| 151 |
IS 302 : Part 2 : Sec 202 (1992) |
Safety of household and similar electrical appliances: Part 2 particular requirements: Sec 202 electric stoves |
- |
Rs 2275/- View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 6 (Classification- IS 302-1 ) |
- |
|
|
|
| 6 (Classification- IS 302-1) |
- |
|
|
|
| 7.1 (Marking- IS 302-1) |
- |
|
|
|
| 7.1 (Marking- IS 302-1) |
- |
|
|
|
| 7.1 (Marking- IS 302-1) |
- |
|
|
|
| 7.1 (Marking- IS 302-1) |
- |
|
|
|
| 7.1 (Marking- IS 302-1) |
- |
|
|
|
| 7.1 (Marking- IS 302-1) |
- |
|
|
|
| 7.1 (Marking- IS 302-1) |
- |
|
|
|
| 7.1 (Marking- IS 302-1) |
- |
|
|
|
| 7.1 (Marking- IS 302-1) |
- |
|
|
|
| 7.3 (Marking- IS 302-1) |
- |
|
|
|
| 7.4 (Marking- IS 302-1) |
- |
|
|
|
| 7.6 (Marking- IS 302-1) |
- |
|
|
|
| 7.11 (Marking- IS 302-1) |
- |
|
|
|
| 7.12 (Marking- IS 302-1) |
- |
|
|
|
| 7.13 (Marking- IS 302-1) |
- |
|
|
|
| 7.14 (Marking- IS 302-1) |
- |
|
|
|
| 7.15 (Marking- IS 302-1) |
- |
|
|
|
| 7.101 (Marking) |
- |
|
|
|
| 8 ( Protection Against Electric Shock, IS 302-1) |
- |
|
|
|
| 10 (Power Input and Current, IS 302-1) |
- |
|
|
|
| 11 (Heating, IS 302-1) |
- |
|
|
|
| 11 (Heating, IS 302-1) |
- |
|
|
|
| 11 (Heating, IS 302-1) |
- |
|
|
|
| 11 (Heating, IS 302-1) |
- |
|
|
|
| 11 (Heating, IS 302-1) |
- |
|
|
|
| 11 (Heating, IS 302-1) |
- |
|
|
|
| 11 (Heating, IS 302-1) |
- |
|
|
|
| 13 (Electrical Insulation and Leakage Current at Operating Temperature: Leakage current, IS 302-1) |
- |
|
|
|
| 13 (Electrical Insulation and Leakage Current at Operating Temperature: High Voltage, IS 302-1) |
- |
|
|
|
| 15.1 (Moisture Resistance, IS 302-1) |
- |
|
|
|
| 15.3 (Moisture Resistance, IS 302-1) |
- |
|
|
|
| 16 (Electrical Insulation and Leakage Current at Operating Temperature: Leakage current, IS 302-1) |
- |
|
|
|
| 16 (Electrical Insulation and Leakage Current at Operating Temperature: High Voltage, IS 302-1) |
- |
|
|
|
| 19.2 (Abnormal Operation, IS 302-1) |
- |
|
|
|
| 19.2 (Abnormal Operation, IS 302-1) |
- |
|
|
|
| 19.3 (Abnormal Operation, IS 302-1) |
- |
|
|
|
| 19.3 (Abnormal Operation, IS 302-1) |
- |
|
|
|
| 20.1 (Stability & Mechanical Hazards, IS 302-1) |
- |
|
|
|
| 21.1 (Mechanical Strength, IS 302-1 & IS 302-2-202) |
- |
|
|
|
| 22 (Construction, IS 302-1) |
- |
|
|
|
| 22.101 (Construction) |
- |
|
|
|
| 22.102 (Construction) |
- |
|
|
|
| 22.103 (Construction) |
- |
|
|
|
| 22.104 (Construction) |
- |
|
|
|
| 22.105 (Construction) |
- |
|
|
|
| 22.105.1 (Construction) |
- |
|
|
|
| 22.105.2 (Construction) |
- |
|
|
|
| 22.106 (Construction) |
- |
|
|
|
| 22.107 (Construction) |
- |
|
|
|
| 11.107.1 (Construction) |
- |
|
|
|
| 23.1 (Internal Wiring, IS 302-1) |
- |
|
|
|
| 23.2 (Internal Wiring, IS 302-1) |
- |
|
|
|
| 23.8 (Internal Wiring, IS 302-1) |
- |
|
|
|
| 23.9 (Internal Wiring, IS 302-1) |
- |
|
|
|
| 23.10 (Internal Wiring, IS 302-1) |
- |
|
|
|
| 24.1 (Components, IS 302-1) |
- |
|
|
|
| 24.2 (Components, IS 302-1) |
- |
|
|
|
| 24.101 (Components) |
- |
|
|
|
| 25.1 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25.4 (Supply Connection and External Flexible Cords) |
- |
|
|
|
| 25.5 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25.6 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25.8 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 26.9 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25.1 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25.11 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25.12 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25.15 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25.16 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25.17 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25.18 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25.19 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25.2 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25.21 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25.22 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 26 (Terminals for External Conductors, IS 302-1) |
- |
|
|
|
| 27.1 (Provision for Earthing, IS 302-1) |
- |
|
|
|
| 27.2 (Provision for Earthing, IS 302-1) |
- |
|
|
|
| 27.3 (Provision for Earthing, IS 302-1) |
- |
|
|
|
| 27.4 (Provision for Earthing, IS 302-1) |
- |
|
|
|
| 27.5 (Provision for Earthing, IS 302-1) |
- |
|
|
|
| 28 (Screws & Connections, IS 302-1) |
- |
|
|
|
| 29.1 (Clearances, Creepage distances and Solid Insulation, IS 302-1) |
- |
|
|
|
| 29.2 (Clearances, Creepage distances and Solid Insulation, IS 302-1) |
- |
|
|
|
| 30.1 (Resistance to Heat, Fire & Tracking, IS 302-1) |
- |
|
|
|
| 30.2 (Resistance to Heat, Fire & Tracking, IS 302-1) |
- |
|
|
|
| 31 (Resistance of Rusting, IS 302-1) |
- |
|
|
|
|
- |
- Except 1. Cl. 14 Transient Overvoltage Test IS 302-1:2008 2. Cl. 19.11 and Cl. 19.12 abnormal test (for Electronic circuit) 3. Cl.24 Component Test IS 302-1:2008 |
| 152 |
IS 302 : Part 2 : Sec 201 (2008) |
Safety of household and similar electrical appliances: Part 2 particular requirements: Sec 201 electric immersion water heaters (First Revision) |
- |
Rs 6900/ View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| Cl.6 of IS 302-‐2-‐201:2008 (Classification) |
- |
|
|
|
| Cl.7 of IS 302-2-201:2008 (Marking and Instruction ) |
- |
|
|
|
| Cl.7 of IS 302-2-201:2008 (Marking and Instruction ) |
- |
|
|
|
| Cl.7 of IS 302-2-201:2008 (Marking and Instruction ) |
- |
|
|
|
| Cl.7 of IS 302-2-201:2008 (Marking and Instruction ) |
- |
|
|
|
| Cl.7 of IS 302-2-201:2008 (Marking and Instruction ) |
- |
|
|
|
| Cl.7 of IS 302-2-201:2008 (Marking and Instruction ) |
- |
|
|
|
| Cl.7 of IS 302-2-201:2008 (Marking and Instruction ) |
- |
|
|
|
| Cl.7 of IS 302-2-201:2008 (Marking and Instruction ) |
- |
|
|
|
| Cl.7 of IS 302-2-201:2008 (Marking and Instruction ) |
- |
|
|
|
| Cl.7 of IS 302-2-201:2008 (Marking and Instruction ) |
- |
|
|
|
| Cl.7 of IS 302-2-201:2008 (Marking and Instruction ) |
- |
|
|
|
| Cl.7 of IS 302-2-201:2008 (Marking and Instruction ) |
- |
|
|
|
| Cl.7 of IS 302-2-201:2008 (Marking and Instruction ) |
- |
|
|
|
| Cl.7 of IS 302-2-201:2008 (Marking and Instruction ) |
- |
|
|
|
| Cl.7 of IS 302-2-201:2008 (Marking and Instruction ) |
- |
|
|
|
| Cl.7 of IS 302-2-201:2008 (Marking and Instruction ) |
- |
|
|
|
| Cl.7 of IS 302-2-201:2008 (Marking and Instruction ) |
- |
|
|
|
| Cl.7 of IS 302-2-201:2008 (Marking and Instruction ) |
- |
|
|
|
| Cl.7 of IS 302-2-201:2008 (Marking and Instruction ) |
- |
|
|
|
| Cl.7 of IS 302-2-201:2008 (Marking and Instruction ) |
- |
|
|
|
| Cl.8 of IS 302‐2-201: 2008 (Protection Against Access to Live Parts) |
- |
|
|
|
| Cl.10 of IS 302‐2‐201:2008 (Power Input and Current ) |
- |
|
|
|
| Cl.11 of IS 302-2201: 2008 (Heating) |
- |
|
|
|
| Cl.11 of IS 302-2201: 2008 (Heating) |
- |
|
|
|
| Cl.11 of IS 302-2201: 2008 (Heating) |
- |
|
|
|
| Cl.11 of IS 302-2201: 2008 (Heating) |
- |
|
|
|
| Cl.11 of IS 302-2201: 2008 (Heating) |
- |
|
|
|
| Cl.11 of IS 302-2201: 2008 (Heating) |
- |
|
|
|
| Cl.11 of IS 302-2201: 2008 (Heating) |
- |
|
|
|
| Cl.11 of IS 302-2201: 2008 (Heating) |
- |
|
|
|
| Cl.11 of IS 302-2201: 2008 (Heating) |
- |
|
|
|
| Cl.11 of IS 302-2201: 2008 (Heating) |
- |
|
|
|
| Cl.11 of IS 302-2201: 2008 (Heating) |
- |
|
|
|
| Cl.13 of IS 302-2-201: 2008 (Leakage Current & Electric Strength at Operating Temperature) |
- |
|
|
|
| Cl.15 of IS 302-2-201:2008 (Moisture Resistance ) |
- |
|
|
|
| Cl.15 of IS 302-2-201:2008 (Moisture Resistance ) |
- |
|
|
|
| Cl.16 of IS 302-2-201:2008 (Leakage Current & Electric Strength) |
- |
|
|
|
| Cl.16 of IS 302-2-201:2008 (Leakage Current & Electric Strength) |
- |
|
|
|
| Cl.19 of IS 302‐2-201: 2008 (Abnormal Operation ) |
- |
|
|
|
| Cl.19 of IS 302‐2-201: 2008 (Abnormal Operation ) |
- |
|
|
|
| Cl.19 of IS 302‐2-201: 2008 (Abnormal Operation ) |
- |
|
|
|
| Cl.19 of IS 302‐2-201: 2008 (Abnormal Operation ) |
- |
|
|
|
| Cl.20 of IS 302-2-201: 2008 (Stability & Mechanical Hazards) |
- |
|
|
|
| Cl.21 of IS 302-2-201: 2008 (Mechanical Strength ) |
- |
|
|
|
| Cl.21 of IS 302-2-201: 2008 (Mechanical Strength ) |
- |
|
|
|
| Cl.21 of IS 302-2-201: 2008 (Mechanical Strength ) |
- |
|
|
|
| Cl.22 of IS 302-2-201: 2008 (Construction) |
- |
|
|
|
| Cl.23 of 302-2-201:2008 (Internal Wiring ) |
- |
|
|
|
| Cl.23 of 302-2-201:2008 (Internal Wiring ) |
- |
|
|
|
| Cl.23 of 302-2-201:2008 (Internal Wiring ) |
- |
|
|
|
| Cl.23 of 302-2-201:2008 (Internal Wiring ) |
- |
|
|
|
| Cl.23 of 302-2-201:2008 (Internal Wiring ) |
- |
|
|
|
| Cl.23 of 302-2-201:2008 (Internal Wiring ) |
- |
|
|
|
| Cl.23 of 302-2-201:2008 (Internal Wiring ) |
- |
|
|
|
| Cl.23 of 302-2-201:2008 (Internal Wiring ) |
- |
|
|
|
| Cl.23 of 302-2-201:2008 (Internal Wiring ) |
- |
|
|
|
| Cl.24 of IS 302-2-201: 2008 (Component) |
- |
|
|
|
| Cl.24 of IS 302-2-201: 2008 (Component) |
- |
|
|
|
| Cl.24 of IS 302-2-201: 2008 (Component) |
- |
|
|
|
| Cl.24 of IS 302-2-201: 2008 (Component) |
- |
|
|
|
| Cl.24 of IS 302-2-201: 2008 (Component) |
- |
|
|
|
| Cl.24 of IS 302-2-201: 2008 (Component) |
- |
|
|
|
| Cl.24 of IS 302-2-201: 2008 (Component) |
- |
|
|
|
| Cl.24 of IS 302-2-201: 2008 (Component) |
- |
|
|
|
| Cl.25 of IS 302-2-201: 2008 (Supply Connection and External Flexible Cords) |
- |
|
|
|
| Cl.25 of IS 302-2-201: 2008 (Supply Connection and External Flexible Cords) |
