| 91 |
IS 5135 : Part 1 (1994) |
Specification for hand - Rotary duster: Part 1 belly - Mounted type (Second Revision) |
- |
Testing charges for the product are Rs 7600/- View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 6.0 (Capacity) |
- |
|
|
|
| 8.0 (WORKMANSHIP AND FINISH) |
- |
|
|
|
|
- |
- " 1 set
Excluding 1.Test for Agitation 2.Test for Strap and Its Assembly 3.PERFORMANCE REQUIREMENTS 4. raw material tests |
| 92 |
IS 1711 (1984) |
Specification for self - Closing taps for water supply purposes |
- |
Rs 600/-,excl endurance test View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| Cl. 3 (NOMINAL SIZE) |
- |
|
|
|
| Cl. 5 (MANUFACTURE AND WORKMANSHIP) |
- |
|
|
|
| Cl. 6.2 (Body and Gland) |
- |
|
|
|
| Cl. 6.3 (Valve and Spindle) |
- |
|
|
|
| Cl. 6.4 (Screw Threads ) |
- |
|
|
|
| Cl. 6.5 (Washers) |
- |
|
|
|
| Cl. 7 (FINISH) |
- |
|
|
|
|
- |
- " 5 NOS.+PIECE FOR COATING
Excluding Except test for flow of water at the outlet end (cl 8.2) and endurance test |
| 93 |
IS 2326 (1987) |
Automatic Flushing Cisterns for Urinals (Other than Plastic Cisterns) |
- |
1275 incl endu test + material as per ISS View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 3.0 (NOMINAL SIZE) |
- |
|
|
|
| 4.2 (Cistern ) |
- |
|
|
|
| 4.3 (Depth of Cistern Body) |
- |
|
|
|
| 4.4 (Siphonic Apparatus) |
- |
|
|
|
| 4.5 (Lid and Cover) |
- |
|
|
|
| 4.6 (Feeding Device -) |
- |
|
|
|
| 5.0 (FINISH) |
- |
|
|
|
| 6.1 (a) (Urinal Delivering capacity) |
- |
|
|
|
| 6.1 (b) (Flushing) |
- |
|
|
|
| 6.1 (c) (Discharge) |
- |
|
|
|
|
- |
- " 1 NO.
Excluding except for material test,external threading, finish and endurance test |
| 94 |
IS 2039 : Part 1 to 3 (1991) |
Steel tubes for bicycle and cycle rickshaws - Specification (Second Revision) |
- |
Rs.4320.00 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| Cl. 6.1 (Workmanship) |
- |
|
|
|
| Cl. 6.2 (Fin Height) |
- |
|
|
|
| Cl. 8.1 (Tensile Strength) |
- |
|
|
|
| Cl. 8.1 (Yield Strength) |
- |
|
|
|
| Cl. 8.1 (Elongation) |
- |
|
|
|
| Cl. 8.2 (Drift Expansion Test- IS 2335) |
- |
|
|
|
| Cl. 8.3 (Flattening Test-IS 2338) |
- |
|
|
|
| Cl. 9 (Diameter) |
- |
|
|
|
| Cl. 9 (Thickness) |
- |
|
|
|
| Cl. 3.2.1, Table 4 (Yield Stress) |
- |
|
|
|
| Cl. 3.2.1, Table 4 (UTS) |
- |
|
|
|
| Cl. 3.2.1, Table 4 (Elongation) |
- |
|
|
|
| Cl. 3.2.2, Table 2 (Drift Expansion Test- IS 2335) |
- |
|
|
|
| Cl. 3.2.3, Table 3 (Flattening Test-IS 2338) |
- |
|
|
|
| Cl. 4.2.1 (Diameter) |
- |
|
|
|
| Cl. 4.2.2 (Thickness) |
- |
|
|
|
| Cl. 4.2.3 (Length) |
- |
|
|
|
| Cl. 4.2.1, Table 7 (Yield Stress) |
- |
|
|
|
| Cl. 4.2.1, Table 7 (UTS) |
- |
|
|
|
| Cl. 4.2.2, Table 8 (Drift Expansion Test- IS 2335) |
- |
|
|
|
| Cl. 4.2.3, Table 9 (Flattening Test-IS 2338) |
- |
|
|
|
| Cl. 5.2.1, Table 10 (Diameter) |
- |
|
|
|
| Cl. 5.2.2 (Mean Thickness) |
- |
|
|
|
| Cl. 5.2.3, Table 6 (Length) |
- |
|
|
|
|
- |
- 1.5mx2
Excluding except drift expansion test, Tensile Test ,chemical test |
| 95 |
IS 1835 (1976) |
Specification for round steel wire for ropes (Third Revision) |
- |
Rs 4500/- View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| Cl 3 (Manufacturing ) |
- |
|
|
|
| Cl 7 (Workmanship) |
- |
|
|
|
| Cl 8 (Manufacturing ) |
- |
|
|
|
| Cl 10 (Diameter) |
- |
|
|
|
| Cl 12.2 (UTM) |
- |
|
|
|
| Cl 12.3 (Torsion) |
- |
|
|
|
| Cl 12.5 (Wrap) |
- |
|
|
|
| Cl 12.6 (Adhesion ) |
- |
|
|
|
|
- |
- " 5 m .
Excluding except tensile test, torsion test, reverse bend test, adhesion test,raw material tests |
| 96 |
IS 10840 (1994) |
Blow moulded hdpe containers for packing of vanaspati - Specification (Second Revision) |
- |
1425 + raw material as per IS:10146 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 4.2 (Manufacture) |
- |
|
|
|
| 4.3 (Capacity) |
- |
|
|
|
| 4.4 (Mass) |
- |
|
|
|
| 4.5 (Shape and Dimensions) |
- |
|
|
|
| 4.6 (Wall Thickness) |
- |
|
|
|
| 4.7.1 (Closure Leakage test) |
- |
|
|
|
| 4.7.2 (Drop impact test) |
- |
|
|
|
| 4.7.3 (Stacking test) |
- |
|
|
|
| 4.7.4 (Handle Pull Test) |
- |
|
|
|
| 4.7.5 (Ink adhesion for printed containers) |
- |
|
|
|
| 4.7.6 (Product Resistance of printed containers) |
- |
|
|
|
| 4.7.7 (Migration test) |
- |
|
|
|
|
- |
- " 12 + 12 Nos.
