11581 |
BIS, Western Regional Laboratory (WRL)
| None
| IS 1970 (1995) |
Cropprotection equipment - Hand - Operated compression - knapsack sprayer - Specification (Fifth Revision) |
- |
Rs.8700/- View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
Cl 6.1 (Tank & Skirt) |
- |
|
|
|
Cl 6.2 (Strap) |
- |
|
|
|
Cl 6.1 (Tank & Skirt) |
- |
|
|
|
Cl 6.3 (Filler Ring) |
- |
|
|
|
Cl 6.4 (Pump Cylinder) |
- |
|
|
|
Cl 6.5 (Piston) |
- |
|
|
|
Cl 6.7 (Handle) |
- |
|
|
|
Cl 6.8 (Valve Assembly) |
- |
|
|
|
Cl 6.9 (Delivery pipe) |
- |
|
|
|
Cl 6.13 (Delivery Hose) |
- |
|
|
|
Cl 6.15 (Nozzle) |
- |
|
|
|
Cl 6.14 (cut Off device & Lance) |
- |
|
|
|
Cl 6.17 (Height) |
- |
|
|
|
Cl 6.18 (Mass) |
- |
|
|
|
Cl 6.19 (Endurance) |
- |
|
|
|
|
- |
- - |
11582 |
BIS, Western Regional Laboratory (WRL)
| None
| IS 5872 (1990) |
Cold rolled steel strips (Box Strappings) - Specification |
- |
- View breakup
Rs 6050/- Excluding Corrosion Resistance and Micro-alloying elements
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
Cl 6 (UTM) |
- |
|
|
|
Cl 7 (Bending To Both Side At 90°, Then Straight) |
- |
|
|
|
Cl 10 (Width & Thickness) |
- |
|
|
|
5 (Chemical Composition) |
- |
|
|
|
5.0 & 5.1 , Table 1 & 2 (Carbon) |
- |
|
|
|
5.0 & 5.1 , Table 1 & 2 (Sulphur) |
- |
|
|
|
5.0 & 5.1 , Table 1 & 2 (Manganese) |
- |
|
|
|
5.0 & 5.1 , Table 1 & 2 (Phosphorus) |
- |
|
|
|
|
- |
- 1. Micro alloying elements |
11583 |
BIS, Northern Regional Laboratory (NRL)
| None
| IS 9890 (1981) |
Specification for general purpose ball valves |
- |
Rs 4520/- View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
5 (End connections) |
- |
|
|
|
|
- |
- Facility for chemical testing is not available |
11584 |
BIS, Central Laboratory (CL)
| None
| IS 2266 (2019) |
Steel wire ropes for general engineering purpose - Specification (Fifth Revision) |
- |
- View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
Clause 8.2 (Phosphorus) |
- |
|
|
|
4 (Rope Size and Tolerance ) |
- |
|
|
|
5 (Minimum Breaking Force) |
- |
|
|
|
6 (General Requirements) |
- |
|
|
|
7 (Construction) |
- |
|
|
|
8 (a) Fibre Core) |
- |
|
|
|
8 (b) Steel Core) |
- |
|
|
|
9 (Joints) |
- |
|
|
|
10 (Galvanizing) |
- |
|
|
|
12 (d) lay) |
- |
|
|
|
12 (f) length of wire rope) |
- |
|
|
|
Clause 8.2 (Grade-1, Table-1, IS 1835:1976, Carbon) |
- |
|
|
|
Clause 8.2 (Sulphur) |
- |
|
|
|
8 (a) Fibre Core) |
- |
|
|
|
Clause 8.2 (Manganese) |
- |
|
|
|
Clause 8.2 (Silicon) |
- |
|
|
|
Clause 8.2 (Copper) |
- |
|
|
|
Clause 8.2 (Nickel) |
- |
|
|
|
Clause 8.2 (Chromium) |
- |
|
|
|
|
- |
- Sample size shall be minimum dia> 3mm and thickness > 0.8 mm; Complete for dia 18 to 22 mm
Excluding only C & S tested for dia < 3mm; Min Breaking Force (Cl 5) (For dia Up to 18 and above 22 mm) |
11585 |
BIS, Northern Regional Laboratory (NRL)
| None
| IS 4398 (1994) |
Carbon - Chromium steel for the manufacture of balls, rollers and bearing races - Specification (Second Revision) |
- |
- View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
8 ( Hardness-IS 1500: Pt 1) |
- |
|
|
|
Cl. 5.1 & Table 1 (Carbon- IS 228 and relevant parts or any other established Instrumental/Chemical method.) |
- |
|
|
|
Cl. 5.1 & Table 1 (Sulphur- IS 228 and relevant parts or any other established Instrumental/Chemical method.) |
- |
|
|
|
Cl. 5.1 & Table 1 (Manganese- IS 228 and relevant parts or any other established Instrumental/Chemical method.) |
- |
|
|
|
Cl. 5.1 & Table 1 (Phosphorus- IS 228 and relevant parts or any other established Instrumental/Chemical method.) |
- |
|
|
|
Cl. 5.1 & Table 1 (Silicon- IS 228 and relevant parts or any other established Instrumental/Chemical method.) |
- |
|
|
|
|
- |
- Microstructure, Inclusion, Decarburization, Cr, Ni, Mo, Cu, V and Ti. |
11586 |
BIS, Western Regional Laboratory (WRL)
| None
| IS 12786 (1989) |
Irrigation equipment - Polyethylene pipes for irrigation laterals - Specification |
- |
- View breakup
Rs. 7800.00 (Excluding Testing Charges for Material Test) Rs. 3600.00 (Testing Charges for Material Test)
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
7.3 (Tensile Test) |
- |
|
|
|
7.3 (Elongation at Break) |
- |
|
|
|
7.4 (SusceptibiIity to Environmental Stress
Cracking) |
- |
|
|
|
7.3 (Tensile Test) |
- |
|
|
|
5 and Table 1 (DIMENSIONS OF PIPES - outside diameters) |
- |
|
|
|
5 and Table 1 (DIMENSIONS OF PIPES - wall thickness shall) |
- |
|
|
|
7.2 (Reversion Test) |
- |
|
|
|
7.1
Table-2