- |
|
|
|
| Cl.25 of IS 302-2-201: 2008 (Supply Connection and External Flexible Cords) |
- |
|
|
|
| Cl.25 of IS 302-2-201: 2008 (Supply Connection and External Flexible Cords) |
- |
|
|
|
| Cl.25 of IS 302-2-201: 2008 (Supply Connection and External Flexible Cords) |
- |
|
|
|
| Cl.25 of IS 302-2-201: 2008 (Supply Connection and External Flexible Cords) |
- |
|
|
|
| Cl.25 of IS 302-2-201: 2008 (Supply Connection and External Flexible Cords) |
- |
|
|
|
| Cl.25 of IS 302-2-201: 2008 (Supply Connection and External Flexible Cords) |
- |
|
|
|
| Cl.25 of IS 302-2-201: 2008 (Supply Connection and External Flexible Cords) |
- |
|
|
|
| Cl.25 of IS 302-2-201: 2008 (Supply Connection and External Flexible Cords) |
- |
|
|
|
| Cl.25 of IS 302-2-201: 2008 (Supply Connection and External Flexible Cords) |
- |
|
|
|
| Cl.25 of IS 302-2-201: 2008 (Supply Connection and External Flexible Cords) |
- |
|
|
|
| Cl.25 of IS 302-2-201: 2008 (Supply Connection and External Flexible Cords) |
- |
|
|
|
| Cl.25 of IS 302-2-201: 2008 (Supply Connection and External Flexible Cords) |
- |
|
|
|
| Cl.25 of IS 302-2-201: 2008 (Supply Connection and External Flexible Cords) |
- |
|
|
|
| Cl.25 of IS 302-2-201: 2008 (Supply Connection and External Flexible Cords) |
- |
|
|
|
| Cl.25 of IS 302-2-201: 2008 (Supply Connection and External Flexible Cords) |
- |
|
|
|
| Cl.25 of IS 302-2-201: 2008 (Supply Connection and External Flexible Cords) |
- |
|
|
|
| Cl.25 of IS 302-2-201: 2008 (Supply Connection and External Flexible Cords) |
- |
|
|
|
| Cl.25 of IS 302-2-201: 2008 (Supply Connection and External Flexible Cords) |
- |
|
|
|
| Cl.26 of IS 302-2-201: 2008 (Terminals for External Conductors) |
- |
|
|
|
| Cl.27 of IS 302-2-201: 2008 (Provision for Earthing ) |
- |
|
|
|
| Cl.27 of IS 302-2-201: 2008 (Provision for Earthing ) |
- |
|
|
|
| Cl.27 of IS 302-2-201: 2008 (Provision for Earthing ) |
- |
|
|
|
| Cl.27 of IS 302-2-201: 2008 (Provision for Earthing ) |
- |
|
|
|
| Cl.27 of IS 302-2-201: 2008 (Provision for Earthing ) |
- |
|
|
|
| Cl.27 of IS 302-2-201: 2008 (Provision for Earthing ) |
- |
|
|
|
| Cl.28 of IS 302-2-201: 2008 (Screws & Connections ) |
- |
|
|
|
| Cl.29 of IS 302-2‐201:2008 (Clearances, Creepage Distances and Solid Insulation ) |
- |
|
|
|
| Cl.30 of IS 302-2‐201:2008 (Resistance to Heat and Fire ) |
- |
|
|
|
| Cl.31 of IS 302-2-201:2008 (Resistance of Rusting ) |
- |
|
|
|
| Cl.32 of IS 302-2-201:2008 (Radiation, Toxicity and Similar Hazards) |
- |
|
|
|
|
- |
- Excluding test facility not availble for rating above 3kW |
| 153 |
IS 302 : Part 2 : Sec 30 (2007) |
Safety of household and similar electrical appliances: Part 2 particular requirements: Sec 30 room heaters (First Revision) |
- |
Please see remarks View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| Cl.6 (Classification) |
- |
|
|
|
| Cl.6 (Classification) |
- |
|
|
|
| Cl.7 & IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7 & IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7 & IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7 & IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7 & IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7 & IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7 & IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7 & IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7 & IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7 (Marking and Instructions) |
- |
|
|
|
| Cl.7 (Marking and Instructions) |
- |
|
|
|
| Cl.7 (Marking and Instructions) |
- |
|
|
|
| Cl.7.3 (Marking and Instructions) |
- |
|
|
|
| Cl.7.3 (Marking and Instructions) |
- |
|
|
|
| Cl.7.3 (Marking and Instructions) |
- |
|
|
|
| Cl.7.4 (Marking and Instructions) |
- |
|
|
|
| Cl.7.5 (Marking and Instructions) |
- |
|
|
|
| Cl.7.6 & IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7.8 of IS :302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7.9 of IS :302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7.10 of IS :302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7.11 of IS :302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7.12 & IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7.12 & IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7.12 & IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7.12 & IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7.12 & IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7.12 & IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7.12 & IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7.12 & IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7.12 & IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7.12 & IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7.12 & IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7.12 & IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7.12.1 & IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7.12.1 & IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7.12.1 & IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7.12.1 & IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7.12.1 & IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7.12.1 & IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7.12.1 & IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7.12.1 & IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7.12.1 & IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7.12.1 & IS:302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7.12.1 & IS:302-1:2009 (Marking and Instructions) |
- |
|
|
|
| Cl.7.13 of IS 302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7.14 of IS302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7.14 (Marking and Instructions) |
- |
|
|
|
| Cl.7.14 (Marking and Instructions) |
- |
|
|
|
| Cl.7.15 of IS 302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7.15 of IS 302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7.15 of IS 302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.7.15 of IS 302-1:2008 (Marking and Instructions) |
- |
|
|
|
| Cl.8 & IS:302-1:2008 (Protection Against Access to Live Parts) |
- |
|
|
|
| Cl.10 & IS:302-1:2008 (Power Input and Current) |
- |
|
|
|
| Cl.11 & IS:302-1:2008 (Heating) |
- |
|
|
|
| Cl.11 & IS:302-1:2008 (Heating) |
- |
|
|
|
| Cl.11 & IS:302-1:2008 (Heating) |
- |
|
|
|
| Cl.11 & IS:302-1:2008 (Heating) |
- |
|
|
|
| Cl.11 & IS:302-1:2008 (Heating) |
- |
|
|
|
| Cl.11 & IS:302-1:2008 (Heating) |
- |
|
|
|
| Cl.11 & IS:302-1:2008 (Heating) |
- |
|
|
|
| Cl.11 & IS:302-1:2008 (Heating) |
- |
|
|
|
| Cl.11 & IS:302-1:2008 (Heating) |
- |
|
|
|
| Cl.11 & IS:302-1:2008 (Heating) |
- |
|
|
|
| Cl.11 & IS:302-1:2008 (Heating) |
- |
|
|
|
| Cl.11 & IS:302-1:2008 (Heating) |
- |
|
|
|
| Cl.11 & IS:302-1:2008 (Heating) |
- |
|
|
|
| Cl.11.8 (Heating) |
- |
|
|
|
| Cl.11.8 (Heating) |
- |
|
|
|
| Cl.11.8 (Heating) |
- |
|
|
|
| Cl.13 & IS:302-1:2008 (Leakage Current & Electric Strength at operating temp. ) |
- |
|
|
|
| Cl.13 & IS:302-1:2008 (Leakage Current & Electric Strength at operating temp. ) |
- |
|
|
|
| Cl.15 & IS: 302-1:2008 (Moisture Resistance
) |
- |
|
|
|
| Cl.15.3 of IS 302-1:200 (Moisture Resistance
) |
- |
|
|
|
| Cl.16 & IS:302-1:2008 (Leakage Current & Electric Strength ) |
- |
|
|
|
| Cl.16 & IS:302-1:2008 (Leakage Current & Electric Strength ) |
- |
|
|
|
| Cl.19 & IS:302-1:2008 (Abnormal Operation.) |
- |
|
|
|
| Cl.19 & IS:302-1:2008 (Abnormal Operation.) |
- |
|
|
|
| Cl.19 & IS:302-1:2008 (Abnormal Operation.) |
- |
|
|
|
| Cl.19 & IS:302-1:2008 (Abnormal Operation.) |
- |
|
|
|
| Cl.19.101 (Abnormal Operation.) |
- |
|
|
|
| Cl.19.102 (Abnormal Operation.) |
- |
|
|
|
| Cl.19.103 (Abnormal Operation.) |
- |
|
|
|
| Cl.19.104 (Abnormal Operation.) |
- |
|
|
|
| Cl.19.105 (Abnormal Operation.) |
- |
|
|
|
| Cl.19.106 (Abnormal Operation.) |
- |
|
|
|
| Table 8 of IS 302-1:2008 (Abnormal Operation.) |
- |
|
|
|
| Cl.19.107 (Abnormal Operation.) |
- |
|
|
|
| Cl.19.108 (Abnormal Operation.) |
- |
|
|
|
| Cl.19.109 (Abnormal Operation.) |
- |
|
|
|
| Cl.19.110 (Abnormal Operation.) |
- |
|
|
|
| Cl.19.111 (Abnormal Operation.) |
- |
|
|
|
| Cl.19.112 (Abnormal Operation.) |
- |
|
|
|
| Cl.19.113 (Abnormal Operation.) |
- |
|
|
|
| Cl.19.114 (Abnormal Operation.) |
- |
|
|
|
| Cl.20 & IS:302-1:2008 (Stability & Mechanical Hazards) |
- |
|
|
|
| Cl.21 & IS:302-1:2008) (Mechanical Strength.) |
- |
|
|
|
| Cl.21.2 of IS 302-1:2008 (Mechanical Strength.) |
- |
|
|
|
| Cl.21.101 (Mechanical Strength.) |
- |
|
|
|
| Cl.21.102 (Mechanical Strength.) |
- |
|
|
|
| Cl.21.103 (Mechanical Strength.) |
- |
|
|
|
| Cl.22.1 of IS 302-1:2008 (Construction) |
- |
|
|
|
| Cl.22.5 of IS 302-1:2008 (Construction) |
- |
|
|
|
| Cl.22.6 of IS 302-1:2008 (Construction) |
- |
|
|
|
| Cl.22.7 of IS 302-1:2008 (Construction) |
- |
|
|
|
| Cl.22.8 of IS 302-1:2008 (Construction) |
- |
|
|
|
| Cl.22.9 of IS 302-1:2008 (Construction) |
- |
|
|
|
| Cl.22.11 (Construction) |
- |
|
|
|
| Cl.22.12 of IS 302-1:2008 (Construction) |
- |
|
|
|
| Cl.22.13 of IS 302-1:2008 (Construction) |
- |
|
|
|
| Cl.22.15 of IS 302-1:2008 (Construction) |
- |
|
|
|
| Cl.22.18 of IS 302-1:2008 (Construction) |
- |
|
|
|
| Cl.22.20 of IS 302-1:2008 (Construction) |
- |
|
|
|
| Cl.22.21 of IS 302-1:2008 (Construction) |
- |
|
|
|
