9421 |
BIS, Eastern Regional Laboratory (ERL)
| IS 9523 (2000) |
Ductile iron fittings for pressure pipes for water, gas and sewage - Specification (First Revision) |
For all sizes |
-
|
Rs.7245.00 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
Cl 5 (Thickness) |
- |
|
|
|
Cl 9 (Tensile Test & Hardness Test) |
- |
|
|
|
Cl 11 (Nominal Diameter, Ovality, Dimensions, No. Of Holes & Bolt Sizes) |
- |
|
|
|
Cl 13 (Coating) |
- |
|
|
|
|
Partial
|
|
- |
- Except Hydrostatic test, Some critical dimention of Flange. Sample req-1 pc and Cut pc for coating, Cut potion for dimension, cement lining, prepared test pc for tensile, hardness |
9422 |
BIS, Eastern Regional Laboratory (ERL)
| IS 5557 (2004) |
Industrial and protective rubber knee and ankle boots - Specification (Fourth Revision) |
For all type and variety |
-
|
Rs 14030/- View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
5/5.1.7/5.1.7.8 (REQUIREMENTS- Physical Requirements-Resistance to oil) |
- |
|
|
|
5/5.1.1-Fig. 1, Fig. 2 and Fig. 3 (REQUIREMENTS-Design) |
- |
|
|
|
5/5.1.2 -IS 1638 (REQUIREMENTS-Size) |
- |
|
|
|
5/5.1.3-Table1 (REQUIREMENTS-Thickness) |
- |
|
|
|
5/5.1.4/5.1.4.1-Table2 (REQUIREMENTS-Materials-Rubber components) |
- |
|
|
|
5/5.1.4/5.1.4.2 (REQUIREMENTS-Materials-Fabric-
accordance with IS 1969) |
- |
|
|
|
5/5.1.4/5.1.4.3 (REQUIREMENTS-Materials-Protective Steel Toe Cap-
an per IS 5852) |
- |
|
|
|
5/5.1.6/5.1.6.1-Fig. 1,
Fig. 2, Fig. 3, .Fig. 4, Fig. 5 and Table 3. (REQUIREMENTS- Construction) |
- |
|
|
|
5/5.1.6/5.1.6.2 (REQUIREMENTS- Construction) |
- |
|
|
|
5/5.1.7/5.1.7.1 (REQUIREMENTS- Physical Requirements-Heat treatment-
as per IS 3400 (Part 4)) |
- |
|
|
|
5/5.1.7/5.1.7.2 (REQUIREMENTS- Physical Requirements-Composite strength) |
- |
|
|
|
5/5.1.7/5.1.7.3-Table 4 (REQUIREMENTS- Physical Requirements-Flexing endurance-
as per Annex B.) |
- |
|
|
|
5/5.1.7/5.1.7.4 (REQUIREMENTS- Physical Requirements- Leakage resistance test) |
- |
|
|
|
5/5.1.7/5.1.7.5 (REQUIREMENTS- Physical Requirements- Consolidation test-
as per IS IS 3400 (Part 5)) |
- |
|
|
|
5/5.1.7/5.1.7.6 (REQUIREMENTS- Physical Requirements- Performance test-
as per Annex C) |
- |
|
|
|
5/5.1.7/5.1.7.7 (REQUIREMENTS- Physical Requirements-Height of the boots) |
- |
|
|
|
|
Partial
|
|
- |
- Sample required- 3 pairs & buttons and prepared slab for tensile & elongation as applicable to be supplied separately. Type to be declared. |
9423 |
BIS, Central Laboratory (CL)
| IS 16415 (2015) |
Composite cement - Specification |
- |
-
|
Rs.9150/- View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
Cl. 6.1,Table 2 (Chloride content) |
- |
|
|
|
7 (Physical Requirement) |
- |
|
|
|
Cl. 6.1,Table 2 (Loss on ignition) |
- |
|
|
|
Cl. 6.1,Table 2 (Total sulphur content calculated as sulphuric anhydride) |
- |
|
|
|
Cl. 6.1,Table 2 (Insoluble residue) |
- |
|
|
|
Cl. 6.1,Table 2 (Magnesia) |
- |
|
|
|
|
Partial
|
|
- |
- EXCLUDING Table 2,Clause 6.1 ,sl. no.(iv)&(vii) , sulphur as sulphide content & alkali content; |
9424 |
BIS, Central Laboratory (CL)
| IS 3601 (2006) |
Steel tubes for mechanical and general engineering purposes - Specification (Second Revision) |
- |
-
|
- View breakup
Rs. 7370/- for Un-galvanized WT & HFS For galvanized tubes Rs. 1945/- extra Rs. 8060/- for CDS & CEW Material testing charges as per relevant referred ISs to be levied additionally
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
4 (Material) |
- |
|
|
|
6.0 (Workmanship) |
- |
|
|
|
8.0 (Straightness) |
- |
|
|
|
19.1.1, 24.1.1, 28.1.1, 33.1.1 (Dimensions- Outside Dia) |
- |
|
|
|
19.1.2, 24.1.2, 28.1.2, 33.1.2 (Dimensions- Thickness) |
- |
|
|
|
11.1 (Surface Protection) |
- |
|
|
|
11.2 (Surface Protection) |
- |
|
|
|
13.1.3 (Tensile Strength) |
- |
|
|
|
13.1.1 (Yield Stress) |
- |
|
|
|
13.1.2 (Elongation) |
- |
|
|
|
13.2 (Flattening Test) |
- |
|
|
|
13.3 (Bend Test (Strip)) |
- |
|
|
|
13.4 (Bend Test (Whole Tube)) |
- |
|
|
|
13.5 (Drift Expansion Test) |
- |
|
|
|
13.6 (Crush Test) |
- |
|
|
|
19.1.3 (Height of Internal Fin) |
- |
|
|
|
4.1 (Sulphur-Percentage by mass) |
- |
|
|
|
4.1 (Phosphorus-Percentage by mass) |
- |
|
|
|
|
Partial
|
|
- |
- Sample Size 5 pcs of 5x5 cm having dia > 3mm and thickeness > 0.8 mm; |
9425 |
BIS, Central Laboratory (CL)
| IS 513 : Part 1 (2016) |
Cold reduced carbon steel sheet and strip: Part 1 cold forming and drawing purpose (Sixth Revision) |
- |
-
|
Rs.8850/- Excluding Tensile Strain Hardening component View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
8 (Mechanical and Physical Properties) |
- |
|
|
|
Cl 9 (Workmanship) |
- |
|
|
|
Cl 9.6 (Workmanship) |
- |
|
|
|
Cl 10 (Workmanship) |
- |
|
|
|
Cl 11 (Length, Width & Thickness) |
- |
|
|
|
Cl 9.5 (Workmanship) |
- |
|
|
|
Cl. 8.4 (Bend Test) |
- |
|
|
|
Cl. 8.3 Table 6 (Hardness Test
( Only for CR0 & CR1)) |
- |
|
|
|
Cl. 8.2 (Cupping Test(Only for sheet and coils CR2, CR3, CR4(having thickness 0.5 mm-2.0 mm)) |
- |
|
|
|
Cl 8 (UTM) |