Excluding Excl material tests(metal content can be tested as per iS 1699) |
| 97 |
IS 15410 (2003) |
Containers for packaging of natural mineral water and packaged drinking water - Specification |
- |
5850 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 4.6.2 (TRANSPARANCY) |
- |
|
|
|
| 4.6.3 (LEAKAGE TEST) |
- |
|
|
|
| 4.6.4 (DROP TEST) |
- |
|
|
|
| 4.6.5 (MIGRATION TEST) |
- |
|
|
|
| 4.6.6 (PORTABILITY TEST) |
- |
|
|
|
| 4.0 (chem) (MATERIAL) |
- |
|
|
|
| 4.6.3, clause 6 of IS:2798:1998 (Leakage test- c. Air pressure leakage) |
- |
|
|
|
| 4.6.3, clause 6 of IS:2798:1998 (Leakage test- b. Vibration leakage) |
- |
|
|
|
| 4.6.3, clause 6 of IS:2798:1998 (Leakage test- a. Closure leakage ) |
- |
|
|
|
| 4.4 , clause 5 of IS:2798:1998 (Brimful capacity in ml) |
- |
|
|
|
| 4.5, IS:2798:1998 (Wall thickness- Bottom, in mm) |
- |
|
|
|
| 4.5, IS:2798:1998 (Wall thickness- Middle , in mm) |
- |
|
|
|
| 4.5, IS:2798:1998 (Wall thickness- Top , in mm ) |
- |
|
|
|
| Cl.4.6.7.2 and 4.6.7.3, Table 3, (i) (Barium) |
- |
|
|
|
| Cl.4.6.7.2 and 4.6.7.3, Table 3, (ii) (Cobalt) |
- |
|
|
|
|
- |
- " 5L and above (20L Jar also)- 8 filled + 10 empty+30 Caps; 500ml and above Bottles: 12 filled+24 empty+40 Caps; Below 500ml Bottles: 12 filled+30 empty+40 Caps "
Except Material Tests. |
| 98 |
IS 737 (2008) |
Wrought aluminium and aluminium alloy sheet and strip for general engineering purposes - Specification (Fourth Revision) |
- |
Rs 8750/- View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 5.0 (Freedom from defects) |
- |
|
|
|
| 7 Table-2 (Tensile Strength) |
- |
|
|
|
| 7 Table-2 (Elongation) |
- |
|
|
|
| 7 Table-2 (0.2 % Proof Stress) |
- |
|
|
|
|
- |
- 1m
Excluding except proof stress, Bend Test, Chem Facility not available |
| 99 |
IS 12585 (1988) |
Specification for thermoplastic hoses (Textile Reinforced) for water - General purpose |
- |
1500 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| Cl 3 (Types) |
- |
|
|
|
| Cl 4.1 (Construction) |
- |
|
|
|
| Cl 4.2 (Dimensions & Tolerances) |
- |
|
|
|
| Cl 4.3.1 & Appendix A (Loss in Mass on Heating) |
- |
|
|
|
| Cl 4.3.2 (Adhesion) |
- |
|
|
|
| Cl 4.3.3 (Pressure Requirements) |
- |
|
|
|
| Cl 4.3.4 (Minimum Bend Radius) |
- |
|
|
|
| Cl 4.3.5 (Low Temperature Flexibility) |
- |
|
|
|
|
- |
- Excluding Loss in mass on heating,Adhesion, Minimum Bend Radius, Low temperature flexibility |
| 100 |
IS 3309 (1992) |
Soluble Coffee - Chicory powder - Specification (Second Revision) |
- |
Rs.2900/- View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 3.4 Table 1 (Moisture content) |
- |
|
|
|
| 3.4 Table 1 (Total ash) |
- |
|
|
|
| 3.7 (Copper content) |
- |
|
|
|
| 3.1 (Description) |
- |
|
|
|
| 3.4 Table 1 (Solubility in boiling) |
- |
|
|
|
| 3.4 Table 1 (Solubility in cold water) |
- |
|
|
|
|
- |
- " 2 x 200 g
Excluding except caffeine content,chicory content and pesticide residue |
| 101 |
IS 2791 (1992) |
Soluble coffee powder - Specification (Third Revision) |
- |
4126 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 3.4 Table 1 (Moisture content) |
- |
|
|
|
| 3.4 Table 1 (Total ash) |
- |
|
|
|
| 3.1 (Description ) |
- |
|
|
|
| 3.4 Table 1 (Solubility in boiling) |
- |
|
|
|
| 3.4 Table 1 (Solubility in cold water) |
- |
|
|
|
|
- |
- " 2 x 200 g
Excluding except caffeine content and pesticide residue |
| 102 |
IS 612 (1992) |
Roasted chicory powder - Specification (Third Revision) |
- |
3400 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 3.5 Table 1 (Acid Insoluble ash) |
- |
|
|
|
| 3.5 Table 1 (Total Ash) |
- |
|
|
|
| 3.5 Table 1 (Moisture) |
- |
|
|
|
| 3.5 Table 1 (Water soluble Matter ) |
- |
|
|
|
| 3.1 (Description) |
- |
|
|
|
| 3.2 (Cup Test) |
- |
|
|
|
|
- |
- " 500 g
Excluding Microscopic Appearance |
| 103 |
IS 4250 (1980) |
Specification for domestic electric food - Mixers (Liquidizers And Grinders) (First Revision) |
- |
Rs. 32600/- View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 6 (Classification- IS 302-1 ) |
- |
|
|
|
| 7.1 (Marking- IS 302-1) |
- |
|
|
|
| 7.2 (Marking) |
- |
|
|
|
| 7.4 (Marking) |
- |
|
|
|
| 7.5 (Marking) |
- |
|
|
|
| 7.6 (Marking) |
- |
|
|
|
| 8 ( Protection Against Electric Shock, IS 302-1) |
- |
|
|
|
| 10 (Power Input and Current, IS 302-1) |
- |
|
|
|
| 11 (Heating, IS 302-1) |
- |
|
|
|
| 13 (Electrical Insulation and Leakage Current at Operating Temperature: Leakage current, IS 302-1) |
- |
|
|
|
| 13 (Electrical Insulation and Leakage Current at Operating Temperature: High Voltage, IS 302-1) |
- |
|
|
|
| 14 (Transient Over Voltages, IS 302-1) |
- |
|
|
|
| 15.1 (Moisture Resistance, IS 302-1) |
- |
|
|
|
| 15.2 (Moisture Resistance-Spillage test) |
- |
|
|
|
| 15 (Moisture Resistance, IS 302-1) |
- |
|
|
|
| 16 (Electrical Insulation and Leakage Current at Operating Temperature: Leakage current, IS 302-1) |
- |
|
|
|
| 16 (Electrical Insulation and Leakage Current at Operating Temperature: High Voltage, IS 302-1) |
- |
|
|
|
| 19 (Abnormal Operation, IS 302-1) |