| Cl.23 & IS:302-1:2008 (Internal Wiring
) |
- |
|
|
|
| Cl.23.4 & Cl.29 of 302-1:2008 (Internal Wiring
) |
- |
|
|
|
| Cl.23.5 of 302-1:2008 (Internal Wiring
) |
- |
|
|
|
| Cl.23.7 of 302-1:2008 (Internal Wiring
) |
- |
|
|
|
| C.23.7 of 302-1:2008 (Internal Wiring
) |
- |
|
|
|
| Cl.24.1 of 302-1:2008 (Component) |
- |
|
|
|
| Cl.24.1 of 302-1:2008 (Component) |
- |
|
|
|
| Cl.24.1.3 (Component) |
- |
|
|
|
| Cl.24.1.3 (Component) |
- |
|
|
|
| Cl.24.1.3 (Component) |
- |
|
|
|
| Cl.24.1.3 (Component) |
- |
|
|
|
| C.24.2 of 302-1:2008 (Component) |
- |
|
|
|
| Cl.24.10 (Component) |
- |
|
|
|
| Cl.24.1 of 302-1:2008 (Component) |
- |
|
|
|
| Cl.24.1 of 302-1:2008 (Component) |
- |
|
|
|
| Cl.24.1.3 (Component) |
- |
|
|
|
| Cl.24.1.3 (Component) |
- |
|
|
|
| Cl.24.1.3 (Component) |
- |
|
|
|
| Cl.24.1.3 (Component) |
- |
|
|
|
| C.24.2 of 302-1:2008 (Component) |
- |
|
|
|
| Cl.24.10 (Component) |
- |
|
|
|
| Cl.25.1 of 302-1:2008 (Supply Connection and External Flexible Cords ) |
- |
|
|
|
| Cl. 25.2 of IS 3021:2008 (Supply Connection and External Flexible Cords ) |
- |
|
|
|
| Cl. 25.3 of IS 302-1:2008 (Supply Connection and External Flexible Cords ) |
- |
|
|
|
| Cl. 25.4 of IS 302-1:2008 (Supply Connection and External Flexible Cords ) |
- |
|
|
|
| Cl.25.5 of 302-1:2008 (Supply Connection and External Flexible Cords ) |
- |
|
|
|
| Cl.25.6 of 302-1:2008 (Supply Connection and External Flexible Cords ) |
- |
|
|
|
| Cl.25.7. (Supply Connection and External Flexible Cords ) |
- |
|
|
|
| Cl.25.8 (Supply Connection and External Flexible Cords ) |
- |
|
|
|
| Cl. 25.9 (Supply Connection and External Flexible Cords ) |
- |
|
|
|
| Cl.25.10 of 302-1:2008 (Supply Connection and External Flexible Cords ) |
- |
|
|
|
| Cl. 25.11 (Supply Connection and External Flexible Cords ) |
- |
|
|
|
| Cl. 25.12 (Supply Connection and External Flexible Cords ) |
- |
|
|
|
| Cl. 25.13 (Supply Connection and External Flexible Cords ) |
- |
|
|
|
| Cl.7.101 (Marking and Instructions) |
- |
|
|
|
| Cl.25.14 of IS 302-1:2008 (Supply Connection and External Flexible Cords ) |
- |
|
|
|
| Cl.25.15 of IS 302-1:2008 (Supply Connection and External Flexible Cords ) |
- |
|
|
|
| Cl.25.17 of IS 302-1:2008 (Supply Connection and External Flexible Cords ) |
- |
|
|
|
| Cl.25.18 (Supply Connection and External Flexible Cords ) |
- |
|
|
|
| Cl.25.20 (Supply Connection and External Flexible Cords ) |
- |
|
|
|
| Cl.26.1 of IS 302-1:2008 (Terminal for External Conductors
) |
- |
|
|
|
| Cl.26.10 of IS 302-1:2008 (Terminal for External Conductors
) |
- |
|
|
|
| Cl.26.11 of IS 302-1:2008 (Terminal for External Conductors
) |
- |
|
|
|
| Cl.27.1 of 302-1:2008 (Provision for Earthing.) |
- |
|
|
|
| Cl.27.5 of 302-1:2008 (Provision for Earthing.) |
- |
|
|
|
| Cl.28 of 302-1:2008 (Screws and Connections.) |
- |
|
|
|
| Cl.29 & IS:302-1:2008 (Clearances, Creepage Distances and Solid Insulation) |
- |
|
|
|
| Cl.29 & IS:302-1:2008 (Clearances, Creepage Distances and Solid Insulation) |
- |
|
|
|
| Cl.30 & IS:302-1:2008 (Resistance to Heat and Fire) |
- |
|
|
|
| Cl.30.2.2 of 302-1:2008 (Resistance to Heat and Fire) |
- |
|
|
|
| Cl.31 & IS:302-1:2008 (Resistance to Rusting.) |
- |
|
|
|
| Cl.32 & IS:302-1:2008 (Radition,Toxicity and similar Hazards.) |
- |
|
|
|
|
- |
- Excluding 1. Cl. 14 Transient Overvoltage Test IS 302-1:2008 2. Cl. 19.11 and Cl. 19.12 abnormal test (for Electronic circuit) 3. Cl.24 Component Test IS 302-1:2008 |
| 154 |
IS 302 : Part 2 : Sec 14 (2009) |
Safety of household and similar electrical appliances: Part 2 particular requirements: Sec 14 electric kitchen machines (First Revision) |
- |
Rs.9800/- View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 6 (Classification- IS 302-1 ) |
- |
|
|
|
| 6 (Classification- IS 302-1) |
- |
|
|
|
| 7.1 (Marking- IS 302-1) |
- |
|
|
|
| 7.1 (Marking- IS 302-1) |
- |
|
|
|
| 7.1 (Marking- IS 302-1) |
- |
|
|
|
| 7.1 (Marking- IS 302-1) |
- |
|
|
|
| 7.1 (Marking- IS 302-1) |
- |
|
|
|
| 7.1 (Marking- IS 302-1) |
- |
|
|
|
| 7.1 (Marking- IS 302-1) |
- |
|
|
|
| 7.1 (Marking- IS 302-1) |
- |
|
|
|
| 7.3 (Marking- IS 302-1) |
- |
|
|
|
| 7.4 (Marking- IS 302-1) |
- |
|
|
|
| 7.6 (Marking- IS 302-1) |
- |
|
|
|
| 7.7 (Marking- IS 302-1) |
- |
|
|
|
| 7.8 (Marking- IS 302-1) |
- |
|
|
|
| 7.11 (Marking- IS 302-1) |
- |
|
|
|
| 7.12 (Marking- IS 302-1) |
- |
|
|
|
| 7.13 (Marking- IS 302-1) |
- |
|
|
|
| 7.14 (Marking- IS 302-1) |
- |
|
|
|
| 7.15 (Marking- IS 302-1) |
- |
|
|
|
| 7.101 (Marking) |
- |
|
|
|
| 8 ( Protection Against Electric Shock, IS 302-1) |
- |
|
|
|
| 10 (Power Input and Current, IS 302-1) |
- |
|
|
|
| 11 (Heating, IS 302-1) |
- |
|
|
|
| 11 (Heating, IS 302-1) |
- |
|
|
|
| 11 (Heating, IS 302-1) |
- |
|
|
|
| 11 (Heating, IS 302-1) |
- |
|
|
|
| 11 (Heating, IS 302-1) |
- |
|
|
|
| 8 ( Protection Against Electric Shock, IS 302-1) |
- |
|
|
|
| 13 (Electrical Insulation and Leakage Current at Operating Temperature: Leakage current, IS 302-1) |
- |
|
|
|
| 13 (Electrical Insulation and Leakage Current at Operating Temperature: High Voltage, IS 302-1) |
- |
|
|
|
| 15.1 (Moisture Resistance, IS 302-1) |
- |
|
|
|
| 15.2 (Moisture Resistance, IS 302-1) |
- |
|
|
|
| 15.1 (Moisture Resistance, IS 302-1) |
- |
|
|
|
| 16 (Electrical Insulation and Leakage Current at Operating Temperature: Leakage current, IS 302-1) |
- |
|
|
|
| 16 (Electrical Insulation and Leakage Current at Operating Temperature: High Voltage, IS 302-1) |
- |
|
|
|
| 19.7 (Abnormal Operation, IS 302-1) |
- |
|
|
|
| 19.8 (Abnormal Operation, IS 302-1) |
- |
|
|
|
| 19.9 (Abnormal Operation, IS 302-1) |
- |
|
|
|
| 19.1 (Abnormal Operation, IS 302-1) |
- |
|
|
|
| 19.101 (Abnormal Operation) |
- |
|
|
|
| 19.102 (Abnormal Operation) |
- |
|
|
|
| 20.1 (Stability & Mechanical Hazards, IS 302-1) |
- |
|
|
|
| 20.2 (Stability & Mechanical Hazards, IS 302-1) |
- |
|
|
|
| 20.101 (Stability & Mechanical Hazards) |
- |
|
|
|
| 20.102 (Stability & Mechanical Hazards) |
- |
|
|
|
| 20.103 (Stability & Mechanical Hazards) |
- |
|
|
|
| 20.104 (Stability & Mechanical Hazards) |
- |
|
|
|
| 20.105 (Stability & Mechanical Hazards) |
- |
|
|
|
| 20.106 (Stability & Mechanical Hazards) |
- |
|
|
|
| 20.107 (Stability & Mechanical Hazards) |
- |
|
|
|
| 20.108 (Stability & Mechanical Hazards) |
- |
|
|
|
| 20.109 (Stability & Mechanical Hazards) |
- |
|
|
|
| 20.110 (Stability & Mechanical Hazards) |
- |
|
|
|
| 20.111 (Stability & Mechanical Hazards) |
- |
|
|
|
| 20.112 (Stability & Mechanical Hazards) |
- |
|
|
|
| 20.113 (Stability & Mechanical Hazards) |
- |
|
|
|
| 20.114 (Stability & Mechanical Hazards) |
- |
|
|
|
| 20.115 (Stability & Mechanical Hazards) |
- |
|
|
|
| 20.116 (Stability & Mechanical Hazards) |
- |
|
|
|
| 21.1 (Mechanical Strength, IS 302-1) |
- |
|
|
|
| 21.2 (Mechanical Strength, IS 302-1) |
- |
|
|
|
| 22 (Construction, IS 302-1) |
- |
|
|
|
| 22.101 (Construction) |
- |
|
|
|
| 22.102 (Construction) |
- |
|
|
|
| 23.1 (Internal Wiring, IS 302-1) |
- |
|
|
|
| 23.2 (Internal Wiring, IS 302-1) |
- |
|
|
|
| 23.3 (Internal Wiring, IS 302-1) |
- |
|
|
|
| 23.4 (Internal Wiring, IS 302-1) |
- |
|
|
|
| 23.5 (Internal Wiring, IS 302-1) |
- |
|
|
|
| 23.6 (Internal Wiring, IS 302-1) |
- |
|
|
|
| 23.7 (Internal Wiring, IS 302-1) |
- |
|
|
|
| 23.8 (Internal Wiring, IS 302-1) |
- |
|
|
|
| 23.9 (Internal Wiring, IS 302-1) |
- |
|
|
|
| 23.10 (Internal Wiring, IS 302-1) |
- |
|
|
|
| 24.1 (Components, IS 302-1) |
- |
|
|
|
| 24.2 (Components, IS 302-1) |
- |
|
|
|
| 24.5 (Components, IS 302-1) |
- |
|
|
|
| 24.6 (Components, IS 302-1) |
- |
|
|
|
| 25.1 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25.5 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25.6 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25.7 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25.8 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 26.9 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25.1 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25.11 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25.12 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25.13 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25.14 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25.15 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25.16 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25.17 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25.18 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25.19 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25.2 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25.21 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25.22 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 26 (Terminals for External Conductors, IS 302-1) |
- |
|
|
|
| 27 (Provision for Earthing, IS 302-1) |
- |
|
|
|
| 27.2 (Provision for Earthing, IS 302-1) |
- |
|
|
|
| 27.3 (Provision for Earthing, IS 302-1) |
- |
|
|
|
| 27.4 (Provision for Earthing, IS 302-1) |
- |
|
|
|
| 27.5 (Provision for Earthing, IS 302-1) |
- |
|
|
|
| 28 (Screws & Connections, IS 302-1) |
- |
|
|
|
| 29.1 (Clearances, Creepage distances and Solid Insulation, IS 302-1) |
- |
|
|
|
| 29.2 (Clearances, Creepage distances and Solid Insulation, IS 302-1) |
- |
|
|
|
| 30.1 (Resistance to Heat and Fire, IS 302-1) |
- |
|
|
|