- |
|
|
|
Cl. 8.1 & Table
5A, 5B & 5C (Elongation at 80 mm gauge length) |
- |
|
|
|
Cl. 8.1 & Table
5A, 5B & 5C (Elongation at 50 mm gauge length) |
- |
|
|
|
Cl. 8.1 & Table
5A, 5B & 5C (Yield Stress) |
- |
|
|
|
Cl. 9 Table 8 (Surface roughness) |
- |
|
|
|
Cl. 11 (Out of square) |
- |
|
|
|
Cl. 11 (Flatness) |
- |
|
|
|
Cl. 11 (Camber) |
- |
|
|
|
Cl. 11 (Width) |
- |
|
|
|
Cl. 11 (Thickness) |
- |
|
|
|
7.0 (CARBON) |
- |
|
|
|
7.0 (SULPHUR) |
- |
|
|
|
7.0 (PHOSPHORUS) |
- |
|
|
|
7.0 (MANGANESE) |
- |
|
|
|
7.0 (SILICON) |
- |
|
|
|
7.0 (ALUMINIUM) |
- |
|
|
|
7.0 (NITROGEN) |
- |
|
|
|
|
Partial
|
|
- |
- Sample Size 5 pcs of 5x5 cm having dia > 3mm and thickeness > 0.8 mm;
EXCLUDING Complete for thickness > 0.8 mm, only C& S can be tested for thickness < 0.8 mm; Plastic Strain Ratio,Tensile Strain Hardening Component,Bake Hardening Index |
9426 |
BIS, Eastern Regional Laboratory (ERL)
| IS 6913 (1973) |
Specification for stainless steel tubes for the food and beverage industry |
For all grades except for the tests mentioned in remarks |
-
|
- View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
Cl. 6.1, Table 2 (Outside Diameter) |
- |
|
|
|
Cl. 6.1, Table 2 (Wall Thickness) |
- |
|
|
|
Cl. 8.1 (Finish-Cl.8.1) |
- |
|
|
|
Cl. 8.2 (Finish-Cl.8.2) |
- |
|
|
|
Cl. 10.1 (Tensile Strength- IS 1894) |
- |
|
|
|
Cl. 10.1 (Elongation on 5.65√So) |
- |
|
|
|
|
Partial
|
|
- |
- Except Parameter: S,Mo, 14 Hydrostatic test, 15 Optional Tests (Intergrannualr corrosion test) |
9427 |
BIS, Bengaluru Branch Laboratory (BNBL)
| IS 3104 : Part 1 (1982) |
Specification for density hydrometers: Part 1 requirements (First Revision) |
- |
-
|
Rs. 4800/- excluding accuracy test. View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
Cl.11.2 ( Stem diameter of the hydrometers shall be not less than 40 mm.) |
- |
|
|
|
Cl.9.1 Bulb and Stem ( — The bulb and the stem shall be made of a suitable
transparent glass, selected and processed to be as free as possible from
stress and visible defects, and having a coefficient of cubical thermal
expansion of (25 ± 2) × 10-6 (°C)-) |
- |
|
|
|
Cl.9.2 Loading Material ( — The loading material shall be fixed in the bottom of the hydrometer. After the finished hydrometer has been kept
in a horizontal position for 1 h at 80°C and subsequently cooled in that
position, the instrument shall meet the requirements of 10.3.) |
- |
|
|
|
Cl.9.3 Scale Strip ( — The strip on which the scale and inscriptions are marked shall have a smooth matt surface. The strip shall show no evidence of charring, and shall not become discoloured or distorted when the stem is exposed for 1 h to a temperature of 80°C.) |
- |
|
|
|
Cl.10.1 workmanshisp and finish ( The outer surface of the hydrometers shall be symmetrical about the main axis) |
- |
|
|
|
Cl.10.2 ( There shall be no abrupt changes in their cross section ( see Fig, 1 )) |
- |
|
|
|
Cl.10.3 ( The cross-section of the stem shall remain unchanged for at least
5 mm below the lowest graduation line on ??? scale.) |
- |
|
|
|
Cl.10.4 (The stem shall extend unchanged in diameter at least 15 mm above
the uppermost graduation line on the scale.) |
- |
|
|
|
Cl.10.5 ( The hydrometer shall float with its axis vertical to within 1.5° of
arc.) |
- |
|
|
|
Cl.10.6 (There shall be no loose material in the instrument) |
- |
|
|
|
Cl.10.7 ( The strip on which the scale and inscriptions are marked shall
remain securely fastened in place at the temperature of use ( see 9.3 ).) |
- |
|
|
|
Cl.10.8 ( The scale shall be straight and without twist.) |
- |
|
|
|
Cl.10.9 ( Appropriate means shall be incorporated for ensuring that any
displacement of the scale or of the strip bearing the scale is readily
apparent.) |
- |
|
|
|
Cl.11.1 ( The dimensions of the hydrometers shall conform to the requirements
given in Table 1.) |
- |
|
|
|
Cl.12.2
Cl.12.2.1
Graduation Lines ( The graduation lines shall be distinct and of uniform thickness
not exceeding 0 2 mm or one-fifth of the distance between the centres of
adjacent lines, whichever is less. For the SP series, the thickness of the
graduation lines shall not exceed 0.2 mm or one-sixth of the distance
between the centres of adjacent lines, whichever is less.) |
- |
|
|
|
Cl.12.2.2 (There shall be no evident local irregularities in the spacing of
the graduation lines.) |
- |
|
|
|
Cl.12.2.3 ( The graduation lines shall be perpendicular to the axis of the
hydrometer.) |
- |
|
|
|
Cl.12.2.4 (The short, medium and long scale lines shall extend, respectively,
at least one-fifth, one-third and one-half of the way round the
circumference of the stem.) |
- |
|
|
|
Cl.12.2.5 ( The highest and lowest graduation lines indicating the nominal
limits of the scale shall be long lines ( see 12.3.1, 12.3.2 and 12.3.3 ).) |
- |
|
|
|
Cl.12.2.6 ( The short, medium and long lines shall each be vertically disposed so that either the mid-points, or the right hand ends or the left hand ends of all graduation lines He on an imaginary line parallel to the axis of the instrument. In the latter two cases, the vertical line may, alternatively, be marked.) |
