| 13081 |
CENTRAL INSTITUTE OF PETROCHEMICALS ENGINEERING AND TECHNOLOGY (CIPET):CSTS-BHOPAL
| 8100534
| IS 10124 : Part 1 (2009) |
Fabricated PVC-U Fittings for Potable Water Supplies - Specification Part 1 General Requirements (Second Revision) |
- |
6025 View breakup
Rs.1444/-,
Rs.3075/- PVC Resin
(After 25% discount for BIS)
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 3(Material) |
- |
4100 |
|
VCM CONTENT RS. 3000/- + K-VALUE RS. 1100/- |
| 4(Size of fitting) |
- |
250 |
|
NIL |
| 5.1 Table-1 Fig.1(Dimension of Socket length) |
- |
250 |
|
NIL |
| 5.1.2 Table-1(Dimensions of mean inside diameter at mid-point of socket depth) |
- |
0 |
|
NIL |
| 5.1.3 (Out of Roundness Tolerance of Socket Inside Diameter) |
- |
0 |
|
NIL |
| 5.2 Table-2 Fig.2(Dimensions of socket for elastomeric sealing ring) |
- |
0 |
|
NIL |
| 6.1(Opacity test in accordance with IS 12235 (Part 3)) |
- |
575 |
|
NIL |
| 6.2(Short Term Hydraulic Test in accordance with Annex A) |
- |
850 |
|
NIL |
| 8(Marking) |
- |
250 |
|
NIL |
|
31 Dec, 2026 |
- upto 600mm dia |
| 13082 |
BIS, Southern Regional Laboratory (SRL)
| None
| IS 5517 (1993) |
Steels for hardening and tempering - Speicification (Second Revision) |
- |
Rs 13670/- excluding Grain size, Cleanliness of steel, View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 5 (Freedom from defects , IS 5517) |
- |
|
|
|
| 8,Table 6 (Hardness Test - IS 1500(Pt -1)) |
- |
|
|
|
| 9, Table 5 (Mechanical ptoperties - IS 1608(Pt -1),IS 1598) |
- |
|
|
|
| Cl. 6.1, 6.2, 6.3, 11.2, 15.1 & Table 2 (Carbon- IS 228 and relevant parts or any other established Instrumental/Chemical method.) |
- |
|
|
|
| Cl. 6.1, 6.2, 6.3, 11.2, 15.1 & Table 2 (Manganese- IS 228 and relevant parts or any other established Instrumental/Chemical method.) |
- |
|
|
|
| Cl. 6.1, 6.2, 6.3, 11.2, 15.1 & Table 2 (Silicon- IS 228 and relevant parts or any other established Instrumental/Chemical method.) |
- |
|
|
|
| Cl. 6.1, 6.2, 6.3, 11.2, 15.1 & Table 2 (Nickel- IS 228 and relevant parts or any other established Instrumental/Chemical method.) |
- |
|
|
|
| Cl. 6.1, 6.2, 6.3, 11.2, 15.1 & Table 2 (Chromium- IS 228 and relevant parts or any other established Instrumental/Chemical method.) |
- |
|
|
|
|
- |
- 25g
Excluding TF for only tensile strength and elongation is available, |
| 13083 |
BIS, Southern Regional Laboratory (SRL)
| None
| IS 204 : Part 2 (1992) |
Tower bolts - Specification: Part 2 non - Ferrous metals (Fifth Revision) |
- |
Rs.2100.00. View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 5.1 (General) |
- |
|
|
|
| 5.2.1 Table 1 (Particulars-Barrel Tower Bolts) |
- |
|
|
|
| 5.2.2 Table 2 (Particulars-Skeleton Tower Bolts) |
- |
|
|
|
| 6.1- Table 1 (Dimension of Barrel tower bolts-1.Size 2.Length of Bolt or Barrel-(A or B) 4.Width of Barrel-C 5.Dia of Bolt-D 6.Length of Socket-E 7.Thickness of Metal of Barrel (Brass or Zink Alloy/Aluminium alloy/Sheet Brass)-F 8.Dia of bore of barrel or socket- G ) |
- |
|
|
|
| 6.1- Table 1 (Dimension of barrel tower bolts-Minimum No. of equally Spaced holes in Barrel & Socket for wooden screw no 6) |
- |
|
|
|
| 6.2- Table 2 (Dimension of Skeleton Tower Bolts 1.Size 2.Length of Bolt -A 3.Length of Bolt Plate -B 4.Width of Bolt Plate or Staple-C 5.Dia of Bolt-D 6.Length of Staple-E 7.Thickness of Plate or Socket (Brass /Aluminium alloy or Zink Alloy)-F 8.Dia of bore of Plate or Staple-G 9.Dia of shank of Knob ) |
- |
|
|
|
| 6.2- Table 2 (Dimension of Skeleton Tower Bolts- Nos of Staples) |
- |
|
|
|
| 6.2- Table 2 (Dimension of Skeleton Tower Bolts-Minimum No. of Screw holes for wood screw no 4) |
- |
|
|
|
| 6.2- Table 3 (PACKING) |
- |
|
|
|
|
- |
- " 3x2 pcs+ 50 g
Excluding Excl material test |
| 13084 |
BIS, Southern Regional Laboratory (SRL)
| None
| IS 1726 (1991) |
Cast iron manhole covers and frames - Specification (Third Revision) |
- |
Rs 3225.00 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 3 (GRADES ) |
- |
|
|
|
| 3 (TYPES) |
- |
|
|
|
| 5.1.1 (Covers and Frames) |
- |
|
|
|
| 5.1.2 (The rise of the chequer) |
- |
|
|
|
| 5.2 (Key Holes and Keys) |
- |
|
|
|
| 5.3 (Locking Devices) |
- |
|
|
|
| 7 and Table 2 and
Fig.3 to 9 (DIMENSIONS OF MANHOLE COVERS AND FRAMES - O) |
- |
|
|
|
| 7 and Table 2 and
Fig.3 to 9 (DIMENSIONS OF MANHOLE COVERS AND FRAMES - O1) |
- |
|
|
|
| 7 and Table 2 and
Fig.3 to 9 (DIMENSIONS OF MANHOLE COVERS AND FRAMES - F) |
- |
|
|
|
| 7 and Table 2 and
Fig.3 to 9 (DIMENSIONS OF MANHOLE COVERS AND FRAMES - F1) |
- |
|
|
|
| 7 and Table 2 and
Fig.3 to 9 (DIMENSIONS OF MANHOLE COVERS AND FRAMES - f) |
- |
|
|
|
| 7 and Table 2 and
Fig.3 to 9 (DIMENSIONS OF MANHOLE COVERS AND FRAMES - f1) |
- |
|
|
|
| 7 and Table 2 and
Fig.3 to 9 (DIMENSIONS OF MANHOLE COVERS AND FRAMES - Fd) |
- |
|
|
|
| 7 and Table 2 and
Fig.3 to 9 (DIMENSIONS OF MANHOLE COVERS AND FRAMES - fd) |
- |
|
|
|
| 7 and Table 2 and
Fig.3 to 9 (DIMENSIONS OF MANHOLE COVERS AND FRAMES - S) |
- |
|
|
|
| 7 and Table 2 and
Fig.3 to 9 (DIMENSIONS OF MANHOLE COVERS AND FRAMES - t) |
- |
|
|
|
| 7 and Table 2 and
Fig.3 to 9 (DIMENSIONS OF MANHOLE COVERS AND FRAMES - t1) |
- |
|
|
|
| 7 and Table 2 and
Fig.3 to 9 (DIMENSIONS OF MANHOLE COVERS AND FRAMES - C) |
- |
|
|
|
| 7 and Table 2 and
Fig.3 to 9 (DIMENSIONS OF MANHOLE COVERS AND FRAMES - C1) |
- |
|
|
|
| 7 and Table 2 and
Fig.3 to 9 (DIMENSIONS OF MANHOLE COVERS AND FRAMES - T) |
- |
|
|
|
| 7 and Table 2 and
Fig.3 to 9 (DIMENSIONS OF MANHOLE COVERS AND FRAMES - T1) |
- |
|
|
|
| 7 and Table 2 and
Fig.3 to 9 (DIMENSIONS OF MANHOLE COVERS AND FRAMES - Clearence (C1)) |
- |
|
|
|
| 8 (COATING - At 63˚C) |
- |
|
|
|
| 8 (COATING - At 0˚C) |
- |
|
|
|
|
- |
- " 5 Nos.+1 piece for coating
excl load test, raw material tests |
| 13085 |
BIS, Southern Regional Laboratory (SRL)
| None
| IS 1341 (2018) |
Steel Butt Hinges - Specification (Sixth Revision) |
- |
- View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 3 Tables 2 to 9 (Types) |
- |
|
|
|
| 5.1 Tables 2 to 9 (2) (Size of Hinge) |
- |
|
|
|
| 5.1 Tables 2 to 9 (3) (Length A) |
- |
|
|
|
| 5.1 Tables 2 to 9 (4) (Breadth B) |
- |
|
|
|
| 5.1 Tables 2 to 9 (4) (Breadth B1) |
- |
|
|
|
| 5.1 Tables 2 to 9 (4) (Breadth B2) |
- |
|
|
|
| 5.1 Tables 2 to 9 (5) (Thickness of Flap C) |
- |
|
|
|
| 5.1 Tables 2 to 9 (6) (Diameter of Hinge Pin D) |
- |
|
|
|
| 5.1 Tables 2 to 9 (7) (Number of Knuckles) |
- |
|
|
|
| 5.1 Tables 2 to 9 (8) (Number of Screw Holes) |
- |
|
|
|
| 5.1 Tables 2 to 9 (9) (Holes for Screw No.) |
- |
|
|
|
| 6.1 (General) |
- |
|
|
|
| 6.2.1 (Knuckles) |
- |
|
|
|
| 6.3 (Pins) |
- |
|
|
|
| 6.4 (Screw Holes) |
- |
|
|
|
| 6.4.2 (Position of Holes) |
- |
|
|
|
| 6.4.2 (X) |
- |
|
|
|
| 6.4.2 (Y) |
- |
|
|
|
| 6.4.2 (Z) |
- |
|
|
|
| 6.4.2.1 (Position of Holes) |
- |
|
|
|
| 7 (Finish) |
- |
|
|
|
|
- |
- " 6 pcs + raw matl
Excluding Exc Chem analysis |
| 13086 |
BIS, Southern Regional Laboratory (SRL)
| None
| IS 704 (1984) |
Specification for crow - Bars and claw - Bars (Second Revision) |
- |
Total Rs.11x 300 = Rs.3300.00 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 3 Table-1 to 9 (Shapes And Dimensions-Width across flats ) |
- |
|
|
|
| 6 (Hardness) |
- |
|
|
|
| 7 (Manufacture and Finish) |
- |
|
|
|
| 8.1 (Drop Test) |
- |
|
|
|
| 12 (Marking) |
- |
|
|
|
|
- |
- 1
Excluding Static load test,raw material tests |
| 13087 |
BIS, Southern Regional Laboratory (SRL)
| None
| IS 7092 : Part 2 (1987) |
Specification for aluminium alloy tube for irrigation purposes: Part 2 extruded tube (Second Revision) |
- |
Rs 11230/- View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| Cl.4 (Workmanship & Finish) |
- |
|
|
|
| Cl.6.2 (Ultimate Tensile Strength- IS 2657) |
- |
|
|
|
| Cl.6.2 (0.2 percent proof strength- IS 2657) |
- |
|
|
|
| Cl.6.2 (Elongation on 50 mm gauge length- IS 2657) |
- |
|
|
|
| Cl.7.1, Table 2 (Outside Diameter-) |
- |
|
|
|
| Cl.7.1, Table 2 (Roundness or Ovality) |
- |
|
|
|
| Cl.7.1, Table 2 (Wall Thickness) |
- |
|
|
|
| Cl. 7.2 (Length) |
- |
|
|
|
|
- |
- " 2 mt + 100g
Excluding Excl Hydrostatic Test, Chemical facility not available |
| 13088 |
BIS, Southern Regional Laboratory (SRL)
| None
| IS 7181 (1986) |
Specification for horizontally cast iron double flanged pipes for water, gas and sewage (First Revision) |
- |
Rs.6600/- View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 3.2 (Manufacture) |
- |
|
|
|
| 3.3 (Manufacture) |
- |
|
|
|
| 3.4 (Manufacture) |
- |
|
|
|
| 5.1 (Tensile Test) |
- |
|
|
|
| 7.1 (Sizes and Mass) |
- |
|
|
|
| 7.2 (Sizes and Mass) |
- |
|
|
|
| 7.3 (Sizes and Mass) |
- |
|
|
|
| 7.3 (Sizes and Mass) |
- |
|
|
|
| 7.4 (Sizes and Mass Dimensions of Flange) |
- |
|
|
|
| 8.5 (Permissible Deviation from a Straight Line) |
- |
|
|
|
|
- |
- - |
| 13089 |
BIS, Southern Regional Laboratory (SRL)
| None
| IS 733 (1983) |
Specification for wrought aluminium and aluminium alloy bars, rods and sections (For General Engineering Purposes) (Third Revision) |
- |
Please see remarks View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| Cl. 4 (Freedom from Defects) |
- |
|
|
|
| Cl. 5.1, Table 2 (0.2 Percent proof stress- IS 1816) |
- |
|
|
|
| Cl. 5.1, Table 2 (Tensile Strength- IS 1816) |
- |
|
|
|
| Cl. 5.1, Table 2 (Elongation on 50 mm or 5.65√So Gauge Length) |
- |
|
|
|
| Cl. 0.4, 5.1, Table 1 (Aluminium- IS 504 or by any other suitable instrumental method) |
- |
|
|
|
| Cl. 0.4, 5.1, Table 1 (Copper- IS 504 or by any other suitable instrumental method) |
- |
|
|
|
| Cl. 0.4, 5.1, Table 1 (Magnesium- IS 504 or by any other suitable instrumental method) |
- |
|
|
|
| Cl. 0.4, 5.1, Table 1 (Silicon- IS 504 or by any other suitable instrumental method) |
- |
|
|
|
| Cl. 0.4, 5.1, Table 1 (Iron- IS 504 or by any other suitable instrumental method) |
- |
|
|
|
| Cl. 0.4, 5.1, Table 1 (Zinc- IS 504 or by any other suitable instrumental method) |
- |
|
|
|
| Cl. 0.4, 5.1, Table 1 (Aluminium- IS 504 or by any other suitable instrumental method) |
- |
|
|
|
| Cl. 0.4, 5.1, Table 1 (Titanium and / or other grain refining elements - IS 504 or by any other suitable instrumental method) |
- |
|
|
|
| Cl. 0.4, 5.1, Table 1 (Chromium- IS 504 or by any other suitable instrumental method) |
- |
|
|
|
| Cl. 0.4, 5.1, Table 1 (Ti+ V- IS 504 or by any other suitable instrumental method) |
- |
|
|
|
| Cl. 0.4, 5.1, Table 1 (Total Impurities- IS 504 or by any other suitable instrumental method) |
- |
|
|
|
| Cl. 0.4, 5.1, Table 1 (Cr+ Mn- IS 504 or by any other suitable instrumental method) |
- |
|
|
|
| Table-1, Clause - 5.1 (Iron) |
- |
|
|
|
| Table-1, Clause - 5.1 (Manganese) |
- |
|
|
|
|
- |
- " 1 m 5 pieces for chemical testing
Excluding Facility for preparation of test specimen not available |
| 13090 |
BIS, Southern Regional Laboratory (SRL)
| None
| IS 7452 (1990) |
Hot rolled steel sections for doors, windows and ventilators - Specification |
- |
Rs 1800/- View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| cl 6 (Dimensions) |
- |
|
|
|
| cl 7 (MASS AND MASS TOLERANCE) |
- |
|
|
|
| cl 8 (SURFACE FINISH) |
- |
|
|
|
|
- |
- " 1.5 mt + 50g
Excluding Excl Bend Test, raw material |
| 13091 |
BIS, Southern Regional Laboratory (SRL)
| None
| IS 7142 (1995) |
Welded low carbon steel cylinders for low pressure liquifiable gases not exceeding 5 litre water capacity - Specification (First Revision) |
- |
Rs. 9552/- View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 6.2.2 (DESIGN) |
- |
|
|
|
| 10.1 (FITTINGS OTHER THAN VALVES) |
- |
|
|
|
| 10.2 i) (FITTINGS OTHER THAN VALVES) |
- |
|
|
|
| 10.3 (Bung) |
- |
|
|
|
| 13 (CHECKING OF WATER CAPACITY) |
- |
|
|
|
| 14.1.1 (PROOF TEST) |
- |
|
|
|
| 15.1 (PNEUMATIC LEAKAGE TEST) |
- |
|
|
|
| 16.2 ( Bursting Test) |
- |
|
|
|
| 17.1.1 & Cl.4.1 (ACCEPTANCE TESTS) |
- |
|
|
|
| 17.3 vii) (Acceptance test Weld joint test Specimen) |
- |
|
|
|
| 17.5 (Macro-examination) |
- |
|
|
|
| 17.6 (Minimum Thickness Test) |
- |
|
|
|
| 18.2 a) (MARKING) |
- |
|
|
|
| 18.2 b) (MARKING) |
- |
|
|
|
| 18.2 c) (MARKING) |
- |
|
|
|
| 18.2 d) (MARKING) |
- |
|
|
|
| 18.2 e) (MARKING) |
- |
|
|
|
| 18.2 f) (MARKING) |
- |
|
|
|
| 18.3 ( BIS Certification Marking) |
- |
|
|
|
| 19 (COLOUR IDENTIFICATION) |
- |
|
|
|
|
- |
- " 2 cylinders
Excluding except raw material tests |
| 13092 |
BIS, Southern Regional Laboratory (SRL)
| None
| IS 778 (1984) |
Specification for 2010 copper alloy gate, globe and check valves for waterworks purposes (Fourth Revision) |
- |
Rs 4500/- View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 3 (Nominal Sizes ) |
- |
|
|
|
| 4 (Classification ) |
- |
|
|
|
| 5 (Types) |
- |
|
|
|
| 7.1.1 (Body End Ports -IS 778) |
- |
|
|
|
| 7.1.2 (Water-Way Area - IS 778) |
- |
|
|
|
| 7.1.3 (Screwed Body End -IS 778) |
- |
|
|
|
| 7.1.4 (Flanged Body End IS 778) |
- |
|
|
|
| 7.1.4.1- Table 3 (Thickness of flange - IS 778) |
- |
|
|
|
| 7.1.4.1- Table 3 (Diameter of Belt circle -IS 778) |
- |
|
|
|
| 7.1.4.1- Table 3 (No. of holes - IS 778) |
- |
|
|
|
| 7.1.4.1- Table 3 (Diameter of holes -IS 778) |
- |
|
|
|