| 30.2 (Resistance to Heat and Fire, IS 302-1) |
- |
|
|
|
| 31 (Resistance of Rusting, IS 302-1) |
- |
|
|
|
| 32 (Radiation, Toxicity and similar Hazard IS 302-1) |
- |
|
|
|
|
- |
- Excluding 1. Cl. 14 Transient Overvoltage Test IS 302-1:2008 2. Cl. 19.11 and Cl. 19.12 abnormal test (for Electronic circuit) 3. Cl.24 Component Test IS 302-1:2008 4.Except Can openers,Cheese graters,Churns(heavy cream and buttermilk),Food mixers with beaters for mixing cake batter,Ice-cream machines,Knives,Mincers |
| 155 |
IS 302 : Part 2 : Sec 3 (2007) |
Safety of household and similar electrical appliances: Part 2 particular requirements: Sec 3 electric iron (First Revision) |
- |
Rs.8330/- View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 6 (Classification- IS 302-1 ) |
- |
|
|
|
| 6 (Classification- IS 302-1) |
- |
|
|
|
| 7.1 (Marking- IS 302-1) |
- |
|
|
|
| 7.1 (Marking- IS 302-1) |
- |
|
|
|
| 7.1 (Marking- IS 302-1) |
- |
|
|
|
| 7.1 (Marking- IS 302-1) |
- |
|
|
|
| 7.1 (Marking- IS 302-1) |
- |
|
|
|
| 7.1 (Marking- IS 302-1) |
- |
|
|
|
| 7.1 (Marking- IS 302-1) |
- |
|
|
|
| 7.1 (Marking- IS 302-1) |
- |
|
|
|
| 7.1 (Marking- IS 302-1) |
- |
|
|
|
| 7.3 (Marking- IS 302-1) |
- |
|
|
|
| 7.4 (Marking- IS 302-1) |
- |
|
|
|
| 7.6 (Marking- IS 302-1) |
- |
|
|
|
| 7.7 (Marking- IS 302-1) |
- |
|
|
|
| 7.8 (Marking- IS 302-1) |
- |
|
|
|
| 7.11 (Marking- IS 302-1) |
- |
|
|
|
| 7.12 (Marking- IS 302-1) |
- |
|
|
|
| 7.13 (Marking- IS 302-1) |
- |
|
|
|
| 7.14 (Marking- IS 302-1) |
- |
|
|
|
| 7.15 (Marking- IS 302-1) |
- |
|
|
|
| 7.101 (Marking) |
- |
|
|
|
| 8 ( Protection Against Electric Shock, IS 302-1) |
- |
|
|
|
| 10 (Power Input and Current, IS 302-1) |
- |
|
|
|
| 11 (Heating, IS 302-1) |
- |
|
|
|
| 11 (Heating, IS 302-1) |
- |
|
|
|
| 11 (Heating, IS 302-1) |
- |
|
|
|
| 11 (Heating, IS 302-1) |
- |
|
|
|
| 11 (Heating, IS 302-1) |
- |
|
|
|
| 11 (Heating, IS 302-1) |
- |
|
|
|
| 11 (Heating, IS 302-1) |
- |
|
|
|
| 11 (Heating, IS 302-1) |
- |
|
|
|
| 13 (Electrical Insulation and Leakage Current at Operating Temperature: Leakage current, IS 302-1) |
- |
|
|
|
| 13 (Electrical Insulation and Leakage Current at Operating Temperature: High Voltage, IS 302-1) |
- |
|
|
|
| 15.1 (Moisture Resistance, IS 302-1) |
- |
|
|
|
| 15.2 (Moisture Resistance, IS 302-1) |
- |
|
|
|
| 15.3 (Moisture Resistance, IS 302-1) |
- |
|
|
|
| 16 (Electrical Insulation and Leakage Current at Operating Temperature: Leakage current, IS 302-1) |
- |
|
|
|
| 16 (Electrical Insulation and Leakage Current at Operating Temperature: High Voltage, IS 302-1) |
- |
|
|
|
| 19.4 (Abnormal Operation, IS 302-1) |
- |
|
|
|
| 19.4 (Abnormal Operation, IS 302-1) |
- |
|
|
|
| 19.5 (Abnormal Operation, IS 302-1) |
- |
|
|
|
| 19.5 (Abnormal Operation, IS 302-1) |
- |
|
|
|
| 19.7 (Abnormal Operation) |
- |
|
|
|
| 19.9 (Abnormal Operation) |
- |
|
|
|
| 19.1 (Abnormal Operation) |
- |
|
|
|
| 19.101 (Abnormal Operation) |
- |
|
|
|
| 20.1 (Stability & Mechanical Hazards, IS 302-1) |
- |
|
|
|
| 20.2 (Stability & Mechanical Hazards, IS 302-1) |
- |
|
|
|
| 21.1 (Mechanical Strength, IS 302-1) |
- |
|
|
|
| 21.2 (Mechanical Strength, IS 302-1) |
- |
|
|
|
| 21.101 (Mechanical Strength, IS 302-2-3) |
- |
|
|
|
| 22 (Construction, IS 302-1) |
- |
|
|
|
| 22.101 (Construction) |
- |
|
|
|
| 22.102 (Construction) |
- |
|
|
|
| 22.103 (Construction) |
- |
|
|
|
| 22.104 (Construction) |
- |
|
|
|
| 22.105 (Construction) |
- |
|
|
|
| 22.106 (Construction) |
- |
|
|
|
| 22.107 (Construction) |
- |
|
|
|
| 23.1 (Internal Wiring, IS 302-1) |
- |
|
|
|
| 23.2 (Internal Wiring, IS 302-1) |
- |
|
|
|
| 23.3 (Internal Wiring, IS 302-1) |
- |
|
|
|
| 23.4 (Internal Wiring, IS 302-1) |
- |
|
|
|
| 23.5 (Internal Wiring, IS 302-1) |
- |
|
|
|
| 23.6 (Internal Wiring, IS 302-1) |
- |
|
|
|
| 23.7 (Internal Wiring, IS 302-1) |
- |
|
|
|
| 23.8 (Internal Wiring, IS 302-1) |
- |
|
|
|
| 23.9 (Internal Wiring, IS 302-1) |
- |
|
|
|
| 23.10 (Internal Wiring, IS 302-1) |
- |
|
|
|
| 25.6 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 24.1 (Components, IS 302-1) |
- |
|
|
|
| 24.2 (Components, IS 302-1) |
- |
|
|
|
| 24.4 (Components, IS 302-1) |
- |
|
|
|
| 24.5 (Components, IS 302-1) |
- |
|
|
|
| 24.6 (Components, IS 302-1) |
- |
|
|
|
| 25.1 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25.5 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25.7 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25.8 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 23.9 (Internal Wiring, IS 302-1) |
- |
|
|
|
| 25.14 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25.14 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25.15 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25.16 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25.15 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25.17 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25.18 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25.19 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25.2 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25.21 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 25.22 (Supply Connection and External Flexible Cords, IS 302-1) |
- |
|
|
|
| 26 (Terminals for External Conductors, IS 302-1) |
- |
|
|
|
| 27.1 (Provision for Earthing, IS 302-1) |
- |
|
|
|
| 27.2 (Provision for Earthing, IS 302-1) |
- |
|
|
|
| 27.3 (Provision for Earthing, IS 302-1) |
- |
|
|
|
| 27.4 (Provision for Earthing, IS 302-1) |
- |
|
|
|
| 27.5 (Provision for Earthing, IS 302-1) |
- |
|
|
|
| 28 (Screws & Connections, IS 302-1) |
- |
|
|
|
| 29.1 (Clearances, Creepage distances and Solid Insulation, IS 302-1) |
- |
|
|
|
| 29.2 (Clearances, Creepage distances and Solid Insulation, IS 302-1) |
- |
|
|
|
| 30.1 (Resistance to Heat, Fire & Tracking, IS 302-1) |
- |
|
|
|
| 30.2 (Resistance to Heat, Fire & Tracking, IS 302-1) |
- |
|
|
|
| 31 (Resistance of Rusting, IS 302-1) |
- |
|
|
|
| 32 (Radiation, Toxicity and similar Hazard IS 302-1) |
- |
|
|
|
|
- |
- Excluding Cl. 22.105 construction for cordless iron ,Cl.22.16 Cord reel test setup,Cl. 14 Transient Overvoltage Test IS 302-1:2008 ,Cl. 19.11 and Cl. 19.12 abnormal test (for Electronic circuit) ,Cl.24 Component Test IS 302-1:2008 |
| 156 |
IS 8041 (1990) |
Rapid hardening portland cement - Specific4tion (Second Revision) |
- |
Please see remarks View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 6.1 (Fineness 4031 Part 2) |
- |
|
|
|
| 6.1 (Fineness 4031 Part 2) |
- |
|
|
|
| 6.2.1 (Expansion by Le Chatelier- 4031 Part 3) |
- |
|
|
|
| 6.2.1 (Expansion by Autoclave- 4031 Part 3) |
- |
|
|
|
| 6.3 a) (Setting Time Initial- 4031 Part 5) |
- |
|
|
|
| 6.3 a) (Setting Time Initial- 4031 Part 5) |
- |
|
|
|
| 6.4 a) (Compressive Strength At 24 hrs ± 30 minutes - IS 4031 Part 6) |
- |
|
|
|
| 5.1 - Table - 1 i (Ratio of percentage of lime to percentages of silica, alumina and iron oxide - Cl 4 of IS 4032:1985) |
- |
|
|
|
| 5.1 - Table - 1 ii (Ratio of percentage of alumina to that of iron oxide - Cl 4 of IS 4032:1985) |
- |
|
|
|
| 5.1 - Table - 1 iii (Insoluble residue - Cl 4.10 of IS 4032:1985) |
- |
|
|
|
| 5.1 - Table - 1 iv (Magnesia - Cl 4.8 of IS 4032:1985) |
- |
|
|
|
| 5.1 - Table - 1 v (Total Sulphur Content calculated as Sulphuric Anhydride (SO3) - Cl 4.9 of IS 4032:1985) |
- |
|
|
|
| 5.1 - Table - 1 vi (Total loss on ignition - Cl 4.2 of IS 4032:1985) |
- |
|
|
|
|
- |
- Test facility is complete |
| 157 |
IS 8042 (2015) |
White portland cement - Specification (Third Revision) |
- |
Rs 12050/- View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 6 -Table 2- i (Fineness 4031 Part 2) |
- |
|
|
|
| 6 -Table 2- ii- a (Expansion by Le Chatelier- 4031 Part 3) |
- |
|
|
|
| 6 -Table 2- ii- a (Expansion after aeration - 4031 Part 3) |
- |
|
|
|
| 6 -Table 2- ii- b (Expansion by Autoclave- 4031 Part 3) |
- |
|
|
|
| 6-Table 2- ii- b (Expansion after aeration- 4031 Part 3) |
- |
|
|
|
| 6 -Table 2- iii- a (Setting Time Initial- 4031 Part 5) |
- |
|
|
|
| 6 -Table 2- iv- a (Compressive Strength At 72 hrs ± 1 hr - IS 4031 Part 6) |
- |
|
|
|
| 5 - Table - 1 iii (Insoluble residue - Cl 4.10 of IS 4032:1985) |
- |
|
|
|
| 5 - Table - 1 i (Ratio of percentage of lime to percentages of silica, alumina and iron oxide - Cl 4 of IS 4032:1985) |
- |
|
|
|
| 5 - Table - 1 iv (Magnesia - Cl 4.8 of IS 4032:1985) |
- |
|
|
|
| 5 - Table - 1 v (Total Sulphur Content calculated as Sulphuric Anhydride (SO3) - Cl 4.9 of IS 4032:1985) |
- |
|
|
|
| 5 - Table - 1 vi (Loss on ignition - Cl 4.2 of IS 4032:1985) |
- |
|
|
|
| 5 - Table - 1 vii (Chloride content - Cl 4.13 of IS 4032:1985) |
- |
|
|
|
| 5 - Table - 1 ii (Iron oxide - Cl 4.5 of IS 4032:1985) |
- |
|
|
|
| 5 - Table - 1 iii (Insoluble residue - Cl 4.10 of IS 4032:1985) |
- |
|
|
|
|
- |
- Excluding Degree of whiteness in terms of reflectance, Optional Test Transverse Strength |
| 158 |
IS 7231 (1994) |
plastic flushing cisterns for waterclosets and urinals |
- |
Rs.8100/- View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| Cl 5.1 (Cistern) |
- |
|
|
|
| Cl 5.2 (Cover) |
- |
|
|
|
| Cl 5.3 (Flush pipe) |
- |
|
|
|
| Cl 5.3.1 (Flush pipe connection to cistern.) |
- |
|
|
|
| Cl 5.4 (Inlet and overflow holes) |
- |
|
|
|
| Cl 5.6 (Operating mechanism / lever) |
- |
|
|
|
| Cl 5.8 (Overflow pipe) |
- |
|
|
|