- |
|
|
|
Cl.12.3.1
Sequence of Graduation Lines ( On hydrometer scales whose smallest interval is 1 kg/m3 or 1 g/ml:) |
- |
|
|
|
Cl.12.3.2 ( On hydrometer scales whose smallest interval is 2 kg/m3, or
2 g/ml) |
- |
|
|
|
Cl.12.3.3 ( On hydrometer scales whose smallest interval is 5 kg/m3
or 5 g/ml:) |
- |
|
|
|
Cl.12.4 Figuring of Graduation Lines
Cl.12.4.0 ( The scale lines and inscriptions should preferably be black and shall be clearly and durably marked.) |
- |
|
|
|
Cl.12.4.1 ( The scale shall have only one set of numbers and the last digits
of the numbers shall be vertically aligned ( see Fig. 2 ).) |
- |
|
|
|
Cl.12.4.2 ( The scale shall be so figured as to enable the value corresponding
to any graduation line to be readily identified.) |
- |
|
|
|
Cl.12.4.3 ( The highest and lowest graduation lines of the nominal limits
shall be figured in full.) |
- |
|
|
|
Cl.12.4.4 ( At least every tenth line shall be figured) |
- |
|
|
|
Cl.12.4.5 ( For density values expressed in grams per cubic centimetres, the
decimal sign shall be included for numbers expressed in full, but may be
omitted from abbreviated numbers.) |
- |
|
|
|
Cl.12.5 Extension of Scale ( — The scale shall be extended beyond the nominal scale limits, as indicated in col 12 of Table 1.) |
- |
|
|
|
|
Partial
|
|
- |
- Except tests for accuracy. |
9428 |
BIS, Eastern Regional Laboratory (ERL)
| IS 6649 (1985) |
Specification for hardened and tempered washers for high strength structural bolts and nuts (First Revision) |
- |
-
|
- View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
3 Table-1 (Dimensions Type A- d1) |
- |
|
|
|
3 Table-1 (Dimensions Type A- d2) |
- |
|
|
|
3 Table-1 (Dimensions Type A- S) |
- |
|
|
|
3 Table-2 (Dimensions Type B&C- d) |
- |
|
|
|
3 Table-2 (Dimensions Type B&C- a) |
- |
|
|
|
3 Table-2 (Dimensions Type B&C- t) |
- |
|
|
|
3 Table-2 (Dimensions Type B&C- θ) |
- |
|
|
|
3.1 (Deviation) |
- |
|
|
|
3.2 (Concentric) |
- |
|
|
|
3.3 (Clearance) |
- |
|
|
|
7 (Hardness) |
- |
|
|
|
8 (Finish) |
- |
|
|
|
8.1 (Freedom from defect) |
- |
|
|
|
8.1 (Uniformity of zinc coating) |
- |
|
|
|
8.1 (Mass of zinc coating) |
- |
|
|
|
8.1 (Knife test (Adhesion of coating)) |
- |
|
|
|
5 (Chemical Composition- Sulphur) |
- |
|
|
|
5 (Chemical Composition- Phosphorus) |
- |
|
|
|
|
Complete
|
|
- |
- - |
9429 |
BIS, Eastern Regional Laboratory (ERL)
| IS 5676 (1995) |
Moulded solid rubber soles and heels - SpecificatlOn (Second Revision) |
For all type |
-
|
Rs.5100/- View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
5/5.1 (REQUIREMENTS-General) |
- |
|
|
|
5/5.2- Fig. 1 to 5 (REQUIREMENTS-Design) |
- |
|
|
|
5/5.5- Table1 (REQUIREMENTS-Thickness) |
- |
|
|
|
5/5.6/5.6.1 (REQUIREMENTS-Channel) |
- |
|
|
|
5/5.7- Table2 (REQUIREMENTS- Physical Requirements-
as per IS 3400 (Part 1, Part 2, Part 4, Part 9, Part 10, Part 16)) |
- |
|
|
|
5.7, Table 2 iv) (Amendment 1) (Abrasion Resistance at applied force of 10 N) |
- |
|
|
|
5.7, Table 2 vii) (Amendment 1) (Tear strength (average force)) |
- |
|
|
|
5.5 (Amendment 1) (Thickness) |
- |
|
|
|
5.7 Table 2 i) (Amendment 1) (Relative Density) |
- |
|
|
|
5.7, Table 2 ii) (Amendment 1) (Hardness, degree, Shore A) |
- |
|
|
|
5.7, Table 2 v) (Amendment 1) (Tensile strength) |
- |
|
|
|
5.7, Table 2 vi) (Amendment 1) (Elongation at break) |
- |
|
|
|
5.7, Table 2 iii) (Amendment 1) (Flexing resistance) |
- |
|
|
|
5/5.3/5.3.1 (REQUIREMENTS- Construction) |
- |
|
|
|
5/5.3/5.3.1 (REQUIREMENTS- Construction) |
- |
|
|
|
5/5.1 (REQUIREMENTS-General) |
- |
|
|
|
5/5.2- Fig. 1 to 5 (REQUIREMENTS-Design) |
- |
|
|
|
5/5.5- Table1 (REQUIREMENTS-Thickness) |
- |
|
|
|
5/5.6/5.6.1 (REQUIREMENTS-Channel) |
- |
|
|
|
5/5.7- Table2 (REQUIREMENTS- Physical Requirements-
as per IS 3400 (Part 1, Part 2, Part 4, Part 9, Part 10, Part 16)) |
- |
|
|
|
5/5.3/5.3.1 (REQUIREMENTS- Construction) |
- |
|
|
|
5/5.1 (REQUIREMENTS-General) |
- |
|
|
|
5/5.2- Fig. 1 to 5 (REQUIREMENTS-Design) |
- |
|
|
|
5/5.5- Table1 (REQUIREMENTS-Thickness) |
- |
|
|
|
5/5.6/5.6.1 (REQUIREMENTS-Channel) |
- |
|
|
|
5/5.7- Table2 (REQUIREMENTS- Physical Requirements-
as per IS 3400 (Part 1, Part 2, Part 4, Part 9, Part 10, Part 16)) |
- |
|
|
|
6 (Marking and packing) |
- |
|
|
|
8.1 (Test methods) |
- |
|
|
|
8.3 (Measurement of thickness) |
- |
|
|
|
Cl.6.1,6.2,6.3 (Marking and packing) |
- |
|
|
|
8.1 (Test Methods) |
- |
|
|
|
Cl.8.3 (Measurement of thickness ") |
- |
|
|
|
|
Partial
|
|
- |
- 2 nos. soles + 2 slab (200mm x 200mm, Thickness 1.8-2.2 mm) |
9430 |
BIS, Southern Regional Laboratory (SRL)
| IS 12585 (1988) |
Specification for thermoplastic hoses (Textile Reinforced) for water - General purpose |
- |
-
|
- View breakup
Rs. 1500/- excluding Loss in mass on heating, Adhesion, Minimum bend radius and Low temperature flexibility.
