| 11821 |
BIS, Eastern Regional Laboratory (ERL)
| None
| IS 14698 (1999) |
Carbon and low alloy steel billets, blooms, slabs and bars for manufacture of shell bodies and proof shots used in defence services - Specification |
For all grades except for the tests mentioned in remarks |
- View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| Table 1,Table 3 ,Table 4 cl6.5,C8 Cl m5.2.27.2.1 as applicable (Charpy Impact value,Min) |
- |
|
|
|
| Table 1,Table 3 ,Table 4 cl6.5,C8 Cl m5.2.27.2.1 as applicable (Izod Impact value,Min) |
- |
|
|
|
| Table 1,Table 3 ,Table 4 cl6.5,C8 Cl m5.2.27.2.1 as applicable (Reduction in area,Min ) |
- |
|
|
|
| Table 1,Table 3 ,Table 4 cl6.5,C8 Cl m5.2.27.2.1 as applicable (Elongation) |
- |
|
|
|
| Table 1,Table 3 ,Table 4 cl6.5,C8 Cl m5.2.27.2.1 as applicable (0.2%Proof stress) ) |
- |
|
|
|
| Table 1,Table 3 ,Table 4 cl6.5,C8 Cl m5.2.27.2.1 as applicable (Tensile strength) |
- |
|
|
|
| Table 1,Table 3 ,Table 4 cl6.5,C8 Cl m5.2.27.2.1 as applicable (Size,mm) |
- |
|
|
|
| Table 1,Table 3 ,Table 4 cl6.5,C8 Cl m5.2.27.2.1 as applicable (Charpy Impact value,Min) |
- |
|
|
|
| Table 1,Table 3 ,Table 4 cl6.5,C8 Cl m5.2.27.2.1 as applicable (Izod Impact value,Min) |
- |
|
|
|
| Table 1,Table 3 ,Table 4 cl6.5,C8 Cl m5.2.27.2.1 as applicable (Reduction in area,Min ) |
- |
|
|
|
| Table 1,Table 3 ,Table 4 cl6.5,C8 Cl m5.2.27.2.1 as applicable (Elongation) |
- |
|
|
|
| Table 1,Table 3 ,Table 4 cl6.5,C8 Cl m5.2.27.2.1 as applicable (0.2%Proof stress) ) |
- |
|
|
|
| Table 1,Table 3 ,Table 4 cl6.5,C8 Cl m5.2.27.2.1 as applicable (Tensile strength) |
- |
|
|
|
| Table 1,Table 3 ,Table 4 cl6.5,C8 Cl m5.2.27.2.1 as applicable (Size,mm) |
- |
|
|
|
| 6.1 (Length) |
- |
|
|
|
| 6.2 (Straightness) |
- |
|
|
|
| 6.3 (Twist) |
- |
|
|
|
| 6.4 (Tolerance) |
- |
|
|
|
|
- |
- Chem: Except S(>0.25), V, Al, Sn,
Mech: Except Test for lead segregation, Magnetic particle/eddy current inspection.
