| 31 |
IS 302 : Part 2 : Sec 74 (2024) |
Household and Similar Electrical Appliances�Safety Part 2 Particular Requirements Section 74 Portable immersion heaters |
- |
66000 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 7(Marking and instructions) |
- |
2000 |
|
- |
| 8(Protection against access to live parts) |
- |
2000 |
|
- |
| 10(Power input and current) |
- |
2000 |
|
- |
| 10(Power input and current) |
- |
0 |
|
Testing charges included in Cl.10 |
| 11(Heating) |
- |
4000 |
|
- |
| 13.1 &13.2(Leakage current test) |
- |
1500 |
|
- |
| 13.1 &13.3(Electric strength test) |
- |
1500 |
|
- |
| 14(Transient overvoltages) |
- |
2000 |
|
- |
| 15(Moisture resistance) |
- |
4000 |
|
- |
| 15.3(Moisture resistance) |
- |
0 |
|
Testing charges included in Cl.15 |
| 16.1 &16.2(Leakage current test) |
- |
1500 |
|
- |
| 16.1 & 16.3(Electric strength test) |
- |
1500 |
|
- |
| 17(Overload protection of transformers and associated circuits) |
- |
4000 |
|
- |
| 19.1 to 19.13, Table No. - 9(Abnormal operation) |
- |
8000 |
|
Charges applicable excluding the test of Cl.19.11.4.1 to Cl.19.11.4.7. The testing charges for EMI/EMC Testing (Cl.19.11.4.1 to Cl.19.11.4.7) will be Rs. 55000 charged extra. |
| 20.1(Stability and mechanical hazards) |
- |
2000 |
|
- |
| 20.2(Stability and mechanical hazards) |
- |
0 |
|
Testing charges included in Cl.20.1 |
| 21(Mechanical strength) |
- |
3000 |
|
- |
| 22(Construction) |
- |
8000 |
|
- |
| 23(Internal wiring) |
- |
2000 |
|
- |
| 24(Components) |
- |
3000 |
|
- |
| 25("Supply connection and
external flexible cords") |
- |
1000 |
|
- |
| 26("Terminals for external
conductors") |
- |
1000 |
|
- |
| 27(Provision for earthing) |
- |
2000 |
|
- |
| 28(Screws and connections) |
- |
1000 |
|
- |
| 29("Clearances, creepage
distances and solid insulation") |
- |
2000 |
|
- |
| 30(Resistance to heat and fire) |
- |
3000 |
|
- |
| 30.101(Resistance to heat and fire) |
- |
0 |
|
Testing charges included in Cl.30 |
| 31(Resistance to rusting) |
- |
1000 |
|
- |
| 32("Radiation, toxicity and similar
hazards") |
- |
1000 |
|
- |
| Cl 19.11.4.1(Electrostatic discharges) |
- |
5000 |
|
if applicable |
| Cl 19.11.4.2(Radiated fields) |
- |
20000 |
|
if applicable |
| Cl 19.11.4.3(Fast transient bursts) |
- |
5000 |
|
if applicable |
| Cl 19.11.4.4(Voltage surges) |
- |
5000 |
|
if applicable |
| Cl 19.11.4.5(Immunity to conducted disturbances) |
- |
10000 |
|
if applicable |
| Cl 19.11.4.6(Voltage dips and interruptions) |
- |
5000 |
|
if applicable |
| Cl 19.11.4.7(Harmonics and inter-harmonics) |
- |
5000 |
|
if applicable |
| Cl 19.11.4.8(Abnormal operation) |
- |
5000 |
|
- |
| 24.101(Components) |
- |
0 |
|
Testing charges included in Cl.24 |
| 7(Marking and instructions) |
- |
0 |
|
- |
| 8(Protection against access to live parts) |
- |
0 |
|
- |
| 10(Power input and current) |
- |
0 |
|
- |
| 10(Power input and current) |
- |
0 |
|
- |
| 11(Heating) |
- |
0 |
|
- |
| 13.1 &13.2(Leakage current test) |
- |
0 |
|
- |
| 13.1 &13.3(Electric strength test) |
- |
0 |
|
- |
| 14(Transient overvoltages) |
- |
0 |
|
- |
| 15(Moisture resistance) |
- |
0 |
|
- |
| 15.3(Moisture resistance) |
- |
0 |
|
- |
| 16.1 &16.2(Leakage current test) |
- |
0 |
|
- |
| 16.1 & 16.3(Electric strength test) |
- |
0 |
|
- |
| 17(Overload protection of transformers and associated circuits) |
- |
0 |
|
- |
| 19.1 to 19.13, Table No. - 9(Abnormal operation) |
- |
0 |
|
- |
| 20.1(Stability and mechanical hazards) |
- |
0 |
|
- |
| 20.2(Stability and mechanical hazards) |
- |
0 |
|
- |
| 21(Mechanical strength) |
- |
0 |
|
- |
| 22(Construction) |
- |
0 |
|
- |
| 23(Internal wiring) |
- |
0 |
|
- |
| 24(Components) |
- |
0 |
|
- |
| 25("Supply connection and
external flexible cords") |
- |
0 |
|
- |
| 26("Terminals for external
conductors") |
- |
0 |
|
- |
| 27(Provision for earthing) |
- |
0 |
|
- |
| 28(Screws and connections) |
- |
0 |
|
- |
| 29("Clearances, creepage
distances and solid insulation") |
- |
0 |
|
- |
| 30(Resistance to heat and fire) |
- |
0 |
|
- |
| 30.101(Resistance to heat and fire) |
- |
0 |
|
- |
| 31(Resistance to rusting) |
- |
0 |
|
- |
| 32("Radiation, toxicity and similar
hazards") |
- |
0 |
|
- |
| Cl 19.11.4.1(Electrostatic discharges) |
- |
0 |
|
- |
| Cl 19.11.4.2(Radiated fields) |
- |
0 |
|
- |
| Cl 19.11.4.3(Fast transient bursts) |
- |
0 |
|
- |
| Cl 19.11.4.4(Voltage surges) |
- |
0 |
|
- |
| Cl 19.11.4.5(Immunity to conducted disturbances) |
- |
0 |
|
- |
| Cl 19.11.4.6(Voltage dips and interruptions) |
- |
0 |
|
- |
| Cl 19.11.4.7(Harmonics and inter-harmonics) |
- |
0 |
|
- |
| Cl 19.11.4.8(Abnormal operation) |
- |
0 |
|
- |
| 24.101(Components) |
- |
0 |
|
- |
|
20 Jun, 2028 |
- Included w.e.f 25.03.2025
Exclusion:Cl 24 (Components), Cl 32 ("Radiation, toxicity and similar hazards") |
| 32 |
IS 302 : Part 2 : Sec 42 (2024) |
Household and Similar Electrical Appliances�Safety Part 2 Particular Requirements Section 42 Commercial electric forced convection ovens, steam cookers and steam-convection ovens |
- |
66000 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 7(Marking and instructions) |
- |
2000 |
|
- |
| 8(Protection against access to live parts) |
- |
2000 |
|
- |
| 10(Power input and current) |
- |
2000 |
|
- |
| 11(Heating) |
- |
4000 |
|
- |
| 13.1 &13.2(Leakage current test) |
- |
1500 |
|
- |
| 13.1 &13.3(Electric strength test) |
- |
1500 |
|
- |
| 14(Transient overvoltages) |
- |
2000 |
|
- |
| 15(Moisture resistance) |
- |
4000 |
|
- |
| 15.3(Moisture resistance) |
- |
0 |
|
Testing charges included in Cl.15 |
| 15.101(Moisture resistance) |
- |
0 |
|
Testing charges included in Cl.15 |
| 16.1 &16.2(Leakage current test) |
- |
1500 |
|
- |
| 16.1 & 16.3(Electric strength test) |
- |
1500 |
|
- |
| 17(Overload protection of transformers and associated circuits) |
- |
4000 |
|
- |
| 19.1 to 19.13, Table No. - 9(Abnormal operation) |
- |
8000 |
|
Charges applicable excluding the test of Cl.19.11.4.1 to Cl.19.11.4.7. The testing charges for EMI/EMC Testing (Cl.19.11.4.1 to Cl.19.11.4.7) will be Rs. 55000 charged extra. |
| 19.101(Abnormal operation) |
- |
0 |
|
Testing charges included in Cl.19.1 to CL.19.13 |
| 20.1(Stability and mechanical hazards) |
- |
2000 |
|
- |
| 20.2(Stability and mechanical hazards) |
- |
0 |
|
Testing charges included in Cl.20.1 |
| 20.101(Stability and mechanical hazards) |
- |
0 |
|
Testing charges included in Cl.20.1 |
| 20.102(Stability and mechanical hazards) |
- |
0 |
|
Testing charges included in Cl.20.1 |
| 21(Mechanical strength) |
- |
3000 |
|
- |
| 21.101(Mechanical strength) |
- |
0 |
|
Testing charges included in Cl.21 |
| 22(Construction) |
- |
8000 |
|
- |
| 22.101(Construction) |
- |
0 |
|
Testing charges included in Cl.22 |
| 22.102(Construction) |
- |
0 |
|
Testing charges included in Cl.22 |
| 22.103(Construction) |
- |
0 |
|
Testing charges included in Cl.22 |
| 22.104(Construction) |
- |
0 |
|
Testing charges included in Cl.22 |
| 22.105(Construction) |
- |
0 |
|
Testing charges included in Cl.22 |
| 22.106(Construction) |
- |
0 |
|
Testing charges included in Cl.22 |
| 22.107(Construction) |
- |
0 |
|
Testing charges included in Cl.22 |
| 22.108(Construction) |
- |
0 |
|
Testing charges included in Cl.22 |
| 22.109(Construction) |
- |
0 |
|
Testing charges included in Cl.22 |
| 22.110(Construction) |
- |
0 |
|
Testing charges included in Cl.22 |
| 22.111(Construction) |
- |
0 |
|
Testing charges included in Cl.22 |
| 22.112(Construction) |
- |
0 |
|
Testing charges included in Cl.22 |
| 22.113(Construction) |
- |
0 |
|
Testing charges included in Cl.22 |
| 22.114(Construction) |
- |
0 |
|
Testing charges included in Cl.22 |
| 22.115(Construction) |
- |
0 |
|
Testing charges included in Cl.22 |
| 22.116(Construction) |
- |
0 |
|
Testing charges included in Cl.22 |
| 22.117(Construction) |
- |
0 |
|
Testing charges included in Cl.22 |
| 22.118(Construction) |
- |
0 |
|
Testing charges included in Cl.22 |
| 22.119(Construction) |
- |
0 |
|
Testing charges included in Cl.22 |
| 23(Internal wiring) |
- |
2000 |
|
- |
| 24(Components) |
- |
3000 |
|
- |
| 25("Supply connection and
external flexible cords") |
- |
1000 |
|
- |
| 26("Terminals for external
conductors") |
- |
1000 |
|
- |
| 27(Provision for earthing) |
- |
2000 |
|
- |
| 28(Screws and connections) |
- |
1000 |
|
- |
| 29("Clearances, creepage
distances and solid insulation") |
- |
2000 |
|
- |
| 30(Resistance to heat and fire) |
- |
3000 |
|
- |
| 31(Resistance to rusting) |
- |
1000 |
|
- |
| 32("Radiation, toxicity and similar
hazards") |
- |
1000 |
|
- |
| 22.109(Construction) |
- |
0 |
|
Testing charges included in Cl.22 |
| 30.101(Resistance to heat and fire) |
- |
0 |
|
Testing charges included in Cl.30 |
| 7(Marking and instructions) |
- |
0 |
|
- |
| 8(Protection against access to live parts) |
- |
0 |
|
- |
| 10(Power input and current) |
- |
0 |
|
- |
| 11(Heating) |
- |
0 |
|
- |
| 13.1 &13.2(Leakage current test) |
- |
0 |
|
- |
| 13.1 &13.3(Electric strength test) |
- |
0 |
|
- |
| 14(Transient overvoltages) |
- |
0 |
|
- |
| 15(Moisture resistance) |
- |
0 |
|
- |
| 15.3(Moisture resistance) |
- |
0 |
|
- |
| 15.101(Moisture resistance) |
- |
0 |
|
- |
| 16.1 &16.2(Leakage current test) |
- |
0 |
|
- |
| 16.1 & 16.3(Electric strength test) |
- |
0 |
|
- |
| 17(Overload protection of transformers and associated circuits) |
- |
0 |
|
- |
| 19.1 to 19.13, Table No. - 9(Abnormal operation) |
- |
0 |
|
- |
| 19.101(Abnormal operation) |
- |
0 |
|
- |
| 20.1(Stability and mechanical hazards) |
- |
0 |
|
- |
| 20.2(Stability and mechanical hazards) |
- |
0 |
|
- |
| 20.101(Stability and mechanical hazards) |
- |
0 |
|
- |
| 20.102(Stability and mechanical hazards) |
- |
0 |
|
- |
| 21(Mechanical strength) |
- |
0 |
|
- |
| 21.101(Mechanical strength) |
- |
0 |
|
- |
| 22(Construction) |
- |
0 |
|
- |
| 22.101(Construction) |
- |
0 |
|
- |
| 22.102(Construction) |
- |
0 |
|
- |
| 22.103(Construction) |
- |
0 |
|
- |
| 22.104(Construction) |
- |
0 |
|
- |
| 22.105(Construction) |
- |
0 |
|
- |
| 22.106(Construction) |
- |
0 |
|
- |
| 22.107(Construction) |
- |
0 |
|
- |
| 22.108(Construction) |
- |
0 |
|
- |
| 22.109(Construction) |
- |
0 |
|
- |
| 22.110(Construction) |
- |
0 |
|
- |
| 22.111(Construction) |
- |
0 |
|
- |
| 22.112(Construction) |
- |
0 |
|
- |
| 22.113(Construction) |
- |
0 |
|
- |
| 22.114(Construction) |
- |
0 |
|
- |
| 22.115(Construction) |
- |
0 |
|
- |
| 22.116(Construction) |
- |
0 |
|
- |
| 22.117(Construction) |
- |
0 |
|
- |
| 22.118(Construction) |
- |
0 |
|
- |
| 22.119(Construction) |
- |
0 |
|
- |
| 23(Internal wiring) |
- |
0 |
|
- |
| 24(Components) |
- |
0 |
|
- |
| 25("Supply connection and
external flexible cords") |
- |
0 |
|
- |
| 26("Terminals for external
conductors") |
- |
0 |
|
- |
| 27(Provision for earthing) |
- |
0 |
|
- |
| 28(Screws and connections) |
- |
0 |
|
- |
| 29("Clearances, creepage
distances and solid insulation") |
- |
0 |
|
- |
| 30(Resistance to heat and fire) |
- |
0 |
|
- |
| 31(Resistance to rusting) |
- |
0 |
|
- |
| 32("Radiation, toxicity and similar
hazards") |
- |
0 |
|
- |
| 22.109(Construction) |
- |
0 |
|
- |
| 30.101(Resistance to heat and fire) |
- |
0 |
|
- |
|
20 Jun, 2028 |
- Included w.e.f 25.03.2025
Exclusion: Cl 24 (Components), Cl 32 ("Radiation, toxicity and similar hazards") |
| 33 |
IS 302 : Part 2 : Sec 13 (2024) |
Household and Similar Electrical Appliances âSafety Part 2 Particular Requirements Section 13 Deep Fat Fryers, Frying Pans and Similar Appliances (First Revision) |
- |
66000 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 7(Marking and instructions) |
- |
2000 |
|
- |
| 8(Protection against access to live parts) |
- |
2000 |
|
- |
| 10(Power input and current) |
- |
2000 |
|
- |
| 11(Heating) |
- |
4000 |
|
- |
| 13.1 &13.2(Leakage current test) |
- |
1500 |
|
- |
| 13.1 &13.3(Electric strength test) |
- |
1500 |
|
- |
| 14(Transient overvoltages) |
- |
2000 |
|
- |
| 15(Moisture resistance) |
- |
4000 |
|
- |
| 15.3(Moisture resistance) |
- |
0 |
|
Testing charges included in Cl.15 |
| 15.101(Moisture resistance) |
- |
0 |
|
Testing charges included in Cl.15 |
| 16.1 &16.2(Leakage current test) |
- |
1500 |
|
- |
| 16.1 & 16.3(Electric strength test) |
- |
1500 |
|
- |
| 17(Overload protection of transformers and associated circuits) |
- |
4000 |
|
- |
| 19.1 to 19.13, Table No. - 9(Abnormal operation) |
- |
8000 |
|
Charges applicable excluding the test of Cl.19.11.4.1 to Cl.19.11.4.7. The testing charges for EMI/EMC Testing (Cl.19.11.4.1 to Cl.19.11.4.7) will be charged extra. |
| 19.101 to to 19.102(Abnormal operation) |
- |
0 |
|
Testing charges included in Cl.19.1 to CL.19.13 |
| 20(Stability and mechanical hazards) |
- |
2000 |
|
- |
| 21(Mechanical strength) |
- |
3000 |
|
- |
| 22(Construction) |
- |
8000 |
|
- |
| 22.101(Construction) |
- |
0 |
|
Testing charges included in Cl.22 |
| 23(Internal wiring) |
- |
2000 |
|
- |
| 24(Components) |
- |
3000 |
|
- |
| 25("Supply connection and
external flexible cords") |
- |
1000 |
|
- |
| 26("Terminals for external
conductors") |
- |
1000 |
|
- |
| 27(Provision for earthing) |
- |
2000 |
|
- |
| 28(Screws and connections) |
- |
1000 |
|
- |
| 29("Clearances, creepage
distances and solid insulation") |
- |
2000 |
|
- |
| 30(Resistance to heat and fire) |
- |
3000 |
|
- |
| 31(Resistance to rusting) |
- |
1000 |
|
- |
| 32("Radiation, toxicity and similar
hazards") |
- |
1000 |
|
- |
|
20 Jun, 2028 |
- Included w.e.f 25.03.2025
Exclusion: Cl 24 (Components), Cl 32 ("Radiation, toxicity and similar hazards") |
| 34 |
IS 302 : Part 2 : Sec 8 (2024) |
Household and Similar Electrical Appliances âSafety Part 2 Particular Requirements Section 8 Shavers, Hair Clippers and Similar Appliances (First Revision) |
- |
73000 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 7(Marking and instructions) |
- |
2000 |
|
- |
| 8(Protection against access to live parts) |
- |
2000 |
|
- |
| 10(Power input and current) |
- |
2000 |
|
- |
| 11(Heating) |
- |
4000 |
|
- |
| 12(Charging of metal-ion batteries) |
- |
15000 |
|
- |
| 13.1 &13.2(Leakage current test) |
- |
1500 |
|
- |
| 13.1 &13.3(Electric strength test) |
- |
1500 |
|
- |
| 14(Transient overvoltages) |
- |
2000 |
|
- |
| 15(Moisture resistance) |
- |
2000 |
|
- |
| 15.3(Moisture resistance) |
- |
2000 |
|
- |
| 16.1 &16.2(Leakage current test) |
- |
1500 |
|
- |
| 16.1 & 16.3(Electric strength test) |
- |
1500 |
|
- |
| 17(Overload protection of transformers and associated circuits) |
- |
4000 |
|
- |
| 19.1 to 19.13, Table No. - 9(Abnormal operation) |
- |
5000 |
|
Charges applicable excluding the test of Cl.19.11.4.1 to Cl.19.11.4.7. The testing charges for EMI/EMC Testing (Cl.19.11.4.1 to Cl.19.11.4.7) will be charged extra. |
| 19.101(Abnormal operation) |
- |
0 |
|
Testing charges included in Cl.19.1 TO cL.19.13 |
| 20.1(Stability and mechanical hazards) |
- |
1000 |
|
- |
| 20.2(Stability and mechanical hazards) |
- |
1000 |
|
- |
| 21(Mechanical strength) |
- |
3000 |
|
- |
| 21.101(Mechanical strength) |
- |
0 |
|
Testing charges included in Cl.21 |
| 21.102(Mechanical strength) |
- |
0 |
|
Testing charges included in Cl.21 |
| 21.103(Mechanical strength) |
- |
0 |
|
Testing charges included in Cl.21 |
| 22(Construction) |
- |
5000 |
|
- |
| 22.101(Construction) |
- |
0 |
|
Testing charges included in Cl.22 |
| 22.102(Construction) |
- |
0 |
|
Testing charges included in Cl.22 |
| 22.103(Construction) |
- |
0 |
|
Testing charges included in Cl.22 |
| 23(Internal wiring) |
- |
2000 |
|
- |
| 24(Components) |
- |
3000 |
|
- |
| 25("Supply connection and
external flexible cords") |
- |
1000 |
|
- |
| 26("Terminals for external
conductors") |
- |
1000 |
|
- |
| 27(Provision for earthing) |
- |
2000 |
|
- |
| 28(Screws and connections) |
- |
1000 |
|
- |
| 29("Clearances, creepage
distances and solid insulation") |
- |
2000 |
|
- |
| 30(Resistance to heat and fire) |
- |
3000 |
|
- |