(b)Acceptance Test for 01 hour at 20°C & 6.9MPa induced stress) |
- |
|
|
|
6.1 (Visual Appearance) |
- |
|
|
|
3.1 (Class of Pipe) |
- |
|
|
|
4.2.b (The dispersion of Carbon Black content shall be satisfactory - IS 2530 : 1963) |
- |
|
|
|
|
- |
- The following test facilities are not available:
(1) Hydraulic characteristics (quality test)
(2) Carbon black content |
11587 |
BIS, Western Regional Laboratory (WRL)
| None
| IS 1825 (1983) |
Specification for aluminium alloy milk cans (Second Revision) |
- |
Rs 4800.00 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
5 (h) Mass 6.5 Kg. Min.) |
- |
|
|
|
2 (Capacity) |
- |
|
|
|
4 Fig. 1 (Dimension) |
- |
|
|
|
4 Fig. 1 (Dimension) |
- |
|
|
|
4 Fig. 1 (Dimension) |
- |
|
|
|
4 Fig. 1 (Dimension) |
- |
|
|
|
4 Fig. 1 (Drain Holes ) |
- |
|
|
|
4 Fig. 1 (Dimension) |
- |
|
|
|
4 Fig. 1 (Dimension) |
- |
|
|
|
4 Fig. 1 (Dimension) |
- |
|
|
|
4 Fig. 1 (Dimension) |
- |
|
|
|
4 Fig. 1 (Dimension) |
- |
|
|
|
4 Fig. 1 (Dimension) |
- |
|
|
|
4 Fig. 1 (Dimension) |
- |
|
|
|
4 Fig. 1 (Dimension) |
- |
|
|
|
4 Fig. 1 (Dimension) |
- |
|
|
|
4 Fig. 1 (Dimension) |
- |
|
|
|
4 Fig. 1 (Hole Dia 8 ,2 holes) |
- |
|
|
|
4 Fig. 1 (Hole Dia 12, 3 holes) |
- |
|
|
|
5 (i) If the thickness at shoulder is less than 2.5 mm a ) |
- |
|
|
|
5 (reinforcement ring of 2 mm thickness shall be provided.) |
- |
|
|
|
5 (ii) Brinell Hardness 85 HB Min.) |
- |
|
|
|
7 (i) Air Pressure Test (Cl 7.1)) |
- |
|
|
|
7 (ii) Drop Test (Cl 7.2)) |
- |
|
|
|
7 (iii) The cans when filled with water and inverted shall not show any profuse leakage through lids. ) |
- |
|
|
|
|
- |
- - |
11588 |
BIS, Northern Regional Laboratory (NRL)
| None
| IS 10086 (1982) |
Specificaton for moulds for use in tests of cement and concrete |
- |
Rs 14700/- and Material testing charges as per relevan View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
4.1 (Dimension and tolerances of cylindrical moulds Table 3) |
- |
|
|
|
Cl 5.1 (Construction) |
- |
|
|
|
Cl 5.3 (Arangement for fastening / Clamping) |
- |
|
|
|
4.1 (Dimension and Tolerances of Cube Moulds Table 2) |
- |
|
|
|
4.1 (Dimension and Tolerances of Cube Moulds Table 2) |
- |
|
|
|
4.1 (Dimension and Tolerances of Cube Moulds Table 2) |
- |
|
|
|
4.1 (Dimension and Tolerances of Cube Moulds Table 2) |
- |
|
|
|
4.1 (Dimension and Tolerances of Cube Moulds Table 2) |
- |
|
|
|
4.1 (Dimension and Tolerances of Cube Moulds Table 2) |
- |
|
|
|
5.1.1 (Construction) |
- |
|
|
|
4.1 (Dimension and Tolerances of Cube Moulds Table 2) |
- |
|
|
|
5.1.2 (Construction) |
- |
|
|
|
5.2.1 (Cube Mould) |
- |
|
|
|
5.2.2 (Cylindrical Mould (Fig.3)) |
- |
|
|
|
5.2.3 (Beam Mould (Fig. 4)) |
- |
|
|
|
5.2.4 (Bar Mould ( Fig. 5, 6, 7 & 8 )) |
- |
|
|
|
4.1 (Dimension and Tolerances of Cube Moulds Table 2) |
- |
|
|
|
4.1 (Dimension and Tolerances of Cube Moulds Table 2) |
- |
|
|
|
4.1 (Dimension and Tolerances of Cube Moulds Table 2) |
- |
|
|
|
4.1 (Dimension and tolerances of cylindrical moulds Table 3) |
- |
|
|
|
4.1 (Dimension and tolerances of beam moulds Table 4) |
- |
|
|
|
4.1 (Dimension and Tolerances of bar moulds Table 5) |
- |
|
|
|
2.1 (Types) |
- |
|
|
|
2.1 (Types) |
- |
|
|
|
2.1 (Types) |
- |
|
|
|
2.1 (Types) |
- |
|
|
|
2.1 (Types) |
- |
|
|
|
4.1 (Dimension and tolerances of cylindrical moulds Table 3) |
- |
|
|
|
|
- |
- Standard has been revised as IS 10086 : 2021 Except Shore Hardness, Dimension stability , Drop test , Facility for chemical testing is not available |
11589 |
BIS, Western Regional Laboratory (WRL)
| None
| IS 5504 (1997) |
Specification for spiral welded pipes (First Revision) |
- |
testing charges for the product are Rs 8640/- View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
Cl. 5.1 (Carbon) |
- |
|
|
|
Cl. 5.1 (Phosphorus) |
- |
|
|
|
Cl. 5.1 (Sulphur) |
- |
|
|
|
6.1 (Tensile Test) |
- |
|
|
|
6.2 (Flattening Test) |
- |
|
|
|
6.3/6.3.1.1 (Submerged Arc Weld Test- Guided bend test) |
- |
|
|
|
8.1 (Length) |
- |
|
|
|
8.2 (Dimensions) |
- |
|
|
|
|
- |
- Test facilities are not available for the following:
1. Hydrostatic Pressure test
2. Size above 914 mm nominal diameter |
11590 |
BIS, Western Regional Laboratory (WRL)
| None
| IS 1785 : Part 2 (1983) |
Specification for plain hard drawn steel wire for prestressed concrete: Part 2 as - Drawn wire (First Revision) |
- |
Rs 3000/- View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
Cl 5.1 (Diameter) |
- |
|
|
|