| 7.1.4.1 (Holes in flange - IS 778) |
- |
|
|
|
| 7.1.5 (Wedge and Disc Guides in the Bodies of Gate Valves - IS 778) |
- |
|
|
|
| 7.2.1 (Bonnets - IS 778) |
- |
|
|
|
| 7.2.1.1 (Bonnets - IS 778) |
- |
|
|
|
| 7.2.1.2 (number of engaged threads - IS 778) |
- |
|
|
|
| 7.2.1.2 (pitch of threads - IS 778) |
- |
|
|
|
| 7.2.1.3 (Bonnets - IS 778) |
- |
|
|
|
| 7.2.2 (Bonnet Flanges - IS 778) |
- |
|
|
|
| 7.3 (Stuffing Box - IS 778) |
- |
|
|
|
| 7.4 (Gland - IS 778) |
- |
|
|
|
| 7.5 (Back Seat- IS 778) |
- |
|
|
|
| 7.6.1 (Stem - IS 778) |
- |
|
|
|
| 7.6.3 (actuating threads - IS 778) |
- |
|
|
|
| 7.6.4 (Length of Stem - IS 778) |
- |
|
|
|
| 7.6.5 (Upper end of Stem - IS 778) |
- |
|
|
|
| 7.6.6 (Rising Stem - IS 778) |
- |
|
|
|
| 7.6.6.1 (Rising Stem - IS 778) |
- |
|
|
|
| 7.6.7 (Non-rising Stem - IS 778) |
- |
|
|
|
| 7.7.1 (Wedge-IS 778) |
- |
|
|
|
| 7.7.2 (Wedge-IS 778) |
- |
|
|
|
| 7.7.3 (Double disc - IS 778) |
- |
|
|
|
| 7.7.3.1 (Spreading assembly - IS 778) |
- |
|
|
|
| 7.7.3.2 (Disc - IS 778) |
- |
|
|
|
| 7.8 (Disc Assembly for Globe Valves - IS 778) |
- |
|
|
|
| 7.8.1 (One-Piece Disc - IS 778) |
- |
|
|
|
| 7.8.2 (Renewable Disc Assembly - IS 778) |
- |
|
|
|
| 7.9 (Disc for Check Valves - IS 778) |
- |
|
|
|
| 7.9.1 (Disc of glove and Check Valves - IS 778) |
- |
|
|
|
| 7.10.1 (Body Seats - IS 778) |
- |
|
|
|
| 7.10.1 (Seat ring - IS 778) |
- |
|
|
|
| 7.11 (Handwheel - IS 778) |
- |
|
|
|
| 8.1- Table 4 (Thickness of Body and Bonnet- IS 778) |
- |
|
|
|
| 8.2 - Table 5 (Flat to Flat size -IS 778 ) |
- |
|
|
|
| 8.3 - Table 6 (Width of end - IS 778) |
- |
|
|
|
| 8.4 - Table 7 (Stem Diameters - IS 778) |
- |
|
|
|
| 8.5 - Table 8 (Size of packing space - IS 778) |
- |
|
|
|
| 8.5 - Table 8 (Dia of stuffing box - IS 778) |
- |
|
|
|
| 8.6- Table 9 to Table 12 (End to end/ centre to ends/ Face to face/Centre to face dimension ) |
- |
|
|
|
|
- |
- " 1no+raw mat
Excluding except thread checking, raw material tests |
| 13093 |
BIS, Southern Regional Laboratory (SRL)
| None
| IS 9523 (2000) |
Ductile iron fittings for pressure pipes for water, gas and sewage - Specification (First Revision) |
- |
Rs.7245.00 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| Cl 5 (Thickness) |
- |
|
|
|
| Cl 6 & Table 4,5,6&7 (Design & Tolerance) |
- |
|
|
|
| Cl 9 (Tensile Test & Hardness Test) |
- |
|
|
|
| Cl 11 (Nominal Diameter, Ovality, Dimensions, No. Of Holes & Bolt Sizes) |
- |
|
|
|
| Cl 13 (Coating) |
- |
|
|
|
|
- |
- - |
| 13094 |
BIS, Southern Regional Laboratory (SRL)
| None
| IS 1239 : Part 1 (2004) |
Steel tubes, tubulars and other wrought steel fittings - Specification: Part 1 steel tubes (Sixth Revision) |
- |
Rs. 9200/- Excluding test on joints View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| Cl 8 (Outer Diameter, Thickness & Mass) |
- |
|
|
|
| Cl 15 (Workmanship) |
- |
|
|
|
| Cl 14 (Tensile Test, Flattening Test & Bend Test) |
- |
|
|
|
| Cl 14 (Tensile Test, Flattening Test & Bend Test) |
- |
|
|
|
| Cl. 6.1.1, table1 of IS 1239(Part1) (Carbon- IS 228 and relevant parts or any other established Instrumental/Chemical method.) |
- |
|
|
|
| Cl. 6.1.1, table1 of IS 1239(Part1) (Manganese- IS 228 and relevant parts or any other established Instrumental/Chemical method.) |
- |
|
|
|
| Cl. 6.1.1, table1 of IS 1239(Part1) (Sulphur- IS 228 and relevant parts or any other established Instrumental/Chemical method.) |
- |
|
|
|
| Cl. 6.1.1, table1 of IS 1239(Part1) (Phosphorus- IS 228 and relevant parts or any other established Instrumental/Chemical method.) |
- |
|
|
|
| 7, 6.1.1 (NITROGEN) |
- |
|
|
|
| 7, 6.1.1 (SILICON) |
- |
|
|
|
| 7, 6.1.1 (ALUMINIUM) |
- |
|
|
|
| 6.2 AND AS PER IS 10748 (CARBON EQUIVALENT) |
- |
|
|
|
| 6.2 AND AS PER IS 10748 (MICRO ALLOY) |
- |
|
|
|
| 6.2 AND AS PER IS 10748 (COPPER) |
- |
|
|
|
|
- |
- " 3m Chemical Facility is available Quantity: 5 Pieces of 5cm X 5cm
Excluding excl bend test, joint (thread checking),hydrostatic test & Leak proof test (at manufacturer’s works). Facility for preparation of test specimen not available. |
| 13095 |
BIS, Southern Regional Laboratory (SRL)
| None
| IS 12592 (2002) |
Precast concrete manhole cover and frame - Specification (First Revision) |
- |
3000 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 3 (Grade) |
- |
|
|
|
| 3 (Type/Shape of Cover) |
- |
|
|
|
| 4.4 (Reinforcement) |
- |
|
|
|
| 4.5 (Steel Fibres - Diameter / equivalent diameterofsteel tibres) |
- |
|
|
|
| 5.2 and Table 1 (Dimensions of Frame - A) |
- |
|
|
|
| 5.2 and Table 1 (Dimensions of Frame - B) |
- |
|
|
|
| 5.2 and Table 1 (Dimensions of Frame - C) |
- |
|
|
|
| 5.2 and Table 1 (Dimensions of Frame - D) |
- |
|
|
|
| 5.2 and Table 1 (Dimensions of Frame - E) |
- |
|
|
|
| 5.2 and Table 1 (Dimensions of Frame - F) |
- |
|
|
|
| 5.2 (Dimensions of cover- Diameter) |
- |
|
|
|
| 5.2 (Clearance at top between the frame and the cover all round the periphery) |
- |
|
|
|
| 5.2 (Top surface ofthe frame and cover is in level) |
- |
|
|
|
| 5.2 (Suitable taper matching with taper given for the frame shall be provided to the periphery of the cover) |
- |
|
|
|
| 5.2 and Fig 1 (Clear cover to reinforcement) |
- |
|
|
|
| 5.2 and Fig 1 (Distance of housing from the edge) |
- |
|
|
|
| 7.4.1 (Edge Protection and Finishing - Frame) |
- |
|
|
|
| 7.4.1 (Edge Protection and Finishing - Frame) |
- |
|
|
|
| 7.4.2 (Edge Protection and Finishing - Cover) |
- |
|
|
|
| 7.4.2 (Edge Protection and Finishing - Cover) |
- |
|
|
|
| 8 (LIFTING HOOKS) |
- |
|
|
|
| 9.1 (General) |
- |
|
|
|
|
- |
- " 1 no each
Excluding excl load test,raw material |
| 13096 |
BIS, Southern Regional Laboratory (SRL)
| None
| IS 10124 : Part 1 (2009) |
Fabricated PVC-U Fittings for Potable Water Supplies - Specification Part 1 General Requirements (Second Revision) |
- |
Rs 1500/- View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 4 (Size of fitting) |
- |
|
|
|
| 5.1 Table-1 Fig.1 (Dimension of Socket length) |
- |
|
|
|
| 5.1.3 (Out of Roundness Tolerance of Socket Inside Diameter) |
- |
|
|
|
| 5.2 Table-2 Fig.2 (Dimensions of socket for elastomeric sealing ring) |
- |
|
|
|
| 6.1 (Opacity test in accordance with IS 12235 (Part 3)) |
- |
|
|
|
| 6.2 (Short Term Hydraulic Test in accordance with Annex A) |
- |
|
|
|
| 8 (Marking) |
- |
|
|
|
|
- |
- " 6 nos+1no.fitted with pipe
Excluding Except Short Term Hydrostatic Test,effect on water |
| 13097 |
BIS, Northern Regional Laboratory (NRL)
| None
| IS 4159 (2002) |
Mineral filled sheathed heating elements - Specification (Third Revision) |
- |
Rs.10500/- View breakup
for 1 to 3 kW Excluding leakage and Hydrostatic Strength Test (for immersion oil heating elements)
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| Cl.6 of IS 4159:2002 &
IS 302-1:2008
(Classification) |
- |
|
|
|
| Cl.6 of IS 4159:2002 &
IS 302-1:2008
(Classification) |
- |
|
|
|
| Cl.7 of IS 4159:2002 & IS 302-1:2008 (Marking
) |
- |
|
|
|
| Cl.7 of IS 4159:2002 & IS 302-1:2008 (Marking
) |
- |
|
|
|
| Cl.7 of IS 4159:2002 & IS 302-1:2008 (Marking
) |
- |
|
|
|
| Cl.7 of IS 4159:2002 & IS 302-1:2008 (Marking
) |
- |
|
|
|
| Cl.7 of IS 4159:2002 & IS 302-1:2008 (Marking
) |
- |
|
|
|
| Cl.7 of IS 4159:2002 & IS 302-1:2008 (Marking
) |
- |
|
|
|
| Cl.7 of IS 4159:2002 & IS 302-1:2008 (Marking
) |
- |
|
|
|
| Cl.7 of IS 4159:2002 & IS 302-1:2008 (Marking
) |
- |
|
|
|
| Cl.7 of IS 4159:2002 & IS 302-1:2008 (Marking
) |
- |
|
|
|
| Cl.7 of IS 4159:2002 & IS 302-1:2008 (Marking
) |
- |
|
|
|
| Cl.7 of IS 4159:2002 & IS 302-1:2008 (Marking
) |
- |
|
|
|
| Cl.7 of IS 4159:2002 & IS 302-1:2008 (Marking
) |
- |
|
|
|
| Cl.7 of IS 4159:2002 & IS 302-1:2008 (Marking
) |
- |
|
|
|
| Cl.8 of IS 4159:2002 & IS 302‐1:2008 (Protection Against Electric Shock) |
- |
|
|
|
| Cl.10 of IS 4159:2002 &
IS 302-1:2008 (Input & Current) |
- |
|
|
|
| Cl.11 of IS 4159:2002 & IS 302‐1:2008 (Temperature Rise) |
- |
|
|
|
| Cl.11 of IS 4159:2002 & IS 302‐1:2008 (Temperature Rise) |
- |
|
|
|
| Cl.11 of IS 4159:2002 & IS 302‐1:2008 (Temperature Rise) |
- |
|
|
|
| Cl.11 of IS 4159:2002 & IS 302‐1:2008 (Temperature Rise) |
- |
|
|
|
| Cl.11 of IS 4159:2002 & IS 302‐1:2008 (Temperature Rise) |
- |
|
|
|
| Cl.11 of IS 4159:2002 & IS 302‐1:2008 (Temperature Rise) |
- |
|
|
|
| Cl.11 of IS 4159:2002 & IS 302‐1:2008 (Temperature Rise) |
- |
|
|
|
| Cl.11 of IS 4159:2002 & IS 302‐1:2008 (Temperature Rise) |
- |
|
|
|
| Cl.11 of IS 4159:2002 & IS 302‐1:2008 (Temperature Rise) |
- |
|
|
|
| Cl.13 of IS 4159:2002 & IS 302-1: 2008 (Electrical Insulation and Leakage Current at Operating Temperature) |
- |
|
|
|
| Cl.13 of IS 4159:2002 & IS 302-1: 2008 (Electrical Insulation and Leakage Current at Operating Temperature) |
- |
|
|
|
| Cl.15 of IS 4159:2002 & IS 302-1: 2008 (Moisture Resistance) |
- |
|
|
|
| Cl.15 of IS 4159:2002 & IS 302-1: 2008 (Moisture Resistance) |
- |
|
|
|
| Cl.15 of IS 4159:2002 & IS 302-1: 2008 (Moisture Resistance) |
- |
|
|
|
| Cl.16 of IS 4159:2002 & IS 302-1: 2008 (Insulation Resistance & Electric Strength (after Humidity Treatment)) |
- |
|
|
|
| Cl.16 of IS 4159:2002 & IS 302-1: 2008 (Insulation Resistance & Electric Strength (after Humidity Treatment)) |
- |
|
|
|
| Cl.18 of IS 4159:2002 (Endurance Test
) |
- |
|
|
|
| Cl.19 of IS 4159:2002 & IS 302-1: 2008 (Abnormal Operation) |
- |
|
|
|
| Cl.19 of IS 4159:2002 & IS 302-1: 2008 (Abnormal Operation) |
- |
|
|
|
| Cl.19 of IS 4159:2002 & IS 302-1: 2008 (Abnormal Operation) |
- |
|
|
|
| Cl.19 of IS 4159:2002 & IS 302-1: 2008 (Abnormal Operation) |
- |
|
|
|
| Cl.19 of IS 4159:2002 & IS 302-1: 2008 (Abnormal Operation) |
- |
|
|
|
| Cl.19 of IS 4159:2002 & IS 302-1: 2008 (Abnormal Operation) |
- |
|
|
|
| Cl.19 of IS 4159:2002 & IS 302-1: 2008 (Abnormal Operation) |
- |
|
|
|
| Cl.19 of IS 4159:2002 & IS 302-1: 2008 (Abnormal Operation) |
- |
|
|
|
| Cl.19 of IS 4159:2002 & IS 302-1: 2008 (Abnormal Operation) |
- |
|
|
|
| Cl.19 of IS 4159:2002 & IS 302-1: 2008 (Abnormal Operation) |
- |
|
|
|
| Cl.19 of IS 4159:2002 & IS 302-1: 2008 (Abnormal Operation) |
- |
|
|
|
| Cl.19 of IS 4159:2002 & IS 302-1: 2008 (Abnormal Operation) |
- |
|
|
|
| Cl.19 of IS 4159:2002 & IS 302-1: 2008 (Abnormal Operation) |
- |
|
|
|
| Cl.19 of IS 4159:2002 & IS 302-1: 2008 (Abnormal Operation) |
- |
|
|
|
| Cl.19 of IS 4159:2002 & IS 302-1: 2008 (Abnormal Operation) |
- |
|
|
|
| Cl.20 of IS 4159:2002 & IS 302-1: 2008 (Stability & Mechanical Hazards
) |
- |
|
|
|
| Cl.21 of IS 4159:2002 & IS 302-1: 2008 (Mechanical Strength) |
- |
|
|
|
| Cl.21 of IS 4159:2002 & IS 302-1: 2008 (Mechanical Strength) |
- |
|
|
|
| Cl.22 of IS 4159:2002 &
IS 302-1: 2008 (Construction) |
- |
|
|
|
| Cl.22 of IS 4159:2002 &
IS 302-1: 2008 (Construction) |
- |
|
|
|
| Cl.22 of IS 4159:2002 &
IS 302-1: 2008 (Construction) |
- |
|
|
|
| Cl.22 of IS 4159:2002 &
IS 302-1: 2008 (Construction) |
- |
|
|
|
| Cl.22 of IS 4159:2002 &
IS 302-1: 2008 (Construction) |
- |
|
|
|
| Cl.19 of IS 4159:2002 & IS 302-1: 2008 (Abnormal Operation) |
- |
|
|
|
| Cl.22 of IS 4159:2002 &
IS 302-1: 2008 (Construction) |
- |
|
|
|
| Cl.22 of IS 4159:2002 &
IS 302-1: 2008 (Construction) |
- |
|
|
|
| Cl.22 of IS 4159:2002 &
IS 302-1: 2008 (Construction) |
- |
|
|
|
| Cl.22 of IS 4159:2002 &
IS 302-1: 2008 (Construction) |
- |
|
|
|
| Cl.22 of IS 4159:2002 &
IS 302-1: 2008 (Construction) |
- |
|
|
|
| Cl.22 of IS 4159:2002 &
IS 302-1: 2008 (Construction) |
- |
|
|
|
| Cl.22 of IS 4159:2002 &
IS 302-1: 2008 (Construction) |
- |
|
|
|
| Cl.22 of IS 4159:2002 &
IS 302-1: 2008 (Construction) |
- |
|
|
|
| Cl.22 of IS 4159:2002 &
IS 302-1: 2008 (Construction) |
- |
|
|
|
| Cl.22 of IS 4159:2002 &
IS 302-1: 2008 (Construction) |
- |
|
|
|
| Cl.23 of IS 4159:2002 &
IS 302-1: 2008 (Internal Wiring
) |
- |
|
|
|
| Cl.23 of IS 4159:2002 &
IS 302-1: 2008 (Internal Wiring
) |
- |
|
|
|
| Cl.23 of IS 4159:2002 &
IS 302-1: 2008 (Internal Wiring
) |
- |
|
|
|
| Cl.23 of IS 4159:2002 &
IS 302-1: 2008 (Internal Wiring
) |
- |
|
|
|
| Cl.23 of IS 4159:2002 &
IS 302-1: 2008 (Internal Wiring
) |
- |
|
|
|
| Cl.23 of IS 4159:2002 &
IS 302-1: 2008 (Internal Wiring
) |
- |
|
|
|
| Cl.23 of IS 4159:2002 &
IS 302-1: 2008 (Internal Wiring
) |
- |
|
|
|
| Cl.23 of IS 4159:2002 &
IS 302-1: 2008 (Internal Wiring
) |
- |
|
|
|
| Cl.23 of IS 4159:2002 &
IS 302-1: 2008 (Internal Wiring
) |
- |
|
|
|
| Cl.23 of IS 4159:2002 &
IS 302-1: 2008 (Internal Wiring
) |
- |
|
|
|
| Cl.24 of IS 4159:2002 &
IS 302-1: 2008 (Component ) |
- |
|
|
|
| Cl.24 of IS 4159:2002 &
IS 302-1: 2008 (Component ) |
- |
|
|
|
| Cl.25 of IS 4159:2002 & IS 302-1: 2008 (Supply connection & external flexible cables & cords) |
- |
|
|
|
| Cl.26 of IS 4159:2002 & IS 302-1: 2008 (Terminals for External Conductors) |
- |
|
|
|
| Cl.26 of IS 4159:2002 & IS 302-1: 2008 (Terminals for External Conductors) |
- |
|
|
|
| Cl.26 of IS 4159:2002 & IS 302-1: 2008 (Terminals for External Conductors) |
- |
|
|
|
| Cl.26 of IS 4159:2002 & IS 302-1: 2008 (Terminals for External Conductors) |
- |
|
|
|
| Cl.26 of IS 4159:2002 & IS 302-1: 2008 (Terminals for External Conductors) |