| 31(Resistance to rusting) |
- |
1000 |
|
- |
| 32("Radiation, toxicity and similar
hazards") |
- |
1000 |
|
- |
|
20 Jun, 2028 |
- Included w.e.f 25.03.2025
Exclusion : Cl 24 (Components), Cl 32 ("Radiation, toxicity and similar hazards") |
| 35 |
IS 302 : Part 1 (2024) |
Household and Similar Electrical Appliances â Safety Part 1 General Requirements (Seventh Revision) |
- |
73000 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 4(General requirement) |
- |
0 |
|
- |
| 5(General conditions for the tests) |
- |
0 |
|
- |
| 6(Classification- IS 302-1) |
- |
0 |
|
- |
| 7(Marking and instructions) |
- |
2000 |
|
- |
| 8.1.1(Protection against live parts in all positions) |
- |
2000 |
|
- |
| 8.1.2(Protection against live parts in openings) |
- |
0 |
|
Testing charges included in Cl.8.1.1 |
| 8.1.3(Protection against live parts in visible glowing heating elements) |
- |
0 |
|
Testing charges included in Cl.8.1.1 |
| 8.1.4(Protection against live parts against protective impedance) |
- |
0 |
|
Testing charges included in Cl.8.1.1 |
| 8.1.5(Live parts of built-in appliances) |
- |
0 |
|
Testing charges included in Cl.8.1.1 |
| 9(Starting of motor operation test requirements and tests) |
- |
0 |
|
- |
| 10.1(Power input) |
- |
2000 |
|
- |
| 10.2(Current input) |
- |
0 |
|
Testing charges included in Cl.10.1 |
| 11.1(General) |
- |
4000 |
|
- |
| 11.2(General) |
- |
0 |
|
Testing charges included in Cl.11.1 |
| 11.3(Heating) |
- |
0 |
|
Testing charges included in Cl.11.1 |
| 11.4(Heating appliances) |
- |
0 |
|
Testing charges included in Cl.11.1 |
| 11.5(Motor-operated appliances) |
- |
0 |
|
Testing charges included in Cl.11.1 |
| 11.6(Combined appliances) |
- |
0 |
|
Testing charges included in Cl.11.1 |
| 11.7(Duration corresponding) |
- |
0 |
|
Testing charges included in Cl.11.1 |
| 11.8(Temperature rise) |
- |
0 |
|
Testing charges included in Cl.11.1 |
| 12(Charging of metal-ion batteries) |
- |
15000 |
|
if applicable |
| 13(Leakage current and electric strength at operating temperature) |
- |
3000 |
|
- |
| 13.2(Leakage current at operating temperature) |
- |
0 |
|
Testing charges included in Cl.13 |
| 13.3(Electric Strength at operating temperature) |
- |
0 |
|
Testing charges included in Cl.13 |
| 14(Transient Over Voltages) |
- |
2000 |
|
- |
| 15.0(Moisture resistance) |
- |
4000 |
|
- |
| 15.1(Ingress Protection test other than IPX0 (IP test)) |
- |
0 |
|
Testing charges included in Cl.15 |
| 15.2(Spillage Test) |
- |
0 |
|
Testing charges included in Cl.15 |
| 15.3(Humidity Test) |
- |
0 |
|
Testing charges included in Cl.15 |
| 16.0(General) |
- |
0 |
|
Testing charges included in Cl.16 |
| 16(Leakage current and electric strength) |
- |
3000 |
|
- |
| 16.2(Leakage Current (after Clause 15)) |
- |
0 |
|
Testing charges included in Cl.16 |
| 16.3(Electric Strength (after clause 15 and 16.2)) |
- |
0 |
|
Testing charges included in Cl.16 |
| 17(Over Load Protection of Transformers and associated circuits) |
- |
4000 |
|
- |
| 17(Overload protection of transformers and associated circuits) |
- |
0 |
|
Testing charges included in Cl.17 |
| 18(Endurance) |
- |
0 |
|
- |
| 19(Abnormal Operation) |
- |
5000 |
|
Charges applicable excluding the test of Cl.19.11.4.1 to Cl.19.11.4.7. The testing charges for EMI/EMC testing (Cl.19.11.4.1 to Cl.19.11.4.7) will be applicable |
| 19.17(Abnormal Operation, IS 302-1) |
- |
0 |
|
Testing charges included in Cl.19 |
| 19.11.4.1(Electrostatic discharges) |
- |
5000 |
|
Complete testing Charges applicable excluding the test of Cl.19.11.4.1 to Cl.19.11.4.7. If applicable, The testing charges for EMI/EMC Testing (Cl.19.11.4.1 to Cl.19.11.4.7) will be charged extra |
| 19.11.4.2(Radiated fields) |
- |
20000 |
|
Complete testing Charges applicable excluding the test of Cl.19.11.4.1 to Cl.19.11.4.7. If applicable, The testing charges for EMI/EMC Testing (Cl.19.11.4.1 to Cl.19.11.4.7) will be charged extra |
| 19.11.4.3(Fast transient bursts) |
- |
5000 |
|
Complete testing Charges applicable excluding the test of Cl.19.11.4.1 to Cl.19.11.4.7. If applicable, The testing charges for EMI/EMC Testing (Cl.19.11.4.1 to Cl.19.11.4.7) will be charged extra |
| 19.11.4.4(Surge immunity test) |
- |
5000 |
|
Complete testing Charges applicable excluding the test of Cl.19.11.4.1 to Cl.19.11.4.7. If applicable, The testing charges for EMI/EMC Testing (Cl.19.11.4.1 to Cl.19.11.4.7) will be charged extra |
| 19.11.4.5(Immunity to conducted discharges) |
- |
10000 |
|
Complete testing Charges applicable excluding the test of Cl.19.11.4.1 to Cl.19.11.4.7. If applicable, The testing charges for EMI/EMC Testing (Cl.19.11.4.1 to Cl.19.11.4.7) will be charged extra |
| 19.11.4.6(Class 3 Voltage dips and interruptions) |
- |
5000 |
|
Complete testing Charges applicable excluding the test of Cl.19.11.4.1 to Cl.19.11.4.7. If applicable, The testing charges for EMI/EMC Testing (Cl.19.11.4.1 to Cl.19.11.4.7) will be charged extra |
| 19.11.4.7(Harmonics) |
- |
5000 |
|
Complete testing Charges applicable excluding the test of Cl.19.11.4.1 to Cl.19.11.4.7. If applicable, The testing charges for EMI/EMC Testing (Cl.19.11.4.1 to Cl.19.11.4.7) will be charged extra |
| 20.1(Stability & Mechanical Hazards, IS 302-1) |
- |
2000 |
|
- |
| 20.2(Stability & Mechanical Hazards, IS 302-1) |
- |
0 |
|
Testing charges included in Cl.20 |
| 21.1(Mechanical Strength, IS 302-1) |
- |
3000 |
|
- |
| 21.2(Mechanical Strength, IS 302-1) |
- |
0 |
|
Testing charges included in Cl.21 |
| 21.3(Mechanical Strength, IS 302-1) |
- |
0 |
|
Testing charges included in Cl.21 |
| 22.1(Construction, IS 302-1) |
- |
5000 |
|
- |
| 22.5(Construction) |
- |
0 |
|
Testing charges included in Cl.22 |
| 22.6(Construction, IS 302-1) |
- |
0 |
|
Testing charges included in Cl.22 |
| 22.11(Construction, IS 302-1) |
- |
0 |
|
Testing charges included in Cl.22 |
| 22.16(Construction) |
- |
0 |
|
Testing charges included in Cl.22 |
| 22.32(Construction, IS 302-1) |
- |
0 |
|
Testing charges included in Cl.22 |
| 22.42(Construction) |
- |
0 |
|
Testing charges included in Cl.22 |
| 23.1(Internal Wiring, IS 302-1) |
- |
2000 |
|
- |
| 23.3(Internal Wiring, IS 302-1) |
- |
0 |
|
Testing charges included in Cl.23 |
| 24(Components) |
- |
3000 |
|
- |
| 25.8(Supply Connection and External Flexible Cords, IS 302-1) |
- |
1000 |
|
- |
| 25.6(Supply connection and external flexible cords, IS 302-1) |
- |
0 |
|
Testing charges included in Cl.25 |
| 25.7(Supply Connection and External Flexible Cords, IS 302-1) |
- |
0 |
|
Testing charges included in Cl.25 |
| 25.14(Supply Connection and External Flexible Cords, IS 302-1) |
- |
0 |
|
Testing charges included in Cl.25 |
| 25.15(Supply Connection and External Flexible Cords, IS 302-1) |
- |
0 |
|
Testing charges included in Cl.25 |
| 26(Terminals for external conductors) |
- |
1000 |
|
- |
| 26.5(Terminals for external conductors) |
- |
0 |
|
Testing charges included in Cl.26 |
| 27.1(Provision for Earthing, IS 302-1) |
- |
2000 |
|
- |
| 27.5(Provision for Earthing, IS 302-1) |
- |
0 |
|
Testing charges included in Cl.27 |
| 28(Screw test and connections) |
- |
1000 |
|
- |
| 28.1(Screws and connections) |
- |
0 |
|
Testing charges included in Cl.28 |
| 29(clearance, creepage distances and solid insulation) |
- |
2000 |
|
- |
| 30.1(Ball pressure test) |
- |
1000 |
|
- |
| 30.2(Glow Wire Test) |
- |
1000 |
|
- |
| 30.2(Needle Flame Test) |
- |
1000 |
|
- |
| 31(Resistance to Rusting) |
- |
1000 |
|
- |
| 32.1(Radiation Toxicity and Similar Hazards) |
- |
1000 |
|
- |
| A.2(Earth continuity test) |
- |
0 |
|
Testing charges included in Cl.27 |
| 22.2(Construction, IS 302-1) |
- |
0 |
|
Testing charges included in Cl.22 |
| 22.3(Construction, IS 302-1) |
- |
0 |
|
Testing charges included in Cl.22 |
| B.22.4(Construction, IS 302-1) |
- |
0 |
|
Testing charges included in Cl.22 |
| B.22.5(Construction, IS 302-1) |
- |
0 |
|
Testing charges included in Cl.22 |
| Annex C(Ageing test on motors) |
- |
0 |
|
- |
| Annex D(Thermal motor protectors) |
- |
0 |
|
- |
| 18(Endurance) |
- |
0 |
|
- |
| 16.1(General) |
- |
0 |
|
Testing charges included in Cl.16 |
| 15.2(Moisture resistance) |
- |
0 |
|
Testing charges included in Cl.15 |
| 4(General requirement) |
- |
0 |
|
- |
| 5(General conditions for the tests) |
- |
0 |
|
- |
| 6(Classification- IS 302-1) |
- |
0 |
|
- |
| 7(Marking and instructions) |
- |
0 |
|
- |
| 8.1.1(Protection against live parts in all positions) |
- |
0 |
|
- |
| 8.1.2(Protection against live parts in openings) |
- |
0 |
|
- |
| 8.1.3(Protection against live parts in visible glowing heating elements) |
- |
0 |
|
- |
| 8.1.4(Protection against live parts against protective impedance) |
- |
0 |
|
- |
| 8.1.5(Live parts of built-in appliances) |
- |
0 |
|
- |
| 9(Starting of motor operation test requirements and tests) |
- |
0 |
|
- |
| 10.1(Power input) |
- |
0 |
|
- |
| 10.2(Current input) |
- |
0 |
|
- |
| 11.1(General) |
- |
0 |
|
- |
| 11.2(General) |
- |
0 |
|
- |
| 11.3(Heating) |
- |
0 |
|
- |
| 11.4(Heating appliances) |
- |
0 |
|
- |
| 11.5(Motor-operated appliances) |
- |
0 |
|
- |
| 11.6(Combined appliances) |
- |
0 |
|
- |
| 11.7(Duration corresponding) |
- |
0 |
|
- |
| 11.8(Temperature rise) |
- |
0 |
|
- |
| 12(Charging of metal-ion batteries) |
- |
0 |
|
- |
| 13(Leakage current and electric strength at operating temperature) |
- |
0 |
|
- |
| 13.2(Leakage current at operating temperature) |
- |
0 |
|
- |
| 13.3(Electric Strength at operating temperature) |
- |
0 |
|
- |
| 14(Transient Over Voltages) |
- |
0 |
|
- |
| 15.0(Moisture resistance) |
- |
0 |
|
- |
| 15.1(Ingress Protection test other than IPX0 (IP test)) |
- |
0 |
|
- |
| 15.2(Spillage Test) |
- |
0 |
|
- |
| 15.3(Humidity Test) |
- |
0 |
|
- |
| 16.0(General) |
- |
0 |
|
- |
| 16(Leakage current and electric strength) |
- |
0 |
|
- |
| 16.2(Leakage Current (after Clause 15)) |
- |
0 |
|
- |
| 16.3(Electric Strength (after clause 15 and 16.2)) |
- |
0 |
|
- |
| 17(Over Load Protection of Transformers and associated circuits) |
- |
0 |
|
- |
| 17(Overload protection of transformers and associated circuits) |
- |
0 |
|
- |
| 18(Endurance) |
- |
0 |
|
- |
| 19(Abnormal Operation) |
- |
0 |
|
- |
| 19.17(Abnormal Operation, IS 302-1) |
- |
0 |
|
- |
| 19.11.4.1(Electrostatic discharges) |
- |
0 |
|
- |
| 19.11.4.2(Radiated fields) |
- |
0 |
|
- |
| 19.11.4.3(Fast transient bursts) |
- |
0 |
|
- |
| 19.11.4.4(Surge immunity test) |
- |
0 |
|
- |
| 19.11.4.5(Immunity to conducted discharges) |
- |
0 |
|
- |
| 19.11.4.6(Class 3 Voltage dips and interruptions) |
- |
0 |
|
- |
| 19.11.4.7(Harmonics) |
- |
0 |
|
- |
| 20.1(Stability & Mechanical Hazards, IS 302-1) |
- |
0 |
|
- |
| 20.2(Stability & Mechanical Hazards, IS 302-1) |
- |
0 |
|
- |
| 21.1(Mechanical Strength, IS 302-1) |
- |
0 |
|
- |
| 21.2(Mechanical Strength, IS 302-1) |
- |
0 |
|
- |
| 21.3(Mechanical Strength, IS 302-1) |
- |
0 |
|
- |
| 22.1(Construction, IS 302-1) |
- |
0 |
|
- |
| 22.5(Construction) |
- |
0 |
|
- |
| 22.6(Construction, IS 302-1) |
- |
0 |
|
- |
| 22.11(Construction, IS 302-1) |
- |
0 |
|
- |
| 22.16(Construction) |
- |
0 |
|
- |
| 22.32(Construction, IS 302-1) |
- |
0 |
|
- |
| 22.42(Construction) |
- |
0 |
|
- |
| 23.1(Internal Wiring, IS 302-1) |
- |
0 |
|
- |
| 23.3(Internal Wiring, IS 302-1) |
- |
0 |
|
- |
| 24(Components) |
- |
0 |
|
- |
| 25.8(Supply Connection and External Flexible Cords, IS 302-1) |
- |
0 |
|
- |
| 25.6(Supply connection and external flexible cords, IS 302-1) |
- |
0 |
|
- |
| 25.7(Supply Connection and External Flexible Cords, IS 302-1) |
- |
0 |
|
- |
| 25.14(Supply Connection and External Flexible Cords, IS 302-1) |
- |
0 |
|
- |
| 25.15(Supply Connection and External Flexible Cords, IS 302-1) |
- |
0 |
|
- |
| 26(Terminals for external conductors) |
- |
0 |
|
- |
| 26.5(Terminals for external conductors) |
- |
0 |
|
- |
| 27.1(Provision for Earthing, IS 302-1) |
- |
0 |
|
- |
| 27.5(Provision for Earthing, IS 302-1) |
- |
0 |
|
- |
| 28(Screw test and connections) |
- |
0 |
|
- |
| 28.1(Screws and connections) |
- |
0 |
|
- |
| 29(clearance, creepage distances and solid insulation) |
- |
0 |
|
- |
| 30.1(Ball pressure test) |
- |
0 |
|
- |
| 30.2(Glow Wire Test) |
- |
0 |
|
- |
| 30.2(Needle Flame Test) |
- |
0 |
|
- |
| 31(Resistance to Rusting) |
- |
0 |
|
- |
| 32.1(Radiation Toxicity and Similar Hazards) |
- |
0 |
|
- |
| A.2(Earth continuity test) |
- |
0 |
|
- |
| 22.2(Construction, IS 302-1) |
- |
0 |
|
- |
| 22.3(Construction, IS 302-1) |
- |
0 |
|
- |
| B.22.4(Construction, IS 302-1) |
- |
0 |
|
- |
| B.22.5(Construction, IS 302-1) |
- |
0 |
|
- |
| Annex C(Ageing test on motors) |
- |
0 |
|
- |
| Annex D(Thermal motor protectors) |
- |
0 |
|
- |
| 18(Endurance) |
- |
0 |
|
- |
| 16.1(General) |
- |
0 |
|
- |
| 15.2(Moisture resistance) |
- |
0 |
|
- |
| 4(General requirement) |
- |
0 |
|
- |
| 5(General conditions for the tests) |
- |
0 |
|
- |
| 6(Classification- IS 302-1) |
- |
0 |
|
- |
| 7(Marking and instructions) |
- |
0 |
|
- |
| 8.1.1(Protection against live parts in all positions) |
- |
0 |
|
- |
| 8.1.2(Protection against live parts in openings) |
- |
0 |
|
- |
| 8.1.3(Protection against live parts in visible glowing heating elements) |
- |
0 |
|
- |
| 8.1.4(Protection against live parts against protective impedance) |
- |
0 |
|
- |
| 8.1.5(Live parts of built-in appliances) |
- |
0 |
|
- |
| 9(Starting of motor operation test requirements and tests) |
- |
0 |
|
- |
| 10.1(Power input) |
- |
0 |
|
- |
| 10.2(Current input) |
- |
0 |
|
- |
| 11.1(General) |
- |
0 |
|
- |
| 11.2(General) |
- |
0 |
|
- |
| 11.3(Heating) |
- |
0 |
|
- |
| 11.4(Heating appliances) |
- |
0 |
|
- |
| 11.5(Motor-operated appliances) |
- |
0 |
|
- |
| 11.6(Combined appliances) |
- |
0 |
|
- |
| 11.7(Duration corresponding) |
- |
0 |
|
- |
| 11.8(Temperature rise) |
- |
0 |
|
- |
| 12(Charging of metal-ion batteries) |
- |
0 |
|
- |
| 13(Leakage current and electric strength at operating temperature) |
- |
0 |
|
- |
| 13.2(Leakage current at operating temperature) |
- |
0 |
|
- |
| 13.3(Electric Strength at operating temperature) |
- |
0 |
|
- |
| 14(Transient Over Voltages) |
- |
0 |
|
- |
| 15.0(Moisture resistance) |
- |
0 |
|
- |
| 15.1(Ingress Protection test other than IPX0 (IP test)) |
- |
0 |
|
- |
| 15.2(Spillage Test) |
- |
0 |
|
- |
| 15.3(Humidity Test) |
- |
0 |
|
- |
| 16.0(General) |
- |
0 |
|
- |
| 16(Leakage current and electric strength) |
- |
0 |
|
- |
| 16.2(Leakage Current (after Clause 15)) |
- |
0 |
|
- |
| 16.3(Electric Strength (after clause 15 and 16.2)) |
- |
0 |
|
- |
| 17(Over Load Protection of Transformers and associated circuits) |
- |
0 |
|
- |
| 17(Overload protection of transformers and associated circuits) |
- |
0 |
|
- |
| 18(Endurance) |
- |
0 |
|
- |
| 19(Abnormal Operation) |
- |
0 |
|
- |
| 19.17(Abnormal Operation, IS 302-1) |
- |
0 |
|
- |
| 19.11.4.1(Electrostatic discharges) |
- |
0 |
|
- |
| 19.11.4.2(Radiated fields) |
- |
0 |
|
- |
| 19.11.4.3(Fast transient bursts) |
- |
0 |
|
- |
| 19.11.4.4(Surge immunity test) |
- |
0 |
|
- |
| 19.11.4.5(Immunity to conducted discharges) |
- |
0 |
|
- |
| 19.11.4.6(Class 3 Voltage dips and interruptions) |
- |
0 |
|
- |
| 19.11.4.7(Harmonics) |
- |
0 |
|
- |
| 20.1(Stability & Mechanical Hazards, IS 302-1) |
- |
0 |
|
- |
| 20.2(Stability & Mechanical Hazards, IS 302-1) |
- |
0 |
|
- |
| 21.1(Mechanical Strength, IS 302-1) |
- |
0 |
|
- |
| 21.2(Mechanical Strength, IS 302-1) |
- |
0 |
|
- |
| 21.3(Mechanical Strength, IS 302-1) |
- |
0 |
|
- |
| 22.1(Construction, IS 302-1) |
- |
0 |
|
- |
| 22.5(Construction) |
- |
0 |
|
- |
| 22.6(Construction, IS 302-1) |
- |
0 |
|
- |
| 22.11(Construction, IS 302-1) |
- |
0 |
|
- |
| 22.16(Construction) |
- |
0 |
|
- |
| 22.32(Construction, IS 302-1) |
- |
0 |
|
- |
| 22.42(Construction) |
- |
0 |
|
- |
| 23.1(Internal Wiring, IS 302-1) |
- |
0 |
|
- |
| 23.3(Internal Wiring, IS 302-1) |
- |
0 |
|
- |
| 24(Components) |
- |
0 |