Sample req- 2 x100 mm (both side) and prepared tensile and impact test pcs |
| 11822 |
BIS, Eastern Regional Laboratory (ERL)
| None
| IS 13387 (1992) |
Tool steel forgings for metal forming - Specification |
- |
- View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 8 (Freedom from defect) |
- |
|
|
|
| 11 (Hardness) |
- |
|
|
|
| 9.1 Table 1 (machining allowance) |
- |
|
|
|
| Cl. 10 (Carbon) |
- |
|
|
|
| Cl. 10 (Silicon) |
- |
|
|
|
| Cl. 10 (Chromium) |
- |
|
|
|
| Cl. 10 (Nickel) |
- |
|
|
|
| Cl. 10 (Sulphur) |
- |
|
|
|
| Cl. 10 (Phosphorus) |
- |
|
|
|
| Cl. 10 (Molybdenum) |
- |
|
|
|
| Cl. 10 (Manganese) |
- |
|
|
|
| Cl. 10 (Copper) |
- |
|
|
|
|
- |
- Except Ultrasonic test, eddy current test,Chem - except V,S,B,Sn |
| 11823 |
BIS, Eastern Regional Laboratory (ERL)
| None
| IS 12145 (1987) |
Specification for quenched and tempered alloy steel forgings for pressure vessels |
- |
- View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 6.1Table4 9.2.2 (Tensile Strength,) |
- |
|
|
|
| 6.1Table4 9.2.1 (Yield strength, Min) |
- |
|
|
|
| 6.1Table4 9.2.1 (Reduction in area,Min ) |
- |
|
|
|
| 6.1Table4 9.2.1 (Impact test,Individual value) |
- |
|
|
|
| 6.1Table4 9.2.1 (Impact test,Mean of three test pieces) |
- |
|
|
|
| 8 (Shape dimension and tolerence) |
- |
|
|
|
| 7 (Appearance) |
- |
|
|
|
|
- |
- Except Vanadium, Ultrasonic Testing |
| 11824 |
BIS, Eastern Regional Laboratory (ERL)
| None
| IS 10794 (1984) |
Specification for mild steel wire for cotter pins |
- |
- View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 6.1,Table1 (Wire Section) |
- |
|
|
|
| 6.2 Table1 (Wire Sizes) |
- |
|
|
|
| 6.3 and 6.3.1Table1 (6.3 and 6.3.1Table1) |
- |
|
|
|
| 7 (Tensile strength) |
- |
|
|
|
| 7.2 Table2 (Hardness) |
- |
|
|
|
| 7.4 (Bend Test) |
- |
|
|
|
| 7.3 (Wrapping test) |
- |
|
|
|
| 9 (Freedom from defects) |
- |
|
|
|
|
- |
- Except V, Nb, Al, 7.3 |
| 11825 |
BIS, Eastern Regional Laboratory (ERL)
| None
| IS 10459 (1983) |
Specification for general purpose plug valves |
- |
- View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 5.1.1 (Min Outside Diameter of Sealing face) |
- |
|
|
|
| 5.2.1 (Face to face dimensions) |
- |
|
|
|
| 5.2.2 (End flange of steel valves) |
- |
|
|
|
| 5.2.3 (End flange face) |
- |
|
|
|
| 7 (Lubrication) |
- |
|
|
|
| 8 (Operation) |
- |
|
|
|
|
- |
- Chem- All except Al, Mo, V, Sn, B, W (also see status for IS 210, 2856, 2004, 1875), Except micro alloying in carbon steel and C, S, Mn in Cast Iron, Mech- All except Pr/Temp ratings, End connection- Thread, Drain connection |
| 11826 |
Central Power Research Institute (CPRI), Bangalore
| 6101024
| IS 16102 : Part 2 (2017) |
Self - Ballasted led lamps for general lighting services: Part 2 performance requirements (First Revision) |
Self Ballasted SSL product or LED |
82500 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 11(Lamp Life) |
- |
0 |
|
Complete test charge will be provided |
| 10(Colour Nomenclature,
Variation and
Rendering) |
- |
0 |
|
Complete test charge will be provided |
| 9(light output) |
- |
0 |
|
Complete test charge will be provided |
| 8(Lamp Input) |
- |
0 |
|
Complete test charge will be provided |
| 8.1(Lamp Power) |
- |
0 |
|
Complete test charge will be provided |
| 8.2(Power Factor) |
- |
0 |
|
Complete test charge will be provided |
| 8.3(Harmonics) |
- |
0 |
|
Complete test charge will be provided |
| 8.4(Emission of Radio Frequency Disturbances) |
- |
0 |
|
Complete test charge will be provided |
| 5(MARKING) |
- |
0 |
|
Complete test charge will be provided |
| 6(Dimensions) |
- |
0 |
|
Complete test charge will be provided |
| 7(TEST CONDITIONS) |
- |
0 |
