| 3721 |
Standard Testing Laboratory Private Limited
| 8170106
| IS 13801 (2013) |
Chequered Cement Concrete Tiles - |
- |
5000 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 7 -Table 2- i(Fineness 4031 Part 2) |
- |
500 |
|
Complete Testing Charges Rs 5000 |
| 7 -Table 2- ii- a(Expansion by Le Chatelier- 4031 Part 3) |
- |
300 |
|
Complete Testing Charges Rs 5000 |
| 7 -Table 2- ii- a(Expansion after aeration - 4031 Part 3) |
- |
300 |
|
Complete Testing Charges Rs 5000 |
| 7 -Table 2- ii- b(Expansion by Autoclave- 4031 Part 3) |
- |
600 |
|
Complete Testing Charges Rs 5000 |
| 7 -Table 2- iii- a(Setting Time Initial- 4031 Part 5) |
- |
500 |
|
Complete Testing Charges Rs 5000 |
| 7 -Table 2-iii- b(Setting Time Final- 4031 Part 5) |
- |
600 |
|
Complete Testing Charges Rs 5000 |
| 7 -Table 2- iv- a(Compressive Strength At 72 hrs ± 1 hr - IS 4031 Part 6) |
- |
600 |
|
Complete Testing Charges Rs 5000 |
| 7 -Table 2- iv- b(Compressive Strength At 168 hrs ± 2 hr - IS 4031 Part 6) |
- |
700 |
|
Complete Testing Charges Rs 5000 |
| 7 -Table 2- iv- c(Compressive Strength At 672 hrs ± 4 hr - IS 4031 Part 6) |
- |
1000 |
|
Complete Testing Charges Rs 5000 |
| 7 -Table 2- vi(Drying Shrinkage- IS 4031 Part 10) |
- |
1000 |
|
Complete Testing Charges Rs 5000 |
| 6 - Table - 1 vi( Alkali content as (Na2O + 0.658 K2O) - Cl 4.11 of IS 4032:1985) |
- |
300 |
|
Complete Testing Charges Rs 5000 |
| 6 - Table - 1 v(Chloride content - Cl 4.13 of IS 4032:1985) |
- |
300 |
|
Complete Testing Charges Rs 5000 |
| 6 - Table - 1 iv(Loss on ignition - Cl 7.1 of IS 4032:1985) |
- |
300 |
|
Complete Testing Charges Rs 5000 |
| 6 - Table - 1 iii(Total Sulphur Content calculated as Sulphuric Anhydride (SO3) - Cl 7.3 of IS 4032:1985) |
- |
300 |
|
Complete Testing Charges Rs 5000 |
| 6 - Table - 1 ii(Magnesia - Cl 7.2 of IS 4032:1985) |
- |
300 |
|
Complete Testing Charges Rs 5000 |
| 6 - Table - 1 i(Insoluble residue - Cl 7.4 of IS 4032:1985) |
- |
300 |
|
Complete Testing Charges Rs 5000 |
| (Cl 7, 8 &9)(Length, Breadth, Thickness, Difference in length of side between the longest side and shorterst side in the sample shall not exceed 1 mm, Half tiles, Difference in Thickness between the thickest and thinnest tile in the sample shall not exceed 10 percent of minimum thickness, Depth of chequred groove, Thickness of wearing layer.) |
- |
900 |
|
Complete Testing Charges Rs 5000 |
| Cl 12.1(Concavity & Convexity ) |
- |
350 |
|
Complete Testing Charges Rs 5000 |
| Cl 12.2(Longest gap between the arms of the square and the edge of the title shall not exceed 2 percent of the length.) |
- |
350 |
|
Complete Testing Charges Rs 5000 |
| Cl 12.3(Shall not exceed 1 percent of the length of the edge.) |
- |
350 |
|
Complete Testing Charges Rs 5000 |
| Cl 12.4(Water absorption) |
- |
500 |
|
Complete Testing Charges Rs 5000 |
| Cl 12.5(Wet transverse strength) |
- |
1000 |
|
Complete Testing Charges Rs 5000 |
| Cl 12.6(Resistance to wear) |
- |
1000 |
|
Complete Testing Charges Rs 5000 |
| Cl 11(Finish) |
- |
100 |
|
Complete Testing Charges Rs 5000 |
| Annex G3.1(Aluminium oxide
content) |
- |
300 |
|
Complete Testing Charges Rs 5000 |
|
10 Apr, 2028 |
- - |
| 3722 |
Standard Testing Laboratory Private Limited
| 8170106
| IS 4270 (2001) |
Steel tubes used for water wells specification (Third Revision) |
- |
8000 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| Cl 6(Tensile Test & Flattening Test) |
- |
3500 |
|
Complete Testing Charges Rs 8000 |
| Cl 7(Outer Diameter, Thickness, Mass & Straightness) |
- |
1500 |
|
Complete Testing Charges Rs 8000 |
| Cl 9(Pipe ends, Angle of bevel & Root Face ) |
- |
800 |
|
Complete Testing Charges Rs 8000 |
| Cl 10(Outer Diameter & Overall Length) |
- |
800 |
|
Complete Testing Charges Rs 8000 |
| Cl 12(Bituminous Coating & Galvanizing ) |
- |
1500 |
|
Complete Testing Charges Rs 8000 |
| Cl 14(Workmanship) |
- |
500 |
|
Complete Testing Charges Rs 8000 |
| 5.2(phosphorus) |
- |
500 |
|
Complete Testing Charges Rs 8000 |
| 5.2(sulphur) |
- |
500 |
|
Complete Testing Charges Rs 8000 |
|
10 Apr, 2028 |
- - |
| 3723 |
Standard Testing Laboratory Private Limited
| 8170106
| IS 4923 (2017) |
Hollow steel sections for structural use - Specification (Third Revision) |
All |
8000 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| Cl.9.1, Table 1(Dimensions and Properties of Hollow Sections (Depth)) |
- |
200 |
|
Complete Testing Charges Rs 8000 |
| Cl.9.1, Table 1(Dimensions and Properties of Hollow Sections (Width)) |
- |
200 |
|
Complete Testing Charges Rs 8000 |
| Cl.9.1, Table 1(Dimensions and Properties of Hollow Sections(Thickness)) |
- |
200 |
|
Complete Testing Charges Rs 8000 |
| Cl.9.1, Table 1(Dimensions and Properties of Hollow Sections (Weigth)) |
- |
200 |
|
Complete Testing Charges Rs 8000 |
| Cl.9.1, Table 1(Dimensions and Properties of Hollow Sections (Area of Section)) |
- |
200 |
|
Complete Testing Charges Rs 8000 |
| Cl.9.1, Table 1(Dimensions and Properties of Hollow Sections (Moment of Inertia)) |
- |
200 |
|
Complete Testing Charges Rs 8000 |
| Cl.9.1, Table 1(Dimensions and Properties of Hollow Sections (Moment of Inertia about X-X)) |
- |
200 |
|
Complete Testing Charges Rs 8000 |
| Cl.9.1, Table 1(Dimensions and Properties of Hollow Sections (Moment of Inertia about Y-Y)) |
- |
200 |
|
Complete Testing Charges Rs 8000 |
| Cl.9.1, Table 1(Dimensions and Properties of Hollow Sections (Radius of Gyration)) |
- |
200 |
|
Complete Testing Charges Rs 8000 |
| Cl.9.1, Table 1(Dimensions and Properties of Hollow Sections (Radius of Gyration about X-X)) |
- |
200 |
|
Complete Testing Charges Rs 8000 |
| Cl.9.1, Table 1(Dimensions and Properties of Hollow Sections(Radius of Gyration about Y-Y)) |
- |
200 |
|
Complete Testing Charges Rs 8000 |
| Cl.9.1, Table 1(Dimensions and Properties of Hollow Sections(Elastic Modulus)) |
- |
200 |
|
Complete Testing Charges Rs 8000 |
| Cl.9.1, Table 1(Dimensions and Properties of Hollow Sections (Elastic Modulus about X-X)) |
- |
200 |
|
Complete Testing Charges Rs 8000 |
| Cl.9.1, Table 1(Dimensions and Properties of Hollow Sections (Elastic Modulus about Y-Y)) |
- |
200 |
|
Complete Testing Charges Rs 8000 |
| Cl.9.1, Table 1(Dimensions and Properties of Hollow Sections (Plastic Modulus)) |
- |
200 |
|
Complete Testing Charges Rs 8000 |
| Cl.9.1, Table 1(Dimensions and Properties of Hollow Sections (Plastic Modulus about X-X)) |
- |
200 |
|
Complete Testing Charges Rs 8000 |
| Cl.9.1, Table 1(Dimensions and Properties of Hollow Sections(Plastic Modulus about Y-Y)) |
- |
200 |
|
Complete Testing Charges Rs 8000 |
| Cl. 10.1, 14.1, 18.1(Straightness) |
- |
500 |
|
Complete Testing Charges Rs 8000 |
| Cl. 10.2, Fig 1(Outside dimension (B)) |
- |
200 |
|
Complete Testing Charges Rs 8000 |
| Cl. 10.2, Fig 1(Outside dimension (H)) |
- |
200 |
|
Complete Testing Charges Rs 8000 |
| Cl. 10.2, Fig 1(Outside dimension (T)) |
- |
200 |
|
Complete Testing Charges Rs 8000 |
| Cl. 10.4, Fig 2(Concavity, X1) |
- |
200 |
|
Complete Testing Charges Rs 8000 |
| Cl. 10.4, Fig 2(Convexity, X2) |
- |
200 |
|
Complete Testing Charges Rs 8000 |
| Cl. 10.5, Fig 3(Squareness of side) |
- |
200 |
|
Complete Testing Charges Rs 8000 |
| Cl. 10.6, Fig 4(External Corner Radius) |
- |
200 |
|
Complete Testing Charges Rs 8000 |
| Cl. 10.7, Fig 5(Total twist, V) |
- |
200 |
|
Complete Testing Charges Rs 8000 |
| Cl. 15.2, Table 3(Tensile Strength- IS 1608) |
- |
1000 |
|
Complete Testing Charges Rs 8000 |
| Cl. 15.2, Table 3(Yield Strength- IS 1608) |
- |
1000 |
|
Complete Testing Charges Rs 8000 |
| Cl. 15.2, Table 3(Elongation- IS 1608) |
- |
1000 |
|
Complete Testing Charges Rs 8000 |
| Cl.7.1(Sulphur- IS 228 and relevant parts or any other established Instrumental/Chemical method.) |
- |
500 |
|
Complete Testing Charges Rs 8000 |
| Cl.7.1(Phosphorus- IS 228 and relevant parts or any other established Instrumental/Chemical method.) |
- |
500 |
|
Complete Testing Charges Rs 8000 |
| Cl.7.1(Carbon- IS 228 and relevant parts or any other established Instrumental/Chemical method.) |
- |
500 |
|
Complete Testing Charges Rs 8000 |
| Cl.7.1(Manganese- IS 228 and relevant parts or any other established Instrumental/Chemical method.) |
- |
500 |
|
Complete Testing Charges Rs 8000 |
| Cl.7.1(Silicon- IS 228 and relevant parts or any other established Instrumental/Chemical method.) |
- |
500 |
|
Complete Testing Charges Rs 8000 |
| Cl.7.1(Aluminium- IS 228 and relevant parts or any other established Instrumental/Chemical method.) |
- |
500 |
|
Complete Testing Charges Rs 8000 |
| Cl.7.1(Copper- IS 228 and relevant parts or any other established Instrumental/Chemical method.) |
- |
500 |
|
Complete Testing Charges Rs 8000 |
| Cl.7.1(Niobium- IS 228 and relevant parts or any other established Instrumental/Chemical method.) |
- |
500 |
|
Complete Testing Charges Rs 8000 |
| Cl.7.1(Vanadium- IS 228 and relevant parts or any other established Instrumental/Chemical method.) |
- |
500 |
|
Complete Testing Charges Rs 8000 |
| Cl.7.1(Titanium- IS 228 and relevant parts or any other established Instrumental/Chemical method.) |
- |
500 |
|
Complete Testing Charges Rs 8000 |
| Cl.7.1(Nitrogen- IS 228 and relevant parts or any other established Instrumental/Chemical method.) |
- |
1000 |
|
Complete Testing Charges Rs 8000 |
| Cl.7.1(Carbon Equivalent-IS 228 and relevant parts or any other established Instrumental/Chemical method.) |
- |
1500 |
|
Complete Testing Charges Rs 8000 |
|
10 Apr, 2028 |
- - |
| 3724 |
Standard Testing Laboratory Private Limited
| 8170106
| IS 1237 (2012) |
Cement Concrete Flooring Tiles - Specification |
- |
4000 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| Cl 12.5(Water absorption) |
- |
500 |
|
Complete Testing Charges Rs 4000 |
| Cl 7.1(Length, Breadth, Minimum thickness, Difference in length of side between the longest side and shorterst side, Half tiles, Difference in Thickness between the thickest and thinnest tile, Thickness of wearing layer) |
- |
600 |
|
Complete Testing Charges Rs 4000 |
| Cl 12.2(Concavity & Convexity ) |
- |
350 |
|
Complete Testing Charges Rs 4000 |
| Cl 12.3(The Maximum gap between the arms of the square and the edge of the title shall notexceed 2 percent of the length.) |
- |
350 |
|
Complete Testing Charges Rs 4000 |
| Cl 12.4(Shall not exceed 1 percent of the length of the edge.) |
- |
350 |
|
Complete Testing Charges Rs 4000 |
| Cl 12.6(Wet transverse strength ) |
- |
1000 |
|
Complete Testing Charges Rs 4000 |
| Cl 12.7(Resistance to wear) |
- |
1000 |
|
Complete Testing Charges Rs 4000 |
| Cl 11(Suface Finish) |
- |
300 |
|
Complete Testing Charges Rs 4000 |
|
10 Apr, 2028 |
- - |
| 3725 |
Standard Testing Laboratory Private Limited
| 8170106
| IS 456 (2000) |
Plain and reinforced concrete - Code of practice (Fourth Revision) |
Construction Water |
2500 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| Cl 5.4 (a)(Acidity) |
- |
400 |
|
Complete Testing Charges Rs 2500 |
| Cl 5.4 (b)(Alkalinity) |
- |
400 |
|
Complete Testing Charges Rs 2500 |
| Cl 5.4 .2(pH) |
- |
500 |
|
Complete Testing Charges Rs 2500 |
| Cl 5.4 Table 1 (i)(Organic Solids) |
- |
500 |
|
Complete Testing Charges Rs 2500 |
| Cl 5.4 Table 1 (ii)(Inorganic Solids) |
- |
500 |
|
Complete Testing Charges Rs 2500 |
| Cl 5.4 Table 1 (iii)(Sulphate) |
- |
500 |
|
Complete Testing Charges Rs 2500 |
| Cl 5.4 Table 1 (iv)(Chloride) |
- |
500 |
|
Complete Testing Charges Rs 2500 |
| 5.4-Table-1 (v)-IS: 3025(P-17)(Suspended matter) |
- |
500 |
|
Complete Testing Charges Rs 2500 |
| 5.4-(a)-IS: 3025 (P-22)(Volume of 0.02 N NaOH to neutralized 100 ml of water using phenolphthalein indicator) |
- |
400 |
|
Complete Testing Charges Rs 2500 |
| 5.4-(b)-IS: 3025 (P-23)(Volume of 0.02 N H2SO4 to neutralized 100 ml of water using mixed indicator) |
- |
400 |
|
Complete Testing Charges Rs 2500 |
| 5.4.2-IS: 3025(P-11)(Ph) |
- |
500 |
|
Complete Testing Charges Rs 2500 |
| 5.4-Table-1 (i)-IS: 3025(P-18)(Organic ) |
- |
500 |
|
Complete Testing Charges Rs 2500 |
| 5.4-Table-1 (i)-IS: 3025(P-18)(In-Organic) |
- |
500 |
|
Complete Testing Charges Rs 2500 |
| Cl 5.4 Table 1 (v)(Suspended Matter) |
- |
500 |
|
Complete Testing Charges Rs 2500 |
|
10 Apr, 2028 |
- - |
| 3726 |
Mysore ESDM Cluster
| 6188826
| IS 302 : Part 1 (2024) |
Household and Similar Electrical Appliances â Safety Part 1 General Requirements (Seventh Revision) |
- |
233500 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 12(Charging of metal-ion batteries) |
- |
2500 |
|
10% (Discount offered to BIS) |
| 30.2(Glow Wire Test) |
- |
3500 |
|
10% (Discount offered to BIS) |
| 16(Leakage current and electric strength) |
- |
5000 |
|
10% (Discount offered to BIS) |
| 30.1(Ball pressure test) |
- |
3000 |
|
10% (Discount offered to BIS) |
| 27.5(Provision for Earthing, IS 302-1) |
- |
0 |
|
Refer Clause 27 |
| 30.2(Needle Flame Test) |
- |
3000 |
|
10% (Discount offered to BIS) |
| 15.3(Humidity Test) |
- |
0 |
|
Refer Clause 15.0 |
| 10.1(Power input) |
- |
2500 |
|
10% (Discount offered to BIS) |
| 13(Leakage current and electric strength at operating temperature) |
- |
5000 |
|
10% (Discount offered to BIS) |
| 29(clearance, creepage distances and solid insulation) |
- |
2500 |
|
10% (Discount offered to BIS) |
| 10.2(Current input) |
- |
2500 |
|
10% (Discount offered to BIS) |
| 28(Screw test and connections) |
- |
3000 |
|
10% (Discount offered to BIS) |
| 7(Marking and instructions) |
- |
2000 |
|
10% (Discount offered to BIS) |
| 14(Transient Over Voltages) |
- |
3500 |
|
10% (Discount offered to BIS) |
| 11.8(Temperature rise) |
- |
5000 |
|
10% (Discount offered to BIS) |
| 19(Abnormal Operation) |
- |
5000 |
|
10% (Discount offered to BIS) |
| 20.1(Stability & Mechanical Hazards, IS 302-1) |
- |
3500 |
|
10% (Discount offered to BIS) |
| 15.1(Ingress Protection test other than IPX0 (IP test)) |
- |
0 |
|
Refer Clause 15.0 |
| 20.2(Stability & Mechanical Hazards, IS 302-1) |
- |
0 |
|
Refer Clause 20.0 |
| 21.2(Mechanical Strength, IS 302-1) |
- |
0 |
|
Refer clause 21.0 |
| 21.3(Mechanical Strength, IS 302-1) |
- |
0 |
|
Refer Clause 21.0 |
| 8.1.3(Protection against live parts in visible glowing heating elements) |
- |
2000 |
|
10% (Discount offered to BIS) |
| 8.1.2(Protection against live parts in openings) |
- |
2000 |
|
10% (Discount offered to BIS) |
| 8.1.1(Protection against live parts in all positions) |
- |
2000 |
|
10% (Discount offered to BIS) |
| 8.1.5(Live parts of built-in appliances) |
- |
2000 |
|
10% (Discount offered to BIS) |
| 8.1.4(Protection against live parts against protective impedance) |
- |
2000 |
|
10% (Discount offered to BIS) |
| A.2(Earth continuity test) |
- |
2000 |
|
10% (Discount offered to BIS) |
| 19.11.4.3(Fast transient bursts) |
- |
15000 |
|
10% (Discount offered to BIS) |
| 19.11.4.4(Surge immunity test) |
- |
20000 |
|
10% (Discount offered to BIS) |
| 19.11.4.5(Immunity to conducted discharges) |
- |
20000 |
|
10% (Discount offered to BIS) |
| 19.11.4.2(Radiated fields) |
- |
40000 |
|
10% (Discount offered to BIS) |
| 19.11.4.1(Electrostatic discharges) |
- |
20000 |
|
10% (Discount offered to BIS) |
| 19.11.4.6(Class 3 Voltage dips and interruptions) |
- |
20000 |
|
10% (Discount offered to BIS) |
| 31(Resistance to Rusting) |
- |
2000 |
|
10% (Discount offered to BIS) |
| 5(General conditions for the tests) |
- |
0 |
|
- |
| 6(Classification- IS 302-1) |
- |
0 |
|
- |
| 4(General requirement) |
- |
0 |
|
- |
| 18(Endurance) |
- |
500 |
|
10% (Discount offered to BIS) |
| 9(Starting of motor operation test requirements and tests) |
- |
500 |
|
10% (Discount offered to BIS) |
| 16.2(Leakage Current (after Clause 15)) |
- |
0 |
|
Refer Clause 16.0 |
| 16.3(Electric Strength (after clause 15 and 16.2)) |
- |
2000 |
|
10% (Discount offered to BIS) |
| 11.7(Duration corresponding) |
- |
0 |
|
Refer clause 11.8 |
| 11.4(Heating appliances) |
- |
0 |
|
Refer Clause 11.8 |
| 11.5(Motor-operated appliances) |
- |
0 |
|
Refer clause 11.8 |
| 11.1(General) |
- |
0 |
|
Refer clause 11.8 |
| 11.2(General) |
- |
0 |
|
Refer clause 11.8 |
| 11.3(Heating) |
- |
0 |
|
Refer Clause 11.8 |
| 32.1(Radiation Toxicity and Similar Hazards) |
- |
500 |
|
10% (Discount offered to BIS) |
| 27.1(Provision for Earthing, IS 302-1) |
- |
2500 |
|
10% (Discount offered to BIS) |
| 25.8(Supply Connection and External Flexible Cords, IS 302-1) |
- |
3500 |
|
10% (Discount offered to BIS) |
| 26(Terminals for external conductors) |
- |
3000 |
|
10% (Discount offered to BIS) |
| 23.1(Internal Wiring, IS 302-1) |
- |
3000 |
|
10% (Discount offered to BIS) |
| 22.1(Construction, IS 302-1) |
- |
5000 |
|
10% (Discount offered to BIS) |
| 22.5(Construction) |
- |
0 |
|
Refer Clause 22.0 |
| 22.6(Construction, IS 302-1) |
- |
0 |
|
Refer Clause 22.0 |
| 22.11(Construction, IS 302-1) |
- |
0 |
|
Refer Clause 22.0 |
| 22.42(Construction) |
- |
0 |
|
Refer Clause 22.0 |
| 16.1(General) |
- |
0 |
|
Refer Clause 16.0 |
| 16.0(General) |
- |
0 |
|
Refer Clause 16.0 |
| 28.1(Screws and connections) |
- |
0 |
|
Refer Clause 28.0 |
| 22.2(Construction, IS 302-1) |
- |
0 |
|
Refer Clause 22.0 |
| 22.3(Construction, IS 302-1) |
- |
2000 |
|
10% (Discount offered to BIS) |
| B.22.4(Construction, IS 302-1) |
- |
2000 |
|
10% (Discount offered to BIS) |
| B.22.5(Construction, IS 302-1) |
- |
2000 |
|
10% (Discount offered to BIS) |
| 25.7(Supply Connection and External Flexible Cords, IS 302-1) |
- |
0 |
|
Refer Clause 25.0 |
| 25.15(Supply Connection and External Flexible Cords, IS 302-1) |
- |
0 |
|
Refer Clause 25.0 |
| 11.6(Combined appliances) |
- |
0 |
|
Refer Clause 11.8 |
| 24(Components) |
- |
2000 |
|
10% (Discount offered to BIS) |
| 13.2(Leakage current at operating temperature) |
- |
0 |
|
Refer Clause 13.0 |
| 13.3(Electric Strength at operating temperature) |
- |
0 |
|
Refer Clause 13.0 |
| 17(Over Load Protection of Transformers and associated circuits) |
- |
4000 |
|
10% (Discount offered to BIS) |
| 15.2(Spillage Test) |
- |
0 |
|
Refer Clause 15.0 |
| 19.17(Abnormal Operation, IS 302-1) |
- |
0 |
|
Refer Clause 19 |
| 21.1(Mechanical Strength, IS 302-1) |
- |
3500 |
|
10% (Discount offered to BIS) |
| 15.0(Moisture resistance) |
- |
15000 |
|
10% (Discount offered to BIS) |
| 26.5(Terminals for external conductors) |
- |
0 |
|
Refer Clause 26.0 |
| Annex D(Thermal motor protectors) |
- |
8000 |
|
10% (Discount offered to BIS) |
| Annex C(Ageing test on motors) |
- |
10000 |
|
10% (Discount offered to BIS) |
| 18(Endurance) |
- |
0 |
|
- |
| 17(Overload protection of transformers and associated circuits) |
- |
0 |
|
- |
| 15.2(Moisture resistance) |
- |
0 |
|
Refer Clause 15.0 |
| 25.6(Supply connection and external flexible cords, IS 302-1) |
- |
3500 |
|
10% (Discount offered to BIS) |
|
14 Oct, 2028 |
- Exclusion: 25.14(Cord flexing Test), 23.3(Cord flexing Test), 22.32(Oxygen Bomb Test), 22.16(Automatic cord reel endurance Test), 19.11.4.7(Harmonics measurement), 32(Optical radiation test), 24 (Components), 22.47(Pressure Test), Annex B.19.1 to B.19.6(Resistance Battery short Tester), Annex B-B.20.1(Manual Pressure Test), 5.19(Measurement of Cell or Battery Voltages), Annex B-B.24.1(Mechanical Shock Test)
"Domestic Electric Clothes Washing Machines
(For testing charges please refer part 2 standard in LIMS)" |
| 3727 |
Fire Engineering Research Laboratory, IIT Gandhinagar
| 7173934
| IS 3614 (2021) |
Specification of Fire Doors and Assembly First Revision of IS 3614 Parts 1 2 |
- |
590000 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 4(Integrity, Insulation) |
- |
590000 |
|
Details of testing charges are as under:
Up to 2 hours test - Rs. 3 lakh,
>2h and up to 3 hours test - Rs. 4 lakh,
>3 h and up to 4 hours tests - Rs. 5 lakh,
GST, as applicable (currently 18%) will be extra |
| Cl 7.2.2(SIZE (width)) |
- |
0 |
|
Included with Integrity/ Insulation test |
| Cl 7.2.2(SIZE (Height)) |
- |
0 |
|
Included with Integrity/ Insulation test |
| Cl-7.2.4(Fire Door Frames) |
- |
0 |
|
Included with Integrity/ Insulation test |
| Cl-7.2.5(Door Leaf) |
- |
0 |
|
Included with Integrity/ Insulation test |
| Cl-7.2.6(Intumescent Seal) |
- |
0.02 |
|
Included with Integrity/ Insulation test |
| 7.2.7(Vision Pane (Uninsulated door) Width) |
- |
0.02 |
|
Included with Integrity/ Insulation test |
| 7.2.7(Vision Pane (Uninsulated door) Height) |
- |
0 |
|
Included with Integrity/ Insulation test |
| 7.2.7(Vision Pane (Insulated door) Width) |
- |
0 |
|
Included with Integrity/ Insulation test |
| 7.2.7(Vision Pane (Insulated door) Height) |
- |
0 |
|
Included with Integrity/ Insulation test |
| Cl-7.2.8(Louvres) |
- |
0.02 |
|
Included with Integrity/ Insulation test |
| Cl-7.2.9(Builder’s Hardware) |
- |
0 |
|
Included with Integrity/ Insulation test |
| Cl 7.3.2(SIZE (width)) |
- |
0.02 |
|
Included with Integrity/ Insulation test |
| Cl 7.3.2(SIZE (Height)) |
- |
0 |
|
Included with Integrity/ Insulation test |
| 7.3.4(Vision Pane (Width)) |
- |
0.02 |
|
Included with Integrity/ Insulation test |
| 7.3.4(Vision Pane (Height)) |
- |
0 |
|
Included with Integrity/ Insulation test |
| Cl-7.3.6(Builder’s Hardware) |
- |
0.02 |
|
Included with Integrity/ Insulation test |
| Cl 7.5.2(SIZE (width)) |
- |
0.03 |
|
Included with Integrity/ Insulation test |
| Cl 7.5.2(SIZE (Height)) |
- |
0.01 |
|
Included with Integrity/ Insulation test |
| Cl-7.5.4(General Requirement of Fire Rated Sliding Door) |
- |
0 |
|
Included with Integrity/ Insulation test |
| Cl-6(VISION PANE ON FIRE DOORS) |
- |
0 |
|
Included with Integrity/ Insulation test |
| Cl-11.4.3(Hardware) |
- |
0.01 |
|
Included with Integrity/ Insulation test |
|
15 Sep, 2026 |
- - |
| 3728 |
Vardhamana Testing Laboratory OPC Pvt. Ltd.