Cl 5.1.2 (Weight) |
- |
|
|
|
Cl 6.1 (Tensile Test On UTM) |
- |
|
|
|
Cl 6.2 (Tensile Test On UTM) |
- |
|
|
|
Cl 6.3 (Tensile Test On UTM) |
- |
|
|
|
Cl 5.1 (Diameter) |
- |
|
|
|
Cl 5.1.2 (Weight) |
- |
|
|
|
3.1.1 (PHOSPHORUS) |
- |
|
|
|
3.1.1 (SULPHUR) |
- |
|
|
|
3.1.1 (PHOSPHORUS) |
- |
|
|
|
3.1.1 (SULPHUR) |
- |
|
|
|
|
- |
- Test facilities are not available for the following:
1. Tensile Test |
11591 |
BIS, Western Regional Laboratory (WRL)
| None
| IS 1785 : Part 1 (1983) |
Specification for plain hard - Drawn steel wire for prestressed concrete: Part 1 cold drawn stress - Relieved wire (Second Revision) |
- |
Rs. 27300.00 (Complete testing charges) Rs. 9300.00 (F View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
Cl 5.1 (Diameter) |
- |
|
|
|
Cl 6.1 (Tensile Test On UTM) |
- |
|
|
|
Cl 6.2 (Tensile Test On UTM) |
- |
|
|
|
Cl 6.4 (Tensile Test On UTM) |
- |
|
|
|
Clause 3.1.1 (Phosphorus) |
- |
|
|
|
Clause 3.1.1 (Sulphur) |
- |
|
|
|
|
- |
- Test facilities are not available for the following:
1. Tensile Test |
11592 |
BIS, Northern Regional Laboratory (NRL)
| None
| IS 2052 (2009) |
Compounded feeds for cattle - Specification (Fourth Revision) |
- |
Rs. 9210/- View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
4.3 - Table 1 - i (Moisture - Cl 4 of IS 7874 (Part 1)) |
- |
|
|
|
4.3 - Table 1 - ii (Crude protein (N x 6.25) - Cl 5 of IS 7874 (Part 1)) |
- |
|
|
|
4.3 - Table 1 - iii (Crude fat - Cl 7 of IS 7874 (Part 1)) |
- |
|
|
|
4.3 - Table 1 - iv (Crude fibre - Cl 8 of IS 7874 (Part 1)) |
- |
|
|
|
4.3 - Table 1 - v (Acid insoluble ash - Cl 10 of IS 7874 (Part 1)) |
- |
|
|
|
4.3 - Table 2 - i (Salt (as NaCl) - Cl 4 of IS 7874 (Part 2)) |
- |
|
|
|
4.3 - Table 2 - ii (Calcium (as Ca) - IS 13433 (Part 1 / Part 2)) |
- |
|
|
|
4.3 - Table 2 - iii (Total Phosphorus - IS 14828) |
- |
|
|
|
4.1 (Description - The feed shall be free from harmful constituents, metallic pieces and adulterants. The feed shall also be free from fungal growth and insect infestation. And from fermented . musty, rancid or any other objectionable odour) |
- |
|
|
|
|
- |
- Except Urea, Vitamin A,D, E, Aflatoxin and Cadmium, available phosphorous |
11593 |
BIS, Central Laboratory (CL)
| None
| IS 2255 (1977) |
Specification for mild steel wire rod for the manufacture of machine screws (By Cold Heading Process) (Second Revision) |
- |
Rs. 600/- View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
Cl. 5.1 (Carbon- Relevant parts of IS 228.) |
- |
|
|
|
Cl. 5.1 (Manganese- Relevant parts of IS 228.) |
- |
|
|
|
Cl. 5.1 (Sulphur- Relevant parts of IS 228.) |
- |
|
|
|
Cl. 5.1 (Phosphorus- Relevant parts of IS 228.) |
- |
|
|
|
|
- |
- Sample size shall be minimum dia> 3mm and thickness > 0.8 mm; |
11594 |
BIS, Western Regional Laboratory (WRL)
| None
| IS 1784 (2020) |
Screwed Closures for Drums — Specification ( Fourth Revision ) |
- |
- View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
6 (Dimensions-Steel flange- d1) |
- |
|
|
|
6 (Dimensions-Steel flange- d2) |
- |
|
|
|
6 (Dimensions-Steel flange- d4) |
- |
|
|
|
6 (Dimensions-Steel flange- h1) |
- |
|
|
|
6 (Dimensions-Steel flange- t1) |
- |
|
|
|
6 (Dimensions-Flange Gasket- wd) |
- |
|
|
|
6 (Dimensions-Flange Gasket-wt) |
- |
|
|
|
6 (Dimensions-Steel Bung- d1) |
- |
|
|
|
6 (Dimensions-Steel Bung- p1) |
- |
|
|
|
6 (Dimensions-Steel Bung- p3) |
- |
|
|
|
6 (Dimensions-Bung Gasket- wt) |
- |
|
|
|
6 (Dimensions-Capseals- d1) |
- |
|
|
|
6 (Dimensions-Capseals- d2) |
- |
|
|
|
6 (Dimensions-Capseals- w1) |
- |
|
|
|
6 (Dimensions-Capseals- h2) |
- |
|
|
|
6 (Dimensions-Tag Ring- d1) |
- |
|
|
|
6 (Dimensions-Tag Ring- d2) |
- |
|
|
|
6 (Dimensions-Zinc Bung- d1) |
- |
|
|
|
6 (Dimensions-Zinc Bung- d3) |
- |
|
|
|
8.4 (Curling Test for Flanges) |
- |
|
|
|
6 (Dimensions-Zinc Bung- d1) |
- |
|
|
|
6 (Dimensions-Zinc Bung- d3) |
- |
|
|
|
8.4 (Curling Test for Flanges) |
- |
|
|
|
6 (Dimensions-Zinc Bung- d1) |
- |
|
|
|
6 (Dimensions-Zinc Bung- d3) |
- |
|
|
|
8.4 (Curling Test for Flanges) |
- |
|
|
|
6 (Dimensions-Zinc Bung- d1) |
- |
|
|
|
6 (Dimensions-Zinc Bung- d3) |
- |
|
|
|
8.4 (Curling Test for Flanges) |
- |
|
|
|
|
- |
- - |
11595 |
BIS, Western Regional Laboratory (WRL)
| None
| IS 1783 : Part 2 (2014) |
Drums large, fixed ends - Specification: Part 2 grade B drums (Fourth Revision) |
- |
- View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
4 (Capacity) |
- |
|
|
|