|
Complete test charge will be provided |
| 9.1(Luminous Flux) |
- |
0 |
|
Complete test charge will be provided |
| 9.2(Luminous Intensity Distribution, Peak Intensity and Beam Angle) |
- |
0 |
|
Complete test charge will be provided |
|
31 Dec, 2026 |
- REVISED VERSION OF IS 16102 (PART-2):2017 INCLUDED W.E.F. 10-06-2021. |
| 11827 |
Central Power Research Institute (CPRI), Bangalore
| 6101024
| IS 16102 : Part 1 (2012) |
Self - Ballasted led lamps for general lighting services: Part 1 safety requirements |
Self Ballasted SSL Product or LED |
25000 View breakup
Rs.25,000/- + 18% GST
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 5(Marking) |
- |
0 |
|
COMPLETE TEST CHARGES WILL BE PROVIDED |
| 6(Interchangeability) |
- |
0 |
|
COMPLETE TEST CHARGES WILL BE PROVIDED |
| 7(Protection against accidental contact with live parts) |
- |
0 |
|
COMPLETE TEST CHARGES WILL BE PROVIDED |
| 8(Strength after humidity treatment) |
- |
0 |
|
COMPLETE TEST CHARGES WILL BE PROVIDED |
| 9(Mechanical strength) |
- |
0 |
|
COMPLETE TEST CHARGES WILL BE PROVIDED |
| 10(Cap temperature rise) |
- |
0 |
|
COMPLETE TEST CHARGES WILL BE PROVIDED |
| 11(Resistance to heat) |
- |
0 |
|
COMPLETE TEST CHARGES WILL BE PROVIDED |
| 12(Resistance to flame and ignition) |
- |
0 |
|
COMPLETE TEST CHARGES WILL BE PROVIDED |
| 13(Fault conditions) |
- |
0 |
|
COMPLETE TEST CHARGES WILL BE PROVIDED |
| 14(Creepage distances and clearances) |
- |
0 |
|
COMPLETE TEST CHARGES WILL BE PROVIDED |
| 15(Selection of lamps for tests (Sampling)) |
- |
0 |
|
COMPLETE TEST CHARGES WILL BE PROVIDED |
| 16(Condition of compliance) |
- |
0 |
|
COMPLETE TEST CHARGES WILL BE PROVIDED |
| 17(Tests) |
- |
0 |
|
COMPLETE TEST CHARGES WILL BE PROVIDED |
|
31 Dec, 2026 |
- ISS included w.e.f. 23/7/2018 |
| 11828 |
BIS, Northern Regional Laboratory (NRL)
| None
| IS 21 (1992) |
Wrought aluminium and aluminium alloys for manufacture of utensils specification (Fourth Revision) |
- |
Rs.6600/- View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 4.2,
Table 2 of IS:21 (Designation & Condition 64430, WP') (Tensile Strength) |
- |
|
|
|
| 4.2,
Table 2 of IS:21 (Designation & Condition 64430, WP') (Bend Test (Radius of Bend)) |
- |
|
|
|
| 4.2,
Table 2 of IS:21 (Designation & Condition 64430, WP') (Elongation on 50 mm gauge length (For thickness over 2.6 to 6.3 mm)) |
- |
|
|
|
| 4.2,
Table 2 of IS:21 (Designation & Condition 64430, WP') (Elongation on 50 mm gauge length (For thickness over 1.3 to 2.6 mm)) |
- |
|
|
|
| 4.2,
Table 2 of IS:21 (Designation & Condition 64430, WP') (Elongation on 50 mm gauge length (For thickness 0.8 to 1.3 mm)) |
- |
|
|
|
| 4.2,
Table 2 of IS:21 (Designation & Condition 64430, WP') (Elongation on 50 mm gauge length (For thickness 0.5 to 0.8 mm)) |
- |
|
|
|
|
- |
- Excluding Microalloying elements and proof stress |
| 11829 |
BIS, Northern Regional Laboratory (NRL)
| None
| IS 318 (1981) |
Specification for leaded tin bronze ingots and castings (Second Revision) |
- |
- View breakup
Rs 1650/- For Castings: Gr LTB1, LTB2, LTB3, LTB5
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 7 (SIZE AND SHAPE) |
- |
|
|
|
| 6 (FREEDOM FROM DEFECTS) |
- |
|
|
|
| 4, Table 2. (MECHANICAL PROPERTIES) |
- |
|
|
|
| 7.2 (Dimension) |
- |
|
|
|
| 7.1 (Mass) |
- |
|
|
|
| 6.2 (Freedom from defects-Castings) |
- |
|
|
|
| 6.1 (Freedom from defects-Ingots) |
- |
|
|
|
| 4.1, Table 2 (Elongation) |
- |
|
|
|
| 4.1, Table 2 (Tensile strength) |
- |
|
|
|
|
- |
- Excluding Proof test, Microalloying elements |
| 11830 |
Central Power Research Institute (CPRI), Bangalore
| 6101024
| IS 13340 : PART 1 (2012) |