| 8178226
| IS 368 (2014) |
Electric immersion water heaters - Specification (Fifth Revision) |
Electric Immersion Water heater |
25000 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| Cl.6 of IS 302-‐2-‐201:2008(Classification) |
- |
0 |
|
- |
| Cl.7 of IS 302-2-201:2008(Marking and Instruction ) |
- |
1000 |
|
- |
| Cl.7 of IS 302-2-201:2008(Marking and Instruction ) |
- |
0 |
|
- |
| Cl.7 of IS 302-2-201:2008(Marking and Instruction ) |
- |
0 |
|
- |
| Cl.7 of IS 302-2-201:2008(Marking and Instruction ) |
- |
0 |
|
- |
| Cl.7 of IS 302-2-201:2008(Marking and Instruction ) |
- |
0 |
|
- |
| Cl.7 of IS 302-2-201:2008(Marking and Instruction ) |
- |
0 |
|
- |
| Cl.7 of IS 302-2-201:2008(Marking and Instruction ) |
- |
0 |
|
- |
| Cl.7 of IS 302-2-201:2008(Marking and Instruction ) |
- |
0 |
|
- |
| Cl.7 of IS 302-2-201:2008(Marking and Instruction ) |
- |
0 |
|
- |
| Cl.7 of IS 302-2-201:2008(Marking and Instruction ) |
- |
0 |
|
- |
| Cl.7 of IS 302-2-201:2008(Marking and Instruction ) |
- |
0 |
|
- |
| Cl.7 of IS 302-2-201:2008(Marking and Instruction ) |
- |
0 |
|
- |
| Cl.7 of IS 302-2-201:2008(Marking and Instruction ) |
- |
0 |
|
- |
| Cl.7 of IS 302-2-201:2008(Marking and Instruction ) |
- |
0 |
|
- |
| Cl.7 of IS 302-2-201:2008(Marking and Instruction ) |
- |
0 |
|
- |
| Cl.7 of IS 302-2-201:2008(Marking and Instruction ) |
- |
0 |
|
- |
| Cl.7 of IS 302-2-201:2008(Marking and Instruction ) |
- |
0 |
|
- |
| Cl.7 of IS 302-2-201:2008(Marking and Instruction ) |
- |
0 |
|
- |
| Cl.7 of IS 302-2-201:2008(Marking and Instruction ) |
- |
0 |
|
- |
| Cl.7 of IS 302-2-201:2008(Marking and Instruction ) |
- |
0 |
|
- |
| Cl.8 of IS 302‐2-201: 2008(Protection Against Access to Live Parts) |
- |
1000 |
|
- |
| Cl.10 of IS 302‐2‐201:2008(Power Input and Current ) |
- |
2000 |
|
- |
| Cl.11 of IS 302-2201: 2008(Heating) |
- |
1500 |
|
- |
| Cl.11 of IS 302-2201: 2008(Heating) |
- |
0 |
|
- |
| Cl.11 of IS 302-2201: 2008(Heating) |
- |
0 |
|
- |
| Cl.11 of IS 302-2201: 2008(Heating) |
- |
0 |
|
- |
| Cl.11 of IS 302-2201: 2008(Heating) |
- |
0 |
|
- |
| Cl.11 of IS 302-2201: 2008(Heating) |
- |
0 |
|
- |
| Cl.11 of IS 302-2201: 2008(Heating) |
- |
0 |
|
- |
| Cl.11 of IS 302-2201: 2008(Heating) |
- |
0 |
|
- |
| Cl.11 of IS 302-2201: 2008(Heating) |
- |
0 |
|
- |
| Cl.11 of IS 302-2201: 2008(Heating) |
- |
0 |
|
- |
| Cl.11 of IS 302-2201: 2008(Heating) |
- |
0 |
|
- |
| Cl. 12 of IS 368:2014(Operation under overload conditions of appliances with heating elements) |
- |
1000 |
|
- |
| Cl.13 of IS 302-2-201: 2008(Leakage Current & Electric Strength at Operating Temperature) |
- |
1000 |
|
- |
| Cl.13 of IS 302-2-201: 2009(Leakage Current & Electric Strength at Operating Temperature) |
- |
0 |
|
- |
| Cl.14 of IS 302‐2-201:2008(Transient Over Voltages ) |
- |
1000 |
|
- |
| Cl.15 of IS 302-2-201:2008(Moisture Resistance ) |
- |
1000 |
|
- |
| Cl.15 of IS 302-2-201:2008(Moisture Resistance ) |
- |
0 |
|
- |
| Cl.16 of IS 302-2-201:2008(Leakage Current & Electric Strength) |
- |
1000 |
|
- |
| Cl.16 of IS 302-2-201:2008(Leakage Current & Electric Strength) |
- |
0 |
|
- |
| Cl.17 of IS 302‐2-201: 2008(Overload Protection of Transformers & Associated Circuits) |
- |
500 |
|
- |
| Cl.19 of IS 302‐2-201: 2008(Abnormal Operation ) |
- |
1000 |
|
- |
| Cl.19 of IS 302‐2-201: 2008(Abnormal Operation ) |
- |
0 |
|
- |
| Cl.19 of IS 302‐2-201: 2008(Abnormal Operation ) |
- |
0 |
|
- |
| Cl.19 of IS 302‐2-201: 2008(Abnormal Operation ) |
- |
0 |
|
- |
| Cl.19 of IS 302‐2-201: 2008(Abnormal Operation ) |
- |
0 |
|
- |
| Cl.20 of IS 302-2-201: 2008(Stability & Mechanical Hazards) |
- |
1000 |
|
- |
| Cl.21 of IS 302-2-201: 2008(Mechanical Strength ) |
- |
1000 |
|
- |
| Cl.21 of IS 302-2-201: 2008(Mechanical Strength ) |
- |
0 |
|
- |
| Cl.21 of IS 302-2-201: 2008(Mechanical Strength ) |
- |
0 |
|
- |
| Cl.22 of IS 302-2-201: 2008(Construction) |
- |
1000 |
|
- |
| Cl.22 of IS 302-2-201: 2008(Construction) |
- |
0 |
|
- |
| Cl.22 of IS 302-2-201: 2008(Construction) |
- |
0 |
|
- |
| Cl.22 of IS 302-2-201: 2008(Construction) |
- |
0 |
|
- |
| Cl.23 of 302-2-201:2008(Internal Wiring ) |
- |
500 |
|
- |
| Cl.23 of 302-2-201:2008(Internal Wiring ) |
- |
0 |
|
- |
| Cl.23 of 302-2-201:2008(Internal Wiring ) |
- |
0 |
|
- |
| Cl.23 of 302-2-201:2008(Internal Wiring ) |
- |
0 |
|
- |
| Cl.23 of 302-2-201:2008(Internal Wiring ) |
- |
0 |
|
- |
| Cl.23 of 302-2-201:2008(Internal Wiring ) |
- |
0 |
|
- |
| Cl.23 of 302-2-201:2008(Internal Wiring ) |
- |
0 |
|
- |
| Cl.23 of 302-2-201:2008(Internal Wiring ) |
- |
0 |
|
- |
| Cl.23 of 302-2-201:2008(Internal Wiring ) |
- |
0 |
|
- |
| Cl.24 of IS 302-2-201: 2008(Component) |
- |
500 |
|
- |
| Cl.24 of IS 302-2-201: 2008(Component) |
- |
0 |
|
- |
| Cl.24 of IS 302-2-201: 2008(Component) |
- |
0 |
|
- |
| Cl.24 of IS 302-2-201: 2008(Component) |
- |
0 |
|
- |
| Cl.24 of IS 302-2-201: 2008(Component) |
- |
0 |
|
- |
| Cl.24 of IS 302-2-201: 2008(Component) |
- |
0 |
|
- |
| Cl.24 of IS 302-2-201: 2008(Component) |
- |
0 |
|
- |
| Cl.24 of IS 302-2-201: 2008(Component) |
- |
0 |
|
- |
| Cl.24 of IS 302-2-201: 2008(Component) |
- |
0 |
|
- |
| Cl.25 of IS 302-2-201: 2008(Supply Connection and External Flexible Cords) |
- |
500 |
|
- |
| Cl.25 of IS 302-2-201: 2008(Supply Connection and External Flexible Cords) |
- |
0 |
|
- |
| Cl.25 of IS 302-2-201: 2008(Supply Connection and External Flexible Cords) |
- |
0 |
|
- |
| Cl.25 of IS 302-2-201: 2008(Supply Connection and External Flexible Cords) |
- |
0 |
|
- |
| Cl.25 of IS 302-2-201: 2008(Supply Connection and External Flexible Cords) |
- |
0 |
|
- |
| Cl.25 of IS 302-2-201: 2008(Supply Connection and External Flexible Cords) |
- |
0 |
|
- |
| Cl.25 of IS 302-2-201: 2008(Supply Connection and External Flexible Cords) |
- |
0 |
|
- |
| Cl.25 of IS 302-2-201: 2008(Supply Connection and External Flexible Cords) |
- |
0 |
|
- |
| Cl.25 of IS 302-2-201: 2008(Supply Connection and External Flexible Cords) |
- |
0 |
|
- |
| Cl.25 of IS 302-2-201: 2008(Supply Connection and External Flexible Cords) |
- |
0 |
|
- |
| Cl.25 of IS 302-2-201: 2008(Supply Connection and External Flexible Cords) |
- |
0 |
|
- |
| Cl.25 of IS 302-2-201: 2008(Supply Connection and External Flexible Cords) |
- |
0 |
|
- |
| Cl.25 of IS 302-2-201: 2008(Supply Connection and External Flexible Cords) |
- |
0 |
|
- |
| Cl.25 of IS 302-2-201: 2008(Supply Connection and External Flexible Cords) |
- |
0 |
|
- |
| Cl.25 of IS 302-2-201: 2008(Supply Connection and External Flexible Cords) |
- |
0 |
|
- |
| Cl.25 of IS 302-2-201: 2008(Supply Connection and External Flexible Cords) |
- |
0 |
|
- |
| Cl.25 of IS 302-2-201: 2008(Supply Connection and External Flexible Cords) |
- |
0 |
|
- |
| Cl.25 of IS 302-2-201: 2008(Supply Connection and External Flexible Cords) |
- |
0 |
|
- |
| Cl.25 of IS 302-2-201: 2008(Supply Connection and External Flexible Cords) |
- |
0 |
|
- |
| Cl.25 of IS 302-2-201: 2008(Supply Connection and External Flexible Cords) |
- |
0 |
|
- |
| Cl.27 of IS 302-2-201: 2008(Provision for Earthing ) |
- |
500 |
|
- |
| Cl.27 of IS 302-2-201: 2008(Provision for Earthing ) |
- |
0 |
|
- |
| Cl.27 of IS 302-2-201: 2008(Provision for Earthing ) |
- |
0 |
|
- |
| Cl.27 of IS 302-2-201: 2008(Provision for Earthing ) |
- |
0 |
|
- |
| Cl.27 of IS 302-2-201: 2008(Provision for Earthing ) |
- |
0 |
|
- |
| Cl.27 of IS 302-2-201: 2008(Provision for Earthing ) |
- |
0 |
|
- |
| Cl.28 of IS 302-2-201: 2008(Screws & Connections ) |
- |
500 |
|
- |
| Cl.29 of IS 302-2‐201:2008(Clearances, Creepage Distances and Solid Insulation ) |
- |
1000 |
|
- |
| Cl.29 of IS 302-2‐201:2008(Clearances, Creepage Distances and Solid Insulation ) |
- |
0 |
|
- |
| Cl.30 of IS 302-2‐201:2008(Resistance to Heat and Fire ) |
- |
1000 |
|
- |
| Cl.30 of IS 302-2‐201:2008(Resistance to Heat and Fire ) |
- |
0 |
|
- |
| Cl.31 of IS 302-2-201:2008(Resistance of Rusting ) |
- |
1000 |
|
- |
| 4(GENERAL REQUIREMENT) |
- |
0 |
|
- |
| 5(GENERAL CONDITIONS FOR THE TESTS) |
- |
0 |
|
- |
| Cl.26 of IS 302-2-201: 2008(Terminals for External Conductors) |
- |
1500 |
|
- |
| Cl.18 of IS 368:2014(Endurance) |
- |
3000 |
|
- |
| Cl.6 of IS 302-‐2-‐201:2008(Classification) |
- |
0 |
|
- |
| Cl.7 of IS 302-2-201:2008(Marking and Instruction ) |
- |
0 |
|
- |
| Cl.7 of IS 302-2-201:2008(Marking and Instruction ) |
- |
0 |
|
- |
| Cl.7 of IS 302-2-201:2008(Marking and Instruction ) |
- |
0 |
|
- |
| Cl.7 of IS 302-2-201:2008(Marking and Instruction ) |
- |
0 |
|
- |
| Cl.7 of IS 302-2-201:2008(Marking and Instruction ) |
- |
0 |
|
- |
| Cl.7 of IS 302-2-201:2008(Marking and Instruction ) |
- |
0 |
|
- |
| Cl.7 of IS 302-2-201:2008(Marking and Instruction ) |
- |
0 |
|
- |
| Cl.7 of IS 302-2-201:2008(Marking and Instruction ) |
- |
0 |
|
- |
| Cl.7 of IS 302-2-201:2008(Marking and Instruction ) |
- |
0 |
|
- |
| Cl.7 of IS 302-2-201:2008(Marking and Instruction ) |
- |
0 |
|
- |
| Cl.7 of IS 302-2-201:2008(Marking and Instruction ) |
- |
0 |
|
- |
| Cl.7 of IS 302-2-201:2008(Marking and Instruction ) |
- |
0 |
|
- |
| Cl.7 of IS 302-2-201:2008(Marking and Instruction ) |
- |
0 |
|
- |
| Cl.7 of IS 302-2-201:2008(Marking and Instruction ) |
- |
0 |
|
- |
| Cl.7 of IS 302-2-201:2008(Marking and Instruction ) |
- |
0 |
|
- |
| Cl.7 of IS 302-2-201:2008(Marking and Instruction ) |
- |
0 |
|
- |
| Cl.7 of IS 302-2-201:2008(Marking and Instruction ) |
- |
0 |
|
- |
| Cl.7 of IS 302-2-201:2008(Marking and Instruction ) |
- |
0 |
|
- |
| Cl.7 of IS 302-2-201:2008(Marking and Instruction ) |
- |
0 |
|
- |
| Cl.7 of IS 302-2-201:2008(Marking and Instruction ) |
- |
0 |
|
- |
| Cl.8 of IS 302‐2-201: 2008(Protection Against Access to Live Parts) |
- |
0 |
|
- |
| Cl.10 of IS 302‐2‐201:2008(Power Input and Current ) |
- |
0 |
|
- |
| Cl.11 of IS 302-2201: 2008(Heating) |
- |
0 |
|
- |
| Cl.11 of IS 302-2201: 2008(Heating) |
- |
0 |
|
- |
| Cl.11 of IS 302-2201: 2008(Heating) |
- |
0 |
|
- |
| Cl.11 of IS 302-2201: 2008(Heating) |
- |
0 |
|
- |
| Cl.11 of IS 302-2201: 2008(Heating) |
- |
0 |
|
- |
| Cl.11 of IS 302-2201: 2008(Heating) |
- |
0 |
|
- |
| Cl.11 of IS 302-2201: 2008(Heating) |
- |
0 |
|
- |
| Cl.11 of IS 302-2201: 2008(Heating) |
- |
0 |
|
- |
| Cl.11 of IS 302-2201: 2008(Heating) |
- |
0 |
|
- |
| Cl.11 of IS 302-2201: 2008(Heating) |
- |
0 |
|
- |
| Cl.11 of IS 302-2201: 2008(Heating) |
- |
0 |
|
- |
| Cl. 12 of IS 368:2014(Operation under overload conditions of appliances with heating elements) |
- |
0 |
|
- |
| Cl.13 of IS 302-2-201: 2008(Leakage Current & Electric Strength at Operating Temperature) |
- |
0 |
|
- |
| Cl.13 of IS 302-2-201: 2009(Leakage Current & Electric Strength at Operating Temperature) |
- |
0 |
|
- |
| Cl.14 of IS 302‐2-201:2008(Transient Over Voltages ) |
- |
0 |
|
- |
| Cl.15 of IS 302-2-201:2008(Moisture Resistance ) |
- |
0 |
|
- |
| Cl.15 of IS 302-2-201:2008(Moisture Resistance ) |
- |
0 |
|
- |
| Cl.16 of IS 302-2-201:2008(Leakage Current & Electric Strength) |
- |
0 |
|
- |
| Cl.16 of IS 302-2-201:2008(Leakage Current & Electric Strength) |
- |
0 |
|
- |
| Cl.17 of IS 302‐2-201: 2008(Overload Protection of Transformers & Associated Circuits) |
- |
0 |
|
- |
| Cl.19 of IS 302‐2-201: 2008(Abnormal Operation ) |
- |
0 |
|
- |
| Cl.19 of IS 302‐2-201: 2008(Abnormal Operation ) |
- |
0 |
|
- |
| Cl.19 of IS 302‐2-201: 2008(Abnormal Operation ) |
- |
0 |
|
- |
| Cl.19 of IS 302‐2-201: 2008(Abnormal Operation ) |
- |
0 |
|
- |
| Cl.19 of IS 302‐2-201: 2008(Abnormal Operation ) |
- |
0 |
|
- |
| Cl.20 of IS 302-2-201: 2008(Stability & Mechanical Hazards) |
- |
0 |
|
- |
| Cl.21 of IS 302-2-201: 2008(Mechanical Strength ) |
- |
0 |
|
- |
| Cl.21 of IS 302-2-201: 2008(Mechanical Strength ) |
- |
0 |
|
- |
| Cl.21 of IS 302-2-201: 2008(Mechanical Strength ) |
- |
0 |
|
- |
| Cl.22 of IS 302-2-201: 2008(Construction) |
- |
0 |
|
- |
| Cl.22 of IS 302-2-201: 2008(Construction) |
- |
0 |
|
- |
| Cl.22 of IS 302-2-201: 2008(Construction) |
- |
0 |
|
- |
| Cl.22 of IS 302-2-201: 2008(Construction) |
- |
0 |
|
- |
| Cl.23 of 302-2-201:2008(Internal Wiring ) |
- |
0 |
|
- |
| Cl.23 of 302-2-201:2008(Internal Wiring ) |
- |
0 |
|
- |
| Cl.23 of 302-2-201:2008(Internal Wiring ) |
- |
0 |
|
- |
| Cl.23 of 302-2-201:2008(Internal Wiring ) |
- |
0 |
|
- |
| Cl.23 of 302-2-201:2008(Internal Wiring ) |
- |
0 |
|
- |
| Cl.23 of 302-2-201:2008(Internal Wiring ) |
- |
0 |
|
- |
| Cl.23 of 302-2-201:2008(Internal Wiring ) |
- |
0 |
|
- |
| Cl.23 of 302-2-201:2008(Internal Wiring ) |
- |
0 |
|
- |
| Cl.23 of 302-2-201:2008(Internal Wiring ) |
- |
0 |
|
- |
| Cl.24 of IS 302-2-201: 2008(Component) |
- |
0 |
|
- |
| Cl.24 of IS 302-2-201: 2008(Component) |
- |
0 |
|
- |
| Cl.24 of IS 302-2-201: 2008(Component) |
- |
0 |
|
- |
| Cl.24 of IS 302-2-201: 2008(Component) |
- |
0 |
|
- |
| Cl.24 of IS 302-2-201: 2008(Component) |
- |
0 |
|
- |
| Cl.24 of IS 302-2-201: 2008(Component) |
- |
0 |
|
- |
| Cl.24 of IS 302-2-201: 2008(Component) |
- |
0 |
|
- |
| Cl.24 of IS 302-2-201: 2008(Component) |
- |
0 |
|
- |
| Cl.24 of IS 302-2-201: 2008(Component) |
- |
0 |
|
- |
| Cl.25 of IS 302-2-201: 2008(Supply Connection and External Flexible Cords) |
- |
0 |
|
- |
| Cl.25 of IS 302-2-201: 2008(Supply Connection and External Flexible Cords) |
- |
0 |
|
- |
| Cl.25 of IS 302-2-201: 2008(Supply Connection and External Flexible Cords) |
- |
0 |
|
- |
| Cl.25 of IS 302-2-201: 2008(Supply Connection and External Flexible Cords) |
- |
0 |
|
- |
| Cl.25 of IS 302-2-201: 2008(Supply Connection and External Flexible Cords) |
- |
0 |
|
- |
| Cl.25 of IS 302-2-201: 2008(Supply Connection and External Flexible Cords) |
- |
0 |
|
- |
| Cl.25 of IS 302-2-201: 2008(Supply Connection and External Flexible Cords) |
- |
0 |
|
- |
| Cl.25 of IS 302-2-201: 2008(Supply Connection and External Flexible Cords) |
- |
0 |
|
- |
| Cl.25 of IS 302-2-201: 2008(Supply Connection and External Flexible Cords) |
- |
0 |
|
- |
| Cl.25 of IS 302-2-201: 2008(Supply Connection and External Flexible Cords) |
- |
0 |
|
- |
| Cl.25 of IS 302-2-201: 2008(Supply Connection and External Flexible Cords) |
- |
0 |
|
- |
| Cl.25 of IS 302-2-201: 2008(Supply Connection and External Flexible Cords) |
- |
0 |
|
- |
| Cl.25 of IS 302-2-201: 2008(Supply Connection and External Flexible Cords) |
- |
0 |
|
- |
| Cl.25 of IS 302-2-201: 2008(Supply Connection and External Flexible Cords) |
- |
0 |
|
- |
| Cl.25 of IS 302-2-201: 2008(Supply Connection and External Flexible Cords) |
- |
0 |
|
- |
| Cl.25 of IS 302-2-201: 2008(Supply Connection and External Flexible Cords) |
- |
0 |
|
- |
| Cl.25 of IS 302-2-201: 2008(Supply Connection and External Flexible Cords) |
- |
0 |
|
- |
| Cl.25 of IS 302-2-201: 2008(Supply Connection and External Flexible Cords) |
- |
0 |
|
- |
| Cl.25 of IS 302-2-201: 2008(Supply Connection and External Flexible Cords) |
- |
0 |
|
- |
| Cl.25 of IS 302-2-201: 2008(Supply Connection and External Flexible Cords) |
- |
0 |
|
- |
| Cl.27 of IS 302-2-201: 2008(Provision for Earthing ) |
- |
0 |
|
- |
| Cl.27 of IS 302-2-201: 2008(Provision for Earthing ) |
- |
0 |
|
- |
| Cl.27 of IS 302-2-201: 2008(Provision for Earthing ) |
- |
0 |
|
- |
| Cl.27 of IS 302-2-201: 2008(Provision for Earthing ) |
- |
0 |
|
- |
| Cl.27 of IS 302-2-201: 2008(Provision for Earthing ) |
- |
0 |
|
- |
| Cl.27 of IS 302-2-201: 2008(Provision for Earthing ) |
- |
0 |
|
- |
| Cl.28 of IS 302-2-201: 2008(Screws & Connections ) |
- |
0 |
|
- |
| Cl.29 of IS 302-2‐201:2008(Clearances, Creepage Distances and Solid Insulation ) |
- |
0 |
|
- |
| Cl.29 of IS 302-2‐201:2008(Clearances, Creepage Distances and Solid Insulation ) |
- |
0 |
|
- |
| Cl.30 of IS 302-2‐201:2008(Resistance to Heat and Fire ) |
- |
0 |
|
- |
| Cl.30 of IS 302-2‐201:2008(Resistance to Heat and Fire ) |
- |
0 |
|
- |
| Cl.31 of IS 302-2-201:2008(Resistance of Rusting ) |
- |
0 |
|
- |
| 4(GENERAL REQUIREMENT) |
- |
0 |
|
- |
| 5(GENERAL CONDITIONS FOR THE TESTS) |
- |
0 |
|
- |
| Cl.26 of IS 302-2-201: 2008(Terminals for External Conductors) |
- |
0 |
|
- |
| Cl.18 of IS 368:2014(Endurance) |
- |
0 |
|
- |
| Cl.6 of IS 302-‐2-‐201:2008(Classification) |
- |
0 |
|
- |
| Cl.7 of IS 302-2-201:2008(Marking and Instruction ) |
- |
0 |
|
- |
| Cl.7 of IS 302-2-201:2008(Marking and Instruction ) |
- |
0 |
|
- |
| Cl.7 of IS 302-2-201:2008(Marking and Instruction ) |
- |
0 |
|
- |
| Cl.7 of IS 302-2-201:2008(Marking and Instruction ) |
- |
0 |
|
- |
| Cl.7 of IS 302-2-201:2008(Marking and Instruction ) |
- |
0 |
|
- |
| Cl.7 of IS 302-2-201:2008(Marking and Instruction ) |
- |
0 |
|
- |
| Cl.7 of IS 302-2-201:2008(Marking and Instruction ) |
- |
0 |
|
- |
| Cl.7 of IS 302-2-201:2008(Marking and Instruction ) |
- |
0 |
|
- |
| Cl.7 of IS 302-2-201:2008(Marking and Instruction ) |
- |
0 |
|
- |
| Cl.7 of IS 302-2-201:2008(Marking and Instruction ) |
- |
0 |
|
- |
| Cl.7 of IS 302-2-201:2008(Marking and Instruction ) |
- |
0 |
|
- |
| Cl.7 of IS 302-2-201:2008(Marking and Instruction ) |
- |
0 |
|
- |
| Cl.7 of IS 302-2-201:2008(Marking and Instruction ) |
- |
0 |
|
- |
| Cl.7 of IS 302-2-201:2008(Marking and Instruction ) |
- |
0 |
|
- |
| Cl.7 of IS 302-2-201:2008(Marking and Instruction ) |
- |
0 |
|
- |
| Cl.7 of IS 302-2-201:2008(Marking and Instruction ) |
- |
0 |
|
- |
| Cl.7 of IS 302-2-201:2008(Marking and Instruction ) |
- |
0 |
|
- |
| Cl.7 of IS 302-2-201:2008(Marking and Instruction ) |
- |
0 |
|
- |
| Cl.7 of IS 302-2-201:2008(Marking and Instruction ) |
- |
0 |
|
- |
| Cl.7 of IS 302-2-201:2008(Marking and Instruction ) |
- |
0 |
|
- |
| Cl.8 of IS 302‐2-201: 2008(Protection Against Access to Live Parts) |
- |
0 |
|
- |
| Cl.10 of IS 302‐2‐201:2008(Power Input and Current ) |
- |
0 |
|
- |
| Cl.11 of IS 302-2201: 2008(Heating) |
- |
0 |
|
- |
| Cl.11 of IS 302-2201: 2008(Heating) |
- |
0 |
|
- |
| Cl.11 of IS 302-2201: 2008(Heating) |
- |
0 |
|
- |
| Cl.11 of IS 302-2201: 2008(Heating) |
- |
0 |
|
- |
| Cl.11 of IS 302-2201: 2008(Heating) |
- |
0 |
|
- |
| Cl.11 of IS 302-2201: 2008(Heating) |
- |
0 |
|
- |
| Cl.11 of IS 302-2201: 2008(Heating) |
- |
0 |
|
- |
| Cl.11 of IS 302-2201: 2008(Heating) |
- |
0 |
|
- |
| Cl.11 of IS 302-2201: 2008(Heating) |
- |
0 |
|
- |
| Cl.11 of IS 302-2201: 2008(Heating) |
- |
0 |
|
- |
| Cl.11 of IS 302-2201: 2008(Heating) |
- |
0 |
|
- |
| Cl. 12 of IS 368:2014(Operation under overload conditions of appliances with heating elements) |
- |
0 |
|
- |
| Cl.13 of IS 302-2-201: 2008(Leakage Current & Electric Strength at Operating Temperature) |
- |
0 |
|
- |
| Cl.13 of IS 302-2-201: 2009(Leakage Current & Electric Strength at Operating Temperature) |
- |
0 |
|
- |
| Cl.14 of IS 302‐2-201:2008(Transient Over Voltages ) |
- |
0 |
|
- |
| Cl.15 of IS 302-2-201:2008(Moisture Resistance ) |
- |
0 |
|
- |
| Cl.15 of IS 302-2-201:2008(Moisture Resistance ) |
- |
0 |
|
- |
| Cl.16 of IS 302-2-201:2008(Leakage Current & Electric Strength) |
- |
0 |
|
- |
| Cl.16 of IS 302-2-201:2008(Leakage Current & Electric Strength) |
- |
0 |
|
- |
| Cl.17 of IS 302‐2-201: 2008(Overload Protection of Transformers & Associated Circuits) |
- |
0 |
|
- |
| Cl.19 of IS 302‐2-201: 2008(Abnormal Operation ) |
- |
0 |
|
- |
| Cl.19 of IS 302‐2-201: 2008(Abnormal Operation ) |
- |
0 |
|
- |
| Cl.19 of IS 302‐2-201: 2008(Abnormal Operation ) |
- |
0 |
|
- |
| Cl.19 of IS 302‐2-201: 2008(Abnormal Operation ) |
- |
0 |
|
- |
| Cl.19 of IS 302‐2-201: 2008(Abnormal Operation ) |
- |
0 |
|
- |
| Cl.20 of IS 302-2-201: 2008(Stability & Mechanical Hazards) |
- |
0 |
|
- |
| Cl.21 of IS 302-2-201: 2008(Mechanical Strength ) |
- |
0 |
|
- |
