Hi Physix Laboratory India Private Limited

B-32/1/2, MIDC, Industrial Area, Ranjangaon, Pune, Pune, Pune, Maharashtra, 412220
8552003805 infohplindia@gmail.com
Scope List
Reset
118 Results
S.No. Indian Standard No. Product Grade / Type / Size / Designation etc. Exclusion Testing Charges (Excl. Of Taxes) Facility Type Effective Date Validity Date Remark
31 IS 302 : Part 2 : Sec 21 (2018) Safety of household and similar electrical appliances: Part 2 particular requirements: Sec 21 stationary storage type electric water heaters (Second Revision) - - 71875 View breakup
-
Complete 20 Jun, 2025 -
INCLUDED W.E.F. 7-7-2021. Exclusion: EMI/EMC (Cl.19.11.4.1 to 19.11.4.7), capacitor test (Cl.24.1.1), switching cycle operation test (Cl.24.1.3), automatic control cycle operation (Cl.24.1.4), Appliance coupler and interconnection coupler test (Cl.24.1.5), Lamp holder test (Cl.24.1.6), capacitor in auxiliary winding of motor test (cl.24.5), motors basic insulation test (Cl.24.6)
32 IS 302 : Part 2 : Sec 9 (2009) Safety of household and similar electrical appliances: Part 2 particular requirements: Sec 9 toasters, grills, roasters and similar appliances (First Revision) - - 72617 View breakup
-
Complete 20 Jun, 2025 -
Exclusion: EMI/EMC (Cl.19.11.4.1 to 19.11.4.7), capacitor test (Cl.24.1.1), switching cycle operation test (Cl.24.1.3), automatic control cycle operation (Cl.24.1.4), Appliance coupler and interconnection coupler test (Cl.24.1.5), Lamp holder test (Cl.24.1.6), capacitor in auxiliary winding of motor test (cl.24.5), motors basic insulation test (Cl.24.6)
33 IS 302 : Part 2 : Sec 23 (2009) Safety of household and similar electrical appliances: Part 2 particular requirements: Sec 23 appliances for skin or hair care (First Revision) - - 130000 View breakup
-
Complete 20 Jun, 2025 -
Exclusion: EMI/EMC (Cl.19.11.4.1 to 19.11.4.7), capacitor test (Cl.24.1.1), switching cycle operation test (Cl.24.1.3), automatic control cycle operation (Cl.24.1.4), Appliance coupler and interconnection coupler test (Cl.24.1.5), Lamp holder test (Cl.24.1.6), capacitor in auxiliary winding of motor test (cl.24.5), motors basic insulation test (Cl.24.6)
34 IS 302 : Part 2 : Sec 75 (2018) Safety of Household and Similar Electrical Appliances Part 2 Particular Requirements Section 75 Commercial Dispensing Appliances and Vending Machines - - 130000 View breakup
-
Complete 20 Jun, 2025 -
. Exclusion: EMI/EMC (Cl.19.11.4.1 to 19.11.4.7), capacitor test (Cl.24.1.1), switching cycle operation test (Cl.24.1.3), automatic control cycle operation (Cl.24.1.4), Appliance coupler and interconnection coupler test (Cl.24.1.5), Lamp holder test (Cl.24.1.6), capacitor in auxiliary winding of motor test (cl.24.5), motors basic insulation test (Cl.24.6)
35 IS 302 : Part 2 : Sec 201 (2008) Safety of household and similar electrical appliances: Part 2 particular requirements: Sec 201 electric immersion water heaters (First Revision) - - 65350 View breakup
-
Complete 20 Jun, 2025 -
Exclusion:EMI/EMC (Cl.19.11.4.1 to 19.11.4.7), capacitor test (Cl.24.1.1), switching cycle operation test (Cl.24.1.3), automatic control cycle operation (Cl.24.1.4), Appliance coupler and interconnection coupler test (Cl.24.1.5), Lamp holder test (Cl.24.1.6), capacitor in auxiliary winding of motor test (cl.24.5), motors basic insulation test (Cl.24.6)
36 IS 302 : Part 2 : Sec 25 (2014) Safety of household and similar electrical appliances: Part 2 Particular requirements: Section 25 Microwave ovens - - 220375 View breakup
-
Complete 20 Jun, 2025 -