Shunt power capacitors of the self - Healing type for AC systems having a rated voltage up to and including 1000 V: Part 1 general - Performance, testing and rating - Safety requirements - Guide for installation and operation (First Revision) |
Upto 100 Kvar |
564800 View breakup
Routine tests for all varieties: Rs.20360/-; Type tests: Rs.247210/- for 1 - 4 kVAR, Rs.257920- for 5 - 10 kVAR, Rs.275630/- for 11 - 30 kVAR, Rs.290610/- for 31 - 50 kVAR, Rs.630850/- for 51 - 100 Kvar
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 7(Capacitance Measurement and Output Calculation) |
- |
4450 |
|
Test charges are dependant on the kvar rating of the test sample and the complete test charges applicable, will be intimated through a proforma invoice on receipt of the test request. |
| 8(Measurement of the tangent of the loss angle (tan δ) of the capacitor) |
- |
3750 |
|
Test charges are dependant on the kvar rating of the test sample and the complete test charges applicable, will be intimated through a proforma invoice on receipt of the test request. |
| 8(Measurement of the tangent of the loss angle (tan δ) of the capacitor) |
- |
0 |
|
- |
| 9.1(Voltage test between terminals) |
- |
1100 |
|
Test charges are dependant on the kvar rating of the test sample and the complete test charges applicable, will be intimated through a proforma invoice on receipt of the test request. |
| 10.1(Voltage test between terminals and container) |
- |
850 |
|
Test charges are dependant on the BIL rating of the test sample and the complete test charges applicable, will be intimated through a proforma invoice on receipt of the test request. |
| 11(Test of Internal Discharge Device) |
- |
700 |
|
Test charges are dependant on the kvar rating of the test sample and the complete test charges applicable, will be intimated through a proforma invoice on receipt of the test request. |
| 12(Sealing Test) |
- |
1350 |
|
Test charges are dependant on the kvar rating of the test sample and the complete test charges applicable, will be intimated through a proforma invoice on receipt of the test request. |
| 13 & Table 2-Ambient air temperature for the thermal stability test(Thermal Stability Test) |
- |
120550 |
|
Test charges are dependant on the kvar rating of the test sample and the complete test charges applicable, will be intimated through a proforma invoice. The above rate is for 100 kvar |
| 14(Measurement of the tangent of the loss angle (tan δ) of the capacitor at elevated temperature) |
- |
5900 |
|
Test charges are dependant on the kvar rating of the test sample and the complete test charges applicable, will be intimated through a proforma invoice |
| 9.2(Voltage test between terminals) |
- |
1100 |
|
Test charges are dependant on the kvar rating of the test sample and the complete test charges applicable, will be intimated through a proforma invoice |
| 10.2(Voltage test between terminals and container) |
- |
850 |
|
Test charges are dependant on the BIL rating of the test sample |
| 15(Lightning impulse voltage test between terminals and container) |
- |
3750 |
|
Test charges are dependant on the BIL rating of the test sample |
| 16(Discharge Test) |
- |
27350 |
|
Test charges are dependant on the kvar rating of the test sample and the complete test charges applicable, will be intimated through a proforma invoice |
| 17 & IEC 60831-2(Ageing Test) |
- |
244250 |
|
Test charges are dependant on the kvar rating of the test sample and the complete test charges applicable, will be intimated through a proforma invoice. The above rate is for 100 kvar. |
| 18 & IEC 60831-2(Self-Healing Test) |
- |
11950 |
|
