
1000 |
|
For BIS samples: 1.5 times of BIS testing charges |
9.2.5(Modulus of rupture - MINIMUM INDIVIDUAL - Annexure K) |
- |
1000 |
|
For BIS samples: 1.5 times of BIS testing charges |
9.2.5(Modulus of elasticity - AVERAGE - Annexure K) |
- |
1000 |
|
For BIS samples: 1.5 times of BIS testing charges |
9.2.5(Modulus of elasticity - MINIMUM INDIVIDUAL - Annexure K) |
- |
1000 |
|
For BIS samples: 1.5 times of BIS testing charges |
9.2.6(Spot test - Annexure L) |
- |
1000 |
|
For BIS samples: 1.5 times of BIS testing charges |
|
17 Jun, 2027 |
- - |
10091 |
National Test House (NR) - NTH, Ghaziabad
| 8101304
| IS 1659 (2004) |
Block boards - Specification (Fourth Revision) |
GRADE-BWP,MR/TYPE-DEC,COM |
11000 View breakup
For BIS samples: BIS approved testing charges. For others: Rs.11000/-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
7.3(Dimensional Requirements - Length - 8.1.4) |
- |
1000 |
|
- |
7.3(Dimensional Requirements - Width - 8.1.4) |
- |
0 |
|
- |
7.3(Dimensional Requirements - Thickness - Annexure E) |
- |
0 |
|
- |
7.3(Dimensional Requirements - Edge Straightness - Annexure D) |
- |
0 |
|
- |
7.3(Dimensional Requirements - Squareness - Annexure D) |
- |
0 |
|
- |
7.3(Dimensional Requirements - Variation in thickness - Annexure E) |
- |
0 |
|
- |
8.1.3, 6.3.3, IS 303(Visual Inspection - Permissible Defects - IS 303 [test method for COMMERCIAL type]) |
- |
1000 |
|
- |
8.1.3, 6.3.3, IS 1328(Visual Inspection - Permissible Defects - IS 1328 [test method for DECORATIVE type]) |
- |
1000 |
|
- |
9.2.1(Dimensional Changes caused by humidity - Delamination - Annexure F) |
- |
1000 |
|
- |
9.2.1(Dimensional Changes caused by humidity - Change in Length - at 90% RH - Annexure F) |
- |
0 |
|
- |
9.2.1(Dimensional Changes caused by humidity - Change in Length - at 40% RH - Annexure F) |
- |
0 |
|
- |
9.2.1(Dimensional Changes caused by humidity - Change in Thickness - at 90% RH - Annexure F) |
- |
0 |
|
- |
9.2.1(Dimensional Changes caused by humidity - Change in thickness - at 40% RH - Annexure F) |
- |
0 |
|
- |
9.2.1(Dimensional Changes caused by humidity Change in local planeness - Annexure F) |
- |
0 |
|
- |
9.2.2 (Resistance to water - Annexure G, Annexure H [For MR Grade]) |
- |
1000 |
|
- |
9.2.2 (Resistance to water - Annexure G, Annexure H [For BWP grade]) |
- |
1000 |
|
- |
9.2.3(Adhesion of Plies - Annexure H) |
- |
1000 |
|
- |
9.2.4(Mycological Test [for MR grade only] - Annexure J) |
- |
2000 |
|
- |
9.2.5(Modulus of rupture - MINIMUM INDIVIDUAL - Annexure K) |
- |
0 |
|
- |
9.2.5(Modulus of rupture - AVERAGE - Annexure K) |
- |
1000 |
|
- |
9.2.5(Modulus of elasticity - MINIMUM INDIVIDUAL - Annexure K) |
- |
0 |
|
- |
9.2.5(Modulus of elasticity - AVERAGE - Annexure K) |
- |
1000 |
|
- |
9.2.6(Spot test - Annexure L) |
- |
2000 |
|
- |
|
26 Oct, 2025 |
- - |
10092 |
MSME Testing Centre, New Delhi
| 8101204
| IS 2888 (2004) |
Toilet soap - Specification (Third Revision) |
- |
6450 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
5.5, Table-1 (vii), Grade-3(Lather) |
- |
500 |
|
- |
5.5, Table-1 (vi), Grade-1, Grade-2 & Grade-3(Free carbonated alkali) |
- |
950 |
|
- |
5.5, Table-1 (v), Grade-1, Grade-2 & Grade-3(Chloride (as sodium chloride), IS 286) |
- |
950 |
|
- |
5.5, Table-1 (iv), Grade-2 & Grade-3(Matter insoluble in alcohol, IS 286) |
- |
950 |
|
- |
5.5, Table-1 (iii), Grade-1, Gr-2 & Gr-3(Free caustic alkali, as sodium hydroxide (NaOH), IS 286) |
- |
950 |
|
- |
5.5, Table-1 (ii), Grade-1, Gr-2 & Gr-3(Rosin acids, percent by mass of total fatty matter, IS 286 ) |
- |
1050 |
|
- |
5.5, Table-1 (i), Grade-3(Total fatty matter, IS 286) |
- |
1350 |
|
- |
5.3(Phenolic substances, IS 286) |
- |
1000 |
|
- |
|
31 Dec, 2026 |
- - |
10093 |
Mitra S.K. Private Limited, Kolkata
| 5131716
| IS 13334 : Part 1 (2014) |
Skimmed milk powder - Specification: Part 1 standard grade (Second Revision) |
- |
10413 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
5.6(Listeria monocytogenes) |
- |
630 |
|
NA |
5.6(Spore count, Anaerobic (Sulfite reducing Clostridia)) |
- |
1219 |
|
NA |
5.6(Spore count, Aerobic (Bacillus cereus)) |
- |
1219 |
|
NA |
5.6(Salmonella) |
- |
630 |
|
NA |
5.6(Coagulase positive Staphylococcus aureus) |
- |
673 |
|
NA |
5.6(Escherichia coli) |
- |
491 |
|
NA |
5.6(Coliform count ) |
- |
490 |
|
NA |
5.6(Bacterial count) |
- |
420 |
|
NA |
5.6(Scorched particles) |
- |
980 |
|
NA |
5.6(Titratable acidity (lactic acid)) |
- |
420 |
|
NA |
5.6(Total ash (on dry basis)) |
- |
252 |
|
NA |
5.6(Insolubility index) |
- |
1050 |
|
NA |
5.6(Milk fat) |
- |
840 |
|
NA |
5.6(Milk protein in milk solids not fat) |
- |
1449 |
|
NA |
5.6(Moisture) |
- |
490 |
|
NA |
5.2(Absence of extraneous matter, added colour and added flavour) |
- |
189 |
|
NA |
4(Description) |
- |
0 |
|
NA |
|
20 Jul, 2024 |
- - |
10094 |
Central Power Research Institute (CPRI), Bangalore
| 6101024
| IS 15549 (2005) |
Stationary valve regulated lead acid batteries - Specification |
- |
258099.99 View breakup
New Type Test Charges: Rs.2,18,152/- for complete type tests (3 samples)
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
12.1(Endurance Life Cycle Test) |
- |
174000 |
|
1. The complete Test Charges shall be intimated through a proforma invoice
2. GST will be added in total test charges as applicable on the date of testing |
12.4(Ampere Hour Efficiency) |
- |
8000 |
|
1. The complete Test Charges shall be intimated through a proforma invoice
2. GST will be added in total test charges as applicable on the date of testing |
12.3(Capacity Test at Other Discharge Rates) |
- |
4100 |
|
1. The complete Test Charges shall be intimated through a proforma invoice
2. GST will be added in total test charges as applicable on the date of testing
3. Capacity test at another discharge rate applicable for per rating and per cell |
12.2(Test for C 1 Capacity) |
- |
4100 |
|
1. The complete Test Charges shall be intimated through a proforma invoice
2. GST will be added in total test charges as applicable on the date of testing |