- |
|
|
|
| 19 (Abnormal Operation, IS 302-1) |
- |
|
|
|
| 20 (Stability & Mechanical Hazards, IS 302-1) |
- |
|
|
|
| 21 (Mechanical Strength, IS 302-1) |
- |
|
|
|
| 21 (Mechanical Strength, IS 302-1) |
- |
|
|
|
| 22.2 (Construction) |
- |
|
|
|
| 22.3 (Construction) |
- |
|
|
|
| 22.4 (Construction) |
- |
|
|
|
| 22.5 (Construction) |
- |
|
|
|
| 22.6 (Construction) |
- |
|
|
|
| 22.8 (Construction) |
- |
|
|
|
| 22.9 (Construction) |
- |
|
|
|
| 23 (Internal Wiring, IS 302-1) |
- |
|
|
|
| 24.2 (Components) |
- |
|
|
|
| 24.4 (Components) |
- |
|
|
|
| 24.5 (Components) |
- |
|
|
|
| 24.6 (Components) |
- |
|
|
|
| 24.7 (Components) |
- |
|
|
|
| 24.8 (Components) |
- |
|
|
|
| 24.9 (Components) |
- |
|
|
|
| 25 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 26 (Terminals for External Conductors, IS 302-1) |
- |
|
|
|
| 27 (Provision for Earthing, IS 302-1) |
- |
|
|
|
| 28 (Screws & Connections, IS 302-1) |
- |
|
|
|
| 29 (Clearances and Distances through Insulation, IS 302-1) |
- |
|
|
|
| 29 (Clearances and Distances through Insulation, IS 302-1) |
- |
|
|
|
| 30 (Resistance to Heat, Fire, Tracking, IS 302-1) |
- |
|
|
|
| 31 (Resistance of Rusting, IS 302-1) |
- |
|
|
|
| 34.2 (Operational tests- Grinding coffee (for machines which have a dry grinding arrangement)) |
- |
|
|
|
| 34.3 (Whisking egg whites ) |
- |
|
|
|
| 34.4 (IDLI batter-Grinding of black gram) |
- |
|
|
|
| 34.4 (IDLI batter-Grinding of rice) |
- |
|
|
|
| 34.5.1 (a) (Operational test for juicers ) |
- |
|
|
|
| 34.5.1 (b) (Operational test for juicers ) |
- |
|
|
|
| 34.5.2 (Operational test for juicers ) |
- |
|
|
|
| 35 (Temperature withstand test for bowl) |
- |
|
|
|
| 37 (Strength of Assembly ) |
- |
|
|
|
| 9 (Starting, IS 302-1) |
- |
|
|
|
| 36 (Test for controls ) |
- |
|
|
|
| 11 (Heating, IS 302-1) |
- |
|
|
|
| 11 (Heating, IS 302-1) |
- |
|
|
|
| 11 (Heating, IS 302-1) |
- |
|
|
|
| 11 (Heating, IS 302-1) |
- |
|
|
|
|
- |
- " 2 Nos.
Complete for IPX0 only. |
| 104 |
IS 774 (2004) |
Flushing cisterns for water closets and urinals (Other Than Plastic Cisterns) - Specification (Fifth Revision) |
- |
Rs. 8020/- View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 5.1 (CONSTRUCTION-Cistern) |
- |
|
|
|
| 5.2 (Cover) |
- |
|
|
|
| 5.3 (Flush Pipe-For high density polyethylene and unplasncized PVC pipes, the outside diameter of the pipes shall be 40 mm) |
- |
|
|
|
| 5.3 (Flush Pipe-whereas the lead flush pipe shall have a mimmum thickness of 3 5 mm) |
- |
|
|
|
| 5.3.1 (Flush Pipe Connection to Cistern- The length ofthe outlet shall be 37 ± 2 mm) |
- |
|
|
|
| 5.3.1 (Flush Pipe Connection to Cistern-The nommal mternal diameter of the cistern outlet shall be not less than 32 mm for high-level cisterns) |
- |
|
|
|
| 5.3.1 (Flush Pipe Connection to Cistern) |
- |
|
|
|
| 5.3.1 (Flush Pipe Connection to Cistern- ) |
- |
|
|
|
| 5.4 (Inlet and Overflow Holes) |
- |
|
|
|
| 5.4 (Inlet and Overflow Holes-) |
- |
|
|
|
| 5.6 (Lever) |
- |
|
|
|
| 5.7 (Chain) |
- |
|
|
|
| 5.8 (Overflow Pipe-) |
- |
|
|
|
| 7.1 (OPERATIONAL AND PERFORMANCE
REQUIREMENTS- Flushing Arrangement) |
- |
|
|
|
| 7.2 (Working Water Level-The working water level shall be a minimum of 65 cm below the effective top edge of the cistern and shall be legibly and permanently marked on the inside of the cistern) |
- |
|
|
|
| 7.3 (Freedom from Self-Siphonage) |
- |
|
|
|
| 7.4 (Reduced Water Level) |
- |
|
|
|
| 7.5,8.1 (Discharge Capacity-Dual-flush cisterns of of 6/3 litre capacity shall discharge 6 ± 0.5 litres and alternatively a reduced flush of 3 ± 0.5 litre.’) |
- |
|
|
|
| 7.6,8.2 (Discharge Rate-The discharge rate for flushing cistern of 10/5 litre capacity shall be 10 ± 0.5 litre within 6 s and 5 ± 0.5 litre within 3 s for full and reduced flush respectively) |
- |
|
|
|
| 7.6,8.2 (Discharge Rate-The discharge rate for flushing cistern of 6/3 litres capacity shall be 6 ± 0.5 litres within 4 s and 3 ± 0.5 litre within 2 s for full and reduced flush respectively.) |
- |
|
|
|
|
- |
- " 1 pc
Excluding *excl endurance test |
| 105 |
IS 4964 (2013) |
Textiles – Vests, cotton, plain (Single jersey) knitted – Specification (fifth revision) |
- |
testing charges for the product are Rs 6400/- View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 4/4.1/4.1.1 (MANUFACTURE AND FINISH- Fabric-The mass of the vest-method given in B-5.) |
- |
|
|
|
| 4/4.2-Fig. 1A, Fig. 1B, Fig. 2A, Fig. 2B, Fig. 3. (MANUFACTURE AND FINISH) |
- |
|
|
|
| 4/4.2/4.2.1 (MANUFACTURE AND FINISH) |
- |
|
|
|
| 4/4.3/4.3.1-see IS 11161, see IS 10789, Table 1. (MANUFACTURE AND FINISH-Seams and Stitches) |
- |
|
|
|
| 4/4.3/4.3.2-according to B-4 (MANUFACTURE AND FINISH-Seams and Stitches-Dimension) |
- |
|
|
|
| 4/4.6 (MANUFACTURE AND FINISH-Freedom from Defects) |
- |
|
|
|
| 5/5.1-Tables 2 and 3 (REQUIREMENTS-Dimensions-method
prescribed in Annex B.) |
- |
|
|
|
| 5/5.2-Tables 4 (REQUIREMENTS-Other Requirements-Dimension) |
- |
|
|
|
|
- |
- " 4 nos.