- |
|
|
|
| Cl.26 of IS 4159:2002 & IS 302-1: 2008 (Terminals for External Conductors) |
- |
|
|
|
| Cl.26 of IS 4159:2002 & IS 302-1: 2008 (Terminals for External Conductors) |
- |
|
|
|
| Cl.26 of IS 4159:2002 & IS 302-1: 2008 (Terminals for External Conductors) |
- |
|
|
|
| Cl.26 of IS 4159:2002 & IS 302-1: 2008 (Terminals for External Conductors) |
- |
|
|
|
| Cl.26 of IS 4159:2002 & IS 302-1: 2008 (Terminals for External Conductors) |
- |
|
|
|
| Cl.26 of IS 4159:2002 & IS 302-1: 2008 (Terminals for External Conductors) |
- |
|
|
|
| Cl.26 of IS 4159:2002 & IS 302-1: 2008 (Terminals for External Conductors) |
- |
|
|
|
| Cl.26 of IS 4159:2002 & IS 302-1: 2008 (Terminals for External Conductors) |
- |
|
|
|
| Cl.27 of IS 4159:2002 & IS 302-1: 2008 (Provision for Earthing) |
- |
|
|
|
| Cl.27 of IS 4159:2002 & IS 302-1: 2008 (Provision for Earthing) |
- |
|
|
|
| Cl.27 of IS 4159:2002 & IS 302-1: 2008 (Provision for Earthing) |
- |
|
|
|
| Cl.27 of IS 4159:2002 & IS 302-1: 2008 (Provision for Earthing) |
- |
|
|
|
| Cl.27 of IS 4159:2002 & IS 302-1: 2008 (Provision for Earthing) |
- |
|
|
|
| Cl.28 of IS 4159:2002 & IS 302-1: 2008 (Screws & Connection ) |
- |
|
|
|
| Cl.28 of IS 4159:2002 & IS 302-1: 2008 (Screws & Connection ) |
- |
|
|
|
| Cl.28 of IS 4159:2002 & IS 302-1: 2008 (Screws & Connection ) |
- |
|
|
|
| Cl.28 of IS 4159:2002 & IS 302-1: 2008 (Screws & Connection ) |
- |
|
|
|
| Cl. 29 of IS 4159:2002 &
IS 302-1: 2008 (Creepage Distances & Clearances) |
- |
|
|
|
| Cl. 29 of IS 4159:2002 &
IS 302-1: 2008 (Creepage Distances & Clearances) |
- |
|
|
|
| Cl. 30 of IS 4159:2002 &
IS 302-1: 2008 (Resistance to Heat, Fire and Tracking) |
- |
|
|
|
| Cl. 30 of IS 4159:2002 &
IS 302-1: 2008 (Resistance to Heat, Fire and Tracking) |
- |
|
|
|
| Cl. 31 of IS 4159:2002 &
IS 302-1: 2008 (Resistance to Rusting) |
- |
|
|
|
| Cl. 33.1 of IS 4159:2002 (Finish Test
) |
- |
|
|
|
| Cl. 29 of IS 4159:2002 &
IS 302-1: 2008 (Creepage Distances & Clearances) |
- |
|
|
|
|
- |
- Standard is revised and test facilty details for latest version mentioned at Sr. no. 16 |
| 13098 |
BIS, Northern Regional Laboratory (NRL)
| None
| IS 8978 (1992) |
Specification for electric instantaneous water heaters (Second Revision) |
- |
Rs.15030/ View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| Cl.6 of IS 302-2-35:2017 (Classification) |
- |
|
|
|
| Cl.6 of IS 302-2-35:2017 (Classification) |
- |
|
|
|
| Cl.8 of IS 302-2-35:2017 (Protection Against Access To Live Parts) |
- |
|
|
|
| Cl.10 of IS 302-2- 35:2011 (Power Input & Current ) |
- |
|
|
|
| Cl.11 of 302-2-35:2017 (Heating) |
- |
|
|
|
| Cl.11 of 302-2-35:2017 (Heating) |
- |
|
|
|
| Cl.11 of 302-2-35:2017 (Heating) |
- |
|
|
|
| Cl.11 of 302-2-35:2017 (Heating) |
- |
|
|
|
| Cl.13 of IS 302-2-35:2017 (Leakage Current & Electrical Strength at Operating Temperature ) |
- |
|
|
|
| Cl.13 of IS 302-2-35:2017 (Leakage Current & Electrical Strength at Operating Temperature ) |
- |
|
|
|
| Cl.15 of IS 302-2-35-2011 (Moisture Resistance ) |
- |
|
|
|
| Cl.15 of IS 302-2-35-2011 (Moisture Resistance ) |
- |
|
|
|
| Cl.16 of IS 302-2-35:2011 (Leakage Current and Electric Strength) |
- |
|
|
|
| Cl.16 of IS 302-2-35:2011 (Leakage Current and Electric Strength) |
- |
|
|
|
| Cl.19 of IS 302-2-35:2017 (Abnormal Operation) |
- |
|
|
|
| Cl.19 of IS 302-2-35:2017 (Abnormal Operation) |
- |
|
|
|
| Cl.19 of IS 302-2-35:2017 (Abnormal Operation) |
- |
|
|
|
| Cl.19 of IS 302-2-35:2017 (Abnormal Operation) |
- |
|
|
|
| Cl.20 of IS 302-2-35-2011 (Stability & Mechanical Hazards
) |
- |
|
|
|
| Cl.21.1 of IS 302-2-35-2011 (Mechanical strength) |
- |
|
|
|
| Cl.22 of IS 302-2-35-2011 (Construction
) |
- |
|
|
|
| Cl.22 of IS 302-2-35-2011 (Construction
) |
- |
|
|
|
| Cl.22 of IS 302-2-35-2011 (Construction
) |
- |
|
|
|
| Cl.22 of IS 302-2-35-2011 (Construction
) |
- |
|
|
|
| Cl.22 of IS 302-2-35-2011 (Construction
) |
- |
|
|
|
| Cl.22 of IS 302-2-35-2011 (Construction
) |
- |
|
|
|
| Cl.22 of IS 302-2-35-2011 (Construction
) |
- |
|
|
|
| Cl.22 of IS 302-2-35-2011 (Construction
) |
- |
|
|
|
| Cl.22 of IS 302-2-35-2011 (Construction
) |
- |
|
|
|
| Cl.22 of IS 302-2-35-2011 (Construction
) |
- |
|
|
|
| Cl.22 of IS 302-2-35-2011 (Construction
) |
- |
|
|
|
| Cl.22 of IS 302-2-35-2011 (Construction
) |
- |
|
|
|
| Cl.22 of IS 302-2-35-2011 (Construction
) |
- |
|
|
|
| Cl.22 of IS 302-2-35-2011 (Construction
) |
- |
|
|
|
| Cl.22 of IS 302-2-35-2011 (Construction
) |
- |
|
|
|
| Cl.22 of IS 302-2-35-2011 (Construction
) |
- |
|
|
|
| Cl.22 of IS 302-2-35-2011 (Construction
) |
- |
|
|
|
| Cl.22 of IS 302-2-35-2011 (Construction
) |
- |
|
|
|
| Cl.22 of IS 302-2-35-2011 (Construction
) |
- |
|
|
|
| Cl.22 of IS 302-2-35-2011 (Construction
) |
- |
|
|
|
| Cl.22 of IS 302-2-35-2011 (Construction
) |
- |
|
|
|
| Cl.22 of IS 302-2-35-2011 (Construction
) |
- |
|
|
|
| Cl.22 of IS 302-2-35-2011 (Construction
) |
- |
|
|
|
| Cl.22 of IS 302-2-35-2011 (Construction
) |
- |
|
|
|
| Cl.22 of IS 302-2-35-2011 (Construction
) |
- |
|
|
|
| Cl.22 of IS 302-2-35-2011 (Construction
) |
- |
|
|
|
| Cl.22 of IS 302-2-35-2011 (Construction
) |
- |
|
|
|
| Cl.22 of IS 302-2-35-2011 (Construction
) |
- |
|
|
|
| Cl.22 of IS 302-2-35-2011 (Construction
) |
- |
|
|
|
| Cl.22 of IS 302-2-35-2011 (Construction
) |
- |
|
|
|
| Cl.22 of IS 302-2-35-2011 (Construction
) |
- |
|
|
|
| Cl.22 of IS 302-2-35-2011 (Construction
) |
- |
|
|
|
| Cl.22 of IS 302-2-35-2011 (Construction
) |
- |
|
|
|
| Cl.22 of IS 302-2-35-2011 (Construction
) |
- |
|
|
|
| Cl.22 of IS 302-2-35-2011 (Construction
) |
- |
|
|
|
| Cl.22 of IS 302-2-35-2011 (Construction
) |
- |
|
|
|
| Cl.22 of IS 302-2-35-2011 (Construction
) |
- |
|
|
|
| Cl.22 of IS 302-2-35-2011 (Construction
) |
- |
|
|
|
| Cl.22 of IS 302-2-35-2011 (Construction
) |
- |
|
|
|
| Cl.22 of IS 302-2-35-2011 (Construction
) |
- |
|
|
|
| Cl.22 of IS 302-2-35-2011 (Construction
) |
- |
|
|
|
| Cl.22 of IS 302-2-35-2011 (Construction
) |
- |
|
|
|
| Cl.22 of IS 302-2-35-2011 (Construction
) |
- |
|
|
|
| Cl.22 of IS 302-2-35-2011 (Construction
) |
- |
|
|
|
| Cl.22 of IS 302-2-35-2011 (Construction
) |
- |
|
|
|
| Cl.22 of IS 302-2-35-2011 (Construction
) |
- |
|
|
|
| Cl.22 of IS 302-2-35-2011 (Construction
) |
- |
|
|
|
| Cl.22 of IS 302-2-35-2011 (Construction
) |
- |
|
|
|
| Cl.22 of IS 302-2-35-2011 (Construction
) |
- |
|
|
|
| Cl.22 of IS 302-2-35-2011 (Construction
) |
- |
|
|
|
| Cl.22 of IS 302-2-35-2011 (Construction
) |
- |
|
|
|
| Cl.22 of IS 302-2-35-2011 (Construction
) |
- |
|
|
|
| Cl.23 of IS 302-2-35-2011 (Internal Wiring) |
- |
|
|
|
| Cl.23 of IS 302-2-35-2011 (Internal Wiring) |
- |
|
|
|
| Cl.23 of IS 302-2-35-2011 (Internal Wiring) |
- |
|
|
|
| Cl.23 of IS 302-2-35-2011 (Internal Wiring) |
- |
|
|
|
| Cl.23 of IS 302-2-35-2011 (Internal Wiring) |
- |
|
|
|
| Cl.23 of IS 302-2-35-2011 (Internal Wiring) |
- |
|
|
|
| Cl.23 of IS 302-2-35-2011 (Internal Wiring) |
- |
|
|
|
| Cl.23 of IS 302-2-35-2011 (Internal Wiring) |
- |
|
|
|
| Cl.23 of IS 302-2-35-2011 (Internal Wiring) |
- |
|
|
|
| Cl.23 of IS 302-2-35-2011 (Internal Wiring) |
- |
|
|
|
| Cl.23 of IS 302-2-35-2011 (Internal Wiring) |
- |
|
|
|
| Cl.23 of IS 302-2-35-2011 (Internal Wiring) |
- |
|
|
|
| Cl.23 of IS 302-2-35-2011 (Internal Wiring) |
- |
|
|
|
| Cl.24 of IS 302-2-35:2017 (Component
) |
- |
|
|
|
| Cl.24 of IS 302-2-35:2017 (Component
) |
- |
|
|
|
| Cl.24 of IS 302-2-35:2017 (Component
) |
- |
|
|
|
| Cl.24 of IS 302-2-35:2017 (Component
) |
- |
|
|
|
| Cl.24 of IS 302-2-35:2017 (Component
) |
- |
|
|
|
| Cl.25 of IS 302-2-35:2017 (Supply Connection & External Flexible Cords) |
- |
|
|
|
| Cl.25 of IS 302-2-35:2017 (Supply Connection & External Flexible Cords) |
- |
|
|
|
| Cl.25 of IS 302-2-35:2017 (Supply Connection & External Flexible Cords) |
- |
|
|
|
| Cl.25 of IS 302-2-35:2017 (Supply Connection & External Flexible Cords) |
- |
|
|
|
| Cl.25 of IS 302-2-35:2017 (Supply Connection & External Flexible Cords) |
- |
|
|
|
| Cl.25 of IS 302-2-35:2017 (Supply Connection & External Flexible Cords) |
- |
|
|
|
| Cl.25 of IS 302-2-35:2017 (Supply Connection & External Flexible Cords) |
- |
|
|
|
| Cl.25 of IS 302-2-35:2017 (Supply Connection & External Flexible Cords) |
- |
|
|
|
| Cl.25 of IS 302-2-35:2017 (Supply Connection & External Flexible Cords) |
- |
|
|
|
| Cl.25 of IS 302-2-35:2017 (Supply Connection & External Flexible Cords) |
- |
|
|
|
| Cl.25 of IS 302-2-35:2017 (Supply Connection & External Flexible Cords) |
- |
|
|
|
| Cl.25 of IS 302-2-35:2017 (Supply Connection & External Flexible Cords) |
- |
|
|
|
| Cl.25 of IS 302-2-35:2017 (Supply Connection & External Flexible Cords) |
- |
|
|
|
| Cl.25 of IS 302-2-35:2017 (Supply Connection & External Flexible Cords) |
- |
|
|
|
| Cl.25 of IS 302-2-35:2017 (Supply Connection & External Flexible Cords) |
- |
|
|
|
| Cl.25 of IS 302-2-35:2017 (Supply Connection & External Flexible Cords) |
- |
|
|
|
| Cl.25 of IS 302-2-35:2017 (Supply Connection & External Flexible Cords) |
- |
|
|
|
| Cl.25 of IS 302-2-35:2017 (Supply Connection & External Flexible Cords) |
- |
|
|
|
| Cl.25 of IS 302-2-35:2017 (Supply Connection & External Flexible Cords) |
- |
|
|
|
| Cl.25 of IS 302-2-35:2017 (Supply Connection & External Flexible Cords) |
- |
|
|
|
| Cl.25 of IS 302-2-35:2017 (Supply Connection & External Flexible Cords) |
- |
|
|
|
| Cl.25 of IS 302-2-35:2017 (Supply Connection & External Flexible Cords) |
- |
|
|
|
| Cl.25 of IS 302-2-35:2017 (Supply Connection & External Flexible Cords) |
- |
|
|
|
| Cl.25 of IS 302-2-35:2017 (Supply Connection & External Flexible Cords) |
- |
|
|
|
| Cl.25 of IS 302-2-35:2017 (Supply Connection & External Flexible Cords) |
- |
|
|
|
| Cl.26 of IS 302-2-35:2017 (Terminals for External Conductors) |
- |
|
|
|
| Cl.26 of IS 302-2-35:2017 (Terminals for External Conductors) |
- |
|
|
|
| Cl.26 of IS 302-2-35:2017 (Terminals for External Conductors) |
- |
|
|
|
| Cl.26 of IS 302-2-35:2017 (Terminals for External Conductors) |
- |
|
|
|
| Cl.26 of IS 302-2-35:2017 (Terminals for External Conductors) |
- |
|
|
|
| Cl.26 of IS 302-2-35:2017 (Terminals for External Conductors) |
- |
|
|
|
| Cl.26 of IS 302-2-35:2017 (Terminals for External Conductors) |
- |
|
|
|
| Cl.26 of IS 302-2-35:2017 (Terminals for External Conductors) |
- |
|
|
|
| Cl.26 of IS 302-2-35:2017 (Terminals for External Conductors) |
- |
|
|
|
| Cl.26 of IS 302-2-35:2017 (Terminals for External Conductors) |
- |
|
|
|
| Cl.26 of IS 302-2-35:2017 (Terminals for External Conductors) |
- |
|
|
|
| Cl.27 of IS 302-2-35:2017 (Provision for Earthing) |
- |
|
|
|
| Cl.27 of IS 302-2-35:2017 (Provision for Earthing) |
- |
|
|
|
| Cl.27 of IS 302-2-35:2017 (Provision for Earthing) |
- |
|
|
|
| Cl.27 of IS 302-2-35:2017 (Provision for Earthing) |
- |
|
|
|
| Cl.27 of IS 302-2-35:2017 (Provision for Earthing) |
- |
|
|
|
| Cl.27 of IS 302-2-35:2017 (Provision for Earthing) |
- |
|
|
|
| Cl.27 of IS 302-2-35:2017 (Provision for Earthing) |
- |
|
|
|
| Cl.28 of IS 302-2-35:2017 (Screws and Connections
) |
- |
|
|
|
| Cl.29 of IS 302-2-35:2017 (Clearances, Creepage Distances and Solid Insulation) |
- |
|
|
|
| Cl.29 of IS 302-2-35:2017 (Clearances, Creepage Distances and Solid Insulation) |
- |
|
|
|
| Cl.29 of IS 302-2-35:2017 (Clearances, Creepage Distances and Solid Insulation) |
- |
|
|
|
| Cl.30 of IS 302-2-35: 2011 (Resistance to Heat and Fire) |
- |
|
|
|
| Cl.30 of IS 302-2-35: 2011 (Resistance to Heat and Fire) |
- |
|
|
|
| Cl.31 of IS 302-2-35: 2011 (Resistance to Rusting
) |
- |
|
|
|
| Cl.32 of IS 302-2-35: 2011 (Radiation, Toxicity and Similar Hazards
) |
- |
|
|
|
| Cl.10 of IS 8978 : 1992 (Finish) |
- |
|
|
|
| Cl.11 of IS 8978 : 1992 (Operation of flow switch) |
- |
|
|
|
| Cl.12 of IS 8978 : 1992 (Endurance) |
- |
|
|
|
| Cl.7 of IS 302-2-35:2017 (Marking) |
- |
|
|
|
| Cl.7 of IS 302-2-35:2017 (Marking) |
- |
|
|
|
| Cl.7 of IS 302-2-35:2017 (Marking) |
- |
|
|
|
| Cl.7 of IS 302-2-35:2017 (Marking) |
- |
|
|
|
| Cl.7 of IS 302-2-35:2017 (Marking) |
- |
|
|
|
| Cl.7 of IS 302-2-35:2017 (Marking) |
- |
|
|
|
| Cl.7 of IS 302-2-35:2017 (Marking) |
- |
|
|
|
| Cl.7 of IS 302-2-35:2017 (Marking) |
- |
|
|
|
| Cl.7 of IS 302-2-35:2017 (Marking) |
- |
|
|
|
| Cl.7 of IS 302-2-35:2017 (Marking) |
- |
|
|
|
| Cl.7 of IS 302-2-35:2017 (Marking) |
- |
|
|
|
| Cl.7 of IS 302-2-35:2017 (Marking) |
- |
|
|
|
| Cl.7 of IS 302-2-35:2017 (Marking) |
- |
|
|
|
| Cl.7 of IS 302-2-35:2017 (Marking) |
- |
|
|
|
| Cl.7 of IS 302-2-35:2017 (Marking) |
- |
|
|
|
| Cl.7 of IS 302-2-35:2017 (Marking) |
- |
|
|
|
| Cl.7 of IS 302-2-35:2017 (Marking) |
- |
|
|
|
| Cl.7 of IS 302-2-35:2017 (Marking) |
- |
|
|
|
| Cl.7 of IS 302-2-35:2017 (Marking) |
- |
|
|
|
| Cl.7 of IS 302-2-35:2017 (Marking) |
- |
|
|
|
| Cl.7 of IS 302-2-35:2017 (Marking) |
- |
|
|
|
| Cl.7 of IS 302-2-35:2017 (Marking) |
- |
|
|
|
| Cl.7 of IS 302-2-35:2017 (Marking) |
- |
|
|
|
| Cl. 21.2 of IS 302-1:2008 (Mechanical strength) |
- |