12.9 & Annex C(Test for Oxygen Recombination Efficiency) |
- |
8000 |
|
1. The complete Test Charges shall be intimated through a proforma invoice
2. GST will be added in total test charges as applicable on the date of testing |
12.6(Test for Retention of Charge) |
- |
24000 |
|
1. The complete Test Charges shall be intimated through a proforma invoice
2. GST will be added in total test charges as applicable on the date of testing |
12.5(Watt Hour Efficiency) |
- |
8000 |
|
1. The complete Test Charges shall be intimated through a proforma invoice
2. GST will be added in total test charges as applicable on the date of testing |
8(Markings on Cell) |
- |
1100 |
|
1. The complete Test Charges shall be intimated through a proforma invoice
2. GST will be added in total test charges as applicable on the date of testing |
7.2(Designation of Cells) |
- |
1100 |
|
1. The complete Test Charges shall be intimated through a proforma invoice
2. GST will be added in total test charges as applicable on the date of testing |
7.5(Information to be Furnished by the Battery Supplier) |
- |
1100 |
|
1. The complete Test Charges shall be intimated through a proforma invoice
2. GST will be added in total test charges as applicable on the date of testing |
12.1(Test for C 10 Capacity) |
- |
24600 |
|
1. The complete Test Charges shall be intimated through a proforma invoice
2. GST will be added in total test charges as applicable on the date of testing |
|
31 Dec, 2026 |
- ISS included w.e.f. 23/7/2018 |
10095 |
National Metallurgical Laboratory Unit, Chennai
| 6107814
| IS 280 (2006) |
Mild steel wire for general engineering purposes (Fourth Revision) |
- |
- View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
No Record Found
|
|
- |
- (Lab of national repute and eminence, facilities of which are being utilized by BIS.) |
10096 |
MSME Testing Centre, New Delhi
| 8101204
| IS 280 (2006) |
Mild steel wire for general engineering purposes (Fourth Revision) |
Upto 4mm |
12780 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
Cl 7 & Table 1(Diameter & Difference Between Two Reading On Any Two Diameters) |
- |
520 |
|
Dimension |
Cl 9(Tensile Test On UTM) |
- |
1444 |
|
- |
Cl 13(Workmanship) |
- |
520 |
|
Freedom from defects |
6 AND AS PER IS 7887(MICRO ALLOY) |
- |
4895 |
|
Chemical Composition |
Cl 11(Workmanship) |
- |
2772 |
|
Coating Test |
9.2(Wrapping Test) |
- |
1271 |
|
- |
Cl 9(Tensile Test On UTM) |
- |
1358 |
|
Bend Test |
|
31 Dec, 2026 |
- - |
10097 |
Central Power Research Institute (CPRI), Bangalore
| 6101024
| IS 648 (2006) |
Cold rolled non-oriented electrical steel sheet and strip - Fully processed type - Specification (Fifth Revision) |
- |
30000 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
Cl 8.3(Length) |
- |
1100 |
|
- |
|
31 Dec, 2026 |
- - |
10098 |
National Metallurgical Laboratory Unit, Chennai
| 6107814
| IS 3601 (2006) |
Steel tubes for mechanical and general engineering purposes - Specification (Second Revision) |
- |
- View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
No Record Found
|
|
- |
- (Lab of national repute and eminence, facilities of which are being utilized by BIS.) |
10099 |
MSME Testing Centre, New Delhi
| 8101204
| IS 3601 (2006) |
Steel tubes for mechanical and general engineering purposes - Specification (Second Revision) |
- |
16495 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
4.1(Sulphur-Percentage by mass) |
- |
3795 |
|
Chemical Composition Test |
8.0(Straightness) |
- |
1352 |
|
- |
19.1.1, 24.1.1, 28.1.1, 33.1.1(Dimensions- Outside Dia) |
- |
2234 |
|
- |
11.2(Surface Protection) |
- |
1386 |
|
- |
13.1.3(Tensile Strength) |
- |
1790 |
|
Tensile, Yield Strength and Elongation |
13.2(Flattening Test) |
- |
1525 |
|
- |
13.3(Bend Test (Strip)) |
- |
1444 |
|
- |
13.4(Bend Test (Whole Tube)) |
- |
1444 |
|
- |
13.5(Drift Expansion Test) |
- |
1525 |
|
- |
|
31 Dec, 2026 |
- - |
10100 |
MSME Testing Centre, New Delhi
| 8101204
| IS 302 : Part 2 : Sec 3 (2007) |
Safety of household and similar electrical appliances: Part 2 particular requirements: Sec 3 electric iron (First Revision) |
- |
12000 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
8( Protection Against Electric Shock, IS 302-1) |
- |
2000 |
|
- |
10(Power Input and Current, IS 302-1) |
- |
2500 |
|
- |
13(Electrical Insulation and Leakage Current at Operating Temperature: Leakage current, IS 302-1) |
- |
4000 |
|
- |
14(Transient Over Voltages, IS 302-1) |
- |
2000 |
|
- |
15.1(Moisture Resistance, IS 302-1) |
- |
4000 |
|
- |
16(Electrical Insulation and Leakage Current at Operating Temperature: High Voltage, IS 302-1) |
- |
4000 |
|
- |
19.4(Abnormal Operation, IS 302-1) |
- |
2000 |
|
- |
21.101(Mechanical Strength, IS 302-2-3) |
- |
2000 |
|
- |
25.2(Supply Connection and External Flexible Cords, IS 302-1) |
- |
2000 |
|
- |
26(Terminals for External Conductors, IS 302-1) |
- |
2000 |
|
- |
27.1(Provision for Earthing, IS 302-1) |
- |
2000 |
|
- |
28(Screws & Connections, IS 302-1) |
- |
2000 |
|
- |
30.1(Resistance to Heat, Fire & Tracking, IS 302-1) |
- |
4000 |
|
- |
31(Resistance of Rusting, IS 302-1) |
- |
2500 |
|
- |
11(Heating, IS 302-1) |
- |
2500 |
|
- |
20.1(Stability & Mechanical Hazards, IS 302-1) |
- |
5000 |
|
- |
29.1(Clearances, Creepage distances and Solid Insulation, IS 302-1) |
- |
2500 |
|
- |
|
31 Dec, 2026 |
- Excl: Cl. 19.11.4.1 to Cl. 19.11.4.7 (EMI/EMC tests) |
10101 |
MSME Testing Centre, New Delhi
| 8101204
| IS 302 : Part 2 : Sec 30 (2007) |
Safety of household and similar electrical appliances: Part 2 particular requirements: Sec 30 room heaters (First Revision) |
- |
12000 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
Cl.8 & IS:302-1:2008(Protection Against Access to Live Parts) |
- |
2500 |
|
- |
Cl.10 & IS:302-1:2008(Power Input and Current) |
- |
2500 |
|
- |
Cl.11 of IS:302-2:30: 2007(Heating : Temperature rise in winding) |
- |
3000 |
|
- |
Cl.13 & IS:302-1:2008(Leakage Current & Electric Strength at operating temp. ) |
- |
4000 |
|
- |