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
Cl 3 (Types) |
- |
|
|
|
Cl 4.1 (Construction) |
- |
|
|
|
Cl 4.2 (Dimensions & Tolerances) |
- |
|
|
|
Cl 4.3.1 & Appendix A (Loss in Mass on Heating) |
- |
|
|
|
Cl 4.3.2 (Adhesion) |
- |
|
|
|
Cl 4.3.3 (Pressure Requirements) |
- |
|
|
|
Cl 4.3.4 (Minimum Bend Radius) |
- |
|
|
|
Cl 4.3.5 (Low Temperature Flexibility) |
- |
|
|
|
|
Partial
|
|
- |
- Excluding Loss in mass on heating,Adhesion, Minimum Bend Radius, Low temperature flexibility |
9431 |
BIS, Northern Regional Laboratory (NRL)
| IS 3104 : Part 1 (1982) |
Specification for density hydrometers: Part 1 requirements (First Revision) |
- |
-
|
- View breakup
Rs. 4800/- excluding accuracy test
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
Cl.11.2 ( Stem diameter of the hydrometers shall be not less than 40 mm.) |
- |
|
|
|
Cl.10.1 workmanshisp and finish ( The outer surface of the hydrometers shall be symmetrical about the main axis) |
- |
|
|
|
Cl.10.2 ( There shall be no abrupt changes in their cross section ( see Fig, 1 )) |
- |
|
|
|
Cl.10.3 ( The cross-section of the stem shall remain unchanged for at least
5 mm below the lowest graduation line on ??? scale.) |
- |
|
|
|
Cl.10.4 (The stem shall extend unchanged in diameter at least 15 mm above
the uppermost graduation line on the scale.) |
- |
|
|
|
Cl.10.5 ( The hydrometer shall float with its axis vertical to within 1.5° of
arc.) |
- |
|
|
|
Cl.10.6 (There shall be no loose material in the instrument) |
- |
|
|
|
Cl.10.7 ( The strip on which the scale and inscriptions are marked shall
remain securely fastened in place at the temperature of use ( see 9.3 ).) |
- |
|
|
|
Cl.10.8 ( The scale shall be straight and without twist.) |
- |
|
|
|
Cl.10.9 ( Appropriate means shall be incorporated for ensuring that any
displacement of the scale or of the strip bearing the scale is readily
apparent.) |
- |
|
|
|
Cl.11.1 ( The dimensions of the hydrometers shall conform to the requirements
given in Table 1.) |
- |
|
|
|
Cl.12.2
Cl.12.2.1
Graduation Lines ( The graduation lines shall be distinct and of uniform thickness
not exceeding 0 2 mm or one-fifth of the distance between the centres of
adjacent lines, whichever is less. For the SP series, the thickness of the
graduation lines shall not exceed 0.2 mm or one-sixth of the distance
between the centres of adjacent lines, whichever is less.) |
- |
|
|
|
Cl.12.2.2 (There shall be no evident local irregularities in the spacing of
the graduation lines.) |
- |
|
|
|
Cl.12.2.3 ( The graduation lines shall be perpendicular to the axis of the
hydrometer.) |
- |
|
|
|
Cl.12.2.4 (The short, medium and long scale lines shall extend, respectively,
at least one-fifth, one-third and one-half of the way round the
circumference of the stem.) |
- |
|
|
|
Cl.12.2.5 ( The highest and lowest graduation lines indicating the nominal
limits of the scale shall be long lines ( see 12.3.1, 12.3.2 and 12.3.3 ).) |
- |
|
|
|
Cl.12.5 Extension of Scale ( — The scale shall be extended beyond the nominal scale limits, as indicated in col 12 of Table 1.) |
- |
|
|
|
|
Partial
|
|
- |
- Excluding Accuracy test |
9432 |
BIS, Southern Regional Laboratory (SRL)
| IS 3309 (1992) |
Soluble Coffee - Chicory powder - Specification (Second Revision) |
- |
-
|
Rs.2900/- View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
3.4 Table 1 (Moisture content) |
- |
|
|
|
3.4 Table 1 (Total ash) |
- |
|
|
|
3.7 (Copper content) |
- |
|
|
|
3.1 (Description) |
- |
|
|
|
3.4 Table 1 (Solubility in boiling) |
- |
|
|
|
3.4 Table 1 (Solubility in cold water) |
- |
|
|
|
|
Partial
|
|
- |
- " 2 x 200 g
Excluding except caffeine content,chicory content and pesticide residue |
9433 |
BIS, Southern Regional Laboratory (SRL)
| IS 2791 (1992) |
Soluble coffee powder - Specification (Third Revision) |
- |
-
|
- View breakup
Rs. 4126/- excluding copper content and pesticide residues
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
3.4 Table 1 (Moisture content) |
- |
|
|
|
3.4 Table 1 (Total ash) |
- |
|
|
|
3.1 (Description ) |
- |
|
|
|
3.4 Table 1 (Solubility in boiling) |
- |
|
|
|
3.4 Table 1 (Solubility in cold water) |
- |
|
|
|
|
Partial
|
|
- |
- " 2 x 200 g
Excluding except caffeine content and pesticide residue |
9434 |
BIS, Eastern Regional Laboratory (ERL)
| IS 4109 (1967) |
Specification for kadahies |
For all shapes except tests mentioned in remarks |
-
|
Rs. 750/- and testing charges as per referred Iss View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
2 (Materials) |
- |
|
|
|
3 (a) Round Shape / Bowl Shape) |
- |
|
|
|
3 (b) Nominal dia. at top D1 mm) |
- |
|
|
|
3 (c) Nominal overall Height H1 mm) |
- |
|
|
|
3 (d) Thickness at bottom mm Min) |
- |
|
|
|
4 (Manufacture and Workmanship) |
- |
|
|
|
6 (Test) |
- |
|
|
|
|
Partial
|
|
- |
- Chem: except Nb, V ,B Ti |
9435 |
BIS, Eastern Regional Laboratory (ERL)
| IS 6528 (1995) |
Stainless steel wire - Specification (First Revision) |
For all grades except for the tests mentioned in remarks |
-
|
- View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
Cl 6 (Workmanship) |
- |
|
|
|
Cl 9.1 & Table 3 (Diameter & Out Of Round) |
- |
|
|
|
Cl 9.1 & Table 3 (Diameter & Out Of Round) |
- |
|
|
|
Cl 9.1 & Table 3 (Diameter & Out Of Round) |
- |
|
|
|
Cl 10 (UTM) |
- |
|
|
|
Cl 10 (UTM) |
- |
|
|
|
Cl 10 (UTM) |
- |
|
|
|
Cl 10 (UTM) |
- |
|
|
|
Cl 10 (UTM) |
- |
|
|
|
Cl 10 (UTM) |
- |
|
|
|
Table-1,( Clauses 7.1, 7.2, 7.3 and 12.1) (Carbon) |
- |
|
|
|
Table-1,( Clauses 7.1, 7.2, 7.3 and 12.1) (Sulphor) |
- |
|
|
|
Table-1,( Clauses 7.1, 7.2, 7.3 and 12.1) (Phosphorous) |
- |
|
|
|
Table-1,( Clauses 7.1, 7.2, 7.3 and 12.1) (Manganese) |
- |
|
|
|
Table-1,( Clauses 7.1, 7.2, 7.3 and 12.1) (Silicon) |
- |
|
|
|
Table-1,( Clauses 7.1, 7.2, 7.3 and 12.1) (Chromium) |
- |
|
|
|
Table-1,( Clauses 7.1, 7.2, 7.3 and 12.1) (Nickel) |
- |
|
|
|
Table-1,( Clauses 7.1, 7.2, 7.3 and 12.1) (Molybdenum) |
- |
|
|
|
Table-1,( Clauses 7.1, 7.2, 7.3 and 12.1) (Copper) |
- |
|
|
|
Table-1,( Clauses 7.1, 7.2, 7.3 and 12.1) (Nitrogen) |
- |
|
|
|
Table-1,( Clauses 7.1, 7.2, 7.3 and 12.1) (Aluminium) |
- |
|
|
|
Table-1,( Clauses 7.1, 7.2, 7.3 and 12.1) (Titanium) |