| Cl.21 of IS 302-2-201: 2008(Mechanical Strength ) |
- |
0 |
|
- |
| Cl.21 of IS 302-2-201: 2008(Mechanical Strength ) |
- |
0 |
|
- |
| Cl.22 of IS 302-2-201: 2008(Construction) |
- |
0 |
|
- |
| Cl.22 of IS 302-2-201: 2008(Construction) |
- |
0 |
|
- |
| Cl.22 of IS 302-2-201: 2008(Construction) |
- |
0 |
|
- |
| Cl.22 of IS 302-2-201: 2008(Construction) |
- |
0 |
|
- |
| Cl.23 of 302-2-201:2008(Internal Wiring ) |
- |
0 |
|
- |
| Cl.23 of 302-2-201:2008(Internal Wiring ) |
- |
0 |
|
- |
| Cl.23 of 302-2-201:2008(Internal Wiring ) |
- |
0 |
|
- |
| Cl.23 of 302-2-201:2008(Internal Wiring ) |
- |
0 |
|
- |
| Cl.23 of 302-2-201:2008(Internal Wiring ) |
- |
0 |
|
- |
| Cl.23 of 302-2-201:2008(Internal Wiring ) |
- |
0 |
|
- |
| Cl.23 of 302-2-201:2008(Internal Wiring ) |
- |
0 |
|
- |
| Cl.23 of 302-2-201:2008(Internal Wiring ) |
- |
0 |
|
- |
| Cl.23 of 302-2-201:2008(Internal Wiring ) |
- |
0 |
|
- |
| Cl.24 of IS 302-2-201: 2008(Component) |
- |
0 |
|
- |
| Cl.24 of IS 302-2-201: 2008(Component) |
- |
0 |
|
- |
| Cl.24 of IS 302-2-201: 2008(Component) |
- |
0 |
|
- |
| Cl.24 of IS 302-2-201: 2008(Component) |
- |
0 |
|
- |
| Cl.24 of IS 302-2-201: 2008(Component) |
- |
0 |
|
- |
| Cl.24 of IS 302-2-201: 2008(Component) |
- |
0 |
|
- |
| Cl.24 of IS 302-2-201: 2008(Component) |
- |
0 |
|
- |
| Cl.24 of IS 302-2-201: 2008(Component) |
- |
0 |
|
- |
| Cl.24 of IS 302-2-201: 2008(Component) |
- |
0 |
|
- |
| Cl.25 of IS 302-2-201: 2008(Supply Connection and External Flexible Cords) |
- |
0 |
|
- |
| Cl.25 of IS 302-2-201: 2008(Supply Connection and External Flexible Cords) |
- |
0 |
|
- |
| Cl.25 of IS 302-2-201: 2008(Supply Connection and External Flexible Cords) |
- |
0 |
|
- |
| Cl.25 of IS 302-2-201: 2008(Supply Connection and External Flexible Cords) |
- |
0 |
|
- |
| Cl.25 of IS 302-2-201: 2008(Supply Connection and External Flexible Cords) |
- |
0 |
|
- |
| Cl.25 of IS 302-2-201: 2008(Supply Connection and External Flexible Cords) |
- |
0 |
|
- |
| Cl.25 of IS 302-2-201: 2008(Supply Connection and External Flexible Cords) |
- |
0 |
|
- |
| Cl.25 of IS 302-2-201: 2008(Supply Connection and External Flexible Cords) |
- |
0 |
|
- |
| Cl.25 of IS 302-2-201: 2008(Supply Connection and External Flexible Cords) |
- |
0 |
|
- |
| Cl.25 of IS 302-2-201: 2008(Supply Connection and External Flexible Cords) |
- |
0 |
|
- |
| Cl.25 of IS 302-2-201: 2008(Supply Connection and External Flexible Cords) |
- |
0 |
|
- |
| Cl.25 of IS 302-2-201: 2008(Supply Connection and External Flexible Cords) |
- |
0 |
|
- |
| Cl.25 of IS 302-2-201: 2008(Supply Connection and External Flexible Cords) |
- |
0 |
|
- |
| Cl.25 of IS 302-2-201: 2008(Supply Connection and External Flexible Cords) |
- |
0 |
|
- |
| Cl.25 of IS 302-2-201: 2008(Supply Connection and External Flexible Cords) |
- |
0 |
|
- |
| Cl.25 of IS 302-2-201: 2008(Supply Connection and External Flexible Cords) |
- |
0 |
|
- |
| Cl.25 of IS 302-2-201: 2008(Supply Connection and External Flexible Cords) |
- |
0 |
|
- |
| Cl.25 of IS 302-2-201: 2008(Supply Connection and External Flexible Cords) |
- |
0 |
|
- |
| Cl.25 of IS 302-2-201: 2008(Supply Connection and External Flexible Cords) |
- |
0 |
|
- |
| Cl.25 of IS 302-2-201: 2008(Supply Connection and External Flexible Cords) |
- |
0 |
|
- |
| Cl.27 of IS 302-2-201: 2008(Provision for Earthing ) |
- |
0 |
|
- |
| Cl.27 of IS 302-2-201: 2008(Provision for Earthing ) |
- |
0 |
|
- |
| Cl.27 of IS 302-2-201: 2008(Provision for Earthing ) |
- |
0 |
|
- |
| Cl.27 of IS 302-2-201: 2008(Provision for Earthing ) |
- |
0 |
|
- |
| Cl.27 of IS 302-2-201: 2008(Provision for Earthing ) |
- |
0 |
|
- |
| Cl.27 of IS 302-2-201: 2008(Provision for Earthing ) |
- |
0 |
|
- |
| Cl.28 of IS 302-2-201: 2008(Screws & Connections ) |
- |
0 |
|
- |
| Cl.29 of IS 302-2‐201:2008(Clearances, Creepage Distances and Solid Insulation ) |
- |
0 |
|
- |
| Cl.29 of IS 302-2‐201:2008(Clearances, Creepage Distances and Solid Insulation ) |
- |
0 |
|
- |
| Cl.30 of IS 302-2‐201:2008(Resistance to Heat and Fire ) |
- |
0 |
|
- |
| Cl.30 of IS 302-2‐201:2008(Resistance to Heat and Fire ) |
- |
0 |
|
- |
| Cl.31 of IS 302-2-201:2008(Resistance of Rusting ) |
- |
0 |
|
- |
| 4(GENERAL REQUIREMENT) |
- |
0 |
|
- |
| 5(GENERAL CONDITIONS FOR THE TESTS) |
- |
0 |
|
- |
| Cl.26 of IS 302-2-201: 2008(Terminals for External Conductors) |
- |
0 |
|
- |
| Cl.18 of IS 368:2014(Endurance) |
- |
0 |
|
- |
|
29 Apr, 2027 |
- - |
| 3729 |
National Test House (NTH), Alipore, Kolkata-700027
| 5123904
| IS 15769 (2008) |
Flux cored (Tubular) electrodes for gas shielded and self - Shielded metal welding of carbon or carbon - Manganese steel |
- |
28000 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 5.2(Radiographic Soundness Test) |
- |
1000 |
|
- |
| 5.3 (Table No.- 1)(Tensile Test(T.S., Y.S. & El), Mpa-IS 1608) |
- |
3000 |
|
- |
| 5.4 (Table No.- 2)(Impact Test,J- IS 1757) |
- |
3000 |
|
- |
| 5.5 (Table No.- 1)(Transverse Tensile Test,Mpa (T.S., Y.S. & El)) |
- |
3000 |
|
- |
| 5.6(Longitudinal Bend Test) |
- |
8000 |
|
- |
| 5.7(Diffusible Hydrogen Test,ml/100g- IS 11802) |
- |
5000 |
|
- |
| 5.8 (Table No.- 15)(Chemical Composition,%) |
- |
5000 |
|
- |
| 5.2(Radiographic Soundness Test) |
- |
0 |
|
Duplicate clause |
| 5.3 (Table No.- 1)(Tensile Test(T.S., Y.S. & El), Mpa-IS 1608) |
- |
0 |
|
Duplicate clause |
| 5.4 (Table No.- 2)(Impact Test,J- IS 1757) |
- |
0 |
|
Duplicate clause |
| 5.5 (Table No.- 1)(Transverse Tensile Test,Mpa (T.S., Y.S. & El)) |
- |
0 |
|
Duplicate clause |
| 5.6(Longitudinal Bend Test) |
- |
0 |
|
Duplicate clause |
| 5.7(Diffusible Hydrogen Test,ml/100g- IS 11802) |
- |
0 |
|
Duplicate clause |
| 5.8 (Table No.- 15)(Chemical Composition,%) |
- |
0 |
|
Duplicate clause |
| 5.2(Radiographic Soundness Test) |
- |
0 |
|
Duplicate clause |
| 5.3 (Table No.- 1)(Tensile Test(T.S., Y.S. & El), Mpa-IS 1608) |
- |
0 |
|
Duplicate clause |
| 5.4 (Table No.- 2)(Impact Test,J- IS 1757) |
- |
0 |
|
Duplicate clause |
| 5.5 (Table No.- 1)(Transverse Tensile Test,Mpa (T.S., Y.S. & El)) |
- |
0 |
|
Duplicate clause |
| 5.6(Longitudinal Bend Test) |
- |
0 |
|
Duplicate clause |
| 5.7(Diffusible Hydrogen Test,ml/100g- IS 11802) |
- |
0 |
|
Duplicate clause |
| 5.8 (Table No.- 15)(Chemical Composition,%) |
- |
0 |
|
Duplicate clause |
| 5.2(Radiographic Soundness Test) |
- |
0 |
|
Duplicate clause |
| 5.3 (Table No.- 1)(Tensile Test(T.S., Y.S. & El), Mpa-IS 1608) |
- |
0 |
|
Duplicate clause |
| 5.4 (Table No.- 2)(Impact Test,J- IS 1757) |
- |
0 |
|
Duplicate clause |
| 5.5 (Table No.- 1)(Transverse Tensile Test,Mpa (T.S., Y.S. & El)) |
- |
0 |
|
Duplicate clause |
| 5.6(Longitudinal Bend Test) |
- |
0 |
|
Duplicate clause |
| 5.7(Diffusible Hydrogen Test,ml/100g- IS 11802) |
- |
0 |
|
Duplicate clause |
| 5.8 (Table No.- 15)(Chemical Composition,%) |
- |
0 |
|
Duplicate clause |
| 5.2(Radiographic Soundness Test) |
- |
0 |
|
Duplicate clause |
| 5.3 (Table No.- 1)(Tensile Test(T.S., Y.S. & El), Mpa-IS 1608) |
- |
0 |
|
Duplicate clause |
| 5.4 (Table No.- 2)(Impact Test,J- IS 1757) |
- |
0 |
|
Duplicate clause |
| 5.5 (Table No.- 1)(Transverse Tensile Test,Mpa (T.S., Y.S. & El)) |
- |
0 |
|
Duplicate clause |
| 5.6(Longitudinal Bend Test) |
- |
0 |
|
Duplicate clause |
| 5.7(Diffusible Hydrogen Test,ml/100g- IS 11802) |
- |
0 |
|
Duplicate clause |
| 5.8 (Table No.- 15)(Chemical Composition,%) |
- |
0 |
|
Duplicate clause |
| 5.2(Radiographic Soundness Test) |
- |
0 |
|
Duplicate clause |
| 5.3 (Table No.- 1)(Tensile Test(T.S., Y.S. & El), Mpa-IS 1608) |
- |
0 |
|
Duplicate clause |
| 5.4 (Table No.- 2)(Impact Test,J- IS 1757) |
- |
0 |
|
Duplicate clause |
| 5.5 (Table No.- 1)(Transverse Tensile Test,Mpa (T.S., Y.S. & El)) |
- |
0 |
|
Duplicate clause |
| 5.6(Longitudinal Bend Test) |
- |
0 |
|
Duplicate clause |
| 5.7(Diffusible Hydrogen Test,ml/100g- IS 11802) |
- |
0 |
|
Duplicate clause |
| 5.8 (Table No.- 15)(Chemical Composition,%) |
- |
0 |
|
Duplicate clause |
| 5.2(Radiographic Soundness Test) |
- |
0 |
|
Duplicate clause |
| 5.3 (Table No.- 1)(Tensile Test(T.S., Y.S. & El), Mpa-IS 1608) |
- |
0 |
|
Duplicate clause |
| 5.4 (Table No.- 2)(Impact Test,J- IS 1757) |
- |
0 |
|
Duplicate clause |
| 5.5 (Table No.- 1)(Transverse Tensile Test,Mpa (T.S., Y.S. & El)) |
- |
0 |
|
Duplicate clause |
| 5.6(Longitudinal Bend Test) |
- |
0 |
|
Duplicate clause |
| 5.7(Diffusible Hydrogen Test,ml/100g- IS 11802) |
- |
0 |
|
Duplicate clause |
| 5.8 (Table No.- 15)(Chemical Composition,%) |
- |
0 |
|
Duplicate clause |
| 5.2(Radiographic Soundness Test) |
- |
0 |
|
Duplicate clause |
| 5.3 (Table No.- 1)(Tensile Test(T.S., Y.S. & El), Mpa-IS 1608) |
- |
0 |
|
Duplicate clause |
| 5.4 (Table No.- 2)(Impact Test,J- IS 1757) |
- |
0 |
|
Duplicate clause |
| 5.5 (Table No.- 1)(Transverse Tensile Test,Mpa (T.S., Y.S. & El)) |
- |
0 |
|
Duplicate clause |
| 5.6(Longitudinal Bend Test) |
- |
0 |
|
Duplicate clause |
| 5.7(Diffusible Hydrogen Test,ml/100g- IS 11802) |
- |
0 |
|
Duplicate clause |
| 5.8 (Table No.- 15)(Chemical Composition,%) |
- |
0 |
|
Duplicate clause |
|
08 Apr, 2027 |
- Included w.e.f.18.08.2025 |
| 3730 |
Vardhamana Testing Laboratory OPC Pvt. Ltd.
| 8178226
| IS 302 : Part 2 : Sec 6 (2009) |
Safety of household and similar electrical appliances: Part 2 particular requirements: Sec 6 cooking ranges, hobs, ovens and similar appliances (First Revision) |
Induction Oven, cooking ranges, hobs, ovens and similar appliances |
25000 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 6.0(Classification) |
- |
1000 |
|
- |
| 7.0(Marking and instructions) |
- |
1000 |
|
- |
| 8.0(Protection against access to live part test) |
- |
1000 |
|
- |
| 10.0(Power Input and current test) |
- |
3000 |
|
- |
| 11.0(Heating test) |
- |
2000 |
|
- |
| 13.0(Leakage current and electric strength test) |
- |
1000 |
|
- |
| 14.0(Transient voltages) |
- |
1000 |
|
- |
| 15.0(Moisture Resistance) |
- |
2000 |
|
- |
| 16.0(Leakage current and electric strength test) |
- |
1000 |
|
- |
| 17.0(Overload protection of transformers test) |
- |
1000 |
|
- |
| 19.0(Abnormal Operations) |
- |
1000 |
|
- |
| 20.0(Stability and Mechanical Hazards) |
- |
500 |
|
- |
| 21.0(Mechanical Strength) |
- |
1000 |
|
- |
| 22.0(Construction verification related tests) |
- |
1000 |
|
- |
| 23.0(Internal wiring) |
- |
1000 |
|
- |
| 24.0(Components) |
- |
500 |
|
- |
| 25.0(Supply connections and External Flexible Cords) |
- |
1000 |
|
- |
| 26.0(Terminal for External Conductors) |
- |
1000 |
|
- |
| 27.0(Provision for Earthing) |
- |
500 |
|
- |
| 28.0(Screws and connections) |
- |
500 |
|
- |
| 29.0(Clearances and Creepage distances and solid insulation) |
- |
1000 |
|
- |
| 30.0(Resistance to heat and fire) |
- |
1000 |
|
- |
| 31.0(Resistance to rusting) |
- |
1000 |
|
- |
| 4(General Requirements) |
- |
0 |
|
- |
| 5(General condition for the tests) |
- |
0 |
|
- |
| 6.0(Classification) |
- |
0 |
|
- |
| 7.0(Marking and instructions) |
- |
0 |
|
- |
| 8.0(Protection against access to live part test) |
- |
0 |
|
- |
| 10.0(Power Input and current test) |
- |
0 |
|
- |
| 11.0(Heating test) |
- |
0 |
|
- |
| 13.0(Leakage current and electric strength test) |
- |
0 |
|
- |
| 14.0(Transient voltages) |
- |
0 |
|
- |
| 15.0(Moisture Resistance) |
- |
0 |
|
- |
| 16.0(Leakage current and electric strength test) |
- |
0 |
|
- |
| 17.0(Overload protection of transformers test) |
- |
0 |
|
- |
| 19.0(Abnormal Operations) |
- |
0 |
|
- |
| 20.0(Stability and Mechanical Hazards) |
- |
0 |
|
- |
| 21.0(Mechanical Strength) |
- |
0 |
|
- |
| 22.0(Construction verification related tests) |
- |
0 |
|
- |
| 23.0(Internal wiring) |
- |
0 |
|
- |
| 24.0(Components) |
- |
0 |
|
- |
| 25.0(Supply connections and External Flexible Cords) |
- |
0 |
|
- |
| 26.0(Terminal for External Conductors) |
- |
0 |
|
- |
| 27.0(Provision for Earthing) |
- |
0 |
|
- |
| 28.0(Screws and connections) |
- |
0 |
|
- |
| 29.0(Clearances and Creepage distances and solid insulation) |
- |
0 |
|
- |
| 30.0(Resistance to heat and fire) |
- |
0 |
|
- |
| 31.0(Resistance to rusting) |
- |
0 |
|
- |
| 4(General Requirements) |
- |
0 |
|
- |
| 5(General condition for the tests) |
- |
0 |
|
- |
|
29 Apr, 2027 |
- - |
| 3731 |
Vardhamana Testing Laboratory OPC Pvt. Ltd.
| 8178226
| IS 302 : Part 2 : Sec 14 (2009) |
Safety of household and similar electrical appliances: Part 2 particular requirements: Sec 14 electric kitchen machines (First Revision) |
Hand blenders, food mixers; grain grinders not exceeding 3 l hopper capacity; mixer grinders |
25000 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 6(Classification- IS 302-1 ) |
- |
500 |
|
- |
| 6(Classification- IS 302-1) |
- |
0 |
|
- |
| 7.1(Marking- IS 302-1) |
- |
0 |
|
- |
| 7.1(Marking- IS 302-1) |
- |
0 |
|
- |
| 7.1(Marking- IS 302-1) |
- |
0 |
|
- |
| 7.1(Marking- IS 302-1) |
- |
0 |
|
- |
| 7.1(Marking- IS 302-1) |
- |
0 |
|
- |
| 7.1(Marking- IS 302-1) |
- |
0 |
|
- |
| 7.1(Marking- IS 302-1) |
- |
0 |
|
- |
| 7.1(Marking- IS 302-1) |
- |
0 |
|
- |
| 7.3(Marking- IS 302-1) |
- |
0 |
|
- |
| 7.4(Marking- IS 302-1) |
- |
0 |
|
- |
| 7.6(Marking- IS 302-1) |
- |
0 |
|
- |
| 7.7(Marking- IS 302-1) |
- |
0 |
|
- |
| 7.8(Marking- IS 302-1) |
- |
0 |
|
- |
| 7.11(Marking- IS 302-1) |
- |
0 |
|
- |
| 7.12(Marking- IS 302-1) |
- |
0 |
|
- |
| 7.13(Marking- IS 302-1) |
- |
0 |
|
- |
| 7.14(Marking- IS 302-1) |
- |
0 |
|
- |
| 7.15(Marking- IS 302-1) |
- |
0 |
|
- |
| 7.101(Marking) |
- |
0 |
|
- |
| 8( Protection Against Electric Shock, IS 302-1) |
- |
1000 |
|
- |
| 10(Power Input and Current, IS 302-1) |
- |
2000 |
|
- |
| 11(Heating, IS 302-1) |
- |
2000 |
|
- |
| 11(Heating, IS 302-1) |
- |
0 |
|
- |
| 11(Heating, IS 302-1) |
- |
0 |
|
- |
| 11(Heating, IS 302-1) |
- |
0 |
|
- |
| 11(Heating, IS 302-1) |
- |
0 |
|
- |
| 13(Electrical Insulation and Leakage Current at Operating Temperature: Leakage current, IS 302-1) |
- |
1000 |
|
- |
| 13(Electrical Insulation and Leakage Current at Operating Temperature: High Voltage, IS 302-1) |
- |
0 |
|
- |
| 14(Transient Over Voltages, IS 302-1) |
- |
1000 |
|
- |
| 15.1(Moisture Resistance, IS 302-1) |
- |
1500 |
|
- |
| 15.2(Moisture Resistance, IS 302-1) |
- |
0 |
|
- |
| 15(Moisture Resistance, IS 302-1) |
- |
0 |
|
- |
| 16(Electrical Insulation and Leakage Current at Operating Temperature: Leakage current, IS 302-1) |
- |
1000 |
|
- |
| 16(Electrical Insulation and Leakage Current at Operating Temperature: High Voltage, IS 302-1) |
- |
0 |
|
- |
| 17(Overload protection of Transformers and Associated Circuits, IS 302-1) |
- |
1000 |
|
- |
| 17(Overload protection of Transformers and Associated Circuits, IS 302-1) |
- |
0 |
|
- |
| 19.7(Abnormal Operation, IS 302-1) |
- |
0 |
|
- |
| 19.8(Abnormal Operation, IS 302-1) |
- |
0 |
|
- |
| 19.9(Abnormal Operation, IS 302-1) |
- |
0 |
|
- |
| 19.1(Abnormal Operation, IS 302-1) |
- |
0 |
|
- |
| 19.101(Abnormal Operation) |
- |
0 |
|
- |
| 19.102(Abnormal Operation) |
- |
0 |
|
- |
| 20.1(Stability & Mechanical Hazards, IS 302-1) |
- |
0 |
|
- |
| 20.2(Stability & Mechanical Hazards, IS 302-1) |
- |
0 |
|
- |
| 20.101(Stability & Mechanical Hazards) |
- |
0 |
|
- |
| 20.102(Stability & Mechanical Hazards) |
- |
0 |
|
- |
| 20.103(Stability & Mechanical Hazards) |
- |
0 |
|
- |
| 20.104(Stability & Mechanical Hazards) |
- |
0 |
|
- |
| 20.105(Stability & Mechanical Hazards) |
- |
0 |
|
- |
| 20.106(Stability & Mechanical Hazards) |
- |
0 |
|
- |
| 20.107(Stability & Mechanical Hazards) |
- |
0 |
|
- |
| 20.108(Stability & Mechanical Hazards) |
- |
0 |
|
- |
| 20.109(Stability & Mechanical Hazards) |
- |
0 |
|
- |
| 20.110(Stability & Mechanical Hazards) |
- |
0 |
|
- |
| 20.111(Stability & Mechanical Hazards) |
- |
0 |
|
- |
| 20.112(Stability & Mechanical Hazards) |
- |
0 |
|
- |
| 20.113(Stability & Mechanical Hazards) |
- |
0 |
|
- |
| 20.114(Stability & Mechanical Hazards) |
- |
0 |
|
- |
| 20.115(Stability & Mechanical Hazards) |
- |
0 |
|
- |
| 20.116(Stability & Mechanical Hazards) |
- |
0 |
|
- |
| 21.1(Mechanical Strength, IS 302-1) |
- |
0 |
|
- |
| 21.2(Mechanical Strength, IS 302-1) |
- |
0 |
|
- |
| 22(Construction, IS 302-1) |
- |
0 |
|
- |
| 22.101(Construction) |
- |
0 |
|
- |
| 22.102(Construction) |
- |
0 |
|
- |
| 23.1(Internal Wiring, IS 302-1) |
- |
0 |
|
- |
| 23.2(Internal Wiring, IS 302-1) |
- |
0 |
|
- |
| 23.3(Internal Wiring, IS 302-1) |
- |
0 |
|
- |
| 23.4(Internal Wiring, IS 302-1) |
- |
0 |
|
- |
| 23.5(Internal Wiring, IS 302-1) |
- |
0 |
|
- |
| 23.6(Internal Wiring, IS 302-1) |
- |
0 |
|
- |
| 23.7(Internal Wiring, IS 302-1) |
- |
0 |
|
- |
| 23.8(Internal Wiring, IS 302-1) |
- |
0 |
|
- |
| 23.9(Internal Wiring, IS 302-1) |
- |
0 |
|
- |
| 23.10(Internal Wiring, IS 302-1) |
- |
0 |
|
- |
| 24.1(Components, IS 302-1) |
- |
0 |
|
- |
| 24.2(Components, IS 302-1) |
- |
0 |
|
- |
| 24.5(Components, IS 302-1) |
- |
0 |
|
- |
| 24.6(Components, IS 302-1) |
- |
0 |
|
- |
| 25.1(Supply Connection and External Flexible Cords, IS 302-1) |
- |
0 |
|
- |
| 25.5(Supply Connection and External Flexible Cords, IS 302-1) |
- |
0 |
|
- |
| 25.6(Supply Connection and External Flexible Cords, IS 302-1) |
- |
0 |
|
- |
| 25.7(Supply Connection and External Flexible Cords, IS 302-1) |
- |
0 |
|
- |
| 25.8(Supply Connection and External Flexible Cords, IS 302-1) |
- |
0 |
|
- |
| 26.9(Supply Connection and External Flexible Cords, IS 302-1) |
- |
0 |
|
- |
| 25.1(Supply Connection and External Flexible Cords, IS 302-1) |
- |
0 |
|
- |
| 25.11(Supply Connection and External Flexible Cords, IS 302-1) |
- |
0 |
|
- |
| 25.12(Supply Connection and External Flexible Cords, IS 302-1) |
- |
0 |
|
- |
| 25.13(Supply Connection and External Flexible Cords, IS 302-1) |
- |
0 |
|
- |
| 25.14(Supply Connection and External Flexible Cords, IS 302-1) |
- |
0 |
|
- |
| 25.14(Supply Connection and External Flexible Cords, IS 302-1) |
- |
0 |
|
- |
| 25.15(Supply Connection and External Flexible Cords, IS 302-1) |
- |
0 |
|
- |
| 25.16(Supply Connection and External Flexible Cords, IS 302-1) |
- |
0 |
|
- |
| 25.17(Supply Connection and External Flexible Cords, IS 302-1) |
- |
0 |
|
- |
| 25.18(Supply Connection and External Flexible Cords, IS 302-1) |
- |
0 |
|
- |
| 25.19(Supply Connection and External Flexible Cords, IS 302-1) |
- |
0 |
|
- |
| 25.2(Supply Connection and External Flexible Cords, IS 302-1) |
- |
0 |
|
- |
| 25.21(Supply Connection and External Flexible Cords, IS 302-1) |
- |
0 |
|
- |
| 25.22(Supply Connection and External Flexible Cords, IS 302-1) |
- |
0 |
|
- |
| 26(Terminals for External Conductors, IS 302-1) |
- |
1000 |
|
- |
| 27(Provision for Earthing, IS 302-1) |
- |
1000 |
|
- |
| 27.2(Provision for Earthing, IS 302-1) |
- |
0 |
|
- |
| 27.3(Provision for Earthing, IS 302-1) |
- |
0 |
|
- |
| 27.4(Provision for Earthing, IS 302-1) |
- |
0 |
|
- |
| 27.5(Provision for Earthing, IS 302-1) |
- |
0 |
|
- |
| 28(Screws & Connections, IS 302-1) |
- |
1000 |
|
- |
| 29.1(Clearances, Creepage distances and Solid Insulation, IS 302-1) |
- |
0 |
|
- |
| 29.2(Clearances, Creepage distances and Solid Insulation, IS 302-1) |
- |
0 |
|
- |
| 30.1(Resistance to Heat and Fire, IS 302-1) |
- |
1000 |
|
- |
| 30.2(Resistance to Heat and Fire, IS 302-1) |
- |
1000 |
|
- |
| 31(Resistance of Rusting, IS 302-1) |
- |
1000 |
|
- |
| 4(GENERAL REQUIREMENTS) |
- |
0 |
|
- |
| 5(GENERAL CONDITIONS FOR THE TESTS) |
- |
0 |
|
- |
| 27(Provision for Earthing) |
- |
1000 |
|
- |
| 29(Clearances, Creepage distances and Solid Insulation) |
- |
1000 |
|
- |
|
29 Apr, 2027 |
- - |
| 3732 |
Vardhamana Testing Laboratory OPC Pvt. Ltd.