Excluding Complete for Undyed vests, Color Fastness test facility not available for dyed vests |
| 106 |
IS 1784 (2020) |
Screwed Closures for Drums — Specification ( Fourth Revision ) |
- |
- View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 6 (Dimensions-Steel flange- d1) |
- |
|
|
|
| 6 (Dimensions-Steel flange- d2) |
- |
|
|
|
| 6 (Dimensions-Steel flange- d3) |
- |
|
|
|
| 6 (Dimensions-Steel flange- d4) |
- |
|
|
|
| 6 (Dimensions-Steel flange- s1) |
- |
|
|
|
| 6 (Dimensions-Steel flange- t1) |
- |
|
|
|
| 6 (Dimensions-Flange Gasket- wd) |
- |
|
|
|
| 6 (Dimensions-Flange Gasket-ww) |
- |
|
|
|
| 6 (Dimensions-Flange Gasket-wt) |
- |
|
|
|
| 6 (Dimensions-Steel Bung- d1) |
- |
|
|
|
| 6 (Dimensions-Steel Bung- p1) |
- |
|
|
|
| 6 (Dimensions-Steel Bung- p2) |
- |
|
|
|
| 6 (Dimensions-Steel Bung- p3) |
- |
|
|
|
| 6 (Dimensions-Flange Gasket- wd) |
- |
|
|
|
| 6 (Dimensions-Bung Gasket- ww) |
- |
|
|
|
| 6 (Dimensions-Bung Gasket- wt) |
- |
|
|
|
| 6 (Dimensions-Capseals- d1) |
- |
|
|
|
| 6 (Dimensions-Capseals- d2) |
- |
|
|
|
| 6 (Dimensions-Capseals- h1) |
- |
|
|
|
| 6 (Dimensions-Capseals- h2) |
- |
|
|
|
| 6 (Dimensions-Capseals- w1) |
- |
|
|
|
| 6 (Dimensions-Tag Ring- d1) |
- |
|
|
|
| 6 (Dimensions-Tag Ring- d2) |
- |
|
|
|
| 6 (Dimensions-Tag Ring- d3) |
- |
|
|
|
| 6 (Dimensions-Tag Ring- d4) |
- |
|
|
|
| 6 (Dimensions-Tag Ring- d5) |
- |
|
|
|
| 6 (Dimensions-Tag Ring- h1) |
- |
|
|
|
| 6 (Dimensions-Zinc Bung- d1) |
- |
|
|
|
| 6 (Dimensions-Zinc Bung- d2) |
- |
|
|
|
| 6 (Dimensions-Zinc Bung- d3) |
- |
|
|
|
| 6 (Dimensions-Zinc Bung- p1) |
- |
|
|
|
| 7 (Finish) |
- |
|
|
|
| 8.1 (Interchangeability) |
- |
|
|
|
|
- |
- " 6 Nos.
Excluding except air pressure test, torque test for steel bungs, curling & thread,chemical tests |
| 107 |
IS 6392 (2020) |
Steel Pipes Flanges — Specification ( First Revision ) |
- |
Rs 3070/- View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 6.1 (Dimension) |
- |
|
|
|
| 7.3 (Joint Faces) |
- |
|
|
|
| 3.1 (Tensile Strength-IS 1608(P-1)) |
- |
|
|
|
| 3.1 (Yield Stress-IS 1608(P-1)) |
- |
|
|
|
| 3.1 (Elongation- IS 1608(P-1)) |
- |
|
|
|
| 6.1 (Dimension) |
- |
|
|
|
| 13.1.1 (Mass of Zinc Coating- IS 4736) |
- |
|
|
|
| 13.1.2 (Uniformity of Zinc Coating-IS2633) |
- |
|
|
|
| 13.1.2 (Adhesion Test- IS 2629) |
- |
|
|
|
|
- |
- " 2 no.
Excluding except Hydrostatic test facility upto 300mm, Facility for preparation of test specimen not available |
| 108 |
IS 1536 (2001) |
Centrifugally cast (Spun) iron pressure pipes for water, gas and sewage - Specification (Fourth Revision) |
- |
Rs.4500.00 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 11.2, annex-A (Tensile Test ( for pipes over 300mm)) |
- |
|
|
|
| 11.3 (Brinell Hardness Test) |
- |
|
|
|
| 13.4
Table 5 (c) |
- |
|
|
|
| 13.4
Table 5 (D) |
- |
|
|
|
| 13.4
Table 5 (E) |
- |
|
|
|
| 13.4
Table 5 (b) |
- |
|
|
|
| 13.4
Table 5 (a) |
- |
|
|
|
| 13.4
Table 5 (r) |
- |
|
|
|
| 13.4
Table 5 (f) |
- |
|
|
|
| 13.4
Table 5 (s) |
- |
|
|
|
| 13.4
Table 5 (Holes Number) |
- |
|
|
|
| 13.4
Table 5 (Holes Diameter) |
- |
|
|
|
| 13.4
Table 5 (Diameter of Bolts) |
- |
|
|
|
| 13.5
Table 6 to 8 (DE Lead joint) |
- |
|
|
|
| 13.5
Table 6 to 8 (DE Push on joint) |
- |
|
|
|
| 13.5
Table 6 to 8 (e) |
- |
|
|
|
| 13.6
Table 9 (DE) |
- |
|
|
|
| 13.6
Table 9 (e) |
- |
|
|
|
|
- |
- " 1 no+ 2test bar
Excluding "Excl. Ring test, Hydrostatic test, chemical tests, and Permissible deviation from a stright line Prepared Test piece needed for Tensile test" |
| 109 |
IS 1538 (1993) |
Cast iron fittings for pressure pipes for water, gas and sewage - Specification (Third Revision) |
- |
Rs 2700/- View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 5.1 (tensile strength) |
- |
|
|
|
| 6.1 (Brinell hardness tests) |
- |
|
|
|
| 9.1,Table 4 (D) |
- |
|
|
|
| 9.1,Table 4 (a) |
- |
|
|
|
| 9.1,Table 4 (b) |
- |
|
|
|
| 9.1,Table 4 (s) |
- |
|
|
|
| 9.1,Table 4 (r) |
- |
|
|
|
| 9.1,Table 5 (D) |
- |
|
|
|
| 9.1,Table 5 (b) |
- |
|
|
|
| 9.1,Table 5 (c) |
- |