|
- |
| 25.8(Supply Connection and External Flexible Cords, IS 302-1) |
- |
0 |
|
- |
| 25.6(Supply connection and external flexible cords, IS 302-1) |
- |
0 |
|
- |
| 25.7(Supply Connection and External Flexible Cords, IS 302-1) |
- |
0 |
|
- |
| 25.14(Supply Connection and External Flexible Cords, IS 302-1) |
- |
0 |
|
- |
| 25.15(Supply Connection and External Flexible Cords, IS 302-1) |
- |
0 |
|
- |
| 26(Terminals for external conductors) |
- |
0 |
|
- |
| 26.5(Terminals for external conductors) |
- |
0 |
|
- |
| 27.1(Provision for Earthing, IS 302-1) |
- |
0 |
|
- |
| 27.5(Provision for Earthing, IS 302-1) |
- |
0 |
|
- |
| 28(Screw test and connections) |
- |
0 |
|
- |
| 28.1(Screws and connections) |
- |
0 |
|
- |
| 29(clearance, creepage distances and solid insulation) |
- |
0 |
|
- |
| 30.1(Ball pressure test) |
- |
0 |
|
- |
| 30.2(Glow Wire Test) |
- |
0 |
|
- |
| 30.2(Needle Flame Test) |
- |
0 |
|
- |
| 31(Resistance to Rusting) |
- |
0 |
|
- |
| 32.1(Radiation Toxicity and Similar Hazards) |
- |
0 |
|
- |
| A.2(Earth continuity test) |
- |
0 |
|
- |
| 22.2(Construction, IS 302-1) |
- |
0 |
|
- |
| 22.3(Construction, IS 302-1) |
- |
0 |
|
- |
| B.22.4(Construction, IS 302-1) |
- |
0 |
|
- |
| B.22.5(Construction, IS 302-1) |
- |
0 |
|
- |
| Annex C(Ageing test on motors) |
- |
0 |
|
- |
| Annex D(Thermal motor protectors) |
- |
0 |
|
- |
| 18(Endurance) |
- |
0 |
|
- |
| 16.1(General) |
- |
0 |
|
- |
| 15.2(Moisture resistance) |
- |
0 |
|
- |
|
20 Jun, 2028 |
- iNCLUDED W.E.F.04.03.2025
EXCLUSION
Cl 32 (Radiation Toxicity and Similar Hazards)
Cl 22.32 (Construction)
CL 24 (Components)
"Domestic Electric Clothes Washing Machines
(For testing charges please refer part 2 standard in LIMS)" |
| 36 |
IS 17550 : Part 2 (2024) |
Household Refrigerating Appliances - Characteristics and Test Methods Part 2 Performance Requirements (First Revision) |
- |
380000 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 6(Storage Test) |
- |
80000 |
|
- |
| 7(Cooling Capacity Test) |
- |
50000 |
|
- |
| 8(Freezing Capacity Test) |
- |
50000 |
|
Testing Charges for DC refrigerator :Nil |
| 9("Automatic Ice-Making
Capacity Test") |
- |
50000 |
|
Testing Charges for DC refrigerator :Nil |
| Cl. No.4.6 & Annex A(PULL-DOWN TEST) |
- |
50000 |
|
- |
| Cl. No.4.6(b) & Annex B("Wine Storage
Appliances And
Compartments;
Storage Test") |
- |
50000 |
|
Testing Charges for DC refrigerator :Nil |
| Cl. No.4.6(C) & AnnexC("Temperature Rise
Test ") |
- |
50000 |
|
Testing Charges for DC refrigerator :Nil |
| Cl. No.4.6(d) & Annex D("Water Vapour Condensation
Test ") |
- |
0 |
|
Rs.50,000/- Testing Charges covered in Part 1. |
|
20 Jun, 2028 |
- - |
| 37 |
IS 17550 : Part 1 (2024) |
Household Refrigerating Appliances - Characteristics and Test Methods Part 1 General Requirements (First Revision) |
- |
265000 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 5(MARKING) |
- |
2000 |
|
- |
| 8(MATERIALS, DESIGN, AND MANUFACTURE) |
- |
3000 |
|
Charges for Clause 13 Water Vapour condensation Test : Rs.50000. |
| 9(Testing The Air Tightness Of Door Or Lid Seal(S)) |
- |
5000 |
|
- |
| 10(Testing The Opening Force Of Door(S) Or Lid(S)) |
- |
10000 |
|
- |
| 11(Testing The Durability Of Hinges And Handles Of Door(S) And Lid(S) |
- |
50000 |
|
- |
| 12(Testing The Mechanical Strength Of Shelves And Similar Components) |
- |
10000 |
|
- |
| 14(Ice-Making Test (If Applicable)) |
- |
30000 |
|
- |
| 15(Test For Absence Of Odour And Taste) |
- |
50000 |
|
- |
| 16(Safety Requirements) |
- |
55000 |
|
For Production Routine tests as per clause 20.3 Rs.15000/- |
| 5(MARKING) |
- |
0 |
|
- |
| 8(MATERIALS, DESIGN, AND MANUFACTURE) |
- |
0 |
|
- |
| 9(Testing The Air Tightness Of Door Or Lid Seal(S)) |
- |
0 |
|
- |
| 10(Testing The Opening Force Of Door(S) Or Lid(S)) |
- |
0 |
|
- |
| 11(Testing The Durability Of Hinges And Handles Of Door(S) And Lid(S) |
- |
0 |
|
- |
| 12(Testing The Mechanical Strength Of Shelves And Similar Components) |
- |
0 |
|
- |
| 14(Ice-Making Test (If Applicable)) |
- |
0 |
|
- |
| 15(Test For Absence Of Odour And Taste) |
- |
0 |
|
- |
| 16(Safety Requirements) |
- |
0 |
|
- |
| 5(MARKING) |
- |
0 |
|
- |
| 8(MATERIALS, DESIGN, AND MANUFACTURE) |
- |
0 |
|
- |
| 9(Testing The Air Tightness Of Door Or Lid Seal(S)) |
- |
0 |
|
- |
| 10(Testing The Opening Force Of Door(S) Or Lid(S)) |
- |
0 |
|
- |
| 11(Testing The Durability Of Hinges And Handles Of Door(S) And Lid(S) |
- |
0 |
|
- |
| 12(Testing The Mechanical Strength Of Shelves And Similar Components) |
- |
0 |
|
- |
| 14(Ice-Making Test (If Applicable)) |
- |
0 |
|
- |
| 15(Test For Absence Of Odour And Taste) |
- |
0 |
|
- |
| 16(Safety Requirements) |
- |
0 |
|
- |
| 5(MARKING) |
- |
0 |
|
- |
| 8(MATERIALS, DESIGN, AND MANUFACTURE) |
- |
0 |
|
- |
| 9(Testing The Air Tightness Of Door Or Lid Seal(S)) |
- |
0 |
|
- |
| 10(Testing The Opening Force Of Door(S) Or Lid(S)) |
- |
0 |
|
- |
| 11(Testing The Durability Of Hinges And Handles Of Door(S) And Lid(S) |
- |
0 |
|
- |
| 12(Testing The Mechanical Strength Of Shelves And Similar Components) |
- |
0 |
|
- |
| 14(Ice-Making Test (If Applicable)) |
- |
0 |
|
- |
| 15(Test For Absence Of Odour And Taste) |
- |
0 |
|
- |
| 16(Safety Requirements) |
- |
0 |
|
- |
|
20 Jun, 2028 |
- Included w.e.f.03.03.2025 |
| 38 |
IS 11951 (2024) |
PUMPSET FOR DIRECT EVAPORATIVE AIR COOLER â SPECIFICATION (Second Revision) |
- |
49500 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 5.1.1(Non-Submersible Pumpset) |
- |
1000 |
|
- |
| 5.1.2(Submersible Pumpset) |
- |
1000 |
|
- |
| 6.1, 7.3, 9.1, 9.4.2, Table-1(Discharge Head, m) |
- |
2500 |
|
- |
| 6.1, 7.3, 9.1, 9.4.2,Table-1(Minimum Discharge, l/min) |
- |
2500 |
|
- |
| 6.1, 7.3, 9.1, 9.4.2, Table-1(Type 1 Motor Wattage) |
- |
1000 |
|
- |
| 6.1, 7.3, 9.1, 9.4.2, Table-1(Type 2 Motor Wattage) |
- |
1000 |
|
- |
| 6.1, 7.3, 9.1, 9.4.2, Table-2(Motor Wattage) |
- |
1000 |
|
- |
| 6.1, 7.3, 9.1,9.4.2, Table-2(Minimum Discharge Head, Hd) |
- |
2500 |
|
- |
| 6.1, 7.3, 9.1, 9.4.2,Table-2(Discharge Measurement Height, h) |
- |
2500 |
|
- |
| 6.1, 7.3, 9.1, 9.4.2, Table-2(Minimum, Discharge*) |
- |
2500 |
|
- |
| Cl-8(GENERAL REQUIREMENTS) |
- |
6000 |
|
- |
| 9.2(Tests on motor) |
- |
5000 |
|
- |
| 9.3(Water Requirement) |
- |
1000 |
|
- |
| 9.4.1(Reliability Tests) |
- |
12000 |
|
- |
| 9.4.3(Ingress protection test) |
- |
5000 |
|
- |
| 9.4.6(Dry Run Test) |
- |
2000 |
|
- |
| 9.5(Routine Test) |
- |
5000 |
|
- |
| 9.6(Type Test) |
- |
49500 |
|
- |
| 9.7(Leakage current and electric strength at operating temperature) |
- |
2000 |
|
- |
| 9.7(Moisture resistance) |
- |
4000 |
|
Additional 2000/- charges will be applicable for the test Cl.31 of IS 302-1. |
| 9.7(Leakage current and electric strength) |
- |
2000 |
|
- |
|
20 Jun, 2028 |
- - |
| 39 |
IS 1475 (2024) |
Drinking Water Coolers - Specification (Fourth Revision) |
- |
51000 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 4(Classification) |
- |
0 |
|
- |
| 5(Construction) |
- |
5000 |
|
- |
| 6.3(Cooling Capacity Test) |
- |
8000 |
|
- |
| 6.4(Maximum Operating Condition Test) |
- |
5000 |
|
- |
| 6.5(Pull Down Test) |
- |
5000 |
|
- |
| 9(Maximum Power Consumption Test) |
- |
5000 |
|
- |
| 10(Annual Energy Consumption Test) |
- |
8000 |
|
- |
| 11(Storage Capacity Test) |
- |
5000 |
|
- |
| 13(Functional Test) |
- |
2000 |
|
- |
| 14 a)(Protection against electric shock) |
- |
2000 |
|
- |
| 14 b)(High voltage (electric strength) test) |
- |
2000 |
|
- |
| 14 c)(Leakage current tests) |
- |
2000 |
|
- |
| 14 d)(Provision for earthing) |
- |
2000 |
|
- |
| 4(Classification) |
- |
0 |
|
- |
| 5(Construction) |
- |
0 |
|
- |
| 6.3(Cooling Capacity Test) |
- |
0 |
|
- |
| 6.4(Maximum Operating Condition Test) |
- |
0 |
|
- |
| 6.5(Pull Down Test) |
- |
0 |
|
- |
| 9(Maximum Power Consumption Test) |
- |
0 |
|
- |
| 10(Annual Energy Consumption Test) |
- |
0 |
|
- |
| 11(Storage Capacity Test) |
- |
0 |
|
- |
| 13(Functional Test) |
- |
0 |
|
- |
| 14 a)(Protection against electric shock) |
- |
0 |
|
- |
| 14 b)(High voltage (electric strength) test) |
- |
0 |
|
- |
| 14 c)(Leakage current tests) |
- |
0 |
|
- |
| 14 d)(Provision for earthing) |
- |
0 |
|
- |
| 4(Classification) |
- |
0 |
|
- |
| 5(Construction) |
- |
0 |
|
- |
| 6.3(Cooling Capacity Test) |
- |
0 |
|
- |
| 6.4(Maximum Operating Condition Test) |
- |
0 |
|
- |
| 6.5(Pull Down Test) |
- |
0 |
|
- |
| 9(Maximum Power Consumption Test) |
- |
0 |
|
- |
| 10(Annual Energy Consumption Test) |
- |
0 |
|
- |
| 11(Storage Capacity Test) |
- |
0 |
|
- |
| 13(Functional Test) |
- |
0 |
|
- |
| 14 a)(Protection against electric shock) |
- |
0 |
|
- |
| 14 b)(High voltage (electric strength) test) |
- |
0 |
|
- |
| 14 c)(Leakage current tests) |
- |
0 |
|
- |
| 14 d)(Provision for earthing) |
- |
0 |
|
- |
| 4(Classification) |
- |
0 |
|
- |
| 5(Construction) |
- |
0 |
|
- |
| 6.3(Cooling Capacity Test) |
- |
0 |
|
- |
| 6.4(Maximum Operating Condition Test) |
- |
0 |
|
- |
| 6.5(Pull Down Test) |
- |
0 |
|
- |
| 9(Maximum Power Consumption Test) |
- |
0 |
|
- |
| 10(Annual Energy Consumption Test) |
- |
0 |
|
- |
| 11(Storage Capacity Test) |
- |
0 |
|
- |
| 13(Functional Test) |
- |
0 |
|
- |
| 14 a)(Protection against electric shock) |
- |
0 |
|
- |
| 14 b)(High voltage (electric strength) test) |
- |
0 |
|
- |
| 14 c)(Leakage current tests) |
- |
0 |
|
- |
| 14 d)(Provision for earthing) |
- |
0 |
|
- |
|
20 Jun, 2028 |
- Included w.e.f 27.03.2025 |
| 40 |
IS 302 : Part 2 : Sec 21 (2024) |
Household and Similar Electrical Appliances�Safety Part 2 Particular Requirements Section 21 Storage Water Heaters |
- |
125000 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 4(General requirement) |
- |
0 |
|
- |
| 5(General conditions for the tests) |
- |
0 |
|
- |
| 6(Classification) |
- |
0 |
|
- |
| 7(Marking and instructions) |
- |
1000 |
|
- |
| 8(Protection against access to live parts) |
- |
2000 |
|
- |
| 10(Power input and current) |
- |
5000 |
|
- |
| 11(Heating) |
- |
6000 |
|
- |
| 13(Leakage current and electric strength at operating temperature) |
- |
3000 |
|
- |
| 14(Transient overvoltages) |
- |
2000 |
|
- |
| 15(Moisture resistance) |
- |
3000 |
|
- |
| 16(Leakage current and electric strength) |
- |
3000 |
|
- |
| 17(Overload protection of transformers and associated circuits) |
- |
2000 |
|
- |
| 19(Abnormal operation) |
- |
10000 |
|
Charges applicable excluding the test of Cl.19.11.4.1 to Cl.19.11.4.7. The testing charges for EMI/EMC testing (Cl.19.11.4.1 to Cl.19.11.4.7) will be applicable |
| 20(Stability and mechanical hazards) |
- |
1000 |
|
- |
| 21(Mechanical strength) |
- |
5000 |
|
- |
| 22(Construction) |
- |
5000 |
|
- |
| 23(Internal wiring) |
- |
1000 |
|
- |
| 24(Components) |
- |
3000 |
|
- |
| 25(Supply connection and external flexible cords) |
- |
3000 |
|
- |
| 26(Terminals for external conductors) |
- |
2000 |
|
- |
| 27(Provision for earthing) |
- |
2000 |
|
- |
| 28(Screws and connections) |
- |
1000 |
|
- |
| 29(Clearances, creepage distances and solid insulation) |
- |
2000 |
|
- |
| 30(Resistance to heat and fire) |
- |
4000 |
|
- |
| 31(Resistance to rusting) |
- |
1000 |
|
- |
| 32(Radiation, toxicity and similar hazards) |
- |
2000 |
|
Charges applicable excluding the test of Cl.12 (Charging of metal-ion batteries). In case of Battery operated water heater used then additional charges and testing time will be applicable accordingly. |
| A.101(Pressure test) |
- |
1000 |
|
- |
| 19.11.4.1(Electrostatic discharges) |
- |
5000 |
|
if applicable |
| 19.11.4.2(Radiated fields) |
- |
20000 |
|
if applicable |
| 19.11.4.3(Fast transient bursts) |
- |
5000 |
|
if applicable |
| 19.11.4.4(Surge immunity test) |
- |
5000 |
|
if applicable |
| 19.11.4.5(Immunity to conducted discharges) |
- |
10000 |
|
if applicable |
| 19.11.4.6(Class 3 Voltage dips and interruptions) |
- |
5000 |
|
if applicable |
| 19.11.4.7(Harmonics) |
- |
5000 |
|
if applicable |
| 9(Starting of motor-operated appliances) |
- |
0 |
|
- |
| 18(Endurance) |
- |
0 |
|
- |
| 4(General requirement) |
- |
0 |
|
- |
| 5(General conditions for the tests) |
- |
0 |
|
- |
| 6(Classification) |
- |
0 |
|
- |
| 7(Marking and instructions) |
- |
0 |
|
- |
| 8(Protection against access to live parts) |
- |
0 |
|
- |
| 10(Power input and current) |
- |
0 |
|
- |
| 11(Heating) |
- |
0 |
|
- |
| 13(Leakage current and electric strength at operating temperature) |
- |
0 |
|
- |
| 14(Transient overvoltages) |
- |
0 |
|
- |
| 15(Moisture resistance) |
- |
0 |
|
- |
| 16(Leakage current and electric strength) |
- |
0 |
|
- |
| 17(Overload protection of transformers and associated circuits) |
- |
0 |
|
- |
| 19(Abnormal operation) |
- |
0 |
|
- |
| 20(Stability and mechanical hazards) |
- |
0 |
|
- |
| 21(Mechanical strength) |
- |
0 |
|
- |
| 22(Construction) |
- |
0 |
|
- |
| 23(Internal wiring) |
- |
0 |
|
- |
| 24(Components) |
- |
0 |
|
- |
| 25(Supply connection and external flexible cords) |
- |
0 |
|
- |
| 26(Terminals for external conductors) |
- |
0 |
|
- |
| 27(Provision for earthing) |
- |
0 |
|
- |
| 28(Screws and connections) |
- |
0 |
|
- |
| 29(Clearances, creepage distances and solid insulation) |
- |
0 |
|
- |
| 30(Resistance to heat and fire) |
- |
0 |
|
- |
| 31(Resistance to rusting) |
- |
0 |
|
- |
| 32(Radiation, toxicity and similar hazards) |
- |
0 |
|
- |
| A.101(Pressure test) |
- |
0 |
|
- |
| 19.11.4.1(Electrostatic discharges) |
- |
0 |
|
- |
| 19.11.4.2(Radiated fields) |
- |
0 |
|
- |
| 19.11.4.3(Fast transient bursts) |
- |
0 |
|
- |
| 19.11.4.4(Surge immunity test) |
- |
0 |
|
- |
| 19.11.4.5(Immunity to conducted discharges) |
- |
0 |
|
- |
| 19.11.4.6(Class 3 Voltage dips and interruptions) |
- |
0 |
|
- |
| 19.11.4.7(Harmonics) |
- |
0 |
|
- |
| 9(Starting of motor-operated appliances) |
- |
0 |
|
- |
| 18(Endurance) |
- |
0 |
|
- |
|
20 Jun, 2028 |
- Included w.e.f 12.11.2024
Exclusion
32 (Radiation, toxicity and similar hazards) |
| 41 |
IS 2993 : Part 2 (2024) |
a.c. Motor Capacitors Part 2 Motor Start Capacitors ( Third Revision ) |
- |
358250 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 5.1.1.1(General) |
- |
4000 |
|
- |
| 5.1.7(Voltage test between the terminals) |
- |
9000 |
|
- |
| 5.1.8(Voltage test between terminals and case) |
- |
9000 |
|
- |
| 5.1.9(Capacitance measurement) |
- |
31500 |
|
capacitance measurement charge is 13500 & Tangent of loss angle charge is 18000 |
| 5.1.10(Check of dimensions) |
- |
4000 |
|
- |
| 5.1.11.1(Robustness of terminations) |
- |
36000 |
|
- |
| 5.1.11.2(Soldering) |
- |
5000 |
|
- |
| 5.1.11.3(Vibration) |
- |
21500 |
|
Vibration charge is : 20000 & Fixing bolt charge is: 1500 |
| 5.1.12(Sealing test) |
- |
9000 |
|
- |
| 5.1.13(Endurance test) |
- |
95000 |
|
- |
| 5.1.14(Damp heat test) |
- |
66000 |
|
- |
| 5.1.15(Self-healing test) |
- |
9000 |
|
- |
| 5.1.16(Destruction test) |
- |
44250 |
|
- |
| 5.1.17.1(Ball-pressure test) |
- |
3000 |
|
- |
| 5.1.17.2(Glow-wire test) |
- |
3000 |
|
- |
| 5.1.17.3(Tracking test) |
- |
5000 |
|
- |
| 5.2(Overloads) |
- |
0 |
|
- |
| 5.3.1(Creepage distances and clearances) |
- |
0 |
|
- |
| 5.3.2(Terminals and connecting cables) |
- |
0 |
|
- |
| 5.3.3(Earth connections) |
- |
0 |
|
- |
| 5.3.4(Discharge devices) |
- |
0 |
|
- |
| 5.3.5(Pollution) |
- |
0 |
|
- |
| 5.4(Marking) |
- |
4000 |
|
- |
| 6.1.6(Voltage test between the terminals) |
- |
9000 |
|
For Electrolytic motor start capacitors |
| 6.1.7(Voltage test between terminals and case) |
- |
9000 |
|
For Electrolytic motor start capacitors |
| 6.1.8(Capacitance and power factor measurement) |
- |
15000 |
|
For Electrolytic motor start capacitors |
| 6.1.9(Check of dimensions) |
- |
4000 |
|
For Electrolytic motor start capacitors |
| 6.1.10.1(Robustness of terminations) |
- |
36000 |
|
For Electrolytic motor start capacitors |
| 6.1.10.2(Soldering) |
- |
5000 |
|
For Electrolytic motor start capacitors |
| 6.1.10.3(Vibration) |