| 8178226
| IS 8978 (1992) |
Specification for electric instantaneous water heaters (Second Revision) |
Electric instantaneous water heater |
25000 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| Cl.7 of IS 302-2-35:2017(Marking) |
- |
0 |
|
- |
| Cl.7 of IS 302-2-35:2017(Marking) |
- |
0 |
|
- |
| Cl.7 of IS 302-2-35:2017(Marking) |
- |
0 |
|
- |
| Cl.7 of IS 302-2-35:2017(Marking) |
- |
0 |
|
- |
| Cl.7 of IS 302-2-35:2017(Marking) |
- |
0 |
|
- |
| Cl.7 of IS 302-2-35:2017(Marking) |
- |
0 |
|
- |
| Cl.7 of IS 302-2-35:2017(Marking) |
- |
0 |
|
- |
| Cl.7 of IS 302-2-35:2017(Marking) |
- |
0 |
|
- |
| Cl.7 of IS 302-2-35:2017(Marking) |
- |
0 |
|
- |
| Cl.7 of IS 302-2-35:2017(Marking) |
- |
0 |
|
- |
| Cl.7 of IS 302-2-35:2017(Marking) |
- |
0 |
|
- |
| Cl.7 of IS 302-2-35:2017(Marking) |
- |
0 |
|
- |
| Cl.7 of IS 302-2-35:2017(Marking) |
- |
0 |
|
- |
| Cl.7 of IS 302-2-35:2017(Marking) |
- |
0 |
|
- |
| Cl.7 of IS 302-2-35:2017(Marking) |
- |
0 |
|
- |
| Cl.7 of IS 302-2-35:2017(Marking) |
- |
0 |
|
- |
| Cl.7 of IS 302-2-35:2017(Marking) |
- |
0 |
|
- |
| Cl.7 of IS 302-2-35:2017(Marking) |
- |
0 |
|
- |
| Cl.7 of IS 302-2-35:2017(Marking) |
- |
0 |
|
- |
| Cl.7 of IS 302-2-35:2017(Marking) |
- |
0 |
|
- |
| Cl.7 of IS 302-2-35:2017(Marking) |
- |
0 |
|
- |
| Cl.7 of IS 302-2-35:2017(Marking) |
- |
0 |
|
- |
| Cl.7 of IS 302-2-35:2017(Marking) |
- |
0 |
|
- |
| Cl.7 of IS 302-2-35:2017(Marking) |
- |
0 |
|
- |
| Cl.7 of IS 302-2-35:2017(Marking) |
- |
0 |
|
- |
| Cl.6 of IS 302-2-35:2017(Classification) |
- |
0 |
|
- |
| Cl.6 of IS 302-2-35:2017(Classification) |
- |
0 |
|
- |
| Cl.8 of IS 302-2-35:2017(Protection Against Access To Live Parts) |
- |
0 |
|
- |
| Cl.10 of IS 302-2- 35:2011(Power Input & Current ) |
- |
0 |
|
- |
| Cl.11 of 302-2-35:2017(Heating) |
- |
0 |
|
- |
| Cl.11 of 302-2-35:2017(Heating) |
- |
0 |
|
- |
| Cl.11 of 302-2-35:2017(Heating) |
- |
0 |
|
- |
| Cl.11 of 302-2-35:2017(Heating) |
- |
0 |
|
- |
| Cl.13 of IS 302-2-35:2017(Leakage Current & Electrical Strength at Operating Temperature ) |
- |
0 |
|
- |
| Cl.13 of IS 302-2-35:2017(Leakage Current & Electrical Strength at Operating Temperature ) |
- |
0 |
|
- |
| Cl.14 of IS 302-2-35:2017(Transient Over Voltages ) |
- |
0 |
|
- |
| Cl.15 of IS 302-2-35-2011(Moisture Resistance ) |
- |
0 |
|
- |
| Cl.15 of IS 302-2-35-2011(Moisture Resistance ) |
- |
0 |
|
- |
| Cl.16 of IS 302-2-35:2011(Leakage Current and Electric Strength) |
- |
0 |
|
- |
| Cl.16 of IS 302-2-35:2011(Leakage Current and Electric Strength) |
- |
0 |
|
- |
| Cl.17 IS 302-2-35:2017(Overload Protection of Transformers & Associated circuits ) |
- |
0 |
|
- |
| Cl.19 of IS 302-2-35:2017(Abnormal Operation) |
- |
0 |
|
- |
| Cl.19 of IS 302-2-35:2017(Abnormal Operation) |
- |
0 |
|
- |
| Cl.19 of IS 302-2-35:2017(Abnormal Operation) |
- |
0 |
|
- |
| Cl.19 of IS 302-2-35:2017(Abnormal Operation) |
- |
0 |
|
- |
| Cl.19 of IS 302-2-35:2017(Abnormal Operation) |
- |
0 |
|
- |
| Cl.20 of IS 302-2-35-2011(Stability & Mechanical Hazards
) |
- |
0 |
|
- |
| Cl.21.1 of IS 302-2-35-2011(Mechanical strength) |
- |
0 |
|
- |
| Cl. 21.2 of IS 302-1:2008(Mechanical strength) |
- |
0 |
|
- |
| Cl.22 of IS 302-2-35-2011(Construction
) |
- |
0 |
|
- |
| Cl.22 of IS 302-2-35-2011(Construction
) |
- |
0 |
|
- |
| Cl.22 of IS 302-2-35-2011(Construction
) |
- |
0 |
|
- |
| Cl.22 of IS 302-2-35-2011(Construction
) |
- |
0 |
|
- |
| Cl.22 of IS 302-2-35-2011(Construction
) |
- |
0 |
|
- |
| Cl.22 of IS 302-2-35-2011(Construction
) |
- |
0 |
|
- |
| Cl.22 of IS 302-2-35-2011(Construction
) |
- |
0 |
|
- |
| Cl.22 of IS 302-2-35-2011(Construction
) |
- |
0 |
|
- |
| Cl.22 of IS 302-2-35-2011(Construction
) |
- |
0 |
|
- |
| Cl.22 of IS 302-2-35-2011(Construction
) |
- |
0 |
|
- |
| Cl.22 of IS 302-2-35-2011(Construction
) |
- |
0 |
|
- |
| Cl.22 of IS 302-2-35-2011(Construction
) |
- |
0 |
|
- |
| Cl.22 of IS 302-2-35-2011(Construction
) |
- |
0 |
|
- |
| Cl.22 of IS 302-2-35-2011(Construction
) |
- |
0 |
|
- |
| Cl.22 of IS 302-2-35-2011(Construction
) |
- |
0 |
|
- |
| Cl.22 of IS 302-2-35-2011(Construction
) |
- |
0 |
|
- |
| Cl.22 of IS 302-2-35-2011(Construction
) |
- |
0 |
|
- |
| Cl.22 of IS 302-2-35-2011(Construction
) |
- |
0 |
|
- |
| Cl.22 of IS 302-2-35-2011(Construction
) |
- |
0 |
|
- |
| Cl.22 of IS 302-2-35-2011(Construction
) |
- |
0 |
|
- |
| Cl.22 of IS 302-2-35-2011(Construction
) |
- |
0 |
|
- |
| Cl.22 of IS 302-2-35-2011(Construction
) |
- |
0 |
|
- |
| Cl.22 of IS 302-2-35-2011(Construction
) |
- |
0 |
|
- |
| Cl.22 of IS 302-2-35-2011(Construction
) |
- |
0 |
|
- |
| Cl.22 of IS 302-2-35-2011(Construction
) |
- |
0 |
|
- |
| Cl.22 of IS 302-2-35-2011(Construction
) |
- |
0 |
|
- |
| Cl.22 of IS 302-2-35-2011(Construction
) |
- |
0 |
|
- |
| Cl.22 of IS 302-2-35-2011(Construction
) |
- |
0 |
|
- |
| Cl.22 of IS 302-2-35-2011(Construction
) |
- |
0 |
|
- |
| Cl.22 of IS 302-2-35-2011(Construction
) |
- |
0 |
|
- |
| Cl.22 of IS 302-2-35-2011(Construction
) |
- |
0 |
|
- |
| Cl.22 of IS 302-2-35-2011(Construction
) |
- |
0 |
|
- |
| Cl.22 of IS 302-2-35-2011(Construction
) |
- |
0 |
|
- |
| Cl.22 of IS 302-2-35-2011(Construction
) |
- |
0 |
|
- |
| Cl.22 of IS 302-2-35-2011(Construction
) |
- |
0 |
|
- |
| Cl.22 of IS 302-2-35-2011(Construction
) |
- |
0 |
|
- |
| Cl.22 of IS 302-2-35-2011(Construction
) |
- |
0 |
|
- |
| Cl.22 of IS 302-2-35-2011(Construction
) |
- |
0 |
|
- |
| Cl.22 of IS 302-2-35-2011(Construction
) |
- |
0 |
|
- |
| Cl.22 of IS 302-2-35-2011(Construction
) |
- |
0 |
|
- |
| Cl.22 of IS 302-2-35-2011(Construction
) |
- |
0 |
|
- |
| Cl.22 of IS 302-2-35-2011(Construction
) |
- |
0 |
|
- |
| Cl.22 of IS 302-2-35-2011(Construction
) |
- |
0 |
|
- |
| Cl.22 of IS 302-2-35-2011(Construction
) |
- |
0 |
|
- |
| Cl.22 of IS 302-2-35-2011(Construction
) |
- |
0 |
|
- |
| Cl.22 of IS 302-2-35-2011(Construction
) |
- |
0 |
|
- |
| Cl.22 of IS 302-2-35-2011(Construction
) |
- |
0 |
|
- |
| Cl.22 of IS 302-2-35-2011(Construction
) |
- |
0 |
|
- |
| Cl.22 of IS 302-2-35-2011(Construction
) |
- |
0 |
|
- |
| Cl.22 of IS 302-2-35-2011(Construction
) |
- |
0 |
|
- |
| Cl.22 of IS 302-2-35-2011(Construction
) |
- |
0 |
|
- |
| Cl.22 of IS 302-2-35-2011(Construction
) |
- |
0 |
|
- |
| Cl.22 of IS 302-2-35-2011(Construction
) |
- |
0 |
|
- |
| Cl.22 of IS 302-2-35-2011(Construction
) |
- |
0 |
|
- |
| Cl.22 of IS 302-2-35-2011(Construction
) |
- |
0 |
|
- |
| Cl.22 of IS 302-2-35-2011(Construction
) |
- |
0 |
|
- |
| Cl.22 of IS 302-2-35-2011(Construction
) |
- |
0 |
|
- |
| Cl.22 of IS 302-2-35-2011(Construction
) |
- |
0 |
|
- |
| Cl.23 of IS 302-2-35-2011(Internal Wiring) |
- |
0 |
|
- |
| Cl.23 of IS 302-2-35-2011(Internal Wiring) |
- |
0 |
|
- |
| Cl.23 of IS 302-2-35-2011(Internal Wiring) |
- |
0 |
|
- |
| Cl.23 of IS 302-2-35-2011(Internal Wiring) |
- |
0 |
|
- |
| Cl.23 of IS 302-2-35-2011(Internal Wiring) |
- |
0 |
|
- |
| Cl.23 of IS 302-2-35-2011(Internal Wiring) |
- |
0 |
|
- |
| Cl.23 of IS 302-2-35-2011(Internal Wiring) |
- |
0 |
|
- |
| Cl.23 of IS 302-2-35-2011(Internal Wiring) |
- |
0 |
|
- |
| Cl.23 of IS 302-2-35-2011(Internal Wiring) |
- |
0 |
|
- |
| Cl.23 of IS 302-2-35-2011(Internal Wiring) |
- |
0 |
|
- |
| Cl.23 of IS 302-2-35-2011(Internal Wiring) |
- |
0 |
|
- |
| Cl.23 of IS 302-2-35-2011(Internal Wiring) |
- |
0 |
|
- |
| Cl.23 of IS 302-2-35-2011(Internal Wiring) |
- |
0 |
|
- |
| Cl.23 of IS 302-2-35-2011(Internal Wiring) |
- |
0 |
|
- |
| Cl.24 of IS 302-2-35:2017(Component
) |
- |
0 |
|
- |
| Cl.24 of IS 302-2-35:2017(Component
) |
- |
0 |
|
- |
| Cl.24 of IS 302-2-35:2017(Component
) |
- |
0 |
|
- |
| Cl.24 of IS 302-2-35:2017(Component
) |
- |
0 |
|
- |
| Cl.24 of IS 302-2-35:2017(Component
) |
- |
0 |
|
- |
| Cl.25 of IS 302-2-35:2017(Supply Connection & External Flexible Cords) |
- |
0 |
|
- |
| Cl.25 of IS 302-2-35:2017(Supply Connection & External Flexible Cords) |
- |
0 |
|
- |
| Cl.25 of IS 302-2-35:2017(Supply Connection & External Flexible Cords) |
- |
0 |
|
- |
| Cl.25 of IS 302-2-35:2017(Supply Connection & External Flexible Cords) |
- |
0 |
|
- |
| Cl.25 of IS 302-2-35:2017(Supply Connection & External Flexible Cords) |
- |
0 |
|
- |
| Cl.25 of IS 302-2-35:2017(Supply Connection & External Flexible Cords) |
- |
0 |
|
- |
| Cl.25 of IS 302-2-35:2017(Supply Connection & External Flexible Cords) |
- |
0 |
|
- |
| Cl.25 of IS 302-2-35:2017(Supply Connection & External Flexible Cords) |
- |
0 |
|
- |
| Cl.25 of IS 302-2-35:2017(Supply Connection & External Flexible Cords) |
- |
0 |
|
- |
| Cl.25 of IS 302-2-35:2017(Supply Connection & External Flexible Cords) |
- |
0 |
|
- |
| Cl.25 of IS 302-2-35:2017(Supply Connection & External Flexible Cords) |
- |
0 |
|
- |
| Cl.25 of IS 302-2-35:2017(Supply Connection & External Flexible Cords) |
- |
0 |
|
- |
| Cl.25 of IS 302-2-35:2017(Supply Connection & External Flexible Cords) |
- |
0 |
|
- |
| Cl.25 of IS 302-2-35:2017(Supply Connection & External Flexible Cords) |
- |
0 |
|
- |
| Cl.25 of IS 302-2-35:2017(Supply Connection & External Flexible Cords) |
- |
0 |
|
- |
| Cl.25 of IS 302-2-35:2017(Supply Connection & External Flexible Cords) |
- |
0 |
|
- |
| Cl.25 of IS 302-2-35:2017(Supply Connection & External Flexible Cords) |
- |
0 |
|
- |
| Cl.25 of IS 302-2-35:2017(Supply Connection & External Flexible Cords) |
- |
0 |
|
- |
| Cl.25 of IS 302-2-35:2017(Supply Connection & External Flexible Cords) |
- |
0 |
|
- |
| Cl.25 of IS 302-2-35:2017(Supply Connection & External Flexible Cords) |
- |
0 |
|
- |
| Cl.25 of IS 302-2-35:2017(Supply Connection & External Flexible Cords) |
- |
0 |
|
- |
| Cl.25 of IS 302-2-35:2017(Supply Connection & External Flexible Cords) |
- |
0 |
|
- |
| Cl.25 of IS 302-2-35:2017(Supply Connection & External Flexible Cords) |
- |
0 |
|
- |
| Cl.25 of IS 302-2-35:2017(Supply Connection & External Flexible Cords) |
- |
0 |
|
- |
| Cl.25 of IS 302-2-35:2017(Supply Connection & External Flexible Cords) |
- |
0 |
|
- |
| Cl.25 of IS 302-2-35:2017(Supply Connection & External Flexible Cords) |
- |
0 |
|
- |
| Cl.26 of IS 302-2-35:2017(Terminals for External Conductors) |
- |
0 |
|
- |
| Cl.26 of IS 302-2-35:2017(Terminals for External Conductors) |
- |
0 |
|
- |
| Cl.26 of IS 302-2-35:2017(Terminals for External Conductors) |
- |
0 |
|
- |
| Cl.26 of IS 302-2-35:2017(Terminals for External Conductors) |
- |
0 |
|
- |
| Cl.26 of IS 302-2-35:2017(Terminals for External Conductors) |
- |
0 |
|
- |
| Cl.26 of IS 302-2-35:2017(Terminals for External Conductors) |
- |
0 |
|
- |
| Cl.26 of IS 302-2-35:2017(Terminals for External Conductors) |
- |
0 |
|
- |
| Cl.26 of IS 302-2-35:2017(Terminals for External Conductors) |
- |
0 |
|
- |
| Cl.26 of IS 302-2-35:2017(Terminals for External Conductors) |
- |
0 |
|
- |
| Cl.26 of IS 302-2-35:2017(Terminals for External Conductors) |
- |
0 |
|
- |
| Cl.26 of IS 302-2-35:2017(Terminals for External Conductors) |
- |
0 |
|
- |
| Cl.27 of IS 302-2-35:2017(Provision for Earthing) |
- |
0 |
|
- |
| Cl.27 of IS 302-2-35:2017(Provision for Earthing) |
- |
0 |
|
- |
| Cl.27 of IS 302-2-35:2017(Provision for Earthing) |
- |
0 |
|
- |
| Cl.27 of IS 302-2-35:2017(Provision for Earthing) |
- |
0 |
|
- |
| Cl.27 of IS 302-2-35:2017(Provision for Earthing) |
- |
0 |
|
- |
| Cl.27 of IS 302-2-35:2017(Provision for Earthing) |
- |
0 |
|
- |
| Cl.27 of IS 302-2-35:2017(Provision for Earthing) |
- |
0 |
|
- |
| Cl.28 of IS 302-2-35:2017(Screws and Connections
) |
- |
0 |
|
- |
| Cl.29 of IS 302-2-35:2017(Clearances, Creepage Distances and Solid Insulation) |
- |
0 |
|
- |
| Cl.29 of IS 302-2-35:2017(Clearances, Creepage Distances and Solid Insulation) |
- |
0 |
|
- |
| Cl.29 of IS 302-2-35:2017(Clearances, Creepage Distances and Solid Insulation) |
- |
0 |
|
- |
| Cl.30 of IS 302-2-35: 2011(Resistance to Heat and Fire) |
- |
0 |
|
- |
| Cl.30 of IS 302-2-35: 2011(Resistance to Heat and Fire) |
- |
0 |
|
- |
| Cl.31 of IS 302-2-35: 2011(Resistance to Rusting
) |
- |
0 |
|
- |
| Cl.10 of IS 8978 : 1992(Finish) |
- |
0 |
|
- |
| Cl.11 of IS 8978 : 1992(Operation of flow switch) |
- |
0 |
|
- |
| Cl.12 of IS 8978 : 1992(Endurance) |
- |
0 |
|
- |
| Cl.12 of IS 8978 : 1992(Endurance) |
- |
0 |
|
- |
| Cl.10 of IS 8978 : 1992(Finish) |
- |
0 |
|
- |
| Cl.31 of IS 302-2-35: 2017(Resistance to Rusting
) |
- |
0 |
|
- |
| Cl.30.2 of IS 302-1:2008(Resistance to Heat and Fire) |
- |
0 |
|
- |
| Cl.30.1 of IS 302-1:2008(Resistance to Heat and Fire) |
- |
0 |
|
- |
| Cl.29.2 of IS 302-2-35:2017(Clearances, Creepage Distances and Solid Insulation : Creepage distance ) |
- |
0 |
|
- |
| Cl.29.1 of IS 302-2-35:2017(Clearances, Creepage Distances and Solid Insulation : Clearance distance ) |
- |
0 |
|
- |
| Cl.28 of IS 302-2-35:2017(Screws and Connections
) |
- |
0 |
|
- |
| Cl.27.5 of IS 302-2-35:2017(Provision for Earthing : ECR ) |
- |
0 |
|
- |
| Cl.27 of IS 302-2-35:2017(Provision for Earthing) |
- |
0 |
|
- |
| Cl.26 of IS 302-2-35:2017(Terminals for External Conductors) |
- |
0 |
|
- |
| Cl.25.18 of IS 302-2-35:2017(Supply Connection & External Flexible Cords) |
- |
0 |
|
- |
| Cl.25.15 of IS 302-2-35:2017(Supply Connection & External Flexible Cords : Cord grip test - displacement ) |
- |
0 |
|
- |
| Cl.25.15 of IS 302-2-35:2017(Supply Connection & External Flexible Cords : Cord grip test ) |
- |
0 |
|
- |
| Cl.25.12 of IS 302-2-35:2017(Supply Connection & External Flexible Cords : Moulding of supply cord ) |
- |
0 |
|
- |
| Cl.25.10 of IS 302-2-35:2017(Supply Connection & External Flexible Cords : Colour of Earthing conductor ) |
- |
0 |
|
- |
| Cl.25.8 of IS 302-2-35:2017(Supply Connection & External Flexible Cords : Resistance of supply cord ) |
- |
0 |
|
- |
| Cl.25.5 of IS 302-2-35:2017(Supply Connection & External Flexible Cords : Type of attachment ) |
- |
0 |
|
- |
| Cl.25.1 of IS 302-2-35:2017(Supply Connection & External Flexible Cords : connection to the supply mains) |
- |
0 |
|
- |
| Cl.25 of IS 302-2-35:2017(Supply Connection & External Flexible Cords) |
- |
0 |
|
- |
| Cl.24 of IS 302-2-35:2017(Component
) |
- |
0 |
|
- |
| Cl.23 of IS 302-2-35:2017(Internal Wiring ; Colour of earthing conductor) |
- |
0 |
|
- |
| Cl.23 of IS 302-2-35:2017(Internal Wiring) |
- |
0 |
|
- |
| Cl.22.110 of IS 302-2-35:2017(Construction : Provision for fixing to wall
) |
- |
0 |
|
- |
| Cl.22.109 of IS 302-2-35:2017(Construction : Operation of presure switch of open outlet water heater
) |
- |
0 |
|
- |
| Cl.22.108 of IS 302-2-35:2017(Construction : Temperature of outlet water intended to supply for showring
) |
- |
0 |
|
- |
| Cl.22.107 of IS 302-2-35:2017(Construction : Temperature of outlet
) |
- |
0 |
|
- |
| Cl.22.106 of IS 302-2-35:2017(Construction : Operation of thermal cut out for closed water heater
) |
- |
0 |
|
- |
| Cl.22.104 of IS 302-2-35:2017(Construction : Pressure in open outlet water heaters
) |
- |
0 |
|
- |
| Cl.22.103 of IS 302-2-35:2017(Construction : Pressure relief device operation for closed water heater
) |
- |
0 |
|
- |
| Cl.22.102 of IS 302-2-35:2017(Construction : excessive temperature of outlet
) |
- |
0 |
|
- |
| Cl.22.101 of IS 302-2-35:2017(Construction : Rated pressure of closed water heater
) |
- |
0 |
|
- |
| Cl.22.47 of IS 302-2-35:2017(Construction : Water pressure test
) |
- |
0 |
|
- |
| Cl.22.44 of IS 302-1:2008(Construction : Shape and decoration
) |
- |
0 |
|
- |
| Cl.22.34, Cl 22.35 of
IS 302-1:2008(Construction : Shaft of operating Knobs ) |
- |
0 |
|
- |
| Cl.22.33 of
IS 302-1:2008(Construction : Direct contact of liquids ) |
- |
0 |
|
- |
| Cl 22.26 ,Cl.22.28, Cl 22.29, Cl 22.30 , Cl 22.31, Cl 22.32 of
IS 302-1:2008(Construction : Supplymentry/ double / reinforced insulation for Class II/ Class III appliance ) |
- |
0 |
|
- |
| Cl.22.18 of IS 302-1:2008(Construction : Resistance to corrosion
) |
- |
0 |
|
- |
| Cl.22.17 of IS 302-1:2008(Construction : Spacers
) |
- |
0 |
|
- |
| Cl.22.14 of IS 302-1:2008(Construction : Ragged or sharp edges
) |
- |
0 |
|
- |
| Cl.22.12 of IS 302-1:2008(Construction : Fixing of Handle, knob, grips, levers and similar parts
) |
- |
0 |
|
- |
| Cl.22.11 of IS 302-1:2008(Construction : Fixing of non detachable parts
) |
- |
0 |
|
- |
| Cl.22.7 of IS 302-1:2008(Construction : safeguards against the risk of excessive pressure.
) |
- |
0 |
|
- |
| Cl.22.6 of IS 302-2-35:2017(Construction : size of drain hole
) |
- |
0 |
|
- |
| Cl.22.6 of IS 302-1:2008(Construction : effect of water on 3 insulation
) |
- |
0 |
|
- |
| Cl.22.2 of IS 302-1:2008(Construction : connection to supply mains
) |
- |
0 |
|
- |
| Cl.22.1 of IS 302-1:2008(Construction : IP test
) |
- |
0 |
|
- |
| Cl. 21.2 of IS 302-1:2008(Mechanical strength : prevent penetration by sharp implements. ) |
- |
0 |
|
- |
| Cl.21.1 of IS 302-1:2008(Mechanical strength : Rough handling in normal use) |
- |
0 |
|
- |
| Cl.20 of IS 302-2-35:2017(Stability & Mechanical Hazards
) |
- |
0 |
|
- |
| Cl.19 of IS 302-2-35:2017(Abnormal Operation : effect on container) |
- |
0 |
|
- |
| Cl.19 of IS 302-2-35:2017(Abnormal Operation : High voltage) |
- |
0 |
|
- |
| Cl.19 of IS 302-2-35:2017(Abnormal Operation : Temperature rise of insulation of supply cord) |
- |
0 |
|
- |
| Cl.19 of IS 302-2-35:2017(Abnormal Operation : Temperature rise of test corner) |
- |
0 |
|
- |
| Cl.19 of IS 302-2-35:2017(Abnormal Operation : Emission of flames, molten metal ,or poisonous or ignitable gas) |
- |
0 |
|
- |
| Cl.16 of IS 302-2-35:2017(Leakage Current and Electric Strength (After Humidity)) |
- |
0 |
|
- |
| Cl.16 of IS 302-2-35:2017(Leakage Current and Electric Strength (After Humidity)) |
- |
0 |
|
- |
| Cl.15 of IS 302-2-35:2017(Moisture Resistance ) |
- |
0 |
|
- |
| Cl.14 of IS 302-2-35:2017(Transient Over Voltages ) |
- |
0 |
|
- |
| Cl.13 of IS 302-2-35:2017(Leakage Current & 3 Strength at Operating Temperature : High voltage ) |
- |
0 |
|
- |
| Cl.13 of IS 302-2-35:2017(Leakage Current & 3 Strength at Operating Temperature ) |
- |
0 |
|
- |
| Cl.11 of 302-2-35:2017(Heating : room temperature) |
- |
0 |
|
- |
| Cl.11 of 302-2-35:2017(Heating : Insulation of supply cord) |
- |
0 |
|
- |
| Cl.11 of 302-2-35:2017(Heating : Temperature rise of test corner) |
- |
0 |
|
- |
| Cl.10 of IS 302-2- 35:2017(Power Input & Current ) |
- |
0 |
|
- |
| Cl.8 of IS 302-2-35:2017(Protection Against Access To Live Parts) |
- |
0 |
|
- |
| Cl.7.102 of IS 302-2-35:2017(Marking : Standard mark) |
- |
0 |
|
- |
| Cl.7.101 of IS 302-2-35:2017(Marking : Woter inlet and outlet idetification) |
- |
0 |
|
- |
| Cl.7.15 of IS 302-1:2008(Marking : Position of marking) |
- |
0 |
|
- |
| Cl.7.14 of IS 302-1:2008(Marking ; Legibility and durability) |
- |
0 |
|
- |
| Cl.7.13 of IS 302-1:2008(Marking : Language) |
- |
0 |
|
- |
| Cl.7.10 & 7.11 of IS 302-1:2008(Marking : Indication for direction of control) |
- |
0 |
|
- |
| Cl.7.8 of IS 302-1:2008(Marking : Terminal for connection ) |
- |
0 |
|
- |
| Cl.7.6 of IS 302-1:2008(Marking : Symbols) |
- |
0 |
|
- |
| Cl.7.1 of IS 302-2-35:2017(Marking : rated pressure) |
- |
0 |
|
- |
| Cl.7.1 of IS 302-1:2008(Marking : Country of manufacture) |
- |
0 |
|
- |
| Cl.7.1 of IS 302-1:2008(Marking : IP number ) |
- |
0 |
|
- |
| Cl.7.1 of IS 302-1:2008(Marking : Symbol for class II) |
- |
0 |
|
- |
| Cl.7.1 of IS 302-1:2008(Marking : Molel or type) |
- |
0 |
|
- |
| Cl.7.1 of IS 302-1:2008(Marking : Manufacture identification) |
- |
0 |
|
- |
| Cl.7.1 of IS 302-1:2008(Marking : Rated power input) |
- |
0 |
|
- |
| Cl.7.1 of IS 302-1:2008(Marking : Nature of supply) |
- |
0 |
|
- |
| Cl.7.1 of IS 302-1:2008(Marking : Rated Voltage) |
- |
0 |
|
- |
| 4(GENERAL REQUIREMENTS) |
- |
0 |
|
- |
| 5(GENERAL NOTE ON TEST) |
- |
0 |
|
- |
| 7(Marking) |
- |
0 |
|
- |
| 7(Marking) |
- |
0 |
|
- |
| (Cl.7.1 of IS 302-2-35:2017)(Marking) |
- |
0 |
|
- |
| (Cl.7.101 of IS 302-2-35:2017)(Marking) |
- |
0 |
|
- |
| (Cl.8.1.1 of IS 8978:1992)(Marking) |
- |
0 |
|
- |
| (Cl.19.13 of IS 302-2-35:2017)(Abnormal operation) |
- |
0 |
|
- |
| (Cl.19.13 of IS 302-2-35:2017)(Abnormal operation) |
- |
0 |
|
- |
| (Cl.22 of IS 302-2-35:2017)(Construction) |
- |
0 |
|
- |
| (Cl.22 of IS 302-2-35:2017)(Construction) |
- |
0 |
|
- |
| (Cl.22 of IS 302-2-35:2017)(Construction) |
- |
0 |
|
- |
| (Cl.22 of IS 302-2-35:2017)(Construction) |
- |
0 |
|
- |
| (Cl.22 of IS 302-2-35:2017)(Construction) |
- |
0 |
|
- |
| (Cl.22 of IS 302-2-35:2017)(Construction) |
- |
0 |
|
- |
| (Cl.22 of IS 302-2-35:2017)(Construction) |
- |
0 |
|
- |
| (Cl.22 of IS 302-2-35:2017)(Construction) |
- |
0 |
|
- |
| (Cl.22 of IS 302-2-35:2017)(Construction) |
- |
0 |
|
- |
| (Cl.22 of IS 302-2-35:2017)(Construction) |
- |
0 |
|
- |
| (Cl.23 of IS 302-2-35:2017)(Internal wiring) |
- |
0 |
|
- |
| (Cl.23 of IS 302-2-35:2017)(Internal wiring) |
- |
0 |
|
- |
| (Cl.23 of IS 302-2-35:2017)(Internal wiring) |
- |
0 |
|
- |
| (Cl.23 of IS 302-2-35:2017)(Internal wiring) |
- |
0 |
|
- |
| (Cl.24 of IS 302-2-35:2017)(Components) |
- |
0 |
|
- |
| (Cl.24 of IS 302-2-35:2017)(Components) |
- |
0 |
|
- |
| (Cl.24 of IS 302-2-35:2017)(Components) |
- |
0 |
|
- |
| (Cl.24 of IS 302-2-35:2017)(Components) |
- |
0 |
|
- |
| (Cl.24 of IS 302-2-35:2017)(Components) |
- |
0 |
|
- |
| (Cl.25.8 of IS 302-2-35:2017)(Supply Connection and External Flexible cords) |
- |
0 |
|
- |
| (CL.27.5 of IS 302-2-35:2017)(Provision for Earthing) |
- |
0 |
|
- |
|
29 Apr, 2027 |
- - |
| 3733 |
Vardhamana Testing Laboratory OPC Pvt. Ltd.