| 4 ,Table- 1, S.No 2 AND AS PER IS 1239-1 (CARBON) |
- |
|
|
|
| 4 ,Table- 1, S.No 2 AND AS PER IS 1239-1 (SULPHUR) |
- |
|
|
|
| 4 ,Table- 1, S.No 2 AND AS PER IS 1239-1 (MANGANESE) |
- |
|
|
|
| 4 ,Table- 1, S.No 2 AND AS PER IS 1239-1 (PHOSPHORUS) |
- |
|
|
|
|
- |
- Test facility not availabe |
| 159 |
IS 14542 (1998) |
Partly skimmed milk powder specification |
ALL TYPE |
- View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| Table 1(i) (Moisture Type I (IS 11623)) |
- |
|
|
|
| Table 1(i) (Moisture Type II (IS 11623)) |
- |
|
|
|
| Table 1(ii) (Total solids (milk solids and added salts) Type I (IS 11623)) |
- |
|
|
|
| Table 1(ii) (Total solids (milk solids and added salts) Type II (IS 11623)) |
- |
|
|
|
| Table 1(iii) (Milk fat, Type I (IS I1722)) |
- |
|
|
|
| Table 1(iii) (Milk fat, Type II (IS I1722)) |
- |
|
|
|
| Table 1(iv) (Insolubility index, a) Roller dried Type I (IS 12759)) |
- |
|
|
|
| Table 1(iv) (Insolubility index, a) Roller dried Type II (IS 12759)) |
- |
|
|
|
| Table 1(iv) (Insolubility index, b) Spray dried Type I (IS 12759)) |
- |
|
|
|
| Table 1(iv) (Insolubility index, b) Spray dried Type II (IS 12759)) |
- |
|
|
|
| Table 1(v) (Total ash Type I (Annex B of IS 14433 - Part 1)) |
- |
|
|
|
| Table 1(v) (Total ash Type II (Annex B of IS 14433 - Part 1)) |
- |
|
|
|
| Table 1(vi) (Titratable acidity (as lactic acid) Type I (IS 11766)) |
- |
|
|
|
| Table 1(vi) (Titratable acidity (as lactic acid) Type II (IS 11766)) |
- |
|
|
|
| Cl 6.6.1 (Bacterial Count (IS 5402)) |
- |
|
|
|
| Cl 6.6.2 (Coliform Count ((IS 5402)) |
- |
|
|
|
|
- |
- Test facility is complete |
| 160 |
IS 9762 (1994) |
Specification for polyethylene floats (Spherical) for float valves |
- |
Rs.4500/ View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 6, 6.1 (Table 1) (Dimensions and Tolerances) |
- |
|
|
|
| 6.2.1 (Wall Thickness) |
- |
|
|
|
| 6.2.2 (Wall Thickness) |
- |
|
|
|
| 6, 6.1 (Table 1) (Tapping of boss, A) |
- |
|
|
|
| 6, 6.1 (Table 1) (Insert wall thickness, t ( below threads )) |
- |
|
|
|
| 6, 6.1 (Table 1) (Insert base thickcess, T) |
- |
|
|
|
| 6, 6.1 (Table 1) (Axial length of thread, B (min)) |
- |
|
|
|
| cl 8.1 (Leakage & water ab. Test) |
- |
|
|
|
| cl 8.2 (Deflection Test) |
- |
|
|
|
| cl 8.3 (Impact test) |
- |
|
|
|
| cl 8.4 (Boss test) |
- |
|
|
|
|
- |
- Excluding dimensional test |
| 161 |
IS 1660 (2009) |
Wrought aluminium utensils - Specification (First Revision) |
- |
Rs 6760/- View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 3.1 (Classification Heavy/Medium/L:ight) |
- |
|
|
|
| 4 (Material) |
- |
|
|
|
| 0.5 (Fabrication) |
- |
|
|
|
| 5.1 (The utensil shall be pressed or spun from one piece) |
- |
|
|
|
| 5.2 ( Body Thickness of the thinnest part of the finished utensil, mm Not declared ) |
- |
|
|
|
| 5.2 (Lid Thickness of the finished utensil, mm) |
- |
|
|
|
| 6.1 & Table 1 ( i) Name of Utensil ) |
- |
|
|
|
| 6.1 & Table 1 (ii) Shape of Utensil) |
- |
|
|
|
| 6.1 & Table 1 ( Nominal Size, mm) |
- |
|
|
|
| 6.1 & Table 1 (Inside dia, Φ D mm Not declared ) |
- |
|
|
|
| 6.1 & Table 1 (Outside dia Ф NA) |
- |
|
|
|
| 6.1 & Table 1 (Height NA) |
- |
|
|
|
| 6.1 & Table 1 (Capacity, l NA) |
- |
|
|
|
| 6.1 ( Minimum sheet thickness for nominal size ) |
- |
|
|
|
| 7.1 (HANDLES ,When fitted shall be of aluminium, stainless steel or of other suitable fire resistance material These shall be fastened to the utensils by tightly drawn aluminium or stainless steel rivets, by welding, by screwing to cast bosses or by riveting between flange at the end of the handles. Handles shall be so shaped and positioned to facilitate the carrying and handling of the utensils in normal use ) |
- |
|
|
|
| 7.2 (Handles shall be sufficiently strong to support a mass in the utensils equivalent to three times the mass of the water capacity of the utensils in the position of normal use without visible permanent deformation of the handle or utensil) |
- |
|
|
|
| 8.1 (The utensils shall be clean reasonably free from distortion, dents, wrinkles, wavy surface, burrs, scratches, pitting and deep tool marks and other surface defects) |
- |
|
|
|
| 8.2 (The design of the utensils shall be such that it is easy to clean and prevent accumulation of dirt) |
- |
|
|
|
| 8.4.3 (Abrasion Resistance When the coating surface is rubbed two or three times with emery paper with emery conforming to grit number 180 using medium finger pressure, it shall not abrade the surface but shall skid over the surface showing not more than a trace of whitening of the surface) |
- |
|
|
|
| 8.4.4 (The colour of the hard anodic coating varies depending upon the alloy, thickness of the coating and electrolye. Normally the colour may vary from dark grey (almost black) to light grey. ) |
- |
|
|
|
| 9 (The manufacturer shall provide full instructions for use and cleaning for coated or hard anodized utensils) |
- |
|
|
|
| 10 (Each vessel shall be legibly and indelibly stamped on the outside surface or handle with the manufacturer’s name or registered trade-mark, size and thickness or class. ) |
- |
|
|
|
|
- |
- Excluding Material tests,anodized and non stick coating, test for lunch boxes. |
| 162 |
IS 8794 (1988) |
Specification for cast iron detachable joints for use with asbestos cement pressure pipes (First Revision) |
- |
3900/- View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 6.1, Table 2 (External Dia of AC Pipe(D2)) |
- |
|
|
|
| 6.1, Table 2 (Inside diaFlange(DI)) |
- |
|
|
|
| 6.1, Table 2 (External Dia at Centre(DEC)) |
- |
|
|
|
| 6.1, Table 2 (Thickness(t)) |
- |
|
|
|
| 6.1, Table 3 (Nominal Dia of Bolt(do)) |
- |
|
|
|
| 6.1, Table 3 (Minimum prefared length of bolt(L)) |
- |
|
|
|
| 6.1, Table 4 (Mass of joints) |
- |
|
|
|
| 8.4 (Coating) |
- |
|
|
|
|
- |
- HST for size above 300 mm, Facility for Chemical tests not available |
| 163 |
IS 1166 (1986) |
Specification for condensed milk, partly skimmed and skimmed condensed milk (Second Revision) |
- |
10430 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| Table 1 (i) (Apendix B) (Total milk solids - Partly Skimmed Condenied Milk) |
- |
|
|
|
| Table 1 (ii) (IS : 11762-
1986) (Fat -Condensed Milk) |
- |
|
|
|
| Table 1 (iii) (Apendix C) (Sucrose -Condensed Milk) |
- |
|
|
|
| Table 1 (vi) (Apendix D) (Titratable acidity (as lactic acid) -Condensed Milk) |
- |
|
|
|
| Table 1 (v) (Apendix E) (Accelerated starage test -Condensed Milk) |
- |
|
|
|
| Cl.5.1.10.1 (Salmonella IS 5887 Part 3) |
- |
|
|
|
| Cl.5.1.10.1 (Shigella IS 5887 Part 7) |
- |
|
|
|
| Cl.5.1.10.2 (Coliform Count IS 5401 Part 1) |
- |
|
|
|
| Cl.5.1.10.3 (Yeast and Mould Count IS 5403) |
- |
|
|
|
| Cl.5.1.10.4 (Coagulase positive Staphylococcus aureus IS 5887 Part 2) |
- |
|
|
|
| Cl.5.1.10.5 (Escherichia coli IS 5887 Part 1) |
- |
|
|
|
|
- |
- Microbiological testing is complete. Excluding Except Lactate Crystals |
| 164 |
IS 2082 (2018) |
Stationary storage type electric water heaters - Specification (Fifth Revision) |
- |
- View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 6 (Classification ) |
- |
|
|
|
| 6 (Classification ) |
- |
|
|
|
| 7 (Marking) |
- |
|
|
|
| 7 (Marking) |
- |
|
|
|
| 7 (Marking) |
- |
|
|
|
| 7 (Marking) |
- |
|
|
|
| 7 (Marking) |
- |
|
|
|
| 7 (Marking) |
- |
|
|
|
| 7 (Marking) |
- |
|
|
|
| 7 (Marking) |
- |
|
|
|
| 7 (Marking) |
- |
|
|
|
| 7 (Marking) |
- |
|
|
|
| 7 (Marking) |
- |
|
|
|
| 7 (Marking) |
- |
|
|
|
| 7 (Marking) |
- |
|
|
|
| 7 (Marking) |
- |
|
|
|
| 7 (Marking) |
- |
|
|
|
| 7 (Marking) |
- |
|
|
|
| 7 (Marking) |
- |
|
|
|
| 7 (Marking) |
- |
|
|
|
| 7 (Marking) |
- |
|
|
|
| 7 (Marking) |
- |
|
|
|
| 7 (Marking) |
- |
|
|
|
| 7 (Marking) |
- |
|
|
|
| 7 (Marking) |
- |
|
|
|
| 7 (Marking) |
- |
|
|
|
| 7 (Marking) |
- |
|
|
|
| 7 (Marking) |
- |
|
|
|
| 7 (Marking) |
- |
|
|
|
| (Cl.8 of IS 302-2-21:2011) (Protection Against Access to Live Parts) |
- |
|
|
|
| (Cl.10 of IS 302-2-21: 2011) (Power Input & Current) |
- |
|
|
|
| (Cl.11 of 302-2-21:2011) (Heating) |
- |
|
|
|
| (Cl.11 of 302-2-21:2011) (Heating) |
- |
|
|
|
| (Cl.13 of IS 302-2-21:2011) (Leakage Current ) |
- |
|
|
|
| (Cl.15 of IS 302-2-21-2011) (Moisture Resistance) |
- |
|
|
|
| (Cl.15 of IS 302-2-21-2011) (Moisture Resistance) |
- |
|
|
|
| (Cl.15 of IS 302-2-21-2011) (Moisture Resistance) |
- |
|
|
|
| (Cl.19 of IS 302-2-21:2011) (Abnormal Operation) |
- |
|
|
|
| (Cl.19 of IS 302-2-21:2011) (Abnormal Operation) |
- |
|
|
|
| (Cl.19 of IS 302-2-21:2011) (Abnormal Operation) |
- |
|
|
|
| (Cl.19 of IS 302-2-21:2011) (Abnormal Operation) |
- |
|
|
|
| (Cl.20 of IS 302-2-21:2011) (Stability & Mechanical Hazards) |
- |
|
|
|
| (Cl.21ofIS302-2-21:2011) (Mechanical strength) |
- |
|
|
|
| (Cl.22 Of
IS 302-2-21:2011) (Construction) |
- |
|
|
|
| (Cl.22 Of
IS 302-2-21:2011) (Construction) |
- |
|
|
|
| (Cl.22 Of
IS 302-2-21:2011) (Construction) |
- |
|
|
|
| (Cl.22 Of
IS 302-2-21:2011) (Construction) |
- |
|
|
|
| (Cl.22 Of
IS 302-2-21:2011) (Construction) |
- |
|
|
|
| (Cl.22 Of
IS 302-2-21:2011) (Construction) |
- |
|
|
|
| (Cl.22 Of
IS 302-2-21:2011) (Construction) |
- |
|
|
|
| (Cl.22 Of
IS 302-2-21:2011) (Construction) |
- |
|
|
|
| (Cl.22 Of
IS 302-2-21:2011) (Construction) |
- |
|
|
|
| (Cl.22 Of
IS 302-2-21:2011) (Construction) |
- |
|
|
|
| (Cl.22 Of
IS 302-2-21:2011) (Construction) |
- |
|
|
|
| (Cl.22 Of