Cl.14 & IS:302-1:2008(Transient Over Voltages) |
- |
2000 |
|
- |
Cl.15 & IS: 302-1:2008(Moisture Resistance
) |
- |
4000 |
|
- |
Cl.16 of IS:302-1:2008(Leakage current and Electric strength (After humidity): Leakage current ) |
- |
4000 |
|
- |
Cl.19.108(Abnormal Operation.) |
- |
2000 |
|
- |
Cl.21 & IS:302-1:2008)(Mechanical Strength.) |
- |
2000 |
|
- |
Cl.25.1 of 302-1:2008(Supply Connection and External Flexible Cords ) |
- |
2000 |
|
- |
Cl.26.1 of IS 302-1:2008(Terminal for External Conductors
) |
- |
2000 |
|
- |
Cl.27.1 of 302-1:2008(Provision for Earthing.) |
- |
2000 |
|
- |
Cl.28 of 302-1:2008(Screws and Connections.) |
- |
2000 |
|
- |
Cl.30 & IS:302-1:2008(Resistance to Heat and Fire) |
- |
4000 |
|
- |
Cl.31 & IS:302-1:2008(Resistance to Rusting.) |
- |
2500 |
|
- |
Cl.29 & IS:302-1:2008(Clearances, Creepage Distances and Solid Insulation) |
- |
2500 |
|
- |
Cl.20 & IS:302-1:2008(Stability & Mechanical Hazards) |
- |
5000 |
|
- |
Cl.22.7 of IS 302-1:2008(Construction) |
- |
2000 |
|
- |
C.23.7 of 302-1:2008(Internal Wiring
) |
- |
2000 |
|
2000 |
C.24.1.4(Component) |
- |
2000 |
|
- |
Cl.32 & IS:302-1:2008(Radition,Toxicity and similar Hazards.) |
- |
2000 |
|
- |
Cl.6 (Classification) |
- |
1000 |
|
- |
Cl.17 & IS:302-1:2008(Over load Protection of Transformers and Associated Circuits ) |
- |
2000 |
|
- |
Cl.18 (Endurance. ) |
- |
4000 |
|
- |
Cl.6 (Classification) |
- |
2000 |
|
- |
Cl.7 & IS:302-1:2008(Marking and Instructions) |
- |
2000 |
|
- |
Cl.7 & IS:302-1:2008(Marking and Instructions) |
- |
2000 |
|
- |
Cl.7 & IS:302-1:2008(Marking and Instructions) |
- |
2000 |
|
- |
Cl.7 & IS:302-1:2008(Marking and Instructions) |
- |
2000 |
|
- |
Cl.7 & IS:302-1:2008(Marking and Instructions) |
- |
2000 |
|
- |
Cl.7 & IS:302-1:2008(Marking and Instructions) |
- |
2000 |
|
- |
Cl.7(Marking and Instructions) |
- |
2000 |
|
- |
Cl.7.3(Marking and Instructions) |
- |
2000 |
|
- |
Cl.7.3(Marking and Instructions) |
- |
2000 |
|
- |
Cl.7.4(Marking and Instructions) |
- |
2000 |
|
- |
Cl.7.5(Marking and Instructions) |
- |
2000 |
|
- |
Cl.7.6 & IS:302-1:2008(Marking and Instructions) |
- |
2000 |
|
- |
Cl.7.8 of IS :302-1:2008(Marking and Instructions) |
- |
2000 |
|
- |
Cl.7.9 of IS :302-1:2008(Marking and Instructions) |
- |
2000 |
|
- |
Cl.7.10 of IS :302-1:2008(Marking and Instructions) |
- |
2000 |
|
- |
Cl.7.11 of IS :302-1:2008(Marking and Instructions) |
- |
2000 |
|
- |
Cl.7.12 & IS:302-1:2008(Marking and Instructions) |
- |
2000 |
|
- |
Cl.7.12 & IS:302-1:2008(Marking and Instructions) |
- |
2000 |
|
- |
Cl.7.12 & IS:302-1:2008(Marking and Instructions) |
- |
2000 |
|
- |
Cl.7.12 & IS:302-1:2008(Marking and Instructions) |
- |
2000 |
|
- |
Cl.7.12 & IS:302-1:2008(Marking and Instructions) |
- |
2000 |
|
- |
Cl.7.12 & IS:302-1:2008(Marking and Instructions) |
- |
2000 |
|
- |
Cl.7.12 & IS:302-1:2008(Marking and Instructions) |
- |
2000 |
|
- |
Cl.7.12 & IS:302-1:2008(Marking and Instructions) |
- |
2000 |
|
- |
Cl.7.12 & IS:302-1:2008(Marking and Instructions) |
- |
2000 |
|
- |
Cl.7.12.1 & IS:302-1:2008(Marking and Instructions) |
- |
2000 |
|
- |
Cl.7.12.1 & IS:302-1:2008(Marking and Instructions) |
- |
2000 |
|
- |
Cl.7.12.1 & IS:302-1:2009(Marking and Instructions) |
- |
2000 |
|
- |
Cl.7.12.1 & IS:302-1:2008(Marking and Instructions) |
- |
2000 |
|
- |
Cl.7.12.1 & IS:302-1:2008(Marking and Instructions) |
- |
2000 |
|
- |
Cl.7.12.1 & IS:302-1:2008(Marking and Instructions) |
- |
2000 |
|
- |
Cl.7.12.1 & IS:302-1:2008(Marking and Instructions) |
- |
2000 |
|
- |
Cl.7.12.1 & IS:302-1:2008(Marking and Instructions) |
- |
2000 |
|
- |
Cl.7.13 of IS 302-1:2008(Marking and Instructions) |
- |
2000 |
|
- |
Cl.7.14(Marking and Instructions) |
- |
2000 |
|
- |
Cl.7.14 of IS302-1:2008(Marking and Instructions) |
- |
2000 |
|
- |
Cl.7.15 of IS 302-1:2008(Marking and Instructions) |
- |
2000 |
|
- |
Cl.7.15 of IS 302-1:2008(Marking and Instructions) |
- |
2000 |
|
- |
Cl.7.15 of IS 302-1:2008(Marking and Instructions) |
- |
2000 |
|
- |
Cl.7.101(Marking and Instructions) |
- |
2000 |
|
- |
Cl.11 & IS:302-1:2008(Heating) |
- |
3000 |
|
- |
Cl.11 & IS:302-1:2008(Heating) |
- |
3000 |
|
- |
Cl.11 & IS:302-1:2008(Heating) |
- |
3000 |
|
- |
Cl.11 & IS:302-1:2008(Heating) |
- |
3000 |
|
- |
Cl.11 & IS:302-1:2008(Heating) |
- |
3000 |
|
- |
Cl.11 & IS:302-1:2008(Heating) |
- |
3000 |
|
- |
Cl.11 & IS:302-1:2008(Heating) |
- |
3000 |
|
- |
Cl.11 & IS:302-1:2008(Heating) |
- |
3000 |
|
- |
Cl.11 & IS:302-1:2008(Heating) |
- |
3000 |
|
- |
Cl.11 & IS:302-1:2008(Heating) |
- |
3000 |
|
- |
Cl.11 & IS:302-1:2008(Heating) |
- |
3000 |
|
- |
Cl.11 & IS:302-1:2008(Heating) |
- |
3000 |
|
- |
Cl.11.8(Heating) |
- |
3000 |
|
- |
Cl.11.8(Heating) |
- |
3000 |
|
- |
Cl.11.8(Heating) |
- |
3000 |
|
- |
Cl.13 & IS:302-1:2008(Leakage Current & Electric Strength at operating temp. ) |
- |
4000 |
|
- |
Cl.15.3 of IS 302-1:200(Moisture Resistance
) |
- |
4500 |
|
- |
Cl.16 & IS:302-1:2008(Leakage Current & Electric Strength ) |
- |
4000 |
|
- |
Cl.16 & IS:302-1:2008(Leakage Current & Electric Strength ) |
- |
4000 |
|
- |
Cl.19 & IS:302-1:2008(Abnormal Operation.) |
- |
2000 |
|
- |
Cl.19 & IS:302-1:2008(Abnormal Operation.) |
- |
2000 |
|
- |
Cl.19.101(Abnormal Operation.) |
- |
2000 |
|
- |
Cl.19.102(Abnormal Operation.) |
- |
2000 |
|
- |
Cl.19.103(Abnormal Operation.) |
- |
2000 |
|
- |
Cl.19.104(Abnormal Operation.) |
- |
2000 |
|
- |
Cl.19.105(Abnormal Operation.) |
- |
2000 |
|
- |
Cl.19.106(Abnormal Operation.) |
- |
2000 |
|
- |
Table 8 of IS 302-1:2008(Abnormal Operation.) |
- |
2000 |
|
- |
Cl.19.107(Abnormal Operation.) |
- |
2000 |
|
- |
Cl.19.109(Abnormal Operation.) |
- |
2000 |
|
- |
Cl.19.110(Abnormal Operation.) |
- |
2000 |
|
- |
Cl.19.111(Abnormal Operation.) |
- |
2000 |
|
- |
Cl.19.112(Abnormal Operation.) |
- |
2000 |
|
- |
Cl.19.113(Abnormal Operation.) |
- |
2000 |
|
- |
Cl.19.114(Abnormal Operation.) |
- |
2000 |
|
- |
Cl.21.2 of IS 302-1:2008(Mechanical Strength.) |
- |
2000 |
|
- |
Cl.21.101 (Mechanical Strength.) |
- |