|
|
|
| 9.1,Table 5 (f) |
- |
|
|
|
| 9.1,Table 5 (s) |
- |
|
|
|
| 9.1,Table 5 (C) |
- |
|
|
|
| 9.1,Table 5 (Holes No) |
- |
|
|
|
| 9.1,Table 5 (Holes diameter) |
- |
|
|
|
| 9.1,Table 5 (Diameterof Bolts) |
- |
|
|
|
| 9.1,Table 6 (D) |
- |
|
|
|
| 9.1,Table 6 (C) |
- |
|
|
|
| 9.1,Table 6 (Holes No) |
- |
|
|
|
| 9.1,Table 6 (Holes diameter) |
- |
|
|
|
| 9.1,Table 6 (Diameterof Bolts) |
- |
|
|
|
| 9.1&11.1,Table 7,8&9 (e) |
- |
|
|
|
| 9.1&11.1,Table 7,8&9 (l) |
- |
|
|
|
| 9.1&11.1,Table 7,8&9 (Mass (Approx)) |
- |
|
|
|
| 9.1&11.1,Table 10 to13 (e) |
- |
|
|
|
| 9.1&11.1,Table 10 to13 (Mass (Approx)) |
- |
|
|
|
| 9.1&11.1,Table 14 (e) |
- |
|
|
|
| 9.1&11.1,Table 14 (l) |
- |
|
|
|
| 9.1&11.1,Table 14 (h) |
- |
|
|
|
| 9.1&11.1,Table 14 (Mass (Approx)) |
- |
|
|
|
| 9.1&11.1,Table 15 (e) |
- |
|
|
|
| 9.1&11.1,Table 15 (l) |
- |
|
|
|
| 9.1&11.1,Table 15 (Mass (Approx)) |
- |
|
|
|
| 9.1&11.1,Table 16 (e) |
- |
|
|
|
| 9.1&11.1,Table 16 (l) |
- |
|
|
|
| 9.1&11.1,Table 16 (h) |
- |
|
|
|
| 9.1&11.1,Table 16 (Mass (Approx)) |
- |
|
|
|
| 9.1&11.1,Table 17 (e1) |
- |
|
|
|
| 9.1&11.1,Table 17 (l1) |
- |
|
|
|
| 9.1&11.1,Table 17 (e2) |
- |
|
|
|
| 9.1&11.1,Table 17 (l2) |
- |
|
|
|
| 9.1&11.1,Table 17 (l3) |
- |
|
|
|
| 9.1&11.1,Table 17 (l) |
- |
|
|
|
| 9.1&11.1,Table 17 (Mass) |
- |
|
|
|
| 9.1&11.1,Table 18 (a) |
- |
|
|
|
| 9.1&11.1,Table 18 (P) |
- |
|
|
|
| 9.1&11.1,Table 18 (Mass (Approx)) |
- |
|
|
|
| 9.1&11.1,Table 19 (DC) |
- |
|
|
|
| 9.1&11.1,Table 19 (e) |
- |
|
|
|
| 9.1&11.1,Table 19 (a) |
- |
|
|
|
| 9.1&11.1,Table 19 (l) |
- |
|
|
|
| 9.1&11.1,Table 19 (Mass (Approx)) |
- |
|
|
|
| 9.1&11.1,Table 20 (DI) |
- |
|
|
|
| 9.1&11.1,Table 20 (h) |
- |
|
|
|
| 9.1&11.1,Table 20 (Mass (Approx)) |
- |
|
|
|
| 9.1&11.1,Table 21 (e) |
- |
|
|
|
| 9.1&11.1,Table 21 (Mass (Approx)) |
- |
|
|
|
| 9.1&11.1,Table 21 (e) |
- |
|
|
|
| 9.1&11.1,Table 22 (a) |
- |
|
|
|
| 9.1&11.1,Table 22 (b) |
- |
|
|
|
| 9.1&11.1,Table 22 (c) |
- |
|
|
|
| 9.1&11.1,Table 22 (g) |
- |
|
|
|
| 9.1&11.1,Table 23 (e) |
- |
|
|
|
| 9.1&11.1,Table 23 (Mass (Approx)) |
- |
|
|
|
| 9.1&11.1,Table 24 (e) |
- |
|
|
|
| 9.1&11.1,Table 24 (l) |
- |
|
|
|
| 9.1&11.1,Table 24 (e1) |
- |
|
|
|
| 9.1&11.1,Table 24 (h) |
- |
|
|
|
| 9.1&11.1,Table 24 (Mass (Approx)) |
- |
|
|
|
| 9.1&11.1,Table 25 (e) |
- |
|
|
|
| 9.1&11.1,Table 25 (l) |
- |
|
|
|
| 9.1&11.1,Table 25 (h) |
- |
|
|
|
| 9.1&11.1,Table 25 (Mass (Approx)) |
- |
|
|
|
| 9.1&11.1,Table 26 (e1) |
- |
|
|
|
| 9.1&11.1,Table 26 (e2) |
- |
|
|
|
| 9.1&11.1,Table 26 (l) |
- |
|
|
|
| 9.1&11.1,Table 26 (Mass (Approx)) |
- |
|
|
|
| 9.1&11.1,Table 27 (e1) |
- |
|
|
|
| 9.1&11.1,Table 27 (e2) |
- |
|
|
|
| 9.1&11.1,Table 27 (l3) |
- |
|
|
|
| 9.1&11.1,Table 27 (Mass) |
- |
|
|
|
| 9.1&11.1,Table 28 (D) |
- |
|
|
|
| 9.1&11.1,Table 28 (t) |
- |
|
|
|
| 9.1&11.1,Table 28 (Mass (Approx)) |
- |
|
|
|
| 12.1 to 12.7 (Coating ) |
- |
|
|
|
|
- |
- " 4 pcsx10cm + 2 nos "
Excluding Excl. Tensile Test (Test Methord IS 2078:1979 Withdrawn) & hydraulic test,chemical tests |
| 110 |
IS 1703 (2000) |
Water Fittings - Copper Alloy Float Valves (Horizontal Plunger Type) - |
- |
Rs. 4800/-and testing charges as per referred ISs View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 3 (CLASSIFICATION) |
- |
|
|
|
| 4 (NOMINAL SIZES) |
- |
|
|
|
| 6 (MANUFACTURE AND WORKMANSHIP) |
- |
|
|
|
| 6.2 (Machining) |
- |
|
|
|
| 7.2 and Fig.1 (CONSTRUCTION) |
- |
|
|
|
| 7.3 and Fig.1 (CONSTRUCTION) |
- |
|
|
|
| 7.4 (Dimensions of Body) |
- |
|
|
|
| 7.6 (Piston) |
- |
|
|
|
| 7.7.1 and Table 5(a) & 5(b) (Dimensions of Levers - A) |
- |
|
|
|
| 7.7.2 (Levers) |
- |
|
|
|
| 7.7.3 (Levers) |
- |
|
|
|
| 7.7.4 (Short arm of the lever) |
- |
|
|
|
| 7.7.6 (Levers) |
- |
|
|
|
| 7.7.7 (Piston Travel) |
- |
|
|
|
| 7.9.1 (Silencing Pipes and Anti-Siphonage Provision) |
- |
|
|
|
| 7.9.2 (Silencing Pipes and Anti-Siphonage Provision) |
- |
|
|
|
| 7.1 (Floats - Dia of float
IS 9762) |
- |
|
|
|
| 7.1 (Floats - Wall thickness
IS 9762) |
- |
|
|
|
|
- |
- " 1 No.