- |
|
|
|
|
Partial
|
|
- |
- Facility not available for S, Al, Mo more than 1.5%, Ti & Nb |
9436 |
BIS, Eastern Regional Laboratory (ERL)
| IS 903 (1993) |
Specification for Fire Hose Delivery Couplings, Branch Pipe, Nozzles And Nozzle Spanner - Specificaion |
- |
-
|
- View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
3 (Finish and workmanship) |
- |
|
|
|
5 (Delivery hose coupling) |
- |
|
|
|
5 (Delivery hose coupling) |
- |
|
|
|
5 (Delivery hose coupling) |
- |
|
|
|
5 (Delivery hose coupling) |
- |
|
|
|
5.3 (Size and Dimension ) |
- |
|
|
|
5.3 (Size and Dimension ) |
- |
|
|
|
5.3 (Size and Dimension ) |
- |
|
|
|
5.3 (Size and Dimension ) |
- |
|
|
|
3 (Finish and workmanship) |
- |
|
|
|
5.3 (Size and Dimension ) |
- |
|
|
|
|
Partial
|
|
- |
- Facility not available for Hydraulic test & critical dimensions , Sn,Si,Mn,Al,Sb |
9437 |
BIS, Eastern Regional Laboratory (ERL)
| IS 6527 (1995) |
Stainless steel wire rods - Specification (First Revision) |
For all designation except for the tests mentioned in remarks |
-
|
- View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
Cl 9 (Tensile & Hardness) |
- |
|
|
|
Cl 9 (Tensile & Hardness) |
- |
|
|
|
Cl 9 (Tensile & Hardness) |
- |
|
|
|
Cl 9 (Tensile & Hardness) |
- |
|
|
|
Cl 10 (Diameter & Out Of Round) |
- |
|
|
|
Cl 10 (Diameter & Out Of Round) |
- |
|
|
|
7,
Table 1of IS:6527 (Designation X04Cr13) (Carbon) |
- |
|
|
|
7,
Table 1of IS:6527 (Designation X04Cr13) (Silicon) |
- |
|
|
|
7,
Table 1of IS:6527 (Designation X04Cr13) (Manganese) |
- |
|
|
|
7,
Table 1of IS:6527 (Designation X04Cr13) (Nickel) |
- |
|
|
|
7,
Table 1of IS:6527 (Designation X04Cr13) (Chromium) |
- |
|
|
|
7,
Table 1of IS:6527 (Designation X04Cr13) (Phosphorous) |
- |
|
|
|
7,
Table 1of IS:6527 (Designation X04Cr13) (Copper) |
- |
|
|
|
7,
Table 1of IS:6527 (Designation X10Cr17Mn6Ni4) (Titanium) |
- |
|
|
|
7,
Table 1of IS:6527 (Designation X04Cr13) (Aluminium) |
- |
|
|
|
|
Partial
|
|
- |
- Facility not available for S, Carbon less than 0.05%, Mn more than 5%, Al, Mo more than 1.5%, Ti & Nb
Steel designation is required and hardness below 20 mm Dia and 0.4mm thickness |
9438 |
BIS, Eastern Regional Laboratory (ERL)
| IS 1322 (1993) |
Bitumen Felts for Water Proofing and Damp-proofing |
For all types except tests mentioned in the remarks |
-
|
Rs.8300/- View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
5.4 & Table 1 (Weight ) |
- |
|
|
|
5.5 (Free from external defects - IS 1322) |
- |
|
|
|
6 (Dimension-IS 1322) |
- |
|
|
|
7.1 (Breaking Strength test- IS 13826(Part 1)) |
- |
|
|
|
7.1 (Pliabilitry Test-IS 13826(Part 2)) |
- |
|
|
|
7.1 (Strage Sticking Test-IS 13826(Part 3)) |
- |
|
|
|
7.1 (Pressure Head Test-IS 13826(Part-4 ) |
- |
|
|
|
7.1 (Heat Resistance Test-IS 13826(Part 5)) |
- |
|
|
|
7.1 (Water Absorption Test-IS 13826(Part 6)) |
- |
|
|
|
3.1.1 (Fibre Base) |
- |
|
|
|
3.1.2 (Hessian Base) |
- |
|
|
|
4.2.1 (Composition) |
- |
|
|
|
4.1.1 (Fibre base felt) |
- |
|
|
|
|
Partial
|
|
- |
- - |
9439 |
BIS, Eastern Regional Laboratory (ERL)
| IS 11652 (2017) |
Textiles – High density polyethylene (HDPE)/ polypropylene (PP) woven sacks for packaging of 50 kg cement – Specification (third revision) |
- |
-
|
- View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
4.2
(width of tape, 2.5 mm ± 0.1 mm) |
- |
|
|
|
Fig. 1- Table 1- Sr. no. ii
(Ends per dm - Annex B 40 ± 2 ) |
- |
|
|
|
Fig. 1- Table 1-Sr. no. iii
(Picks per dm-Annex B 40 ± 2 ) |
- |
|
|
|
Fig. 1- Table 1- Sr. no. i
(Dimensions, mm (see Note )- Annex B
c) Width of gusset (e) 76 ± 10 mm
) |
- |
|
|
|
Fig. 1- Table 1- Sr. no. i
(Dimensions, mm (see Note ) -Annex B
d) Width of valve (v) 100, + 10/-5 mm
) |
- |
|
|
|
Fig. 1- Table 1-Sr. no. i
(Dimensions, mm (see Note )- Annex B
b) Width of sack (w) 480 ± 10 mm
) |
- |
|
|
|
Fig. 1, Table 1
(i) Dimensions, mm (see Note ) -Annex B
a) Length of sack, inside (l), 710 ± 10 mm
) |
- |
|
|
|
4.4 (Seam The two rows of stitches shall be separated from each other by minimum 5 mm and ) |
- |
|
|
|
4.4 (Seam The outer stitch shall be minimum 8 mm from the outer edge of the sacks. ) |
- |
|
|
|
4.4 (Seam The stitching shall be done with double fold over seam to) |
- |
|
|
|
4.4 (The number of stitches/dm shall be 14 ± 2.) |
- |
|
|
|
5/5.1-Table 1-Sr. no. iv (Requirements, Mass of Sack- IS 1964
a) Non-gusseted type 70 + 6%) |
- |
|
|
|
5/5.1-Table 1-Sr. no. iv (Requirements, Mass of Sack- IS 1964
a) gusseted type 71 + 6%) |
- |
|
|
|
5/5.1 (The mass of bale of sacks (excluding packing materials) shall be within ± 3 percent of the mass calculated by multiplying the number of sacks with the mass of sack specified in Table 1.) |
- |
|
|
|
5/5.3-Table 1-Sr. no.v (Average breaking strength of fabric [Ravelled strip method, 325 mm × 70 mm] Min, N(kgf): -1969 (Part 1) a) Lengthwise , 900 (91.8) ) |
- |
|
|
|
5/5.3-Table 1-Sr. no.v (Average breaking strength of fabric [Ravelled strip method, 325 mm × 70 mm] Min, N(kgf): - 1969 (Part 1) b) Widthwise , 900 (91.8) ) |
- |
|
|
|
5/5.3-Table 1-Sr. no.vi (Breaking strength of top seam (Ravelled strip method), Min, - IS 9030 N (kgf) 400 (40.8)) |
- |
|
|
|
5/5.3-Table 1-Sr. no.vi (Breaking strength of bottom seam (Ravelled strip method), Min, - IS 9030 N (kgf) 400 (40.8)) |
- |
|
|
|
5/5.3-Table 1-Sr. no.vii (Elongation at break of fabric (Ravelled strip method), percent : - IS 1969 (Part1 ) a) Lengthwise 15 to 25) |
- |
|
|
|
5/5.3-Table 1-Sr. no.vii (Elongation at break of fabric (Ravelled strip method), percent : - IS 1969 (Part1 ) b) Widthwise 15 to 25) |
- |
|
|
|
5/5.5-Table 1-Sr. no.viii (Ash content Max percent- Annex D a) For UV stabilized sacks 2.2
) |
- |
|
|
|
5/5.5-Table 1-Sr. no.viii (Ash content Max percent- Annex D b) For non-UV stabilized sacks 6
) |
- |
|
|
|
|
Partial
|
|
- |
- Except Cl 5.6 UV Resistance (optional test) |
9440 |
BIS, Eastern Regional Laboratory (ERL)
| IS 11587 (1986) |
Specification for structural weather resistant steels |
For all grades except for the test mentioned in remarks |
-
|
- View breakup
Rs 5600/- (rounded off to nearest Rs 50/-) Chemical parameters in Table 1 is Rs. 8600/- (rounded off to nearest 50/-).