2000 |
|
- |
Cl.21.102(Mechanical Strength.) |
- |
2000 |
|
- |
Cl.21.103(Mechanical Strength.) |
- |
2000 |
|
- |
Cl.22.5 of IS 302-1:2008(Construction) |
- |
2000 |
|
- |
Cl.22.6 of IS 302-1:2008(Construction) |
- |
2000 |
|
- |
Cl.22.8 of IS 302-1:2008(Construction) |
- |
2000 |
|
- |
Cl.22.9 of IS 302-1:2008(Construction) |
- |
2000 |
|
- |
Cl.22.11(Construction) |
- |
2000 |
|
- |
Cl.22.12 of IS 302-1:2008(Construction) |
- |
2000 |
|
- |
Cl.22.13 of IS 302-1:2008(Construction) |
- |
2000 |
|
- |
Cl.22.14 of IS 302-1:2008(Construction) |
- |
2000 |
|
- |
Cl.22.15 of IS 302-1:2008(Construction) |
- |
2000 |
|
- |
Cl.22.18 of IS 302-1:2008(Construction) |
- |
2000 |
|
- |
Cl.22.20 of IS 302-1:2008(Construction) |
- |
2000 |
|
- |
Cl.22.21 of IS 302-1:2008(Construction) |
- |
2000 |
|
- |
Cl.23.4 & Cl.29 of 302-1:2008(Internal Wiring
) |
- |
2000 |
|
- |
Cl.23.5 of 302-1:2008(Internal Wiring
) |
- |
2000 |
|
- |
Cl.23.7 of 302-1:2008(Internal Wiring
) |
- |
2000 |
|
- |
Cl.24.1 of 302-1:2008(Component) |
- |
2000 |
|
- |
Cl.24.1.3 (Component) |
- |
2000 |
|
- |
Cl.24.1.3 (Component) |
- |
2000 |
|
- |
Cl.24.1.3 (Component) |
- |
2000 |
|
- |
Cl.24.1.3 (Component) |
- |
2000 |
|
- |
C.24.2 of 302-1:2008(Component) |
- |
2000 |
|
- |
Cl.24.10(Component) |
- |
2000 |
|
- |
Cl. 25.2 of IS 3021:2008(Supply Connection and External Flexible Cords ) |
- |
2000 |
|
- |
Cl. 25.3 of IS 302-1:2008(Supply Connection and External Flexible Cords ) |
- |
2000 |
|
- |
Cl. 25.4 of IS 302-1:2008(Supply Connection and External Flexible Cords ) |
- |
2000 |
|
- |
Cl.25.5 of 302-1:2008(Supply Connection and External Flexible Cords ) |
- |
2000 |
|
- |
Cl.25.6 of 302-1:2008(Supply Connection and External Flexible Cords ) |
- |
2000 |
|
- |
Cl.25.7.(Supply Connection and External Flexible Cords ) |
- |
2000 |
|
- |
Cl.25.8(Supply Connection and External Flexible Cords ) |
- |
2000 |
|
- |
Cl. 25.9(Supply Connection and External Flexible Cords ) |
- |
2000 |
|
- |
Cl.25.10 of 302-1:2008(Supply Connection and External Flexible Cords ) |
- |
2000 |
|
- |
Cl. 25.11(Supply Connection and External Flexible Cords ) |
- |
2000 |
|
- |
Cl. 25.12(Supply Connection and External Flexible Cords ) |
- |
2000 |
|
- |
Cl. 25.13(Supply Connection and External Flexible Cords ) |
- |
2000 |
|
- |
Cl.25.14 of IS 302-1:2008(Supply Connection and External Flexible Cords ) |
- |
2000 |
|
- |
Cl.25.15 of IS 302-1:2008(Supply Connection and External Flexible Cords ) |
- |
2000 |
|
- |
Cl.25.15 of IS 302-1:2008(Supply Connection and External Flexible Cords ) |
- |
2000 |
|
- |
Cl.25.17 of IS 302-1:2008(Supply Connection and External Flexible Cords ) |
- |
2000 |
|
- |
Cl.25.18(Supply Connection and External Flexible Cords ) |
- |
2000 |
|
- |
Cl.25.20(Supply Connection and External Flexible Cords ) |
- |
2000 |
|
- |
Cl.26.10 of IS 302-1:2008(Terminal for External Conductors
) |
- |
2000 |
|
- |
Cl.26.11 of IS 302-1:2008(Terminal for External Conductors
) |
- |
2000 |
|
- |
Cl.27.5 of 302-1:2008(Provision for Earthing.) |
- |
2000 |
|
- |
Cl.29 & IS:302-1:2008(Clearances, Creepage Distances and Solid Insulation) |
- |
2500 |
|
- |
Cl.30.2.2 of 302-1:2008(Resistance to Heat and Fire) |
- |
4000 |
|
- |
Cl.31 of IS:302-1:2008(Resistance to Rusting.) |
- |
2500 |
|
- |
Cl.30.2 of 302-1:2008(Resistance to Heat and Fire : Resistance to fire) |
- |
4000 |
|
- |
Cl.30.1 of IS:302-1:2008(Resistance to Heat and Fire: Resistance to heat. ) |
- |
4000 |
|
- |
Cl.29.2 of IS:302-1:2008(Clearances, Creepage Distances and Solid Insulation : Creepage Distance) |
- |
2500 |
|
- |
Cl.29.1 of IS:302-1:2008(Clearances, Creepage Distances and Solid Insulation : Clearance ) |
- |
2500 |
|
- |
Cl.28 of 302-1:2008(Screws and Connections.) |
- |
2000 |
|
- |
Cl.27.5 of 302-1:2008(Provision for Earthing : ECR) |
- |
2000 |
|
- |
Cl.27.1 of 302-1:2008(Provision for Earthing ) |
- |
2000 |
|
- |
Cl.26 of IS 302-1:2008(Terminal for External Conductors
) |
- |
2000 |
|
- |
Cl.25.20 of 302-1:2008(Supply Connection and External Flexible Cords : Additional insulation ) |
- |
2000 |
|
- |
Cl.25.18 of 302-1:2008(Supply Connection and External Flexible Cords : Arrangement of cord anchorages ) |
- |
2000 |
|
- |
Cl.25.15 of IS 302-1:2008(Supply Connection and External Flexible Cords : Cord grip test - displacement) |
- |
2000 |
|
- |
Cl.25.15 of IS 302-1:2008(Supply Connection and External Flexible Cords : Cord grip test - strain at terminals ) |
- |
2000 |
|
- |
Cl. 25.13 of 302-1:2008(Supply Connection and External Flexible Cords : Inlet opening of supply cords ) |
- |
2000 |
|
- |
Cl. 25.12 of 302-1:2008(Supply Connection and External Flexible Cords : Moulding of cords ) |
- |
2000 |
|
- |
Cl.25.10 of 302-1:2008(Supply Connection and External Flexible Cords : Colour of earthing wire ) |
- |
2000 |
|
- |
Cl. 25.9 of 302-1:2008(Supply Connection and External Flexible Cords : Contact with sharp edge ) |
- |
2000 |
|
- |
Cl.25.8 of 302-1:2008(Supply Connection and External Flexible Cords : Resistance of supply wires ) |
- |
2000 |
|
- |
Cl.25.7 of IS:302-2-30:2007(Supply Connection and External Flexible Cords : Supply cords material ) |
- |
2000 |
|
- |
Cl.25.5 of 302-1:2008(Supply Connection and External Flexible Cords : Type of attachments ) |
- |
2000 |
|
- |
Cl.25.1 of 302-1:2008(Supply Connection and External Flexible Cords : Means of connection ) |
- |
2000 |
|
- |
Cl.24 of IS:302-2-30:2007(Component) |
- |
2000 |
|
- |
Cl.23.7 of 302-1:2008(Internal Wiring : Colour of earting conductor
) |
- |
2000 |
|
- |
Cl.23 of IS:302-1:2008(Internal Wiring
) |
- |
2000 |
|
- |
Cl.22.106 of IS:302-2-30:2007(Construction : Checking of thermostats, timers or similar means for visibl glowing radiant heaters) |
- |
2000 |
|
- |
Cl.22.106 of IS:302-2-30:2007(Construction : Checking of openings on the underside) |
- |
2000 |
|
- |
Cl.22.102 & Cl 22.103 of IS:302-2-30:2007(Construction : Fireguard ) |
- |
2000 |
|
- |
Cl.22.101 of IS:302-2-30:2007(Construction : Prevention to contact with heating element) |
- |
2000 |
|
- |