IS 302-2-21:2011) (Construction) |
- |
|
|
|
| (Cl.22 Of
IS 302-2-21:2011) (Construction) |
- |
|
|
|
| (Cl.22 Of
IS 302-2-21:2011) (Construction) |
- |
|
|
|
| (Cl.22 Of
IS 302-2-21:2011) (Construction) |
- |
|
|
|
| (Cl.22 Of
IS 302-2-21:2011) (Construction) |
- |
|
|
|
| (Cl.22 Of
IS 302-2-21:2011) (Construction) |
- |
|
|
|
| (Cl.22 Of
IS 302-2-21:2011) (Construction) |
- |
|
|
|
| (Cl.22 Of
IS 302-2-21:2011) (Construction) |
- |
|
|
|
| (Cl.22 Of
IS 302-2-21:2011) (Construction) |
- |
|
|
|
| (Cl.22 Of
IS 302-2-21:2011) (Construction) |
- |
|
|
|
| (Cl.22 Of
IS 302-2-21:2011) (Construction) |
- |
|
|
|
| (Cl.22 Of
IS 302-2-21:2011) (Construction) |
- |
|
|
|
| (Cl.22 Of
IS 302-2-21:2011) (Construction) |
- |
|
|
|
| (Cl.22 Of
IS 302-2-21:2011) (Construction) |
- |
|
|
|
| (Cl.22 Of
IS 302-2-21:2011) (Construction) |
- |
|
|
|
| (Cl.22 Of
IS 302-2-21:2011) (Construction) |
- |
|
|
|
| (Cl.22 Of
IS 302-2-21:2011) (Construction) |
- |
|
|
|
| (Cl.22 Of
IS 302-2-21:2011) (Construction) |
- |
|
|
|
| (Cl.22 Of
IS 302-2-21:2011) (Construction) |
- |
|
|
|
| (Cl.22 Of
IS 302-2-21:2011) (Construction) |
- |
|
|
|
| (Cl.22 Of
IS 302-2-21:2011) (Construction) |
- |
|
|
|
| (Cl.22 Of
IS 302-2-21:2011) (Construction) |
- |
|
|
|
| (Cl.22 Of
IS 302-2-21:2011) (Construction) |
- |
|
|
|
| (Cl.22 Of
IS 302-2-21:2011) (Construction) |
- |
|
|
|
| (Cl.22 Of
IS 302-2-21:2011) (Construction) |
- |
|
|
|
| (Cl.22 Of
IS 302-2-21:2011) (Construction) |
- |
|
|
|
| (Cl.22 Of
IS 302-2-21:2011) (Construction) |
- |
|
|
|
| (Cl.22 Of
IS 302-2-21:2011) (Construction) |
- |
|
|
|
| (Cl.22 Of
IS 302-2-21:2011) (Construction) |
- |
|
|
|
| (Cl.22 Of
IS 302-2-21:2011) (Construction) |
- |
|
|
|
| (Cl.22 Of
IS 302-2-21:2011) (Construction) |
- |
|
|
|
| (Cl.22 Of
IS 302-2-21:2011) (Construction) |
- |
|
|
|
| (Cl.22 Of
IS 302-2-21:2011) (Construction) |
- |
|
|
|
| (Cl.22 Of
IS 302-2-21:2011) (Construction) |
- |
|
|
|
| (Cl.22 Of
IS 302-2-21:2011) (Construction) |
- |
|
|
|
| (Cl.22 Of
IS 302-2-21:2011) (Construction) |
- |
|
|
|
| (Cl.22 Of
IS 302-2-21:2011) (Construction) |
- |
|
|
|
| (Cl. 23 of IS 302-2-21: 2011) (Internal Wiring
) |
- |
|
|
|
| (Cl. 23 of IS 302-2-21: 2011) (Internal Wiring
) |
- |
|
|
|
| (Cl. 23 of IS 302-2-21: 2011) (Internal Wiring
) |
- |
|
|
|
| (Cl. 23 of IS 302-2-21: 2011) (Internal Wiring
) |
- |
|
|
|
| (Cl. 23 of IS 302-2-21: 2011) (Internal Wiring
) |
- |
|
|
|
| (Cl. 23 of IS 302-2-21: 2011) (Internal Wiring
) |
- |
|
|
|
| (Cl. 23 of IS 302-2-21: 2011) (Internal Wiring
) |
- |
|
|
|
| (Cl. 23 of IS 302-2-21: 2011) (Internal Wiring
) |
- |
|
|
|
| (Cl. 23 of IS 302-2-21: 2011) (Internal Wiring
) |
- |
|
|
|
| (Cl. 23 of IS 302-2-21: 2011) (Internal Wiring
) |
- |
|
|
|
| (Cl.24ofIS302-221:2011) (Component) |
- |
|
|
|
| (Cl.24ofIS302-221:2011) (Component) |
- |
|
|
|
| (Cl. 23 of IS 302-2-21: 2011) (Internal Wiring
) |
- |
|
|
|
| (Cl.24ofIS302-221:2011) (Component) |
- |
|
|
|
| (Cl.24ofIS302-221:2011) (Component) |
- |
|
|
|
| (Cl.24ofIS302-221:2011) (Component) |
- |
|
|
|
| (Cl.25 of IS 302-2-21:2011) (Supply Connection & External Flexible Cords) |
- |
|
|
|
| (Cl.25 of IS 302-2-21:2011) (Supply Connection & External Flexible Cords) |
- |
|
|
|
| (Cl.25 of IS 302-2-21:2011) (Supply Connection & External Flexible Cords) |
- |
|
|
|
| (Cl.25 of IS 302-2-21:2011) (Supply Connection & External Flexible Cords) |
- |
|
|
|
| (Cl.25 of IS 302-2-21:2011) (Supply Connection & External Flexible Cords) |
- |
|
|
|
| (Cl.25 of IS 302-2-21:2011) (Supply Connection & External Flexible Cords) |
- |
|
|
|
| (Cl.25 of IS 302-2-21:2011) (Supply Connection & External Flexible Cords) |
- |
|
|
|
| (Cl.25 of IS 302-2-21:2011) (Supply Connection & External Flexible Cords) |
- |
|
|
|
| (Cl.25 of IS 302-2-21:2011) (Supply Connection & External Flexible Cords) |
- |
|
|
|
| (Cl.25 of IS 302-2-21:2011) (Supply Connection & External Flexible Cords) |
- |
|
|
|
| (Cl.25 of IS 302-2-21:2011) (Supply Connection & External Flexible Cords) |
- |
|
|
|
| (Cl.25 of IS 302-2-21:2011) (Supply Connection & External Flexible Cords) |
- |
|
|
|
| (Cl.25 of IS 302-2-21:2011) (Supply Connection & External Flexible Cords) |
- |
|
|
|
| (Cl.25 of IS 302-2-21:2011) (Supply Connection & External Flexible Cords) |
- |
|
|
|
| (Cl.25 of IS 302-2-21:2011) (Supply Connection & External Flexible Cords) |
- |
|
|
|
| (Cl.25 of IS 302-2-21:2011) (Supply Connection & External Flexible Cords) |
- |
|
|
|
| (Cl.26 of IS 302-2-21: 2011) (Terminals for External Conductors) |
- |
|
|
|
| (Cl.26 of IS 302-2-21: 2011) (Terminals for External Conductors) |
- |
|
|
|
| (Cl.26 of IS 302-2-21: 2011) (Terminals for External Conductors) |
- |
|
|
|
| (Cl.26 of IS 302-2-21: 2011) (Terminals for External Conductors) |
- |
|
|
|
| (Cl.26 of IS 302-2-21: 2011) (Terminals for External Conductors) |
- |
|
|
|
| (Cl.26 of IS 302-2-21: 2011) (Terminals for External Conductors) |
- |
|
|
|
| (Cl.26 of IS 302-2-21: 2011) (Terminals for External Conductors) |
- |
|
|
|
| (Cl.26 of IS 302-2-21: 2011) (Terminals for External Conductors) |
- |
|
|
|
| (Cl.26 of IS 302-2-21: 2011) (Terminals for External Conductors) |
- |
|
|
|
| (Cl.26 of IS 302-2-21: 2011) (Terminals for External Conductors) |
- |
|
|
|
| (Cl.27 of IS 302-2-21:2011) (Provision for Earthing) |
- |
|
|
|
| (Cl.27 of IS 302-2-21:2011) (Provision for Earthing) |
- |
|
|
|
| (Cl.27 of IS 302-2-21:2011) (Provision for Earthing) |
- |
|
|
|
| (Cl.27 of IS 302-2-21:2011) (Provision for Earthing) |
- |
|
|
|
| (Cl.27 of IS 302-2-21:2011) (Provision for Earthing) |
- |
|
|
|
| (Cl.27 of IS 302-2-21:2011) (Provision for Earthing) |
- |
|
|
|
| (Cl.28 of IS 302-2-21:2011) (Screws & Connections) |
- |
|
|
|
| (Cl.29ofIS302-2-21:2011) (Clearances, Creepage Distances and Solid Insulation) |
- |
|
|
|
| (Cl.30 of IS 302-2-21:2011) (Resistance to Heat & Fire) |
- |
|
|
|
| (Cl.30 of IS 302-2-21:2011) (Resistance to Heat & Fire) |
- |
|
|
|
| (Cl.31 of IS 302-2-21:2011) (Resistance to Rusting) |
- |
|
|
|
| (Cl.15 of IS 2082:2018) (Verification of the Rated Capacity) |
- |
|
|
|
| (Cl.16 of IS 2082:2018) (Standing Loss per 24 Hours) |
- |
|
|
|
| (Cl.17 of IS 2082:2018) (Hot Water Output) |
- |
|
|
|
| (Cl.18 of IS 2082:2018) ( Reheating Time) |
- |
|
|
|
| (Cl.19 of IS 2082:2018) (Mixing Factor) |
- |
|
|
|
| (Cl.20 of IS 2082:2018) (Deviation of Dial Calibration) |
- |
|
|
|
| (Cl.21 of IS 2082:2018) (Cyclic Temperature Variation) |
- |
|
|
|
| (Cl.22 of IS 2082:2018) (Finish) |
- |
|
|
|
| (Cl.19 of IS 302-2-21:2011) (Abnormal Operation) |
- |
|
|
|
| (Cl.19 of IS 302-2-21:2011) (Abnormal Operation) |
- |
|
|
|
| (Cl.19 of IS 302-2-21:2011) (Abnormal Operation) |
- |
|
|
|
| (Cl.22 Of
IS 302-2-21:2011) (Construction) |
- |
|
|
|
| (Cl.22 Of
IS 302-2-21:2011) (Construction) |
- |
|
|
|
| (Cl.21ofIS302-2-21:2011) (Mechanical strength) |
- |
|
|
|
| (Cl.22 Of
IS 302-2-21:2011) (Construction) |
- |
|
|
|
| (Cl.22 Of
IS 302-2-21:2011) (Construction) |
- |
|
|
|
| (Cl.22 Of
IS 302-2-21:2011) (Construction) |
- |
|
|
|
| (Cl.22 Of
IS 302-2-21:2011) (Construction) |
- |
|
|
|
| (Cl.22 Of
IS 302-2-21:2011) (Construction) |
- |
|
|
|
| (Cl.22 Of
IS 302-2-21:2011) (Construction) |
- |
|
|
|
| (Cl.22 Of
IS 302-2-21:2011) (Construction) |
- |
|
|
|
| (Cl.22 Of
IS 302-2-21:2011) (Construction) |
- |
|
|
|
| (Cl.22 Of
IS 302-2-21:2011) (Construction) |
- |
|
|
|
| (Cl.22 Of
IS 302-2-21:2011) (Construction) |
- |
|
|
|
| (Cl.22 Of
IS 302-2-21:2011) (Construction) |
- |
|
|
|
| (Cl.22 Of
IS 302-2-21:2011) (Construction) |
- |
|
|
|
| (Cl.22 Of
IS 302-2-21:2011) (Construction) |
- |
|
|
|
| (Cl.22 Of
IS 302-2-21:2011) (Construction) |
- |
|
|
|
| (Cl.22 Of
IS 302-2-21:2011) (Construction) |
- |
|
|
|
| (Cl.22 Of
IS 302-2-21:2011) (Construction) |
- |
|
|
|
| (Cl.22 Of
IS 302-2-21:2011) (Construction) |
- |
|
|
|
| (Cl.22 Of
IS 302-2-21:2011) (Construction) |
- |
|
|
|
| Cl.22.103 of
IS 302-2-21:2018 (Construction : Operation of Pressure relieve devices ) |
- |
|
|
|
| Cl.22.104 of
IS 302-2-21:2018 (Construction : Outlet of open outlet heater ) |
- |
|
|
|
| Cl.22.106 of
IS 302-2-21:2018 (Construction : Operation of thermal cut- out ) |
- |
|
|
|
| (Cl.22 of IS 302-2-21:2018) (Constructions) |
- |
|
|
|
| (Cl.22 of IS 302-2-21:2018) (Constructions) |
- |
|
|
|
| (Cl.22 of IS 302-2-21:2018) (Constructions) |
- |
|
|
|
| (Cl.22 of IS 302-2-21:2018) (Constructions) |
- |
|
|
|
| Cl.22.111 of
IS 302-2-21:2018 (Construction : Resistance to vacuum ) |
- |
|
|
|
| Cl.22.110 of
IS 302-2-21:2018 (Construction : Material of Inner conatiner ) |
- |
|
|
|
| Cl.22.110 of
IS 302-2-21:2018 (Construction : meterial of connections ) |
- |
|
|
|
| Cl.22.109 of
IS 302-2-21:2018 (Construction : Drain for appliance having a capacity of more than 15 liter) |
- |
|
|
|
| Cl.22.108 of
IS 302-2-21:2018 (Construction : fixing to wall ) |
- |
|
|
|
| Cl.22.107 of
IS 302-2-21:2018 (Construction : Position of Heating elements and thermal control sensor) |
- |
|
|
|
| Cl.22.106 of
IS 302-2-21:2018 (Construction : Operation of thermal cut- out ) |
- |
|
|
|
| (Cl.22.105 of IS 302-2-21:2018) (Constructions) |
- |
|
|
|
| (Cl.22.104 of IS 302-2-21:2018) (Constructions) |
- |
|
|
|
| Cl.22.103 of
IS 302-2-21:2018 (Construction : Operation of Pressure relieve devices ) |
- |
|
|
|
| Cl.22.102 of