Excluding Except hydraulic test, shutting off test and test for mechanical strength of lever, Thread Check,chemical tests |
| 111 |
IS 1729 (2002) |
Cast iron/ductile iron drainage pipes and pipe fittings for over ground non-pressure pipeline socket and spigot series (Second Revision) |
- |
Rs. 2850/- and testing charges as per referred Iss View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 5.1 (Tensile Strrngth - IS1608(Pt-1)) |
- |
|
|
|
| 5.1 (Elongation - IS 1608(Pt-1)) |
- |
|
|
|
| 5.3 (Casting Defects) |
- |
|
|
|
| 5.4 (Hardness- IS 1500) |
- |
|
|
|
| 6 (Hammer Test - IS1729) |
- |
|
|
|
| 11 (Coating Test at 65degree Celcius ) |
- |
|
|
|
| 11 (Coating Test at 0degree Celcius) |
- |
|
|
|
|
- |
- " 1 full length pipe +1 piece for coating test "
Excluding excl leakage test for fittings,Chemical tests |
| 112 |
IS 1342 (2019) |
Oil pressure stoves - Specification (Seventh Revision) |
- |
- View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 4/4.1 (DESIGNATION, TYPES AND FUEL CAPACITY , ) |
- |
|
|
|
| 4/4.1 (DESIGNATION, TYPES AND FUEL CAPACITY , ) |
- |
|
|
|
| 4/4.1 (DESIGNATION, TYPES AND FUEL CAPACITY , ) |
- |
|
|
|
| 4/4.1.1 ( Volume of the oil hold in fuel tank) |
- |
|
|
|
| 6/6.1/Fig 1(Shape) and Fig. 2, 4, 5, 6 and 11(Dimensions) . (SHAPE AND DIMENSIONS /for designation OTR for roarer type burner and OTS for silencer type burner) |
- |
|
|
|
| 6/6.2/Fig 3(Shape) and Fig. 2, 4, 5, 11, 12, 14 and 16.(Dimensions) . (SHAPE AND DIMENSIONS /for designation OR for roarer
type burner and OS for silencer type burner) |
- |
|
|
|
| 7/7.1/7.1.2 (CONSTRUCTION) |
- |
|
|
|
| 7/7.1/7.1.3 (CONSTRUCTION/The stove shall be so made as to be firm on its base and the legs shall be so fitted as to have the bottom of the fuel container at least 13 mm clear of the ground on which stove stands.) |
- |
|
|
|
| 7/7.1/7.1.3 (CONSTRUCTION) |
- |
|
|
|
| 7/7.1/7.1.4 (CONSTRUCTION) |
- |
|
|
|
| 7/7.1/7.1.4 (CONSTRUCTION) |
- |
|
|
|
| 7/7.2- IS 8808 (Burner assembly) |
- |
|
|
|
| 7/7.3 (Pump) |
- |
|
|
|
| 7/7.4/7.4.1 (Pressure - Release Screw) |
- |
|
|
|
| 7/7.5 (Filler cap assembly) |
- |
|
|
|
| 7/7.7 (Pricker) |
- |
|
|
|
| 7/7.8 (Interchangeable Parts
) |
- |
|
|
|
| 7/7.9 Refer Table-2 (Strength of Body of Stove) |
- |
|
|
|
| 8 (Finish) |
- |
|
|
|
| 9/9.1/9.1.1 (Air Pressure Test) |
- |
|
|
|
| 9/9.1/9.1.2 (Safety Pressure Test) |
- |
|
|
|
| 9/9.1/9.1.3 ( Bursting Pressure Test) |
- |
|
|
|
| 9/9.2 Annex D (Fuel Consumption
) |
- |
|
|
|
| 9/9.4 Annex E. (Surface Temperature and Fuel Temperature Test (Type Test)) |
- |
|
|
|
| 9/9.5 Annex F. ( Combustion Efficiency Test (Type Test)/carbon monoxide/carbon dioxide
) |
- |
|
|
|
| 9/9.6 Annex F. (Resistance to Draught (Type Test)) |
- |
|
|
|
| 9/9.7 (Fuel Creep) |
- |
|
|
|
|
- |
- " 2 nos.
Excluding Excl. thermal efficiency and threads,chemical tests |
| 113 |
IS 3466 (1988) |
Specification For Masonry Cement |
- |
Please see remarks. View breakup
Rs. 7350/- excluding chemical tests.