- |
20000 |
|
For Electrolytic motor start capacitors |
| 6.1.10.4(Fixing bolt or stud (if fitted)) |
- |
1500 |
|
- |
| 6.1.10.5(Rapid change of temperature) |
- |
10000 |
|
For Electrolytic motor start capacitors |
| 6.1.11(Sealing test) |
- |
9000 |
|
For Electrolytic motor start capacitors |
| 6.1.12(Endurance test) |
- |
95000 |
|
For Electrolytic motor start capacitors |
| 6.1.13(Damp heat test) |
- |
66000 |
|
For Electrolytic motor start capacitors |
| 6.1.14(Pressure relief test) |
- |
5000 |
|
For Electrolytic motor start capacitors |
| 6.1.15.1(Ball-pressure test) |
- |
3000 |
|
For Electrolytic motor start capacitors |
| 6.1.15.2(Glow-wire test) |
- |
3000 |
|
For Electrolytic motor start capacitors |
| 6.1.15.3(Tracking test) |
- |
5000 |
|
For Electrolytic motor start capacitors |
| 6.2(Overloads) |
- |
0 |
|
- |
| 6.3.1(Creepage distances and clearances) |
- |
0 |
|
- |
| 6.3.2(Terminals and connecting cables) |
- |
0 |
|
- |
| 6.3.3(Earth connections) |
- |
0 |
|
- |
| 6.3.4(Discharge devices) |
- |
0 |
|
- |
| 6.3.5(Pollution) |
- |
0 |
|
- |
| 6.4(Marking) |
- |
4000 |
|
For Electrolytic motor start capacitors |
| 7.2.1(Measurement of working voltage) |
- |
0 |
|
- |
| 7.2.2(Influence of capacitance) |
- |
0 |
|
- |
| 7.3(Checking capacitor temperature) |
- |
0 |
|
- |
| 7.4(Checking transients) |
- |
0 |
|
- |
| 7.5(Storage of electrolytic capacitors) |
- |
0 |
|
- |
| Annex A(Test voltage) |
- |
0 |
|
- |
| 5.1.10(Check of dimensions) |
- |
0 |
|
- |
| 6.1.10.4(Fixing bolt or stud (if fitted)) |
- |
0 |
|
- |
| 5.1.1.1(General) |
- |
- |
|
- |
| 5.1.7(Voltage test between the terminals) |
- |
- |
|
- |
| 5.1.8(Voltage test between terminals and case) |
- |
- |
|
- |
| 5.1.9(Capacitance measurement) |
- |
- |
|
- |
| 5.1.10(Check of dimensions) |
- |
- |
|
- |
| 5.1.11.1(Robustness of terminations) |
- |
- |
|
- |
| 5.1.11.2(Soldering) |
- |
- |
|
- |
| 5.1.11.3(Vibration) |
- |
- |
|
- |
| 5.1.12(Sealing test) |
- |
- |
|
- |
| 5.1.13(Endurance test) |
- |
- |
|
- |
| 5.1.14(Damp heat test) |
- |
- |
|
- |
| 5.1.15(Self-healing test) |
- |
- |
|
- |
| 5.1.16(Destruction test) |
- |
- |
|
- |
| 5.1.17.1(Ball-pressure test) |
- |
- |
|
- |
| 5.1.17.2(Glow-wire test) |
- |
- |
|
- |
| 5.1.17.3(Tracking test) |
- |
- |
|
- |
| 5.2(Overloads) |
- |
- |
|
- |
| 5.3.1(Creepage distances and clearances) |
- |
- |
|
- |
| 5.3.2(Terminals and connecting cables) |
- |
- |
|
- |
| 5.3.3(Earth connections) |
- |
- |
|
- |
| 5.3.4(Discharge devices) |
- |
- |
|
- |
| 5.3.5(Pollution) |
- |
- |
|
- |
| 5.4(Marking) |
- |
- |
|
- |
| 6.1.6(Voltage test between the terminals) |
- |
- |
|
- |
| 6.1.7(Voltage test between terminals and case) |
- |
- |
|
- |
| 6.1.8(Capacitance and power factor measurement) |
- |
- |
|
- |
| 6.1.9(Check of dimensions) |
- |
- |
|
- |
| 6.1.10.1(Robustness of terminations) |
- |
- |
|
- |
| 6.1.10.2(Soldering) |
- |
- |
|
- |
| 6.1.10.3(Vibration) |
- |
- |
|
- |
| 6.1.10.4(Fixing bolt or stud (if fitted)) |
- |
- |
|
- |
| 6.1.10.5(Rapid change of temperature) |
- |
- |
|
- |
| 6.1.11(Sealing test) |
- |
- |
|
- |
| 6.1.12(Endurance test) |
- |
- |
|
- |
| 6.1.13(Damp heat test) |
- |
- |
|
- |
| 6.1.14(Pressure relief test) |
- |
- |
|
- |
| 6.1.15.1(Ball-pressure test) |
- |
- |
|
- |
| 6.1.15.2(Glow-wire test) |
- |
- |
|
- |
| 6.1.15.3(Tracking test) |
- |
- |
|
- |
| 6.2(Overloads) |
- |
- |
|
- |
| 6.3.1(Creepage distances and clearances) |
- |
- |
|
- |
| 6.3.2(Terminals and connecting cables) |
- |
- |
|
- |
| 6.3.3(Earth connections) |
- |
- |
|
- |
| 6.3.4(Discharge devices) |
- |
- |
|
- |
| 6.3.5(Pollution) |
- |
- |
|
- |
| 6.4(Marking) |
- |
- |
|
- |
| 7.2.1(Measurement of working voltage) |
- |
- |
|
- |
| 7.2.2(Influence of capacitance) |
- |
- |
|
- |
| 7.3(Checking capacitor temperature) |
- |
- |
|
- |
| 7.4(Checking transients) |
- |
- |
|
- |
| 7.5(Storage of electrolytic capacitors) |
- |
- |
|
- |
| Annex A(Test voltage) |
- |
- |
|
- |
| 5.1.10(Check of dimensions) |
- |
- |
|
- |
| 6.1.10.4(Fixing bolt or stud (if fitted)) |
- |
- |
|
- |
|
20 Jun, 2028 |
- Included w.e.f 05.11.2024 |
| 42 |
IS 2993 : Part 1 (2024) |
a.c. Motor Capacitors Part 1 General - Performance, Testing and Rating - Safety Requirements - Guidance for Installation and Operation ( Third Revision ) |
- |
455750 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 5.1.1(General) |
- |
4000 |
|
- |
| 5.5(Tangent of loss angle) |
- |
18000 |
|
- |
| 5.7("Voltage test between terminals
") |
- |
9000 |
|
- |
| 5.8(Voltage test between terminals and case) |
- |
9000 |
|
- |
| 5.9(Capacitance measurement) |
- |
13500 |
|
- |
| 5.9(Capacitance measurement) |
- |
0 |
|
- |
| 5.1(Check of dimensions) |
- |
4000 |
|
Actual Cl. no. is 5.10 |
| 5.11(Mechanical tests) |
- |
62500 |
|
- |
| 5.12(Sealing test) |
- |
9000 |
|
- |
| 5.13(Endurance test) |
- |
192500 |
|
- |
| 5.14(Damp heat test) |
- |
66000 |
|
- |
| 5.15(Self-healing test) |
- |
9000 |
|
- |
| 5.16(Destruction test) |
- |
44250 |
|
- |
| 5.17(Resistance to heat, fire and tracking) |
- |
0 |
|
- |
| 5.17.1(Ball-pressure test) |
- |
3000 |
|
- |
| 5.17.2(Glow-wire test) |
- |
3000 |
|
- |
| 5.17.3(Tracking test) |
- |
5000 |
|
- |
| 6.1(Maximum permissible voltage) |
- |
0 |
|
- |
| 6.2("Maximum permissible current
") |
- |
0 |
|
- |
| 6.3(Maximum permissible reactive output) |
- |
0 |
|
- |
| 7(Safety requirements) |
- |
0 |
|
- |
| 7.1(Requirements for Creepage distances and clearances) |
- |
0 |
|
- |
| 7.2(Terminals and connecting cables) |
- |
0 |
|
- |
| 7.3(Earth connections) |
- |
0 |
|
- |
| 7.4(Discharge devices) |
- |
0 |
|
- |
| 8(Marking) |
- |
4000 |
|
- |
| 9.2.1(Measurements of working voltage) |
- |
0 |
|
- |
| 9.2.2(Influence of capacitance) |
- |
0 |
|
- |
| 9.3(Checking capacitor temperature) |
- |
0 |
|
- |
| 9.4(Checking transients) |
- |
0 |
|
- |
| 9.5(Leakage current) |
- |
0 |
|
- |
| 5.1.1(General) |
- |
0 |
|
- |
| 5.5(Tangent of loss angle) |
- |
0 |
|
- |
| 5.7("Voltage test between terminals
") |
- |
0 |
|
- |
| 5.8(Voltage test between terminals and case) |
- |
0 |
|
- |
| 5.9(Capacitance measurement) |
- |
0 |
|
- |
| 5.9(Capacitance measurement) |
- |
0 |
|
- |
| 5.1(Check of dimensions) |
- |
0 |
|
- |
| 5.11(Mechanical tests) |
- |
0 |
|
- |
| 5.12(Sealing test) |
- |
0 |
|
- |
| 5.13(Endurance test) |
- |
0 |
|
- |
| 5.14(Damp heat test) |
- |
0 |
|
- |
| 5.15(Self-healing test) |
- |
0 |
|
- |
| 5.16(Destruction test) |
- |
0 |
|
- |
| 5.17(Resistance to heat, fire and tracking) |
- |
0 |
|
- |
| 5.17.1(Ball-pressure test) |
- |
0 |
|
- |
| 5.17.2(Glow-wire test) |
- |
0 |
|
- |
| 5.17.3(Tracking test) |
- |
0 |
|
- |
| 6.1(Maximum permissible voltage) |
- |
0 |
|
- |
| 6.2("Maximum permissible current
") |
- |
0 |
|
- |
| 6.3(Maximum permissible reactive output) |
- |
0 |
|
- |
| 7(Safety requirements) |
- |
0 |
|
- |
| 7.1(Requirements for Creepage distances and clearances) |
- |
0 |
|
- |
| 7.2(Terminals and connecting cables) |
- |
0 |
|
- |
| 7.3(Earth connections) |
- |
0 |
|
- |
| 7.4(Discharge devices) |
- |
0 |
|
- |
| 8(Marking) |
- |
0 |
|
- |
| 9.2.1(Measurements of working voltage) |
- |
0 |
|
- |
| 9.2.2(Influence of capacitance) |
- |
0 |
|
- |
| 9.3(Checking capacitor temperature) |
- |
0 |
|
- |
| 9.4(Checking transients) |
- |
0 |
|
- |
| 9.5(Leakage current) |
- |
0 |
|
- |
| 5.1.1(General) |
- |
0 |
|
- |
| 5.5(Tangent of loss angle) |
- |
0 |
|
- |
| 5.7("Voltage test between terminals
") |
- |
0 |
|
- |
| 5.8(Voltage test between terminals and case) |
- |
0 |
|
- |
| 5.9(Capacitance measurement) |
- |
0 |
|
- |
| 5.9(Capacitance measurement) |
- |
0 |
|
- |
| 5.1(Check of dimensions) |
- |
0 |
|
- |
| 5.11(Mechanical tests) |
- |
0 |
|
- |
| 5.12(Sealing test) |
- |
0 |
|
- |
| 5.13(Endurance test) |
- |
0 |
|
- |
| 5.14(Damp heat test) |
- |
0 |
|
- |
| 5.15(Self-healing test) |
- |
0 |
|
- |
| 5.16(Destruction test) |
- |
0 |
|
- |
| 5.17(Resistance to heat, fire and tracking) |
- |
0 |
|
- |
| 5.17.1(Ball-pressure test) |
- |
0 |
|
- |
| 5.17.2(Glow-wire test) |
- |
0 |
|
- |
| 5.17.3(Tracking test) |
- |
0 |
|
- |
| 6.1(Maximum permissible voltage) |
- |
0 |
|
- |
| 6.2("Maximum permissible current
") |
- |
0 |
|
- |
| 6.3(Maximum permissible reactive output) |
- |
0 |
|
- |
| 7(Safety requirements) |
- |
0 |
|
- |
| 7.1(Requirements for Creepage distances and clearances) |
- |
0 |
|
- |
| 7.2(Terminals and connecting cables) |
- |
0 |
|
- |
| 7.3(Earth connections) |
- |
0 |
|
- |
| 7.4(Discharge devices) |
- |
0 |
|
- |
| 8(Marking) |
- |
0 |
|
- |
| 9.2.1(Measurements of working voltage) |
- |
0 |
|
- |
| 9.2.2(Influence of capacitance) |
- |
0 |
|
- |
| 9.3(Checking capacitor temperature) |
- |
0 |
|
- |
| 9.4(Checking transients) |
- |
0 |
|
- |
| 9.5(Leakage current) |
- |
0 |
|
- |
|
20 Jun, 2028 |
- Included w.e.f.08.11.2024 |
| 43 |
IS 3315 (2024) |
Direct Evaporative Air Cooler â Specification (Fourth Revision) |
- |
82000 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| Cl-5.1(Enclosure) |
- |
12000 |
|
- |
| Cl-5.2(Filter Pads) |
- |
0 |
|
- |
| Cl-5.3(Sump Tank Capacities) |
- |
5000 |
|
- |
| Cl-5.4(Blower/Fan) |
- |
0 |
|
- |
| Cl-5.4.3(Fan motor) |
- |
0 |
|
Compliance will be checked by pre-testing documents. In case testing is required as per IS 996 additional charges of Rs. 14334/- will be applicable. |
| Cl-5.5(Pump Set) |
- |
0 |
|
Compliance will be checked by pre-testing documents. In case testing is required as per IS 11951 additional charges of Rs. 49500/- will be applicable. |
| Cl-5.6.1(Electrical wiring and connection) |
- |
1000 |
|
- |
| Cl-5.6.2(Suitable power cable) |
- |
1000 |
|
Length of measurement of cords |
| Cl-5.7(Switches) |
- |
0 |
|
In case switch need to be tested as per Cl. 5.7 a), b), c), d). Additional Testing charges will be applicable of Rs. 10000/- |
| Cl-6(Rating Requirement) |
- |
0 |
|
- |
| Cl-8.1(Performance Requirement) |
- |
0 |
|
Charges given in main test clauses |
| Cl-8.2(Sound Test) |
- |
10000 |
|
- |
| Cl-8.3(Air Delivery (Air Flow) Test) |
- |
10000 |
|
- |
| Cl-8.4(Cooling Efficiency Test) |
- |
10000 |
|
- |
| Cl-8.5(Power Consumption) |
- |
5000 |
|
Including Power factor measurements |
| Cl-8.6(EER Calculation Method) |
- |
1000 |
|
- |
| Cl-8.7(Drop Test) |
- |
2000 |
|
- |
| Cl-8.8(Air Cooler Blower/Fan Reliability Test) |
- |
15000 |
|
- |
| Cl-12.2.1(General Running Tests) |
- |
1000 |
|
- |
| Cl-12.2.2(Protection against Electric Shock) |
- |
2000 |
|
- |
| Cl-12.2.3(High Voltage Tests) |
- |
2000 |
|
- |
| Cl-12.2.4(Leakage Current) |
- |
2000 |
|
- |
| Cl-12.2.5(Provision for Earthing) |
- |
2000 |
|
- |
| Cl-12.2.6(Finish) |
- |
1000 |
|
- |
| Cl-13(Additional Requirement for ECO-Mark) |
- |
0 |
|
- |
| Cl-14(Storage) |
- |
0 |
|
- |
| Cl-5.1(Enclosure) |
- |
0 |
|
- |
| Cl-5.2(Filter Pads) |
- |
0 |
|
- |
| Cl-5.3(Sump Tank Capacities) |
- |
0 |
|
- |
| Cl-5.4(Blower/Fan) |
- |
0 |
|
- |
| Cl-5.4.3(Fan motor) |
- |
0 |
|
- |
| Cl-5.5(Pump Set) |
- |
0 |
|
- |
| Cl-5.6.1(Electrical wiring and connection) |
- |
0 |
|
- |
| Cl-5.6.2(Suitable power cable) |
- |
0 |
|
- |
| Cl-5.7(Switches) |
- |
0 |
|
- |
| Cl-6(Rating Requirement) |
- |
0 |
|
- |
| Cl-8.1(Performance Requirement) |
- |
0 |
|
- |
| Cl-8.2(Sound Test) |
- |
0 |
|
- |
| Cl-8.3(Air Delivery (Air Flow) Test) |
- |
0 |
|
- |
| Cl-8.4(Cooling Efficiency Test) |
- |
0 |
|
- |
| Cl-8.5(Power Consumption) |
- |
0 |
|
- |
| Cl-8.6(EER Calculation Method) |
- |
0 |
|
- |
| Cl-8.7(Drop Test) |
- |
0 |
|
- |
| Cl-8.8(Air Cooler Blower/Fan Reliability Test) |
- |
0 |
|
- |
| Cl-12.2.1(General Running Tests) |
- |
0 |
|
- |
| Cl-12.2.2(Protection against Electric Shock) |
- |
0 |
|
- |
| Cl-12.2.3(High Voltage Tests) |
- |
0 |
|
- |
| Cl-12.2.4(Leakage Current) |
- |
0 |
|
- |
| Cl-12.2.5(Provision for Earthing) |
- |
0 |
|
- |
| Cl-12.2.6(Finish) |
- |
0 |
|
- |
| Cl-13(Additional Requirement for ECO-Mark) |
- |
0 |
|
- |
| Cl-14(Storage) |
- |
0 |
|
- |
| Cl-5.1(Enclosure) |
- |
0 |
|
- |
| Cl-5.2(Filter Pads) |
- |
0 |
|
- |
| Cl-5.3(Sump Tank Capacities) |
- |
0 |
|
- |
| Cl-5.4(Blower/Fan) |
- |
0 |
|
- |
| Cl-5.4.3(Fan motor) |
- |
0 |
|
- |
| Cl-5.5(Pump Set) |
- |
0 |
|
- |
| Cl-5.6.1(Electrical wiring and connection) |
- |
0 |
|
- |
| Cl-5.6.2(Suitable power cable) |
- |
0 |
|
- |
| Cl-5.7(Switches) |
- |
0 |
|
- |
| Cl-6(Rating Requirement) |
- |
0 |
|
- |
| Cl-8.1(Performance Requirement) |
- |
0 |
|
- |
| Cl-8.2(Sound Test) |
- |
0 |
|
- |
| Cl-8.3(Air Delivery (Air Flow) Test) |
- |
0 |
|
- |
| Cl-8.4(Cooling Efficiency Test) |
- |
0 |
|
- |
| Cl-8.5(Power Consumption) |
- |
0 |
|
- |
| Cl-8.6(EER Calculation Method) |
- |
0 |
|
- |
| Cl-8.7(Drop Test) |
- |
0 |
|
- |
| Cl-8.8(Air Cooler Blower/Fan Reliability Test) |
- |
0 |
|
- |
| Cl-12.2.1(General Running Tests) |
- |
0 |
|
- |
| Cl-12.2.2(Protection against Electric Shock) |
- |
0 |
|
- |
| Cl-12.2.3(High Voltage Tests) |
- |
0 |
|
- |
| Cl-12.2.4(Leakage Current) |
- |
0 |
|
- |
| Cl-12.2.5(Provision for Earthing) |
- |
0 |
|
- |
| Cl-12.2.6(Finish) |
- |
0 |
|
- |
| Cl-13(Additional Requirement for ECO-Mark) |
- |
0 |
|
- |
| Cl-14(Storage) |
- |
0 |
|
- |
| Cl-5.1(Enclosure) |
- |
0 |
|
- |
| Cl-5.2(Filter Pads) |
- |
0 |
|
- |
| Cl-5.3(Sump Tank Capacities) |
- |
0 |
|
- |
| Cl-5.4(Blower/Fan) |
- |
0 |
|
- |
| Cl-5.4.3(Fan motor) |
- |
0 |
|
- |
| Cl-5.5(Pump Set) |
- |
0 |
|
- |
| Cl-5.6.1(Electrical wiring and connection) |
- |
0 |
|
- |
| Cl-5.6.2(Suitable power cable) |
- |
0 |
|
- |
| Cl-5.7(Switches) |
- |
0 |
|
- |
| Cl-6(Rating Requirement) |
- |
0 |
|
- |
| Cl-8.1(Performance Requirement) |
- |
0 |
|
- |
| Cl-8.2(Sound Test) |
- |
0 |
|
- |
| Cl-8.3(Air Delivery (Air Flow) Test) |
- |
0 |
|
- |
| Cl-8.4(Cooling Efficiency Test) |
- |
0 |
|
- |
| Cl-8.5(Power Consumption) |
- |
0 |
|
- |
| Cl-8.6(EER Calculation Method) |
- |
0 |
|
- |
| Cl-8.7(Drop Test) |
- |
0 |
|
- |
| Cl-8.8(Air Cooler Blower/Fan Reliability Test) |
- |
0 |
|
- |
| Cl-12.2.1(General Running Tests) |
- |
0 |
|
- |
| Cl-12.2.2(Protection against Electric Shock) |
- |
0 |
|
- |
| Cl-12.2.3(High Voltage Tests) |
- |
0 |
|
- |
| Cl-12.2.4(Leakage Current) |
- |
0 |
|
- |
| Cl-12.2.5(Provision for Earthing) |
- |
0 |
|
- |
| Cl-12.2.6(Finish) |
- |
0 |
|
- |
| Cl-13(Additional Requirement for ECO-Mark) |
- |
0 |
|
- |
| Cl-14(Storage) |
- |
0 |
|
- |
| Cl-5.1(Enclosure) |
- |
0 |
|
- |
| Cl-5.2(Filter Pads) |
- |
0 |
|
- |
| Cl-5.3(Sump Tank Capacities) |
- |
0 |
|
- |
| Cl-5.4(Blower/Fan) |
- |
0 |
|
- |
| Cl-5.4.3(Fan motor) |
- |
0 |
|
- |
| Cl-5.5(Pump Set) |
- |
0 |
|
- |
| Cl-5.6.1(Electrical wiring and connection) |
- |
0 |
|
- |
| Cl-5.6.2(Suitable power cable) |
- |
0 |
|
- |
| Cl-5.7(Switches) |
- |
0 |
|
- |
| Cl-6(Rating Requirement) |
- |
0 |
|
- |
| Cl-8.1(Performance Requirement) |
- |
0 |
|
- |
| Cl-8.2(Sound Test) |
- |
0 |
|
- |
| Cl-8.3(Air Delivery (Air Flow) Test) |
- |
0 |
|
- |
| Cl-8.4(Cooling Efficiency Test) |
- |
0 |
|
- |
| Cl-8.5(Power Consumption) |
- |
0 |
|
- |
| Cl-8.6(EER Calculation Method) |
- |
0 |
|
- |
| Cl-8.7(Drop Test) |
- |
0 |
|
- |
| Cl-8.8(Air Cooler Blower/Fan Reliability Test) |
- |
0 |
|
- |
| Cl-12.2.1(General Running Tests) |
- |
0 |
|
- |
| Cl-12.2.2(Protection against Electric Shock) |
- |
0 |
|
- |
| Cl-12.2.3(High Voltage Tests) |
- |
0 |
|
- |
| Cl-12.2.4(Leakage Current) |
- |
0 |
|
- |
| Cl-12.2.5(Provision for Earthing) |
- |
0 |
|
- |
| Cl-12.2.6(Finish) |
- |
0 |
|
- |
| Cl-13(Additional Requirement for ECO-Mark) |
- |
0 |
|
- |
| Cl-14(Storage) |
- |
0 |
|
- |
|
20 Jun, 2028 |
- Included w.e.f. 05.11.2024 |
| 44 |
IS 16270 (2023) |
Secondary cells and batteries for solar photovoltaic application - General requirements and methods of test |
upto 120V/200A, upto 18V/500A |
2320000 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| Cl-4.1(Photovoltaic Energy System) |
- |
0 |
|
- |
| Cl-4.2(Secondary Cells and Batteries) |
- |
0 |
|
- |
| Cl-4.3(General Operating Conditions) |