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
Cl 8 (Tensile Test) |
- |
|
|
|
Cl 9 (Bend Test) |
- |
|
|
|
Cl 10 (Impact Test) |
- |
|
|
|
Cl 11 (Flattening Test) |
- |
|
|
|
Cl 12 (Freedom from Defects) |
- |
|
|
|
Cl 13 (Dimensions) |
- |
|
|
|
Cl 16 (Mass) |
- |
|
|
|
Clause 5.1, Table -1 (WR-Fe 480 A, C ) |
- |
|
|
|
Clause 5.1, Table -1 (WR-Fe 480 A, Si) |
- |
|
|
|
Clause 5.1, Table -1 (WR-Fe 480 A, Mn) |
- |
|
|
|
Clause 5.1, Table -1 (WR-Fe 480 A, P ) |
- |
|
|
|
Clause 5.1, Table -1 (WR-Fe 480 A, S ) |
- |
|
|
|
Clause 5.1, Table -1 (WR-Fe 480 A, Cr ) |
- |
|
|
|
Clause 5.1, Table -1 (WR-Fe 480 A, Ni) |
- |
|
|
|
Clause 5.1, Table -1 (WR-Fe 480 A, Cu) |
- |
|
|
|
|
Partial
|
|
- |
- Chem: except V |
9441 |
BIS, Southern Regional Laboratory (SRL)
| IS 612 (1992) |
Roasted chicory powder - Specification (Third Revision) |
- |
-
|
- View breakup
The testing charges for the product are Rs 3400.00
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
3.5 Table 1 (Acid Insoluble ash) |
- |
|
|
|
3.5 Table 1 (Total Ash) |
- |
|
|
|
3.5 Table 1 (Moisture) |
- |
|
|
|
3.5 Table 1 (Water soluble Matter ) |
- |
|
|
|
3.1 (Description) |
- |
|
|
|
3.2 (Cup Test) |
- |
|
|
|
|
Partial
|
|
- |
- " 500 g
Excluding Microscopic Appearance |
9442 |
BIS, Southern Regional Laboratory (SRL)
| IS 4250 (1980) |
Specification for domestic electric food - Mixers (Liquidizers And Grinders) (First Revision) |
- |
-
|
- View breakup
Rs 9750/- Excluding Endurance test for juicers
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
6 (Classification- IS 302-1 ) |
- |
|
|
|
7.1 (Marking- IS 302-1) |
- |
|
|
|
7.2 (Marking) |
- |
|
|
|
7.4 (Marking) |
- |
|
|
|
7.5 (Marking) |
- |
|
|
|
7.6 (Marking) |
- |
|
|
|
8 ( Protection Against Electric Shock, IS 302-1) |
- |
|
|
|
10 (Power Input and Current, IS 302-1) |
- |
|
|
|
11 (Heating, IS 302-1) |
- |
|
|
|
13 (Electrical Insulation and Leakage Current at Operating Temperature: Leakage current, IS 302-1) |
- |
|
|
|
13 (Electrical Insulation and Leakage Current at Operating Temperature: High Voltage, IS 302-1) |
- |
|
|
|
14 (Transient Over Voltages, IS 302-1) |
- |
|
|
|
15.1 (Moisture Resistance, IS 302-1) |
- |
|
|
|
15.2 (Moisture Resistance-Spillage test) |
- |
|
|
|
15 (Moisture Resistance, IS 302-1) |
- |
|
|
|
16 (Electrical Insulation and Leakage Current at Operating Temperature: Leakage current, IS 302-1) |
- |
|
|
|
16 (Electrical Insulation and Leakage Current at Operating Temperature: High Voltage, IS 302-1) |
- |
|
|
|
19 (Abnormal Operation, IS 302-1) |
- |
|
|
|
19 (Abnormal Operation, IS 302-1) |
- |
|
|
|
20 (Stability & Mechanical Hazards, IS 302-1) |
- |
|
|
|
21 (Mechanical Strength, IS 302-1) |
- |
|
|
|
21 (Mechanical Strength, IS 302-1) |
- |
|
|
|
22.2 (Construction) |
- |
|
|
|
22.3 (Construction) |
- |
|
|
|
22.4 (Construction) |
- |
|
|
|
22.5 (Construction) |
- |
|
|
|
22.6 (Construction) |
- |
|
|
|
22.8 (Construction) |
- |
|
|
|
22.9 (Construction) |
- |
|
|
|
23 (Internal Wiring, IS 302-1) |
- |
|
|
|
24.2 (Components) |
- |
|
|
|
24.4 (Components) |
- |
|
|
|
24.5 (Components) |
- |
|
|
|
24.6 (Components) |
- |
|
|
|
24.7 (Components) |
- |
|
|
|
24.8 (Components) |
- |
|
|
|
24.9 (Components) |
- |
|
|
|
25 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
25 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
26 (Terminals for External Conductors, IS 302-1) |
- |
|
|
|
27 (Provision for Earthing, IS 302-1) |
- |
|
|
|
28 (Screws & Connections, IS 302-1) |
- |
|
|
|
29 (Clearances and Distances through Insulation, IS 302-1) |
- |
|
|
|
29 (Clearances and Distances through Insulation, IS 302-1) |
- |
|
|
|
30 (Resistance to Heat, Fire, Tracking, IS 302-1) |
- |
|
|
|
31 (Resistance of Rusting, IS 302-1) |
- |
|
|
|
34.2 (Operational tests- Grinding coffee (for machines which have a dry grinding arrangement)) |
- |
|
|
|
34.3 (Whisking egg whites ) |
- |
|
|
|
34.4 (IDLI batter-Grinding of black gram) |
- |
|
|
|
34.4 (IDLI batter-Grinding of rice) |
- |
|
|
|
34.5.1 (a) (Operational test for juicers ) |
- |
|
|
|
34.5.1 (b) (Operational test for juicers ) |
- |
|
|
|
34.5.2 (Operational test for juicers ) |
- |
|
|
|
35 (Temperature withstand test for bowl) |
- |
|
|
|
37 (Strength of Assembly ) |
- |
|
|
|
9 (Starting, IS 302-1) |
- |
|
|
|
36 (Test for controls ) |
- |
|
|
|
|
Complete
|
|
- |
- " 2 Nos.