Cl.22.24 of IS:302-2-30:2007(Construction : test of bare heating element) |
- |
2000 |
|
- |
Cl.22.18 of IS 302-1:2008(Construction : Resistance to corrosion ) |
- |
2000 |
|
- |
Cl.22.14 of IS 302-1:2008(Construction : ragged and sharp edges) |
- |
2000 |
|
- |
Cl.22.13 of IS 302-1:2008(Construction : Position of handles ) |
- |
2000 |
|
- |
Cl.22.12 of IS 302-1:2008(Construction : Fixing of Handle, knobs,grips,lever and similer parts ) |
- |
2000 |
|
- |
Cl.22.11 of IS 302-1:2008(Construction : Fixing of non detachable parts ) |
- |
2000 |
|
- |
Cl.22.7 of IS:302-2-30:2007(Construction : Pressure test of oil heater ) |
- |
2000 |
|
- |
Cl.21.101 of IS:302-2-30:2007(Mechanical Strength : fire gaurd deformation test ) |
- |
2000 |
|
- |
Cl.21.2 of IS 302-1:2008(Mechanical Strength : Pentration by sharp implementation ) |
- |
2000 |
|
- |
Cl.21.1 of IS:302-1:2008)(Mechanical Strength : Rough handling ) |
- |
2000 |
|
- |
Cl.20 of IS:302-2-30:2007(Stability of Mechanical Hazards) |
- |
5000 |
|
- |
Cl.19.114 of IS:302-2-30:2007(Abnormal Operation : the temp. of the surface of the container for oil heaters ) |
- |
2000 |
|
- |
Cl.19.112 of IS:302-2-30:2007(Abnormal Operation : Ignition of bleached cotton gauge) |
- |
2000 |
|
- |
Cl.19.111 of IS:302-2-30:2007(Abnormal Operation : Ignition of flannelette for Visibly glowing heaters) |
- |
2000 |
|
- |
Cl.19.110 of IS:302-2-30:2007(Abnormal Operation : operation against wall for visibly glowing radiant heaters ) |
- |
2000 |
|
- |
Cl.19.109 of IS:302-2-30:2007(Abnormal Operation : operation against wall for fan heater ) |
- |
2000 |
|
- |
Cl.19.106 of IS:302-2-30:2007(Abnormal Operation : Locked rotor of fan hetear ) |
- |
2000 |
|
- |
Cl.19.103 , Cl 19.104 of IS:302-2-30:2007(Abnormal Operation : Operation after Covering by cotton) |
- |
2000 |
|
- |
Cl.19 of IS:302-2-30:2007(Abnormal Operation : High Voltage ) |
- |
2000 |
|
- |
Cl.19 of IS:302-2-30:2007(Abnormal Operation : temp rise of supply cord ) |
- |
2000 |
|
- |
Cl.19 of IS:302-2-30:2007(Abnormal Operation : Temp rise of test corner ) |
- |
2000 |
|
- |
Cl.19 of IS:302-1:2008(Abnormal Operation : Emission of molten or poisonous or ignitable gas) |
- |
2000 |
|
- |
Cl.15 of IS 302-1:2008(Moisture Resistance
) |
- |
4000 |
|
- |
Cl.14 of IS:302-1:2008(Transient Over Voltages) |
- |
2000 |
|
- |
Cl.13 of IS:302-1:2008(Leakage Current of Electric Strength at operating temp. ) |
- |
4000 |
|
- |
Cl.13 of IS:302-1:2008(Leakage Current of Electric Strength at operating temp. ) |
- |
4000 |
|
- |
Cl.11 of IS:302-2:30: 2007(Heating : Room temperature) |
- |
3000 |
|
- |
Cl.11.8 of IS:302-2:30: 2007(Heating : For liquid filled radiators the temp. rise of the outer surface of the liquid container) |
- |
3000 |
|
- |
Cl.11 of IS:302-2:30: 2007(Heating : Air-outlet grills) |
- |
3000 |
|
- |
Cl.11 of IS:302-2:30: 2007(Heating : Surfaces of handles, knobs, grips and similar parts) |
- |
3000 |
|
- |
Cl.11 of IS:302-2:30: 2007(Heating : Wooden supports, walls, ceiling and floor of the test corner) |
- |
3000 |
|
- |
Cl.11 of IS:302-2:30: 2007(Heating : PVC Insulation ) |
- |
3000 |
|
- |
Cl.10 of IS:302-1:2008(Power Input and Current) |
- |
2500 |
|
- |
Cl.8 of IS:302-1:2008(Protection Against Access to Live Parts) |
- |
2500 |
|
- |
Cl.7.101 of IS:302-2:30: 2007(Marking and Instructions : standard mark. ) |
- |
2000 |
|
- |
Cl.7.15 of IS 302-1:2008(Marking and Instructions : Visibility of marking concerning covering) |
- |
2000 |
|
- |
Cl.7.15 of IS 302-1:2008(Marking and Instructions : discernibility from the out side ) |
- |
2000 |
|
- |
Cl.7.14 of IS:302-2:30: 2007(Marking and Instructions : Height of “Do not cover”) |
- |
2000 |
|
- |
Cl.7.14 of IS:302-2:30: 2007(Marking and Instructions : height of symbol) |
- |
2000 |
|
- |
Cl.7.13 of IS 302-1:2008(Marking and Instructions : Languge of instruction and texts ) |
- |
2000 |
|
- |
Cl.7.11 of IS :302-1:2008(Marking and Instructions : Controls ) |
- |
2000 |
|
- |
Cl.7.9 of IS :302-1:2008(Marking and Instructions : switches ) |
- |
2000 |
|
- |
Cl.7.8 of IS :302-1:2008(Marking and Instructions : terminals ) |
- |
2000 |
|
- |
Cl.7.6 of IS:302-1:2008(Marking and Instructions : Symbols ) |
- |
2000 |
|
- |
Cl.7.5 of IS:302-1:2008(Marking and Instructions : upper of lower limit of the rated power input ) |
- |
2000 |
|
- |
Cl 7.1 & Cl.7.6 of IS:302-2:30: 2007(Marking and Instructions : Do not cover ) |
- |
2000 |
|
- |
Cl.7.1 of IS:302-1:2008(Marking and Instructions : Country of manufacture ) |
- |
2000 |
|
- |
Cl.7.1 of IS:302-1:2008(Marking and Instructions : Symbol for Class-II ) |
- |
2000 |
|
- |
Cl.7.1 of IS:302-1:2008(Marking and Instructions : rated power input ) |
- |
2000 |
|
- |
Cl.7.1 of IS:302-1:2008(Marking and Instructions : Nature of supply ) |
- |
2000 |
|
- |
Cl.7.1 of IS:302-1:2008(Marking and Instructions : Rated Voltage ) |
- |
2000 |
|
- |
|
31 Dec, 2026 |
- Excl: Cl. 19.11.4.1 to Cl. 19.11.4.7 (EMI/EMC tests) |
10102 |
Northern India Textile Research Association (NITRA), Ghaziabad
| 8163504
| IS 15741 (2007) |
Textiles - Resistance to ignition of curtains and drapes - Specification |
- |
- View breakup
Rs.62000/- Plus 18% GST
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
No Record Found
|
|
- |
- (Lab of national repute and eminence, facilities of which are being utilized by BIS.) |
10103 |
Northern India Textile Research Association (NITRA), Ghaziabad
| 8163504
| IS 15748 (2007) |
Textiles – Protective clothing for industrial workers exposed to heat (Excluding firefighters’ and welders’ clothing) |
- |
- View breakup
Rs.41100/- Plus 18% GST
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
No Record Found
|
|
- |
- (Lab of national repute and eminence, facilities of which are being utilized by BIS.) |
10104 |
National Test House (NR) - NTH, Ghaziabad
| 8101304
| IS 1786 (2008) |
High strength deformed steel bars and wires for concretere inforcement - Specification (Fourth Revision) |
- |
24000 View breakup
i) Size 8-12mm: Rs.8000/- All test + Rs.10000/- for Pullout Test