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 3.1 Table 1 i (Fineness
IS : 4031:1988) |
- |
|
|
|
| 3.1 Table 1 i (Fineness
IS : 4031:1988) |
- |
|
|
|
| 3.1 Table 1 ii a (Setting Time ( by Vicat Apparatus ),Initial
IS : 4031:1988) |
- |
|
|
|
| 3.1 Table 1 ii a (Setting Time ( by Vicat Apparatus ),Initial
IS : 4031:1988) |
- |
|
|
|
| 3.1 Table 1 ii a (Setting Time ( by Vicat Apparatus ),Initial
IS : 4031:1988) |
- |
|
|
|
| 3.1 Table 1 ii a (Setting Time ( by Vicat Apparatus ),Initial
IS : 4031:1988) |
- |
|
|
|
| 3.1 Table 1 ii a (Setting Time ( by Vicat Apparatus ),Initial
IS : 4031:1988) |
- |
|
|
|
| 3.1 Table 1 ii b (Setting Time ( by Vicat Apparatus ), Final
IS : 4031:1988) |
- |
|
|
|
| 3.1 Table 1 ii b (Setting Time ( by Vicat Apparatus ), Final
IS : 4031:1988) |
- |
|
|
|
| 3.1 Table 1 iii a (Soundness, Le-Chate1ier expansion
IS 4031:1988) |
- |
|
|
|
| 3.1 Table 1 iii a (Soundness, Le-Chate1ier expansion
IS 4031:1988) |
- |
|
|
|
| 3.1 Table 1 iii b (Soundness, Autoclave expansion
IS 4031:1988) |
- |
|
|
|
| 3.1 Table 1 iii b (Soundness, Autoclave expansion
IS 4031:1988) |
- |
|
|
|
| 3.1 Table 1 iv (Compretsive Strenqth 7 days
IS 4031:1988) |
- |
|
|
|
| 3.1 Table 1 iv (Compretsive Strenqth 7 days
IS 4031:1988) |
- |
|
|
|
| 3.1 Table 1 iv (Compretsive Strenqth 7 days
IS 4031:1988) |
- |
|
|
|
| 3.1 Table 1 iv (Compretsive Strenqth 7 days
IS 4031:1988) |
- |
|
|
|
| 3.1 Table 1 iv (Compretsive Strenqth 28 days
IS 4031:1988) |
- |
|
|
|
| 3.1 Table 1 iv (Compretsive Strenqth 28 days
IS 4031:1988) |
- |
|
|
|
| 3.1 Table 1 iv (Compretsive Strenqth 28 days
IS 4031:1988) |
- |
|
|
|
| 3.1 Table 1 iv (Compretsive Strenqth 28 days
IS 4031:1988) |
- |
|
|
|
|
- |
- " 500 g
Excluding Excl Air Content and Water retention test |
| 114 |
IS 12600 (1989) |
Portland cement, low heat - specification |
- |
- View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 6.1 (Fineness 4031 Part 2) |
- |
|
|
|
| 6.2.1 (Expansion by Le Chatelier- 4031 Part 3) |
- |
|
|
|
| 6.2.1 (Expansion by Autoclave- 4031 Part 3) |
- |
|
|
|
| 6.3 a) (Setting Time Initial- 4031 Part 5) |
- |
|
|
|
| 6.3 b) (Setting Time Final- 4031 Part 5) |
- |
|
|
|
| 6.3 a) (Setting Time Initial- 4031 Part 5) |
- |
|
|
|
| 6.3 b) (Setting Time Final- 4031 Part 5) |
- |
|
|
|
| 6.3 a) (Setting Time Initial- 4031 Part 5) |
- |
|
|
|
| 6.3 b) (Setting Time Final- 4031 Part 5) |
- |
|
|
|
| 6.3 a) (Setting Time Initial- 4031 Part 5) |
- |
|
|
|
| 6.3 b) (Setting Time Final- 4031 Part 5) |
- |
|
|
|
| 6.3 a) (Setting Time Initial- 4031 Part 5) |
- |
|
|
|
| 6.3 b) (Setting Time Final- 4031 Part 5) |
- |
|
|
|
| 6.4 a) (Compressive Strength At 72 hrs ± 1 hr - IS 4031 Part 6) |
- |
|
|
|
| 6.4 b) (Compressive Strength At 168 hrs ± 2 hr - IS 4031 Part 6) |
- |
|
|
|
| 6.4 c) (Compressive Strength At 672 hrs ± 4 hr - IS 4031 Part 6) |
- |
|
|
|
| 6.4 a) (Compressive Strength At 72 hrs ± 1 hr - IS 4031 Part 6) |
- |
|
|
|
| 6.4 b) (Compressive Strength At 168 hrs ± 2 hr - IS 4031 Part 6) |
- |
|
|
|
| 6.4 c) (Compressive Strength At 672 hrs ± 4 hr - IS 4031 Part 6) |
- |
|
|
|
| 6.4 a) (Compressive Strength At 72 hrs ± 1 hr - IS 4031 Part 6) |
- |
|
|
|
| 6.4 b) (Compressive Strength At 168 hrs ± 2 hr - IS 4031 Part 6) |
- |
|
|
|
| 6.4 c) (Compressive Strength At 672 hrs ± 4 hr - IS 4031 Part 6) |
- |
|
|
|
| 6.4 a) (Compressive Strength At 72 hrs ± 1 hr - IS 4031 Part 6) |
- |
|
|
|
| 6.4 b) (Compressive Strength At 168 hrs ± 2 hr - IS 4031 Part 6) |
- |
|
|
|
| 6.4 c) (Compressive Strength At 672 hrs ± 4 hr - IS 4031 Part 6) |
- |
|
|
|
| 6.4 a) (Compressive Strength At 72 hrs ± 1 hr - IS 4031 Part 6) |
- |
|
|
|
| 6.4 b) (Compressive Strength At 168 hrs ± 2 hr - IS 4031 Part 6) |
- |
|
|
|
| 6.4 c) (Compressive Strength At 672 hrs ± 4 hr - IS 4031 Part 6) |
- |
|
|
|
| 6.4 a) (Compressive Strength At 72 hrs ± 1 hr - IS 4031 Part 6) |
- |
|
|
|
| 6.4 b) (Compressive Strength At 168 hrs ± 2 hr - IS 4031 Part 6) |
- |
|
|
|
| 6.4 c) (Compressive Strength At 672 hrs ± 4 hr - IS 4031 Part 6) |
- |
|
|
|
| 6.4 a) (Compressive Strength At 72 hrs ± 1 hr - IS 4031 Part 6) |
- |
|
|
|
| 6.4 b) (Compressive Strength At 168 hrs ± 2 hr - IS 4031 Part 6) |
- |
|
|
|
| 6.4 c) (Compressive Strength At 672 hrs ± 4 hr - IS 4031 Part 6) |
- |
|
|
|
|
- |
- " 8Kg+1kg
Excluding Excl Heat of Hydration |
| 115 |
IS 12337 (1988) |
Specification for manually operated fertilizer broadcaster |
- |
Rs 600/- View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 4.1 (Constructional Requirements- Hopper) |
- |
|
|
|
| 4.1.1 (Constructional Requirements- Hopper) |
- |
|
|
|
| 4.2 (Constructional Requirements- Spreading Disc) |
- |
|
|
|
| 4.3 (Constructional Requirements- Feed Control Mechanism) |
- |
|
|
|
| 4.4 (Constructional Requirements- Agitator) |
- |
|
|
|
| 4.5 (Constructional Requirements- Gear Box and Gears) |
- |
|
|
|
| 4.6 (Constructional Requirements- Crank) |
- |
|
|
|
| 4.7 (Constructional Requirements- Straps) |
- |
|
|
|
| 4.7.1 (Constructional Requirements- Straps (Strap Drop Test)) |
- |
|
|
|
| 4.7 (Constructional Requirements- Straps (cushion width)) |
- |
|
|
|
| 4.7 (Constructional Requirements- Straps (cushion thickness)) |
- |
|
|
|
| 4.7.1 (Constructional Requirements- Straps (Strap Drop Test)) |
- |
|
|
|
| 4.8 (Constructional Requirements- Bearings) |
- |
|
|
|
| 4.9 (Constructional Requirements- Total Mass) |
- |
|
|
|
| 4.10. (Constructional Requirements) |
- |
|
|
|
| 5 (Capacity) |
- |
|
|
|
| 6.1 (Workmanship and Finish) |
- |
|
|
|
| 6.2 (Workmanship and Finish) |
- |
|
|
|
|
- |
- " 1 No.+ 15 kg of Fertilizer
excluding chemical tests |
| 116 |
IS 8329 (2000) |
Centrifugally cast (Spun) ductile iron pressure pipes for water, gas and sewage - Specification (Third Revision) |
- |
Rs.7800/- View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| Cl 10 (Hardness & Tensile Test) |
- |
|
|
|
| Cl 11 (Hydrostatic Test) |
- |
|
|
|
| Cl 13 (Length, Diameter, Wall Thickness & Ovality) |
- |
|
|
|
|
- |
- " 1 No.