|
|
|
|
- |
- Excluding Cl 22.105 Operation of electronic circuit and software evaulation annnex R
Cl. 22.108 Fault condition for electronic condition and software evaulation annnex R
Cl. 24.1.3 test on components and water heaters above 3kW"
Cl. 19.11 and Cl. 19.12 abnormal test (for Electronic circuit) |
| 13099 |
BIS, Northern Regional Laboratory (NRL)
| None
| IS 4250 (1980) |
Specification for domestic electric food - Mixers (Liquidizers And Grinders) (First Revision) |
- |
Rs. 32600/- View breakup
Rs 9750/- Excluding Endurance test for juicers
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 6 (Classification- IS 302-1 ) |
- |
|
|
|
| 6 (Classification- IS 302-1) |
- |
|
|
|
| 7.1 (Marking- IS 302-1) |
- |
|
|
|
| 7.1 (Marking- IS 302-1) |
- |
|
|
|
| 7.1 (Marking- IS 302-1) |
- |
|
|
|
| 7.1 (Marking- IS 302-1) |
- |
|
|
|
| 7.1 (Marking- IS 302-1) |
- |
|
|
|
| 7.1 (Marking- IS 302-1) |
- |
|
|
|
| 7.1 (Marking- IS 302-1) |
- |
|
|
|
| 7.1 (Marking- IS 302-1) |
- |
|
|
|
| 7.1 (Marking- IS 302-1) |
- |
|
|
|
| 7.1 (Marking- IS 302-1) |
- |
|
|
|
| 7.1 (Marking- IS 302-1) |
- |
|
|
|
| 7.1 (Marking- IS 302-1) |
- |
|
|
|
| 7.2 (Marking) |
- |
|
|
|
| 7.1 (Marking- IS 302-1) |
- |
|
|
|
| 7.1 (Marking- IS 302-1) |
- |
|
|
|
| 7.1 (Marking- IS 302-1) |
- |
|
|
|
| 7.4 (Marking) |
- |
|
|
|
| 7.5 (Marking) |
- |
|
|
|
| 7.6 (Marking) |
- |
|
|
|
| 8 ( Protection Against Electric Shock, IS 302-1) |
- |
|
|
|
| 9 (Starting, IS 302-1) |
- |
|
|
|
| 10 (Power Input and Current, IS 302-1) |
- |
|
|
|
| 11 (Heating, IS 302-1) |
- |
|
|
|
| 11 (Heating, IS 302-1) |
- |
|
|
|
| 11 (Heating, IS 302-1) |
- |
|
|
|
| 11 (Heating, IS 302-1) |
- |
|
|
|
| 11 (Heating, IS 302-1) |
- |
|
|
|
| 13 (Electrical Insulation and Leakage Current at Operating Temperature: Leakage current, IS 302-1) |
- |
|
|
|
| 16 (Electrical Insulation and Leakage Current at Operating Temperature: Leakage current, IS 302-1) |
- |
|
|
|
| 13 (Electrical Insulation and Leakage Current at Operating Temperature: High Voltage, IS 302-1) |
- |
|
|
|
| 15.2 (Moisture Resistance-Spillage test) |
- |
|
|
|
| 15 (Moisture Resistance, IS 302-1) |
- |
|
|
|
| 16 (Electrical Insulation and Leakage Current at Operating Temperature: Leakage current, IS 302-1) |
- |
|
|
|
| 16 (Electrical Insulation and Leakage Current at Operating Temperature: High Voltage, IS 302-1) |
- |
|
|
|
| 11 (Heating, IS 302-1) |
- |
|
|
|
| 19 (Abnormal Operation, IS 302-1) |
- |
|
|
|
| 11 (Heating, IS 302-1) |
- |
|
|
|
| 19 (Abnormal Operation, IS 302-1) |
- |
|
|
|
| 19 (Abnormal Operation, IS 302-1) |
- |
|
|
|
| 19 (Abnormal Operation, IS 302-1) |
- |
|
|
|
| 19 (Abnormal Operation, IS 302-1) |
- |
|
|
|
| 20 (Stability & Mechanical Hazards, IS 302-1) |
- |
|
|
|
| 20 (Stability & Mechanical Hazards, IS 302-1) |
- |
|
|
|
| 21 (Mechanical Strength, IS 302-1) |
- |
|
|
|
| 20 (Stability & Mechanical Hazards, IS 302-1) |
- |
|
|
|
| 21 (Mechanical Strength, IS 302-1) |
- |
|
|
|
| 21 (Mechanical Strength, IS 302-1) |
- |
|
|
|
| 22.1 (Construction, IS 302-1) |
- |
|
|
|
| 22.2 (Construction) |
- |
|
|
|
| 22.3 (Construction) |
- |
|
|
|
| 22.4 (Construction) |
- |
|
|
|
| 22.5 (Construction) |
- |
|
|
|
| 24.6 (Components) |
- |
|
|
|
| 24.7 (Components) |
- |
|
|
|
| 22.9 (Construction) |
- |
|
|
|
| 22.1 (Construction) |
- |
|
|
|
| 23 (Internal Wiring, IS 302-1) |
- |
|
|
|
| 23 (Internal Wiring, IS 302-1) |
- |
|
|
|
| 23 (Internal Wiring, IS 302-1) |
- |
|
|
|
| 23 (Internal Wiring, IS 302-1) |
- |
|
|
|
| 23 (Internal Wiring, IS 302-1) |
- |
|
|
|
| 23 (Internal Wiring, IS 302-1) |
- |
|
|
|
| 23 (Internal Wiring, IS 302-1) |
- |
|
|
|
| 23 (Internal Wiring, IS 302-1) |
- |
|
|
|
| 23 (Internal Wiring, IS 302-1) |
- |
|
|
|
| 24.1 (Components, IS 302-1) |
- |
|
|
|
| 24.1 (Components, IS 302-1) |
- |
|
|
|
| 24.1 (Components, IS 302-1) |
- |
|
|
|
| 24.1 (Components, IS 302-1) |
- |
|
|
|
| 24.2 (Components) |
- |
|
|
|
| 24.4 (Components) |
- |
|
|
|
| 24.5 (Components) |
- |
|
|
|
| 24.6 (Components) |
- |
|
|
|
| 24.7 (Components) |
- |
|
|
|
| 24.8 (Components) |
- |
|
|
|
| 24.9 (Components) |
- |
|
|
|
| 25 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 23 (Internal Wiring, IS 302-1) |
- |
|
|
|
| 25 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 26 (Terminals for External Conductors, IS 302-1) |
- |
|
|
|
| 27 (Provision for Earthing, IS 302-1) |
- |
|
|
|
| 27 (Provision for Earthing, IS 302-1) |
- |
|
|
|
| 27 (Provision for Earthing, IS 302-1) |
- |
|
|
|
| 27 (Provision for Earthing, IS 302-1) |
- |
|
|
|
| 28 (Screws & Connections, IS 302-1) |
- |
|
|
|
| 29 (Clearances and Distances through Insulation, IS 302-1) |
- |
|
|
|
| 29 (Clearances and Distances through Insulation, IS 302-1) |
- |
|
|
|
| 30 (Resistance to Heat, Fire, Tracking, IS 302-1) |
- |
|
|
|
| 30 (Resistance to Heat, Fire, Tracking, IS 302-1) |
- |
|
|
|
| 34.2 (Operational tests- Grinding coffee (for machines which have a dry grinding arrangement)) |
- |
|
|
|
| 34.2 (Operational tests- Grinding coffee (for machines which have a dry grinding arrangement)) |
- |
|
|
|
| 34.4 (IDLI batter-Grinding of black gram) |
- |
|
|
|
| 34.4 (IDLI batter-Grinding of rice) |
- |
|
|
|
| 34.2 (Operational tests- Grinding coffee (for machines which have a dry grinding arrangement)) |
- |
|
|
|
| 34.4 (IDLI batter-Grinding of rice) |
- |
|
|
|
| 34.5.1 (a) (Operational test for juicers ) |
- |
|
|
|
| 34.5.1 (b) (Operational test for juicers ) |
- |
|
|
|
| 34.5.2 (Operational test for juicers ) |
- |
|
|
|
| 35 (Temperature withstand test for bowl) |
- |
|
|
|
| 36 (Test for controls ) |
- |
|
|
|
| 37 (Strength of Assembly ) |
- |
|
|
|
| 37 (Strength of Assembly ) |
- |
|
|
|
|
- |
- Excluding 1. Cl. 14 Transient Overvoltage Test IS 302-1:2008 2. Cl. 19.11 and Cl. 19.12 abnormal test (for Electronic circuit) 3. Cl.24 Component Test IS 302-1:2008 |
| 13100 |
BIS, Northern Regional Laboratory (NRL)
| None
| IS 369 (2019) |
Household electric direct - Acting room heaters - Performance requirements (Fourth Revision) |
- |
- View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| Cl.6 of IS 302-2-30:2007 (Classification) |
- |
|
|
|
| Cl.6 of IS 302-2-30:2007 (Classification) |
- |
|
|
|
| Cl.7 of IS 302-2-30:2007 &IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7 of IS 302-2-30:2007 &IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7 of IS 302-2-30:2007 &IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7 of IS 302-2-30:2007 &IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7 of IS 302-2-30:2007 &IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7 of IS 302-2-30:2007 &IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7 of IS 302-2-30:2007 &IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7 of IS 302-2-30:2007 &IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7 of IS 302-2-30:2007 &IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7 of IS 302-2-30:2007 &IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7 of IS 302-2-30:2007 &IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7 of IS 302-2-30:2007 &IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7 of IS 302-2-30:2007 &IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7 of IS 302-2-30:2007 &IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7 of IS 302-2-30:2007 &IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7 of IS 302-2-30:2007 &IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7 of IS 302-2-30:2007 &IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7 of IS 302-2-30:2007 &IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7 of IS 302-2-30:2007 &IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7 of IS 302-2-30:2007 &IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7 of IS 302-2-30:2007 &IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7 of IS 302-2-30:2007 &IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7 of IS 302-2-30:2007 &IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7 of IS 302-2-30:2007 &IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7 of IS 302-2-30:2007 &IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7 of IS 302-2-30:2007 &IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7 of IS 302-2-30:2007 &IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7 of IS 302-2-30:2007 &IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7 of IS 302-2-30:2007 &IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7 of IS 302-2-30:2007 &IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7 of IS 302-2-30:2007 &IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7 of IS 302-2-30:2007 &IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7 of IS 302-2-30:2007 &IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7 of IS 302-2-30:2007 &IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7 of IS 302-2-30:2007 &IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7 of IS 302-2-30:2007 &IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7 of IS 302-2-30:2007 &IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7 of IS 302-2-30:2007 &IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7 of IS 302-2-30:2007 &IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7 of IS 302-2-30:2007 &IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7 of IS 302-2-30:2007 &IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7 of IS 302-2-30:2007 &IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7 of IS 302-2-30:2007 &IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7 of IS 302-2-30:2007 &IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7 of IS 302-2-30:2007 &IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7 of IS 302-2-30:2007 &IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7 of IS 302-2-30:2007 &IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7 of IS 302-2-30:2007 &IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7 of IS 302-2-30:2007 &IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7 of IS 302-2-30:2007 &IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7 of IS 302-2-30:2007 &IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7 of IS 302-2-30:2007 &IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7 of IS 302-2-30:2007 &IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7 of IS 302-2-30:2007 &IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7 of IS 302-2-30:2007 &IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.8 of IS 302-2-30:2007 &IS:302-1:2008 (Protection Against Access to Live Parts) |
- |
|
|
|
| Cl.10 of IS 302-2-30:2007 &IS:302-1:2008 (Power Input and Current) |
- |
|
|
|
| Cl.11 of IS 302-2-30:2007 &IS:302-1:2008 (Heating) |
- |
|
|
|
| Cl.7 of IS 302-2-30:2007 &IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.11 of IS 302-2-30:2007 &IS:302-1:2008 (Heating) |
- |
|
|
|
| Cl.11 of IS 302-2-30:2007 &IS:302-1:2008 (Heating) |
- |
|
|
|
| Cl.11 of IS 302-2-30:2007 &IS:302-1:2008 (Heating) |
- |
|
|
|
| Cl.11 of IS 302-2-30:2007 &IS:302-1:2008 (Heating) |
- |
|
|
|
| Cl.11 of IS 302-2-30:2007 &IS:302-1:2008 (Heating) |
- |
|
|
|
| Cl.11 of IS 302-2-30:2007 &IS:302-1:2008 (Heating) |
- |
|
|
|
| Cl.11 of IS 302-2-30:2007 &IS:302-1:2008 (Heating) |
- |
|
|
|
| Cl.11 of IS 302-2-30:2007 &IS:302-1:2008 (Heating) |
- |
|
|
|
| Cl.11 of IS 302-2-30:2007 &IS:302-1:2008 (Heating) |
- |
|
|
|
| Cl.11 of IS 302-2-30:2007 &IS:302-1:2008 (Heating) |
- |
|
|
|
| Cl.11 of IS 302-2-30:2007 &IS:302-1:2008 (Heating) |
- |
|
|
|
| Cl.11 of IS 302-2-30:2007 &IS:302-1:2008 (Heating) |
- |
|
|
|
| Cl.11 of IS 302-2-30:2007 &IS:302-1:2008 (Heating) |
- |
|
|
|
| Cl.11 of IS 302-2-30:2007 &IS:302-1:2008 (Heating) |
- |
|
|
|
| Cl.11 of IS 302-2-30:2007 &IS:302-1:2008 (Heating) |
- |
|
|
|
| Cl.11 of IS 302-2-30:2007 &IS:302-1:2008 (Heating) |
- |
|
|
|
| Cl.11 of IS 302-2-30:2007 &IS:302-1:2008 (Heating) |
- |
|
|
|
| Cl.11 of IS 302-2-30:2007 &IS:302-1:2008 (Heating) |
- |
|
|
|
| Cl.11 of IS 302-2-30:2007 &IS:302-1:2008 (Heating) |
- |
|
|
|
| Cl.11 of IS 302-2-30:2007 &IS:302-1:2008 (Heating) |
- |
|
|
|
| Cl.11 of IS 302-2-30:2007 &IS:302-1:2008 (Heating) |
- |
|
|
|
| Cl.11 of IS 302-2-30:2007 &IS:302-1:2008 (Heating) |
- |
|
|
|
| Cl.11 of IS 302-2-30:2007 &IS:302-1:2008 (Heating) |
- |
|
|
|
| Cl.11 of IS 302-2-30:2007 &IS:302-1:2008 (Heating) |
- |
|
|
|
| Cl.13 of IS 302-2-30:2007 &IS:302-1:2008 (Leakage Current & Electric Strength at operating temp) |
- |
|
|
|
| Cl.16 of IS 302-2-30:2007 &IS:302-1:2008 (Leakage Current & Electric Strength ) |
- |
|
|
|
| Cl.13 of IS 302-2-30:2007 &IS:302-1:2008 (Leakage Current & Electric Strength at operating temp) |
- |
|
|
|
| Cl.15 of IS 302-2-30:2007 &IS:302-1:2008 (Moisture Resistance) |
- |
|
|
|
| Cl.15 of IS 302-2-30:2007 &IS:302-1:2008 (Moisture Resistance) |
- |
|
|
|
| Cl.16 of IS 302-2-30:2007 &IS:302-1:2008 (Leakage Current & Electric Strength ) |
- |
|
|
|
| Cl.16 of IS 302-2-30:2007 &IS:302-1:2008 (Leakage Current & Electric Strength ) |
- |
|
|
|
| Cl.19 of IS 302-2-30:2007 &IS:302-1:2008 (Abnormal Operation) |