ii) Size 16-28mm: Rs.9000/- All test + Rs.15000/- for Pullout Test
iii) Size 32mm: Rs.10000/- All test + Rs.15000/- for Pullout Test. [Additional fee Rs.2000/- for micro element]
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
Cl. 5 (Cl.5 Mean area of ribs/unit length (Ar), ) |
- |
1000 |
|
- |
Cl. 5 (Cl. 5 - Mean projected area of transverse ribs (1/3 of Ar)) |
- |
0 |
|
- |
Cl 7.2(Weight) |
- |
1000 |
|
- |
Cl. 8.1 Table 3(Tensile Strength (TS)) |
- |
1000 |
|
- |
Cl. 8.1 Table 3(Yield Stress (YS)) |
- |
1000 |
|
- |
Cl. 8.1 Table 3(Elongation, percentage) |
- |
1000 |
|
- |
Cl. 8.1 Table 3(TS/YS ratio) |
- |
0 |
|
- |
Cl. 9.3, Table 4(Bend Test ) |
- |
1000 |
|
- |
Cl.9.4 & Cl. 9.4.1(Rebend test) |
- |
1000 |
|
- |
Clause - 4.2 & 4.2.1(Fe- 415, Fe- 415D, Fe-500, Fe-500D, Fe-550, Fe-550D, Fe-600 CARBON ) |
- |
500 |
|
- |
Clause - 4.2 & 4.2.1(Fe- 415, Fe- 415D, Fe-500, Fe-500D, Fe-550, Fe-550D, Fe-600 SULPHUR) |
- |
500 |
|
- |
Clause - 4.2 & 4.2.1(Fe- 415, Fe- 415D, Fe-500, Fe-500D, Fe-550, Fe-550D, Fe-600 PHOSPHURS) |
- |
500 |
|
- |
Clause - 4.2 & 4.2.1(Fe- 415, Fe- 415D, Fe-500, Fe-500D, Fe-550, Fe-550D, Fe-600 SULPHUR+PHOSPHUR) |
- |
1000 |
|
- |
Clause - 4.2 & 4.2.1(Fe- 415, Fe- 415D, Fe-500, Fe-500D, Fe-550, Fe-550D, Fe-600 CARBON +EQUIVELENT ) |
- |
1000 |
|
- |
Cl 5(Deformations and Surface Characteristics) |
- |
15000 |
|
- |
4.1(Sulphur and phosphorous) |
- |
500 |
|
- |
4.1(CE) |
- |
1000 |
|
- |
4.1( Nitrogen%) |
- |
500 |
|
- |
4.1(Ni) |
- |
500 |
|
- |
4.1(Mo) |
- |
500 |
|
- |
4.1(Cr) |
- |
500 |
|
- |
4.1( Ti) |
- |
500 |
|
- |
4.1(V) |
- |
500 |
|
- |
4.1( Copper %) |
- |
500 |
|
- |
4.1(Silicon %) |
- |
500 |
|
- |
4.1(Sulphur %) |
- |
500 |
|
- |
4.1(Phosphorus %) |
- |
500 |
|
- |
4.1(Manganese %) |
- |
500 |
|
- |
4.1(Carbon %) |
- |
500 |
|
- |
4.1( Aluminium %) |
- |
500 |
|
- |
Clause - 4.2 & 4.2.1(Fe- 415, Fe- 415D, Fe-500, Fe-500D, Fe-550, Fe-550D, Fe-600 MANGANESE) |
- |
500 |
|
- |
Clause - 4.2 & 4.2.1(Fe- 415, Fe- 415D, Fe-500, Fe-500D, Fe-550, Fe-550D, Fe-600 NITROGEN) |
- |
500 |
|
- |
|
26 Oct, 2025 |
- - |
10105 |
MSME Testing Centre, New Delhi
| 8101204
| IS 1786 (2008) |
High strength deformed steel bars and wires for concretere inforcement - Specification (Fourth Revision) |
Upto 32mm |
10756 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
Cl.4.2 of IS 1786 (Grade:- Fe 415,Fe 415D,Fe 415S,Fe 500,Fe 500D,Fe 500S,Fe 550,Fe 550D,Fe600,Fe 650,Fe 700)(Carbon-IS 228) |
- |
3795 |
|
- |
Cl 5(Deformations and Surface Characteristics) |
- |
2195 |
|
- |
Cl 7.2(Weight) |
- |
520 |
|
- |
Cl 8.1(UTM) |
- |
1444 |
|
Tensile Test |
Cl 9.3(Load In One Direction) |
- |
1358 |
|
Bend Test |
Cl 9.4(Load In Other Direction From Bend) |
- |
1444 |
|
Rebend Test |
|
31 Dec, 2026 |
- Cl 5.7 Pull out test |
10106 |
NATIONAL TEST HOUSE (SOUTHERN REGION) - NTH, CHENNAI
| 6122704
| IS 1786 (2008) |
High strength deformed steel bars and wires for concretere inforcement - Specification (Fourth Revision) |
- |
27000 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
Cl 8.1(UTM) |
Nitrogen exclusion |
4000 |
|
Rs 4000/- for 32mm, Rs 3000/- for 16mm-28mm, Rs 2000/- for 8mm-12mm. |
Cl.4.2 of IS 1786 (Grade:- Fe 415,Fe 415D,Fe 415S,Fe 500,Fe 500D,Fe 500S,Fe 550,Fe 550D,Fe600,Fe 650,Fe 700)(Sulphur & Phosphorous) |
Nitrogen exclusion |
1180 |
|
INCLUDING 18 % GST |
Cl.4.2 of IS 1786 (Grade:- Fe 415D,Fe 415S, Fe 500D,Fe 500S,Fe 550D)(Carbon Equivalent) |
Nitrogen exclusion |
1180 |
|
INCLUDING 18 % GST |
Cl.4.2 of IS 1786 (Grade:- Fe 415,Fe 415D,Fe 415S,Fe 500,Fe 500D,Fe 500S,Fe 550,Fe 550D,Fe600,Fe 650,Fe 700)(Carbon-IS 228) |
Nitrogen exclusion |
1180 |
|
INCLUDING 18 % GST |
Cl.4.2 of IS 1786 (Grade:- Fe 415,Fe 415D,Fe 415S,Fe 500,Fe 500D,Fe 500S,Fe 550,Fe 550D,Fe600,Fe 650,Fe 700)(Sulphur-IS 228) |
Nitrogen exclusion |
1180 |
|
INCLUDING 18 % GST |
Cl.4.2 of IS 1786 (Grade:- Fe 415,Fe 415D,Fe 415S,Fe 500,Fe 500D,Fe 500S,Fe 550,Fe 550D,Fe600,Fe 650,Fe 700)(Phosphorous- IS 228) |
Nitrogen exclusion |
1180 |
|
INCLUDING 18 % GST |
Cl. 5 (Cl. 5 - Mean projected area of transverse ribs (1/3 of Ar)) |
Nitrogen exclusion |
1000 |
|
- |
Cl. 5.7(Bond Strength at 0.25 mm slip) |
Nitrogen exclusion |
15000 |
|
Rs 10000/- for 8mm- 12mm, Rs 15000 for 16mm- 32mm. |
Cl 7.2(Weight) |
Nitrogen exclusion |
1000 |
|
- |
Cl 8.1(UTM) |
Nitrogen exclusion |
4000 |
|
- |
Cl. 9.3, Table 4(Bend Test ) |
Nitrogen exclusion |
1000 |
|
- |
Cl.9.4 & Cl. 9.4.1(Rebend test) |
Nitrogen exclusion |
1000 |
|
- |
|
28 Nov, 2025 |
- - |
10107 |
CIPET, Hajipur
| 5118334
| IS 14151 : Part 2 (2008) |
Irrigation equipment - Sprinkler pipes - Specification: Part 2 quick coupled polyethylene pipes and fittings (Second Revision) |
- |
38725 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
7.2.1 (Visual and Workmanship Requirement) |
- |
300 |
|
- |
6.2, 6.2.1 (Quick Coupled Fittings) |
- |
6750.0 |
|
Density : 1000 (500*2)
Melt Flow Rate: 2200 (1100*2)
Carbon Black Content: 1850 (925*2)
Carbon Black Dispersion:1400 (700*2)
Workmanship & Appearance: 300 |
6.1.3.2 (Quick coupled fittings) |
- |
0.0 |
|
- |
6.1.3.1.1(Weldability Test) |
- |
6400.0 |
|
Acceptance Test: 1600
Quality Test: 4800 |
6.1.3, 6.1.3.1(Weldability Test) |
- |
0.0 |
|
- |
6.1.2.2( Hydraulic Proof Test) |
- |
850.0 |
|
- |
6.1.2, 6.1.2.1( Hydraulic Proof Test) |
- |
850.0 |
|
- |
6.1(Quick Coupled Pipes and Fittings) |
- |
0.0 |
|
- |
5.3(Dimensions of Quick Coupled Sprinkler Saddles Table 1.) |
- |
500.0 |
|
- |
5.2(Dimensions of Quick Coupled Pump Connectors Table 3.) |
- |
0.0 |
|
- |
4.2.7(Valve openers Table 1 of IS 8008 (Part 2)) |
- |
0.0 |
|
- |
4.2.7(Insert vatve couplers Table 1 of IS 8008 (Part 3)) |
- |
0.0 |
|
- |
4.2.7(End caps Table 1 of IS 8008 (Part 9)) |
- |
0.0 |
|
- |
4.2.7(Pipe ends Table 1 of IS 8008 (Part 6)) |
- |
0.0 |
|
- |
4.2.7(Ferrule reducers Table 1 of IS 8008 (Part 5)) |
- |
0.0 |
|
- |
4.2.7(Reducers Table 1 and 2 of IS 8008 (Part 4)) |
- |
0.0 |
|
- |
4.2.7(1 Dimensions of Quick Coupled Pipes and Fittings) |
- |
0.0 |