Excluding following tests: EMI/EMC (ESD, Radiated fields, EFT Surge, Conducted Immunity, Dips & Interruptions, Harmonics & Interharmonics) (Cl.19.11.4.1 to 19.11.4.7), Capacitor Test (Cl. 24.1.1), Switching Cycle Operation Test (Cl. 24.1.3), Automatic Control Cycle Operation Test (Cl. 24.1.4), Appliance Coupler and Interconnection (Cl. 24.1.5), Lamp Holder Test (Cl. 24.1.6), Microwave Ovens for Board Ships (Annex BB) and Environmental Testing – Test Kb: Salt Mist, Cyclic (Sodium Chloride Solution). (ANNEX CC)
37 IS 16242 : Part 1 (2014) Uninterruptible power systems (UPS): Part 1 general and safety requirements for UPS - - 190000 View breakup
-
Complete 20 Jun, 2025 -
Excluding following tests: Thermal Controls Test (Cl. 4.5 (Cl. 1.5.3 of RD)), Capacitor Bridging Insulation (Cl. 4.5 (Cl. 1.5.6 of RD)), Components in Equipment for IT Power Distribution Systems (Cl. 4.5 (Cl. 1.5.8 of RD)), Safety Interlocks (Cl. 5.6 (Cl. 2.8.5, Cl. 2.8.7 of RD)), Semiconductor Devices (Only Opto-coupler tests as per IEC 60747- 5-5) (Cl. 5.7 (Cl. 2.10.5.4 of RD)), Construction of Printed Boards (Except Dimensional Measurement) (Cl. 5.7 (Cl. 2.10.6 of RD)), Component External Terminations (Except Dimensional Measurement) (Cl. 5.7 (Cl. 2.10.7 of RD)), Tests on Coated Printed Boards and Coated Components (Except Dimension Measurement) (Cl. 5.7(Cl. 2.10.8 of RD)), AC Power Supply Cords (Except Cross Sectional area of cable /cords) (Cl. 6.2.2 (Cl. 3.2.5.1 of RD)), Cathode Ray Tube (Cl. 7.3 (Cl. 4.2.8 RD)), Solid state back feed protection (ESD tests, Radio frequency electromagnetic field test, Fast transient burst test, Surge test, conducted radio frequency commen mode test, Immunity to low frequency signal test, Immunity to power frequency magnetic field test), Insulating Winding Wire for use without Interleaved Insulation (Annex U of RD) and Evaluation of Integrated Circuit (IC) Current Limiter (Annex CC of RD).
38 IS 16444 (2015) AC static direct connected watthour smart meter class 1 and 2 - Specification Single Phase and Three Phase - 600000 View breakup
-
Complete 20 Jun, 2025 -
Included w.e.f. 02.08.2023. Exclusion: 1. Cl.10.5 (Data exchange protocol (Granted for only six months up to 02.08.2024)) 2. Cl.11 (Functional requirements (Granted for only six months up to 02.08.2024)) 3. Cl.10.6.1 (The modules for WAN/NAN/HD 4. Cl.10.6.2 (Tests for smart meter communicability (Granted for only six months up to 02.08.2024))
39 IS 16444 : Part 2 (2017) AC static transformer operated watthour and var - Hour smart meters, class 0.2 S, 0.5 S and 1.0 S: Part 2 specification transformer operated smart meters Single Phase and Three Phase - 300000 View breakup
-
Complete 20 Jun, 2025 -
Included w.e.f. 02.08.2023. Exclusion: Cl.9.4 (Data exchange protocol (Granted for only six months up to 02.08.2024)) 2. Cl.10 (Functional requirements (Granted for only six months up to 02.08.2024)) 3. Cl.9.5.1 (The modules for WAN/NAN/HD 4 Cl.9.5.2 (Test for smart meter communicability (Granted for only six months up to 02.08.2024))
40 IS 15884 (2010) Alternating current direct connected static prepayment meters for active energy (Class 1 And 2) - Specification single Phase and Three Phase - 700000 View breakup
-
Complete 20 Jun, 2025 -
Included w.e.f. 02.08.2023
41 IS 14697 (2021) ac STATIC TRANSFORMER OPERATED WATTHOUR METERS CLASS 02 S AND 05 S AND VAR-HOUR METERS CLASS 02 S 05 S AND 10 S - SPECIFICATION First Revision 1 Phase and 3 Phase - 170000 View breakup
-
Complete 20 Jun, 2025 -
Included w.e.f. 02.08.2023