- |
|
|
|
| Cl.19 of IS 302-2-30:2007 &IS:302-1:2008 (Abnormal Operation) |
- |
|
|
|
| Cl.11 of IS 302-2-30:2007 &IS:302-1:2008 (Heating) |
- |
|
|
|
| Cl.11 of IS 302-2-30:2007 &IS:302-1:2008 (Heating) |
- |
|
|
|
| Cl.11 of IS 302-2-30:2007 &IS:302-1:2008 (Heating) |
- |
|
|
|
| Cl.11 of IS 302-2-30:2007 &IS:302-1:2008 (Heating) |
- |
|
|
|
| Cl.19 of IS 302-2-30:2007 &IS:302-1:2008 (Abnormal Operation) |
- |
|
|
|
| Cl.19 of IS 302-2-30:2007 &IS:302-1:2008 (Abnormal Operation) |
- |
|
|
|
| Cl.19 of IS 302-2-30:2007 &IS:302-1:2008 (Abnormal Operation) |
- |
|
|
|
| Cl.11 of IS 302-2-30:2007 &IS:302-1:2008 (Heating) |
- |
|
|
|
| Cl.19 of IS 302-2-30:2007 &IS:302-1:2008 (Abnormal Operation) |
- |
|
|
|
| Cl.19 of IS 302-2-30:2007 &IS:302-1:2008 (Abnormal Operation) |
- |
|
|
|
| Cl.11 of IS 302-2-30:2007 &IS:302-1:2008 (Heating) |
- |
|
|
|
| Cl.19 of IS 302-2-30:2007 &IS:302-1:2008 (Abnormal Operation) |
- |
|
|
|
| Cl.19 of IS 302-2-30:2007 &IS:302-1:2008 (Abnormal Operation) |
- |
|
|
|
| Cl.19 of IS 302-2-30:2007 &IS:302-1:2008 (Abnormal Operation) |
- |
|
|
|
| Cl.19 of IS 302-2-30:2007 &IS:302-1:2008 (Abnormal Operation) |
- |
|
|
|
| Cl.19 of IS 302-2-30:2007 &IS:302-1:2008 (Abnormal Operation) |
- |
|
|
|
| Cl.19 of IS 302-2-30:2007 &IS:302-1:2008 (Abnormal Operation) |
- |
|
|
|
| Cl.19 of IS 302-2-30:2007 &IS:302-1:2008 (Abnormal Operation) |
- |
|
|
|
| Cl.19 of IS 302-2-30:2007 &IS:302-1:2008 (Abnormal Operation) |
- |
|
|
|
| Cl.19 of IS 302-2-30:2007 &IS:302-1:2008 (Abnormal Operation) |
- |
|
|
|
| Cl.19 of IS 302-2-30:2007 &IS:302-1:2008 (Abnormal Operation) |
- |
|
|
|
| Cl.20 of IS 302-2-30:2007 &IS:302-1:2008 (Stability & Mechanical Hazards) |
- |
|
|
|
| Cl.21 of IS 302-2-30:2007 &IS:302-1:2008 (Mechanical Strength) |
- |
|
|
|
| Cl.21 of IS 302-2-30:2007 &IS:302-1:2008 (Mechanical Strength) |
- |
|
|
|
| Cl.21 of IS 302-2-30:2007 &IS:302-1:2008 (Mechanical Strength) |
- |
|
|
|
| Cl.21 of IS 302-2-30:2007 &IS:302-1:2008 (Mechanical Strength) |
- |
|
|
|
| Cl.21 of IS 302-2-30:2007 &IS:302-1:2008 (Mechanical Strength) |
- |
|
|
|
| Cl.22 of IS 302-2-30:2007 &IS:302-1:2008 (Construction) |
- |
|
|
|
| Cl.22 of IS 302-2-30:2007 &IS:302-1:2008 (Construction) |
- |
|
|
|
| Cl.22 of IS 302-2-30:2007 &IS:302-1:2008 (Construction) |
- |
|
|
|
| Cl.24 of IS 302-2-30:2007 &IS:302-1:2008 (Component) |
- |
|
|
|
| Cl.22 of IS 302-2-30:2007 &IS:302-1:2008 (Construction) |
- |
|
|
|
| Cl.22 of IS 302-2-30:2007 &IS:302-1:2008 (Construction) |
- |
|
|
|
| Cl.22 of IS 302-2-30:2007 &IS:302-1:2008 (Construction) |
- |
|
|
|
| Cl.22 of IS 302-2-30:2007 &IS:302-1:2008 (Construction) |
- |
|
|
|
| Cl.22 of IS 302-2-30:2007 &IS:302-1:2008 (Construction) |
- |
|
|
|
| Cl.22 of IS 302-2-30:2007 &IS:302-1:2008 (Construction) |
- |
|
|
|
| Cl.22 of IS 302-2-30:2007 &IS:302-1:2008 (Construction) |
- |
|
|
|
| Cl.22 of IS 302-2-30:2007 &IS:302-1:2008 (Construction) |
- |
|
|
|
| Cl.22 of IS 302-2-30:2007 &IS:302-1:2008 (Construction) |
- |
|
|
|
| Cl.22 of IS 302-2-30:2007 &IS:302-1:2008 (Construction) |
- |
|
|
|
| Cl.23 of IS 302-2-30:2007 &IS:302-1:2008 (Internal Wiring) |
- |
|
|
|
| Cl.23 of IS 302-2-30:2007 &IS:302-1:2008 (Internal Wiring) |
- |
|
|
|
| Cl.23 of IS 302-2-30:2007 &IS:302-1:2008 (Internal Wiring) |
- |
|
|
|
| Cl.23 of IS 302-2-30:2007 &IS:302-1:2008 (Internal Wiring) |
- |
|
|
|
| Cl.23 of IS 302-2-30:2007 &IS:302-1:2008 (Internal Wiring) |
- |
|
|
|
| Cl.24 of IS 302-2-30:2007 &IS:302-1:2008 (Component) |
- |
|
|
|
| Cl.24 of IS 302-2-30:2007 &IS:302-1:2008 (Component) |
- |
|
|
|
| Cl.24 of IS 302-2-30:2007 &IS:302-1:2008 (Component) |
- |
|
|
|
| Cl.24 of IS 302-2-30:2007 &IS:302-1:2008 (Component) |
- |
|
|
|
| Cl.24 of IS 302-2-30:2007 &IS:302-1:2008 (Component) |
- |
|
|
|
|
- |
- Excluding Performance test |
| 13101 |
BIS, Northern Regional Laboratory (NRL)
| None
| IS 368 (2014) |
Electric immersion water heaters - Specification (Fifth Revision) |
- |
Please see remarks. View breakup
To keep the uniformity of testing charges for different wattage (kW), the testing charges ( taken as average of all wattage) is Rs.12600.00 (for 1 kW to 3 kW).
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| Cl.6 of IS 302-‐2-‐201:2008 (Classification) |
- |
|
|
|
| Cl.7 of IS 302-2-201:2008 (Marking and Instruction ) |
- |
|
|
|
| Cl.7 of IS 302-2-201:2008 (Marking and Instruction ) |
- |
|
|
|
| Cl.7 of IS 302-2-201:2008 (Marking and Instruction ) |
- |
|
|
|
| Cl.7 of IS 302-2-201:2008 (Marking and Instruction ) |
- |
|
|
|
| Cl.7 of IS 302-2-201:2008 (Marking and Instruction ) |
- |
|
|
|
| Cl.7 of IS 302-2-201:2008 (Marking and Instruction ) |
- |
|
|
|
| Cl.7 of IS 302-2-201:2008 (Marking and Instruction ) |
- |
|
|
|
| Cl.7 of IS 302-2-201:2008 (Marking and Instruction ) |
- |
|
|
|
| Cl.7 of IS 302-2-201:2008 (Marking and Instruction ) |
- |
|
|
|
| Cl.7 of IS 302-2-201:2008 (Marking and Instruction ) |
- |
|
|
|
| Cl.7 of IS 302-2-201:2008 (Marking and Instruction ) |
- |
|
|
|
| Cl.7 of IS 302-2-201:2008 (Marking and Instruction ) |
- |
|
|
|
| Cl.7 of IS 302-2-201:2008 (Marking and Instruction ) |
- |
|
|
|
| Cl.7 of IS 302-2-201:2008 (Marking and Instruction ) |
- |
|
|
|
| Cl.7 of IS 302-2-201:2008 (Marking and Instruction ) |
- |
|
|
|
| Cl.7 of IS 302-2-201:2008 (Marking and Instruction ) |
- |
|
|
|
| Cl.7 of IS 302-2-201:2008 (Marking and Instruction ) |
- |
|
|
|
| Cl.7 of IS 302-2-201:2008 (Marking and Instruction ) |
- |
|
|
|
| Cl.7 of IS 302-2-201:2008 (Marking and Instruction ) |
- |
|
|
|
| Cl.8 of IS 302‐2-201: 2008 (Protection Against Access to Live Parts) |
- |
|
|
|
| Cl.10 of IS 302‐2‐201:2008 (Power Input and Current ) |
- |
|
|
|
| Cl.11 of IS 302-2201: 2008 (Heating) |
- |
|
|
|
| Cl.11 of IS 302-2201: 2008 (Heating) |
- |
|
|
|
| Cl.11 of IS 302-2201: 2008 (Heating) |
- |
|
|
|
| Cl.11 of IS 302-2201: 2008 (Heating) |
- |
|
|
|
| Cl.11 of IS 302-2201: 2008 (Heating) |
- |
|
|
|
| Cl.11 of IS 302-2201: 2008 (Heating) |
- |
|
|
|
| Cl.11 of IS 302-2201: 2008 (Heating) |
- |
|
|
|
| Cl.11 of IS 302-2201: 2008 (Heating) |
- |
|
|
|
| Cl.11 of IS 302-2201: 2008 (Heating) |
- |
|
|
|
| Cl.11 of IS 302-2201: 2008 (Heating) |
- |
|
|
|
| Cl.11 of IS 302-2201: 2008 (Heating) |
- |
|
|
|
| Cl.13 of IS 302-2-201: 2008 (Leakage Current & Electric Strength at Operating Temperature) |
- |
|
|
|
| Cl.13 of IS 302-2-201: 2009 (Leakage Current & Electric Strength at Operating Temperature) |
- |
|
|
|
| Cl.15 of IS 302-2-201:2008 (Moisture Resistance ) |
- |
|
|
|
| Cl.15 of IS 302-2-201:2008 (Moisture Resistance ) |
- |
|
|
|
| Cl.16 of IS 302-2-201:2008 (Leakage Current & Electric Strength) |
- |
|
|
|
| Cl.16 of IS 302-2-201:2008 (Leakage Current & Electric Strength) |
- |
|
|
|
| Cl.18 of IS 368:2014 (Endurance) |
- |
|
|
|
| Cl.19 of IS 302‐2-201: 2008 (Abnormal Operation ) |
- |
|
|
|
| Cl.19 of IS 302‐2-201: 2008 (Abnormal Operation ) |
- |
|
|
|
| Cl.19 of IS 302‐2-201: 2008 (Abnormal Operation ) |
- |
|
|
|
| Cl.19 of IS 302‐2-201: 2008 (Abnormal Operation ) |
- |
|
|
|
| Cl.20 of IS 302-2-201: 2008 (Stability & Mechanical Hazards) |
- |
|
|
|
| Cl.21 of IS 302-2-201: 2008 (Mechanical Strength ) |
- |
|
|
|
| Cl.21 of IS 302-2-201: 2008 (Mechanical Strength ) |
- |
|
|
|
| Cl.22 of IS 302-2-201: 2008 (Construction) |
- |
|
|
|
| Cl.22 of IS 302-2-201: 2008 (Construction) |
- |
|
|
|
| Cl.22 of IS 302-2-201: 2008 (Construction) |
- |
|
|
|
| Cl.22 of IS 302-2-201: 2008 (Construction) |
- |
|
|
|
| Cl.23 of 302-2-201:2008 (Internal Wiring ) |
- |
|
|
|
| Cl.23 of 302-2-201:2008 (Internal Wiring ) |
- |
|
|
|
| Cl.23 of 302-2-201:2008 (Internal Wiring ) |
- |
|
|
|
| Cl.23 of 302-2-201:2008 (Internal Wiring ) |
- |
|
|
|
| Cl.23 of 302-2-201:2008 (Internal Wiring ) |
- |
|
|
|
| Cl.23 of 302-2-201:2008 (Internal Wiring ) |
- |
|
|
|
| Cl.23 of 302-2-201:2008 (Internal Wiring ) |
- |
|
|
|
| Cl.23 of 302-2-201:2008 (Internal Wiring ) |
- |
|
|
|
| Cl.24 of IS 302-2-201: 2008 (Component) |
- |
|
|
|
| Cl.24 of IS 302-2-201: 2008 (Component) |
- |
|
|
|
| Cl.24 of IS 302-2-201: 2008 (Component) |
- |
|
|
|
| Cl.24 of IS 302-2-201: 2008 (Component) |
- |
|
|
|
| Cl.24 of IS 302-2-201: 2008 (Component) |
- |
|
|
|
| Cl.24 of IS 302-2-201: 2008 (Component) |
- |
|
|
|
| Cl.24 of IS 302-2-201: 2008 (Component) |
- |
|
|
|
| Cl.24 of IS 302-2-201: 2008 (Component) |
- |
|
|
|
| Cl.24 of IS 302-2-201: 2008 (Component) |
- |
|
|
|
| Cl.25 of IS 302-2-201: 2008 (Supply Connection and External Flexible Cords) |
- |
|
|
|
| Cl.25 of IS 302-2-201: 2008 (Supply Connection and External Flexible Cords) |
- |
|
|
|
| Cl.25 of IS 302-2-201: 2008 (Supply Connection and External Flexible Cords) |
- |
|
|
|
| Cl.25 of IS 302-2-201: 2008 (Supply Connection and External Flexible Cords) |
- |
|
|
|
| Cl.25 of IS 302-2-201: 2008 (Supply Connection and External Flexible Cords) |
- |
|
|
|
| Cl.25 of IS 302-2-201: 2008 (Supply Connection and External Flexible Cords) |
- |
|
|
|
| Cl.25 of IS 302-2-201: 2008 (Supply Connection and External Flexible Cords) |
- |
|
|
|
| Cl.25 of IS 302-2-201: 2008 (Supply Connection and External Flexible Cords) |
- |
|
|
|
| Cl.25 of IS 302-2-201: 2008 (Supply Connection and External Flexible Cords) |
- |
|
|
|
| Cl.25 of IS 302-2-201: 2008 (Supply Connection and External Flexible Cords) |
- |
|
|
|
| Cl.25 of IS 302-2-201: 2008 (Supply Connection and External Flexible Cords) |
- |
|
|
|
| Cl.25 of IS 302-2-201: 2008 (Supply Connection and External Flexible Cords) |
- |
|
|
|
| Cl.25 of IS 302-2-201: 2008 (Supply Connection and External Flexible Cords) |
- |
|
|
|
| Cl.25 of IS 302-2-201: 2008 (Supply Connection and External Flexible Cords) |
- |
|
|
|
| Cl.25 of IS 302-2-201: 2008 (Supply Connection and External Flexible Cords) |
- |
|
|
|
| Cl.25 of IS 302-2-201: 2008 (Supply Connection and External Flexible Cords) |
- |
|
|
|
| Cl.25 of IS 302-2-201: 2008 (Supply Connection and External Flexible Cords) |
- |
|
|
|
| Cl.26 of IS 302-2-201: 2008 (Terminals for External Conductors) |
- |
|
|
|
| Cl.27 of IS 302-2-201: 2008 (Provision for Earthing ) |
- |
|
|
|
| Cl.27 of IS 302-2-201: 2008 (Provision for Earthing ) |
- |
|
|
|
| Cl.27 of IS 302-2-201: 2008 (Provision for Earthing ) |
- |
|
|
|
| Cl.27 of IS 302-2-201: 2008 (Provision for Earthing ) |
- |
|
|
|
| Cl.27 of IS 302-2-201: 2008 (Provision for Earthing ) |
- |
|
|
|
| Cl.27 of IS 302-2-201: 2008 (Provision for Earthing ) |
- |
|
|
|
| Cl.28 of IS 302-2-201: 2008 (Screws & Connections ) |
- |
|
|
|
| Cl.29 of IS 302-2‐201:2008 (Clearances, Creepage Distances and Solid Insulation ) |
- |
|
|
|
| Cl.29 of IS 302-2‐201:2008 (Clearances, Creepage Distances and Solid Insulation ) |
- |
|
|
|
| Cl.30 of IS 302-2‐201:2008 (Resistance to Heat and Fire ) |
- |
|
|
|
| Cl.30 of IS 302-2‐201:2008 (Resistance to Heat and Fire ) |
- |
|
|
|
| Cl.31 of IS 302-2-201:2008 (Resistance of Rusting ) |
- |
|
|
|
| Cl.32 of IS 302-2-201:2008 (Radiation, Toxicity and Similar Hazards) |
- |
|
|
|
|
- |
- Excluding test facility not availble for rating above 3kW |
| 13102 |
BIS, Northern Regional Laboratory (NRL)
| None
| IS 302 : Part 2 : Sec 202 (1992) |
Safety of household and similar electrical appliances: Part 2 particular requirements: Sec 202 electric stoves |
- |
Rs 2275/- View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 6 (Classification- IS 302-1 ) |
- |
|
|
|
| 6 (Classification- IS 302-1) |
- |
|
|
|
| 7.1 (Marking- IS 302-1) |
- |
|
|
|
| 7.1 (Marking- IS 302-1) |
- |
|
|
|
| 7.1 (Marking- IS 302-1) |
- |
|
|
|
| 7.1 (Marking- IS 302-1) |
- |
|
|
|
| 7.1 (Marking- IS 302-1) |
- |
|
|
|
| 7.1 (Marking- IS 302-1) |
- |
|
|
|
| 7.1 (Marking- IS 302-1) |
- |
|
|
|
| 7.1 (Marking- IS 302-1) |
- |
|
|
|
| 7.1 (Marking- IS 302-1) |
- |
|
|
|
| 7.3 (Marking- IS 302-1) |
- |
|
|
|
| 7.4 (Marking- IS 302-1) |
- |
|
|
|
| 7.6 (Marking- IS 302-1) |
- |
|
|
|
| 7.11 (Marking- IS 302-1) |
- |
|
|
|
| 7.12 (Marking- IS 302-1) |
- |
|
|
|
| 7.13 (Marking- IS 302-1) |
- |
|
|
|
| 7.14 (Marking- IS 302-1) |
- |
|
|
|
| 7.15 (Marking- IS 302-1) |
- |
|
|
|
| 7.101 (Marking) |
- |
|
|
|
| 8 ( Protection Against Electric Shock, IS 302-1) |
- |
|
|
|
| 10 (Power Input and Current, IS 302-1) |
- |
|
|
|
| 11 (Heating, IS 302-1) |
- |
|
|
|
| 11 (Heating, IS 302-1) |
- |
|
|
|
| 11 (Heating, IS 302-1) |
- |
|
|
|
| 11 (Heating, IS 302-1) |
- |
|
|
|
| 11 (Heating, IS 302-1) |
- |
|
|
|
| 11 (Heating, IS 302-1) |
- |
|
|
|
| 11 (Heating, IS 302-1) |
- |
|
|
|
| 13 (Electrical Insulation and Leakage Current at Operating Temperature: Leakage current, IS 302-1) |
- |
|
|
|
| 13 (Electrical Insulation and Leakage Current at Operating Temperature: High Voltage, IS 302-1) |
- |
|
|
|
| 15.1 (Moisture Resistance, IS 302-1) |
- |
|
|
|
| 15.3 (Moisture Resistance, IS 302-1) |
- |
|
|
|
| 16 (Electrical Insulation and Leakage Current at Operating Temperature: Leakage current, IS 302-1) |
- |
|
|
|
| 16 (Electrical Insulation and Leakage Current at Operating Temperature: High Voltage, IS 302-1) |
- |
|
|