|
- |
4.2.7(Quick Coupled ~pe HDPE Fittings) |
- |
0.0 |
|
- |
4.2.6(Quick Coupled ~pe HDPE Fittings) |
- |
0.0 |
|
- |
4.2.5(Quick Coupled ~pe HDPE Fittings) |
- |
0.0 |
|
- |
4.2.4(Quick Coupled ~pe HDPE Fittings) |
- |
0.0 |
|
- |
4.2.3(Quick Coupled ~pe HDPE Fittings) |
- |
0.0 |
|
- |
4.2.2(Quick Coupled ~pe HDPE Fittings) |
- |
0.0 |
|
- |
4.2.1(Quick Coupled ~pe HDPE Fittings) |
- |
0.0 |
|
- |
4.1.5(Rubber Ring) |
- |
4950.0 |
|
Hardness before Ageing: 375.0
Ageing : 4200.0
Hardness after Ageing: 375.0 |
4.1.4(b)(Holding Attachments for Coupler Parts) |
- |
0.0 |
|
- |
4.1.4(a)(Holding Attachments for Coupler Parts) |
- |
0.0 |
|
- |
4.1 .3(Workmanship and Appearance) |
- |
300.0 |
|
- |
4.1 .1.2.2(HDPE couplers) |
- |
0.0 |
|
- |
4.1 .1.2.1(HDPE couplers) |
- |
0.0 |
|
- |
Cl. 4.1.1.2.1, IS 14151 (P-1)-1999, Cl. 4, IS 2530-1963, Cl. 16(Carbon Black Dispersion) |
- |
700.0 |
|
- |
Cl. 4.1.1.2.1, IS 14151 (P-1)-1999, Cl. 4, IS 2530-1963, Cl. 10(Cabon Black Content) |
- |
925 |
|
- |
4.1 (b)(HDPE couplers —) |
- |
0.0 |
|
- |
4.1 (a)( Quick Coupled Male and Female Couplers) |
- |
0.0 |
|
- |
4(QUICK COUPLED FITTINGS) |
- |
0.0 |
|
- |
3(QUICK COUPLED PIPES) |
- |
17575.0 |
|
- |
Cl.6.1.3(Weldability Test- b) Acceptance test) |
- |
1600 |
|
- |
Cl.6.1.3(Weldability Test- a) Quality test) |
- |
4800 |
|
- |
Cl 4.1.5(Rubber rings- C)Rubber ring shall be of black colour:) |
- |
300.0 |
|
- |
Cl 4.1.5(Rubber rings- B) Change in hardness) |
- |
375 |
|
- |
Cl 4.1.4(Holding attachments for coupler parts) |
- |
1700.0 |
|
850+850 |
Cl.4.1.3(Workmanship and appearance ) |
- |
300.0 |
|
- |
Cl.4.1(Quick Coupled Male and Female Couplers) |
- |
0.0 |
|
- |
|
07 Oct, 2025 |
- Restricted for Couplers of HDPE type only. (Testing
charges has been
fixed for two years
w.e.f. I 1.02.2019 to
10.02.2021 |
10108 |
CENTRAL INSTITUTE OF PETROCHEMICALS ENGINEERING AND TECHNOLOGY (CIPET):CSTS-BHOPAL
| 8100534
| IS 14151 : Part 2 (2008) |
Irrigation equipment - Sprinkler pipes - Specification: Part 2 quick coupled polyethylene pipes and fittings (Second Revision) |
- |
42575.00 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
3(QUICK COUPLED PIPES) |
- |
925.00 |
|
Test charges for Carbon Black Content test |
Cl.3(Quick Coupled pipes) |
- |
700.00 |
|
Charges for Carbon Black dispersion test |
4.1 (b)(HDPE couplers —) |
- |
1000.00 |
|
Charges for Density (Male and female both) |
Cl. 4.1.1.2.1, IS 14151 (P-1)-1999, Cl. 4, IS 2530-1963, Cl. 10(Cabon Black Content) |
- |
1850.00 |
|
Charges for Melt flow rate (both male and female) |
Cl. 4.1.1.2.1, IS 14151 (P-1)-1999, Cl. 4, IS 2530-1963, Cl. 16(Carbon Black Dispersion) |
- |
1400.00 |
|
- |
4.1 .1.2.1(HDPE couplers) |
- |
2200.00 |
|
Melt flow rate (both male and female) |
4.1 .3(Workmanship and Appearance) |
- |
300.00 |
|
- |
4.1.4(b)(Holding Attachments for Coupler Parts) |
- |
0 |
|
- |
4.1.5(Rubber Ring) |
- |
1050.00 |
|
Material Identification |
Cl 4.1.5(Rubber rings- A)Shore hardness (Shore-A)) |
- |
375.00 |
|
- |
Cl 4.1.5(Rubber rings- B) Change in hardness) |
- |
4575.00 |
|
Test charges Rs. 375.00 + ageing charges for rubber ring Rs. 4200.00 |
Cl 4.1.5(Rubber rings- C)Rubber ring shall be of black colour:) |
- |
300.00 |
|
- |
4.2.7(1 Dimensions of Quick Coupled Pipes and Fittings) |
- |
500.00 |
|
- |
6.1.1, 6.1.1.1(Leakage Test) |
- |
850.00 |
|
- |
6.1.2, 6.1.2.1( Hydraulic Proof Test) |
- |
850.00 |
|
- |
6.1.2.2( Hydraulic Proof Test) |
- |
0 |
|
test charges is already taken in 6.1.2, 6.1.2.1 (Hydraulic Proof Test) |
6.1.3, 6.1.3.1(Weldability Test) |
- |
1600.00 |
|
- |
6.1.3.1.1(Weldability Test) |
- |
4800.00 |
|
- |
6.1.3.2 (Quick coupled fittings) |
- |
0 |
|
- |
|
31 Dec, 2026 |
- EXCLUSION: Metallic part (4.1.1) |
10109 |
MSME Testing Centre, New Delhi
| 8101204
| IS 302 : Part 2 : Sec 14 (2009) |
Safety of household and similar electrical appliances: Part 2 particular requirements: Sec 14 electric kitchen machines (First Revision) |
- |
12000 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
7.1(Marking- IS 302-1) |
- |
2000 |
|
- |
8( Protection Against Electric Shock, IS 302-1) |
- |
2500 |
|
- |
10(Power Input and Current, IS 302-1) |
- |
2500 |
|
- |
11(Heating, IS 302-1) |
- |
3000 |
|
- |
13(Electrical Insulation and Leakage Current at Operating Temperature: Leakage current, IS 302-1) |
- |
4000 |
|
- |
14(Transient Over Voltages, IS 302-1) |
- |
2000 |
|
- |
15.2(Moisture Resistance, IS 302-1) |
- |
4000 |
|
- |
16(Electrical Insulation and Leakage Current at Operating Temperature: Leakage current, IS 302-1) |
- |
4000 |
|
- |
17(Overload protection of Transformers and Associated Circuits, IS 302-1) |
- |
2000 |
|
- |
19.1(Abnormal Operation, IS 302-1) |
- |
2000 |
|
- |
21.1(Mechanical Strength, IS 302-1) |
- |
5000 |
|
- |
25.1(Supply Connection and External Flexible Cords, IS 302-1) |
- |
2000 |
|
- |
26(Terminals for External Conductors, IS 302-1) |
- |
2000 |
|
- |
27(Provision for Earthing, IS 302-1) |
- |
2000 |
|
- |
28(Screws & Connections, IS 302-1) |
- |
2000 |
|
- |
30.1(Resistance to Heat and Fire, IS 302-1) |
- |
4000 |
|
- |
31(Resistance of Rusting, IS 302-1) |
- |
2500 |
|
- |
20.115(Stability & Mechanical Hazards) |
- |
5000 |
|
- |
29.1(Clearances, Creepage distances and Solid Insulation, IS 302-1) |
- |
2000 |
|
- |
22(Construction, IS 302-1) |
- |
2000 |
|
- |
23.1(Internal Wiring, IS 302-1) |
- |
2000 |
|
- |
24.1(Components, IS 302-1) |
- |
2000 |
|
- |
32(Radiation, Toxicity and similar Hazard IS 302-1) |
- |
2000 |
|
- |
6(Classification- IS 302-1 ) |
- |
1000 |
|
- |
6(Classification- IS 302-1) |
- |
1000 |
|
- |
7.1(Marking- IS 302-1) |
- |
2000 |
|
- |
7.1(Marking- IS 302-1) |
- |
2000 |
|
- |
7.1(Marking- IS 302-1) |
- |
2000 |
|
- |
7.1(Marking- IS 302-1) |
- |
2000 |
|
- |
7.1(Marking- IS 302-1) |
- |
2000 |
|
- |
7.1(Marking- IS 302-1) |
- |
2000 |
|
- |
7.1(Marking- IS 302-1) |
- |
2000 |
|
- |
7.3(Marking- IS 302-1) |
- |
2000 |
|
- |
7.4(Marking- IS 302-1) |
- |
2000 |
|
- |
7.6(Marking- IS 302-1) |
- |
2000 |
|
- |