Excluding Complete for IPX0 only. |
9443 |
BIS, Northern Regional Laboratory (NRL)
| IS 5852 (2004) |
Protective Steel Toe Caps for Footwear |
- |
-
|
Rs 2400/- View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
5/5.1- Fig. 1 and Fig. 2, Table 1. (REQUIREMENTS-Shape and Dimension) |
- |
|
|
|
5/5.3 (REQUIREMENTS-Finish) |
- |
|
|
|
5/5.1- Fig. 1 and Fig. 2, Table 1. (REQUIREMENTS-Shape and Dimension) |
- |
|
|
|
5/5.3 (REQUIREMENTS-Finish) |
- |
|
|
|
5/5.1- Fig. 1 and Fig. 2, Table 1. (REQUIREMENTS-Shape and Dimension) |
- |
|
|
|
5/5.3 (REQUIREMENTS-Finish) |
- |
|
|
|
|
Partial
|
|
- |
- Test facility not available NRL |
9444 |
BIS, Northern Regional Laboratory (NRL)
| IS 14433 (2007) |
Infant milk substitutes - Specification (First Revision) |
- |
-
|
- View breakup
Rs. 29610/- excl. Vitamin-E, Linoleate content, Vitamin-A(as retinol), added Vitamin-D (expressed as Cholecalciferol), Thimine, Niacin, Riboflavin, Vitamin-B6, Vitamin-B12, Folic
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
6.1 (Moisture) |
- |
|
|
|
6.1 (Milk protein) |
- |
|
|
|
6.1 (Milk fat) |
- |
|
|
|
6.1 (Total ash) |
- |
|
|
|
6.1 (Acid insoluble ash) |
- |
|
|
|
6.1 (Insolubility index) |
- |
|
|
|
6.4 (Scorched particles) |
- |
|
|
|
|
Partial
|
|
- |
- Microbiological testing is complete, Partial for Chemical Excluding Vitamins, Heavy Metals |
9445 |
BIS, Eastern Regional Laboratory (ERL)
| IS 13620 (1993) |
Fusion Bonded Epoxy Coated Reinforcing Bars - |
For all grades except for the tests mentioned in remarks |
-
|
- View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
Cl 7.2 (Continuity Of Coating) |
- |
|
|
|
Cl 7.3 (Adhesion ) |
- |
|
|
|
4.1 (Carbon- IS 228(Part 1)) |
- |
|
|
|
4.1 (Sulphur- IS 228(Part 9)) |
- |
|
|
|
4.1 (Phosphorous- IS 228(Part 3)) |
- |
|
|
|
4.1 (Sulphur & Phosphorous) |
- |
|
|
|
4.1 (Carbon Equivalent) |
- |
|
|
|
Cl 7.1 (Coating Thickness) |
- |
|
|
|
Cl 7.2 (Continuity Of Coating) |
- |
|
|
|
Cl 7.3 (Adhesion ) |
- |
|
|
|
Cl 7.1 (Coating Thickness) |
- |
|
|
|
Cl 7.2 (Continuity Of Coating) |
- |
|
|
|
Cl 7.3 (Adhesion ) |
- |
|
|
|
Cl 7.1 (Coating Thickness) |
- |
|
|
|
|
Partial
|
|
- |
- Facility not available for Nb, V, Ti, Al, Cl 4.1 Pull out test, Abrasion Resistance
1 m of coated bar as per IS 13620 & 2 x 1 m of HSDS bar as per IS 1786 |
9446 |
BIS Patna Branch Laboratory (PBL)
| IS 6444 (1979) |
Specification for sulphur dusting powders (First Revision) |
- |
-
|
Rs.2100.00 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
2.2 Table 1 (Sulphur Content, NV upto 9) |
- |
|
|
|
2.2 Table 1 (Sulphur Content, NV Above 9 below 50) |
- |
|
|
|
2.2 Table 1 (Sulphur Content, NV above 50) |
- |
|
|
|
2.2 Table 1 (Material passing through 75 micron sieve) |
- |
|
|
|
2.1 (Description) |
- |
|
|
|
2.2 Table 1 (Bulk Density after compacting) |
- |
|
|
|
|
Partial
|
|
- |
- All test facilities are available as per the IS |
9447 |
BIS Patna Branch Laboratory (PBL)
| IS 3383 (1982) |
Specification for wettable sulphur powder |
- |
-
|
Rs 4200/- View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
2.2 Table 1 (Wettability) |
- |
|
|
|
2.2 Table 1 (Sulphur content, NV upto 9) |
- |
|
|
|
2.2 Table 1 (Sulphur content, NV above 9 below 50) |
- |
|
|
|
2.2 Table 1 (Sulphur content, NV above 50) |
- |
|
|
|
2.2 Table 1 (Material passing through 45 micron IS Sieve, after
accelerated storage) |
- |
|
|
|
2.1 (Description) |
- |
|
|
|
|
Partial
|
|
- |
- All test facilities are available as per the IS |
9448 |
KC INDIA TEST LABORATORIES LLP
| IS 398 : Part 2 (1996) |
Aluminium conductors for overhead transmission purposes - Specification: Part 2 aluminium conuuctors, galvanized steel - Reinforced (Third Revision) |
- |
-
|
8500 View breakup
For 7 Strands Rs. 5625.00
For 13 Strands Rs. 5785.00
Separated Wire Before Stranding (If Provided) Rs. 1500.00
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
8.1.1 & 13.2 Table-1 (mech)(Diameter of Aluminium Wires Before Stranding) |
- |
150 |
|
20% discount to BIS |
8.1.1 & 13.2 Table 2 (mech)(Diameter of Steel Wires Before Stranding) |
- |
150 |
|
20% discount to BIS |
8.1.1 & 13.2 Table-1 (mech)(Diameter of Aluminium Wires After Stranding) |
- |
150 |
|
20% discount to BIS |
8.1.1 & 13.2 Table 2 (mech)(Diameter of Steel Wires After Stranding) |
- |
175 |
|
20% discount to BIS |
13.3 Table 1 (mech)(Breaking Load of Aluminium Wires Before Stranding) |
- |
310 |
|
20% discount to BIS |
13.3 Table 2 (mech)(Breaking Load of Steel Wires Before Stranding) |
- |
310 |
|
20% discount to BIS |
13.3 Table 1 (mech)(Breaking Load of Aluminium Wires After Stranding) |
- |
320 |
|
20% discount to BIS |
13.3 Table 2 (mech)(Breaking Load of Steel Wires After Stranding) |
- |
310 |
|
20% discount to BIS |
13.4.1 (mech)(Ductility by Torsion Test before stranding) |
- |
300 |
|
20% discount to BIS |
13.4.1 (mech)(Ductility by Torsion Test after stranding) |
- |
300 |
|
20% discount to BIS |
13.4.2 (elec)(Ductility by Elongation Test before stranding) |
- |
300 |
|
20% discount to BIS |
13.4.2 (elec)(Ductility by Elongation Test after stranding) |
- |
350 |
|
20% discount to BIS |
13.5.1 (mech)(Wrapping Test Aluminium Wires Before Stranding) |
- |
150 |
|
20% discount to BIS |
13.5.1 (mech)(Wrapping Test Aluminium Wires After Stranding) |
- |
150 |
|
20% discount to BIS |
13.5.2 (mech)(Wrapping Test Galvanized Steel Wires Before Stranding) |
- |
150 |
|
20% discount to BIS |
13.5.2 (mech)(Wrapping Test Galvanized Steel Wires After Stranding) |
- |
175 |
|
20% discount to BIS |
13.6 (elec)(Resistance test-Aluminium wire before Stranding) |
- |
500 |
|
20% discount to BIS |
13.6 (elec)(Resistance test-Aluminium wire after stranding) |
- |
500 |
|
20% discount to BIS |
13.8 Table-4 (mech)(Lay Ratio- Aluminium Wire Outermost Layer) |
- |
625 |
|
20% discount to BIS |
13.8 Table-4 (mech)(Lay Ratio- Aluminium Wire Layer Immediately Beneath Outermost Layer) |
- |
625 |
|
20% discount to BIS |
13.8 Table-4 (mech)(Lay Ratio- Aluminium Wire Innermost Layer of Conductors with 3 Aluminium Wire Layers) |
- |
625 |
|
20% discount to BIS |
13.8 Table-4 (mech)(Lay Ratio- Steel Core (6 Wire Layer)) |
- |
625 |
|
20% discount to BIS |
13.7.2 (chem)(Mass of Zinc coating) |
- |
2125 |
|
20% discount to BIS |
13.7.2 (chem)(Uniformity of Zinc coating) |
- |
1500 |
|
20% discount to BIS |
|
Complete
|
19 Jul, 2024 |
06 Jun, 2027 |
- • Up & including 100 Sq.mm |
9449 |
Electronics and IT Products Safety Testing Laboratory
