Search by IS Number
Reset
12007 Results
S.No. Lab Name Osl Code Indian Standard No. Product Grade / Type / Size / Designation etc. Testing Charges (Excl. Of Taxes) Validity Date Remark
11521 BIS, Central Laboratory (CL) None IS 3195 (1992) Steel for the manufacture of volute and helical springs (For Railway Rolling Stock) - Specification (Third Revision) - 1050 Chemical View breakup
-
- -
Sample size shall be minimum dia> 3mm and thickness > 0.8 mm; Excluding Except Vanadium as per table 1; Decarburization (Cl 8)
11522 BIS, Western Regional Laboratory (WRL) None IS 10124 : Part 1 (2009) Fabricated PVC-U Fittings for Potable Water Supplies - Specification Part 1 General Requirements (Second Revision) - Rs 1500/- View breakup
-
- -
The following test facilities are not available: (1)Effect on water (2) Testing facility above 250 mm for Short Term Hydrostatic test
11523 BIS, Western Regional Laboratory (WRL) None IS 9798 (2013) Low pressure regulators for use with liquefied petroleum gas (LPG) - Specification (Second Revision) - - View breakup
Rs. 14276/- + testing charges as per referred ISS (excluding excess flow valve and strength on inlet connection).
- -
Test facilities are not available for the following: a) Mechanical strength of connections, Cl. 8.11 b) Compression set test for Rubber components c) Test Bench as per Annex K
11524 BIS, Western Regional Laboratory (WRL) None IS 9295 (1983) Specification for steel tubes for idlers for belt conveyors (First Revision) - Rs 5100/- View breakup
-
- -
Test facilities are not available for the following: 1.Except Drift Expansion
11525 BIS, Western Regional Laboratory (WRL) None IS 8737 (2017) Valve fittings for use with liquefied petroleum gas (LPG) cylinders for more than 5 litre water capacity - Specification (Second Revision) - - View breakup
-
- -
"1.Cycles test 2. Security Cap /Nut 3. Spring a) Load Test b)Permanent set test c)Rust proofness of spring"
11526 BIS, Western Regional Laboratory (WRL) None IS 8423 (1994) Specification for controlled percolating hose for fire fighting - Rs. 4200/- View breakup
-
- -
-
11527 BIS, Eastern Regional Laboratory (ERL) None IS 204 : Part 1 (1991) Tower bolts - Specification: Part 1 ferrous metals (Fifth Revision) All grades (except tests mentioned in remarks) Rs.2100.00. View breakup
-
- -
Chem-Facility not available for micro alloying elements, for cast iron- facility not available for Sulphur
11528 BIS, Central Laboratory (CL) None IS 8446 (1991) Pesticide - Carbendazim (MBC) WP - Specification (First Revision) - Rs 4700/- View breakup
-
- -
-
11529 BIS, Western Regional Laboratory (WRL) None IS 7887 (1992) Mild steel wire rod for general engineering purposes - Specification (First Revision) - Rs.7200/- View breakup
-
- -
Test facilities are not available for the following: 1. Chemical composition (Al)
11530 BIS, Central Laboratory (CL) None IS 3074 (2013) Steel tubes for automotive purposes - Specification (Third Revision) - - View breakup
Rs.3750/- for CDS-1, CDS-2, CDS-3, CDS-4, CDS-5, Rs.4720/- for CDS-6, Rs.6750/- for CDS-7 & CDS-8, Rs.6750/- for CDS-9. Rs.3750/- for ERW/HFIW (ERW-1, ERW-2, ERW-3). Rs.4200/- for Mechanical testing charges.
- -
Sample size shall be minimum dia> 3mm and thickness > 0.8 mm; Excluding -; Leak tightness Test (Cl 23)
11531 BIS, Western Regional Laboratory (WRL) None IS 7834 : Part 3 (1987) injection moulded PVC socket fittings with solvent cement joints for water supplies: Part 3 Specific requirements for 90 degree elbows - Rs.2700/- View breakup
-
- -
The following test facilities are not available: 6.3 Effect on water
11532 BIS, Eastern Regional Laboratory (ERL) None IS 9962 (1981) Specification for steel wire for needles all size and grade - View breakup
-
- -
Grade,size and finish to be declared
11533 BIS, Western Regional Laboratory (WRL) None IS 7834 : Part 1 (1987) injection moulded PVC socket fittings with solvent cement joints for water supplies: Part 1 General requirements - Rs.2400/- View breakup
-
- -
The following test facilities are not available: 6.3 Effect on water
11534 BIS, Northern Regional Laboratory (NRL) None IS 5312 : Part 1 (2004) Swing Check Type Reflux (Non-Return] Valves for Water Works Purposes - Part 1 : Single-Door Pattern - Rs 5700/- View breakup
-
- -
All test excluding HST for size above 300 mm, Facility for chemical testing is not available
11535 BIS, Northern Regional Laboratory (NRL) None IS 781 (1984) Specification for cast copper alloy screw down bib taps and stop valves for water services (Third Revision) - Rs.2700/- View breakup
-
- -
Facility for chemical testing is not available
11536 BIS, Western Regional Laboratory (WRL) None IS 15490 (2017) Seamless steel cylinders for on - Board storage of compressed natural gas as a fuel for automotive vehicles - Specification (First Revision) - - View breakup
-
- -