| 8178226
| IS 366 (1991) |
Electric iron - Specification (Fourth Revision) |
Electric iron |
25000 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 7.0(Classification (as per Cl.6 of IS 302-2-3 and Cl.6.1 of IS 302-1)) |
- |
500 |
|
- |
| 7.0(Classification (as per Cl.6 of IS 302-2-3 and Cl.6.2 of IS 302-1)) |
- |
0 |
|
- |
| 9.0(Protection against access to live parts (as per Cl. 8 of IS 302-2-3 and IS 302-1)) |
- |
1000 |
|
- |
| 9.0(Power input and current (as per Cl. 10 of IS 302-2-3 and IS 302-1)) |
- |
2000 |
|
- |
| 9.0(Temperature Rise (as per Cl. 11 of IS 302-2-3 and IS 302-1)) |
- |
1000 |
|
- |
| 9.0(Temperature Rise (as per Cl. 11 of IS 302-2-3 and IS 302-1)) |
- |
0 |
|
- |
| 9.0(Temperature Rise (as per Cl. 11 of IS 302-2-3 and IS 302-1)) |
- |
0 |
|
- |
| 9.0(Temperature Rise (as per Cl. 11 of IS 302-2-3 and IS 302-1)) |
- |
0 |
|
- |
| 9.0(Leakage current and Electric Strength at Operating Temperature (as per Cl. 13 of IS 302-2-3 and IS 302-1)) |
- |
1000 |
|
- |
| 9.0(Leakage current and Electric Strength at Operating Temperature (as per Cl. 13 of IS 302-2-3 and IS 302-1)) |
- |
0 |
|
- |
| 9.0(Transient Overvoltage (as per of Cl. 14 of IS 302-2-3 and Table 6 of IS 302-1)) |
- |
1000 |
|
- |
| 9.0(Moisture Resistance (as per of Cl.15 of IS 302-2-3 and IS 302-1)) |
- |
1500 |
|
- |
| 9.0(Moisture Resistance (as per of Cl.15 of IS 302-2-3 and IS 302-1)) |
- |
0 |
|
- |
| 9.0(Abnormal Operation (as per of Cl.19 of IS 302-2-3 and IS 302-1) ) |
- |
1000 |
|
- |
| 9.0(Abnormal Operation (as per of Cl.19 of IS 302-2-3 and IS 302-1) ) |
- |
0 |
|
- |
| 9.0(Abnormal Operation (as per of Cl.19 of IS 302-2-3 and IS 302-1) ) |
- |
0 |
|
- |
| 9.0(Abnormal Operation (as per of Cl.19 of IS 302-2-3 and IS 302-1) ) |
- |
0 |
|
- |
| 9.0(Abnormal Operation (as per of Cl.19 of IS 302-2-3 and IS 302-1) ) |
- |
0 |
|
- |
| 9.0(Staibilty and mechanical hazards (as per of Cl.20 of IS 302-2-3 and IS 302-1) ) |
- |
1000 |
|
- |
| 9.0(Mechanical strength (as per of Cl.21 of IS 302-2-3 and IS 302-1) ) |
- |
1000 |
|
- |
| 9.0(Construction (as per of Cl.22 of IS 302-2-3 and IS 302-1) ) |
- |
1000 |
|
- |
| 9.0(Construction (as per of Cl.22 of IS 302-2-3 and IS 302-1) ) |
- |
0 |
|
- |
| 9.0(Construction (as per of Cl.22 of IS 302-2-3 and IS 302-1) ) |
- |
0 |
|
- |
| 9.0(Construction (as per of Cl.22 of IS 302-2-3 and IS 302-1) ) |
- |
0 |
|
- |
| 9.0(Construction (as per of Cl.22 of IS 302-2-3 and IS 302-1) ) |
- |
0 |
|
- |
| 9.0(Construction (as per of Cl.22 of IS 302-2-3 and IS 302-1) ) |
- |
0 |
|
- |
| 9.0(Construction (as per of Cl.22 of IS 302-2-3 and IS 302-1) ) |
- |
0 |
|
- |
| 9.0(Internal wiring (as per of Cl.23 of IS 302-2-3 and IS 302-1) ) |
- |
1000 |
|
- |
| 9.0(Internal wiring (as per of Cl.23 of IS 302-2-3 and IS 302-1) ) |
- |
0 |
|
- |
| 9.0(Internal wiring (as per of Cl.23 of IS 302-2-3 and IS 302-1) ) |
- |
0 |
|
- |
| 9.0(Internal wiring (as per of Cl.23 of IS 302-2-3 and IS 302-1) ) |
- |
0 |
|
- |
| 9.0(Components (as per of Cl.24 of IS 302-2-3 and IS 302-1) ) |
- |
0 |
|
- |
| 9.0(Supply connection and external flexible cord (as per of Cl.25 of IS 302-2-3 and IS 302-1) ) |
- |
1000 |
|
- |
| 9.0(Supply connection and external flexible cord (as per of Cl.25 of IS 302-2-3 and IS 302-1) ) |
- |
0 |
|
- |
| 9.0(Supply connection and external flexible cord (as per of Cl.25 of IS 302-2-3 and IS 302-1) ) |
- |
0 |
|
- |
| 9.0(Supply connection and external flexible cord (as per of Cl.25 of IS 302-2-3 and IS 302-1) ) |
- |
0 |
|
- |
| 9.0(Supply connection and external flexible cord (as per of Cl.25 of IS 302-2-3 and IS 302-1) ) |
- |
0 |
|
- |
| 9.0(Terminals for external conductors (as per of Cl.26 of IS 302-2-3 and IS 302-1) ) |
- |
0 |
|
- |
| 9.0(Provision for earthing (as per of Cl.27 of IS 302-2-3 and IS 302-1) ) |
- |
1000 |
|
- |
| 9.0(Provision for earthing (as per of Cl.27 of IS 302-2-3 and IS 302-1) ) |
- |
0 |
|
- |
| 9.0(Provision for earthing (as per of Cl.27 of IS 302-2-3 and IS 302-1) ) |
- |
0 |
|
- |
| 9.0(Provision for earthing (as per of Cl.27 of IS 302-2-3 and IS 302-1) ) |
- |
0 |
|
- |
| 9.0(Screw and connections (as per of Cl.28 of IS 302-2-3 and IS 302-1)) |
- |
1000 |
|
- |
| 9.0(Screw and connections (as per of Cl.28 of IS 302-2-3 and IS 302-1)) |
- |
0 |
|
- |
| 9.0(Clearances, creepage distances and solid insulation (as per of Cl.29 of IS 302-2-3 and IS 302-1)) |
- |
1000 |
|
- |
| 9.0(Clearances, creepage distances and solid insulation (as per of Cl.29 of IS 302-2-3 and IS 302-1)) |
- |
0 |
|
- |
| 9.0(Resistance to Heat and Fire (as per of Cl.30 of IS 302-2-3 and IS 302-1)) |
- |
1000 |
|
- |
| 9.0(Resistance to Rusting (as per of Cl.31 of IS 302-2-3 and IS 302-1)) |
- |
1000 |
|
- |
| 10.0(Measurement of Heating up time) |
- |
1000 |
|
- |
| 10.0(Measurement of Heating up time) |
- |
0 |
|
- |
| 11.0(Measurement of sole plate temperature) |
- |
1000 |
|
- |
| 11.0(Measurement of sole plate temperature) |
- |
0 |
|
- |
| 11.0(Measurement of sole plate temperature) |
- |
0 |
|
- |
| 11.0(Measurement of sole plate temperature) |
- |
0 |
|
- |
| 12.0(Measurement of Tempearture Distribution) |
- |
1000 |
|
- |
| 13.0(Measurement of Initial overswing temperature and Heating up excess temperature) |
- |
1000 |
|
- |
| 13.0(Measurement of Initial overswing temperature and Heating up excess temperature) |
- |
0 |
|
- |
| 14.0(Measurement of Cyclic fluctuation of temperature of hottest point ) |
- |
1000 |
|
- |
| 16.0(Measurement of Thermostatic staibility) |
- |
500 |
|
- |
| 16.0(Measurement of Thermostatic staibility) |
- |
0 |
|
- |
| 16.0(Measurement of Thermostatic staibility) |
- |
0 |
|
- |
| 16.0(Measurement of Thermostatic staibility) |
- |
0 |
|
- |
| 16.0(Measurement of Thermostatic staibility) |
- |
0 |
|
- |
| 16.0(Measurement of Thermostatic staibility) |
- |
0 |
|
- |
| 7.0(Classification (as per Cl.6 of IS 302-2-3 and Cl.6.1 of IS 302-1)) |
- |
0 |
|
- |
| 7.0(Classification (as per Cl.6 of IS 302-2-3 and Cl.6.2 of IS 302-1)) |
- |
0 |
|
- |
| 9.0(Protection against access to live parts (as per Cl. 8 of IS 302-2-3 and IS 302-1)) |
- |
0 |
|
- |
| 9.0(Power input and current (as per Cl. 10 of IS 302-2-3 and IS 302-1)) |
- |
0 |
|
- |
| 9.0(Temperature Rise (as per Cl. 11 of IS 302-2-3 and IS 302-1)) |
- |
0 |
|
- |
| 9.0(Temperature Rise (as per Cl. 11 of IS 302-2-3 and IS 302-1)) |
- |
0 |
|
- |
| 9.0(Temperature Rise (as per Cl. 11 of IS 302-2-3 and IS 302-1)) |
- |
0 |
|
- |
| 9.0(Temperature Rise (as per Cl. 11 of IS 302-2-3 and IS 302-1)) |
- |
0 |
|
- |
| 9.0(Leakage current and Electric Strength at Operating Temperature (as per Cl. 13 of IS 302-2-3 and IS 302-1)) |
- |
0 |
|
- |
| 9.0(Leakage current and Electric Strength at Operating Temperature (as per Cl. 13 of IS 302-2-3 and IS 302-1)) |
- |
0 |
|
- |
| 9.0(Transient Overvoltage (as per of Cl. 14 of IS 302-2-3 and Table 6 of IS 302-1)) |
- |
0 |
|
- |
| 9.0(Moisture Resistance (as per of Cl.15 of IS 302-2-3 and IS 302-1)) |
- |
0 |
|
- |
| 9.0(Moisture Resistance (as per of Cl.15 of IS 302-2-3 and IS 302-1)) |
- |
0 |
|
- |
| 9.0(Abnormal Operation (as per of Cl.19 of IS 302-2-3 and IS 302-1) ) |
- |
0 |
|
- |
| 9.0(Abnormal Operation (as per of Cl.19 of IS 302-2-3 and IS 302-1) ) |
- |
0 |
|
- |
| 9.0(Abnormal Operation (as per of Cl.19 of IS 302-2-3 and IS 302-1) ) |
- |
0 |
|
- |
| 9.0(Abnormal Operation (as per of Cl.19 of IS 302-2-3 and IS 302-1) ) |
- |
0 |
|
- |
| 9.0(Abnormal Operation (as per of Cl.19 of IS 302-2-3 and IS 302-1) ) |
- |
0 |
|
- |
| 9.0(Staibilty and mechanical hazards (as per of Cl.20 of IS 302-2-3 and IS 302-1) ) |
- |
0 |
|
- |
| 9.0(Mechanical strength (as per of Cl.21 of IS 302-2-3 and IS 302-1) ) |
- |
0 |
|
- |
| 9.0(Construction (as per of Cl.22 of IS 302-2-3 and IS 302-1) ) |
- |
0 |
|
- |
| 9.0(Construction (as per of Cl.22 of IS 302-2-3 and IS 302-1) ) |
- |
0 |
|
- |
| 9.0(Construction (as per of Cl.22 of IS 302-2-3 and IS 302-1) ) |
- |
0 |
|
- |
| 9.0(Construction (as per of Cl.22 of IS 302-2-3 and IS 302-1) ) |
- |
0 |
|
- |
| 9.0(Construction (as per of Cl.22 of IS 302-2-3 and IS 302-1) ) |
- |
0 |
|
- |
| 9.0(Construction (as per of Cl.22 of IS 302-2-3 and IS 302-1) ) |
- |
0 |
|
- |
| 9.0(Construction (as per of Cl.22 of IS 302-2-3 and IS 302-1) ) |
- |
0 |
|
- |
| 9.0(Internal wiring (as per of Cl.23 of IS 302-2-3 and IS 302-1) ) |
- |
0 |
|
- |
| 9.0(Internal wiring (as per of Cl.23 of IS 302-2-3 and IS 302-1) ) |
- |
0 |
|
- |
| 9.0(Internal wiring (as per of Cl.23 of IS 302-2-3 and IS 302-1) ) |
- |
0 |
|
- |
| 9.0(Internal wiring (as per of Cl.23 of IS 302-2-3 and IS 302-1) ) |
- |
0 |
|
- |
| 9.0(Components (as per of Cl.24 of IS 302-2-3 and IS 302-1) ) |
- |
0 |
|
- |
| 9.0(Supply connection and external flexible cord (as per of Cl.25 of IS 302-2-3 and IS 302-1) ) |
- |
0 |
|
- |
| 9.0(Supply connection and external flexible cord (as per of Cl.25 of IS 302-2-3 and IS 302-1) ) |
- |
0 |
|
- |
| 9.0(Supply connection and external flexible cord (as per of Cl.25 of IS 302-2-3 and IS 302-1) ) |
- |
0 |
|
- |
| 9.0(Supply connection and external flexible cord (as per of Cl.25 of IS 302-2-3 and IS 302-1) ) |
- |
0 |
|
- |
| 9.0(Supply connection and external flexible cord (as per of Cl.25 of IS 302-2-3 and IS 302-1) ) |
- |
0 |
|
- |
| 9.0(Terminals for external conductors (as per of Cl.26 of IS 302-2-3 and IS 302-1) ) |
- |
0 |
|
- |
| 9.0(Provision for earthing (as per of Cl.27 of IS 302-2-3 and IS 302-1) ) |
- |
0 |
|
- |
| 9.0(Provision for earthing (as per of Cl.27 of IS 302-2-3 and IS 302-1) ) |
- |
0 |
|
- |
| 9.0(Provision for earthing (as per of Cl.27 of IS 302-2-3 and IS 302-1) ) |
- |
0 |
|
- |
| 9.0(Provision for earthing (as per of Cl.27 of IS 302-2-3 and IS 302-1) ) |
- |
0 |
|
- |
| 9.0(Screw and connections (as per of Cl.28 of IS 302-2-3 and IS 302-1)) |
- |
0 |
|
- |
| 9.0(Screw and connections (as per of Cl.28 of IS 302-2-3 and IS 302-1)) |
- |
0 |
|
- |
| 9.0(Clearances, creepage distances and solid insulation (as per of Cl.29 of IS 302-2-3 and IS 302-1)) |
- |
0 |
|
- |
| 9.0(Clearances, creepage distances and solid insulation (as per of Cl.29 of IS 302-2-3 and IS 302-1)) |
- |
0 |
|
- |
| 9.0(Resistance to Heat and Fire (as per of Cl.30 of IS 302-2-3 and IS 302-1)) |
- |
0 |
|
- |
| 9.0(Resistance to Rusting (as per of Cl.31 of IS 302-2-3 and IS 302-1)) |
- |
0 |
|
- |
| 10.0(Measurement of Heating up time) |
- |
0 |
|
- |
| 10.0(Measurement of Heating up time) |
- |
0 |
|
- |
| 11.0(Measurement of sole plate temperature) |
- |
0 |
|
- |
| 11.0(Measurement of sole plate temperature) |
- |
0 |
|
- |
| 11.0(Measurement of sole plate temperature) |
- |
0 |
|
- |
| 11.0(Measurement of sole plate temperature) |
- |
0 |
|
- |
| 12.0(Measurement of Tempearture Distribution) |
- |
0 |
|
- |
| 13.0(Measurement of Initial overswing temperature and Heating up excess temperature) |
- |
0 |
|
- |
| 13.0(Measurement of Initial overswing temperature and Heating up excess temperature) |
- |
0 |
|
- |
| 14.0(Measurement of Cyclic fluctuation of temperature of hottest point ) |
- |
0 |
|
- |
| 16.0(Measurement of Thermostatic staibility) |
- |
0 |
|
- |
| 16.0(Measurement of Thermostatic staibility) |
- |
0 |
|
- |
| 16.0(Measurement of Thermostatic staibility) |
- |
0 |
|
- |
| 16.0(Measurement of Thermostatic staibility) |
- |
0 |
|
- |
| 16.0(Measurement of Thermostatic staibility) |
- |
0 |
|
- |
| 16.0(Measurement of Thermostatic staibility) |
- |
0 |
|
- |
| 6(Measurement of Thermostatic staibility) |
- |
0 |
|
- |
| 15(MEASUREMENT OF TEMPERATURE DROP UNDER LOAD) |
- |
0 |
|
- |
| 17(Measurement of Thermostatic staibility) |
- |
0 |
|
- |
| 16 of IS 302-2-3(Leakage current electric strength) |
- |
0 |
|
- |
| 4(GENERAL REQUIREMENTS) |
- |
0 |
|
- |
| 5(GENERAL NOTES ON TESTS) |
- |
0 |
|
- |
| 8(Marking) |
- |
0 |
|
- |
| (Cl.8 of IS 366:1991 )(Marking and Instructions) |
- |
0 |
|
- |
| (Cl.8 of IS 366:1991 )(Marking and Instructions) |
- |
0 |
|
- |
| (Cl.8 of IS 366:1991 )(Marking and Instructions) |
- |
0 |
|
- |
| (Cl.8 of IS 366:1991 )(Marking and Instructions) |
- |
500 |
|
- |
| (Cl.11 of IS 302-2-3 :2007)(Heating) |
- |
0 |
|
- |
| (Cl.22 of IS 302-2-3 :2007)(Construction) |
- |
0 |
|
- |
| (Cl.22 of IS 302-2-3 :2007)(Construction) |
- |
0 |
|
- |
|
29 Apr, 2027 |
- - |
| 3734 |
FARE Labs Pvt. Ltd., Gurugram
| 8135716
| IS 253 (2014) |
Specification for common salt (Fourth Revision) |
--- |
5000 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| Clause -3 for common salt 3.1 ( 3.1.1 ) ( The material shall be crystalline solid, white or pale pink or light grey in colour.) |
- |
200 |
|
Rs. 5000/- (for both common salt & dairy salt) |
| Clause -3 for common salt 3.1 ( 3.1.2 ) Annex-2(Moisture The material shall contain not more than 6.0 percent by mass of moisture, on as received basis, when tested according to the method given in A-2) |
- |
200 |
|
Rs. 5000/- (for both common salt & dairy salt) |
| Clause-3.2 for dairy salt (3.2.1)(The material shall be crystalline white solid and free from any visible impurities.) |
- |
200 |
|
Rs. 5000/- (for both common salt & dairy salt) |
| Clause-3.1 for dairy salt (3.2.2)(3.2.2 Particle Size 99 percent by mass of the material shall pass completely through 850-micron IS Sieve [see IS 460 (Part I)].) |
- |
200 |
|
Rs. 5000/- (for both common salt & dairy salt) |
| Clause-3.2 for dairy salt (3.2.3) Annex -2(3.2.3 Moisture The material shall contain not more than 0.5 percent by mass of moisture, on as received basis, when tested according to the methods given in A-2.) |
- |
200 |
|
Rs. 5000/- (for both common salt & dairy salt) |
| Table 1 (i) Annex -4(Water insoluble matter, common) |
- |
200 |
|
Rs. 5000/- (for both common salt & dairy salt) |
| Table 1 (i) Annex -4(Water insoluble matter, Dairy) |
- |
200 |
|
Rs. 5000/- (for both common salt & dairy salt) |
| Table 1 (ii) Annex-5(Chloride content (as NaCl)common) |
- |
300 |
|
Rs. 5000/- (for both common salt & dairy salt) |
| Table 1 (ii) Annex-5(Chloride content (as NaCl), Dairy) |
- |
300 |
|
Rs. 5000/- (for both common salt & dairy salt) |
| Table 1 (iii) Annex-6( Matter soluble in water, other than sodium chloride, common) |
- |
300 |
|
Rs. 5000/- (for both common salt & dairy salt) |
| Table 1 (iii) Annex-6( Matter soluble in water, other than sodium chloride, Dairy) |
- |
300 |
|
Rs. 5000/- (for both common salt & dairy salt) |
| Table 1 (iv)(Calcium (as Ca), water soluble, percent by mass, common) |
- |
300 |
|
Rs. 5000/- (for both common salt & dairy salt) |
| Table 1 (iv) Annex-7(Calcium (as Ca), water soluble, percent by mass, Dairy) |
- |
300 |
|
Rs. 5000/- (for both common salt & dairy salt) |
| Table 1 (v)(Magnesium (as Mg), water soluble, percent by mass, common ) |
- |
300 |
|
Rs. 5000/- (for both common salt & dairy salt) |
| Table 1 (v) Annex-7(Magnesium (as Mg), water soluble, percent by mass, Dairy ) |
- |
300 |
|
Rs. 5000/- (for both common salt & dairy salt) |
| Table 1 (vi)(Sulphate as SO2 percent by mass, common) |
- |
300 |
|
Rs. 5000/- (for both common salt & dairy salt) |
| Table 1 (vi) Annex-8(sulphate as SO2 percent by mass, Dairy) |
- |
300 |
|
Rs. 5000/- (for both common salt & dairy salt) |
| Table 1 (vii) Annex-9(Alkalinity (as Na2CO3), common) |
- |
300 |
|
Rs. 5000/- (for both common salt & dairy salt) |
| Table 1 (vii) Annex-11(Alkalinity (as Na2CO3), Dairy) |
- |
300 |
|
Rs. 5000/- (for both common salt & dairy salt) |
| Table 1 (viii)(Lead (as Pb), common) |
- |
600 |
|
Rs. 5000/- (for both common salt & dairy salt) |
| Table 1 (viii)(Lead (as Pb),Dairy ) |
- |
600 |
|
Rs. 5000/- (for both common salt & dairy salt) |
| Table 1 (ix)(Iron (as Fe), common) |
- |
600 |
|
Rs. 5000/- (for both common salt & dairy salt) |
| Table 1 (ix)(Iron (as Fe), Dairy) |
- |
600 |
|
Rs. 5000/- (for both common salt & dairy salt) |
| Table 1 (x) Annex-11(x) Arsenic (as As), common) |
- |
600 |
|
Rs. 5000/- (for both common salt & dairy salt) |
| Table 1 (x) Annex-11(x) Arsenic (as As),Dairy) |
- |
600 |
|
Rs. 5000/- (for both common salt & dairy salt) |
| Table 1 (xi) Annex-12(Copper (as Cu), common) |
- |
600 |
|
Rs. 5000/- (for both common salt & dairy salt) |
| Table 1 (xi) Annex-12(Copper (as Cu), Dairy ) |
- |
600 |
|
Rs. 5000/- (for both common salt & dairy salt) |
| Cl-3.1.3(Determination of ferrocyanide (Common Salt)) |
- |
200 |
|
Rs. 5000/- (for both common salt & dairy salt) |
| Clause -3 for common salt 3.1 ( 3.1.1 ) ( The material shall be crystalline solid, white or pale pink or light grey in colour.) |
- |
0 |
|
- |
| Clause -3 for common salt 3.1 ( 3.1.2 ) Annex-2(Moisture The material shall contain not more than 6.0 percent by mass of moisture, on as received basis, when tested according to the method given in A-2) |
- |
0 |
|
- |
| Clause-3.2 for dairy salt (3.2.1)(The material shall be crystalline white solid and free from any visible impurities.) |
- |
0 |
|
- |
| Clause-3.1 for dairy salt (3.2.2)(3.2.2 Particle Size 99 percent by mass of the material shall pass completely through 850-micron IS Sieve [see IS 460 (Part I)].) |
- |
0 |
|
- |
| Clause-3.2 for dairy salt (3.2.3) Annex -2(3.2.3 Moisture The material shall contain not more than 0.5 percent by mass of moisture, on as received basis, when tested according to the methods given in A-2.) |
- |
0 |
|
- |
| Table 1 (i) Annex -4(Water insoluble matter, common) |
- |
0 |
|
- |
| Table 1 (i) Annex -4(Water insoluble matter, Dairy) |
- |
0 |
|
- |
| Table 1 (ii) Annex-5(Chloride content (as NaCl)common) |
- |
0 |
|
- |
| Table 1 (ii) Annex-5(Chloride content (as NaCl), Dairy) |
- |
0 |
|
- |
| Table 1 (iii) Annex-6( Matter soluble in water, other than sodium chloride, common) |
- |
0 |
|
- |
| Table 1 (iii) Annex-6( Matter soluble in water, other than sodium chloride, Dairy) |
- |
0 |
|
- |
| Table 1 (iv)(Calcium (as Ca), water soluble, percent by mass, common) |
- |
0 |
|
- |
| Table 1 (iv) Annex-7(Calcium (as Ca), water soluble, percent by mass, Dairy) |
- |
0 |
|
- |
| Table 1 (v)(Magnesium (as Mg), water soluble, percent by mass, common ) |
- |
0 |
|
- |
| Table 1 (v) Annex-7(Magnesium (as Mg), water soluble, percent by mass, Dairy ) |
- |
0 |
|
- |
| Table 1 (vi)(Sulphate as SO2 percent by mass, common) |
- |
0 |
|
- |
| Table 1 (vi) Annex-8(sulphate as SO2 percent by mass, Dairy) |
- |
0 |
|
- |
| Table 1 (vii) Annex-9(Alkalinity (as Na2CO3), common) |
- |
0 |
|
- |
| Table 1 (vii) Annex-11(Alkalinity (as Na2CO3), Dairy) |
- |
0 |
|
- |
| Table 1 (viii)(Lead (as Pb), common) |
- |
0 |
|
- |
| Table 1 (viii)(Lead (as Pb),Dairy ) |
- |
0 |
|
- |
| Table 1 (ix)(Iron (as Fe), common) |
- |
0 |
|
- |
| Table 1 (ix)(Iron (as Fe), Dairy) |
- |
0 |
|
- |
| Table 1 (x) Annex-11(x) Arsenic (as As), common) |
- |
0 |
|
- |
| Table 1 (x) Annex-11(x) Arsenic (as As),Dairy) |
- |
0 |
|
- |
| Table 1 (xi) Annex-12(Copper (as Cu), common) |
- |
0 |
|
- |
| Table 1 (xi) Annex-12(Copper (as Cu), Dairy ) |
- |
0 |
|
- |
| Cl-3.1.3(Determination of ferrocyanide (Common Salt)) |
- |
0 |
|
- |