|
| 19.2 (Abnormal Operation, IS 302-1) |
- |
|
|
|
| 19.2 (Abnormal Operation, IS 302-1) |
- |
|
|
|
| 19.3 (Abnormal Operation, IS 302-1) |
- |
|
|
|
| 19.3 (Abnormal Operation, IS 302-1) |
- |
|
|
|
| 20.1 (Stability & Mechanical Hazards, IS 302-1) |
- |
|
|
|
| 21.1 (Mechanical Strength, IS 302-1 & IS 302-2-202) |
- |
|
|
|
| 22 (Construction, IS 302-1) |
- |
|
|
|
| 22.101 (Construction) |
- |
|
|
|
| 22.102 (Construction) |
- |
|
|
|
| 22.103 (Construction) |
- |
|
|
|
| 22.104 (Construction) |
- |
|
|
|
| 22.105 (Construction) |
- |
|
|
|
| 22.105.1 (Construction) |
- |
|
|
|
| 22.105.2 (Construction) |
- |
|
|
|
| 22.106 (Construction) |
- |
|
|
|
| 22.107 (Construction) |
- |
|
|
|
| 11.107.1 (Construction) |
- |
|
|
|
| 23.1 (Internal Wiring, IS 302-1) |
- |
|
|
|
| 23.2 (Internal Wiring, IS 302-1) |
- |
|
|
|
| 23.8 (Internal Wiring, IS 302-1) |
- |
|
|
|
| 23.9 (Internal Wiring, IS 302-1) |
- |
|
|
|
| 23.10 (Internal Wiring, IS 302-1) |
- |
|
|
|
| 24.1 (Components, IS 302-1) |
- |
|
|
|
| 24.2 (Components, IS 302-1) |
- |
|
|
|
| 24.101 (Components) |
- |
|
|
|
| 25.1 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25.4 (Supply Connection and External Flexible Cords) |
- |
|
|
|
| 25.5 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25.6 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25.8 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 26.9 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25.1 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25.11 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25.12 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25.15 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25.16 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25.17 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25.18 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25.19 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25.2 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25.21 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25.22 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 26 (Terminals for External Conductors, IS 302-1) |
- |
|
|
|
| 27.1 (Provision for Earthing, IS 302-1) |
- |
|
|
|
| 27.2 (Provision for Earthing, IS 302-1) |
- |
|
|
|
| 27.3 (Provision for Earthing, IS 302-1) |
- |
|
|
|
| 27.4 (Provision for Earthing, IS 302-1) |
- |
|
|
|
| 27.5 (Provision for Earthing, IS 302-1) |
- |
|
|
|
| 28 (Screws & Connections, IS 302-1) |
- |
|
|
|
| 29.1 (Clearances, Creepage distances and Solid Insulation, IS 302-1) |
- |
|
|
|
| 29.2 (Clearances, Creepage distances and Solid Insulation, IS 302-1) |
- |
|
|
|
| 30.1 (Resistance to Heat, Fire & Tracking, IS 302-1) |
- |
|
|
|
| 30.2 (Resistance to Heat, Fire & Tracking, IS 302-1) |
- |
|
|
|
| 31 (Resistance of Rusting, IS 302-1) |
- |
|
|
|
|
- |
- Except 1. Cl. 14 Transient Overvoltage Test IS 302-1:2008 2. Cl. 19.11 and Cl. 19.12 abnormal test (for Electronic circuit) 3. Cl.24 Component Test IS 302-1:2008 |
| 13103 |
BIS, Northern Regional Laboratory (NRL)
| None
| IS 302 : Part 2 : Sec 201 (2008) |
Safety of household and similar electrical appliances: Part 2 particular requirements: Sec 201 electric immersion water heaters (First Revision) |
- |
Rs 6900/ View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| Cl.6 of IS 302-‐2-‐201:2008 (Classification) |
- |
|
|
|
| Cl.7 of IS 302-2-201:2008 (Marking and Instruction ) |
- |
|
|
|
| Cl.7 of IS 302-2-201:2008 (Marking and Instruction ) |
- |
|
|
|
| Cl.7 of IS 302-2-201:2008 (Marking and Instruction ) |
- |
|
|
|
| Cl.7 of IS 302-2-201:2008 (Marking and Instruction ) |
- |
|
|
|
| Cl.7 of IS 302-2-201:2008 (Marking and Instruction ) |
- |
|
|
|
| Cl.7 of IS 302-2-201:2008 (Marking and Instruction ) |
- |
|
|
|
| Cl.7 of IS 302-2-201:2008 (Marking and Instruction ) |
- |
|
|
|
| Cl.7 of IS 302-2-201:2008 (Marking and Instruction ) |
- |
|
|
|
| Cl.7 of IS 302-2-201:2008 (Marking and Instruction ) |
- |
|
|
|
| Cl.7 of IS 302-2-201:2008 (Marking and Instruction ) |
- |
|
|
|
| Cl.7 of IS 302-2-201:2008 (Marking and Instruction ) |
- |
|
|
|
| Cl.7 of IS 302-2-201:2008 (Marking and Instruction ) |
- |
|
|
|
| Cl.7 of IS 302-2-201:2008 (Marking and Instruction ) |
- |
|
|
|
| Cl.7 of IS 302-2-201:2008 (Marking and Instruction ) |
- |
|
|
|
| Cl.7 of IS 302-2-201:2008 (Marking and Instruction ) |
- |
|
|
|
| Cl.7 of IS 302-2-201:2008 (Marking and Instruction ) |
- |
|
|
|
| Cl.7 of IS 302-2-201:2008 (Marking and Instruction ) |
- |
|
|
|
| Cl.7 of IS 302-2-201:2008 (Marking and Instruction ) |
- |
|
|
|
| Cl.7 of IS 302-2-201:2008 (Marking and Instruction ) |
- |
|
|
|
| Cl.7 of IS 302-2-201:2008 (Marking and Instruction ) |
- |
|
|
|
| Cl.8 of IS 302‐2-201: 2008 (Protection Against Access to Live Parts) |
- |
|
|
|
| Cl.10 of IS 302‐2‐201:2008 (Power Input and Current ) |
- |
|
|
|
| Cl.11 of IS 302-2201: 2008 (Heating) |
- |
|
|
|
| Cl.11 of IS 302-2201: 2008 (Heating) |
- |
|
|
|
| Cl.11 of IS 302-2201: 2008 (Heating) |
- |
|
|
|
| Cl.11 of IS 302-2201: 2008 (Heating) |
- |
|
|
|
| Cl.11 of IS 302-2201: 2008 (Heating) |
- |
|
|
|
| Cl.11 of IS 302-2201: 2008 (Heating) |
- |
|
|
|
| Cl.11 of IS 302-2201: 2008 (Heating) |
- |
|
|
|
| Cl.11 of IS 302-2201: 2008 (Heating) |
- |
|
|
|
| Cl.11 of IS 302-2201: 2008 (Heating) |
- |
|
|
|
| Cl.11 of IS 302-2201: 2008 (Heating) |
- |
|
|
|
| Cl.11 of IS 302-2201: 2008 (Heating) |
- |
|
|
|
| Cl.13 of IS 302-2-201: 2008 (Leakage Current & Electric Strength at Operating Temperature) |
- |
|
|
|
| Cl.15 of IS 302-2-201:2008 (Moisture Resistance ) |
- |
|
|
|
| Cl.15 of IS 302-2-201:2008 (Moisture Resistance ) |
- |
|
|
|
| Cl.16 of IS 302-2-201:2008 (Leakage Current & Electric Strength) |
- |
|
|
|
| Cl.16 of IS 302-2-201:2008 (Leakage Current & Electric Strength) |
- |
|
|
|
| Cl.19 of IS 302‐2-201: 2008 (Abnormal Operation ) |
- |
|
|
|
| Cl.19 of IS 302‐2-201: 2008 (Abnormal Operation ) |
- |
|
|
|
| Cl.19 of IS 302‐2-201: 2008 (Abnormal Operation ) |
- |
|
|
|
| Cl.19 of IS 302‐2-201: 2008 (Abnormal Operation ) |
- |
|
|
|
| Cl.20 of IS 302-2-201: 2008 (Stability & Mechanical Hazards) |
- |
|
|
|
| Cl.21 of IS 302-2-201: 2008 (Mechanical Strength ) |
- |
|
|
|
| Cl.21 of IS 302-2-201: 2008 (Mechanical Strength ) |
- |
|
|
|
| Cl.21 of IS 302-2-201: 2008 (Mechanical Strength ) |
- |
|
|
|
| Cl.22 of IS 302-2-201: 2008 (Construction) |
- |
|
|
|
| Cl.23 of 302-2-201:2008 (Internal Wiring ) |
- |
|
|
|
| Cl.23 of 302-2-201:2008 (Internal Wiring ) |
- |
|
|
|
| Cl.23 of 302-2-201:2008 (Internal Wiring ) |
- |
|
|
|
| Cl.23 of 302-2-201:2008 (Internal Wiring ) |
- |
|
|
|
| Cl.23 of 302-2-201:2008 (Internal Wiring ) |
- |
|
|
|
| Cl.23 of 302-2-201:2008 (Internal Wiring ) |
- |
|
|
|
| Cl.23 of 302-2-201:2008 (Internal Wiring ) |
- |
|
|
|
| Cl.23 of 302-2-201:2008 (Internal Wiring ) |
- |
|
|
|
| Cl.23 of 302-2-201:2008 (Internal Wiring ) |
- |
|
|
|
| Cl.24 of IS 302-2-201: 2008 (Component) |
- |
|
|
|
| Cl.24 of IS 302-2-201: 2008 (Component) |
- |
|
|
|
| Cl.24 of IS 302-2-201: 2008 (Component) |
- |
|
|
|
| Cl.24 of IS 302-2-201: 2008 (Component) |
- |
|
|
|
| Cl.24 of IS 302-2-201: 2008 (Component) |
- |
|
|
|
| Cl.24 of IS 302-2-201: 2008 (Component) |
- |
|
|
|
| Cl.24 of IS 302-2-201: 2008 (Component) |
- |
|
|
|
| Cl.24 of IS 302-2-201: 2008 (Component) |
- |
|
|
|
| Cl.25 of IS 302-2-201: 2008 (Supply Connection and External Flexible Cords) |
- |
|
|
|
| Cl.25 of IS 302-2-201: 2008 (Supply Connection and External Flexible Cords) |
- |
|
|
|
| Cl.25 of IS 302-2-201: 2008 (Supply Connection and External Flexible Cords) |
- |
|
|
|
| Cl.25 of IS 302-2-201: 2008 (Supply Connection and External Flexible Cords) |
- |
|
|
|
| Cl.25 of IS 302-2-201: 2008 (Supply Connection and External Flexible Cords) |
- |
|
|
|
| Cl.25 of IS 302-2-201: 2008 (Supply Connection and External Flexible Cords) |
- |
|
|
|
| Cl.25 of IS 302-2-201: 2008 (Supply Connection and External Flexible Cords) |
- |
|
|
|
| Cl.25 of IS 302-2-201: 2008 (Supply Connection and External Flexible Cords) |
- |
|
|
|
| Cl.25 of IS 302-2-201: 2008 (Supply Connection and External Flexible Cords) |
- |
|
|
|
| Cl.25 of IS 302-2-201: 2008 (Supply Connection and External Flexible Cords) |
- |
|
|
|
| Cl.25 of IS 302-2-201: 2008 (Supply Connection and External Flexible Cords) |
- |
|
|
|
| Cl.25 of IS 302-2-201: 2008 (Supply Connection and External Flexible Cords) |
- |
|
|
|
| Cl.25 of IS 302-2-201: 2008 (Supply Connection and External Flexible Cords) |
- |
|
|
|
| Cl.25 of IS 302-2-201: 2008 (Supply Connection and External Flexible Cords) |
- |
|
|
|
| Cl.25 of IS 302-2-201: 2008 (Supply Connection and External Flexible Cords) |
- |
|
|
|
| Cl.25 of IS 302-2-201: 2008 (Supply Connection and External Flexible Cords) |
- |
|
|
|
| Cl.25 of IS 302-2-201: 2008 (Supply Connection and External Flexible Cords) |
- |
|
|
|
| Cl.25 of IS 302-2-201: 2008 (Supply Connection and External Flexible Cords) |
- |
|
|
|
| Cl.25 of IS 302-2-201: 2008 (Supply Connection and External Flexible Cords) |
- |
|
|
|
| Cl.25 of IS 302-2-201: 2008 (Supply Connection and External Flexible Cords) |
- |
|
|
|
| Cl.26 of IS 302-2-201: 2008 (Terminals for External Conductors) |
- |
|
|
|
| Cl.27 of IS 302-2-201: 2008 (Provision for Earthing ) |
- |
|
|
|
| Cl.27 of IS 302-2-201: 2008 (Provision for Earthing ) |
- |
|
|
|
| Cl.27 of IS 302-2-201: 2008 (Provision for Earthing ) |
- |
|
|
|
| Cl.27 of IS 302-2-201: 2008 (Provision for Earthing ) |
- |
|
|
|
| Cl.27 of IS 302-2-201: 2008 (Provision for Earthing ) |
- |
|
|
|
| Cl.27 of IS 302-2-201: 2008 (Provision for Earthing ) |
- |
|
|
|
| Cl.28 of IS 302-2-201: 2008 (Screws & Connections ) |
- |
|
|
|
| Cl.29 of IS 302-2‐201:2008 (Clearances, Creepage Distances and Solid Insulation ) |
- |
|
|
|
| Cl.30 of IS 302-2‐201:2008 (Resistance to Heat and Fire ) |
- |
|
|
|
| Cl.31 of IS 302-2-201:2008 (Resistance of Rusting ) |
- |
|
|
|
| Cl.32 of IS 302-2-201:2008 (Radiation, Toxicity and Similar Hazards) |
- |
|
|
|
|
- |
- Excluding test facility not availble for rating above 3kW |
| 13104 |
BIS, Northern Regional Laboratory (NRL)
| None
| IS 302 : Part 2 : Sec 30 (2007) |
Safety of household and similar electrical appliances: Part 2 particular requirements: Sec 30 room heaters (First Revision) |
- |
Please see remarks View breakup
Rs.9950/- up to and including 1 Kw Rs. 10900/- up to and including 2 Kw
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| Cl.6 (Classification) |
- |
|
|
|
| Cl.6 (Classification) |
- |
|
|
|
| Cl.7 & IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7 & IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7 & IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7 & IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7 & IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7 & IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7 & IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7 & IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7 & IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7 (Marking and Instructions) |
- |
|
|
|
| Cl.7 (Marking and Instructions) |
- |
|
|
|
| Cl.7 (Marking and Instructions) |
- |
|
|
|
| Cl.7.3 (Marking and Instructions) |
- |
|
|
|
| Cl.7.3 (Marking and Instructions) |
- |
|
|
|
| Cl.7.3 (Marking and Instructions) |
- |
|
|
|
| Cl.7.4 (Marking and Instructions) |
- |
|
|
|
| Cl.7.5 (Marking and Instructions) |
- |
|
|
|
| Cl.7.6 & IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7.8 of IS :302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7.9 of IS :302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7.10 of IS :302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7.11 of IS :302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7.12 & IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7.12 & IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7.12 & IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7.12 & IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7.12 & IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7.12 & IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7.12 & IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7.12 & IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7.12 & IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7.12 & IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7.12 & IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7.12 & IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7.12.1 & IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7.12.1 & IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7.12.1 & IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7.12.1 & IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7.12.1 & IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7.12.1 & IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7.12.1 & IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7.12.1 & IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7.12.1 & IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7.12.1 & IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7.12.1 & IS:302-1:2009 (Marking and Instructions) |