IS 302-2-21:2018 (Construction : repeated drawing of water temp ) |
- |
|
|
|
| (Cl.22.101 of IS 302-2-21:2018) (Constructions) |
- |
|
|
|
| (Cl.22.47 of IS 302-2-21:2018) (Constructions) |
- |
|
|
|
| Cl. 23 of IS 302-1:2008 (Internal Wiring
) |
- |
|
|
|
| (Cl.25 of IS 302-2-21:2018) (Supply Connection and External Flexible cords) |
- |
|
|
|
| Cl.26 of IS 302-2-21: 2018 (Terminals for External Conductors) |
- |
|
|
|
|
- |
- Excluding Cl.24.102.1 and Cl.24.102.2 Electronic circuit and Software evaluation
Cl. 19.11 and Cl. 19.12 abnormal test (for Electronic circuit) |
| 165 |
IS 8462 (1977) |
Specification for sterilizer, portable, vertical, pressure type |
- |
For sterilizers with painted steel stand Rs.9580/-. For View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 4.1 (Shape and Dimensions) |
- |
|
|
|
| 4.2 (Thickness) |
- |
|
|
|
| 5.8 (Construction) |
- |
|
|
|
| 6.1 (Workmanship and Finish) |
- |
|
|
|
| 6.2 (Workmanship and Finish) |
- |
|
|
|
| 8.1 (Proof Pressure Test) |
- |
|
|
|
|
- |
- Mechanical: Test facility is complete, Facility for chemical test is not available |
| 166 |
IS 8329 (2000) |
Centrifugally cast (Spun) ductile iron pressure pipes for water, gas and sewage - Specification (Third Revision) |
- |
Rs.7800/- View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| Cl 10 (Hardness & Tensile Test) |
- |
|
|
|
| Cl 11 (Hydrostatic Test) |
- |
|
|
|
| Cl 13 (Length, Diameter, Wall Thickness & Ovality) |
- |
|
|
|
|
- |
- Excluding HST for size above 300 mm |
| 167 |
IS 6240 (2008) |
Hot rolled steel plate (Up To 6 Mm) sheet and strip for the manufacture of low pressure liquefiable gas cylinders (Fourth Revision) |
- |
9710 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| Cl 7 (UTM) |
- |
|
|
|
| Cl 8 (Press) |
- |
|
|
|
| Cl 9 (Strainage Embrittlement) |
- |
|
|
|
| Cl 13 (Length, Width & Thickness) |
- |
|
|
|
| 6.1 (Carbon %) |
- |
|
|
|
| 6.1 (Manganese %) |
- |
|
|
|
| 6.1 (Phosphorus %) |
- |
|
|
|
| 6.1 (Sulphur %) |
- |
|
|
|
| 6.1 (Silicon %) |
- |
|
|
|
| 6.1 (Nitrogen%) |
- |
|
|
|
|
- |
- Excluding, Cupping Test, Microalloying elements |
| 168 |
IS 814 (2004) |
Covered electrodes for manual metal arc welding of carbon and carbon manganese steel - Specification (Sixth Revision) |
- |
Rs. 17500/- View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 7.1.1 (Diameter of Core Wire) |
- |
|
|
|
| 7.1.2 (Length of Electrodes) |
- |
|
|
|
| 7.2.1 (Contact End) |
- |
|
|
|
| 7.2.2 (Arc striking End) |
- |
|
|
|
| 7.3 (Concentricity of Flux covering with core wire) |
- |
|
|
|
| 9.1.2 Table 6 (Ultimate Tensile Strength-Annex F) |
- |
|
|
|
| 9.1.2 Table 6 ( Yield Stress -Annex F) |
- |
|
|
|
| 9.1.2 Table 6 (Percentage Elongation on Gauge Length-Annex F) |
- |
|
|
|
| 9.2 (Butt Weld Bend Test-IS 1599) |
- |
|
|
|
| 6 & 8.2 (Carbon- Relevant Parts of IS 228 or any other established instrumental/chemical method) |
- |
|
|
|
| 6 & 8.2 (Sulphur- Relevant Parts of IS 228 or any other established instrumental/chemical method) |
- |
|
|
|
| 6 & 8.2 (Silicon- Relevant Parts of IS 228 or any other established instrumental/chemical method) |
- |
|
|
|
| 6 & 8.2 (Manganese- Relevant Parts of IS 228 or any other established instrumental/chemical method) |
- |
|
|
|
| 6 & 8.2 (Phosphorous- Relevant Parts of IS 228 or any other established instrumental/chemical method) |
- |
|
|
|
| 6 & 8.2 (Copper- Relevant Parts of IS 228 or any other established instrumental/chemical method) |
- |
|
|
|
| 6 & 8.2 (Vanadium- Relevant Parts of IS 228 or any other established instrumental/chemical method) |
- |
|
|
|
| 6 & 8.2 (Titanium- Relevant Parts of IS 228 or any other established instrumental/chemical method) |
- |
|
|
|
| 6 & 8.2 (Alumiminium- Relevant Parts of IS 228 or any other established instrumental/chemical method) |
- |
|
|
|
| 6 & 8.2 (Cr+Ni+Mo - Relevant Parts of IS 228 or any other established instrumental/chemical method) |
- |
|
|
|
| 6 & 8.2 (Chromium- Relevant Parts of IS 228 or any other established instrumental/chemical method) |
- |
|
|
|
| 6 & 8.2 (Nickel- Relevant Parts of IS 228 or any other established instrumental/chemical method) |
- |
|
|
|
| 6 & 8.2 (Molybdenum- Relevant Parts of IS 228 or any other established instrumental/chemical method) |
- |
|
|
|
| 6 & 8.2 (Mn+Ni+Cr+Mo+V - Relevant Parts of IS 228 or any other established instrumental/chemical method) |
- |
|
|
|
|
- |
- Radiographic test, increased metal recovery, diffusible hydrogen evaluation and For tensile and bend test prepared test pieces are required. Complete testing facility for Cl. 6 is available. Test Facility as per Cl. 8.2 is not available |
| 169 |
IS 2061 (1995) |
Bicycle - Front forks - Specification (First Revision) |
- |
Rs. 2727/- View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 8 (MARKING) |
- |
|
|
|
| 3 (Material) |
- |
|
|
|
| 4 (Dimensions) |
- |
|
|
|
| 5 (. Manufacturer&Finish) |
- |
|
|
|
| 7.1.1 ( i) Load test ) |
- |
|
|
|
| 7.1.2 (ii) Expansion Tes ) |
- |
|
|
|
| 7.1.3 (iii) Tests for Finish) |
- |
|
|
|
| 7.1.4 (iv) Impact Test) |
- |
|
|
|
| 7.1.3 (iii) Tests for Finish) |
- |
|
|
|
|
- |
- Mechanical: Test facility is complete, Chemical: Excluding Microalloying elements |
| 170 |
IS 7887 (1992) |
Mild steel wire rod for general engineering purposes - Specification (First Revision) |
- |
Rs.7200/- View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| Cl 8 (Workmanship) |
- |
|
|
|
| Cl 9 (Nominal Diameter & Out Of Shape) |
- |
|
|
|
| 6.1 (Carbon %) |
- |
|
|
|
| 6.1 (Manganese %) |
- |
|
|
|
| 6.1 (Phosphorus %) |
- |
|
|
|
| 6.1 (Sulphur %) |
- |
|
|
|
| 6.1 (Silicon %) |
- |
|
|
|
|
- |
- Mechanical-Complete Excluding Microalloying Elements, Copper |
| 171 |
IS 13334 : Part 2 (2014) |
Skimmed milk powder - Specification: Part 2 extra grade (First Revision) |
- |
Rs 10430/- View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| Table 1 (i) (Moisture (IS 116231or 16072)) |
- |
|
|
|
| Table 1 (v) (Total ash (on dry basis), Annex B of IS 14433) |
- |
|
|
|
| Table 1 (iv) (Insolubility index (IS 12759)) |
- |
|
|
|
| Table 1 (vi) (Titratable acidity (IS 11766)) |
- |
|
|
|
| Table 1 (iv) (Insolubility index (IS 12759)) |
- |
|
|
|
| Table 1 (vi) (Titratable acidity (IS 11766)) |
- |
|
|
|
| Table 1 (iv) (Insolubility index (IS 12759)) |
- |
|
|
|
| Table 1 (vi) (Titratable acidity (IS 11766)) |
- |
|
|
|
| Table 1 (iii) (Milk fat (IS 117213) or Annex B) |
- |
|
|
|
| Table 1 (viii) (Scorched particles (equivalent to Disc B) (IS 13500)) |
- |
|
|
|
| Table 1 (ix) (Bacterial count (IS 5402)) |
- |
|
|
|
| Table 1 (x) (Coliform count (IS 5401 - Part 1)) |
- |
|
|
|
| Table 1 (xi) (Escherichia coli (IS 5887 - Part 1)) |
- |
|
|
|
| Table 1 (xii) (Coagulase positive Staphylococcus aureus (IS 5887 - Part 2)) |
- |
|
|
|
| Table 1 (xiii) (Salmonella (IS 5887 - Part 3)) |
- |
|
|
|
| Table 1 (xiv)(a) (Spore Count: a) Aerobic (Bacillus cereus) Type M (IS 5887 - Part 6)) |
- |
|
|
|
| Table 1 (xiv)(b) (Spore Count: b) Anaerobic (Sulfite reducing Clostridia) Type m (ISO 15213 : 2003)) |
- |
|
|
|
| Table 1 (xv) (Listeria monocytogenes (IS 14988 - Part 2 : 2001)) |
- |
|
|
|
|
- |
- Microbiological testing is complete. Excluding Lactate Content |
| 172 |
IS 784 (2019) |
Prestressed concrete pipes (Including Specials) - Specification (Third Revision) |
- |
- View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 8.4 (Circumferential Prestressing) |
- |
|
|
|
|
- |
- Certification Scheme is being operated on FT basis Excluding only compression strength can be done |
| 173 |
IS 7834 : Part 1 (1987) |
injection moulded PVC socket fittings with solvent cement joints for water supplies: Part 1 General requirements |
- |
Rs.2400/- View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| Cl.4 (Minimum Thickness) |
- |
|
|
|
| Cl. 5.1.1, 5.1.2, Table 1, Fig 1 (Minimum Socket Length) |
- |
|
|
|
| Cl. 5.1.1, 5.1.2, Table 1, Fig 1 (Mean Socket Internal Diameter at Mid-Point of Socket Length) |
- |
|
|
|
| Cl. 5.1.1, 5.1.2, Table 1, Fig 1 (Out-of-roundness tolerances of socket inside diameter) |
- |
|
|
|
| Cl. 6.1 (Stress Relief Test- Appendix A) |
- |
|
|
|
| Cl. 6.4 (Short-Term Hydraulic Test- Appendix D) |
- |
|
|
|
|
- |
- Excluding Performance requirements |
| 174 |
IS 7466 (1994) |
Rubber gaskets for pressure cookers - Specifications (First Revison) |
- |
Rs.9480/- View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 3.2 (Workmanship and Finish ) |
- |
|
|
|
| 3.4-Table 1(ii) (Requirements of Rubber Used for Gaskets-Tensile strength,) |
- |
|
|
|
| 3.4-Table 1(iii) (Requirements of Rubber Used for Gaskets-Elongation at break) |
- |
|
|
|
| 3.4-Table 1(iv-b) (Requirements of Rubber Used for Gaskets-Tensile strength(After ageing 3 days in Aie-oven Change From Original Value)) |
- |
|
|
|
| 3.4-Table 1(iv-c) (Requirements of Rubber Used for Gaskets-Elongation at break(After ageing 3 days in Aie-oven Change From Original Value)) |
- |
|
|
|
|
- |
- Excluding Hardness, Tensile, Elongation and compression, Test Facility for chemical test is not available |
| 175 |
IS 7452 (1990) |
Hot rolled steel sections for doors, windows and ventilators - Specification |
- |
Rs 1800/- View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| cl 6 (Dimensions) |
- |
|
|
|
| cl 7 (MASS AND MASS TOLERANCE) |
- |
|
|
|
| cl 9 (BEND TEST) |
- |
|
|
|
| cl 8 (SURFACE FINISH) |