Test facilities are not available for the following: 1. Cr, Ni, Mo, V, Al, N, B, Zr 2.Pressure cycling Test 3. Base check 4. Hydrostatic Stretch Test 5. Leakage Test 6.Neck threads 7. Surface Defects 8. Verticality 9. Hydraulic Bursting Test 10. Sulphide Stress Cracking Resistance Test 11 Ultrasonic testing 12 Leakage before breakage test 13 Bonfire test Remark: Prepared piece for tensile (2 nos), bend (4 nos) and impact (3 nos)
11537 BIS, Western Regional Laboratory (WRL) None IS 7285 : Part 1 (2018) Refillable seamless steel gas cylinders - Specification: Part 1 normalized steel cylinders (Fourth Revision) - - View breakup
-
- -
Test facilities are not available for the following: 1. Cr, Ni, Mo, V, Al, N, B, Zr 2.Pressure cycling Test 3. Base check 4. Hydrostatic Stretch Test 5. Leakage Test 6.Neck threads 7. Surface Defects 8. Verticality 9. Hydraulic Bursting Test 10. Sulphide Stress Cracking Resistance Test 11 Ultrasonic testing Remark: Prepared piece for tensile (2 nos), bend (4 nos) and impact (3 nos)
11538 BIS, Central Laboratory (CL) None IS 3039 (1988) Specification for structural steel for construction of hulls of ships (Second Revision) - - View breakup
-
- -
Sample size shall be minimum dia> 3mm and thickness > 0.8 mm;
11539 BIS, Western Regional Laboratory (WRL) None IS 7142 (1995) Welded low carbon steel cylinders for low pressure liquifiable gases not exceeding 5 litre water capacity - Specification (First Revision) - Rs. 9552/- View breakup
-
- -
Test facilities are not available for the following: 1. Thread gauges
11540 BIS, Western Regional Laboratory (WRL) None IS 7092 : Part 2 (1987) Specification for aluminium alloy tube for irrigation purposes: Part 2 extruded tube (Second Revision) - Rs 11230/- View breakup
-
- -
" 1. Tensile Test 2. Hydrostatic Machine "
11541 BIS, Western Regional Laboratory (WRL) None IS 6603 (2001) Stainless steel bars and flats - Specification (First Revision) - - View breakup
-
- -
Test facilities are not available for the following: 1. Ti, Nb, Mo, Cu 2. Corrosion resistance Remark: Prepared piece of impact (3 nos)
11542 BIS, Central Laboratory (CL) None IS 2831 (2012) Carbon steel cast billet ingots, billets, blooms and slabs for re-rolling into structural steel (Ordinary Quality) - Specification (Fourth Revision) - Rs. 4500/- View breakup
Excluding Macro examination and Sulphur print
- -
"Grade designation to be declared. Microalloying element/type of killing (element)/any other element to be declared. Sample size shall be minimum dia> 3mm and thickness > 0.8 mm; "
11543 BIS, Western Regional Laboratory (WRL) None IS 6529 (1996) Stainless steel blooms, billets and slabs for forging - Specification (First Revision) - - View breakup
-
- -
Test facilities are not available for the following: 1. Ni, Cr, Mo, Ti, Nb, N 2. Corrosion Test
11544 BIS, Northern Regional Laboratory (NRL) None IS 6006 (2014) Uncoated stress relieved strand for prestressed concrete - Specification (Second Revision) - Rs 4035/- Excluding Proof Stress and Relaxation Test View breakup
-
- -
Test Facility Complete for Chemical Except Stress relaxation test, Proof stress
11545 BIS, Northern Regional Laboratory (NRL) None IS 3575 (1993) Bitumen drums - Specification (Third Revision) - - View breakup
Rs. 1800/- and Material testing charges as per relevant referred Iss
- -
Except air pressure test and Microalloying elements
11546 BIS, Western Regional Laboratory (WRL) None IS 14333 (1996) High Density Polyethylene Pipe For Sewerage - - - View breakup
-
- -
The following test facilities are not available: (1)Internal Pressure creep rupture test (2)Tensile Strength for Butt-fusion (3) Slow Crack Growth rate test (4) Depth of strip (5) Overall Migration (7) Carbon Black content (8) For Size above 250 mm
11547 BIS, Western Regional Laboratory (WRL) None IS 6240 (2008) Hot rolled steel plate (Up To 6 Mm) sheet and strip for the manufacture of low pressure liquefiable gas cylinders (Fourth Revision) - - View breakup
Rs.9710/- excluding Erichsen cupping test.
- -
Test facilities are not available for the following: 1. Al, N, Micro alloying element 2. Erichsen Cuppling Machine
11548 BIS, Western Regional Laboratory (WRL) None IS 11513 (2017) Hot rolled carbon steel strip for cold rolling purposes - Specification (Second Revision) - - View breakup
-
- -
Test facilities are not available for the following: 1. Micro alloy, N, Al, Cu, Cr, Mo, Ni
11549 BIS, Northern Regional Laboratory (NRL) None IS 6911 (2017) Stainless steel plate, sheet and strip - Specification (Second Revision) - - View breakup
-
- -
Facility for chemical testing is not available, Erichsen Cupping(Cl11), Corrosion(Cl 12), Proof stress
11550 BIS, Western Regional Laboratory (WRL) None IS 4923 (2017) Hollow steel sections for structural use - Specification (Third Revision) - - View breakup
-
- -
Test facilities are not available for the following: 1. Cu

Designed, Developed and Maintained by:

Arohatech IT Services (P) Ltd.

Contact for any query/support: supportlims@bis.gov.in