- |
|
|
|
| Cl.7.13 of IS 302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7.14 of IS302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7.14 (Marking and Instructions) |
- |
|
|
|
| Cl.7.14 (Marking and Instructions) |
- |
|
|
|
| Cl.7.15 of IS 302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7.15 of IS 302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7.15 of IS 302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7.15 of IS 302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.8 & IS:302-1:2008 (Protection Against Access to Live Parts) |
- |
|
|
|
| Cl.10 & IS:302-1:2008 (Power Input and Current) |
- |
|
|
|
| Cl.11 & IS:302-1:2008 (Heating) |
- |
|
|
|
| Cl.11 & IS:302-1:2008 (Heating) |
- |
|
|
|
| Cl.11 & IS:302-1:2008 (Heating) |
- |
|
|
|
| Cl.11 & IS:302-1:2008 (Heating) |
- |
|
|
|
| Cl.11 & IS:302-1:2008 (Heating) |
- |
|
|
|
| Cl.11 & IS:302-1:2008 (Heating) |
- |
|
|
|
| Cl.11 & IS:302-1:2008 (Heating) |
- |
|
|
|
| Cl.11 & IS:302-1:2008 (Heating) |
- |
|
|
|
| Cl.11 & IS:302-1:2008 (Heating) |
- |
|
|
|
| Cl.11 & IS:302-1:2008 (Heating) |
- |
|
|
|
| Cl.11 & IS:302-1:2008 (Heating) |
- |
|
|
|
| Cl.11 & IS:302-1:2008 (Heating) |
- |
|
|
|
| Cl.11 & IS:302-1:2008 (Heating) |
- |
|
|
|
| Cl.11.8 (Heating) |
- |
|
|
|
| Cl.11.8 (Heating) |
- |
|
|
|
| Cl.11.8 (Heating) |
- |
|
|
|
| Cl.13 & IS:302-1:2008 (Leakage Current & Electric Strength at operating temp. ) |
- |
|
|
|
| Cl.13 & IS:302-1:2008 (Leakage Current & Electric Strength at operating temp. ) |
- |
|
|
|
| Cl.15 & IS: 302-1:2008 (Moisture Resistance
) |
- |
|
|
|
| Cl.15.3 of IS 302-1:200 (Moisture Resistance
) |
- |
|
|
|
| Cl.16 & IS:302-1:2008 (Leakage Current & Electric Strength ) |
- |
|
|
|
| Cl.16 & IS:302-1:2008 (Leakage Current & Electric Strength ) |
- |
|
|
|
| Cl.19 & IS:302-1:2008 (Abnormal Operation.) |
- |
|
|
|
| Cl.19 & IS:302-1:2008 (Abnormal Operation.) |
- |
|
|
|
| Cl.19 & IS:302-1:2008 (Abnormal Operation.) |
- |
|
|
|
| Cl.19 & IS:302-1:2008 (Abnormal Operation.) |
- |
|
|
|
| Cl.19.101 (Abnormal Operation.) |
- |
|
|
|
| Cl.19.102 (Abnormal Operation.) |
- |
|
|
|
| Cl.19.103 (Abnormal Operation.) |
- |
|
|
|
| Cl.19.104 (Abnormal Operation.) |
- |
|
|
|
| Cl.19.105 (Abnormal Operation.) |
- |
|
|
|
| Cl.19.106 (Abnormal Operation.) |
- |
|
|
|
| Table 8 of IS 302-1:2008 (Abnormal Operation.) |
- |
|
|
|
| Cl.19.107 (Abnormal Operation.) |
- |
|
|
|
| Cl.19.108 (Abnormal Operation.) |
- |
|
|
|
| Cl.19.109 (Abnormal Operation.) |
- |
|
|
|
| Cl.19.110 (Abnormal Operation.) |
- |
|
|
|
| Cl.19.111 (Abnormal Operation.) |
- |
|
|
|
| Cl.19.112 (Abnormal Operation.) |
- |
|
|
|
| Cl.19.113 (Abnormal Operation.) |
- |
|
|
|
| Cl.19.114 (Abnormal Operation.) |
- |
|
|
|
| Cl.20 & IS:302-1:2008 (Stability & Mechanical Hazards) |
- |
|
|
|
| Cl.21 & IS:302-1:2008) (Mechanical Strength.) |
- |
|
|
|
| Cl.21.2 of IS 302-1:2008 (Mechanical Strength.) |
- |
|
|
|
| Cl.21.101 (Mechanical Strength.) |
- |
|
|
|
| Cl.21.102 (Mechanical Strength.) |
- |
|
|
|
| Cl.21.103 (Mechanical Strength.) |
- |
|
|
|
| Cl.22.1 of IS 302-1:2008 (Construction) |
- |
|
|
|
| Cl.22.5 of IS 302-1:2008 (Construction) |
- |
|
|
|
| Cl.22.6 of IS 302-1:2008 (Construction) |
- |
|
|
|
| Cl.22.7 of IS 302-1:2008 (Construction) |
- |
|
|
|
| Cl.22.8 of IS 302-1:2008 (Construction) |
- |
|
|
|
| Cl.22.9 of IS 302-1:2008 (Construction) |
- |
|
|
|
| Cl.22.11 (Construction) |
- |
|
|
|
| Cl.22.12 of IS 302-1:2008 (Construction) |
- |
|
|
|
| Cl.22.13 of IS 302-1:2008 (Construction) |
- |
|
|
|
| Cl.22.15 of IS 302-1:2008 (Construction) |
- |
|
|
|
| Cl.22.18 of IS 302-1:2008 (Construction) |
- |
|
|
|
| Cl.22.20 of IS 302-1:2008 (Construction) |
- |
|
|
|
| Cl.22.21 of IS 302-1:2008 (Construction) |
- |
|
|
|
| Cl.23 & IS:302-1:2008 (Internal Wiring
) |
- |
|
|
|
| Cl.23.4 & Cl.29 of 302-1:2008 (Internal Wiring
) |
- |
|
|
|
| Cl.23.5 of 302-1:2008 (Internal Wiring
) |
- |
|
|
|
| Cl.23.7 of 302-1:2008 (Internal Wiring
) |
- |
|
|
|
| C.23.7 of 302-1:2008 (Internal Wiring
) |
- |
|
|
|
| Cl.24.1 of 302-1:2008 (Component) |
- |
|
|
|
| Cl.24.1 of 302-1:2008 (Component) |
- |
|
|
|
| Cl.24.1.3 (Component) |
- |
|
|
|
| Cl.24.1.3 (Component) |
- |
|
|
|
| Cl.24.1.3 (Component) |
- |
|
|
|
| Cl.24.1.3 (Component) |
- |
|
|
|
| C.24.2 of 302-1:2008 (Component) |
- |
|
|
|
| Cl.24.10 (Component) |
- |
|
|
|
| Cl.24.1 of 302-1:2008 (Component) |
- |
|
|
|
| Cl.24.1 of 302-1:2008 (Component) |
- |
|
|
|
| Cl.24.1.3 (Component) |
- |
|
|
|
| Cl.24.1.3 (Component) |
- |
|
|
|
| Cl.24.1.3 (Component) |
- |
|
|
|
| Cl.24.1.3 (Component) |
- |
|
|
|
| C.24.2 of 302-1:2008 (Component) |
- |
|
|
|
| Cl.24.10 (Component) |
- |
|
|
|
| Cl.25.1 of 302-1:2008 (Supply Connection and External Flexible Cords ) |
- |
|
|
|
| Cl. 25.2 of IS 3021:2008 (Supply Connection and External Flexible Cords ) |
- |
|
|
|
| Cl. 25.3 of IS 302-1:2008 (Supply Connection and External Flexible Cords ) |
- |
|
|
|
| Cl. 25.4 of IS 302-1:2008 (Supply Connection and External Flexible Cords ) |
- |
|
|
|
| Cl.25.5 of 302-1:2008 (Supply Connection and External Flexible Cords ) |
- |
|
|
|
| Cl.25.6 of 302-1:2008 (Supply Connection and External Flexible Cords ) |
- |
|
|
|
| Cl.25.7. (Supply Connection and External Flexible Cords ) |
- |
|
|
|
| Cl.25.8 (Supply Connection and External Flexible Cords ) |
- |
|
|
|
| Cl. 25.9 (Supply Connection and External Flexible Cords ) |
- |
|
|
|
| Cl.25.10 of 302-1:2008 (Supply Connection and External Flexible Cords ) |
- |
|
|
|
| Cl. 25.11 (Supply Connection and External Flexible Cords ) |
- |
|
|
|
| Cl. 25.12 (Supply Connection and External Flexible Cords ) |
- |
|
|
|
| Cl. 25.13 (Supply Connection and External Flexible Cords ) |
- |
|
|
|
| Cl.7.101 (Marking and Instructions) |
- |
|
|
|
| Cl.25.14 of IS 302-1:2008 (Supply Connection and External Flexible Cords ) |
- |
|
|
|
| Cl.25.15 of IS 302-1:2008 (Supply Connection and External Flexible Cords ) |
- |
|
|
|
| Cl.25.17 of IS 302-1:2008 (Supply Connection and External Flexible Cords ) |
- |
|
|
|
| Cl.25.18 (Supply Connection and External Flexible Cords ) |
- |
|
|
|
| Cl.25.20 (Supply Connection and External Flexible Cords ) |
- |
|
|
|
| Cl.26.1 of IS 302-1:2008 (Terminal for External Conductors
) |
- |
|
|
|
| Cl.26.10 of IS 302-1:2008 (Terminal for External Conductors
) |
- |
|
|
|
| Cl.26.11 of IS 302-1:2008 (Terminal for External Conductors
) |
- |
|
|
|
| Cl.27.1 of 302-1:2008 (Provision for Earthing.) |
- |
|
|
|
| Cl.27.5 of 302-1:2008 (Provision for Earthing.) |
- |
|
|
|
| Cl.28 of 302-1:2008 (Screws and Connections.) |
- |
|
|
|
| Cl.29 & IS:302-1:2008 (Clearances, Creepage Distances and Solid Insulation) |
- |
|
|
|
| Cl.29 & IS:302-1:2008 (Clearances, Creepage Distances and Solid Insulation) |
- |
|
|
|
| Cl.30 & IS:302-1:2008 (Resistance to Heat and Fire) |
- |
|
|
|
| Cl.30.2.2 of 302-1:2008 (Resistance to Heat and Fire) |
- |
|
|
|
| Cl.31 & IS:302-1:2008 (Resistance to Rusting.) |
- |
|
|
|
| Cl.32 & IS:302-1:2008 (Radition,Toxicity and similar Hazards.) |
- |
|
|
|
|
- |
- Excluding 1. Cl. 14 Transient Overvoltage Test IS 302-1:2008 2. Cl. 19.11 and Cl. 19.12 abnormal test (for Electronic circuit) 3. Cl.24 Component Test IS 302-1:2008 |
| 13105 |
BIS, Northern Regional Laboratory (NRL)
| None
| IS 302 : Part 2 : Sec 14 (2009) |
Safety of household and similar electrical appliances: Part 2 particular requirements: Sec 14 electric kitchen machines (First Revision) |
- |
Rs.9800/- View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 6 (Classification- IS 302-1 ) |
- |
|
|
|
| 6 (Classification- IS 302-1) |
- |
|
|
|
| 7.1 (Marking- IS 302-1) |
- |
|
|
|
| 7.1 (Marking- IS 302-1) |
- |
|
|
|
| 7.1 (Marking- IS 302-1) |
- |
|
|
|
| 7.1 (Marking- IS 302-1) |
- |
|
|
|
| 7.1 (Marking- IS 302-1) |
- |
|
|
|
| 7.1 (Marking- IS 302-1) |
- |
|
|
|
| 7.1 (Marking- IS 302-1) |
- |
|
|
|
| 7.1 (Marking- IS 302-1) |
- |
|
|
|
| 7.3 (Marking- IS 302-1) |
- |
|
|
|
| 7.4 (Marking- IS 302-1) |
- |
|
|
|
| 7.6 (Marking- IS 302-1) |
- |
|
|
|
| 7.7 (Marking- IS 302-1) |
- |
|
|
|
| 7.8 (Marking- IS 302-1) |
- |
|
|
|
| 7.11 (Marking- IS 302-1) |
- |
|
|
|
| 7.12 (Marking- IS 302-1) |
- |
|
|
|
| 7.13 (Marking- IS 302-1) |
- |
|
|
|
| 7.14 (Marking- IS 302-1) |
- |
|
|
|
| 7.15 (Marking- IS 302-1) |
- |
|
|
|
| 7.101 (Marking) |
- |
|
|
|
| 8 ( Protection Against Electric Shock, IS 302-1) |
- |
|
|
|
| 10 (Power Input and Current, IS 302-1) |
- |
|
|
|
| 11 (Heating, IS 302-1) |
- |
|
|
|
| 11 (Heating, IS 302-1) |
- |
|
|
|
| 11 (Heating, IS 302-1) |
- |
|
|
|
| 11 (Heating, IS 302-1) |
- |
|
|
|
| 11 (Heating, IS 302-1) |
- |
|
|
|
| 8 ( Protection Against Electric Shock, IS 302-1) |
- |
|
|
|
| 13 (Electrical Insulation and Leakage Current at Operating Temperature: Leakage current, IS 302-1) |
- |
|
|
|
| 13 (Electrical Insulation and Leakage Current at Operating Temperature: High Voltage, IS 302-1) |
- |
|
|
|
| 15.1 (Moisture Resistance, IS 302-1) |
- |
|
|
|
| 15.2 (Moisture Resistance, IS 302-1) |
- |
|
|
|
| 15.1 (Moisture Resistance, IS 302-1) |
- |
|
|
|
| 16 (Electrical Insulation and Leakage Current at Operating Temperature: Leakage current, IS 302-1) |
- |
|
|
|
| 16 (Electrical Insulation and Leakage Current at Operating Temperature: High Voltage, IS 302-1) |
- |
|
|
|
| 19.7 (Abnormal Operation, IS 302-1) |
- |
|
|
|
| 19.8 (Abnormal Operation, IS 302-1) |
- |
|
|
|
| 19.9 (Abnormal Operation, IS 302-1) |
- |
|
|
|
| 19.1 (Abnormal Operation, IS 302-1) |
- |
|
|
|
| 19.101 (Abnormal Operation) |
- |
|
|
|
| 19.102 (Abnormal Operation) |
- |
|
|
|
| 20.1 (Stability & Mechanical Hazards, IS 302-1) |
- |
|
|
|
| 20.2 (Stability & Mechanical Hazards, IS 302-1) |
- |
|
|
|
| 20.101 (Stability & Mechanical Hazards) |
- |
|
|
|
| 20.102 (Stability & Mechanical Hazards) |
- |
|
|
|
| 20.103 (Stability & Mechanical Hazards) |
- |
|
|
|
| 20.104 (Stability & Mechanical Hazards) |
- |
|
|
|
| 20.105 (Stability & Mechanical Hazards) |
- |
|
|
|
| 20.106 (Stability & Mechanical Hazards) |
- |
|
|
|
| 20.107 (Stability & Mechanical Hazards) |
- |
|
|
|
| 20.108 (Stability & Mechanical Hazards) |
- |
|
|
|
| 20.109 (Stability & Mechanical Hazards) |
- |
|
|
|
| 20.110 (Stability & Mechanical Hazards) |
- |
|
|
|
| 20.111 (Stability & Mechanical Hazards) |
- |
|
|
|
| 20.112 (Stability & Mechanical Hazards) |
- |
|
|
|
| 20.113 (Stability & Mechanical Hazards) |
- |
|
|
|
| 20.114 (Stability & Mechanical Hazards) |
- |
|
|
|
| 20.115 (Stability & Mechanical Hazards) |
- |
|
|
|
| 20.116 (Stability & Mechanical Hazards) |
- |
|
|
|
| 21.1 (Mechanical Strength, IS 302-1) |
- |
|
|
|
| 21.2 (Mechanical Strength, IS 302-1) |
- |
|
|
|
| 22 (Construction, IS 302-1) |
- |
|
|
|
| 22.101 (Construction) |
- |
|
|
|
| 22.102 (Construction) |
- |
|
|
|
| 23.1 (Internal Wiring, IS 302-1) |
- |
|
|
|
| 23.2 (Internal Wiring, IS 302-1) |
- |
|
|
|
| 23.3 (Internal Wiring, IS 302-1) |
- |
|
|
|
| 23.4 (Internal Wiring, IS 302-1) |
- |
|
|
|
| 23.5 (Internal Wiring, IS 302-1) |
- |
|
|
|
| 23.6 (Internal Wiring, IS 302-1) |
- |
|
|
|
| 23.7 (Internal Wiring, IS 302-1) |
- |
|
|
|
| 23.8 (Internal Wiring, IS 302-1) |
- |
|
|
|
| 23.9 (Internal Wiring, IS 302-1) |
- |
|
|
|
| 23.10 (Internal Wiring, IS 302-1) |
- |
|
|
|
| 24.1 (Components, IS 302-1) |
- |
|
|
|
| 24.2 (Components, IS 302-1) |
- |
|
|
|
| 24.5 (Components, IS 302-1) |
- |
|
|
|
| 24.6 (Components, IS 302-1) |
- |
|
|
|
| 25.1 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25.5 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25.6 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25.7 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25.8 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 26.9 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25.1 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25.11 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25.12 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25.13 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25.14 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25.15 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25.16 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25.17 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25.18 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25.19 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25.2 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25.21 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25.22 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 26 (Terminals for External Conductors, IS 302-1) |
- |
|
|
|
| 27 (Provision for Earthing, IS 302-1) |
- |
|
|
|
| 27.2 (Provision for Earthing, IS 302-1) |
- |
|
|
|
| 27.3 (Provision for Earthing, IS 302-1) |
- |
|
|
|
| 27.4 (Provision for Earthing, IS 302-1) |
- |
|
|
|
| 27.5 (Provision for Earthing, IS 302-1) |
- |
|
|
|
| 28 (Screws & Connections, IS 302-1) |