| Cl-3.2.4(Determination of ferrocyanide (Dairy Salt)) |
- |
0 |
|
- |
|
09 Mar, 2026 |
- Included w.e.f.19.05.2025 |
| 3735 |
Atharva Laboratories Pvt. Ltd. (C-54), Noida
| 8165026
| IS 10322 : Part 5 : Sec 9 (2017) |
Luminaires: Part 5 particular requirements: Sec 9 rope lights |
- |
30000 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 21.4(General Test Requireements) |
- |
0 |
|
- |
| 21.5(Classification of Luminaires') |
- |
2000 |
|
- |
| 21.6(Marking) |
- |
1000 |
|
- |
| 21.7(Construction) |
- |
15000 |
|
- |
| 21.8(Creepage Distance and Clearances) |
- |
1000 |
|
- |
| 21.9(Provision for earthing) |
- |
2000 |
|
- |
| 21.10(Terminals) |
- |
1000 |
|
- |
| 21.11(External & Internal Wiring) |
- |
1000 |
|
- |
| 21.12(Protection against electric shock) |
- |
1000 |
|
- |
| 21.13(Endurance Tests and Thermal Tests) |
- |
1000 |
|
- |
| 21.14(Resistance to Dust & Moisture) |
- |
1000 |
|
- |
| 21.15(Insulation Resistance and Electric Strength) |
- |
2000 |
|
- |
| 21.16(Resistance to Heat , fire and tracking) |
- |
3000 |
|
- |
| 21.7.1(General) |
- |
0 |
|
- |
| 21.7.3(Terminals and supply connections) |
- |
0 |
|
- |
| 21.7.4(Control units) |
- |
0 |
|
- |
| 21.7.5(Mechanical strength) |
- |
0 |
|
- |
| 21.4(General Test Requireements) |
- |
- |
|
- |
| 21.5(Classification of Luminaires') |
- |
- |
|
- |
| 21.6(Marking) |
- |
- |
|
- |
| 21.7(Construction) |
- |
- |
|
- |
| 21.8(Creepage Distance and Clearances) |
- |
- |
|
- |
| 21.9(Provision for earthing) |
- |
- |
|
- |
| 21.10(Terminals) |
- |
- |
|
- |
| 21.11(External & Internal Wiring) |
- |
- |
|
- |
| 21.12(Protection against electric shock) |
- |
- |
|
- |
| 21.13(Endurance Tests and Thermal Tests) |
- |
- |
|
- |
| 21.14(Resistance to Dust & Moisture) |
- |
- |
|
- |
| 21.15(Insulation Resistance and Electric Strength) |
- |
- |
|
- |
| 21.16(Resistance to Heat , fire and tracking) |
- |
- |
|
- |
| 21.7.1(General) |
- |
- |
|
- |
| 21.7.3(Terminals and supply connections) |
- |
- |
|
- |
| 21.7.4(Control units) |
- |
- |
|
- |
| 21.7.5(Mechanical strength) |
- |
- |
|
- |
|
23 Feb, 2029 |
- Included w.e.f. 26.09.2025
Exclusion: 21.7 (Construction) |
| 3736 |
DARSHAN ELECTRICAL TESTING AND RESEARCH LABORATORY (DETRL), RAJKOT
| 7165436
| IS 9283 (2024) |
LINE OPERATED A.C. MOTORS FOR SUBMERSIBLE PUMPSETS - SPECIFICATION (THIRD REVISION) |
0.37-2.2 Kw(1-Ph),0.75-37 kW(3-Ph) |
15000 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| As Per Clause 5.1.2 Table 1(Material) |
- |
20 |
|
Rs. 7200 Up to 3.7 kW; Rs. 8400 above 3.7 to 7.5 kW; Rs. 9600 above 7.5 to 11 kW; Rs. 10200 above 11 to 15 kW; Rs. 10800 above 15 to 20 kW; Rs. 12000 above 20 to 25 kW; Rs. 13200 above 25 to 30 kW; Rs. 15000 above 30 to37 kW |
| As Per Clause 5.1.3(Construction-General) |
- |
15 |
|
Rs. 7200 Up to 3.7 kW; Rs. 8400 above 3.7 to 7.5 kW; Rs. 9600 above 7.5 to 11 kW; Rs. 10200 above 11 to 15 kW; Rs. 10800 above 15 to 20 kW; Rs. 12000 above 20 to 25 kW; Rs. 13200 above 25 to 30 kW; Rs. 15000 above 30 to37 kW |
| As per Clause 5.1.4(Construction-General) |
- |
15 |
|
Rs. 7200 Up to 3.7 kW; Rs. 8400 above 3.7 to 7.5 kW; Rs. 9600 above 7.5 to 11 kW; Rs. 10200 above 11 to 15 kW; Rs. 10800 above 15 to 20 kW; Rs. 12000 above 20 to 25 kW; Rs. 13200 above 25 to 30 kW; Rs. 15000 above 30 to37 kW |
| As per Clause 5.2.1(Earthing) |
- |
80 |
|
Rs. 7200 Up to 3.7 kW; Rs. 8400 above 3.7 to 7.5 kW; Rs. 9600 above 7.5 to 11 kW; Rs. 10200 above 11 to 15 kW; Rs. 10800 above 15 to 20 kW; Rs. 12000 above 20 to 25 kW; Rs. 13200 above 25 to 30 kW; Rs. 15000 above 30 to37 kW |
| As per Clause 5.4.1(Construction-Type of cable & Size of conductor of cable) |
- |
20 |
|
Rs. 7200 Up to 3.7 kW; Rs. 8400 above 3.7 to 7.5 kW; Rs. 9600 above 7.5 to 11 kW; Rs. 10200 above 11 to 15 kW; Rs. 10800 above 15 to 20 kW; Rs. 12000 above 20 to 25 kW; Rs. 13200 above 25 to 30 kW; Rs. 15000 above 30 to37 kW |
| As per Clause 5.4.2(Construction-Length of cable) |
- |
20 |
|
Rs. 7200 Up to 3.7 kW; Rs. 8400 above 3.7 to 7.5 kW; Rs. 9600 above 7.5 to 11 kW; Rs. 10200 above 11 to 15 kW; Rs. 10800 above 15 to 20 kW; Rs. 12000 above 20 to 25 kW; Rs. 13200 above 25 to 30 kW; Rs. 15000 above 30 to37 kW |
| As per Clause 5.4.3(Construction-Joint in Cable) |
- |
20 |
|
Rs. 7200 Up to 3.7 kW; Rs. 8400 above 3.7 to 7.5 kW; Rs. 9600 above 7.5 to 11 kW; Rs. 10200 above 11 to 15 kW; Rs. 10800 above 15 to 20 kW; Rs. 12000 above 20 to 25 kW; Rs. 13200 above 25 to 30 kW; Rs. 15000 above 30 to37 kW |
| As per Clause 5.5(Finish of Bearings) |
- |
500 |
|
Rs. 7200 Up to 3.7 kW; Rs. 8400 above 3.7 to 7.5 kW; Rs. 9600 above 7.5 to 11 kW; Rs. 10200 above 11 to 15 kW; Rs. 10800 above 15 to 20 kW; Rs. 12000 above 20 to 25 kW; Rs. 13200 above 25 to 30 kW; Rs. 15000 above 30 to37 kW |
| As per Clause 5.6(Balancing of Rotor) |
- |
800 |
|
Rs. 7200 Up to 3.7 kW; Rs. 8400 above 3.7 to 7.5 kW; Rs. 9600 above 7.5 to 11 kW; Rs. 10200 above 11 to 15 kW; Rs. 10800 above 15 to 20 kW; Rs. 12000 above 20 to 25 kW; Rs. 13200 above 25 to 30 kW; Rs. 15000 above 30 to37 kW |
| As per Clause 7.1(Dimensions of Motors) |
- |
100 |
|
Rs. 7200 Up to 3.7 kW; Rs. 8400 above 3.7 to 7.5 kW; Rs. 9600 above 7.5 to 11 kW; Rs. 10200 above 11 to 15 kW; Rs. 10800 above 15 to 20 kW; Rs. 12000 above 20 to 25 kW; Rs. 13200 above 25 to 30 kW; Rs. 15000 above 30 to37 kW |
| As per Clause 7.2(Tolerances) |
- |
100 |
|
Rs. 7200 Up to 3.7 kW; Rs. 8400 above 3.7 to 7.5 kW; Rs. 9600 above 7.5 to 11 kW; Rs. 10200 above 11 to 15 kW; Rs. 10800 above 15 to 20 kW; Rs. 12000 above 20 to 25 kW; Rs. 13200 above 25 to 30 kW; Rs. 15000 above 30 to37 kW |
| As per Clause 12.1(Efficiency) |
- |
500 |
|
Rs. 7200 Up to 3.7 kW; Rs. 8400 above 3.7 to 7.5 kW; Rs. 9600 above 7.5 to 11 kW; Rs. 10200 above 11 to 15 kW; Rs. 10800 above 15 to 20 kW; Rs. 12000 above 20 to 25 kW; Rs. 13200 above 25 to 30 kW; Rs. 15000 above 30 to37 kW |
| As per Clause 12.1(Efficiency) |
- |
500 |
|
Rs. 7200 Up to 3.7 kW; Rs. 8400 above 3.7 to 7.5 kW; Rs. 9600 above 7.5 to 11 kW; Rs. 10200 above 11 to 15 kW; Rs. 10800 above 15 to 20 kW; Rs. 12000 above 20 to 25 kW; Rs. 13200 above 25 to 30 kW; Rs. 15000 above 30 to37 kW |
| As per Clause 13(Terminal Marking) |
- |
30 |
|
Rs. 7200 Up to 3.7 kW; Rs. 8400 above 3.7 to 7.5 kW; Rs. 9600 above 7.5 to 11 kW; Rs. 10200 above 11 to 15 kW; Rs. 10800 above 15 to 20 kW; Rs. 12000 above 20 to 25 kW; Rs. 13200 above 25 to 30 kW; Rs. 15000 above 30 to37 kW |
| As per Clause 15.1(Rating Plate) |
- |
30 |
|
Rs. 7200 Up to 3.7 kW; Rs. 8400 above 3.7 to 7.5 kW; Rs. 9600 above 7.5 to 11 kW; Rs. 10200 above 11 to 15 kW; Rs. 10800 above 15 to 20 kW; Rs. 12000 above 20 to 25 kW; Rs. 13200 above 25 to 30 kW; Rs. 15000 above 30 to37 kW |
| As per Clause 15.1(Rating Plate) |
- |
30 |
|
Rs. 7200 Up to 3.7 kW; Rs. 8400 above 3.7 to 7.5 kW; Rs. 9600 above 7.5 to 11 kW; Rs. 10200 above 11 to 15 kW; Rs. 10800 above 15 to 20 kW; Rs. 12000 above 20 to 25 kW; Rs. 13200 above 25 to 30 kW; Rs. 15000 above 30 to37 kW |
| As per Clause 15.1(Rating Plate) |
- |
30 |
|
Rs. 7200 Up to 3.7 kW; Rs. 8400 above 3.7 to 7.5 kW; Rs. 9600 above 7.5 to 11 kW; Rs. 10200 above 11 to 15 kW; Rs. 10800 above 15 to 20 kW; Rs. 12000 above 20 to 25 kW; Rs. 13200 above 25 to 30 kW; Rs. 15000 above 30 to37 kW |
| As per Clause 15.1(Rating Plate) |
- |
30 |
|
Rs. 7200 Up to 3.7 kW; Rs. 8400 above 3.7 to 7.5 kW; Rs. 9600 above 7.5 to 11 kW; Rs. 10200 above 11 to 15 kW; Rs. 10800 above 15 to 20 kW; Rs. 12000 above 20 to 25 kW; Rs. 13200 above 25 to 30 kW; Rs. 15000 above 30 to37 kW |
| As per Clause 15.1(Rating Plate) |
- |
30 |
|
Rs. 7200 Up to 3.7 kW; Rs. 8400 above 3.7 to 7.5 kW; Rs. 9600 above 7.5 to 11 kW; Rs. 10200 above 11 to 15 kW; Rs. 10800 above 15 to 20 kW; Rs. 12000 above 20 to 25 kW; Rs. 13200 above 25 to 30 kW; Rs. 15000 above 30 to37 kW |
| As per Clause 15.1(Rating Plate) |
- |
30 |
|
Rs. 7200 Up to 3.7 kW; Rs. 8400 above 3.7 to 7.5 kW; Rs. 9600 above 7.5 to 11 kW; Rs. 10200 above 11 to 15 kW; Rs. 10800 above 15 to 20 kW; Rs. 12000 above 20 to 25 kW; Rs. 13200 above 25 to 30 kW; Rs. 15000 above 30 to37 kW |
| As per Clause 15.1(Rating Plate) |
- |
30 |
|
Rs. 7200 Up to 3.7 kW; Rs. 8400 above 3.7 to 7.5 kW; Rs. 9600 above 7.5 to 11 kW; Rs. 10200 above 11 to 15 kW; Rs. 10800 above 15 to 20 kW; Rs. 12000 above 20 to 25 kW; Rs. 13200 above 25 to 30 kW; Rs. 15000 above 30 to37 kW |
| As per Clause 15.1(Rating Plate) |
- |
30 |
|
Rs. 7200 Up to 3.7 kW; Rs. 8400 above 3.7 to 7.5 kW; Rs. 9600 above 7.5 to 11 kW; Rs. 10200 above 11 to 15 kW; Rs. 10800 above 15 to 20 kW; Rs. 12000 above 20 to 25 kW; Rs. 13200 above 25 to 30 kW; Rs. 15000 above 30 to37 kW |
| As per Clause 15.1(Rating Plate) |
- |
30 |
|
Rs. 7200 Up to 3.7 kW; Rs. 8400 above 3.7 to 7.5 kW; Rs. 9600 above 7.5 to 11 kW; Rs. 10200 above 11 to 15 kW; Rs. 10800 above 15 to 20 kW; Rs. 12000 above 20 to 25 kW; Rs. 13200 above 25 to 30 kW; Rs. 15000 above 30 to37 kW |
| As per Clause 15.1(Rating Plate) |
- |
30 |
|
Rs. 7200 Up to 3.7 kW; Rs. 8400 above 3.7 to 7.5 kW; Rs. 9600 above 7.5 to 11 kW; Rs. 10200 above 11 to 15 kW; Rs. 10800 above 15 to 20 kW; Rs. 12000 above 20 to 25 kW; Rs. 13200 above 25 to 30 kW; Rs. 15000 above 30 to37 kW |
| As per Clause 15.1(Rating Plate) |
- |
30 |
|
Rs. 7200 Up to 3.7 kW; Rs. 8400 above 3.7 to 7.5 kW; Rs. 9600 above 7.5 to 11 kW; Rs. 10200 above 11 to 15 kW; Rs. 10800 above 15 to 20 kW; Rs. 12000 above 20 to 25 kW; Rs. 13200 above 25 to 30 kW; Rs. 15000 above 30 to37 kW |
| As per Clause 15.1(Rating Plate) |
- |
30 |
|
Rs. 7200 Up to 3.7 kW; Rs. 8400 above 3.7 to 7.5 kW; Rs. 9600 above 7.5 to 11 kW; Rs. 10200 above 11 to 15 kW; Rs. 10800 above 15 to 20 kW; Rs. 12000 above 20 to 25 kW; Rs. 13200 above 25 to 30 kW; Rs. 15000 above 30 to37 kW |
| As per Clause 15.1(Rating Plate) |
- |
30 |
|
Rs. 7200 Up to 3.7 kW; Rs. 8400 above 3.7 to 7.5 kW; Rs. 9600 above 7.5 to 11 kW; Rs. 10200 above 11 to 15 kW; Rs. 10800 above 15 to 20 kW; Rs. 12000 above 20 to 25 kW; Rs. 13200 above 25 to 30 kW; Rs. 15000 above 30 to37 kW |
| As per Clause 15.1(Rating Plate) |
- |
30 |
|
Rs. 7200 Up to 3.7 kW; Rs. 8400 above 3.7 to 7.5 kW; Rs. 9600 above 7.5 to 11 kW; Rs. 10200 above 11 to 15 kW; Rs. 10800 above 15 to 20 kW; Rs. 12000 above 20 to 25 kW; Rs. 13200 above 25 to 30 kW; Rs. 15000 above 30 to37 kW |
| As per Clause 15.1(Rating Plate) |
- |
30 |
|
Rs. 7200 Up to 3.7 kW; Rs. 8400 above 3.7 to 7.5 kW; Rs. 9600 above 7.5 to 11 kW; Rs. 10200 above 11 to 15 kW; Rs. 10800 above 15 to 20 kW; Rs. 12000 above 20 to 25 kW; Rs. 13200 above 25 to 30 kW; Rs. 15000 above 30 to37 kW |
| As per Clause 15.2(Rating Plate) |
- |
30 |
|
Rs. 7200 Up to 3.7 kW; Rs. 8400 above 3.7 to 7.5 kW; Rs. 9600 above 7.5 to 11 kW; Rs. 10200 above 11 to 15 kW; Rs. 10800 above 15 to 20 kW; Rs. 12000 above 20 to 25 kW; Rs. 13200 above 25 to 30 kW; Rs. 15000 above 30 to37 kW |
| As per Clause 16.1(a),21(Insulationresistance test(Before HV Test)) |
- |
150 |
|
Rs. 7200 Up to 3.7 kW; Rs. 8400 above 3.7 to 7.5 kW; Rs. 9600 above 7.5 to 11 kW; Rs. 10200 above 11 to 15 kW; Rs. 10800 above 15 to 20 kW; Rs. 12000 above 20 to 25 kW; Rs. 13200 above 25 to 30 kW; Rs. 15000 above 30 to37 kW |
| As per Clause 16.1(a),21(Insulationresistance test(After HV Test)) |
- |
150 |
|
Rs. 7200 Up to 3.7 kW; Rs. 8400 above 3.7 to 7.5 kW; Rs. 9600 above 7.5 to 11 kW; Rs. 10200 above 11 to 15 kW; Rs. 10800 above 15 to 20 kW; Rs. 12000 above 20 to 25 kW; Rs. 13200 above 25 to 30 kW; Rs. 15000 above 30 to37 kW |
| As per Clause 16.1(b),20(High voltage test) |
- |
400 |
|
Rs. 7200 Up to 3.7 kW; Rs. 8400 above 3.7 to 7.5 kW; Rs. 9600 above 7.5 to 11 kW; Rs. 10200 above 11 to 15 kW; Rs. 10800 above 15 to 20 kW; Rs. 12000 above 20 to 25 kW; Rs. 13200 above 25 to 30 kW; Rs. 15000 above 30 to37 kW |
| As per Clause 16.[c](Measurement of stator resistance) |
- |
250 |
|
Rs. 7200 Up to 3.7 kW; Rs. 8400 above 3.7 to 7.5 kW; Rs. 9600 above 7.5 to 11 kW; Rs. 10200 above 11 to 15 kW; Rs. 10800 above 15 to 20 kW; Rs. 12000 above 20 to 25 kW; Rs. 13200 above 25 to 30 kW; Rs. 15000 above 30 to37 kW |
| As per Clause 16.(d)(No Load Test) |
- |
300 |
|
Rs. 7200 Up to 3.7 kW; Rs. 8400 above 3.7 to 7.5 kW; Rs. 9600 above 7.5 to 11 kW; Rs. 10200 above 11 to 15 kW; Rs. 10800 above 15 to 20 kW; Rs. 12000 above 20 to 25 kW; Rs. 13200 above 25 to 30 kW; Rs. 15000 above 30 to37 kW |
| As per Clause 16.(e)(Reduced voltage running up test at no load) |
- |
250 |
|
Rs. 7200 Up to 3.7 kW; Rs. 8400 above 3.7 to 7.5 kW; Rs. 9600 above 7.5 to 11 kW; Rs. 10200 above 11 to 15 kW; Rs. 10800 above 15 to 20 kW; Rs. 12000 above 20 to 25 kW; Rs. 13200 above 25 to 30 kW; Rs. 15000 above 30 to37 kW |
| As per Clause 16.(f)(Locked rotor readings of voltage, current, power input and torque of motors) |
- |
400 |
|
Rs. 7200 Up to 3.7 kW; Rs. 8400 above 3.7 to 7.5 kW; Rs. 9600 above 7.5 to 11 kW; Rs. 10200 above 11 to 15 kW; Rs. 10800 above 15 to 20 kW; Rs. 12000 above 20 to 25 kW; Rs. 13200 above 25 to 30 kW; Rs. 15000 above 30 to37 kW |
| As per Clause 16.(g)(Full load reading of voltage, current, power input, speed and frequency) |
- |
1000 |
|
Rs. 7200 Up to 3.7 kW; Rs. 8400 above 3.7 to 7.5 kW; Rs. 9600 above 7.5 to 11 kW; Rs. 10200 above 11 to 15 kW; Rs. 10800 above 15 to 20 kW; Rs. 12000 above 20 to 25 kW; Rs. 13200 above 25 to 30 kW; Rs. 15000 above 30 to37 kW |
| As per Clause 16.(h),11(Performance characteristics) |
- |
4500 |
|
Rs. 7200 Up to 3.7 kW; Rs. 8400 above 3.7 to 7.5 kW; Rs. 9600 above 7.5 to 11 kW; Rs. 10200 above 11 to 15 kW; Rs. 10800 above 15 to 20 kW; Rs. 12000 above 20 to 25 kW; Rs. 13200 above 25 to 30 kW; Rs. 15000 above 30 to37 kW |
| As per Clause 16.(j),19(Temperature rise test at rated voltage) |
- |
1500 |
|
Rs. 7200 Up to 3.7 kW; Rs. 8400 above 3.7 to 7.5 kW; Rs. 9600 above 7.5 to 11 kW; Rs. 10200 above 11 to 15 kW; Rs. 10800 above 15 to 20 kW; Rs. 12000 above 20 to 25 kW; Rs. 13200 above 25 to 30 kW; Rs. 15000 above 30 to37 kW |
| As per Clause 16.(k),19(Temperature rise test at reduced voltage) |
- |
1500 |
|
Rs. 7200 Up to 3.7 kW; Rs. 8400 above 3.7 to 7.5 kW; Rs. 9600 above 7.5 to 11 kW; Rs. 10200 above 11 to 15 kW; Rs. 10800 above 15 to 20 kW; Rs. 12000 above 20 to 25 kW; Rs. 13200 above 25 to 30 kW; Rs. 15000 above 30 to37 kW |
| As per Clause 16.(m),18(Momentary Overload Test) |
- |
1000 |
|
Rs. 7200 Up to 3.7 kW; Rs. 8400 above 3.7 to 7.5 kW; Rs. 9600 above 7.5 to 11 kW; Rs. 10200 above 11 to 15 kW; Rs. 10800 above 15 to 20 kW; Rs. 12000 above 20 to 25 kW; Rs. 13200 above 25 to 30 kW; Rs. 15000 above 30 to37 kW |
| As per Clause 16.(n),22(Leakage Current Test at rated voltage at no load) |
- |
400 |
|
Rs. 7200 Up to 3.7 kW; Rs. 8400 above 3.7 to 7.5 kW; Rs. 9600 above 7.5 to 11 kW; Rs. 10200 above 11 to 15 kW; Rs. 10800 above 15 to 20 kW; Rs. 12000 above 20 to 25 kW; Rs. 13200 above 25 to 30 kW; Rs. 15000 above 30 to37 kW |
| As Per Clause 5.1.2 Table 1(Material) |
- |
0 |
|
Repeated |
| As Per Clause 5.1.3(Construction-General) |
- |
0 |
|
Repeated |
| As per Clause 5.1.4(Construction-General) |
- |
0 |
|
Repeated |
| As per Clause 5.2.1(Earthing) |
- |
0 |
|
Repeated |
| As per Clause 5.4.1(Construction-Type of cable & Size of conductor of cable) |
- |
0 |
|
Repeated |
| As per Clause 5.4.2(Construction-Length of cable) |
- |
0 |
|
Repeated |
| As per Clause 5.4.3(Construction-Joint in Cable) |
- |
0 |
|
Repeated |
| As per Clause 5.5(Finish of Bearings) |
- |
0 |
|
Repeated |
| As per Clause 5.6(Balancing of Rotor) |
- |
0 |
|
Repeated |
| As per Clause 7.1(Dimensions of Motors) |
- |
0 |
|
Repeated |
| As per Clause 7.2(Tolerances) |
- |
0 |
|
Repeated |
| As per Clause 12.1(Efficiency) |
- |
0 |
|
Repeated |
| As per Clause 12.1(Efficiency) |
- |
0 |
|
Repeated |
| As per Clause 13(Terminal Marking) |
- |
0 |
|
Repeated |
| As per Clause 15.1(Rating Plate) |
- |
0 |
|
Repeated |
| As per Clause 15.1(Rating Plate) |
- |
0 |
|
Repeated |
| As per Clause 15.1(Rating Plate) |
- |
0 |
|
Repeated |
| As per Clause 15.1(Rating Plate) |
- |
0 |
|
Repeated |
| As per Clause 15.1(Rating Plate) |
- |
0 |
|
Repeated |
| As per Clause 15.1(Rating Plate) |
- |
0 |
|
Repeated |
| As per Clause 15.1(Rating Plate) |
- |
0 |
|
Repeated |
| As per Clause 15.1(Rating Plate) |
- |
0 |
|
Repeated |
| As per Clause 15.1(Rating Plate) |
- |
0 |
|
Repeated |
| As per Clause 15.1(Rating Plate) |
- |
0 |
|
Repeated |
| As per Clause 15.1(Rating Plate) |
- |
0 |
|
Repeated |
| As per Clause 15.1(Rating Plate) |
- |
0 |
|
Repeated |
| As per Clause 15.1(Rating Plate) |
- |
0 |
|
Repeated |
| As per Clause 15.1(Rating Plate) |
- |
0 |
|
Repeated |
| As per Clause 15.1(Rating Plate) |
- |
0 |
|
Repeated |
| As per Clause 15.2(Rating Plate) |
- |
0 |
|
Repeated |
| As per Clause 16.1(a),21(Insulationresistance test(Before HV Test)) |
- |
0 |
|
Repeated |
| As per Clause 16.1(a),21(Insulationresistance test(After HV Test)) |
- |
0 |
|
Repeated |
| As per Clause 16.1(b),20(High voltage test) |
- |
0 |
|
Repeated |
| As per Clause 16.[c](Measurement of stator resistance) |
- |
0 |
|
Repeated |
| As per Clause 16.(d)(No Load Test) |
- |
0 |
|
Repeated |
| As per Clause 16.(e)(Reduced voltage running up test at no load) |
- |
0 |
|
Repeated |
| As per Clause 16.(f)(Locked rotor readings of voltage, current, power input and torque of motors) |
- |
0 |
|
Repeated |
| As per Clause 16.(g)(Full load reading of voltage, current, power input, speed and frequency) |
- |
0 |
|
Repeated |
| As per Clause 16.(h),11(Performance characteristics) |
- |
0 |
|
Repeated |
| As per Clause 16.(j),19(Temperature rise test at rated voltage) |
- |
0 |
|
Repeated |
| As per Clause 16.(k),19(Temperature rise test at reduced voltage) |
- |
0 |
|
Repeated |
| As per Clause 16.(m),18(Momentary Overload Test) |
- |
0 |
|
Repeated |
| As per Clause 16.(n),22(Leakage Current Test at rated voltage at no load) |
- |
0 |
|
Repeated |
|
09 Aug, 2026 |
- Included w.e.f 07.05.2025 |
| 3737 |
Atharva Laboratories Pvt. Ltd. (C-54), Noida
| 8165026
| IS 10322 : Part 5 : Sec 8 (2013) |
Luminaires: Part 5 particular requirements: Sec 8 emergency lighting |
- |
55000 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 4(General Test Requireements) |
- |
4000 |
|
- |
| 5(Classification of Luminaires') |
- |
4000 |
|
- |
| 6.0(Marking) |
- |
4000 |
|
- |
| 7.0(Construction) |
- |
6000 |
|
- |
| 8.0(Creepage Distance and Clearances) |
- |
3000 |
|
- |
| 9.0(Provision for earthing) |
- |
3000 |
|
- |
| 10.0(Terminals) |
- |
3000 |
|
- |
| 11.0(External & Internal Wiring) |
- |
3000 |
|
- |
| 12.0(Protection against electric shock) |
- |
4000 |
|
- |
| 13.0(Endurance Tests and Thermal Tests) |
- |
10000 |
|
- |
| 14.0(Resistance to Dust & Moisture) |
- |
5000 |
|
- |
| 15.0(Insulation Resistance and Electric Strength) |
- |
5000 |
|
- |
| 16.0(Resistance to Heat , fire and tracking) |
- |
6000 |
|
- |
| 17.0(Functional Safety) |
- |
6000 |
|
- |
| 18.0(Changeover Operation) |
- |
6000 |
|
- |
| 19.0(High Temperature Operation) |
- |
6000 |
|
- |
| 20.0(BATTERY CHARGERS FOR SELFCONTAINED EMERGENCY LUMINAIRES) |
- |
6000 |
|
- |