- |
|
|
|
| Cl 5.1 (Carbon- IS 228(Part 1)) |
- |
|
|
|
| 5.1 (Sulphur- IS 228(Part 9)) |
- |
|
|
|
| 5.1 (Phosphorous- IS 228(Part 3)) |
- |
|
|
|
| 5.1 (Manganese- IS 228(Part 2)) |
- |
|
|
|
| 5.1 (Silicon- IS 228(Part 8)) |
- |
|
|
|
| 5.1 (Nitrogen-IS 228(P-19)) |
- |
|
|
|
|
- |
- Mechanical-Complete Facility for chemical test is not available |
| 176 |
IS 1538 (1993) |
Cast iron fittings for pressure pipes for water, gas and sewage - Specification (Third Revision) |
- |
Rs 2700/- View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 4.1 (The metal used for the manufacture of pipe shall be of a quality not less than that specified for grade FG 150 of IS 210 ) |
- |
|
|
|
| 5.1 (tensile strength) |
- |
|
|
|
| 6.1 (Brinell hardness tests) |
- |
|
|
|
| 8 (Hydrostatic Test) |
- |
|
|
|
| 9.1,Table 2 & 3 (DI) |
- |
|
|
|
| 9.1,Table 2 & 3 (P) |
- |
|
|
|
| 9.1,Table 2 & 3 (g) |
- |
|
|
|
| 9.1,Table 2 & 3 (h) |
- |
|
|
|
| 9.1,Table 2 & 3 (K) |
- |
|
|
|
| 9.1,Table 2 & 3 (L) |
- |
|
|
|
| 9.1,Table 2 & 3 (M) |
- |
|
|
|
| 9.1,Table 2 & 3 (N) |
- |
|
|
|
| 9.1,Table 2 & 3 (f) |
- |
|
|
|
| 9.1,Table 4 (D) |
- |
|
|
|
| 9.1,Table 4 (a) |
- |
|
|
|
| 9.1,Table 4 (b) |
- |
|
|
|
| 9.1,Table 4 (s) |
- |
|
|
|
| 9.1,Table 4 (r) |
- |
|
|
|
| 9.1,Table 5 (D) |
- |
|
|
|
| 9.1,Table 5 (g) |
- |
|
|
|
| 9.1,Table 5 (a) |
- |
|
|
|
| 9.1,Table 5 (b) |
- |
|
|
|
| 9.1,Table 5 (c) |
- |
|
|
|
| 9.1,Table 5 (f) |
- |
|
|
|
| 9.1,Table 5 (s) |
- |
|
|
|
| 9.1,Table 5 (C) |
- |
|
|
|
| 9.1,Table 6 (Holes No) |
- |
|
|
|
| 9.1,Table 6 (Holes diameter) |
- |
|
|
|
| 9.1,Table 6 (Diameterof Bolts) |
- |
|
|
|
| 9.1&11.1,Table 7,8&9 (e) |
- |
|
|
|
| 9.1&11.1,Table 7,8&9 (l) |
- |
|
|
|
| 9.1&11.1,Table 10 to13 (Mass (Approx)) |
- |
|
|
|
| 9.1&11.1,Table 10 to13 (e) |
- |
|
|
|
| 9.1&11.1,Table 10 to13 (r) |
- |
|
|
|
| 9.1&11.1,Table 10 to13 (a) |
- |
|
|
|
| 9.1&11.1,Table 10 to13 (b) |
- |
|
|
|
| 9.1&11.1,Table 10 to13 (Mass (Approx)) |
- |
|
|
|
| 9.1&11.1,Table 15 (e) |
- |
|
|
|
| 9.1&11.1,Table 14 (Nominal Diameter) |
- |
|
|
|
| 9.1&11.1,Table 15 (e1) |
- |
|
|
|
| 9.1&11.1,Table 14 (l) |
- |
|
|
|
| 9.1&11.1,Table 14 (h) |
- |
|
|
|
| 9.1&11.1,Table 24 (Mass (Approx)) |
- |
|
|
|
| 9.1&11.1,Table 25 (e) |
- |
|
|
|
| 9.1&11.1,Table 25 (l) |
- |
|
|
|
| 9.1&11.1,Table 24 (h) |
- |
|
|
|
| 9.1&11.1,Table 25 (Mass (Approx)) |
- |
|
|
|
| 9.1&11.1,Table 26 (e1) |
- |
|
|
|
| 9.1&11.1,Table 26 (h1) |
- |
|
|
|
| 9.1&11.1,Table 26 (Nominal Diameter) |
- |
|
|
|
| 9.1&11.1,Table 26 (e2) |
- |
|
|
|
| 9.1&11.1,Table 26 (l2) |
- |
|
|
|
| 9.1&11.1,Table 26 (l3) |
- |
|
|
|
| 9.1&11.1,Table 26 (l) |
- |
|
|
|
| 9.1&11.1,Table 26 (Mass (Approx)) |
- |
|
|
|
| 9.1&11.1,Table 27 (dn) |
- |
|
|
|
| 9.1&11.1,Table 27 (e1) |
- |
|
|
|
| 9.1&11.1,Table 27 (b) |
- |
|
|
|
| 9.1&11.1,Table 27 (l3) |
- |
|
|
|
| 9.1&11.1,Table 27 (l2) |
- |
|
|
|
| 9.1&11.1,Table 27 (e2) |
- |
|
|
|
| 9.1&11.1,Table 27 (r) |
- |
|
|
|
| 9.1&11.1,Table 27 (l1) |
- |
|
|
|
| 9.1&11.1,Table 27 (Mass) |
- |
|
|
|
| 9.1&11.1,Table 28 (D) |
- |
|
|
|
| 9.1&11.1,Table 28 (t) |
- |
|
|
|
| 9.1&11.1,Table 28 (Mass (Approx)) |
- |
|
|
|
| 12.1 to 12.7 (Coating ) |
- |
|
|
|
|
- |
- Excluding HST for DN above 300 mm |
| 177 |
IS 15647 (2006) |
Hot rolled steel narrow width strip for welded tubes and pipes |
- |
Rs.9900/- View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| Cl 8 (UTM) |
- |
|
|
|
| Cl 9 (Press) |
- |
|
|
|
| Cl 11 (Workmanship) |
- |
|
|
|
| Cl 12 (Length, Width & Thickness) |
- |
|
|
|
| Cl 13 (Workmanship) |
- |
|
|
|
| 7 (Carbon as C - IS:228) |
- |
|
|
|
| 7 (Sulphur as S- IS:228) |
- |
|
|
|
| 7 (Manganese as Mn-IS:228) |
- |
|
|
|
| 7 (Phosphorus as P-IS:228) |
- |
|
|
|
| 7 (Silicon as S-IS:228) |
- |
|
|
|
| 7 (Nitrogen IS 228 (part 19) IS 8811: 1998) |
- |
|
|
|
| 7 (Aluminium -IS:228) |
- |
|
|
|
| 7 (Chromium IS 8811: 1998) |
- |
|
|
|
| 7 (Nickel IS 8811: 1998) |
- |
|
|
|
| 7 (Boron IS 8811: 1998) |
- |
|
|
|
| 7 (Titanium IS 8811: 1998) |
- |
|
|
|
| 7 (Niobium IS 8811: 1998) |
- |
|
|
|
| 7 (Vanadium IS 8811: 1998) |
- |
|
|
|
| 5.2 (Molybednum Astime 1086: 2014) |
- |
|
|
|
|
- |
- Test facility is complete |
| 178 |
IS 1566 (1982) |
Specification for hard - Drawn steel wire fabric for concrete reinforcement (Second Revision) |
- |
Rs 300/- + mat test as per IS:432(Pt 2) View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 6 (DIMENSIONS) |
- |
|
|
|
| 7 (SIZES OF SHEETS ‘OR ROLLS) |
- |
|
|
|
| 8 (MASS) |
- |
|
|
|
| 9.2 (Tolerance on Size of Mesh) |
- |
|
|
|
| 9.3 (Tolerance on Size of Sheet) |
- |
|
|
|
| 9.4 (Tolerance on Mass of Fabric) |
- |
|
|
|
| 10 (MECHANICAL PROPERTIES) |
- |
|
|
|
| 11.2 (Tensile Test) |
- |
|
|
|
| 11.3 (Reverse Bend Test) |
- |
|
|
|
|
- |
- Test facility is complete |
| 179 |
IS 4397 (1999) |
Cold - Rolled carbon steel strips for ball and roller bearing cages retainers - Specification (Second Revision) |
- |
- View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 4 (Freedom from defects ) |
- |
|
|
|
| 8 ( Bend Test ) |
- |
|
|
|
| 9 (Hardness-IS 1500: Pt 1) |
- |
|
|
|
| 14 ( ROLLING TOLERANCES) |
- |
|
|
|
| Cl. 5.2, 6.1, 6.1.1, 6.2 Table 1 (Carbon- IS 228 and relevant parts or any other established Instrumental/Chemical method.) |
- |
|
|
|
| Cl. 5.2, 6.1, 6.1.1, 6.2 Table 1 (Manganese- IS 228 and relevant parts or any other established Instrumental/Chemical method.) |
- |
|
|
|
| Cl. 5.2, 6.1, 6.1.1, 6.2 Table 1 (Phosphorus- IS 228 and relevant parts or any other established Instrumental/Chemical method.) |
- |
|
|
|
| Cl. 5.2, 6.1, 6.1.1, 6.2 Table 1 (Sulphur- IS 228 and relevant parts or any other established Instrumental/Chemical method.) |
- |
|
|
|
| Cl. 5.2, 6.1, 6.1.1, 6.2 Table 1 (Aluminium- IS 228 and relevant parts or any other established Instrumental/Chemical method.) |
- |
|
|
|
| Cl. 5.2, 6.1, 6.1.1, 6.2 Table 1 (Silicon- IS 228 and relevant parts or any other established Instrumental/Chemical method.) |
- |
|
|
|
| Cl. 5.2, 6.1, 6.1.1, 6.2 Table 1 (Nitrogen- IS 228 and relevant parts or any other established Instrumental/Chemical method.) |
- |
|
|
|
| Cl. 5.2, 6.1, 6.1.1, 6.2 Table 1 (Chromium- IS 228 and relevant parts or any other established Instrumental/Chemical method.) |
- |
|
|
|
| Cl. 5.2, 6.1, 6.1.1, 6.2 Table 1 (Nickel- IS 228 and relevant parts or any other established Instrumental/Chemical method.) |
- |
|
|
|
| Cl. 5.2, 6.1, 6.1.1, 6.2 Table 1 (Molybdenum- IS 228 and relevant parts or any other established Instrumental/Chemical method.) |
- |
|
|
|
| Cl. 5.2, 6.1, 6.1.1, 6.2 Table 1 (Copper- IS 228 and relevant parts or any other established Instrumental/Chemical method.) |
- |
|
|
|
| Cl. 5.2, 6.1, 6.1.1, 6.2 Table 1 (Niobium- IS 228 and relevant parts or any other established Instrumental/Chemical method.) |
- |
|
|
|
| Cl. 5.2, 6.1, 6.1.1, 6.2 Table 1 (Vanadium- IS 228 and relevant parts or any other established Instrumental/Chemical method.) |
- |
|
|
|
| Cl. 5.2, 6.1, 6.1.1, 6.2 Table 1 (Titanium- IS 228 and relevant parts or any other established Instrumental/Chemical method.) |
- |
|
|
|
| Cl. 5.2, 6.1, 6.1.1, 6.2 Table 1 (Boron- IS 228 and relevant parts or any other established Instrumental/Chemical method.) |
- |
|
|
|
|
- |
- Excluding Micro examination, Cupping test. |
| 180 |
IS 1537 (1976) |
Specification for vertically cast iron pressure pipes for water, gas and sewage (First Revision) |
- |
Rs. 3972/- (for flanged ends only) + materials as per View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 3.1 , 6 of IS 210 ( The composition of cast iron shall be left to the
discretion of the manufacturer) |
- |
|
|
|
| 4.1 (Tensile Strength) |
- |
|
|
|
| 4.2 (Hardness test) |
- |
|
|
|
| 6.1 (Hydrostatic test) |
- |
|
|
|
| 7.1 & Table 2 (DE) |
- |
|
|
|
| 7.1 & Table 2 (DI) |
- |
|
|
|
| 7.1 & Table 2 (P) |
- |
|
|
|
| 7.1 & Table 2 (g) |
- |
|
|
|
| 7.1 & Table 2 (h) |
- |
|
|
|
| 7.1 & Table 2 (DC) |
- |
|
|
|
| 7.1 & Table 2 (c) |
- |
|
|
|
| 7.1 & Table 2 (f) |
- |
|
|
|
| 7.1 & Table 3 (DI) |
- |
|
|
|
| 7.1 & Table 3 (P) |
- |
|
|
|
| 7.1 & Table 3 (g) |
- |
|
|
|
| 7.1 & Table 3 (h) |
- |
|
|
|
| 7.1 & Table 4 (D) |
- |
|
|
|
| 7.1 & Table 4 (a) |
- |
|
|
|
| 7.1 & Table 4 (b) |
- |
|
|
|
| 7.1 & Table 4 (s) |
- |
|
|
|
| 7.1 & Table 4 (r) |
- |
|
|
|
| 7.1 & Table 5 (D) |
- |
|
|
|
| 7.1 & Table 5 (C) |
- |
|
|
|
| 7.1 & Table 5 (Holes Number) |
- |
|
|
|
| 7.1 & Table 5 (Holes Diameter) |
- |
|
|
|
| 7.1 & Table 5 (Diameter of Bolts) |
- |
|
|
|
| 7.1 & Table 6 to 8 (DE) |
- |
|
|
|
| 7.1 & Table 6 to 8 (t) |
- |
|
|
|
| 7.1 & Table 6 to 8 (Mass of one meter barrel (Approx)) |
- |
|
|
|
| 7.1 & Table 6 to 8 (Socket mass (Approx)) |
- |
|
|
|
| 7.1 & Table 6 to 8 (Total mass for one working length in meter) |
- |
|
|
|
| 8.4 (Permissible deviation from a straight line) |
- |
|
|
|
| 9.1,Table 9 (DE) |
- |
|
|
|
| 9.1,Table 9 (e) |
- |
|
|
|
| 9.1,Table 9 (Flange, Mass of one meter (Approx)) |
- |
|
|
|
| 9.1,Table 9 (Mass of one flange (Approx)) |
- |
|
|
|
| 9.1,Table 9 (Working Length) |
- |
|
|
|
| 10.1 to 10.6 (Coating ) |
- |
|
|
|
| 3.1 , 6 of IS 210 ( The composition of cast iron shall be left to the
discretion of the manufacturer) |
- |
|
|
|
| 7.1 & Table 5 (Holes Number) |
- |
|
|
|
|
- |
- Excluding HST for size above 300 mm, Facility for chemical test is not available |