- |
|
|
|
| 29.1 (Clearances, Creepage distances and Solid Insulation, IS 302-1) |
- |
|
|
|
| 29.2 (Clearances, Creepage distances and Solid Insulation, IS 302-1) |
- |
|
|
|
| 30.1 (Resistance to Heat and Fire, IS 302-1) |
- |
|
|
|
| 30.2 (Resistance to Heat and Fire, IS 302-1) |
- |
|
|
|
| 31 (Resistance of Rusting, IS 302-1) |
- |
|
|
|
| 32 (Radiation, Toxicity and similar Hazard IS 302-1) |
- |
|
|
|
|
- |
- Excluding 1. Cl. 14 Transient Overvoltage Test IS 302-1:2008 2. Cl. 19.11 and Cl. 19.12 abnormal test (for Electronic circuit) 3. Cl.24 Component Test IS 302-1:2008 4.Except Can openers,Cheese graters,Churns(heavy cream and buttermilk),Food mixers with beaters for mixing cake batter,Ice-cream machines,Knives,Mincers |
| 13106 |
BIS, Northern Regional Laboratory (NRL)
| None
| IS 302 : Part 2 : Sec 3 (2007) |
Safety of household and similar electrical appliances: Part 2 particular requirements: Sec 3 electric iron (First Revision) |
- |
Rs.8330/- View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 6 (Classification- IS 302-1 ) |
- |
|
|
|
| 6 (Classification- IS 302-1) |
- |
|
|
|
| 7.1 (Marking- IS 302-1) |
- |
|
|
|
| 7.1 (Marking- IS 302-1) |
- |
|
|
|
| 7.1 (Marking- IS 302-1) |
- |
|
|
|
| 7.1 (Marking- IS 302-1) |
- |
|
|
|
| 7.1 (Marking- IS 302-1) |
- |
|
|
|
| 7.1 (Marking- IS 302-1) |
- |
|
|
|
| 7.1 (Marking- IS 302-1) |
- |
|
|
|
| 7.1 (Marking- IS 302-1) |
- |
|
|
|
| 7.1 (Marking- IS 302-1) |
- |
|
|
|
| 7.3 (Marking- IS 302-1) |
- |
|
|
|
| 7.4 (Marking- IS 302-1) |
- |
|
|
|
| 7.6 (Marking- IS 302-1) |
- |
|
|
|
| 7.7 (Marking- IS 302-1) |
- |
|
|
|
| 7.8 (Marking- IS 302-1) |
- |
|
|
|
| 7.11 (Marking- IS 302-1) |
- |
|
|
|
| 7.12 (Marking- IS 302-1) |
- |
|
|
|
| 7.13 (Marking- IS 302-1) |
- |
|
|
|
| 7.14 (Marking- IS 302-1) |
- |
|
|
|
| 7.15 (Marking- IS 302-1) |
- |
|
|
|
| 7.101 (Marking) |
- |
|
|
|
| 8 ( Protection Against Electric Shock, IS 302-1) |
- |
|
|
|
| 10 (Power Input and Current, IS 302-1) |
- |
|
|
|
| 11 (Heating, IS 302-1) |
- |
|
|
|
| 11 (Heating, IS 302-1) |
- |
|
|
|
| 11 (Heating, IS 302-1) |
- |
|
|
|
| 11 (Heating, IS 302-1) |
- |
|
|
|
| 11 (Heating, IS 302-1) |
- |
|
|
|
| 11 (Heating, IS 302-1) |
- |
|
|
|
| 11 (Heating, IS 302-1) |
- |
|
|
|
| 11 (Heating, IS 302-1) |
- |
|
|
|
| 13 (Electrical Insulation and Leakage Current at Operating Temperature: Leakage current, IS 302-1) |
- |
|
|
|
| 13 (Electrical Insulation and Leakage Current at Operating Temperature: High Voltage, IS 302-1) |
- |
|
|
|
| 15.1 (Moisture Resistance, IS 302-1) |
- |
|
|
|
| 15.2 (Moisture Resistance, IS 302-1) |
- |
|
|
|
| 15.3 (Moisture Resistance, IS 302-1) |
- |
|
|
|
| 16 (Electrical Insulation and Leakage Current at Operating Temperature: Leakage current, IS 302-1) |
- |
|
|
|
| 16 (Electrical Insulation and Leakage Current at Operating Temperature: High Voltage, IS 302-1) |
- |
|
|
|
| 19.4 (Abnormal Operation, IS 302-1) |
- |
|
|
|
| 19.4 (Abnormal Operation, IS 302-1) |
- |
|
|
|
| 19.5 (Abnormal Operation, IS 302-1) |
- |
|
|
|
| 19.5 (Abnormal Operation, IS 302-1) |
- |
|
|
|
| 19.7 (Abnormal Operation) |
- |
|
|
|
| 19.9 (Abnormal Operation) |
- |
|
|
|
| 19.1 (Abnormal Operation) |
- |
|
|
|
| 19.101 (Abnormal Operation) |
- |
|
|
|
| 20.1 (Stability & Mechanical Hazards, IS 302-1) |
- |
|
|
|
| 20.2 (Stability & Mechanical Hazards, IS 302-1) |
- |
|
|
|
| 21.1 (Mechanical Strength, IS 302-1) |
- |
|
|
|
| 21.2 (Mechanical Strength, IS 302-1) |
- |
|
|
|
| 21.101 (Mechanical Strength, IS 302-2-3) |
- |
|
|
|
| 22 (Construction, IS 302-1) |
- |
|
|
|
| 22.101 (Construction) |
- |
|
|
|
| 22.102 (Construction) |
- |
|
|
|
| 22.103 (Construction) |
- |
|
|
|
| 22.104 (Construction) |
- |
|
|
|
| 22.105 (Construction) |
- |
|
|
|
| 22.106 (Construction) |
- |
|
|
|
| 22.107 (Construction) |
- |
|
|
|
| 23.1 (Internal Wiring, IS 302-1) |
- |
|
|
|
| 23.2 (Internal Wiring, IS 302-1) |
- |
|
|
|
| 23.3 (Internal Wiring, IS 302-1) |
- |
|
|
|
| 23.4 (Internal Wiring, IS 302-1) |
- |
|
|
|
| 23.5 (Internal Wiring, IS 302-1) |
- |
|
|
|
| 23.6 (Internal Wiring, IS 302-1) |
- |
|
|
|
| 23.7 (Internal Wiring, IS 302-1) |
- |
|
|
|
| 23.8 (Internal Wiring, IS 302-1) |
- |
|
|
|
| 23.9 (Internal Wiring, IS 302-1) |
- |
|
|
|
| 23.10 (Internal Wiring, IS 302-1) |
- |
|
|
|
| 25.6 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 24.1 (Components, IS 302-1) |
- |
|
|
|
| 24.2 (Components, IS 302-1) |
- |
|
|
|
| 24.4 (Components, IS 302-1) |
- |
|
|
|
| 24.5 (Components, IS 302-1) |
- |
|
|
|
| 24.6 (Components, IS 302-1) |
- |
|
|
|
| 25.1 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25.5 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25.7 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25.8 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 23.9 (Internal Wiring, IS 302-1) |
- |
|
|
|
| 25.14 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25.14 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25.15 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25.16 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25.15 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25.17 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25.18 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25.19 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25.2 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25.21 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25.22 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 26 (Terminals for External Conductors, IS 302-1) |
- |
|
|
|
| 27.1 (Provision for Earthing, IS 302-1) |
- |
|
|
|
| 27.2 (Provision for Earthing, IS 302-1) |
- |
|
|
|
| 27.3 (Provision for Earthing, IS 302-1) |
- |
|
|
|
| 27.4 (Provision for Earthing, IS 302-1) |
- |
|
|
|
| 27.5 (Provision for Earthing, IS 302-1) |
- |
|
|
|
| 28 (Screws & Connections, IS 302-1) |
- |
|
|
|
| 29.1 (Clearances, Creepage distances and Solid Insulation, IS 302-1) |
- |
|
|
|
| 29.2 (Clearances, Creepage distances and Solid Insulation, IS 302-1) |
- |
|
|
|
| 30.1 (Resistance to Heat, Fire & Tracking, IS 302-1) |
- |
|
|
|
| 30.2 (Resistance to Heat, Fire & Tracking, IS 302-1) |
- |
|
|
|
| 31 (Resistance of Rusting, IS 302-1) |
- |
|
|
|
| 32 (Radiation, Toxicity and similar Hazard IS 302-1) |
- |
|
|
|
|
- |
- Excluding Cl. 22.105 construction for cordless iron ,Cl.22.16 Cord reel test setup,Cl. 14 Transient Overvoltage Test IS 302-1:2008 ,Cl. 19.11 and Cl. 19.12 abnormal test (for Electronic circuit) ,Cl.24 Component Test IS 302-1:2008 |
| 13107 |
Envirocare Labs Pvt Ltd, Thane
| 7120616
| IS 253 (2014) |
Specification for common salt (Fourth Revision) |
-- |
4950 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| Clause -3 for common salt 3.1 ( 3.1.1 ) ( The material shall be crystalline solid, white or pale pink or light grey in colour.) |
- |
75 |
|
- |
| Clause -3 for common salt 3.1 ( 3.1.2 ) Annex-2(Moisture The material shall contain not more than 6.0 percent by mass of moisture, on as received basis, when tested according to the method given in A-2) |
- |
225 |
|
- |
| Clause-3.2 for dairy salt (3.2.3) Annex -2(3.2.3 Moisture The material shall contain not more than 0.5 percent by mass of moisture, on as received basis, when tested according to the methods given in A-2.) |
- |
225 |
|
- |
| Table 1 (i) Annex -4(Water insoluble matter, common) |
- |
225 |
|
- |
| Table 1 (iii) Annex-6( Matter soluble in water, other than sodium chloride, common) |
- |
225 |
|
- |
| Table 1 (iv) Annex-7(Calcium (as Ca), water soluble, percent by mass, Dairy) |
- |
412.5 |
|
- |
| Table 1 (v) Annex-7(Magnesium (as Mg), water soluble, percent by mass, Dairy ) |
- |
412.5 |
|
- |
| Table 1 (vi)(Sulphate as SO2 percent by mass, common) |
- |
412.5 |
|
- |
| Table 1 (vii) Annex-9(Alkalinity (as Na2CO3), common) |
- |
412.5 |
|
- |
| Table 1 (viii)(Lead (as Pb), common) |
- |
412.5 |
|
- |
| Table 1 (ix)(Iron (as Fe), common) |
- |
412.5 |
|
- |
| Table 1 (x) Annex-11(x) Arsenic (as As), common) |
- |
412.5 |
|
- |
| Table 1 (xi) Annex-12(Copper (as Cu), Dairy ) |
- |
412.5 |
|
- |
| Clause-3.2 for dairy salt (3.2.1)(The material shall be crystalline white solid and free from any visible impurities.) |
- |
75 |
|
- |
| Clause-3.1 for dairy salt (3.2.2)(3.2.2 Particle Size 99 percent by mass of the material shall pass completely through 850-micron IS Sieve [see IS 460 (Part I)].) |
- |
150 |
|
- |
| Table 1 (i) Annex -4(Water insoluble matter, Dairy) |
- |
225 |
|
- |
| Table 1 (ii) Annex-5(Chloride content (as NaCl), Dairy) |
- |
300 |
|
- |
| Table 1 (iii) Annex-6( Matter soluble in water, other than sodium chloride, Dairy) |
- |
225 |
|
- |
| Table 1 (vi) Annex-8(sulphate as SO2 percent by mass, Dairy) |
- |
412.5 |
|
- |
| Table 1 (vii) Annex-11(Alkalinity (as Na2CO3), Dairy) |
- |
412.5 |
|
- |
| Table 1 (viii)(Lead (as Pb),Dairy ) |
- |
412.5 |
|
- |
| Table 1 (ix)(Iron (as Fe), Dairy) |
- |
412.5 |
|
- |
| Table 1 (x) Annex-11(x) Arsenic (as As),Dairy) |
- |
412.5 |
|
- |
| Cl-3.1.3(Determination of ferrocyanide (Common Salt)) |
- |
637.5 |
|
- |
|
25 May, 2027 |
- - |
| 13108 |
BIS, Eastern Regional Laboratory (ERL)
| None
| IS 10124 : Part 2 (2009) |
Fabricated pvc - U fittings for potable water supplies - Specification: Part 2 specific requirements for sockets (Second Revision) |
For all classes except for the tests mentioned in remarks |
Rs.1800/ View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 3.2.1, Table-1, Fig-1 (Minimum wall thickness for working pressure) |
- |
|
|
|
| 3.2.1, Table-1, Fig-1 (Nominal size) |
- |
|
|
|
| Clause 3.2.2, and Fig. 2. (B) |
- |
|
|
|
| 10.3 of IS 4985 & Cl. 3.1 of IS 12235(P-4) (Effect on water: Lead (First Extraction)) |
- |
|
|
|
| 10.3 of IS 4985 & Cl. 3.1 of IS 12235(P-4) (Effect on water: Lead (Third Extraction)) |
- |
|
|
|
| 10.3 of IS 4985 & Cl. 3.1 of IS 12235(P-10) (Effect on water:Dialkyl tin C4 and
higher homologues
measured as tin (third
extraction)) |
- |
|
|
|
| 10.3 of IS 4985 & Cl. 3.2 of IS 12235(P-4) (Effect on water: Cadmium (all three extracts)) |
- |
|
|
|
| 10.3 of IS 4985 & Cl. 3.2 of IS 12235(P-4) (Effect on water: Mercury (all three extracts)) |
- |
|
|
|
|
- |
- Facility not available for Short term hydraulic test.
Chemical: All except Effect on Water which is for Pipes above 60 mm Nominal dia and except for the requirement of 'Other Toxic Substances such a di-n-octyl Tin -s-s bis iso-octyl mercapto acetate' and 'butyl stearate'; |
| 13109 |
BIS, Eastern Regional Laboratory (ERL)
| None
| IS 6003 (2010) |
Indented Wire For--Prestressed Concrete ” |
- |
Rs.4110/- excl. relaxation test View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| Cl 5.1 (Diameter) |
- |
|
|
|
| Cl 6.1.2 (Weight) |
- |
|
|
|
| Cl 7.1 (Tensile Test On UTM) |
- |
|
|
|
| Cl 7.2 (Tensile Test On UTM) |
- |
|
|
|
| 4.1.1 (Phosphorus %) |
- |
|
|
|
| 4.1.1 (Phosphorus %) |
- |
|
|
|
| 4.1.1 (Sulphur %) |
- |
|
|
|
| 4.1.1 (Sulphur %) |
- |
|
|
|
| "Cl 5.1 Cl 6.1.2" (Avarage Outer dia (06)) |
- |
|
|
|
| "Cl 5.1 Cl 6.1.2" (Maximum Ovality (06)) |
- |
|
|
|
|
- |
- Facility not available for Relaxation test |
| 13110 |
BIS, Eastern Regional Laboratory (ERL)
| None
| IS 1341 (2018) |
Steel Butt Hinges - Specification (Sixth Revision) |
For all types except test mentioned in remarks |
- View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 5.1 Tables 2 to 9 (2) (Size of Hinge) |
- |
|
|
|
| 5.1 Tables 2 to 9 (3) (Length A) |
- |
|
|
|
| 5.1 Tables 2 to 9 (4) (Breadth B) |
- |
|
|
|
| 5.1 Tables 2 to 9 (4) (Breadth B1) |
- |
|
|
|
| 5.1 Tables 2 to 9 (4) (Breadth B2) |
- |
|
|
|
| 5.1 Tables 2 to 9 (5) (Thickness of Flap C) |
- |
|
|
|
| 5.1 Tables 2 to 9 (6) (Diameter of Hinge Pin D) |
- |
|
|
|
| 5.1 Tables 2 to 9 (7) (Number of Knuckles) |
- |
|
|
|
| 5.1 Tables 2 to 9 (8) (Number of Screw Holes) |
- |
|
|
|
| 5.1 Tables 2 to 9 (9) (Holes for Screw No.) |
- |
|
|
|
| 6.1 (General) |
- |
|
|
|
| 6.1 (General) |
- |
|
|
|
| 6.2.1 (Knuckles) |
- |
|
|
|
| 6.3 (Pins) |
- |
|
|
|
| 6.4.2 (X) |
- |
|
|
|
| 6.4.2 (Y) |
- |
|
|
|
| 6.4.2 (Z) |
- |
|
|
|
| 7 (Finish) |
- |
|
|
|
| Clause 4 Table 1 (Carbon ( Flap)) |
- |
|
|
|
| Clause 4 Table 1 (Sulphur ( Flap)) |
- |
|
|
|
| Clause 4 Table 1 (Phosphorus ( Flap)) |
- |
|
|
|
| Clause 4 Table 1 (Manganese ( Flap)) |
- |
|
|
|
| Clause 4 Table 1 (Nitrogen ( Flap)) |
- |
|
|
|
| Clause 4 Table 1 (Carbon ( Pin)) |
- |
|
|
|
| Clause 4 Table 1 (Sulphur ( Pin)) |
- |
|
|
|
| Clause 4 Table 1 (Phosphorus ( Pin)) |
- |
|
|
|
| Clause 4 Table 1 (Manganese ( Pin)) |
- |
|
|
|
| Clause 4 Table 1 (Carbon ( Flap)) |
- |
|
|
|
| Clause 4 Table 1 (Sulphur ( Flap)) |
- |
|
|
|
| Clause 4 Table 1 (Phosphorus ( Flap)) |
- |
|
|
|
| Clause 4 Table 1 (Manganese ( Flap)) |
- |
|
|
|
| Clause 4 Table 1 (Nitrogen ( Flap)) |
- |
|
|
|
| Clause 4 Table 1 (Carbon ( Pin)) |
- |
|
|
|
| Clause 4 Table 1 (Sulphur ( Pin)) |
- |
|
|
|
| Clause 4 Table 1 (Phosphorus ( Pin)) |
- |
|
|
|
| Clause 4 Table 1 (Manganese ( Pin)) |
- |
|
|
|
|
- |
- Chem: Except Al |