- |
0 |
|
- |
| Cl-4.3.8(Storage) |
- |
0 |
|
- |
| Cl-4.3.9(Operating Temperature) |
- |
0 |
|
- |
| Cl-5.1(Mechanical Endurance) |
- |
0 |
|
- |
| Cl-5.2(Charge Efficiency) |
- |
0 |
|
- |
| Cl-5.3(Deep Discharge Protection) |
- |
0 |
|
- |
| Cl-5.4(Marking) |
- |
5000 |
|
- |
| Cl-5.5(Safety) |
- |
2500 |
|
- |
| Cl-5.6(Documentation) |
- |
2500 |
|
- |
| Cl-6(Functional characteristice) |
- |
0 |
|
- |
| Cl-7(General test conditions) |
- |
0 |
|
- |
| Cl-8.1(Capacity Test) |
- |
80000 |
|
Rs. 40000/ for upto 250AH, Rs.50000 for > 250 to 500AH, Rs. 60000 for > 500 to 1000AH, Rs. 80000 for > 1000 to 2500AH |
| Cl-8.2(Endurance Test) |
- |
630000 |
|
Rs. 315000/ for upto 250AH, Rs.383750 for > 250 to 500AH, Rs. 472500 for > 500 to 1000AH, Rs. 630000 for > 1000 to 2500AH |
| Cl-8.3(Charge Retention Test) |
- |
200000 |
|
Rs. 100000/ for upto 250AH, Rs.125000 for > 250 to 500AH, Rs. 150000 for > 500 to 1000AH, Rs. 200000 for > 1000 to 2500AH |
| Cl-8.4(Cycle Endurance in Photovoltaic Application (Extreme Conditions)) |
- |
1200000 |
|
Rs. 600000/ for upto 250AH, Rs.750000 for > 250 to 500AH, Rs. 900000 for > 500 to 1000AH, Rs. 1200000 for > 1000 to 2500AH |
| Cl-8.5(Sulphation Test (Applicable for Lead Acid Batteries only)) |
- |
60000 |
|
Rs. 30000/ for upto 250AH, Rs.40000 for > 250 to 500AH, Rs. 45000 for > 500 to 1000AH, Rs. 60000 for > 1000 to 2500AH |
| Cl-8.6(Water Loss Test (Valid for Flooded Lead Acid Batteries only)) |
- |
140000 |
|
Rs. 70000/ for upto 250AH, Rs. 87500 for > 250 to 500AH, Rs. 105000 for > 500 to 1000AH, Rs. 140000 for > 1000 to 2500AH |
| Cl-9.1(Type Tests) |
- |
2320000 |
|
Only for type test as per cl. 9.1 |
| Cl-9.2(Acceptance Test) |
- |
85000 |
|
Only for acceptance test as per cl .9.2 |
| Cl-4.1(Photovoltaic Energy System) |
- |
0 |
|
- |
| Cl-4.2(Secondary Cells and Batteries) |
- |
0 |
|
- |
| Cl-4.3(General Operating Conditions) |
- |
0 |
|
- |
| Cl-4.3.8(Storage) |
- |
0 |
|
- |
| Cl-4.3.9(Operating Temperature) |
- |
0 |
|
- |
| Cl-5.1(Mechanical Endurance) |
- |
0 |
|
- |
| Cl-5.2(Charge Efficiency) |
- |
0 |
|
- |
| Cl-5.3(Deep Discharge Protection) |
- |
0 |
|
- |
| Cl-5.4(Marking) |
- |
0 |
|
- |
| Cl-5.5(Safety) |
- |
0 |
|
- |
| Cl-5.6(Documentation) |
- |
0 |
|
- |
| Cl-6(Functional characteristice) |
- |
0 |
|
- |
| Cl-7(General test conditions) |
- |
0 |
|
- |
| Cl-8.1(Capacity Test) |
- |
0 |
|
- |
| Cl-8.2(Endurance Test) |
- |
0 |
|
- |
| Cl-8.3(Charge Retention Test) |
- |
0 |
|
- |
| Cl-8.4(Cycle Endurance in Photovoltaic Application (Extreme Conditions)) |
- |
0 |
|
- |
| Cl-8.5(Sulphation Test (Applicable for Lead Acid Batteries only)) |
- |
0 |
|
- |
| Cl-8.6(Water Loss Test (Valid for Flooded Lead Acid Batteries only)) |
- |
0 |
|
- |
| Cl-9.1(Type Tests) |
- |
0 |
|
- |
| Cl-9.2(Acceptance Test) |
- |
0 |
|
- |
|
20 Jun, 2028 |
- Included w.e.f. 27.08.2024 |
| 45 |
IS 302 : Part 2 : Sec 7 (2024) |
Safety of Household And Similar Electrical Appliances Part 2 Particular Requirements Section 7: Domestic Electric Clothes Washing Machines |
- |
130000 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 4(GENERAL REQUIREMENT) |
- |
0 |
|
- |
| 6(CLASSIFICATION) |
- |
0 |
|
- |
| 7(MARKING AND INSTRUCTIONS) |
- |
1000 |
|
- |
| 8(PROTECTION AGAINST ACCESS TO LIVE PARTS) |
- |
2000 |
|
- |
| 10(POWER INPUT AND CURRENT) |
- |
5000 |
|
- |
| 11(HEATING) |
- |
5000 |
|
- |
| 13(LEAKAGE CURRENT AND ELECTRIC STRENGTH AT OPERATING TEMPERATURE) |
- |
3000 |
|
- |
| 14(TRANSIENT OVERVOLTAGES) |
- |
2000 |
|
- |
| 15(MOISTURE RESISTANCE) |
- |
6000 |
|
- |
| 16(LEAKAGE CURRENT AND ELECTRIC STRENGTH) |
- |
3000 |
|
- |
| 17("OVERLOAD PROTECTION OF
TRANSFORMERS AND ASSOCIATED CIRCUITS ") |
- |
2000 |
|
- |
| 17("OVERLOAD PROTECTION OF
TRANSFORMERS AND ASSOCIATED CIRCUITS ") |
- |
0 |
|
- |
| 18(ENDURANCE) |
- |
10000 |
|
- |
| 19(ABNORMAL OPERATION) |
- |
5000 |
|
- |
| 19.11.4.1(Electrostatic discharges) |
- |
5000 |
|
- |
| 19.11.4.2(Radiated fields) |
- |
20000 |
|
- |
| 19.11.4.3(Fast transient bursts) |
- |
5000 |
|
- |
| 19.11.4.4(Surge immunity test) |
- |
5000 |
|
- |
| 19.11.4.5(Immunity to conducted discharges) |
- |
10000 |
|
- |
| 19.11.4.6(Class 3 Voltage dips and interruptions) |
- |
5000 |
|
- |
| 19.11.4.7(Harmonics) |
- |
5000 |
|
- |
| 20(STABILITY AND MECHANICAL HAZARDS) |
- |
1000 |
|
- |
| 21(MECHANICAL STRENGTH) |
- |
5000 |
|
- |
| 22(CONSTRUCTION) |
- |
5000 |
|
- |
| 23(INTERNAL WIRING) |
- |
1000 |
|
- |
| 24(COMPONENTS) |
- |
5000 |
|
- |
| 25(SUPPLY CONNECTION AND EXTERNAL FLEXIBLE CORDS) |
- |
2000 |
|
- |
| 26(TERMINALS FOR EXTERNAL CONDUCTORS) |
- |
2000 |
|
- |
| 27(PROVISION FOR EARTHING) |
- |
2000 |
|
- |
| 28(SCREWS AND CONNECTIONS) |
- |
1000 |
|
- |
| 29(CLEARANCES, CREEPAGE DISTANCES AND SOLID INSULATION) |
- |
2000 |
|
- |
| 30(RESISTANCE TO HEAT AND FIRE) |
- |
3000 |
|
- |
| 31(RESISTANCE TO RUSTING) |
- |
2000 |
|
- |
| 4(GENERAL REQUIREMENT) |
- |
0 |
|
- |
| 6(CLASSIFICATION) |
- |
0 |
|
- |
| 7(MARKING AND INSTRUCTIONS) |
- |
0 |
|
- |
| 8(PROTECTION AGAINST ACCESS TO LIVE PARTS) |
- |
0 |
|
- |
| 10(POWER INPUT AND CURRENT) |
- |
0 |
|
- |
| 11(HEATING) |
- |
0 |
|
- |
| 13(LEAKAGE CURRENT AND ELECTRIC STRENGTH AT OPERATING TEMPERATURE) |
- |
0 |
|
- |
| 14(TRANSIENT OVERVOLTAGES) |
- |
0 |
|
- |
| 15(MOISTURE RESISTANCE) |
- |
0 |
|
- |
| 16(LEAKAGE CURRENT AND ELECTRIC STRENGTH) |
- |
0 |
|
- |
| 17("OVERLOAD PROTECTION OF
TRANSFORMERS AND ASSOCIATED CIRCUITS ") |
- |
0 |
|
- |
| 17("OVERLOAD PROTECTION OF
TRANSFORMERS AND ASSOCIATED CIRCUITS ") |
- |
0 |
|
- |
| 18(ENDURANCE) |
- |
0 |
|
- |
| 19(ABNORMAL OPERATION) |
- |
0 |
|
- |
| 19.11.4.1(Electrostatic discharges) |
- |
0 |
|
- |
| 19.11.4.2(Radiated fields) |
- |
0 |
|
- |
| 19.11.4.3(Fast transient bursts) |
- |
0 |
|
- |
| 19.11.4.4(Surge immunity test) |
- |
0 |
|
- |
| 19.11.4.5(Immunity to conducted discharges) |
- |
0 |
|
- |
| 19.11.4.6(Class 3 Voltage dips and interruptions) |
- |
0 |
|
- |
| 19.11.4.7(Harmonics) |
- |
0 |
|
- |
| 20(STABILITY AND MECHANICAL HAZARDS) |
- |
0 |
|
- |
| 21(MECHANICAL STRENGTH) |
- |
0 |
|
- |
| 22(CONSTRUCTION) |
- |
0 |
|
- |
| 23(INTERNAL WIRING) |
- |
0 |
|
- |
| 24(COMPONENTS) |
- |
0 |
|
- |
| 25(SUPPLY CONNECTION AND EXTERNAL FLEXIBLE CORDS) |
- |
0 |
|
- |
| 26(TERMINALS FOR EXTERNAL CONDUCTORS) |
- |
0 |
|
- |
| 27(PROVISION FOR EARTHING) |
- |
0 |
|
- |
| 28(SCREWS AND CONNECTIONS) |
- |
0 |
|
- |
| 29(CLEARANCES, CREEPAGE DISTANCES AND SOLID INSULATION) |
- |
0 |
|
- |
| 30(RESISTANCE TO HEAT AND FIRE) |
- |
0 |
|
- |
| 31(RESISTANCE TO RUSTING) |
- |
0 |
|
- |
| 4(GENERAL REQUIREMENT) |
- |
0 |
|
- |
| 6(CLASSIFICATION) |
- |
0 |
|
- |
| 7(MARKING AND INSTRUCTIONS) |
- |
0 |
|
- |
| 8(PROTECTION AGAINST ACCESS TO LIVE PARTS) |
- |
0 |
|
- |
| 10(POWER INPUT AND CURRENT) |
- |
0 |
|
- |
| 11(HEATING) |
- |
0 |
|
- |
| 13(LEAKAGE CURRENT AND ELECTRIC STRENGTH AT OPERATING TEMPERATURE) |
- |
0 |
|
- |
| 14(TRANSIENT OVERVOLTAGES) |
- |
0 |
|
- |
| 15(MOISTURE RESISTANCE) |
- |
0 |
|
- |
| 16(LEAKAGE CURRENT AND ELECTRIC STRENGTH) |
- |
0 |
|
- |
| 17("OVERLOAD PROTECTION OF
TRANSFORMERS AND ASSOCIATED CIRCUITS ") |
- |
0 |
|
- |
| 17("OVERLOAD PROTECTION OF
TRANSFORMERS AND ASSOCIATED CIRCUITS ") |
- |
0 |
|
- |
| 18(ENDURANCE) |
- |
0 |
|
- |
| 19(ABNORMAL OPERATION) |
- |
0 |
|
- |
| 19.11.4.1(Electrostatic discharges) |
- |
0 |
|
- |
| 19.11.4.2(Radiated fields) |
- |
0 |
|
- |
| 19.11.4.3(Fast transient bursts) |
- |
0 |
|
- |
| 19.11.4.4(Surge immunity test) |
- |
0 |
|
- |
| 19.11.4.5(Immunity to conducted discharges) |
- |
0 |
|
- |
| 19.11.4.6(Class 3 Voltage dips and interruptions) |
- |
0 |
|
- |
| 19.11.4.7(Harmonics) |
- |
0 |
|
- |
| 20(STABILITY AND MECHANICAL HAZARDS) |
- |
0 |
|
- |
| 21(MECHANICAL STRENGTH) |
- |
0 |
|
- |
| 22(CONSTRUCTION) |
- |
0 |
|
- |
| 23(INTERNAL WIRING) |
- |
0 |
|
- |
| 24(COMPONENTS) |
- |
0 |
|
- |
| 25(SUPPLY CONNECTION AND EXTERNAL FLEXIBLE CORDS) |
- |
0 |
|
- |
| 26(TERMINALS FOR EXTERNAL CONDUCTORS) |
- |
0 |
|
- |
| 27(PROVISION FOR EARTHING) |
- |
0 |
|
- |
| 28(SCREWS AND CONNECTIONS) |
- |
0 |
|
- |
| 29(CLEARANCES, CREEPAGE DISTANCES AND SOLID INSULATION) |
- |
0 |
|
- |
| 30(RESISTANCE TO HEAT AND FIRE) |
- |
0 |
|
- |
| 31(RESISTANCE TO RUSTING) |
- |
0 |
|
- |
| 19.13(ABNORMAL OPERATION) |
- |
0 |
|
- |
| 19.101(Abnormal Operation) |
- |
0 |
|
- |
| 19.102(Abnormal Operation) |
- |
0 |
|
- |
|
20 Jun, 2028 |
- Included w.e.f. 03.05.2024
Exclusion: CL.24 (COMPONENTS) |
| 46 |
IS 17681 (2022) |
Specification for Bottled water dispensers |
- |
240000 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 4(Construction) |
- |
0 |
|
Charges added subcluases |
| 4.1(General Design) |
- |
500 |
|
- |
| 4.3(Finish) |
- |
500 |
|
- |
| 4.4(Thermal Insulation) |
- |
500 |
|
- |
| 4.5(Hardware) |
- |
500 |
|
- |
| 4.6(Disposal of Waste Water) |
- |
500 |
|
- |
| 4.7(Hot Water Tank) |
- |
500 |
|
- |
| 4.8(Hermetically Sealed Compressor) |
- |
500 |
|
- |
| 4.9(Protective Guards) |
- |
500 |
|
- |
| 5(Refrigeration System) |
- |
0 |
|
Charges added subcluases |
| 5.1(Pipes and Connections/Fitting) |
- |
500 |
|
- |
| 5.2(Control of Operation) |
- |
500 |
|
- |
| 6.1(General) |
- |
1000 |
|
- |
| 6.1(Protection against electric shock (Cl. 8 of IS 302-2-24)) |
- |
3000 |
|
- |
| 6.1(Power Input & Current (Cl. 10 of IS 302-2-24)) |
- |
5000 |
|
- |
| 6.1(Temperature Rise/ Heating (Cl. 11 of IS 302-2-24)) |
- |
6000 |
|
- |
| 6.1("Insulation Resistance and Electric Strength/ Leakage Current and Electric Strength
(Cl. 13 of IS 302-2-24)") |
- |
5000 |
|
- |
| 6.1("Moisture Resistance
(Cl. 15 of IS 302-2-24)") |
- |
12000 |
|
- |
| 6.1("Insulation resistance and electric strength
(After humidity treatment)
(Cl. 16 of IS 302-2-24)") |
- |
5000 |
|
- |
| 6.1("Provision For Earthing
(Cl. 27 of IS 302-2-24)") |
- |
3000 |
|
- |
| 6.1("Screws & Connections
(Cl. 28 of IS 302-2-24)") |
- |
3000 |
|
- |
| 6.2(Electrical Accessories) |
- |
1000 |
|
- |
| 6.3(Salt Mist Test) |
- |
25000 |
|
- |
| 7(Sound pressure level) |
- |
15000 |
|
- |
| 10.1(Cooling Capacity Test) |
- |
20000 |
|
- |
| 10.2(Maximum Operating Condition Test (Environmental)) |
- |
15000 |
|
- |
| 10.3(Maximum Operating Condition Test (Voltage)) |
- |
15000 |
|
- |
| 10.4(Heating Capacity Test) |
- |
20000 |
|
- |
| 10.5(Annual Energy Consumption Test) |
- |
30000 |
|
- |
| 10.6(Freeze-up Test) |
- |
20000 |
|
- |
| 10.7(Door Opening and Closing Test) |
- |
10000 |
|
- |
| 10.8(Door Seal Test) |
- |
3000 |
|
- |
| 10.9(Pull-down Test) |
- |
15000 |
|
- |
| 11(Marking and instruction) |
- |
2000 |
|
- |
| 4.2(Materials) |
- |
1000 |
|
- |
|
20 Jun, 2028 |
- Included w.e.f. 19.03.2024 |
| 47 |
IS 1475 : Part 1 (2001) |
Self - Contained drinking water coolers - Specification: Part 1 energy consumption and performance (Third Revision) |
- |
24700 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 6.1(COMPONENTS AND THEIR MATERIALS) |
- |
100 |
|
- |
| 6.2(COMPONENTS AND THEIR MATERIALS) |
- |
100 |
|
- |
| 6.3(COMPONENTS AND THEIR MATERIALS) |
- |
100 |
|
- |
| 6.4(COMPONENTS AND THEIR MATERIALS) |
- |
100 |
|
- |
| 6.5(COMPONENTS AND THEIR MATERIALS) |
- |
100 |
|
- |
| 6.6(COMPONENTS AND THEIR MATERIALS) |
- |
100 |
|
- |
| 6.7(COMPONENTS AND THEIR MATERIALS) |
- |
100 |
|
- |
| 6.8(COMPONENTS AND THEIR MATERIALS) |
- |
100 |
|
- |
| 6.9(COMPONENTS AND THEIR MATERIALS) |
- |
100 |
|
- |
| 6.1(COMPONENTS AND THEIR MATERIALS) |
- |
100 |
|
- |
| 6.11(COMPONENTS AND THEIR MATERIALS) |
- |
100 |
|
- |
| 6.12(COMPONENTS AND THEIR MATERIALS) |
- |
100 |
|
- |
| 6.13(COMPONENTS AND THEIR MATERIALS) |
- |
100 |
|
- |
| 6.14(COMPONENTS AND THEIR MATERIALS) |
- |
100 |
|
- |
| 6.15(COMPONENTS AND THEIR MATERIALS) |
- |
100 |
|
- |
| 6.16(COMPONENTS AND THEIR MATERIALS) |
- |
100 |
|
- |
| 6.17(COMPONENTS AND THEIR MATERIALS) |
- |
100 |
|
- |
| 7.7.1(Insulation Resistance) |
- |
1000 |
|
- |
| 7.7.2(High Voltage Test) |
- |
1000 |
|
- |
| 7.7.3(Cooling capacity rating test) |
- |
8000 |
|
- |
| 7.7.4(Maximum operating conditions) |
- |
5000 |
|
- |
| 7.8.2(Performance test) |
- |
8000 |
|
- |
| 6.1(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
| 6.2(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
| 6.3(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
| 6.4(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
| 6.5(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
| 6.6(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
| 6.7(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
| 6.8(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
| 6.9(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
| 6.1(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
| 6.11(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
| 6.12(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
| 6.13(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
| 6.14(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
| 6.15(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
| 6.16(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
| 6.17(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
| 7.7.1(Insulation Resistance) |
- |
0 |
|
- |
| 7.7.2(High Voltage Test) |
- |
0 |
|
- |
| 7.7.3(Cooling capacity rating test) |
- |
0 |
|
- |
| 7.7.4(Maximum operating conditions) |
- |
0 |
|
- |
| 7.8.2(Performance test) |
- |
0 |
|
- |
| 6.1(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
| 6.2(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
| 6.3(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
| 6.4(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
| 6.5(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
| 6.6(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
| 6.7(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
| 6.8(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
| 6.9(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
| 6.1(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
| 6.11(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
| 6.12(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
| 6.13(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
| 6.14(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
| 6.15(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
| 6.16(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
| 6.17(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
| 7.7.1(Insulation Resistance) |
- |
0 |
|
- |
| 7.7.2(High Voltage Test) |
- |
0 |
|
- |
| 7.7.3(Cooling capacity rating test) |
- |
0 |
|
- |
| 7.7.4(Maximum operating conditions) |
- |
0 |
|
- |
| 7.8.2(Performance test) |
- |
0 |
|
- |
| 6.1(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
| 6.2(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
| 6.3(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
| 6.4(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
| 6.5(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
| 6.6(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
| 6.7(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
| 6.8(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
| 6.9(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
| 6.1(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
| 6.11(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
| 6.12(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
| 6.13(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
| 6.14(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
| 6.15(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
| 6.16(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
| 6.17(COMPONENTS AND THEIR MATERIALS) |
- |
0 |
|
- |
| 7.7.1(Insulation Resistance) |
- |
0 |
|
- |
| 7.7.2(High Voltage Test) |
- |
0 |
|
- |
| 7.7.3(Cooling capacity rating test) |
- |
0 |
|
- |
| 7.7.4(Maximum operating conditions) |
- |
0 |
|
- |
| 7.8.2(Performance test) |
- |
0 |
|
- |
|
20 Jun, 2028 |
- Included w.e.f. 19.03.2024 |