5 (Dimensions (Type 1 C Drums Figure 1)) |
- |
|
|
|
5 (Dimensions (Type 1 C Drums Figure 1)) |
- |
|
|
|
5 (Dimensions (Type 1 C Drums Figure 1)) |
- |
|
|
|
5 (Dimensions (Type 1 C Drums Figure 1)) |
- |
|
|
|
5 (Dimensions (Type 1 C Drums Figure 1)) |
- |
|
|
|
5 (Dimensions (Type 1 C Drums Figure 1)) |
- |
|
|
|
5 (Dimensions (Type 1 C Drums Figure 1)) |
- |
|
|
|
5 (Dimensions (Type 1 C Drums Figure 1)) |
- |
|
|
|
5 (Dimensions (Type 1 D Drums Figure 1)) |
- |
|
|
|
5 (Dimensions (Type 1 D Drums Figure 1)) |
- |
|
|
|
5 (Dimensions (Type 1 D Drums Figure 1)) |
- |
|
|
|
5 (Dimensions (Type 1 D Drums Figure 1)) |
- |
|
|
|
5 (Dimensions (Type 1 D Drums Figure 1)) |
- |
|
|
|
5 (Dimensions (Type 1 D Drums Figure 1)) |
- |
|
|
|
5 (Dimensions (Type 1 D Drums Figure 1)) |
- |
|
|
|
5 (Dimensions (Type 1 D Drums Figure 1)) |
- |
|
|
|
5 (Dimensions (Type 1 C Drums Figure 2)) |
- |
|
|
|
5 (Dimensions (Type 1 C Drums Figure 2)) |
- |
|
|
|
5 (Dimensions (Type 1 C Drums Figure 2)) |
- |
|
|
|
5 (Dimensions (Type 1 C Drums Figure 2)) |
- |
|
|
|
5 (Dimensions (Type 1 D Drums Figure 1)) |
- |
|
|
|
5 (Dimensions (Type 1 C Drums Figure 2)) |
- |
|
|
|
5 (Dimensions (Type 1 C Drums Figure 2)) |
- |
|
|
|
5 (Dimensions (Type 1 C Drums Figure 2)) |
- |
|
|
|
5 (Dimensions (Type 1 D Drums Figure 2)) |
- |
|
|
|
5 (Dimensions (Type 1 D Drums Figure 2)) |
- |
|
|
|
5 (Dimensions (Type 1 D Drums Figure 1)) |
- |
|
|
|
5 (Dimensions (Type 1 D Drums Figure 2)) |
- |
|
|
|
5 (Dimensions (Type 1 D Drums Figure 2)) |
- |
|
|
|
5 (Dimensions (Type 1 D Drums Figure 2)) |
- |
|
|
|
5 (Dimensions (Type 1 D Drums Figure 2)) |
- |
|
|
|
5 (Dimensions (Type 1 D Drums Figure 2)) |
- |
|
|
|
6 (Material) |
- |
|
|
|
7.5 (Construction) |
- |
|
|
|
9.1 (Leakage at air pressure ) |
- |
|
|
|
9.2 (Drop Test) |
- |
|
|
|
9.3 (Hydraulic Pressure Test) |
- |
|
|
|
|
- |
- - |
11596 |
BIS, Western Regional Laboratory (WRL)
| None
| IS 1783 : Part 1 (2014) |
Drums large, fixed ends - Specification: Part 1 grade A drums (Fourth Revision) |
- |
Rs.4800/- and testing charges as per relevant referred View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
6 (Material) |
- |
|
|
|
4 (Capacity) |
- |
|
|
|
5 (Dimensions (Type 1 C Drums Figure 1)) |
- |
|
|
|
5 (Dimensions (Type 1 C Drums Figure 1)) |
- |
|
|
|
5 (Dimensions (Type 1 C Drums Figure 1)) |
- |
|
|
|
5 (Dimensions (Type 1 C Drums Figure 1)) |
- |
|
|
|
5 (Dimensions (Type 1 C Drums Figure 1)) |
- |
|
|
|
5 (Dimensions (Type 1 C Drums Figure 1)) |
- |
|
|
|
5 (Dimensions (Type 1 C Drums Figure 1)) |
- |
|
|
|
5 (Dimensions (Type 1 D Drums Figure 1)) |
- |
|
|
|
5 (Dimensions (Type 1 D Drums Figure 1)) |
- |
|
|
|
5 (Dimensions (Type 1 D Drums Figure 1)) |
- |
|
|
|
5 (Dimensions (Type 1 D Drums Figure 1)) |
- |
|
|
|
5 (Dimensions (Type 1 D Drums Figure 1)) |
- |
|
|
|
5 (Dimensions (Type 1 D Drums Figure 1)) |
- |
|
|
|
5 (Dimensions (Type 1 D Drums Figure 1)) |
- |
|
|
|
5 (Dimensions (Type 1 C Drums Figure 2)) |
- |
|
|
|
5 (Dimensions (Type 1 C Drums Figure 2)) |
- |
|
|
|
5 (Dimensions (Type 1 C Drums Figure 2)) |
- |
|
|
|
5 (Dimensions (Type 1 C Drums Figure 2)) |
- |
|
|
|
5 (Dimensions (Type 1 C Drums Figure 2)) |
- |
|
|
|
5 (Dimensions (Type 1 C Drums Figure 2)) |
- |
|
|
|
5 (Dimensions (Type 1 C Drums Figure 2)) |
- |
|
|
|
5 (Dimensions (Type 1 C Drums Figure 2)) |
- |
|
|
|
5 (Dimensions (Type 1 D Drums Figure 1)) |
- |
|
|
|
5 (Dimensions (Type 1 D Drums Figure 2)) |
- |
|
|
|
5 (Dimensions (Type 1 D Drums Figure 2)) |
- |
|
|
|
5 (Dimensions (Type 1 D Drums Figure 2)) |
- |
|
|
|
5 (Dimensions (Type 1 D Drums Figure 2)) |
- |
|
|
|
5 (Dimensions (Type 1 D Drums Figure 1)) |
- |
|
|
|
5 (Dimensions (Type 1 D Drums Figure 2)) |
- |
|
|
|
5 (Dimensions (Type 1 D Drums Figure 2)) |
- |
|
|
|
6 (Material) |
- |
|
|
|
9.1 (Leakage at air pressure ) |
- |
|
|
|
9.2 (Drop Test) |
- |
|
|
|
9.3 (Hydraulic Pressure Test) |
- |
|
|
|
|
- |
- - |
11597 |
BIS, Central Laboratory (CL)
| None
| IS 2141 (2000) |
Hot dip galvanized stay strand - Specification (Fourth Revision) |
- |
Rs7935/- View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
4 (S) |
- |
|
|
|
4 (P) |
- |
|
|
|
9.2 referes to IS 4826, Table 1 (Mass of Zinc coating- as per IS 6745 for 0.2 to 0.32 mm dia For Hard Core) |
- |
|
|
|
9.2 referes to IS 4826, Table 1 (Uniformity of zinc coating- As per IS 2633 for Dia 0.20 to 0.32 mm For Hard Core) |
- |
|
|
|
11 (a) Size) |
- |
|
|