7.7(Marking- IS 302-1) |
- |
2000 |
|
- |
7.8(Marking- IS 302-1) |
- |
2000 |
|
- |
7.11(Marking- IS 302-1) |
- |
2000 |
|
- |
7.12(Marking- IS 302-1) |
- |
2000 |
|
- |
7.13(Marking- IS 302-1) |
- |
2000 |
|
- |
7.14(Marking- IS 302-1) |
- |
2000 |
|
- |
7.15(Marking- IS 302-1) |
- |
2000 |
|
- |
7.101(Marking) |
- |
2000 |
|
- |
11(Heating, IS 302-1) |
- |
3000 |
|
- |
11(Heating, IS 302-1) |
- |
3000 |
|
- |
11(Heating, IS 302-1) |
- |
3000 |
|
- |
11(Heating, IS 302-1) |
- |
3000 |
|
- |
13(Electrical Insulation and Leakage Current at Operating Temperature: High Voltage, IS 302-1) |
- |
4000 |
|
- |
15(Moisture Resistance, IS 302-1) |
- |
4500 |
|
- |
16(Electrical Insulation and Leakage Current at Operating Temperature: High Voltage, IS 302-1) |
- |
4000 |
|
- |
17(Overload protection of Transformers and Associated Circuits, IS 302-1) |
- |
2000 |
|
- |
19.8(Abnormal Operation, IS 302-1) |
- |
2000 |
|
- |
19.9(Abnormal Operation, IS 302-1) |
- |
2000 |
|
- |
19.101(Abnormal Operation) |
- |
2000 |
|
- |
19.102(Abnormal Operation) |
- |
2000 |
|
- |
20.2(Stability & Mechanical Hazards, IS 302-1) |
- |
5000 |
|
- |
20.101(Stability & Mechanical Hazards) |
- |
5000 |
|
- |
20.102(Stability & Mechanical Hazards) |
- |
5000 |
|
- |
20.1(Stability & Mechanical Hazards, IS 302-1) |
- |
5000 |
|
- |
20.103(Stability & Mechanical Hazards) |
- |
5000 |
|
- |
20.104(Stability & Mechanical Hazards) |
- |
5000 |
|
- |
20.105(Stability & Mechanical Hazards) |
- |
5000 |
|
- |
20.106(Stability & Mechanical Hazards) |
- |
5000 |
|
- |
20.107(Stability & Mechanical Hazards) |
- |
5000 |
|
- |
20.108(Stability & Mechanical Hazards) |
- |
5000 |
|
- |
20.109(Stability & Mechanical Hazards) |
- |
5000 |
|
- |
20.110(Stability & Mechanical Hazards) |
- |
5000 |
|
- |
20.111(Stability & Mechanical Hazards) |
- |
5000 |
|
- |
20.112(Stability & Mechanical Hazards) |
- |
5000 |
|
- |
20.113(Stability & Mechanical Hazards) |
- |
5000 |
|
- |
20.114(Stability & Mechanical Hazards) |
- |
5000 |
|
- |
20.116(Stability & Mechanical Hazards) |
- |
5000 |
|
- |
21.2(Mechanical Strength, IS 302-1) |
- |
5000 |
|
- |
22.101(Construction) |
- |
2000 |
|
- |
22.102(Construction) |
- |
2000 |
|
- |
23.2(Internal Wiring, IS 302-1) |
- |
2000 |
|
- |
23.3(Internal Wiring, IS 302-1) |
- |
2000 |
|
- |
23.4(Internal Wiring, IS 302-1) |
- |
2000 |
|
- |
23.5(Internal Wiring, IS 302-1) |
- |
2000 |
|
- |
23.6(Internal Wiring, IS 302-1) |
- |
2000 |
|
- |
23.7(Internal Wiring, IS 302-1) |
- |
2000 |
|
- |
23.8(Internal Wiring, IS 302-1) |
- |
2000 |
|
- |
23.9(Internal Wiring, IS 302-1) |
- |
2000 |
|
- |
23.10(Internal Wiring, IS 302-1) |
- |
2000 |
|
- |
24.2(Components, IS 302-1) |
- |
2000 |
|
- |
24.5(Components, IS 302-1) |
- |
2000 |
|
- |
24.6(Components, IS 302-1) |
- |
2000 |
|
- |
25.5(Supply Connection and External Flexible Cords, IS 302-1) |
- |
2000 |
|
- |
25.6(Supply Connection and External Flexible Cords, IS 302-1) |
- |
2000 |
|
- |
25.7(Supply Connection and External Flexible Cords, IS 302-1) |
- |
2000 |
|
- |
25.8(Supply Connection and External Flexible Cords, IS 302-1) |
- |
2000 |
|
- |
25.1(Supply Connection and External Flexible Cords, IS 302-1) |
- |
2000 |
|
- |
25.11(Supply Connection and External Flexible Cords, IS 302-1) |
- |
2000 |
|
- |
25.12(Supply Connection and External Flexible Cords, IS 302-1) |
- |
2000 |
|
- |
25.13(Supply Connection and External Flexible Cords, IS 302-1) |
- |
2000 |
|
- |
25.14(Supply Connection and External Flexible Cords, IS 302-1) |
- |
2000 |
|
- |
25.15(Supply Connection and External Flexible Cords, IS 302-1) |
- |
2000 |
|
- |
25.16(Supply Connection and External Flexible Cords, IS 302-1) |
- |
2000 |
|
- |
25.17(Supply Connection and External Flexible Cords, IS 302-1) |
- |
2000 |
|
- |
25.18(Supply Connection and External Flexible Cords, IS 302-1) |
- |
2000 |
|
- |
25.19(Supply Connection and External Flexible Cords, IS 302-1) |
- |
2000 |
|
- |
25.2(Supply Connection and External Flexible Cords, IS 302-1) |
- |
2000 |
|
- |
25.21(Supply Connection and External Flexible Cords, IS 302-1) |
- |
2000 |
|
- |
25.22(Supply Connection and External Flexible Cords, IS 302-1) |
- |
2000 |
|
- |
27.2(Provision for Earthing, IS 302-1) |
- |
2000 |
|
- |
27.3(Provision for Earthing, IS 302-1) |
- |
2000 |
|
- |
27.4(Provision for Earthing, IS 302-1) |
- |
2000 |
|
- |
27.5(Provision for Earthing, IS 302-1) |
- |
2000 |
|
- |
29.2(Clearances, Creepage distances and Solid Insulation, IS 302-1) |
- |
2000 |
|
- |
30.2(Resistance to Heat and Fire, IS 302-1) |
- |
4000 |
|
- |
|
31 Dec, 2026 |
- Excl: Cl. 19.11.4.1 to Cl. 19.11.4.7 (EMI/EMC tests) |
10110 |
MSME Testing Centre, New Delhi
| 8101204
| IS 302 : Part 2 : Sec 15 (2009) |
Safety of household and similar electrical appliances: Part 2 particular requirements: Sec 15 appliances for heating liquids (First Revision) |
0 |
12000 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
7(Marking and instructions) |
- |
2000 |
|
- |
8(Protection against live parts) |
- |
2500 |
|
- |
10(POWER INPUT AND CURRENT) |
- |
2500 |
|
- |
11(HEATING) |
- |
3000 |
|
- |
13(LEAKAGE CURRENT AND ELECTRIC STRENGTH AT OPERATING TEMPERATURE) |
- |
4000 |
|
- |
14(TRANSIENT OVERVOLTAGES) |
- |
2000 |
|
- |
15(MOISTURE RESISTANCE) |
- |
4000 |
|
- |
16(LEAKAGE CURRENT AND ELECTRIC STRENGTH) |
- |
4000 |
|
- |
17(OVERLOAD PROTECTION OF TRANSFORMERS AND ASSOCIATED CIRCUITS) |
- |
2000 |
|
- |
19(ABNORMAL OPERATION) |
- |
2000 |
|
- |
21(MECHANICAL STRENGTH) |
- |
5000 |
|
- |
25(SUPPLY CONNECTION AND EXTERNAL FLEXIBLE CORDS) |
- |
2000 |
|
- |
26(TERMINALS FOR EXTERNAL CONDUCTORS) |
- |
2000 |
|
- |
27(PROVISION FOR EARTHING) |
- |
2000 |
|
- |
28(SCREWS AND CONNECTIONS) |
- |
2000 |
|
- |
30(RESISTANCE TO HEAT AND FIRE) |
- |
4000 |
|
- |
31(RESISTANCE TO RUSTING) |
- |
2500 |
|
- |
20(STABILITY AND MECHANICAL HAZARDS) |
- |
5000 |
|
- |
29(CLEARANCES, CREEPAGE DISTANCES AND SOLID INSULATION) |
- |
2000 |
|
- |
|
31 Dec, 2026 |
- Excl: Cl. 19.11.4.1 to Cl. 19.11.4.7 (EMI/EMC tests) |