| 48 |
IS 16333 : Part 3 (2022) |
Mobile phone handsets: Part 3 Indian language support for mobile phone handsets - Specific requirements(Second Revision) |
- |
40000 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 5.1(Inputting of text) |
- |
0 |
|
Included in clause 5 |
| 5.2(Message Readability) |
- |
0 |
|
Included in clause 5 |
| 6(Marking) |
- |
5000 |
|
- |
| "Cl.6.1 "(Marking) |
- |
0 |
|
Included in clause 6 |
| "Cl.6.2 "(BIS Certification Marking) |
- |
0 |
|
Included in clause 6 |
| 4(Requirements) |
- |
0 |
|
- |
| 5(Tests) |
- |
35000 |
|
- |
| 6(Marking) |
- |
0 |
|
- |
|
20 Jun, 2028 |
- Included w.e.f. 19.03.2024 |
| 49 |
IS 302 : Part 2 : Sec 7 (2010) |
Safety of household and similar electrical appliances: Part 2 particular requirements: Sec 7 domestic electric clothes washing machines (First Revision) |
- |
130000 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 4(GENERAL REQUIREMENTS) |
- |
0 |
|
- |
| 5(GENERAL CONDITIONS FOR THE TESTS) |
- |
0 |
|
- |
| 6(Classification) |
- |
0 |
|
- |
| 7(Marking) |
- |
1000 |
|
- |
| 8(Protection against access to live parts) |
- |
2000 |
|
- |
| 9(Starting of Motor operated appliances) |
- |
0 |
|
Not applicable |
| 10(Power Input
& Current
) |
- |
5000 |
|
- |
| 11(Temperature Rise/ Heating) |
- |
5000 |
|
- |
| 13(Leakage Current and Electric Strength at Operating Temperature) |
- |
3000 |
|
- |
| 14(Transient Over Voltage) |
- |
2000 |
|
- |
| 15(Moisture Resistance) |
- |
6000 |
|
- |
| 16(Leakage Current and Electric Strength) |
- |
3000 |
|
- |
| 17(Overload Protection/ Overload Protection of Transformers & Associated Circuits) |
- |
2000 |
|
- |
| 18(Endurance) |
- |
10000 |
|
- |
| 19(Abnormal Operation) |
- |
5000 |
|
- |
| 20(Stability & Mechanical Hazards) |
- |
1000 |
|
- |
| 21(Mechanical strength) |
- |
5000 |
|
- |
| 22(Construction) |
- |
5000 |
|
- |
| 23(Internal wiring) |
- |
1000 |
|
- |
| 24(Components) |
- |
5000 |
|
- |
| 25(Supply Connection & External Flexible Cords) |
- |
2000 |
|
- |
| 26(Terminals For External Conductors) |
- |
2000 |
|
- |
| 27(Provision For Earthing) |
- |
2000 |
|
- |
| 28(Screws & Connections) |
- |
1000 |
|
- |
| 29(Clearances, Creepage Distances & Solid Insulation) |
- |
2000 |
|
- |
| 30(Resistance to Heat & Fire) |
- |
3000 |
|
- |
| 31(Resistance to Rusting) |
- |
1000 |
|
- |
| 32(Radiation ,Toxicity and similar hazards) |
- |
1000 |
|
- |
| 19.11.4.1(Electrostatic discharges) |
- |
5000 |
|
- |
| 19.11.4.2(Radiated fields) |
- |
20000 |
|
- |
| 19.11.4.3(Fast transient bursts) |
- |
5000 |
|
- |
| 19.11.4.4(Surge immunity test) |
- |
5000 |
|
- |
| 19.11.4.5(Immunity to conducted discharges) |
- |
10000 |
|
- |
| 19.11.4.6(Voltage dips and interruptions) |
- |
5000 |
|
- |
| 19.11.4.7(Harmonics) |
- |
5000 |
|
- |
|
20 Jun, 2028 |
- Included w.e.f. 19.03.2024
Exclusion: CL.24 (COMPONENTS), Cl.19.11.4.1 (Electrostatic discharges), Cl.19.11.4.2 (Radiated fields), Cl.19.11.4.3 (Fast transient bursts), Cl.19.11.4.4 (Surge immunity test), Cl.19.11.4.5 (Immunity to conducted discharges), Cl.19.11.4.6 (Class 3 Voltage dips and interruptions), Cl.19.11.4.7 (Harmonics) |
| 50 |
IS 1391 : Part 2 (2023) |
Room Air Conditioners Specification Part 2 Split Air Conditioners Fourth Revision |
Upto 20kW |
650000 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 5(Construction )("The air conditioner and its parts shall be
constructed with the strength and rigidity adequate
for normal conditions of handling, transport, and
usage.") |
- |
1000 |
|
For Clause 5.1 only |
| 5.2((Electrically Charged Parts)) |
- |
1000 |
|
- |
| 5.3((Refrigerant Circuit)) |
- |
1000 |
|
- |
| 5.4((Provision for Earthing)) |
- |
1000 |
|
- |
| 5.5((Air Filter)) |
- |
3000 |
|
- |
| 5.6((Temperature Sensing Controls)) |
- |
1000 |
|
- |
| 5.7((Hermetic Compressors)) |
- |
1000 |
|
- |
| 5.8((Heat Exchanger)) |
- |
1000 |
|
- |
| 5.9((Motors)) |
- |
10000 |
|
This Testing charges is appilcable for the test specified in this clause only (Input and speed test). For other test as per IS 996 additional charges will be applicable, if required. |
| 6((RATING REQUIREMENTS)) |
- |
0 |
|
- |
| 7(RATINGS BASED ON FUNCTION) |
- |
0 |
|
- |
| 8(RATING AND TEST CONDITIONS) |
- |
0 |
|
- |
| 8.1(Cooling Test) |
- |
0 |
|
- |
| 8.1.2((Maximum Operating Test Conditions)) |
- |
0 |
|
- |
| 8.1.3((Freeze-Up Test Conditions)) |
- |
0 |
|
- |
| 8.1.4((Enclosure Sweat Test Conditions)) |
- |
0 |
|
- |
| 8.2((Heating Test)) |
- |
0 |
|
- |
| 8.2.1((Heating Capacity Test Conditions)) |
- |
0 |
|
- |
| "8.2.2((Heating by Heat Pump Overload Rating Test Conditions (Maximum Heating Performance Test))") |
- |
0 |
|
- |
| "8.3((Method of Measurement of Indian Seasonal
Energy Efficiency Ratio (ISEER))") |
- |
0 |
|
- |
| 9((PERFORMANCE REQUIREMENTS)) |
- |
0 |
|
- |
| 9.1((Variations Allowed in Performance Test Conditions)) |
- |
0 |
|
- |
| 9.2((Safety)) |
- |
0 |
|
Charges included in clasue 12.3.3 |
| 9.3((Power Factor Test)) |
- |
10000 |
|
- |
| 9.4((Maximum Operating Conditions Test)) |
- |
80000 |
|
- |
| 9.5((Freeze-Up Tests)) |
- |
0 |
|
Charges included in clause 9.5.3&9.5.4 |
| 9.5.3((Air Blockage Test)) |
- |
30000 |
|
- |
| 9.5.4(( Drip Test)) |
- |
30000 |
|
- |
| 9.6((Enclosure Sweat Test)) |
- |
30000 |
|
- |
| 9.7((Power Consumption Test for Cooling)) |
- |
20000 |
|
- |
| 9.8((Power Consumption Test for Heating by Heat Pump)) |
- |
20000 |
|
- |
| 9.9(( Cooling Capacity Test)) |
- |
110000 |
|
- |
| 9.10((Heating Capacity Test)) |
- |
110000 |
|
- |
| "9.11((Method of Measurement of Indian Seasonal
Energy Efficiency Ratio (ISEER))") |
- |
45000 |
|
- |
| 9.12((Maximum Heating Performance Test)) |
- |
80000 |
|
- |
| 9.13((Sound Pressure Test)) |
- |
40000 |
|
- |
| 10((CALCULATIONS)) |
- |
0 |
|
- |
| 11((INSTRUMENTS)) |
- |
0 |
|
- |
| 12.1((Classification of Tests)) |
- |
0 |
|
- |
| 12.2.1((General Running Test)) |
- |
10000 |
|
- |
| 12.2.2(( Leakage Test)) |
- |
10000 |
|
- |
| 12.2.3((High Voltage Test)) |
- |
10000 |
|
- |
| 12.2.4(Leakage Current Test)) |
- |
10000 |
|
- |
| "12.2.5(Provisions for Earthing (Earth Resistance
Test)") |
- |
10000 |
|
- |
| 12.3.3(Safety Tests) |
- |
20000 |
|
- |
| 12.4(Acceptance Test) |
- |
0 |
|
Testing charges will be applicable as given for type or routine test, if required. |
| 12.4.1(Performance Test) |
- |
0 |
|
Testing charges will be applicable as given for type or routine test, if required. |
| 12.4.2(Pressure Test or Leakage Test) |
- |
0 |
|
Testing charges will be applicable as given for type or routine test, if required. |
| 12.4.3(Leakage Current Test) |
- |
0 |
|
Testing charges will be applicable as given for type or routine test, if required. |
| 13(MARKING) |
- |
5000 |
|
- |
|
20 Jun, 2028 |
- - |
| 51 |
IS 1391 : Part 1 (2023) |
Room Air Conditioners Specification Part 1 Unitary Air Conditioners Fourth Revision |
Capacity upto 20kW |
550000 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 5((CONSTRUCTION )) |
- |
1000 |
|
For cl. 5.1 only |
| 5.2((Electrically Charged Parts)) |
- |
1000 |
|
- |
| 5.3((Refrigerant Circuit)) |
- |
1000 |
|
- |
| 5.4((Provision for Earthing)) |
- |
1000 |
|
- |
| 5.5((Air Filter)) |
- |
2000 |
|
- |
| 5.6((Temperature Sensing Controls)) |
- |
1000 |
|
- |
| 5.7((Hermetic Compressors)) |
- |
1000 |
|
- |
| 5.8((Heat Exchanger)) |
- |
1000 |
|
- |
| 5.9((Motors)) |
- |
10000 |
|
This testing charges is applicable for the Test specified in this clause (Input power and speed test). For other test as per IS 996 separate charges will be applicable. |
| 5.10(Drain Plug) |
- |
1000 |
|
- |
| 6(RATING REQUIREMENTS) |
- |
0 |
|
- |
| 7(RATINGS BASED ON FUNCTION) |
- |
0 |
|
- |
| 8(RATING AND TEST CONDITIONS) |
- |
0 |
|
- |
| 8.1(Cooling Test) |
- |
0 |
|
- |
| 8.1.2((Maximum Operating Test Conditions)) |
- |
0 |
|
- |
| 8.1.3((Freeze-Up Test Conditions)) |
- |
0 |
|
- |
| 8.1.4((Enclosure Sweat Test Conditions)) |
- |
0 |
|
- |
| 8.1.5((Condensate Disposal Test Conditions)) |
- |
0 |
|
- |
| 8.2((Heating Test)) |
- |
0 |
|
- |
| 8.2.1((Heating Capacity Test Conditions)) |
- |
0 |
|
- |
| "8.2.2((Heating by Heat Pump Overload Rating Test Conditions (Maximum Heating Performance Test))") |
- |
0 |
|
- |
| "8.3((Method of Measurement of Indian Seasonal Energy Efficiency Ratio (ISEER))") |
- |
0 |
|
- |
| 9((PERFORMANCE REQUIREMENTS)) |
- |
0 |
|
- |
| 9.1(Variations Allowed in Performance Test Conditions) |
- |
0 |
|
- |
| 9.2(Safety) |
- |
0 |
|
Testing charges included in clasue 12.3.3 |
| 9.3(Power Factor Test) |
- |
10000 |
|
- |
| 9.4(Maximum Operating Conditions Test) |
- |
50000 |
|
- |
| 9.5(Freeze-Up Tests) |
- |
0 |
|
Testing charges included in clause 9.5.3 & 9.5.4. |
| 9.5.3(Air Blockage Test) |
- |
30000 |
|
- |
| 9.5.4(Drip Test) |
- |
30000 |
|
- |
| 9.6(Enclosure Sweat Test) |
- |
30000 |
|
- |
| 9.7(Condensate Disposal Test) |
- |
40000 |
|
- |
| 9.8(Power Consumption Test for Cooling) |
- |
20000 |
|
- |
| 9.9(Power Consumption Test for Heating by Heat Pump) |
- |
20000 |
|
- |
| 9.10(Cooling Capacity Test) |
- |
75000 |
|
- |
| 9.11(Heating Capacity Test) |
- |
75000 |
|
- |
| "9.12(Method of Measurement of Indian Seasonal Energy Efficiency Ratio (ISEER)") |
- |
45000 |
|
- |
| 9.13(Maximum Heating Performance Test) |
- |
50000 |
|
- |
| 9.14(Sound Pressure Test) |
- |
30000 |
|
- |
| 10(CALCULATIONS) |
- |
0 |
|
- |
| 11(INSTRUMENTS) |
- |
0 |
|
- |
| 12.1(Classification of Tests) |
- |
0 |
|
- |
| 12.2.1(General Running Test) |
- |
10000 |
|
- |
| 12.2.2(Leakage Test) |
- |
10000 |
|
- |
| 12.2.3(High Voltage Test) |
- |
10000 |
|
- |
| 12.2.4(Leakage Current Test) |
- |
10000 |
|
- |
| "12.2.5(Provisions for Earthing (Earth Resistance Test)") |
- |
10000 |
|
- |
| 12.3.3(Safety Tests) |
- |
20000 |
|
- |
| 12.4(Acceptance Test) |
- |
0 |
|
- |
| 12.4.1(Performance Test) |
- |
0 |
|
Testing charges will be applicable as given for Type or routine test, if required. |
| 12.4.2(Pressure Test or Leakage Test) |
- |
0 |
|
Testing charges will be applicable as given for Type or routine test, if required. |
| 12.4.3(Leakage Current Test) |
- |
0 |
|
Testing charges will be applicable as given for Type or routine test, if required. |
| 13(MARKING) |
- |
5000 |
|
- |
| 5.9 (Motors)() |
- |
0 |
|
- |
|
20 Jun, 2028 |
- Included w.e.f. 08.02.2024 upto 20kW |
| 52 |
IS 302 : Part 2 : Sec 21 (2018) |
Safety of household and similar electrical appliances: Part 2 particular requirements: Sec 21 stationary storage type electric water heaters (Second Revision) |
- |
71875 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 7.0(Marking and Instructions) |
- |
1000 |
|
- |
| 6.0(Classification) |
- |
0 |
|
- |
| 8.0(Protection against access to live parts) |
- |
2000 |
|
- |
| 10.0(Input and Current) |
- |
5000 |
|
- |
| 11.0(Heating) |
- |
6000 |
|
- |
| 13.0(Leakage Current and electric strength at operating temperature) |
- |
3000 |
|
- |
| 14.0(Transient Overvoltage) |
- |
2000 |
|
- |
| 15.0(Moisture resistance) |
- |
3000 |
|
- |
| 16.0(Leakage current and Electric strength (After Humidity (Environmental) Treatment)) |
- |
3000 |
|
- |
| 17.0(Overload Protection of transformer and associated circuit) |
- |
2000 |
|
- |
| 19.0(Abnormal Operation) |
- |
10000 |
|
Charges applicable excluding the test of Cl.19.11.4.1 to Cl.19.11.4.7. The testing charges for EMI/EMC Testing (Cl.19.11.4.1 to Cl.19.11.4.7) will be charged extra. |
| 20.0(Stability and mechanical hazards) |
- |
1000 |
|
- |
| 21.0(Mechanical Strength) |
- |
5000 |
|
- |
| 22.0(Construction) |
- |
5000 |
|
- |
| 23.0(Internal Wiring) |
- |
1000 |
|
- |
| 25.0(Supply Connection and External Flexible Cords) |
- |
3000 |
|
- |
| 26.0(Terminals for external conductors) |
- |
2000 |
|
- |
| 27.0(Provision For Earthing) |
- |
2000 |
|
- |
| 28.0(Screws and Connections) |
- |
1000 |
|
- |
| 29.0(Creepage Distances and Clearances) |
- |
2000 |
|
- |
| 30.0(Resistance To Heat and Fire) |
- |
4000 |
|
- |
| 31.0(Resistance To Rusting) |
- |
1000 |
|
- |
| 19.11.4.1(Electrostatic discharges) |
- |
5000 |
|
-- |
| 19.11.4.2(Radiated fields) |
- |
20000 |
|
-- |
| 19.11.4.3(Fast transient bursts) |
- |
5000 |
|
-- |
| 19.11.4.4(Surge immunity test) |
- |
5000 |
|
-- |
| 19.11.4.5(Immunity to conducted discharges) |
- |
10000 |
|
-- |
| 19.11.4.6(Class 3 Voltage dips and interruptions) |
- |
5000 |
|
-- |
| 19.11.4.7(Harmonics) |
- |
5000 |
|
-- |
|
20 Jun, 2028 |
- INCLUDED W.E.F. 7-7-2021. Exclusion: EMI/EMC (Cl.19.11.4.1 to 19.11.4.7), capacitor test (Cl.24.1.1), switching cycle operation test (Cl.24.1.3), automatic control cycle operation (Cl.24.1.4), Appliance coupler and interconnection coupler test (Cl.24.1.5), Lamp holder test (Cl.24.1.6), capacitor in auxiliary winding of motor test (cl.24.5), motors basic insulation test (Cl.24.6) |
| 53 |
IS 302 : Part 2 : Sec 9 (2009) |
Safety of household and similar electrical appliances: Part 2 particular requirements: Sec 9 toasters, grills, roasters and similar appliances (First Revision) |
- |
72617 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 7.1 to 7.13, 7.15, 7.16(Marking) |
- |
1000 |
|
- |
| 7.14(Legibility & Durability of Markings test) |
- |
0 |
|
Testing charges already included in 7.1 |
| 8.1, 8.1.1 & 8.2(Protection against access to live parts) |
- |
2000 |
|
- |
| 8.1.2(Protection against access to live parts) |
- |
0 |
|
Testing charges already included in 8.1 |
| 8.1.3(Protection against access to live parts) |
- |
0 |
|
Testing charges already included in 8.1 |
| 8.1.4(Protection against access to live parts) |
- |
0 |
|
Testing charges already included in 8.1 |
| 8.1.5(Protection against access to live parts) |
- |
0 |
|
Testing charges already included in 8.1 |
| 10.1 & 10.2 -Table No. 1, Table No. 2(Power Input and Current) |
- |
5000 |
|
- |
| 11.1 to 11.8, Table No.-3(Heating) |
- |
6000 |
|
- |
| 11.101(Heating) |
- |
0 |
|
Testing charges already included in 11.1 |
| 13.1, 13.2(Leakage current test) |
- |
3000 |
|
- |
| 13.1, 13.2(Leakage current test) |
- |
0 |
|
Testing charges already included in 13.1 |
| 13.3 and Table No.- 4(Electric strength test) |
- |
0 |
|
Testing charges already included in 13.1 |
| 14, Table No.- 6 & Table No.-16(Transient over voltages) |
- |
2000 |
|
- |
| 15.1(Moisture resistance) |
- |
3000 |
|
- |
| 15.2(Moisture resistance) |
- |
0 |
|
Testing charges already included in 15.1 |
| 15.2(Moisture resistance) |
- |
0 |
|
Testing charges already included in 15.1 |
| 15.2(Moisture resistance) |
- |
0 |
|
Testing charges already included in 15.1 |
| 15.2(Moisture resistance) |
- |
0 |
|
Testing charges already included in 15.1 |
| 15.3(Moisture resistance) |
- |
0 |
|
Testing charges already included in 15.1 |
| 15.3(Moisture resistance) |
- |
0 |
|
Testing charges already included in 15.1 |
| 15.3(Moisture resistance) |
- |
0 |
|
Testing charges already included in 15.1 |
| 16.1 & 16.2(Leakage current test) |
- |
3000 |
|
- |
| 16.3(Electric strength test) |
- |
0 |
|
Testing charges already included in 16.1 |
| 16.3(Insulation resistance test) |
- |
0 |
|
Testing charges already included in 16.1 |
| 17(Overload protection of transformers and associated circuits) |
- |
2000 |
|
- |
| 19.1 to 19.13, Table No. - 9(ABNORMAL OPERATION) |
- |
10000 |
|
Charges applicable excluding the test of Cl.19.11.4.1 to Cl.19.11.4.7. The testing charges for EMI/EMC Testing (Cl.19.11.4.1 to Cl.19.11.4.7) will be charged extra. |
| 19.101(ABNORMAL OPERATION) |
- |
0 |
|
Testing charges already included in 19.1 |
| 19.102(ABNORMAL OPERATION) |
- |
0 |
|
Testing charges already included in 19.1 |
| 19.103(ABNORMAL OPERATION) |
- |
0 |
|
Testing charges already included in 19.1 |
| 19.104(ABNORMAL OPERATION) |
- |
0 |
|
Testing charges already included in 19.1 |
| 20.1(Stability and mechanical hazards) |
- |
1000 |
|
- |
| 20.2(Stability and mechanical hazards) |
- |
0 |
|
Testing charges already included in 20.1 |
| 21.1(MECHANICAL STRENGTH) |
- |
5000 |
|