|
11 (b) Construction) |
- |
|
|
|
11 (c) tensile designation) |
- |
|
|
|
11 (d) lay) |
- |
|
|
|
11 (e) coating) |
- |
|
|
|
11 (f) length) |
- |
|
|
|
11 ( g) mass) |
- |
|
|
|
11 (i) lot number along with the order number) |
- |
|
|
|
9 (a) Tensile) |
- |
|
|
|
9 (b) Elongation) |
- |
|
|
|
9 (c) Galvanizing Test) |
- |
|
|
|
9.2 referes to IS 4826, Table 1 (Mass of Zinc coating- as per IS 6745 for 0.2 to 0.32 mm dia For Hard Core) |
- |
|
|
|
9.2 referes to IS 4826, Table 1 (Uniformity of zinc coating- As per IS 2633 for Dia 0.20 to 0.32 mm For Hard Core) |
- |
|
|
|
11 (a) Size) |
- |
|
|
|
11 (b) Construction) |
- |
|
|
|
11 (c) tensile designation) |
- |
|
|
|
11 (d) lay) |
- |
|
|
|
11 (e) coating) |
- |
|
|
|
11 (f) length) |
- |
|
|
|
11 ( g) mass) |
- |
|
|
|
7 (Freedom from defects) |
- |
|
|
|
9 (a) Tensile) |
- |
|
|
|
9 (b) Elongation) |
- |
|
|
|
9 (c) Galvanizing Test) |
- |
|
|
|
|
- |
- Sample size shall be minimum dia> 3mm and thickness > 0.8 mm;
Excluding Except coating test; Test on completed strand (Cl 9) |
11598 |
BIS, Western Regional Laboratory (WRL)
| None
| IS 1759 (1986) |
Specification for powrahs (Second Revision) |
- |
Rs.2100 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
2.1 (Dimensions of Powrah-A) |
- |
|
|
|
2.3 (Blade thickness) |
- |
|
|
|
5.2 (Hardness) |
- |
|
|
|
4 (Mass) |
- |
|
|
|
10.1 (Drop test) |
- |
|
|
|
|
- |
- - |
11599 |
BIS, Central Laboratory (CL)
| None
| IS 2090 (1983) |
Specification for high tensile steel bars used in prestressed concrete (First Revision) |
- |
- View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
3.1.1 (Sulphur- Relevant parts of IS 228 ) |
- |
|
|
|
3.1.1 (Phosphorus- Relevant parts of IS 228 ) |
- |
|
|
|
|
- |
- Sample size shall be minimum dia> 3mm and thickness > 0.8 mm; |
11600 |
BIS, Central Laboratory (CL)
| None
| IS 3224 (2002) |
Valve fittings for compressed gas cylinders excluding liquefied petroleum gas (LPG) cylinders - Specification (Third Revision) |
- |
Rs 11790.00 View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
4.2.1 (Types of Valve: Type A
) |
- |
|
|
|
4.2.1 (Types of Valve:TypeB) |
- |
|
|
|
4.2.1 (Types of Valve:Type C) |
- |
|
|
|
5.2.1.1.1 ( Lead ) |
- |
|
|
|
5.2.1.1.1 ( Tin) |
- |
|
|
|
5.2.1.1.1 ( Iron) |
- |
|
|
|
5.2.1.1.1 (Nickel) |
- |
|
|
|
5.2.1.1.1 ( Silicon) |
- |
|
|
|
4.1 (Classification of valve:direct acting valves ) |
- |
|
|
|
4.1 (Classification of valve:indirect acting valves) |
- |
|
|
|
5.2 Table-7 and Table-8 (Chemical Composition) |
- |
|
|
|
5.3.1 (Tensile Strength- IS 1608) |
- |
|
|
|
5.3.1 (Elongation- IS 1608) |
- |
|
|
|
5.3.2 (Izod impact strength-IS 1598 for brass,manganesebronzeor aluminium
bronze, aluminium silicon bronze) |
- |
|
|
|
5.3.2 (Izod impact strength-IS 1598 for for steel) |
- |
|
|
|
6.1.12-Table 1 ( Design Criteria : Diameter of main gas passages in Valve stem a) |
- |
|
|
|
7.2.2 (The bursting pressure range of the bursting discs fitted to CO2 cylinders) |
- |
|
|
|
8.1.3- Fig. 8, and in
Table 3 and Table 4 (Type of Threads) |
- |
|
|
|
9.1 - Table 7,8 (VALVE OUTLET CONNECTIONS AND SPINDLES) |
- |
|
|
|
9.3 -Tables 7 and 8 (VALVE OUTLET CONNECTIONS AND SPINDLES) |
- |
|
|
|
9.1 - Table 7,8 (VALVE OUTLET CONNECTIONS AND SPINDLES) |
- |
|
|
|
9.3.1 (VALVE OUTLET CONNECTIONS AND SPINDLES) |
- |
|
|
|
9.3.2 (VALVE OUTLET CONNECTIONS AND SPINDLES) |
- |
|
|
|
9.3.3 (VALVE OUTLET CONNECTIONS AND SPINDLES) |
- |
|
|
|
9.3.4 (VALVE OUTLET CONNECTIONS AND SPINDLES) |
- |
|
|
|
9.3.5 (VALVE OUTLET CONNECTIONS AND SPINDLES) |
- |
|
|
|
10.1.1.1 (Hydrostatic test) |
- |
|
|
|
10.1.1.3 (Valve Impact test) |
- |
|
|
|
10.1.1.5 (Cycle test) |
- |
|
|
|
10.1.1.6 (Stress corrosion test for copper alloy valve bodies) |
- |
|
|
|
|
- |
- Sample dia > 3mm or thickness > 0.8 mm can only be tested;
Excluding test facility not available for Valve spindle as per 5.2.1.2; Cl 10.1.1.2 - Pneumatic tests,(Cl 10.1.1.4)-Valving torque test,Cl 10.1.1.5)-Cycle test, |
11601 |
BIS, Western Regional Laboratory (WRL)
| None
| IS 1011 (2002) |
Biscuits - Specification (Fourth Revision) |
- |
Rs.3280/- View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
6.3 Table 2 i (Moisture) |
- |
|
|
|
6.3 Table 2 ii (Acid insoluble ash (on dry basis)) |
- |
|
|
|
6.3 Table 2 iii (Acidity of extracted fat (as oleic acid)) |
- |
|
|
|
|
- |
- - |
11602 |
BIS, Northern Regional Laboratory (NRL)
| None
| IS 15911 (2010) |