| IS 16242 : Part 1 (2014) |
Uninterruptible power systems (UPS): Part 1 general and safety requirements for UPS |
- |
-
|
100000.00 View breakup
1,00,000/-
UPS/ Inverters of rating <= 5KVA
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
4.6(Power interface) |
- |
0.00 |
|
Test charge for this clause included |
4.7(Marking & instructions) |
- |
0.00 |
|
Test charge for this clause included |
5.1(Protection against shock and energy hazards) |
- |
0.00 |
|
Test charge for this clause included |
5.2(Requirement of auxiliary circuits) |
- |
0.06 |
|
Test charge for this clause included |
5.3(Protective earthing and bonding) |
- |
0.00 |
|
Test charge for this clause included |
5.5(Over current and earth fault condition) |
- |
0.00 |
|
Test charge for this clause included |
5.6(Safety interlocks) |
- |
0.00 |
|
Test charge for this clause included |
6.1(Wiring, connections and supply) |
- |
0.00 |
|
Test charge for this clause included |
6.2(Connection to power) |
- |
0.00 |
|
Test charge for this clause included |
6.3(Wiring terminals for external power conductors) |
- |
0.00 |
|
Test charge for this clause included |
7.1(Enclosure) |
- |
0.00 |
|
Test charge for this clause included |
7.2(STABILITY) |
- |
0.00 |
|
Test charge for this clause included |
7.4(Construction details) |
- |
0.02 |
|
Test charge for this clause included |
7.5(Resistance to fire) |
- |
0.00 |
|
Test charge for this clause included |
7.7(Temperature rise) |
- |
0.04 |
|
Test charge for this clause included |
8.1(General procision for earth leakage) |
- |
0.02 |
|
Test charge for this clause included |
8.2(Electric Strength) |
- |
0.00 |
|
Test charge for this clause included |
8.3(Abnormal operating and fault conditions) |
- |
0.00 |
|
Test charge for this clause included |
9.0(Connection to telecommunication networks) |
- |
0.00 |
|
Test charge for this clause included |
|
Complete
|
|
18 Dec, 2022 |
- Excluding the following test:- Components (Cl. 4.5), Battery location (Cl. 7.6) |
9450 |
Electronics and IT Products Safety Testing Laboratory
| IS 13252 : Part 1 (2010) |
Information technology equipment - Safety: Part 1 general requirements (Second Revision) |
- |
-
|
90000.00 View breakup
Laptop/Notebook/tablet-90,000/-
Visual Display unit, Video monitors upto 40″-90,000/-
Scanners-90,000/-
Wireless Keyboard-71,900/-
Telephone answering machines-80,300/-
Automatic Data processing Ma chine-90,000/-
Printer & Plotters-90,000/-
Set Top Box-90,000/-
Mobile Phone-73,250/-
Power Adaptors for IT equipments-75,350/-
Cash Register-90,000/-
Point of Sale Terminal-90,000/-
Copying Machine-Duplicator-90,000/-
Smart Card Reader-73,700/-
Mail Processing Machine / Postage machine / Franking Machine-90,000/-
Passport Reader-73,700/-
Power Bank for Portable Application-75,350/-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
1.5(Components) |
- |
0.00 |
|
Testing charge for this clause is included. |
1.6(Power interface .) |
- |
0.00 |
|
Testing charge for this clause is included. |
1.7(Markings and instructions) |
- |
0.00 |
|
Testing charge for this clause is included. |
2.1(Protection from electric shock and energy hazards) |
- |
0.00 |
|
Testing charge for this clause is included. |
2.2(SELV circuits) |
- |
0.00 |
|
Testing charge for this clause is included. |
2.3(TNV circuits) |
- |
0.00 |
|
Testing charge for this clause is included. |
2.4(Limited current circuits) |
- |
0.00 |
|
Testing charge for this clause is included. |
2.5(Limited power sources .) |
- |
0.00 |
|
Testing charge for this clause is included. |
2.6(Provisions for earthing and bonding) |
- |
0.00 |
|
Testing charge for this clause is included. |
2.7(Overcurrent and earth fault protection in primary circuits) |
- |
0.00 |
|
Testing charge for this clause is included. |
2.8(Safety interlocks) |
- |
0.00 |
|
Testing charge for this clause is included. |
2.9(Electrical insulation) |
- |
0.00 |
|
Testing charge for this clause is included. |
2.10(Clearances, creepage distances and distances through insulation) |
- |
0.00 |
|
Testing charge for this clause is included. |
3.1(General) |
- |
0.00 |
|
Testing charge for this clause is included. |
3.2(Connection to a mains supply) |
- |
0.00 |
|
Testing charge for this clause is included. |
4.1(Stability) |
- |
0.00 |
|
Testing charge for this clause is included. |
4.2(Mechanical strength) |
- |
0.00 |
|
Testing charge for this clause is included. |
4.3(Design and construction) |
- |
0.00 |
|
Testing charge for this clause is included. |
4.4(Protection against hazardous moving parts) |
- |
0.00 |
|
Testing charge for this clause is included. |
4.5(Thermal requirements) |
- |
0.00 |
|
Testing charge for this clause is included. |
4.6(Openings in enclosures) |
- |
0.00 |
|
Testing charge for this clause is included. |
4.7(Resistance to fire) |
- |
0.00 |
|
Testing charge for this clause is included. |
5.1(Touch current and protective conductor curren) |
- |
0.00 |
|
Testing charge for this clause is included. |
5.2(Electric strength) |
- |
0.00 |
|
Testing charge for this clause is included. |
6.1(Protection of telecommunication network service persons, and users of other equipment connected to the network, from hazards in the equipment) |
- |
0.00 |
|
Testing charge for this clause is included. |
6.2(Protection of equipment users from overvoltages on networks telecommunication) |
- |
0.00 |
|
Testing charge for this clause is included. |
6.3(Protection of the telecommunication wiring system from overheating) |
- |
0.00 |
|
Testing charge for this clause is included. |
7.4(Insulation between primary circuits and cable distribution systems) |
- |
0.00 |
|
Testing charge for this clause is included. |
5.3(Abnormal operating and fault conditions) |
- |
0.00 |
|
Testing charge for this clause is included. |
|
Complete
|
|
18 Dec, 2022 |
- Excluding the following test:- Solid insulation (Cl. 2.10.5), Construction of printed boards (Cl. 2.10.6), Component external terminations (Cl. 2.10.7), Tests on coated printed boards and coated components (Cl. 2.10.8), Thermal cycling (Cl. 2.10.9), Test for Pollution Degree 1 env. and for insulating compound (Cl. 2.10.10), Tests for semiconductor devices and for cemented joints (Cl. 2.10.11), Enclosed and sealed parts (Cl. 2.10.12), Power supply cords (Cl. 3.2.5), Cathode ray tubes (Cl. 4.2.8), Batteries (Cl. 4.3.8), Dust, powders, liquids and gases (Cl. 4.3.10), Flammable liquids (Cl. 4.3.12), Radiation (Cl. 4.3.13) |