- |
| 21.2(MECHANICAL STRENGTH) |
- |
0 |
|
Testing charges already included in 21.1 |
| 21.101(MECHANICAL STRENGTH) |
- |
0 |
|
Testing charges already included in 21.1 |
| 21.101(MECHANICAL STRENGTH) |
- |
0 |
|
Testing charges already included in 21.1 |
| 22.1(Constructions) |
- |
5000 |
|
- |
| 22.2(Constructions) |
- |
0 |
|
Testing charges already included in 22.1 |
| 22.3(Constructions) |
- |
0 |
|
Testing charges already included in 22.1 |
| 22.4(Constructions) |
- |
0 |
|
Testing charges already included in 22.1 |
| 22.5(Constructions) |
- |
0 |
|
Testing charges already included in 22.1 |
| 22.6(Constructions) |
- |
0 |
|
Testing charges already included in 22.1 |
| 22.7 to 22.10(Constructions) |
- |
0 |
|
Testing charges already included in 22.1 |
| 22.11(Constructions) |
- |
0 |
|
Testing charges already included in 22.1 |
| 22.12(Constructions) |
- |
0 |
|
Testing charges already included in 22.1 |
| 22.13 to 22.48(Constructions) |
- |
0 |
|
Testing charges already included in 22.1 |
| 22.101 to 22.107(Constructions) |
- |
0 |
|
Testing charges already included in 22.1 |
| 22.108(Constructions) |
- |
0 |
|
Testing charges already included in 22.1 |
| 22.109(Constructions) |
- |
0 |
|
Testing charges already included in 22.1 |
| 22.11o(Constructions) |
- |
0 |
|
Testing charges already included in 22.1 |
| 22.111(Constructions) |
- |
0 |
|
Testing charges already included in 22.1 |
| 22.111(Constructions) |
- |
0 |
|
Testing charges already included in 22.1 |
| 23.1 & 23.2(Internal wiring) |
- |
1000 |
|
- |
| 23.3(Internal wiring) |
- |
0 |
|
Testing charges already included in 23.1 |
| 23.4(Internal wiring) |
- |
0 |
|
Testing charges already included in 23.1 |
| 23.5(Internal wiring) |
- |
0 |
|
Testing charges already included in 23.1 |
| 23.6 to 23.10(Internal wiring) |
- |
0 |
|
Testing charges already included in 23.1 |
| 24.1(Components) |
- |
10000 |
|
- |
| 24.2 to 24.6(Components) |
- |
0 |
|
Testing charges already included in 24.1 |
| 24.101(Components) |
- |
0 |
|
Testing charges already included in 24.1 |
| 24.101(Components) |
- |
0 |
|
Testing charges already included in 24.1 |
| 25.1(Supply connection and external flexible cords) |
- |
3000 |
|
- |
| 25.2(Supply connection and external flexible cords) |
- |
0 |
|
Testing charges already included in 25.1 |
| 25.3(Supply connection and external flexible cords) |
- |
0 |
|
Testing charges already included in 25.1 |
| 25.4(Supply connection and external flexible cords) |
- |
0 |
|
Testing charges already included in 25.1 |
| 25.5 to 25.7(Supply connection and external flexible cords) |
- |
0 |
|
Testing charges already included in 25.1 |
| 25.8, Table No.-11(Supply connection and external flexible cords) |
- |
0 |
|
Testing charges already included in 25.1 |
| 25.9 to 25.13(Supply connection and external flexible cords) |
- |
0 |
|
Testing charges already included in 25.1 |
| 25.14(Supply connection and external flexible cords) |
- |
0 |
|
Testing charges already included in 25.1 |
| 25.14(Supply connection and external flexible cords) |
- |
0 |
|
Testing charges already included in 25.1 |
| 25.15(Supply connection and external flexible cords) |
- |
0 |
|
Testing charges already included in 25.1 |
| 25.16 to 25.25(Supply connection and external flexible cords) |
- |
0 |
|
Testing charges already included in 25.1 |
| 26.1 to 26.8(Terminals for external conductors) |
- |
2000 |
|
- |
| 26.9(Terminals for external conductors) |
- |
0 |
|
Testing charges already included in 26.1 |
| 26.10 & 26.11(Terminals for external conductors) |
- |
0 |
|
Testing charges already included in 26.1 |
| 27.1 to 27.4(Provision for earthing) |
- |
2000 |
|
- |
| 27.5(Provision for earthing) |
- |
0 |
|
Testing charges already included in 27.1 |
| 27.6(Provision for earthing) |
- |
0 |
|
Testing charges already included in 27.1 |
| 28.1, Table No.-14(Screws and connections) |
- |
1000 |
|
- |
| 28.2 to 28.4(Screws and connections) |
- |
0 |
|
Testing charges already included in 28.1 |
| 29.1, Table No.- 16, Table No.- 17 & Table No.18(Clearances, creepage distances and solid insulation) |
- |
2000 |
|
- |
| 29.1, Table No.- 16, Table No.- 17 & Table No.18(Clearances, creepage distances and solid insulation) |
- |
0 |
|
Testing charges already included in 29.1 |
| 29.2(Clearances, creepage distances and solid insulation) |
- |
0 |
|
Testing charges already included in 29.1 |
| 29.2(Clearances, creepage distances and solid insulation) |
- |
0 |
|
Testing charges already included in 29.1 |
| 29.3(Clearances, creepage distances and solid insulation) |
- |
0 |
|
Testing charges already included in 29.1 |
| 30.1(Resistance to heat and fire) |
- |
4000 |
|
- |
| 30.2(Resistance to heat and fire) |
- |
0 |
|
Testing charges already included in 30.1 |
| 30.2.4(Resistance to heat and fire) |
- |
0 |
|
Testing charges already included in 30.1 |
| 31(Resistance to rusting) |
- |
1000 |
|
- |
| 31(Resistance to rusting) |
- |
0 |
|
Testing charges already included in 31 |
| 32(Radiation, toxicity and similar hazards) |
- |
1000 |
|
- |
| 19(Abnormal Operation) |
- |
55000 |
|
For EMI/EMC Testing (Cl.19.11.4.1 to Cl.19.11.4.7) |
|
20 Jun, 2028 |
- Exclusion: EMI/EMC (Cl.19.11.4.1 to 19.11.4.7), capacitor test (Cl.24.1.1), switching cycle operation test (Cl.24.1.3), automatic control cycle operation (Cl.24.1.4), Appliance coupler and interconnection coupler test (Cl.24.1.5), Lamp holder test (Cl.24.1.6), capacitor in auxiliary winding of motor test (cl.24.5), motors basic insulation test (Cl.24.6) |
| 54 |
IS 302 : Part 2 : Sec 23 (2009) |
Safety of household and similar electrical appliances: Part 2 particular requirements: Sec 23 appliances for skin or hair care (First Revision) |
- |
130000 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 7(Marking/ Marking & Instructions) |
- |
1000 |
|
- |
| 8(Protection against Electric Shock/ Protection against Access to Live Parts) |
- |
2000 |
|
- |
| 10(Power Input
& Current) |
- |
5000 |
|
- |
| 11(Temperature Rise/Heating) |
- |
6000 |
|
- |
| 13(Leakage Current and Electric Strength at Operating Temperature) |
- |
3000 |
|
- |
| 14(Transient Over Voltage) |
- |
2000 |
|
- |
| 15(Moisture Resistance) |
- |
3000 |
|
- |
| 16(Leakage Current and Electric Strength) |
- |
3000 |
|
- |
| 17(Overload Protection/ Overload Protection of Transformers & Associated Circuits) |
- |
2000 |
|
- |
| 19(Abnormal Operation) |
- |
10000 |
|
Charges applicable including the test of Cl.19.11.4.1 to Cl.19.11.4.7. The testing charges for EMI/EMC Testing (Cl.19.11.4.1 to Cl.19.11.4.7) will be charged extra 55000. |
| 20(Stability & Mechanical Hazards) |
- |
1000 |
|
- |
| 21(Mechanical strength) |
- |
5000 |
|
- |
| 22(Construction) |
- |
5000 |
|
- |
| 23(Internal wiring) |
- |
1000 |
|
- |
| 24(Component) |
- |
10000 |
|
- |
| 25(Supply Connection & External Flexible Cables and Cords) |
- |
3000 |
|
- |
| 26(Terminals For External Conductors) |
- |
2000 |
|
- |
| 27(Provision For Earthing) |
- |
2000 |
|
- |
| 28(Screws & Connection) |
- |
1000 |
|
- |
| 29(Clearances, Creepage Distances & Solid Insulation) |
- |
2000 |
|
- |
| 30(Resistance to Heat & Fire) |
- |
4000 |
|
- |
| 31(Resistance to Rusting) |
- |
1000 |
|
- |
| 32(Radiation ,Toxicity and similar hazards) |
- |
1000 |
|
- |
|
20 Jun, 2028 |
- Exclusion: EMI/EMC (Cl.19.11.4.1 to 19.11.4.7), capacitor test (Cl.24.1.1), switching cycle operation test (Cl.24.1.3), automatic control cycle operation (Cl.24.1.4), Appliance coupler and interconnection coupler test (Cl.24.1.5), Lamp holder test (Cl.24.1.6), capacitor in auxiliary winding of motor test (cl.24.5), motors basic insulation test (Cl.24.6) |
| 55 |
IS 302 : Part 2 : Sec 75 (2018) |
Safety of Household and Similar Electrical Appliances Part 2 Particular Requirements Section 75 Commercial Dispensing Appliances and Vending Machines |
- |
130000 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 7.1 to 7.13, 7.15, 7.16(Marking) |
- |
1000 |
|
Testing charges are for Cl 7. |
| 7.14(Legibility & Durability of Markings test) |
- |
0 |
|
Testing charges are included in Cl 7.1,to 7.13, 7.15, 7.16. |
| 8.1, 8.1.1 & 8.2(Protection against access to live parts) |
- |
2000 |
|
Testing charges are for Cl 8. |
| 8.1.2(Protection against access to live parts) |
- |
0 |
|
Testing charges are included in Cl 8.1, 8.1.1 & 8.2. |
| 8.1.3(Protection against access to live parts) |
- |
0 |
|
Testing charges are included in Cl 8.1, 8.1.1 & 8.2. |
| 8.1.4(Protection against access to live parts) |
- |
0 |
|
Testing charges are included in Cl 8.1, 8.1.1 & 8.2. |
| 8.1.5(Protection against access to live parts) |
- |
0 |
|
Testing charges are included in Cl 8.1, 8.1.1 & 8.2. |
| 10.1 & 10.2 -Table No. 1, Table No. 2(Power Input and Current) |
- |
5000 |
|
- |
| 11.1 to 11.8, Table No.-3(Heating) |
- |
6000 |
|
- |
| 13.1, 13.2(Leakage current test) |
- |
3000 |
|
Testing charges are for Cl 13. |
| 13.3 and Table No.- 4(Electric strength test) |
- |
0 |
|
Testing charges are included in Cl 13.1, 13.2. |
| 14, Table No.- 6 & Table No.-16(Transient over voltages) |
- |
2000 |
|
- |
| 15.1(Moisture resistance) |
- |
3000 |
|
Testing charges are for Cl 15. |
| 15.2(Moisture resistance) |
- |
0 |
|
Testing charges are included in Cl 15.1. |
| 15.3(Moisture resistance) |
- |
0 |
|
Testing charges are included in Cl 15.1. |
| 15.101(Moisture resistance) |
- |
0 |
|
Testing charges are included in Cl 15.1. |
| 15.102(Moisture resistance) |
- |
0 |
|
Testing charges are included in Cl 15.1. |
| 16.1 & 16.2(Leakage current test) |
- |
3000 |
|
Testing charges are for Cl 16. |
| 16.3(Electric strength test) |
- |
0 |
|
Testing charges are included in Cl 16.1 & 16.2. |
| 16.3(Insulation resistance test) |
- |
0 |
|
Testing charges are included in Cl 16.1 & 16.2. |
| 17(Overload protection of transformers and associated circuits) |
- |
2000 |
|
- |
| 19.1 to 19.13, Table No. - 9(ABNORMAL OPERATION) |
- |
10000 |
|
Charges applicable excluding the test of Cl.19.11.4.1 to Cl.19.11.4.7. The testing charges for EMI/EMC Testing (Cl.19.11.4.1 to Cl.19.11.4.7) will be charged extra. |
| 19.101 and 19.102(ABNORMAL OPERATION) |
- |
0 |
|
Testing charges are included in Cl 19.1 to 19.13. |
| 20.1(Stability and mechanical hazards) |
- |
1000 |
|
Testing charges are for Cl 20 |
| 20.2(Stability and mechanical hazards) |
- |
0 |
|
Testing charges are included in Cl 20.1. |
| 21.1(MECHANICAL STRENGTH) |
- |
5000 |
|
Testing charges are for Cl 21 |
| 21.2(MECHANICAL STRENGTH) |
- |
0 |
|
Testing charges are included in Cl 21.1 |
| 22.1(Constructions) |
- |
5000 |
|
Testing charges are for Cl 22 |
| 22.2(Constructions) |
- |
0 |
|
Testing charges are included in Cl 22.1 |
| 22.3(Constructions) |
- |
0 |
|
Testing charges are included in Cl 22.1 |
| 22.4(Constructions) |
- |
0 |
|
Testing charges are included in Cl 22.1 |
| 22.5(Constructions) |
- |
0 |
|
Testing charges are included in Cl 22.1 |
| 22.6(Constructions) |
- |
0 |
|
Testing charges are included in Cl 22.1 |
| 22.7 to 22.10(Constructions) |
- |
0 |
|
Testing charges are included in Cl 22.1 |
| 22.11(Constructions) |
- |
0 |
|
Testing charges are included in Cl 22.1 |
| 22.11(Constructions) |
- |
0 |
|
Testing charges are included in Cl 22.1 |
| 22.12(Constructions) |
- |
0 |
|
Testing charges are included in Cl 22.1 |
| 22.13 to 22.48(Constructions) |
- |
0 |
|
Testing charges are included in Cl 22.1 |
| 22.101 to 22.114(Constructions) |
- |
0 |
|
Testing charges are included in Cl 22.1 |
| 23.1 & 23.2(Internal wiring) |
- |
1000 |
|
Testing charges are for Cl 23 |
| 23.3(Internal wiring) |
- |
0 |
|
Testing charges are included in Cl 23.1 & 23.2 |
| 23.4(Internal wiring) |
- |
0 |
|
Testing charges are included in Cl 23.1 & 23.2 |
| 23.5(Internal wiring) |
- |
0 |
|
Testing charges are included in Cl 23.1 & 23.2 |
| 23.6 to 23.10(Internal wiring) |
- |
0 |
|
Testing charges are included in Cl 23.1 & 23.2 |
| 23.101 to 23.102(Internal wiring) |
- |
0 |
|
Testing charges are included in Cl 23.1 & 23.2 |
| 24.1(Components) |
- |
10000 |
|
Testing charges are for Cl 24. |
| 24.2 to 24.6(Components) |
- |
0 |
|
Testing charges are included in Cl 24.1 |
| 24.101 to 24.103(Components) |
- |
0 |
|
Testing charges are included in Cl 24.1 |
| 25.1(Supply connection and external flexible cords) |
- |
3000 |
|
Testing charges are for Cl 25. |
| 25.2(Supply connection and external flexible cords) |
- |
0 |
|
Testing charges are included in Cl 25.1 |
| 25.3(Supply connection and external flexible cords) |
- |
0 |
|
Testing charges are included in Cl 25.1 |
| 25.4(Supply connection and external flexible cords) |
- |
0 |
|
Testing charges are included in Cl 25.1 |
| 25.5 to 25.7(Supply connection and external flexible cords) |
- |
0 |
|
Testing charges are included in Cl 25.1 |
| 25.8, Table No.-11(Supply connection and external flexible cords) |
- |
0 |
|
Testing charges are included in Cl 25.1 |
| 25.9 to 25.13(Supply connection and external flexible cords) |
- |
0 |
|
Testing charges are included in Cl 25.1 |
| 25.14(Supply connection and external flexible cords) |
- |
0 |
|
Testing charges are included in Cl 25.1 |
| 25.16 to 25.25(Supply connection and external flexible cords) |
- |
0 |
|
Testing charges are included in Cl 25.1 |
| 26.1 to 26.8(Terminals for external conductors) |
- |
2000 |
|
Testing charges are for Cl 26. |
| 26.9(Terminals for external conductors) |
- |
0 |
|
Testing charges are included in Cl 26.1 |
| 26.10 & 26.11(Terminals for external conductors) |
- |
0 |
|
Testing charges are included in Cl 26.1 |
| 27.1 to 27.4(Provision for earthing) |
- |
2000 |
|
Testing charges are for Cl 27. |
| 27.5(Provision for earthing) |
- |
0 |
|
Testing charges are included in Cl 27.1 |
| 27.6(Provision for earthing) |
- |
0 |
|
Testing charges are included in Cl 27.1. |
| 28.1, Table No.-14(Screws and connections) |
- |
1000 |
|
Testing charges are for Cl 28. |
| 28.2 to 28.4(Screws and connections) |
- |
0 |
|
Testing charges are included in Cl 28.1. |
| 29.1, Table No.- 16, Table No.- 17 & Table No.18(Clearances, creepage distances and solid insulation) |
- |
2000 |
|
Testing charges are for Cl 29. |
| 29.1, Table No.- 16, Table No.- 17 & Table No.18(Clearances, creepage distances and solid insulation) |
- |
0 |
|
Testing charges are included in Cl 29.1. |
| 29.2(Clearances, creepage distances and solid insulation) |
- |
0 |
|
Testing charges are included in Cl 29.1. |
| 29.3(Clearances, creepage distances and solid insulation) |
- |
0 |
|
Testing charges are included in Cl 29.1. |
| 30.1(Resistance to heat and fire) |
- |
4000 |
|
Testing charges are for Cl 30.1. |
| 30.2(Resistance to heat and fire) |
- |
0 |
|
Testing charges are included in Cl 30.1. |
| 30.2.4(Resistance to heat and fire) |
- |
0 |
|
Testing charges are included in Cl 30.1. |
| 31(Resistance to rusting) |
- |
1000 |
|
- |
| 32(Radiation, toxicity and similar hazards) |
- |
1000 |
|
- |
| 19.1 to 19.13, Table No. - 9(ABNORMAL OPERATION) |
- |
55000 |
|
Charges applicable for the test of EMI/EMC Testing Cl.19.11.4.1 to Cl.19.11.4.7. |
|
20 Jun, 2028 |
- . Exclusion: Cl.24.1.1 of IS 302-1:2008 (Capacitor Test), Cl.24.1.3 of IS 302-1:2008 (Switching cycle operation Test), Cl.24.1.4 of IS 302-1:2008 (Automatic control cycle operation Test ), Cl.24.1.5 of IS 302-1:2008 (Appliance coupler and Interconnection coupler Test), Cl.24.1.6 of IS 302-1:2008 (Lamp holder test), Cl.24.5 of IS 302-1:2008 (Capacitor in auxiliary winding of motor test), Cl.24.6 of IS 302-1:2008 (Motors Basic Insulation Test) |
| 56 |
IS 302 : Part 2 : Sec 201 (2008) |
Safety of household and similar electrical appliances: Part 2 particular requirements: Sec 201 electric immersion water heaters (First Revision) |
- |
65350 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| Cl.7 of IS 302-2-201:2008(Marking and Instruction ) |
- |
1000 |
|
- |
| Cl.8 of IS 302‐2-201: 2008(Protection Against Access to Live Parts) |
- |
2000 |
|
- |