Structural steel (Ordinary Quality) - Specification |
E 165 ,E 170 , E 215 |
Rs 6750/- For elements other than Table-1: Rs 1004/- pe View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
Table-1, 5.1, 8.1 & 8.2 (Carbon: Relevant parts of IS 228 or any other established instrumental/chemical method) |
- |
|
|
|
Table-1, 5.1, 8.1 & 8.2 (Sulphur: Relevant parts of IS 228 or any other established instrumental/chemical method) |
- |
|
|
|
Table-1, 5.1, 8.1 & 8.2 (Phosphorous: Relevant parts of IS 228 or any other established instrumental/chemical method) |
- |
|
|
|
Table-1, 5.1, 8.1 & 8.2 (Manganese: Relevant parts of IS 228 or any other established instrumental/chemical method) |
- |
|
|
|
Table-1, 5.1, 8.1 & 8.2 (Silicon: Relevant parts of IS 228 or any other established instrumental/chemical method) |
- |
|
|
|
Table-1, 5.1, 8.1 & 8.2 (Phosphorous: Relevant parts of IS 228 or any other established instrumental/chemical method) |
- |
|
|
|
Table-1, 5.1, 8.1 & 8.2 (Manganese: Relevant parts of IS 228 or any other established instrumental/chemical method) |
- |
|
|
|
Table-1, 5.1, 8.1 & 8.2 (Nitrogen: Relevant parts of IS 228 or any other established instrumental/chemical method) |
- |
|
|
|
|
- |
- Except Microalloys , Al,Cu |
11603 |
BIS, Northern Regional Laboratory (NRL)
| None
| IS 8783 : Part 4 : Sec 3 (1995) |
Winding wires for submersible motors - Specification: Part 4 specification for individual wires: Sec 3 polyester and polypropylene insulated winding wires (First Revision) |
- |
Rs.8700/- View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
5.1 (The winding wire shall either be wound on spools / reels conforming to IS 482-1981. or supplied in a coils packed and labelled.) |
- |
|
|
|
6.1 (The winding wire shall carry following information marked on the lable on spool / reel / coil;) |
- |
|
|
|
6.1 (a) Reference to this Indian Standard;) |
- |
|
|
|
6.1 (c) Size of conductor / maximum overall diameter,) |
- |
|
|
|
6.1 (d) Length of conductor on spool / reel /coil;) |
- |
|
|
|
6.1 (e) Number of lengths onspool / reel / coil (if more than one);) |
- |
|
|
|
6.1 (f) Country of Manufacturer) |
- |
|
|
|
6.1 (g) Year of Manufacture.) |
- |
|
|
|
6.2 (BIS Certification Mark) |
- |
|
|
|
4 (i) Material) |
- |
|
|
|
5 (ii) Diameter [mm] Seperate wire:) |
- |
|
|
|
5 (ii) Diameter [mm] Wire taken from cable:) |
- |
|
|
|
5 (iii) Annealing test [Percentage] on Seperate wire:) |
- |
|
|
|
5 (iii) Annealing test [Percentage] on Wire taken from cable:) |
- |
|
|
|
5 (d) Resistance test [Ohm/km corrected to 20°c) |
- |
|
|
|
4.1, table 1 & 2 (a) Thickness of Polyster (mm)) |
- |
|
|
|
4.1, table 1 & 3 (b) Thickness of Polypropylene (mm)) |
- |
|
|
|
4.1, table 1 & 4 (c) Total thickness of Insulation(mm)) |
- |
|
|
|
4.2 (Application of insulation) |
- |
|
|
|
4.3 (Colour of Insuation) |
- |
|
|
|
4.4 (Overall diameter (mm)) |
- |
|
|
|
4 (Before ageing Tensile strength [N/mm²]) |
- |
|
|
|
4 (Before ageing Elongation at break [Percentage]) |
- |
|
|
|
4 (After ageing Tensile strength [N/mm²]) |
- |
|
|
|
4 (Variation on tensile strangth [Percentage]) |
- |
|
|
|
4 (After ageing Elongation at break [Percentage]) |
- |
|
|
|
4 (Variation on elongation at break [Percentage]) |
- |
|
|
|
4 (Shrinkage test [Percentage]) |
- |
|
|
|
4 (After Shrinkage Cracks found.) |
- |
|
|
|
4.1 (Water absorption test [Gravimetric] [mg/cm²]) |
- |
|
|
|
4.1 (Hot Deformation test [depth of indentation) [Percentage]) |
- |
|
|
|
4.1 (Heat Shock Test - No cracks found) |
- |
|
|
|
4.1 (Insulation Resistance test [ohm-cm] At 27 ºC) |
- |
|
|
|
4.1 ([Insulation Resistance test [ohm-cm] At 90 ºC) |
- |
|
|
|
4.5 (High Voltage test [Water Immersion test] 3 KV for 1 Minute) |
- |
|
|
|
5 (The winding wire shall either be wound on spools / reels conforming to IS 482-1981. or supplied in a coils packed and labelled.) |
- |
|
|
|
6 (The winding wire shall carry following information marked on the lable on spool / reel / coil;) |
- |
|
|
|
6 (a) Reference to this Indian Standard;) |
- |
|
|
|
6 (c) Size of conductor / maximum overall diameter,) |
- |
|
|
|
6 (d) Length of conductor on spool / reel /coil;) |
- |
|
|
|
6 (e) Number of lengths onspool / reel / coil (if more than one);) |
- |
|
|
|
6 (f) Country of Manufacturer Marking) |
- |
|
|
|
6 (g) Year of Manufacture.) |
- |
|
|
|
6.2 (BIS Certification Mark) |
- |
|
|
|
4 (i) Material) |
- |
|
|
|
4 (ii) Diameter [mm] Seperate wire:) |
- |
|
|
|