| 21.0(TEST DEVICES FOR EMERGENCY OPERATION) |
- |
1000 |
|
- |
| 22.0(REST MODE AND INIHIBITION MODE FACILITIES) |
- |
1000 |
|
- |
|
23 Feb, 2029 |
- Included w.e.f 18.08.2025
Exclusion: Clause 4.24 as per IS 10322 Part 1 (UV Radiation), Clause 4.26 as per IS 10322 Part 1 (Short Circuit Protection) |
| 3738 |
Atharva Laboratories Pvt. Ltd. (C-54), Noida
| 8165026
| IS 10322 : Part 5 : Sec 7 (2017) |
Luminaires: Part 5 particular requirements: Sec 7 lighting chains (First Revision) |
- |
44000 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 20.4(General Test Requireements) |
- |
4000 |
|
- |
| 20.5(Classification of Luminaires') |
- |
4000 |
|
- |
| 20.6(Marking) |
- |
4000 |
|
- |
| 20.7(Construction) |
- |
5000 |
|
- |
| 20.8(Creepage Distance and Clearances) |
- |
3000 |
|
- |
| 20.9(Provision for earthing) |
- |
6000 |
|
- |
| 20.10(Terminals) |
- |
3000 |
|
- |
| 20.11(External & Internal Wiring) |
- |
3000 |
|
- |
| 20.12(Protection against electric shock) |
- |
3000 |
|
- |
| 20.13(Endurance Tests and Thermal Tests) |
- |
8500 |
|
- |
| 20.14(Resistance to Dust & Moisture) |
- |
6000 |
|
- |
| 20.15(Insulation Resistance and Electric Strength) |
- |
4000 |
|
- |
| 20.16(Resistance to Heat , fire and tracking) |
- |
5000 |
|
- |
| 20.4(General Test Requireements) |
- |
- |
|
- |
| 20.5(Classification of Luminaires') |
- |
- |
|
- |
| 20.6(Marking) |
- |
- |
|
- |
| 20.7(Construction) |
- |
- |
|
- |
| 20.8(Creepage Distance and Clearances) |
- |
- |
|
- |
| 20.9(Provision for earthing) |
- |
- |
|
- |
| 20.10(Terminals) |
- |
- |
|
- |
| 20.11(External & Internal Wiring) |
- |
- |
|
- |
| 20.12(Protection against electric shock) |
- |
- |
|
- |
| 20.13(Endurance Tests and Thermal Tests) |
- |
- |
|
- |
| 20.14(Resistance to Dust & Moisture) |
- |
- |
|
- |
| 20.15(Insulation Resistance and Electric Strength) |
- |
- |
|
- |
| 20.16(Resistance to Heat , fire and tracking) |
- |
- |
|
- |
|
23 Feb, 2029 |
- Included w.e.f 18.08.2025
Exclusion: Clause 4.24 as per IEC 60598- 1 (UV Radiation), Clause 4.26 as per IEC 60598- 1 (Short Circuit Protection) |
| 3739 |
Alpha Test House Private Limited, Delhi
| 8131026
| IS 302 : Part 2 : Sec 35 (2017) |
Safety of household and similar electrical appliances: Part 2 particular requirements: Sec 35 electric instantaneous water heaters (Second Revision) |
- |
3500 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| Cl.32(Verification) |
- |
0 |
|
- |
| Cl.31(Verification) |
- |
0 |
|
- |
| Cl.30(Verification) |
- |
0 |
|
- |
| CL.29(Verification) |
- |
0 |
|
- |
| Cl.28(Verification) |
- |
0 |
|
- |
| Cl.27(Verification) |
- |
0 |
|
- |
| Cl.26(Verification) |
- |
0 |
|
- |
| Cl.25(Verification) |
- |
0 |
|
- |
| Cl.24(Verification) |
- |
0 |
|
- |
| Cl.23(Verification) |
- |
0 |
|
- |
| Cl.22(Verification) |
- |
0 |
|
- |
| Cl.21(Verification) |
- |
0 |
|
- |
| Cl.20(Verification) |
- |
0 |
|
- |
| Cl.19(Verification) |
- |
0 |
|
- |
| Cl.17(Verification) |
- |
0 |
|
- |
| Cl. 16(Verification) |
- |
0 |
|
- |
| Cl.15(Verification) |
- |
0 |
|
- |
| Cl.14(Verification) |
- |
0 |
|
- |
| Cl.13(Verification) |
- |
0 |
|
- |
| Cl.11(Verification) |
- |
0 |
|
- |
| Cl.10(Verification) |
- |
0 |
|
- |
| Cl.8(Verification) |
- |
0 |
|
- |
| Cl. 7(Verification) |
- |
0 |
|
- |
| Cl. 7(Verification) |
- |
0 |
|
- |
| Cl. 32
IS 302-2-35(Radiation, Toxicity and similar hazards) |
- |
100 |
|
- |
| Cl. 31
IS 302-2-35(Resistance to Rusting) |
- |
100 |
|
- |
| Cl. 30
IS 302-2-35(Resistance to Heat Fire & Tracking ) |
- |
500 |
|
- |
| Cl. 29
IS 302-2-35(Clearances, Creepage Distances & Solid insulation ) |
- |
100 |
|
- |
| Cl. 28
IS 302-2-35(Screws & Connections) |
- |
100 |
|
- |
| Cl. 27
IS 302-2-35(Provision for Earthing ) |
- |
100 |
|
- |
| Cl. 26
IS 302-2-35(Terminals for External conductors ) |
- |
100 |
|
- |
| Cl. 25
IS 302-2-35(Supply Connection & External Flexible Cords) |
- |
100 |
|
- |
| Cl. 24
IS 302-2-35(Components) |
- |
200 |
|
- |
| Cl. 23
IS 302-2-35(Internal Wiring) |
- |
100 |
|
- |
| Cl. 22
IS 302-2-35(Construction ) |
- |
100 |
|
- |
| Cl. 21
IS 302-2-35(Mechanical strength) |
- |
100 |
|
- |
| Cl. 20
IS 302-2-35(Stability & Mechanical Hazards) |
- |
100 |
|
- |
| Cl. 19
IS 302-2-35(Abnormal Operation ) |
- |
100 |
|
- |
| Cl. 18
IS 302-2-35(Endurance) |
- |
100 |
|
- |
| Cl. 17
IS 302-2-35(Overload Protection of Transformers and Associated Circuit) |
- |
100 |
|
- |
| Cl. 16
IS 302-2-35(Leakage Current & Electric Strength at Operating Temperature (After Humidity Treatment)) |
- |
100 |
|
- |
| Cl. 15
IS 302-2-35(Moisture Resistance Test ) |
- |
500 |
|
- |
| Cl. 14
IS 302-2-35(Radio and television interference suppression / Transient over voltages) |
- |
100 |
|
- |
| Cl. 13
IS 302-2-35(Leakage Current & Electric Strength at Operating Temperature) |
- |
100 |
|
- |
| Cl. 11
IS 302-2-35(Heating) |
- |
400 |
|
- |
| Cl. 10
IS 302-2-35(Power Input and Current ) |
- |
200 |
|
- |
| Cl. 9
IS 302-2-35(Starting of motor operated appliances) |
- |
100 |
|
- |
| Cl. 8
IS 302-2-35(Protection against access to live parts) |
- |
100 |
|
- |
| Cl. 7
IS 302-2-35(Marking and Instruction) |
- |
100 |
|
- |
| Cl. 6
IS 302-2-35(Classification) |
- |
100 |
|
- |
| 5(GENERAL CONDITIONS FOR THE TESTS) |
- |
50 |
|
- |
| 4(GENERAL REQUIREMENT) |
- |
50 |
|
- |
|
17 May, 2027 |
- Exclusion: Cl 19.11.4.1-19.11.4.7 (EMI/EMC) |
| 3740 |
Atharva Laboratories Pvt. Ltd. (C-54), Noida
| 8165026
| IS 10322 : Part 5 : Sec 6 (2013) |
Luminaires: Part 5 particular requirements: Sec 6 handlamps |
- |
34000 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 8.2(Packing -Each Package shall bear the following Particulars) |
- |
4000 |
|
- |
| 4(General Test Requireements) |
- |
4000 |
|
- |
| 5(Classification of Luminaires') |
- |
3000 |
|
- |
| 6.0(Marking) |
- |
3000 |
|
- |
| 7.0(Construction) |
- |
6000 |
|
- |
| 8.0(Creepage Distance and Clearances) |
- |
3000 |
|
- |
| 9.0(Provision for earthing) |
- |
0 |
|
- |
| 10.0(Terminals) |
- |
3000 |
|
- |
| 11.0(External & Internal Wiring) |
- |
4000 |
|
- |
| 12.0(Protection against electric shock) |
- |
4000 |
|
- |
| 13.0(Endurance Tests and Thermal Tests) |
- |
8500 |
|
- |
| 14.0(Resistance to Dust & Moisture) |
- |
5000 |
|
- |
| 15.0(Insulation Resistance and Electric Strength) |
- |
4000 |
|
- |
| 16.0(Resistance to Heat , fire and tracking) |
- |
5000 |
|
- |
| 8.2(Packing -Each Package shall bear the following Particulars) |
- |
- |
|
- |
|
23 Feb, 2029 |
- Included w.e.f 18.08.2025
Exclusion: Clause 4.24 as per IEC 60598- 1 (UV Radiation), Clause 4.26 as per IEC 60598- 1 (Short Circuit Protection) |
| 3741 |
Hi Physix Laboratory India Private Limited, Pune
| 7126926
| IS 14286 : Part 1 (2023) |
Terrestrial Photovoltaic PV Modules Design Qualification and Type Approval Part 1: Test Requirements (Third Revision) |
- |
1830000 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 4.1(Visual inspection (MQT 01)) |
- |
20000 |
|
- |
| 4.2(Maximum power determination (MQT 02)) |
- |
30000 |
|
- |
| 4.3(Insulation test (MQT 03)) |
- |
15000 |
|
- |
| 4.4(Measurement of temperature coefficients (MQT 04)) |
- |
60000 |
|
- |
| 4.5(Placeholder section, formerly NMOT) |
- |
0 |
|
- |
| 4.6(Performance at STC (MQT 06.1)) |
- |
30000 |
|
- |
| 4.7(Performance at low irradiance (MQT 07)) |
- |
30000 |
|
- |
| 4.8(Outdoor exposure test (MQT 08)) |
- |
30000 |
|
- |
| 4.9(Hot-spot endurance test (MQT 09)) |
- |
200000 |
|
- |
| 4.10(UV preconditioning test (MQT 10)) |
- |
150000 |
|
- |
| 4.11(Thermal cycling test (MQT 11)) |
- |
250000 |
|
- |
| 4.12(2 Humidity-freeze test (MQT 12)) |
- |
100000 |
|
- |
| 4.13(Damp heat test (MQT 13)) |
- |
150000 |
|
- |
| 4.14(Robustness of terminations (MQT 14)) |
- |
15000 |
|
- |
| 4.15(5 Wet leakage current test (MQT 15)) |
- |
20000 |
|
- |
| 4.16(Static mechanical load test (MQT 16)) |
- |
40000 |
|
- |
| 4.17(Hail test (MQT 17)) |
- |
20000 |
|
- |
| 4.18(Bypass diode testing (MQT 18)) |
- |
80000 |
|
- |
| 4.19(Stabilization (MQT 19)) |
- |
150000 |
|
- |
| 4.20(Cyclic (dynamic) mechanical load test (MQT 20)) |
- |
120000 |
|
- |
| 4.21(Potential induced degradation test (MQT 21)) |
- |
300000 |
|
- |
| 4.22(Bending test (MQT 22)) |
- |
20000 |
|
- |
|
20 Jun, 2028 |
- Included w.e.f 07.05.2025 |
| 3742 |
Hi Physix Laboratory India Private Limited, Pune
| 7126926
| IS 17980 (2022) |
Maximum Power Point Tracking Efficiency of Grid Connected Photovoltaic Inverters (First Revision) |
Upto 150kW |
550000 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| Cl-4.1 (a)(Static MPPT efficiency) |
- |
250000 |
|
- |
| Cl-4.1 (b)(Dynamic MPPT efficiency) |
- |
300000 |
|
- |
|
20 Jun, 2028 |
- Included w.e.f.28.04.2025 |
| 3743 |
Vardhamana Testing Laboratory OPC Pvt. Ltd.
| 8178226
| IS 302 : Part 2 : Sec 35 (2017) |
Safety of household and similar electrical appliances: Part 2 particular requirements: Sec 35 electric instantaneous water heaters (Second Revision) |
Electric Instantaneous Water Heaters |
25000 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| Cl.31(Verification) |
- |
0 |
|
- |
| Cl.30(Verification) |
- |
0 |
|
- |
| CL.29(Verification) |
- |
0 |
|
- |
| Cl.28(Verification) |
- |
0 |
|
- |
| Cl.27(Verification) |
- |
0 |
|
- |
| Cl.26(Verification) |
- |
0 |
|
- |
| Cl.25(Verification) |
- |
0 |
|
- |
| Cl.24(Verification) |
- |
0 |
|
- |
| Cl.23(Verification) |
- |
0 |
|
- |
| Cl.22(Verification) |
- |
0 |
|
- |
| Cl.21(Verification) |
- |
0 |
|
- |
| Cl.20(Verification) |
- |
0 |
|
- |
| Cl.19(Verification) |
- |
0 |
|
- |
| Cl.17(Verification) |
- |
0 |
|
- |
| Cl. 16(Verification) |
- |
0 |
|
- |
| Cl.15(Verification) |
- |
0 |
|
- |
| Cl.14(Verification) |
- |
0 |
|
- |
| Cl.13(Verification) |
- |
0 |
|
- |
| Cl.11(Verification) |
- |
0 |
|
- |
| Cl.10(Verification) |
- |
0 |
|
- |
| Cl.8(Verification) |
- |
0 |
|
- |
| Cl. 7(Verification) |
- |
0 |
|
- |
| Cl. 7(Verification) |
- |
0 |
|
- |
| Cl. 31
IS 302-2-35(Resistance to Rusting) |
- |
1000 |
|
- |
| Cl. 30
IS 302-2-35(Resistance to Heat Fire & Tracking ) |
- |
1000 |
|
- |
| Cl. 29
IS 302-2-35(Clearances, Creepage Distances & Solid insulation ) |
- |
2000 |
|
- |
| Cl. 28
IS 302-2-35(Screws & Connections) |
- |
1000 |
|
- |
| Cl. 27
IS 302-2-35(Provision for Earthing ) |
- |
1000 |
|
- |
| Cl. 26
IS 302-2-35(Terminals for External conductors ) |
- |
1000 |
|
- |
| Cl. 25
IS 302-2-35(Supply Connection & External Flexible Cords) |
- |
1000 |
|
- |
| Cl. 24
IS 302-2-35(Components) |
- |
1000 |
|
- |
| Cl. 23
IS 302-2-35(Internal Wiring) |
- |
1000 |
|
- |
| Cl. 22
IS 302-2-35(Construction ) |
- |
1000 |
|
- |
| 5(GENERAL CONDITIONS FOR THE TESTS) |
- |
0 |
|
- |
| 4(GENERAL REQUIREMENT) |
- |
0 |
|
- |
| Cl. 6
IS 302-2-35(Classification) |
- |
1000 |
|
- |
| Cl. 21
IS 302-2-35(Mechanical strength) |
- |
1000 |
|
- |
| Cl. 20
IS 302-2-35(Stability & Mechanical Hazards) |
- |
500 |
|
- |
| Cl. 19
IS 302-2-35(Abnormal Operation ) |
- |
1000 |
|
- |
| Cl. 17
IS 302-2-35(Overload Protection of Transformers and Associated Circuit) |
- |
1000 |
|
- |
| Cl. 16
IS 302-2-35(Leakage Current & Electric Strength at Operating Temperature (After Humidity Treatment)) |
- |
1000 |
|
- |
| Cl. 15
IS 302-2-35(Moisture Resistance Test ) |
- |
1000 |
|
- |
| Cl. 14
IS 302-2-35(Radio and television interference suppression / Transient over voltages) |
- |
1000 |
|
- |
| Cl. 13
IS 302-2-35(Leakage Current & Electric Strength at Operating Temperature) |
- |
1000 |
|
- |
| Cl. 11
IS 302-2-35(Heating) |
- |
2000 |
|
- |
| Cl. 10
IS 302-2-35(Power Input and Current ) |
- |
2000 |
|
- |
| Cl. 8
IS 302-2-35(Protection against access to live parts) |
- |
1000 |
|
- |
| Cl. 7
IS 302-2-35(Marking and Instruction) |
- |
500 |
|
- |
|
29 Apr, 2027 |
- - |
| 3744 |
KRISHNA DIGITAL MATERIAL TESTING LABORATORY LLP, BHOPAL
| 8168706
| IS 1786 (2008) |
High strength deformed steel bars and wires for concretere inforcement - Specification (Fourth Revision) |
Grade- Fe 415, Fe 415D, Fe 415S, Fe 500, Fe 500D, Fe 500S, Fe 550, Fe 550D, Fe 600 / Size- 8 mm, 10 mm, 12 mm, 16 mm, 20 mm, 25 mm, 28 mm, 32 mm, 36 mm, 40 mm |
7750 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| Cl. 4.3(Visual Inspection.) |
- |
100 |
|
- |
| 5.7(PullOut (Bond Test)) |
- |
1500 |
|
- |
| Cl. 5.2(Surface Characteristics) |
- |
100 |
|
- |
| Cl. 6.1(Nominal Size) |
- |
50 |
|
- |
| Cl. 6.2, 6.3 Table 1(Gross Cross Sectional Area, A) |
- |
50 |
|
- |
| Clause 6.3(Effective Cross-sectional Area) |
- |
50 |
|
- |
| Cl 8.1(UTM) |
- |
1500 |
|
- |
| Cl. 9.3, Table 4(Bend Test ) |
- |
250 |
|
- |
| Cl.9.4 & Cl. 9.4.1(Rebend test) |
- |
250 |
|
- |
| 4.1(Carbon %) |
- |
100 |
|
- |
| 4.1(Sulphur %) |
- |
100 |
|
- |
| 4.1(Phosphorus %) |
- |
100 |
|
- |
| 4.1(CE) |
- |
100 |
|
- |
| 4.1(Manganese %) |
- |
100 |
|
- |
| 4.1(Cr) |
- |
100 |
|
- |
| 4.1(Mo) |
- |
100 |
|
- |
| 4.1(V) |
- |
100 |
|
- |
| 4.1(Ni) |
- |
100 |
|
- |
| 4.1( Copper %) |
- |
100 |
|
- |
| 4.1( Aluminium %) |
- |
100 |
|
- |
| 4.1( Nb) |
- |
100 |
|
- |
| 4.2(Boron (B)) |
- |
100 |
|
- |
| 4.1( Ti) |
- |
100 |
|
- |
| 4.1( Nitrogen%) |
- |
100 |
|
- |
| 4.1(Sulphur and phosphorous) |
- |
100 |
|
- |
| Clause - 4.2 & 4.2.1(Fe- 415, Fe- 415D, Fe-500, Fe-500D, Fe-550, Fe-550D, Fe-600 CARBON ) |
- |
100 |
|
- |
| Clause - 4.2 & 4.2.1(Fe- 415, Fe- 415D, Fe-500, Fe-500D, Fe-550, Fe-550D, Fe-600 SULPHUR) |
- |
100 |
|
- |
| Clause - 4.2 & 4.2.1(Fe- 415, Fe- 415D, Fe-500, Fe-500D, Fe-550, Fe-550D, Fe-600 PHOSPHURS) |
- |
100 |
|
- |
| Clause - 4.2 & 4.2.1(Fe- 415, Fe- 415D, Fe-500, Fe-500D, Fe-550, Fe-550D, Fe-600 CARBON +EQUIVELENT ) |
- |
100 |
|
- |
| Clause - 4.2 & 4.2.1(Fe- 415, Fe- 415D, Fe-500, Fe-500D, Fe-550, Fe-550D, Fe-600 SULPHUR+PHOSPHUR) |
- |
100 |
|
- |
| 4.1(Silicon %) |
- |
100 |
|
- |
| Cl. 5.7(Average compressive strength of cubes at 28 days) |
- |
200 |
|
- |
| Cl. 5.7(Bond Strength at 0.25 mm slip) |
- |
100 |
|
- |
| Cl. 5.7(Date of testing of concrete cubes) |
- |
0 |
|
- |
| Cl. 5.7(Date of casting of concrete cubes) |
- |
0 |
|
- |
| Cl. 8.1 Table 3(Elongation, percentage) |
- |
150 |
|
- |
| Cl. 8.1 Table 3(TS/YS ratio) |
- |
100 |
|
- |
| Cl. 8.1 Table 3(Tensile Strength (TS)) |
- |
200 |
|
- |
| Cl. 8.1 Table 3(Yield Stress (YS)) |
- |
200 |
|
- |
| 8.18.1 Table 3(Total elongation at maximum force) |
- |
150 |
|
- |
| Cl. 5.3 (a)(The ribs contributing the projected area - Longitudinal Ribs) |
- |
100 |
|
- |
| Cl. 5.3 (b)(The ribs contributing the projected area - Transverse Ribs) |
- |
100 |
|
- |
| Cl 6.1(Length, Width & Thickness) |
- |
50 |
|
- |
| Cl 7.2(Weight) |
- |
50 |
|
- |
| Cl. 5 (Cl. 5 - Mean projected area of transverse ribs (1/3 of Ar)) |
- |
150 |
|
- |
| Cl. 5 (Cl.5 Mean area of ribs/unit length (Ar), ) |
- |
150 |
|
- |
| Cl. 4.3(Visual Inspection.) |
- |
0 |
|
- |
| 5.7(PullOut (Bond Test)) |
- |
0 |
|
- |
| Cl. 5.2(Surface Characteristics) |
- |
0 |
|
- |
| Cl. 6.2, 6.3 Table 1(Gross Cross Sectional Area, A) |
- |
0 |
|
- |
| Clause 6.3(Effective Cross-sectional Area) |
- |
0 |
|
- |
| Cl 8.1(UTM) |
- |
0 |
|
- |
| 4.2(Boron (B)) |
- |
0 |
|
- |
| Cl. 5.7(Average compressive strength of cubes at 28 days) |
- |
0 |
|
- |
| Cl. 5.7(Bond Strength at 0.25 mm slip) |
- |
0 |
|
- |
| Cl. 5.7(Date of testing of concrete cubes) |
- |
0 |
|
- |
| Cl. 5.7(Date of casting of concrete cubes) |
- |
0 |
|
- |
| 8.18.1 Table 3(Total elongation at maximum force) |
- |
0 |
|
- |
| Cl. 5.3 (a)(The ribs contributing the projected area - Longitudinal Ribs) |
- |
0 |
|
- |
| Cl. 5.3 (b)(The ribs contributing the projected area - Transverse Ribs) |
- |
0 |
|
- |
| Cl. 4.3(Visual Inspection.) |
- |
0 |
|
- |
| 5.7(PullOut (Bond Test)) |
- |
0 |
|
- |
| Cl. 5.2(Surface Characteristics) |
- |
0 |
|
- |
| Cl. 6.2, 6.3 Table 1(Gross Cross Sectional Area, A) |
- |
0 |
|
- |
| Clause 6.3(Effective Cross-sectional Area) |
- |
0 |
|
- |
| Cl 8.1(UTM) |
- |
0 |
|
- |
| 4.2(Boron (B)) |
- |
0 |
|
- |
| Cl. 5.7(Average compressive strength of cubes at 28 days) |
- |
0 |
|
- |
| Cl. 5.7(Bond Strength at 0.25 mm slip) |
- |
0 |
|
- |
| Cl. 5.7(Date of testing of concrete cubes) |
- |
0 |
|
- |
| Cl. 5.7(Date of casting of concrete cubes) |
- |
0 |
|
- |
| 8.18.1 Table 3(Total elongation at maximum force) |
- |
0 |
|
- |
| Cl. 5.3 (a)(The ribs contributing the projected area - Longitudinal Ribs) |
- |
0 |
|
- |
| Cl. 5.3 (b)(The ribs contributing the projected area - Transverse Ribs) |
- |
0 |
|
- |
|
19 Aug, 2027 |
- Included w.e.f 24.04.2025 |
| 3745 |
Hi Physix Laboratory India Private Limited, Pune
| 7126926
| IS/IEC 61683 (1999) |
Photovoltaic systems - Power conditioners - Procedure for measuring efficiency |
Upto 150kW |
120000 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 5(Efficiency calculations) |
- |
50000 |
|
- |
| 6(Efficiency test circuits) |
- |
50000 |
|
- |
| 7(Loss measurement) |
- |
20000 |
|
- |
| Annex A(Power conditioner description) |
- |
0 |
|
- |
| Annex B(Power efficiency and conversion factor) |
- |
0 |
|
- |
| Annex C(Weighted average energy efficiency) |
- |
0 |
|
- |
| Annex D(Derivation of efficiency tolerance in Table 2) |
- |
0 |
|
- |
| 4(Efficiency measurement conditions) |
- |
0 |
|
- |
| 4.1(DC power source for testing) |
- |
0 |
|
- |
| 4.2(Temperature) |
- |
0 |
|
- |
| 4.3(Output voltage and frequency) |
- |
0 |
|
- |
| 4.4(Input voltage) |
- |
0 |
|
- |
| 4.5(Ripple and distortion) |
- |
0 |
|
- |
| 4.6(Resistive loads/utility grid) |
- |
0 |
|
- |
| 4.7(Reactive loads) |
- |
0 |
|
- |
| 4.8(Resistive plus non-linear loads) |
- |
0 |
|
- |
| 4.9(Complex loads) |
- |
0 |
|
- |
|
20 Jun, 2028 |
- Included w.e.f.28.04.2025 |
| 3746 |
Atharva Laboratories Pvt. Ltd. (C-54), Noida
| 8165026
| IS 10322 : Part 5 : Sec 5 (2013) |
Luminaires: Part 5 particular requirements: Sec 5 floodlights (First Revision) |
- |
44000 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 4(General Test Requireements) |
- |
4000 |
|
- |
| 5(Classification of Luminaires') |
- |
4000 |
|
- |
| 6.0(Marking) |
- |
4000 |
|
- |
| 7.0(Construction) |
- |
6000 |
|
- |
| 8.0(Creepage Distance and Clearances) |
- |
3000 |
|
- |
| 9.0(Provision for earthing) |
- |
5000 |
|
- |
| 10.0(Terminals) |
- |
3000 |
|
- |
| 11.0(External & Internal Wiring) |
- |
4000 |
|
- |
| 12.0(Protection against electric shock) |
- |
4000 |
|
- |
| 13.0(Endurance Tests and Thermal Tests) |
- |
8500 |
|
- |
| 14.0(Resistance to Dust & Moisture) |
- |
5000 |
|
- |
| 15.0(Insulation Resistance and Electric Strength) |
- |
3000 |
|
- |
| 16.0(Resistance to Heat , fire and tracking) |
- |
5000 |
|
- |
| 17.0(Photometric Test) |
- |
12000 |
|
- |
|
23 Feb, 2029 |
- Included w.e.f 18.08.2025
Exclusion: Clause 4.24 as per IEC 60598- 1 (UV Radiation), Clause 4.26 as per IEC 60598- 1 (Short Circuit Protection) |
| 3747 |
Central Power Research Institute (CPRI), Bangalore
| 6101024
| IS 2993 : Part 2 (2024) |
a.c. Motor Capacitors Part 2 Motor Start Capacitors ( Third Revision ) |
- |
2951880 View breakup
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor.