| Cl.10 of IS 302‐2‐201:2008(Power Input and Current ) |
- |
5000 |
|
- |
| Cl.11 of IS 302-2201: 2008(Heating) |
- |
6000 |
|
- |
| Cl.13 of IS 302-2-201: 2008(Leakage Current & Electric Strength at Operating Temperature) |
- |
3000 |
|
- |
| Cl.14 of IS 302‐2-201:2008(Transient Over Voltages ) |
- |
2000 |
|
- |
| Cl.15 of IS 302-2-201:2008(Moisture Resistance ) |
- |
3000 |
|
- |
| Cl.16 of IS 302-2-201:2008(Leakage Current & Electric Strength) |
- |
3000 |
|
- |
| Cl.17 of IS 302‐2-201: 2008(Overload Protection of Transformers & Associated Circuits) |
- |
2000 |
|
- |
| Cl.19 of IS 302‐2-201: 2008(Abnormal Operation ) |
- |
10000 |
|
Charges applicable excluding the test of Cl.19.11.4.1 to Cl.19.11.4.7. The testing charges for EMI/EMC Testing (Cl.19.11.4.1 to Cl.19.11.4.7) will be charged extra. |
| Cl.20 of IS 302-2-201: 2008(Stability & Mechanical Hazards) |
- |
1000 |
|
- |
| Cl.21 of IS 302-2-201: 2008(Mechanical Strength ) |
- |
5000 |
|
- |
| Cl.22 of IS 302-2-201: 2008(Construction) |
- |
6000 |
|
- |
| Cl.23 of 302-2-201:2008(Internal Wiring ) |
- |
1000 |
|
- |
| Cl.24 of IS 302-2-201: 2008(Component) |
- |
10000 |
|
- |
| Cl.25 of IS 302-2-201: 2008(Supply Connection and External Flexible Cords) |
- |
3000 |
|
- |
| Cl.26 of IS 302-2-201: 2008(Terminals for External Conductors) |
- |
2000 |
|
- |
| Cl.27 of IS 302-2-201: 2008(Provision for Earthing ) |
- |
2000 |
|
- |
| Cl.28 of IS 302-2-201: 2008(Screws & Connections ) |
- |
1000 |
|
- |
| Cl.29 of IS 302-2‐201:2008(Clearances, Creepage Distances and Solid Insulation ) |
- |
2000 |
|
- |
| Cl.30 of IS 302-2‐201:2008(Resistance to Heat and Fire ) |
- |
4000 |
|
- |
| Cl.31 of IS 302-2-201:2008(Resistance of Rusting ) |
- |
1000 |
|
- |
| Cl.32 of IS 302-2-201:2008(Radiation, Toxicity and Similar Hazards) |
- |
0 |
|
- |
| 19.11.4.1(Electrostatic discharges) |
- |
5000 |
|
-- |
| 19.11.4.2(Radiated fields) |
- |
20000 |
|
- |
| 19.11.4.3(Fast transient bursts) |
- |
5000 |
|
- |
| 19.11.4.4(Surge immunity test) |
- |
5000 |
|
- |
| 19.11.4.5(Immunity to conducted discharges) |
- |
10000 |
|
- |
| 19.11.4.6(Class 3 Voltage dips and interruptions) |
- |
5000 |
|
- |
| 19.11.4.7(Harmonics) |
- |
5000 |
|
- |
|
20 Jun, 2028 |
- Exclusion:EMI/EMC (Cl.19.11.4.1 to 19.11.4.7), capacitor test (Cl.24.1.1), switching cycle operation test (Cl.24.1.3), automatic control cycle operation (Cl.24.1.4), Appliance coupler and interconnection coupler test (Cl.24.1.5), Lamp holder test (Cl.24.1.6), capacitor in auxiliary winding of motor test (cl.24.5), motors basic insulation test (Cl.24.6) |
| 57 |
IS 302 : Part 2 : Sec 25 (2014) |
Safety of household and similar electrical appliances: Part 2 Particular requirements: Section 25 Microwave ovens |
- |
220375 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 6.0(Classification) |
- |
0 |
|
- |
| 7(Marking and instructions) |
- |
1000 |
|
- |
| 8(Protection against live parts) |
- |
2000 |
|
- |
| 10(POWER INPUT AND CURRENT) |
- |
8000 |
|
- |
| 13(LEAKAGE CURRENT AND ELECTRIC STRENGTH AT OPERATING TEMPERATURE) |
- |
3000 |
|
- |
| 14(IMPULSE VOLTAGE TEST) |
- |
2000 |
|
- |
| 15(HUMIDITY TREATMENT TEST) |
- |
3000 |
|
- |
| 16(LEAKAGE CURRENT AND ELECTRIC STRENGTH) |
- |
3000 |
|
- |
| 17(OVERLOAD PROTECTION OF TRANSFORMERS AND ASSOCIATED CIRCUITS) |
- |
2000 |
|
- |
| 18(ENDURANCE) |
- |
40000 |
|
- |
| 19(ABNORMAL OPERATION) |
- |
10000 |
|
Charges applicable excluding the test of Cl.19.11.4.1 to Cl.19.11.4.7. The testing charges for EMI/EMC Testing (Cl.19.11.4.1 to Cl.19.11.4.7) will be charged extra 55000. |
| 20(STABILITY AND MECHANICAL HAZARDS) |
- |
2000 |
|
- |
| 21(MECHANICAL STRENGTH) |
- |
5000 |
|
- |
| 22(CONSTRUCTION) |
- |
10000 |
|
- |
| 23(INTERNAL WIRING) |
- |
1000 |
|
- |
| 24(COMPONENTS) |
- |
20000 |
|
Additional testing charges will be applicable for other components testing ,if required . Excluding for testing charges of components |
| 25(SUPPLY CONNECTION AND EXTERNAL FLEXIBLE CORDS) |
- |
3000 |
|
- |
| 26(TERMINALS FOR EXTERNAL CONDUCTORS) |
- |
2000 |
|
- |
| 27(PROVISION FOR EARTHING) |
- |
2000 |
|
- |
| 28(SCREWS AND CONNECTIONS) |
- |
1000 |
|
- |
| 29(CLEARANCES, CREEPAGE DISTANCES AND SOLID INSULATION) |
- |
2000 |
|
- |
| 30(RESISTANCE TO HEAT AND FIRE) |
- |
4000 |
|
- |
| 31(RESISTANCE TO RUSTING) |
- |
1000 |
|
- |
| 32(RADIATION, TOXICITY AND SIMILAR HAZARDS) |
- |
3000 |
|
- |
| 11(HEATING) |
- |
10000 |
|
- |
|
20 Jun, 2028 |
- Excluding following
tests: EMI/EMC (ESD,
Radiated fields, EFT
Surge, Conducted
Immunity, Dips &
Interruptions,
Harmonics &
Interharmonics)
(Cl.19.11.4.1 to
19.11.4.7), Capacitor Test (Cl.
24.1.1), Switching
Cycle Operation Test
(Cl. 24.1.3), Automatic
Control Cycle Operation
Test (Cl. 24.1.4),
Appliance Coupler and
Interconnection (Cl.
24.1.5), Lamp Holder
Test (Cl. 24.1.6),
Microwave Ovens for
Board Ships (Annex BB)
and Environmental
Testing – Test Kb: Salt
Mist, Cyclic (Sodium
Chloride Solution).
(ANNEX CC) |
| 58 |
IS 16242 : Part 1 (2014) |
Uninterruptible power systems (UPS): Part 1 general and safety requirements for UPS |
- |
190000 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 4.6(Power interface) |
- |
15000 |
|
- |
| 4.7(Marking & instructions) |
- |
3000 |
|
- |
| 5.1(Protection against shock and energy hazards) |
- |
5000 |
|
- |
| 5.2(Requirement of auxiliary circuits) |
- |
10000 |
|
- |
| 5.3(Protective earthing and bonding) |
- |
5000 |
|
- |
| 5.4(AC and DC power isolation) |
- |
3000 |
|
- |
| 5.5(Over current and earth fault condition) |
- |
5000 |
|
- |
| 5.6(Safety interlocks) |
- |
5000 |
|
- |
| 5.7(CLEARANCES, CREEPAGE DISTANCES AND SOLID INSULATION) |
- |
5000 |
|
- |
| 6.1(Wiring, connections and supply) |
- |
3000 |
|
- |
| 6.2(Connection to power) |
- |
5000 |
|
- |
| 6.3(Wiring terminals for external power conductors) |
- |
5000 |
|
- |
| 7.1(Enclosure) |
- |
5000 |
|
- |
| 7.2(STABILITY) |
- |
5000 |
|
- |
| 7.3(MECHANICAL STRENGTH) |
- |
5000 |
|
- |
| 7.4(Construction details) |
- |
5000 |
|
- |
| 7.5(Resistance to fire) |
- |
5000 |
|
- |
| 7.6(Battery location) |
- |
8000 |
|
- |
| 7.7(Temperature rise) |
- |
5000 |
|
- |
| 8.1(General procision for earth leakage) |
- |
5000 |
|
- |
| 8.2(Electric Strength) |
- |
3000 |
|
- |
| 8.3(Abnormal operating and fault conditions) |
- |
5000 |
|
- |
| 9.0(Connection to telecommunication networks) |
- |
10000 |
|
- |
| 4.5(Components) |
- |
5000 |
|
- |
| Annex I.5(Solid-state backfeed protection) |
- |
55000 |
|
Charges applicable for Cl. I.5 Solid state back feed protection (ESD tests, Radio frequency electromagnetic field test, Fast transient burst test, Surge test, conducted radio frequency commen mode test, Immunity to power frequency magnetic field test) |
|
20 Jun, 2028 |
- Excluding following
tests: Thermal Controls
Test (Cl. 4.5 (Cl. 1.5.3
of RD)), Capacitor
Bridging Insulation (Cl.
4.5 (Cl. 1.5.6 of RD)),
Components in
Equipment for IT Power
Distribution Systems
(Cl. 4.5 (Cl. 1.5.8 of
RD)), Safety Interlocks
(Cl. 5.6 (Cl. 2.8.5, Cl.
2.8.7 of RD)),
Semiconductor Devices
(Only Opto-coupler
tests as per IEC 60747-
5-5) (Cl. 5.7 (Cl.
2.10.5.4 of RD)),
Construction of Printed
Boards (Except
Dimensional
Measurement) (Cl. 5.7
(Cl. 2.10.6 of RD)),
Component External
Terminations (Except
Dimensional
Measurement) (Cl. 5.7
(Cl. 2.10.7 of RD)),
Tests on Coated Printed
Boards and Coated
Components (Except
Dimension
Measurement) (Cl.
5.7(Cl. 2.10.8 of RD)),
AC Power Supply Cords
(Except Cross
Sectional area of cable
/cords) (Cl. 6.2.2 (Cl.
3.2.5.1 of RD)),
Cathode Ray Tube (Cl.
7.3 (Cl. 4.2.8 RD)),
Solid state back feed protection (ESD tests, Radio frequency electromagnetic field test, Fast transient burst test, Surge test, conducted radio frequency commen mode test, Immunity to low frequency signal test, Immunity to power frequency magnetic field test), Insulating
Winding Wire for use
without Interleaved
Insulation (Annex U of
RD) and Evaluation of
Integrated Circuit (IC)
Current Limiter (Annex
CC of RD). |
| 59 |
IS 16444 (2015) |
AC static direct connected watthour smart meter class 1 and 2 - Specification |
Single Phase and Three Phase |
600000 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 6.8(Marking of smart meters
Name plate) |
- |
1000 |
|
- |
| 6.3(Clearance and creepage distances) |
- |
1000 |
|
- |
| 11.0(Smart meter functional requirements) |
- |
5000 |
|
- |
| 9, 10.6(Test of Smart Meter Communicability) |
- |
10000 |
|
- |
| 10.3(Test of Display) |
- |
2000 |
|
- |
| 10.5(Test for Data Exchange Protocol) |
- |
80000 |
|
- |
| 7.2, 10.4(Performance Requirements for Load Switching (UC1)) |
- |
185000 |
|
For Three Phase and Rs-95000/- for Single Phase |
| 7.2, 10.4(Dielectric strength (G-8)) |
- |
7500 |
|
- |
| 7.2, 10.4(Minimum switched current (G-7)) |
- |
7500 |
|
- |
| 7.2, 10.4(Short circuit current carrying capacity (G-6)) |
- |
35000 |
|
For Three Phase and Rs-30000/- for Single Phase |
| 7.2, 10.4(Line to load voltage surge withstand (G-4)) |
- |
10000 |
|
- |
| 7.2, 10.4(Electrical endurance (G-3)) |
- |
130000 |
|
For Three Phase and Rs-105000/- for Single Phase |
| 7.2, 10.4(Normal operation (G-2)) |
- |
10000 |
|
- |
| 6.5(Test of resistance to heat and fire) |
- |
3000 |
|
- |
| 6.5(Protection against penetration of dust and water) |
- |
5000 |
|
- |
| 6.5(Spring Hammer test) |
- |
1000 |
|
- |
| 6.5(Shock test) |
- |
8000 |
|
- |
| 6.5(Vibration test) |
- |
10000 |
|
- |
| 6.9(Damp heat cyclic test) |
- |
10000 |
|
- |
| 6.9(Cold test) |
- |
10000 |
|
- |
| 6.9(Dry heat test) |
- |
8000 |
|
- |
| 6.11(Surge Immunity test) |
- |
10000 |
|
- |
| 6.11(Test of immunity to electromagnetic HF field) |
- |
48000 |
|
- |
| 6.11(Test of immunity to electrostatic discharge) |
- |
10000 |
|
- |
| 6.11(Fast transient burst test) |
- |
12000 |
|
- |
| 6.11(Radio interference measurement) |
- |
55000 |
|
For Three Phase and Rs-52000/- for Single Phase |
| 6.10.7(Test of influence of immunity to earth fault) |
- |
5000 |
|
- |
| 6.10.5(Test of influence of heating) |
- |
2000 |
|
- |
| 6.10.4(Test of influence of self-heating) |
- |
3000 |
|
- |
| 6.10.3(Test of influence of short time over currents) |
- |
8000 |
|
- |
| 6.10.2(Test of influence of supply voltage) |
- |
2000 |
|
- |
| 6.10.1(Test of power consumption) |
- |
1000 |
|
- |
| 6.12(Test of influence quantities) |
- |
20000 |
|
- |
| 6.12(Test of repeatability of error ) |
- |
3000 |
|
- |
| 6.12(Test of ambient temperature influence) |
- |
2000 |
|
- |
| 6.12(Test of no-load condition) |
- |
2000 |
|
- |
| 6.12(Test of starting condition) |
- |
2000 |
|
- |
| 6.12(Test of meter constant) |
- |
3000 |
|
For Three Phase and Rs-2000/- for Single Phase |
| 6.12(Test on limits of error due to variation of the current) |
- |
4000 |
|
For Three Phase and Rs-3000/- for Single Phase |
| 6.10.6(Insulation resistance test) |
- |
1000 |
|
- |
| 6.10.6(ac high voltage test) |
- |
2000 |
|
- |
| 6.10.6(Impulse voltage test) |
- |
5000 |
|
- |
| 6.2(General and constructional requirements) |
- |
6000 |
|
- |
| 6.6(Display of measured values) |
- |
1000 |
|
- |
| 6.7(Output device) |
- |
3000 |
|
- |
| cl 11.1 of IS 13779(Limits of Error and Interpretation or Test Results) |
- |
1000 |
|
- |
| 7.2, 10.4(Fault current making capacity (G-5)) |
- |
35000 |
|
For Three Phase and Rs-30000/- for Single Phase |
|
20 Jun, 2028 |
- Included w.e.f. 02.08.2023. Exclusion: 1. Cl.10.5 (Data exchange protocol (Granted for only six months up to 02.08.2024))
2. Cl.11 (Functional requirements (Granted for only six months up to 02.08.2024))
3. Cl.10.6.1 (The modules for WAN/NAN/HD
4. Cl.10.6.2 (Tests for smart meter communicability (Granted for only six months up to 02.08.2024)) |
| 60 |
IS 16444 : Part 2 (2017) |
AC static transformer operated watthour and var - Hour smart meters, class 0.2 S, 0.5 S and 1.0 S: Part 2 specification transformer operated smart meters |
Single Phase and Three Phase |
300000 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 6.8(Marking of meters
Name plate) |
- |
1000 |
|
For Single and Three Phase |
| 6.3(Clearance and creepage distances) |
- |
1000 |
|
For Single and Three Phase |
| 10.0(Smart Meter Functional Requirements) |
- |
5000 |
|
For Single and Three Phase |
| 8, 9.5(Smart Meter Communicability) |
- |
10000 |
|
For Single and Three Phase |
| 9.3(Test of Display) |
- |
1000 |
|
For Single and Three Phase |
| 7, 9.4(Data Exchange for Electricity Meter Reading, Tariff and Load Control Companion Specification
(The requirement as per IS 15959 : Part 1 & Part 3 shall apply)) |
- |
80000 |
|
For Single and Three Phase |
| 6.4(Test of resistance to heat and fire) |
- |
2000 |
|
For Single and Three Phase |
| 6.5(Test of protection against penetration of dust and water) |
- |
5000 |
|
For Single and Three Phase |
| 6.5(Spring hammer test) |
- |
1000 |
|
For Single and Three Phase |
| 6.5(Shock test) |
- |
7500 |
|
For Single and Three Phase |
| 6.5(Vibration test) |
- |
9500 |
|
For Single and Three Phase |
| 6.9(Damp heat cyclic test) |
- |
10000 |
|
For Single and Three Phase |
| 6.9(Cold test) |
- |
10000 |
|
For Single and Three Phase |
| 6.9(Dry heat test) |
- |
8000 |
|
For Single and Three Phase |
| 6.11(Surge Immunity test) |
- |
8000 |
|
For Single and Three Phase |
| 6.11(Test of immunity to electromagnetic HF field) |
- |
35000 |
|
For Single and Three Phase |
| 6.11(Test of immunity to electrostatic discharge) |
- |
10000 |
|
For Single and Three Phase |
| 6.11(Fast transient burst test) |
- |
10000 |
|
For Single and Three Phase |
| 6.11(Radio interference measurement) |
- |
35000 |
|
for Three Phase and Rs-30000 for Single Phase |
| 6.10.7(Test of immunity to earth/phase fault) |
- |
4000 |
|
For Single and Three Phase |
| 6.10.5(Test of influence of heating) |
- |
2000 |
|
For Single and Three Phase |
| 6.10.4(Test of influence of self-heating) |
- |
3000 |
|
For Single and Three Phase |
| 6.10.3(Test of influence of short time over currents) |
- |
3000 |
|
For Single and Three Phase |
| 6.10.2(Test of influence of supply voltage) |
- |
2000 |
|
For Single and Three Phase |
| 6.10.1(Test of power consumption) |
- |
1000 |
|
For Single and Three Phase |
| 6.12(Test of influence quantities) |
- |
8000 |
|
For Single and Three Phase |
| 6.12(Test of repeatability of error) |
- |
4000 |
|
For Single and Three Phase |
| 6.12(Test of ambient temperature influence) |
- |
2000 |
|
For Single and Three Phase |
| 6.12(Test of no-load condition) |
- |
2000 |
|
for Three Phase and Rs-1500 for Single Phase |
| 6.12(Test of starting condition) |
- |
2000 |
|
for Three Phase and Rs-1500 for Single Phase |
| 6.12(Test of meter constant) |
- |
2000 |
|
For Single and Three Phase |
| 6.12(Test on limits of error) |
- |
3000 |
|
For Single and Three Phase |
| 6.10.6(Insulation test) |
- |
1000 |
|
For Single and Three Phase |
| 6.10.6(ac high voltage test) |
- |
1000 |
|
For Single and Three Phase |
| 6.10.6(Impulse voltage test) |
- |
3000 |
|
For Single and Three Phase |
| 6.7(Output device) |
- |
3000 |
|
For Single and Three Phase |
| 6.6(Display of measured values) |
- |
1000 |
|
For Single and Three Phase |
| 6.2.2(Terminal Cover(s)) |
- |
1000 |
|
For Single and Three Phase |
| 6.2(General Constructional requirements) |
- |
0 |
|
Already included |
| 6.2.1(Terminals, terminal block and protective earth terminal) |
- |
2000 |
|
For Single and Three Phase |
| 6.1(Electrical Requirments) |
- |
1000 |
|
For Single and Three Phase |
| 6.8(Marking of meters
Name plate) |
- |
- |
|
- |
| 6.3(Clearance and creepage distances) |
- |
- |
|
- |
| 6.1(Electrical Requirments) |
- |
- |
|
- |
|
20 Jun, 2028 |
- Included w.e.f. 02.08.2023. Exclusion: Cl.9.4 (Data exchange protocol (Granted for only six months up to 02.08.2024))
2. Cl.10 (Functional requirements (Granted for only six months up to 02.08.2024))
3. Cl.9.5.1 (The modules for WAN/NAN/HD
4 Cl.9.5.2 (Test for smart meter communicability (Granted for only six months up to 02.08.2024)) |