4 (ii) Diameter [mm] Wire taken from cable) |
- |
|
|
|
4 (iii) Annealing test [Percentage] on Seperate wire:) |
- |
|
|
|
4 ([iii) Annealing test [Percentage] on Wire taken from cable:) |
- |
|
|
|
4 (d) Resistance test [Ohm/km corrected to 20°c]) |
- |
|
|
|
4 (a) Thickness of Polyster (mm)) |
- |
|
|
|
4 (b) Thickness of Polypropylene (mm)) |
- |
|
|
|
4 (c) Total thickness of Insulation(mm)) |
- |
|
|
|
4.2 (Application of insulation) |
- |
|
|
|
4 (Colour of Insuation) |
- |
|
|
|
4 (Overall diameter (mm)) |
- |
|
|
|
4 (Before ageing Tensile strength [N/mm²]) |
- |
|
|
|
4 (Before ageing Elongation at break [Percentage]) |
- |
|
|
|
4 (After ageing Tensile strength [N/mm²]) |
- |
|
|
|
4 (Variation on tensile strangth [Percentage]) |
- |
|
|
|
4 (After ageing Elongation at break [Percentage]) |
- |
|
|
|
4 (Variation on elongation at break [Percentage]) |
- |
|
|
|
4 (Shrinkage test [Percentage]) |
- |
|
|
|
4 (After Shrinkage Cracks found.) |
- |
|
|
|
4 (Water absorption test [Gravimetric] [mg/cm²]) |
- |
|
|
|
4 (Hot Deformation test [depth of indentation) [Percentage]) |
- |
|
|
|
4 (Heat Shock Test - No cracks found Physical) |
- |
|
|
|
4 (High Voltage test [Water Immersion test] 3 KV for 1 Minute) |
- |
|
|
|
4 (Insulation Resistance test [ohm-cm] At 27 ºC) |
- |
|
|
|
4 (Insulation Resistance test [ohm-cm] At 90 ºC) |
- |
|
|
|
|
- |
- Test facility is complete |
11604 |
BIS, Central Laboratory (CL)
| None
| IS 1855 (2003) |
Stranded steel wire ropes for winding and man - Riding haulages in mines - Specification (Second Revision) |
- |
Rs. 11100/- & Testing charges as per relevant referred View breakup
Rs. 11100/- & Testing charges as per relevant referred Iss
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
6.1 (as per IS 1835) (Carbon- Is228) |
- |
|
|
|
6.1 (as per IS 1835) (Manganese - IS 228) |
- |
|
|
|
6.1 (as per IS 1835) (Silicon - IS 228) |
- |
|
|
|
6.1 (as per IS 1835) (P + S - IS 228) |
- |
|
|
|
6.3.1 (Joints - IS 1855) |
- |
|
|
|
6.4.1 (Direction of Lay- IS 1855) |
- |
|
|
|
6.4.2 (Length of Lay- IS 1855) |
- |
|
|
|
6.5.1-Table 1 to Table 7 (Mass of Rope with Fiber core - IS 1855) |
- |
|
|
|
6.5.1-Table 1 to Table 8 (Mass of Rope with Steel core - IS 1856) |
- |
|
|
|
8.1 (LUBRICATION-IS1855) |
- |
|
|
|
9 (FREEDOM FROM DEFECTS-IS 1855) |
- |
|
|
|
6.1 (as per IS 1835) (Sulphur - IS 228) |
- |
|
|
|
6.1 (as per IS 1835) (Phosphorus - IS228) |
- |
|
|
|
6.1 (as per IS 1835) (Copper-IS228) |
- |
|
|
|
6.1 (as per IS 1835) (Nickel - IS 228) |
- |
|
|
|
6.1 (as per IS 1835) (Chromium - IS 228) |
- |
|
|
|
|
- |
- Sample size shall be minimum dia> 3mm and thickness > 0.8 mm;
Excluding complete for dia >3 mm, partial dia < 3mm; Min Breaking Force (Cl 5) (For dia Up to 18 and above 22 mm) |
11605 |
BIS, Central Laboratory (CL)
| None
| IS 2568 (1978) |
Specification for malathion dusting powders |
- |
- View breakup
Rs. 3300/-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
2.1 (Description) |
- |
|
|
|
2.2. Table1.i (Malathion content) |
- |
|
|
|
2.2. Table1.ii (High temperature stability after storage for 20 hours at 90°C) |
- |
|
|
|
2.2. Table1.iii (Material passing through 75-micron IS Sieve) |
- |
|
|
|
2.2. Table1.iv (Bulk'density after compacting) |
- |
|
|
|
2.2. Table1.v (Acidity/Alkalinity) |
- |
|
|
|
|
- |
- - |
11606 |
BIS, Central Laboratory (CL)
| None
| IS 447 (1988) |
Specification for rubber hose for welding (Fourth Revision) |
- |
- View breakup
Rs. 3300/- excluding Hydrostatic test, Burst pressure and Adhesion between components.
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
Cl. 3.2 - Table 1 (Bore size) |
- |
|
|
|
Cl. 3.2 - Table 1 (Lining Thickness) |
- |
|
|
|
Cl. 3.2 - Table 1 (Cover Thickness) |
- |
|
|
|
Cl. 3.2 - Table 1 (Length %) |
- |
|
|
|
Cl. 3.3 - Table 2 (Tensile strength - Lining MPA) |
- |
|
|
|
Cl. 3.3 - Table 2 (Tensile strength - Cover Mpa) |
- |
|
|
|
Cl. 3.3 - Table 2 (Elongation at break - Lining %) |
- |
|
|
|
Cl. 3.3 - Table 2 (Elongation at break - Cover %) |
- |
|
|
|
Cl. 3.3 - Table 2 (After Ageing Elongation at break - Lining %) |
- |
|
|
|
Cl. 3.4 - Table3 (Pressure Tests) |
- |
|
|
|
Cl. 3.4 - Table3 (Adhesion KN/m Min) |
- |
|
|
|
|
- |
- - |
11607 |
BIS, Western Regional Laboratory (WRL)
| None
| IS 299 (2012) |
Alumino - Ferric - Specification (Fifth Revision) |
- |
- View breakup
testing charges are Rs.3250.00 (for Grade 1, 2 & 3) and Rs.8250.00 (for Grade 4 & 5).