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 5.1.1.1(General) |
- |
0 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
| 5.1.7(Voltage test between the terminals) |
- |
6340 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
| 5.1.8(Voltage test between terminals and case) |
- |
11520 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
| 5.1.9(Capacitance measurement) |
- |
46080 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
| 5.1.10(Check of dimensions) |
- |
2200 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
| 5.1.10(Check of dimensions) |
- |
2200 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
| 5.1.12(Sealing test) |
- |
1380 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
| 5.1.13(Endurance test) |
- |
1542150 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
| 5.1.14(Damp heat test) |
- |
161360 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
| 5.1.15(Self-healing test) |
- |
62230 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
| 5.1.16(Destruction test) |
- |
285200 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
| 5.1.17.1(Ball-pressure test) |
- |
21290 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
| 5.1.17.2(Glow-wire test) |
- |
17940 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
| 5.1.17.3(Tracking test) |
- |
9660 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
| 5.4(Marking) |
- |
640 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
| 6.1.6(Voltage test between the terminals) |
- |
6340 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
| 6.1.7(Voltage test between terminals and case) |
- |
11520 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
| 6.1.9(Check of dimensions) |
- |
2200 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
| 6.1.11(Sealing test) |
- |
1380 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
| 6.1.12(Endurance test) |
- |
1542150 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
| 6.1.13(Damp heat test) |
- |
161360 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
| 6.1.15.1(Ball-pressure test) |
- |
21290 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
| 6.1.15.2(Glow-wire test) |
- |
17940 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
| 6.1.15.3(Tracking test) |
- |
9660 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
| 6.4(Marking) |
- |
640 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
| 5.1.11.1(Robustness of terminations) |
- |
35140 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
| 5.1.11.2(Soldering) |
- |
15720 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
| 5.2(Overloads) |
- |
0 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
| 5.3.1(Creepage distances and clearances) |
- |
0 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
| 5.3.2(Terminals and connecting cables) |
- |
0 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
| 5.3.3(Earth connections) |
- |
0 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
| 5.3.4(Discharge devices) |
- |
0 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
| 5.3.5(Pollution) |
- |
0 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
| 6.1.8(Capacitance and power factor measurement) |
- |
92160 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
| 6.1.10.1(Robustness of terminations) |
- |
35140 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
| 6.1.10.2(Soldering) |
- |
15720 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
| 6.2(Overloads) |
- |
0 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
| 6.3.1(Creepage distances and clearances) |
- |
0 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
| 6.3.2(Terminals and connecting cables) |
- |
0 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
| 6.3.3(Earth connections) |
- |
0 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
| 6.3.4(Discharge devices) |
- |
0 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
| 6.3.5(Pollution) |
- |
0 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
| 7.2.1(Measurement of working voltage) |
- |
0 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
| 7.2.2(Influence of capacitance) |
- |
0 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
| 5.1.11.3(Vibration) |
- |
35140 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
| 6.1.10.3(Vibration) |
- |
35140 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
| 7.3(Checking capacitor temperature) |
- |
0 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
| 7.4(Checking transients) |
- |
0 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
| 7.5(Storage of electrolytic capacitors) |
- |
0 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
| Annex A(Test voltage) |
- |
0 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
| 6.1.14(Pressure relief test) |
- |
285200 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
| 6.1.10.4(Fixing bolt or stud (if fitted)) |
- |
0 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
| 6.1.10.4(Fixing bolt or stud (if fitted)) |
- |
0 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
| 6.1.10.5(Rapid change of temperature) |
- |
0 |
|
Test charges are dependant on rating of the capacitors. Hence it is to be noted that that along with full details a request is to be submitted for getting proforma invoice with full details of the construction and rating of the motor capacitor |
|
31 Dec, 2026 |
- Included w.e.f 30.04.2025 |
| 3748 |
Classic Testing & Research Centre (B17), Noida
| 8180826
| IS 302 : Part 2 : Sec 13 (2024) |
Household and Similar Electrical Appliances âSafety Part 2 Particular Requirements Section 13 Deep Fat Fryers, Frying Pans and Similar Appliances (First Revision) |
- |
45000 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 7(Marking and instructions) |
- |
5000 |
|
- |
| 8(Protection against access to live parts) |
- |
5000 |
|
- |
| 10(Power input and current) |
- |
5000 |
|
- |
| 11(Heating) |
- |
5000 |
|
- |
| 13.1 &13.2(Leakage current test) |
- |
5000 |
|
- |
| 13.1 &13.3(Electric strength test) |
- |
5000 |
|
- |
| 14(Transient overvoltages) |
- |
5000 |
|
- |
| 15(Moisture resistance) |
- |
5000 |
|
- |
| 15.3(Moisture resistance) |
- |
5000 |
|
- |
| 15.101(Moisture resistance) |
- |
5000 |
|
- |
| 16.1 &16.2(Leakage current test) |
- |
5000 |
|
- |
| 16.1 & 16.3(Electric strength test) |
- |
5000 |
|
- |
| 17(Overload protection of transformers and associated circuits) |
- |
5000 |
|
- |
| 19.1 to 19.13, Table No. - 9(Abnormal operation) |
- |
5000 |
|
- |
| 19.101 to to 19.102(Abnormal operation) |
- |
5000 |
|
- |
| 20(Stability and mechanical hazards) |
- |
5000 |
|
- |
| 21(Mechanical strength) |
- |
5000 |
|
- |
| 22(Construction) |
- |
5000 |
|
- |
| 22.101(Construction) |
- |
5000 |
|
- |
| 23(Internal wiring) |
- |
5000 |
|
- |
| 24(Components) |
- |
5000 |
|
- |
| 25("Supply connection and
external flexible cords") |
- |
5000 |
|
- |
| 26("Terminals for external
conductors") |
- |
5000 |
|
- |
| 27(Provision for earthing) |
- |
5000 |
|
- |
| 28(Screws and connections) |
- |
5000 |
|
- |
| 29("Clearances, creepage
distances and solid insulation") |
- |
5000 |
|
- |
| 30(Resistance to heat and fire) |
- |
5000 |
|
- |
| 31(Resistance to rusting) |
- |
5000 |
|
- |
| 32("Radiation, toxicity and similar
hazards") |
- |
5000 |
|
- |
| 7(Marking and instructions) |
- |
5000 |
|
- |
| 8(Protection against access to live parts) |
- |
5000 |
|
- |
| 10(Power input and current) |
- |
5000 |
|
- |
| 11(Heating) |
- |
5000 |
|
- |
| 13.1 &13.2(Leakage current test) |
- |
5000 |
|
- |
| 13.1 &13.3(Electric strength test) |
- |
5000 |
|
- |
| 14(Transient overvoltages) |
- |
5000 |
|
- |
| 15(Moisture resistance) |
- |
5000 |
|
- |
| 15.3(Moisture resistance) |
- |
5000 |
|
- |
| 15.101(Moisture resistance) |
- |
5000 |
|
- |
| 16.1 &16.2(Leakage current test) |
- |
5000 |
|
- |
| 16.1 & 16.3(Electric strength test) |
- |
5000 |
|
- |
| 17(Overload protection of transformers and associated circuits) |
- |
5000 |
|
- |
| 19.1 to 19.13, Table No. - 9(Abnormal operation) |
- |
5000 |
|
- |
| 19.101 to to 19.102(Abnormal operation) |
- |
5000 |
|
- |
| 20(Stability and mechanical hazards) |
- |
5000 |
|
- |
| 21(Mechanical strength) |
- |
5000 |
|
- |
| 22(Construction) |
- |
5000 |
|
- |
| 22.101(Construction) |
- |
5000 |
|
- |
| 23(Internal wiring) |
- |
5000 |
|
- |
| 24(Components) |
- |
5000 |
|
- |
| 25("Supply connection and
external flexible cords") |
- |
5000 |
|
- |
| 26("Terminals for external
conductors") |
- |
5000 |
|
- |
| 27(Provision for earthing) |
- |
5000 |
|
- |
| 28(Screws and connections) |
- |
5000 |
|
- |
| 29("Clearances, creepage
distances and solid insulation") |
- |
5000 |
|
- |
| 30(Resistance to heat and fire) |
- |
5000 |
|
- |
| 31(Resistance to rusting) |
- |
5000 |
|
- |
|
15 Oct, 2027 |
- Included w.e.f.06.05.2025
Exclusion
Cl 19.1 to 19.13, Table No. - 9 (Abnormal operation)
Cl 32 ("Radiation, toxicity and similar hazards") |
| 3749 |
Atharva Laboratories Pvt. Ltd. (C-54), Noida
| 8165026
| IS 10322 : PART 5 : SEC 3 (2012) |
Luminaires: Part 5 particular requirements: Sec 3 luminaires for road and street lighting (First Revision) |
- |
38990 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 4(General Test Requireements) |
- |
500 |
|
- |
| 5(Classification of Luminaires') |
- |
500 |
|
- |
| 6.0(Marking) |
- |
1000 |
|
- |
| 7.0(Construction) |
- |
2500 |
|
- |
| 8.0(Creepage Distance and Clearances) |
- |
2500 |
|
- |
| 9.0(Provision for earthing) |
- |
1990 |
|
- |
| 10.0(Terminals) |
- |
2000 |
|
- |
| 11.0(External & Internal Wiring) |
- |
2500 |
|
- |
| 12.0(Protection against electric shock) |
- |
1500 |
|
- |
| 13.0(Endurance Tests and Thermal Tests) |
- |
3000 |
|
- |
| 14.0(Resistance to Dust & Moisture) |
- |
4500 |
|
- |
| 15.0(Insulation Resistance and Electric Strength) |
- |
2500 |
|
- |
| 16.0(Resistance to Heat , fire and tracking) |
- |
2000 |
|
- |
| 17.0(Photometric Test) |
- |
12000 |
|
- |
|
23 Feb, 2029 |
- Included w.e.f 18.08.2025
Exclusion: Clause 4.24 as per IEC 60598- 1 (UV Radiation), Clause 4.26 as per IEC 60598- 1 (Short Circuit Protection) |
| 3750 |
URS PRODUCTS AND TESTING PVT LTD (F3), NOIDA
| 8136826
| IS 302 : Part 2 : Sec 9 (2009) |
Safety of household and similar electrical appliances: Part 2 particular requirements: Sec 9 toasters, grills, roasters and similar appliances (First Revision) |
- |
25000 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| Cl.32(Verification) |
- |
100 |
|
10 % Discount (BIS) |
| Cl.31(Verification) |
- |
500 |
|
- |
| Cl.30(Verification) |
- |
1000 |
|
- |
| CL.29(Verification) |
- |
500 |
|
- |
| Cl.28(Verification) |
- |
500 |
|
- |
| Cl.27(Verification) |
- |
500 |
|
- |
| Cl.26(Verification) |
- |
500 |
|
- |
| Cl.25(Verification) |
- |
1500 |
|
- |
| Cl.24(Verification) |
- |
800 |
|
- |
| Cl.23(Verification) |
- |
500 |
|
- |
| Cl.22(Verification) |
- |
500 |
|
- |
| Cl.21(Verification) |
- |
500 |
|
- |
| Cl.20(Verification) |
- |
1000 |
|
- |
| Cl.19(Verification) |
- |
3000 |
|
- |
| Cl. 16(Verification) |
- |
1500 |
|
- |
| Cl.15.1(Moisture Resistance) |
- |
3000 |
|
- |
| Cl.14(Verification) |
- |
1000 |
|
- |
| Cl.13(Verification) |
- |
1000 |
|
- |
| Cl.11(Verification) |
- |
5000 |
|
- |
| Cl.10(Verification) |
- |
1000 |
|
- |
| Cl.8(Verification) |
- |
500 |
|
- |
| Cl. 7(Verification) |
- |
500 |
|
- |
| Cl. 6(Classification- IS 302-1) |
- |
100 |
|
- |
| Cl. 32
IS 302-2-9(Radiation, Toxicity and similar hazards) |
- |
0 |
|
- |
| Cl. 31
IS 302-2-9(Resistance To Rusting ) |
- |
0 |
|
- |
| Cl. 30
IS 302-2-9(Resistance To Heat, Fire And Tracking) |
- |
0 |
|
- |
| Cl. 29
IS 302-2-9(Creepage Distances, Clearances And Distances Through Insulation) |
- |
0 |
|
- |
| Cl. 28
IS 302-2-9(Screws and Connections) |
- |
0 |
|
- |
| Cl. 27
IS 302-2-9(Provision For Earthing ) |
- |
0 |
|
- |
| Cl. 26
IS 302-2-9(Terminal For External Conductors ) |
- |
0 |
|
- |
| Cl. 25
IS 302-2-9(Supply Connections and External Flexible Cables and Cords ) |
- |
0 |
|
- |
| Cl. 24
IS 302-2-9(Components) |
- |
0 |
|
- |
| Cl. 23
IS 302-2-9(Internal Wiring) |
- |
0 |
|
- |
| Cl. 22
IS 302-2-9(Construction ) |
- |
0 |
|
- |
| Cl. 21
IS 302-2-9(Mechanical Strength) |
- |
0 |
|
- |
| Cl. 20
IS 302-2-9(Stability and mechanical Hazards) |
- |
0 |
|
- |
| Cl. 19
IS 302-2-9(Abnormal Operation ) |
- |
0 |
|
- |
| Cl. 18
IS 302-2-9(Endurance) |
- |
0 |
|
- |
| Cl. 17
IS 302-2-9(Overload protection of transformers and associated circuits.) |
- |
0 |
|
- |
| Cl. 16
IS 302-2-9(Leakage Current and Electric strength ) |
- |
0 |
|
- |
| Cl. 15
IS 302-2-9(Moisture Resistance) |
- |
0 |
|
- |
| Cl. 14
IS 302-2-9(Transient overvoltage) |
- |
0 |
|
- |
| Cl. 13.3 IS 302-2-9(Leakage Current & Electric Strength at Operating Temperature) |
- |
0 |
|
- |
| Cl. 11
IS 302-2-9(Heating) |
- |
0 |
|
- |
| Cl. 10
IS 302-2-9(Power Input and Current ) |
- |
0 |
|
- |
| Cl. 9
IS 302-2-9(Starting of motor operated appliances) |
- |
0 |
|
- |
| Cl. 8
IS 302-2-9(Protection against access to live parts) |
- |
0 |
|
- |
| Cl. 7
IS 302-2-9(Marking and Instruction) |
- |
0 |
|
- |
| Cl. 6 IS 302-2-9(Classification- IS 302-1) |
- |
0 |
|
- |
| 32(Radiation, toxicity and similar hazards) |
- |
0 |
|
- |
| 31(Resistance to rusting) |
- |
0 |
|
- |
| 31(Resistance to rusting) |
- |
0 |
|
- |
| 30.2.4(Resistance to heat and fire) |
- |
0 |
|
- |
| 30.2(Resistance to heat and fire) |
- |
0 |
|
- |
| 30.1(Resistance to heat and fire) |
- |
0 |
|
- |
| 29.3(Clearances, creepage distances and solid insulation) |
- |
0 |
|
- |
| 29.2(Clearances, creepage distances and solid insulation) |
- |
0 |
|
- |
| 29.2(Clearances, creepage distances and solid insulation) |
- |
0 |
|
- |
| 29.1, Table No.- 16, Table No.- 17 & Table No.18(Clearances, creepage distances and solid insulation) |
- |
0 |
|
- |
| 29.1, Table No.- 16, Table No.- 17 & Table No.18(Clearances, creepage distances and solid insulation) |
- |
0 |
|
- |
| 28.2 to 28.4(Screws and connections) |
- |
0 |
|
- |
| 28.1, Table No.-14(Screws and connections) |
- |
0 |
|
- |
| 27.6(Provision for earthing) |
- |
0 |
|
- |
| 27.5(Provision for earthing) |
- |
0 |
|
- |
| 27.1 to 27.4(Provision for earthing) |
- |
0 |
|
- |
| 26.10 & 26.11(Terminals for external conductors) |
- |
0 |
|
- |
| 26.9(Terminals for external conductors) |
- |
0 |
|
- |
| 26.1 to 26.8(Terminals for external conductors) |
- |
0 |
|
- |
| 25.16 to 25.25(Supply connection and external flexible cords) |
- |
0 |
|
- |
| 25.15(Supply connection and external flexible cords) |
- |
0 |
|
- |
| 25.14(Supply connection and external flexible cords) |
- |
0 |
|
- |
| 25.14(Supply connection and external flexible cords) |
- |
0 |
|
- |
| 25.9 to 25.13(Supply connection and external flexible cords) |
- |
0 |
|
- |
| 25.8, Table No.-11(Supply connection and external flexible cords) |
- |
0 |
|
- |
| 25.5 to 25.7(Supply connection and external flexible cords) |
- |
0 |
|
- |
| 25.4(Supply connection and external flexible cords) |
- |
0 |
|
- |
| 25.3(Supply connection and external flexible cords) |
- |
0 |
|
- |
| 25.2(Supply connection and external flexible cords) |
- |
0 |
|
- |
| 25.1(Supply connection and external flexible cords) |
- |
0 |
|
- |
| 24.101(Components) |
- |
0 |
|
- |
| 24.101(Components) |
- |
0 |
|
- |
| 24.2 to 24.6(Components) |
- |
0 |
|
- |
| 24.1(Components) |
- |
0 |
|
- |
| 23.6 to 23.10(Internal wiring) |
- |
0 |
|
- |
| 23.5(Internal wiring) |
- |
0 |
|
- |
| 23.4(Internal wiring) |
- |
0 |
|
- |
| 23.3(Internal wiring) |
- |
0 |
|
- |
| 23.1 & 23.2(Internal wiring) |
- |
0 |
|
- |
| 22.111(Constructions) |
- |
0 |
|
- |
| 22.111(Constructions) |
- |
0 |
|
- |
| 22.11o(Constructions) |
- |
0 |
|
- |
| 22.109(Constructions) |
- |
0 |
|
- |
| 22.108(Constructions) |
- |
0 |
|
- |
| 22.101 to 22.107(Constructions) |
- |
0 |
|
- |
| 22.13 to 22.48(Constructions) |
- |
0 |
|
- |
| 22.12(Constructions) |
- |
0 |
|
- |
| 22.11(Constructions) |
- |
0 |
|
- |
| 22.11(Constructions) |
- |
0 |
|
- |
| 22.7 to 22.10(Constructions) |
- |
0 |
|
- |
| 22.6(Constructions) |
- |
0 |
|
- |
| 22.5(Constructions) |
- |
0 |
|
- |
| 22.4(Constructions) |
- |
0 |
|
- |
| 22.3(Constructions) |
- |
0 |
|
- |
| 22.2(Constructions) |
- |
0 |
|
- |
| 22.1(Constructions) |
- |
0 |
|
- |
| 21.101(MECHANICAL STRENGTH) |
- |
0 |
|
- |
| 21.101(MECHANICAL STRENGTH) |
- |
0 |
|
- |
| 21.2(MECHANICAL STRENGTH) |
- |
0 |
|
- |
| 21.1(MECHANICAL STRENGTH) |
- |
0 |
|
- |
| 20.2(Stability and mechanical hazards) |
- |
0 |
|
- |
| 20.1(Stability and mechanical hazards) |
- |
0 |
|
- |
| 19.104(ABNORMAL OPERATION) |
- |
0 |
|
- |
| 19.103(ABNORMAL OPERATION) |
- |
0 |
|
- |
| 19.102(ABNORMAL OPERATION) |
- |
0 |
|
- |
| 19.101(ABNORMAL OPERATION) |
- |
0 |
|
- |
| 19.1 to 19.13, Table No. - 9(ABNORMAL OPERATION) |
- |
0 |
|
- |
| 17(Overload protection of transformers and associated circuits) |
- |
0 |
|
- |
| 16.3(Insulation resistance test) |
- |
0 |
|
- |
| 16.3(Electric strength test) |
- |
0 |
|
- |
| 16.1 & 16.2(Leakage current test) |
- |
0 |
|
- |
| 15.3(Moisture resistance) |
- |
0 |
|
- |
| 15.3(Moisture resistance) |
- |
0 |
|
- |
| 15.3(Moisture resistance) |
- |
0 |
|
- |
| 15.2(Moisture resistance) |
- |
0 |
|
- |
| 15.2(Moisture resistance) |
- |
0 |
|
- |
| 15.2(Moisture resistance) |
- |
0 |
|
- |
| 15.2(Moisture resistance) |
- |
0 |
|
- |
| 15.1(Moisture resistance) |
- |
0 |
|
- |
| 14, Table No.- 6 & Table No.-16(Transient over voltages) |
- |
0 |
|
- |
| 13.3 and Table No.- 4(Electric strength test) |
- |
0 |
|
- |
| 13.1, 13.2(Leakage current test) |
- |
0 |
|
- |
| 13.1, 13.2(Leakage current test) |
- |
0 |
|
- |
| 11.101(Heating) |
- |
0 |
|
- |
| 11.1 to 11.8, Table No.-3(Heating) |
- |
0 |
|
- |
| 10.1 & 10.2 -Table No. 1, Table No. 2(Power Input and Current) |
- |
0 |
|
- |
| 8.1.5(Protection against access to live parts) |
- |
0 |
|
- |
| 8.1.4(Protection against access to live parts) |
- |
0 |
|
- |
| 8.1.3(Protection against access to live parts) |
- |
0 |
|
- |
| 8.1.2(Protection against access to live parts) |
- |
0 |
|
- |
| 8.1, 8.1.1 & 8.2(Protection against access to live parts) |
- |
0 |
|
- |
| 7.14(Legibility & Durability of Markings test) |
- |
0 |
|
- |
| 7.1 to 7.13, 7.15, 7.16(Marking) |
- |
0 |
|
- |
| 32(Radiation, toxicity and similar hazards) |
- |
0 |
|
- |
| 31(Resistance to rusting) |
- |
0 |
|
- |
| 31(Resistance to rusting) |
- |
0 |
|
- |
| 30.2.4(Resistance to heat and fire) |
- |
0 |
|
- |
| 30.2(Resistance to heat and fire) |
- |
0 |
|
- |
| 30.1(Resistance to heat and fire) |
- |
0 |
|
- |
| 29.3(Clearances, creepage distances and solid insulation) |
- |
0 |
|
- |
| 29.2(Clearances, creepage distances and solid insulation) |
- |
0 |
|
- |
| 29.2(Clearances, creepage distances and solid insulation) |
- |
0 |
|
- |
| 29.1, Table No.- 16, Table No.- 17 & Table No.18(Clearances, creepage distances and solid insulation) |
- |
0 |
|
- |
| 29.1, Table No.- 16, Table No.- 17 & Table No.18(Clearances, creepage distances and solid insulation) |
- |
0 |
|
- |
| 28.2 to 28.4(Screws and connections) |
- |
0 |
|
- |
| 28.1, Table No.-14(Screws and connections) |
- |
0 |
|
- |
| 27.6(Provision for earthing) |
- |
0 |
|
- |
| 27.5(Provision for earthing) |
- |
0 |
|
- |
| 27.1 to 27.4(Provision for earthing) |
- |
0 |
|
- |
| 26.10 & 26.11(Terminals for external conductors) |
- |
0 |
|
- |
| 26.9(Terminals for external conductors) |
- |
0 |
|
- |
| 26.1 to 26.8(Terminals for external conductors) |
- |
0 |
|
- |
| 25.16 to 25.25(Supply connection and external flexible cords) |
- |
0 |
|
- |
| 25.15(Supply connection and external flexible cords) |
- |
0 |
|
- |
| 25.14(Supply connection and external flexible cords) |
- |
0 |
|
- |
| 25.14(Supply connection and external flexible cords) |
- |
0 |
|
- |
| 25.9 to 25.13(Supply connection and external flexible cords) |
- |
0 |
|
- |
| 25.8, Table No.-11(Supply connection and external flexible cords) |
- |
0 |
|
- |
| 25.5 to 25.7(Supply connection and external flexible cords) |
- |
0 |
|
- |
| 25.4(Supply connection and external flexible cords) |
- |
0 |
|
- |
| 25.3(Supply connection and external flexible cords) |
- |
0 |
|
- |
| 25.2(Supply connection and external flexible cords) |
- |
0 |
|
- |
| 25.1(Supply connection and external flexible cords) |
- |
0 |
|
- |
| 24.101(Components) |
- |
0 |
|
- |
| 24.101(Components) |
- |
0 |
|
- |
| 24.2 to 24.6(Components) |
- |
0 |
|
- |
| 24.1(Components) |
- |
0 |
|
- |
| 23.6 to 23.10(Internal wiring) |
- |
0 |
|
- |
| 23.5(Internal wiring) |
- |
0 |
|
- |
| 23.4(Internal wiring) |
- |
0 |
|
- |
| 23.3(Internal wiring) |
- |
0 |
|
- |
| 23.1 & 23.2(Internal wiring) |
- |
0 |
|
- |
| 22.111(Constructions) |
- |
0 |
|
- |
| 22.111(Constructions) |
- |
0 |
|
- |
| 22.11o(Constructions) |
- |
0 |
|
- |
| 22.109(Constructions) |
- |
0 |
|
- |
| 22.108(Constructions) |
- |
0 |
|
- |
| 22.101 to 22.107(Constructions) |
- |
0 |
|
- |
| 22.13 to 22.48(Constructions) |
- |
0 |
|
- |
| 22.12(Constructions) |
- |
0 |
|
- |
| 22.11(Constructions) |
- |
0 |
|
- |
| 22.11(Constructions) |
- |
0 |
|
- |
| 22.7 to 22.10(Constructions) |
- |
0 |
|
- |
| 22.6(Constructions) |
- |
0 |
|
- |
| 22.5(Constructions) |
- |
0 |
|
- |
| 22.4(Constructions) |
- |
0 |
|
- |
| 22.3(Constructions) |
- |
0 |
|
- |
| 22.2(Constructions) |
- |
0 |
|
- |
| 22.1(Constructions) |
- |
0 |
|
- |
| 21.101(MECHANICAL STRENGTH) |
- |
0 |
|
- |
| 21.101(MECHANICAL STRENGTH) |
- |
0 |
|
- |
| 21.2(MECHANICAL STRENGTH) |
- |
0 |
|
- |
| 21.1(MECHANICAL STRENGTH) |
- |
0 |
|
- |
| 20.2(Stability and mechanical hazards) |
- |
0 |
|
- |
| 20.1(Stability and mechanical hazards) |
- |
0 |
|
- |
| 19.104(ABNORMAL OPERATION) |
- |
0 |
|
- |
| 19.103(ABNORMAL OPERATION) |
- |
0 |
|
- |
| 19.102(ABNORMAL OPERATION) |
- |
0 |
|
- |
| 19.101(ABNORMAL OPERATION) |
- |
0 |
|
- |
| 19.1 to 19.13, Table No. - 9(ABNORMAL OPERATION) |
- |
0 |
|
- |
| 17(Overload protection of transformers and associated circuits) |
- |
0 |
|
- |
| 16.3(Insulation resistance test) |
- |
0 |
|
- |
| 16.3(Electric strength test) |
- |
0 |
|
- |
| 16.1 & 16.2(Leakage current test) |
- |
0 |
|
- |
| 15.3(Moisture resistance) |
- |
0 |
|
- |
| 15.3(Moisture resistance) |
- |
0 |
|
- |
| 15.3(Moisture resistance) |
- |
0 |
|
- |
| 15.2(Moisture resistance) |
- |
0 |
|
- |
| 15.2(Moisture resistance) |
- |
0 |
|
- |
| 15.2(Moisture resistance) |
- |
0 |
|
- |
| 15.2(Moisture resistance) |
- |
0 |
|
- |
| 15.1(Moisture resistance) |
- |
0 |
|
- |
| 14, Table No.- 6 & Table No.-16(Transient over voltages) |
- |
0 |
|
- |
| 13.3 and Table No.- 4(Electric strength test) |
- |
0 |
|
- |
| 13.1, 13.2(Leakage current test) |
- |
0 |
|
- |
| 13.1, 13.2(Leakage current test) |
- |
0 |
|
- |
| 11.101(Heating) |
- |
0 |
|
- |
| 11.1 to 11.8, Table No.-3(Heating) |
- |
0 |
|
- |
| 10.1 & 10.2 -Table No. 1, Table No. 2(Power Input and Current) |
- |
0 |
|
- |
| 8.1.5(Protection against access to live parts) |
- |
0 |
|
- |
| 8.1.4(Protection against access to live parts) |
- |
0 |
|
- |
| 8.1.3(Protection against access to live parts) |
- |
0 |
|
- |
| 8.1.2(Protection against access to live parts) |
- |
0 |
|
- |
| 8.1, 8.1.1 & 8.2(Protection against access to live parts) |
- |
0 |
|
- |
| 7.14(Legibility & Durability of Markings test) |
- |
0 |
|
- |
| 7.1 to 7.13, 7.15, 7.16(Marking) |
- |
0 |
|
- |
| 32(Radiation ,Toxicity and similar hazards) |
- |
0 |
|
- |
| 31(Resistance to Rusting) |
- |
0 |
|
- |
| 30(Resistance to Heat & Fire) |
- |
0 |
|
- |
| 29(Clearances, Creepage Distances & Solid Insulation) |
- |
0 |
|
- |
| 28(Screws & Connections) |
- |
0 |
|
- |
| 27(Provision For Earthing) |
- |
0 |
|
- |
| 26(Terminals For External Conductors) |
- |
0 |
|
- |
| 25(Supply Connection & External Flexible Cords) |
- |
0 |
|
- |
| 24(Components) |
- |
0 |
|
- |
| 23(Internal wiring) |
- |
0 |
|
- |
| 22(Construction) |
- |
0 |
|
- |
| 21(Mechanical strength) |
- |
0 |
|
- |
| 20(Stability & Mechanical Hazards) |
- |
0 |
|
- |
| 19(Abnormal Operation) |
- |
0 |
|
- |
| 17(Overload Protection/ Overload Protection of Transformers & Associated Circuits) |
- |
0 |
|
- |
| 16(Leakage Current and Electric Strength) |
- |
0 |
|
- |
| 15(Moisture Resistance) |
- |
0 |
|
- |
| 14(Transient Over Voltage) |
- |
0 |
|
- |
| 13(Leakage Current and Electric Strength at Operating Temperature) |
- |
0 |
|
- |
| 11(Temperature Rise/ Heating) |
- |
0 |
|
- |
| 10(Power Input
& Current) |
- |
0 |
|
- |
| 9(Starting Of Motor Operated Appliances) |
- |
0 |
|
- |
| 8(Protection against access to live parts) |
- |
0 |
|
- |
| 32(Radiation ,Toxicity and similar hazards) |
- |
0 |
|
- |
| 31(Resistance to Rusting) |
- |
0 |
|
- |
| 30(Resistance to Heat & Fire) |
- |
0 |
|
- |
| 29(Clearances, Creepage Distances & Solid Insulation) |
- |
0 |
|
- |
| 28(Screws & Connections) |
- |
0 |
|
- |
| 27(Provision For Earthing) |
- |
0 |
|
- |
| 26(Terminals For External Conductors) |
- |
0 |
|
- |
| 25(Supply Connection & External Flexible Cords) |
- |
0 |
|
- |
| 24(Components) |
- |
0 |
|
- |
| 23(Internal wiring) |
- |
0 |
|
- |
| 22(Construction) |
- |
0 |
|
- |
| 21(Mechanical strength) |
- |
0 |
|
- |
| 20(Stability & Mechanical Hazards) |
- |
0 |
|
- |
| 19(Abnormal Operation) |
- |
0 |
|
- |
| 17(Overload Protection/ Overload Protection of Transformers & Associated Circuits) |
- |
0 |
|
- |
| 16(Leakage Current and Electric Strength) |
- |
0 |
|
- |
| 15(Moisture Resistance) |
- |
0 |
|
- |
| 14(Transient Over Voltage) |
- |
0 |
|
- |
| 13(Leakage Current and Electric Strength at Operating Temperature) |
- |
0 |
|
- |
| 11(Temperature Rise/ Heating) |
- |
0 |
|
- |
| 10(Power Input
& Current) |
- |
0 |
|
- |
| 9(Starting Of Motor Operated Appliances) |
- |
0 |
|
- |
| 8(Protection against access to live parts) |
- |
0 |
|
- |
| 19.11.4.1(Electrostatic discharges) |
- |
0 |
|
- |
| 19.11.4.2(Radiated fields) |
- |
0 |
|
- |
| 19.11.4.3(Fast transient bursts) |
- |
0 |
|
- |
| 19.11.4.4(Surge immunity test) |
- |
0 |
|
- |
| 19.11.4.5(Immunity to conducted discharges) |
- |
0 |
|
- |
| 19.11.4.6(Class 3 Voltage dips and interruptions) |
- |
0 |
|
- |
| 19.11.4.7(Harmonics) |
- |
0 |
|
- |
|
31 Dec, 2026 |
- Included w.e.f 29.04.2025
Exclusion: Cl 19.11.4.1-19.11.4.7(EMI/EMC) |