42 IS 13779 (2020) ac STATIC WATTHOUR METERS CLASS 1 AND 2-Specefication 1 Phase & 3 Phase - 160000 View breakup
-
Complete 20 Jun, 2025 -
Included w.e.f. 02.08.2023
43 IS/IEC 61730 : PART 2 (2004) Photovoltaic (PV) Module Safety Qualification Part 2 Requirements for Testing - - 960000.00 View breakup
-
Complete 20 Jun, 2025 -
-
44 IS 16169 (2014) Utility - Interconnected photovoltaic inverters - Test procedure of islanding prevention measures - - 100000 View breakup
-
Complete 20 Jun, 2025 -
-
45 IS 13340 : PART 1 (2012) Shunt power capacitors of the self - Healing type for AC systems having a rated voltage up to and including 1000 V: Part 1 general - Performance, testing and rating - Safety requirements - Guide for installation and operation (First Revision) - - 192650.00 View breakup
-
Complete 20 Jun, 2025 -
-
46 IS 16476 : Part 1 (2017) LED Based Solar Lantern Part 1 Specification - - 310000 View breakup
-
Complete 20 Jun, 2025 -
-
47 IS 11951 (2009) PUMPSET FOR DESERT COOLERS - SPECIFICATION ( First Revision) - - 43000 View breakup
-
Complete 20 Jun, 2025 -
-
48 IS 8148 (2018) Ducted and package air - Conditioners - Specification (Second Revision) - - 800000 View breakup
-
Complete 20 Jun, 2025 -
-
49 IS/IEC 61730 : PART 2 (2016) Photovoltaic (PV) module safety qualification: Part 2 requirements for testing (First Revision) - - 960000 View breakup
-
Complete 20 Jun, 2025 -
-
50 IS/IEC 61730 : PART 1 (2004) Photovoltaic (PV) Module Safety Qualification Part 1 Requirements for Construction - - 460000 View breakup
-
Complete 20 Jun, 2025 -
-
51 IS 10322 : Part 5 : Sec 9 (2017) Luminaires: Part 5 particular requirements: Sec 9 rope lights - - 68250 View breakup
-
Complete 20 Jun, 2025 -
-
52 IS 7872 (2020) Deep Freezers - Specification ( Second Revision ) - - 600000 View breakup
-
Complete 20 Jun, 2025 -
-
53 IS 1391 : Part 2 (2018) Room air conditioners - Specification: Part 2 split air conditioners (Third Revision) - - 700000 View breakup
-
Complete 20 Jun, 2025 -
-
54 IS 1391 : Part 1 (2017) Room air conditioners - Specification: Part 1 unitary air conditioners (Third Revision) - - 505000 View breakup
-
Complete 20 Jun, 2025 -
-
55 IS 16221 : Part 1 (2016) Safety of Power Converters for use in Photovoltaic Power Systems Part 1 General Requirements - - 1200000.00 View breakup
-
Complete 20 Jun, 2025 -
Excluding following test : UV resistance test(Cl. 13.6.4)
56 IS 16102 : Part 2 (2017) Self - Ballasted led lamps for general lighting services: Part 2 performance requirements (First Revision) - - 258000 View breakup
-
Complete 20 Jun, 2025 -
-
57 IS 16333 : Part 3 (2017) Mobile phone handsets: Part 3 indian language support for mobile phone handsets - Specific requirements (First Revision) - - 31350 View breakup
-
Complete 20 Jun, 2025 -
-
58 IS 1476 : Part 1 (2000) Performance of household refrigerating appliance - Refrigerators with or without low temperature compartment: Part 1 energy consumption and performance (Third Revision) - - 250000 View breakup
-
Complete 20 Jun, 2025 -
-
59 IS 15644 (2006) Safety of electric toys - - 65000 View breakup
-
Complete 20 Jun, 2025 -
Excluding following tests: Components (Cl. 16) and Radiation, toxicity and similar hazards (Cl. 20
60 IS 15750 (2006) Household frost - Free refrigerating appliances - Refrigerators cooled by internal forced air circulation - Characteristics and test methods - Specification - - 530000 View breakup
-
Complete 20 Jun, 2025 -
-

Designed, Developed and Maintained by:

Arohatech IT Services (P) Ltd.