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
1 (i) Table 1 ( Insouble matter, Grade 1, A-3) |
- |
|
|
|
1 (ii) Table 1 (Soluble iron compound (as Fe2+ and Fe3+), Grade 1, A-4) |
- |
|
|
|
1 (iii) Table 1 (Water soluble aluminium compounds (as Al2O3), Grade 1, A-5) |
- |
|
|
|
1 (iv) Table 1 (pH (of 5 percent aqueous solution), Grade 1, A-6) |
- |
|
|
|
1 (v) Table 1 (Free acidity (as H2SO4)/Basicity (as Al2O3), Grade 1, A-7) |
- |
|
|
|
|
- |
- Test facility not available for the following:
1. Cd, Se, Hg |
11608 |
BIS, Central Laboratory (CL)
| None
| IS 1812 (1982) |
Specification for carbon steel wire for the manufacture of wood screws (Second Revision) |
- |
- View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
Cl. 5.1 (Carbon- IS 228 and relevant parts or any other established Instrumental/Chemical method.) |
- |
|
|
|
Cl. 5.1 (Manganese- IS 228 and relevant parts or any other established Instrumental/Chemical method.) |
- |
|
|
|
Cl. 5.1 (Sulphur- IS 228 and relevant parts or any other established Instrumental/Chemical method.) |
- |
|
|
|
Cl. 5.1 (Phosphorus- IS 228 and relevant parts or any other established Instrumental/Chemical method.) |
- |
|
|
|
Cl. 5.1 (Silicon- IS 228 and relevant parts or any other established Instrumental/Chemical method.) |
- |
|
|
|
|
- |
- Sample size shall be minimum dia> 3mm and thickness > 0.8 mm; |
11609 |
BIS, Western Regional Laboratory (WRL)
| None
| IS 13592 (2013) |
Unplasticized Polyvinyl Chloride (PVC-U) Pipes for Soil and Waste Discharge System Inside and Outside Buiildings Including Ventilation and Rainwater System |
- |
- View breakup
-
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
Cl. 9, IS 12235 Part 7 (Resistance to Sulphuric Acid) |
- |
|
|
|
Cl.7.1 (Mean outside diameter, outside diameter at any point
for Type A and Type B pipes
manufactured plain or with socket shall be as given in
Table 1. Dimensions shall be measured according to
the method given in IS 12235 (Part 1).) |
- |
|
|
|
Cl.7.1 ( outside diameter at any point
for Type A and Type B pipes
manufactured plain or with socket shall be as given in
Table 1. Dimensions shall be measured according to
the method given in IS 12235 (Part 1).) |
- |
|
|
|
Cl.7.1 ( wall thickness at any point
for Type A and Type B pipes
manufactured plain or with socket shall be as given in
Table 1. Dimensions shall be measured according to
the method given in IS 12235 (Part 1).) |
- |
|
|
|
Cl.7.3.1 (Minimum wall thickness of socket on pipes shall
be as given in Table 2 read with Fig. 2 and Fig. 3.) |
- |
|
|
|
Cl.7.3.2 (Dimensions of sockets for solvent cementing and
grooved sockets of pipes shall be as given in Tables 3
and 4 respectively, read with Fig. 2 and 3.) |
- |
|
|
|
Cl.8.2 (When tested by the method described in IS 12235
(Part 5), a length of pipe sample of 200 ± 20 mm shall
not alter in length by more than 5 percent. In the case
of socket ended pipes, this test shall be carried out on
the plain portion of pipe taken at least 100 mm away
from the root of the socket.) |
- |
|
|
|
Cl8.3 (This test shall be carried out for socket end pipes only.
When tested by the method described in IS 12235
(Part 6), the test specimens shall not show blisters,
excessive delamination or cracking or signs of weld
line splitting.) |
- |
|
|
|
Cl.8.4 (When determined in accordance with IS 12235 (Part 2),
the vicat softening temperature of the specimen shall
not be less than 79°C.) |
- |
|
|
|
Cl.10.1 (When tested by method prescribed in IS 12235 (Part 9),the pipe shall have a true impact rate of not more than
10 percent. Mass of striker and height of fall shall be
as per Annex A.) |
- |
|
|
|
Cl.10.2 (When determined in accordance with the method
described in IS 12235 (Part 13), the tensile strength at
break shall not be less than 45 MPa.) |
- |
|
|
|
Cl.10.3 (The axial shrinkage shall not exceed 2 percent when
determined in accordance with Annex B.) |
- |
|
|
|
Cl.11. (Jointing of solvent
cementing joints is to be carried out using solvent
conforming to IS 14182.
Apply a pressure of 0.05 MPa for a period of 15 min
and there should be no leakage at any joint.) |
- |
|
|
|
Cl.7.2 (Pipes shall be supplied in nominal lengths of 2, 3, 4 or
6 metres either plain or with socket for solvent
cementing/grooved socket. Tolerances on specified
length shall be + 10 mm and – 0 mm.The nominal length of the pipe with socket for solvent
cementing/grooved socket shall be as given in Fig. 1.) |
- |
|
|
|
Cl.10.2 (When determined in accordance with the method
described in IS 12235 (Part 13), the tensile strength at
break shall not be less than 45 MPa.) |
- |
|
|
|
Cl. 12, IS 12235 Part 11 (Resistance to Di-Chloro-Methane) |
- |
|
|
|
|
- |
- The following test facilities are not available:
(1) For Outside Diameter above 250 mm,
(2) Resistance to di chloromethane
(3) Effect on water (Clause 8.6)
(4) IMPACT TEST |
11610 |
BIS, Western Regional Laboratory (WRL)
| None
| IS 3074 (2013) |
Steel tubes for automotive purposes - Specification (Third Revision) |
- |
- View breakup
Rs.3750/- for CDS-1, CDS-2, CDS-3, CDS-4, CDS-5, Rs.4720/- for CDS-6, Rs.6750/- for CDS-7 & CDS-8, Rs.6750/- for CDS-9. Rs.3750/- for ERW/HFIW (ERW-1, ERW-2, ERW-3). Rs.4200/- for Mechanical testing charges.
Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
6 (STRAIGHTNESS) |
- |
|
|
|
8.3,18, (Flattening Test) |
- |
|
|
|
8.4 (Crushing Test) |
- |
|
|
|
8.5 (Drift Test) |
- |
|
|
|
8.2,15,17,22, Table 3,5 &7 (Tensile Tests,IS 1608 Part 1) |
- |
|
|
|
7, 20,Table 1,2,4 &6 ( C) |
- |
|
|
|
7, Table 1,2,4 &6 (Mn) |
- |
|
|
|
7, Table 1,2,4 &6 (S) |
- |
|
|
|
7, Table 1,2,4 &6 (P) |
- |
|
|
|
7, Table 1,2,4 &6 (Si) |
- |
|
|
|
|
- |
- Test facilities are not available for the following:
1. Ni, Cr, Mo, Micro alloying elements
2. Drift Expanding Test
3.Internal Hydraulic/Air Pressure Test |