Excluding Excl hydrostatic test, chemical facilty. Facility for preparation of test specimen not available. |
| 117 |
IS 1038 (1983) |
Specification For Steel Doors, Windows And Ventilators |
- |
3000 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 4.1. (Size-Height) |
- |
|
|
|
| 4.1 (Size-Width) |
- |
|
|
|
| 4.1. (Size-Height) |
- |
|
|
|
| 4.1 (Size-Width) |
- |
|
|
|
| 4.1. (Size-Height) |
- |
|
|
|
| 4.1 (Size-Width) |
- |
|
|
|
| 4.3 (Designation) |
- |
|
|
|
| 6.1.1.1 (Visual Inspection Test) |
- |
|
|
|
| 6.2 (Side Hung Shutter- Thickness of hinge) |
- |
|
|
|
| 6.2 (Side Hung Shutter- Pin diameter) |
- |
|
|
|
| 6.2 (Side Hung Shutter) |
- |
|
|
|
| 6.2 (Side Hung Shutter-Width of hinge) |
- |
|
|
|
| 6.2.2 & 6.2.2.1 (Handle and Handle Plate-Material of handel ) |
- |
|
|
|
| 6.2.2 & 6.2.2.1 (Handle and Handle Plate- Thicknesss of handle) |
- |
|
|
|
| 6.2.2 & 6.2.2.1 (Handle and Handle Plate-Height of handle plate) |
- |
|
|
|
| 6.2.3 (Peg Stay - Material) |
- |
|
|
|
| 6.2.3 (Peg Stay - Thickness) |
- |
|
|
|
| 6.2.3 (Peg Stay ) |
- |
|
|
|
| 6.3 (Top Hung Ventilator) |
- |
|
|
|
| 6.3 (Top Hung Ventilator-Thickness of hinge) |
- |
|
|
|
| 6.3 (Top Hung Ventilator-Pin diameter) |
- |
|
|
|
| 6.3 (Top Hung Ventilator-Width of hinge) |
- |
|
|
|
| 7.1 (Position of Holes) |
- |
|
|
|
| 7.2 Table 2 (Position of Fixing Screws) |
- |
|
|
|
| 7.2 Table 2 (Lugs-A) |
- |
|
|
|
| 7.2 Table 2 (Lugs-B) |
- |
|
|
|
| 7.2 Table 2 (Lugs-C) |
- |
|
|
|
| 7.2 Table 2 (Lugs-D) |
- |
|
|
|
| 7.2 Table 2 (Lugs-E) |
- |
|
|
|
| 6.2.3 (Peg Stay - Dimensions-F) |
- |
|
|
|
| 7.2 Table 2 (Lugs-G) |
- |
|
|
|
| 8 (Finish) |
- |
|
|
|
| 9 (Glazing) |
- |
|
|
|
|
- |
- " 1+1 NO.
Excluding Excl. micro and macro examination & Fillet weld test |
| 118 |
IS 4308 (2019) |
Dry Chemical Powders for Fire Fighting — BC, ABC and D Types — Specification ( Third Revision ) |
- |
Rs 5770/- for both ordinary type & foam compatible type View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| Clause 5 Table 1(iii) (Apparent density (Declared value by
the manufacturer)) |
- |
|
|
|
| Clause 5 Table 1(iv) (Particle size / sieve analysis (Declared value by
the manufacturer)) |
- |
|
|
|
| Clause 5 Table 1(vi) (Water repellency) |
- |
|
|
|
| Clause 5 Table 1(vii) (Moisture content) |
- |
|
|
|
| Clause 5 Table 1(xii) (colour) |
- |
|
|
|
|
- |
- " 5 kg
Excluding Rate of flow, Foam compatibility, Fire Test, Temperature Resistance Test , chemical constituents |
| 119 |
IS 11722 (1986) |
Specification for thin walled flexible quick coupling pipes |
- |
4800 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 4.1 (Pipe Manufacturing Process ) |
- |
|
|
|
| 5,5.1 (Workmsnship &Finish) |
- |
|
|
|
| 6 &7 ; Table 1 (Dimension & Tolerance) |
- |
|
|
|
| 8 (Length) |
- |
|
|
|
| 12 (Straightness) |
- |
|
|
|
| 13.1 (Flattening Test,IS 2328) |
- |
|
|
|
| 13.2 (Tensile Test ,; IS 1608(P1)) |
- |
|
|
|
|
- |
- " 2 nos.+coupler
Excluding excl hydraulic test,chemical tests |
| 120 |
IS 4224 (1972) |
Specification for steel wire for staples, pins and clips (First Revision) |
- |
525 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 4 (Freedom from defects , IS 4224) |
- |
|
|
|
| 5 (Sizes and Tolerances - IS 4224) |
- |
|
|
|
| 6 (Finish) |
- |
|
|
|
| 7.1 (Tensile Test - IS 1608(Pt -1)) |
- |
|
|
|
|
- |
- " 5 m + 100g drill.
Excluding chemical test |