Test charges are dependant on the kvar rating of the test sample and the complete test charges applicable, will be intimated through a proforma invoice |
| 19 & IEC 60831-2(Destruction Test) |
- |
121400 |
|
Test charges are dependant on the kvar rating of the test sample and the complete test charges applicable, will be intimated through a proforma invoice. The above rate is for 100 kvar. |
|
31 Dec, 2026 |
- - |
| 11831 |
Central Power Research Institute (CPRI), Bangalore
| 6101024
| IS 9079 (2018) |
Monoset pumps for clear, cold water for agricultural and water supply purposes - Specification (Third Revision) |
- |
13000 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 9.1.2(The pump shall be capable to perform as per guaranteed duty point at the manometric suction lift as specified in Table 1.) |
- |
0 |
|
- |
| 9.4(The pump efficiency of monoset pumps at duty point as declared by the manufacturer for 2 and 4 poles shall not be less than given in
Fig. 3 to Fig. 6 and beyond this range, the efficiency shall be declared by manufacturer.) |
- |
13000 |
|
Test charge applicable will be intimated through a proforma invoice. This charge is for 5.5-11 kW capacity |
|
31 Dec, 2026 |
- - |
| 11832 |
Central Power Research Institute (CPRI), Bangalore
| 6101024
| IS 8034 (2018) |
Submersible pumpsets - Specification (Third Revision) |
- |
13000 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 10.2(Laboratory Tests
Cl.8 of IS 11346-2002
Rate of flow and head
Cl.8 of IS 11346-2002) |
- |
0 |
|
- |
| 11.1.1(Guarantee of Performance) |
- |
13000 |
|
Test charge applicable will be intimated through a proforma invoice. This charge is for 7.5-11 kW capacity |
|
31 Dec, 2026 |
- - |
| 11833 |
Central Power Research Institute (CPRI), Bangalore
| 6101024
| IS 14220 (2018) |
Openwell submersible pumpsets - Specification (First Revision) |
- |
13000 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 9(Efficiency) |
- |
0 |
|
- |
| 15.2(Laboratory Tests
Cl.8 of IS 11346-2002
Rate of flow and head
Cl.8 of IS 11346-2002) |
- |
0 |
|
- |
| 15.5(Hydrostatic Pressure Test) |
- |
0 |
|
- |
| 16.1.1( Guarantee of Performance) |
- |
13000 |
|
Test charge applicable will be intimated through a proforma invoice. This charge is for 5.5-11 kW capacity |
|
31 Dec, 2026 |
- - |
| 11834 |
Central Power Research Institute (CPRI), Bangalore
| 6101024
| IS 17018 : Part 1 (2018) |
Solar photovoltaic water pumping systems: Part 1 centrifugal pumps - Specification |
Solar Water Pumping System / 10HP |
203100 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 10.1(Electrical performance Test-Electrical Measurement) |
- |
105600 |
|
Test charge applicable will be intimated through a proforma invoice. This charge include solar PV modules testing and IP 65 testing of controller |
| 10.3(Whole day Performance (with Sun simulator)) |
- |
65000 |
|
Test charge applicable will be intimated through a proforma invoice. This charge is for hot & cold simulator test |
| 10.3(Whole day Performance (real condition testing)) |
- |
32500 |
|
Test charge applicable will be intimated through a proforma invoice. This charge is for realistic test |
|
31 Dec, 2026 |
- - |
| 11835 |
Central Power Research Institute (CPRI), Bangalore
| 6101024
| IS 16221 : Part 1 (2016) |
Safety of Power Converters for use in Photovoltaic Power Systems Part 1 General Requirements |
Inverter/500kW |
1116000 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 15(Software and firmware performing safety functions) |
- |
1000 |
|
Test charges applicable only up to 20kW capacity.
Complete test charges as applicable will be intimated through a proforma invoice. |
| 14(Components) |
- |
10000 |
|
Test charges applicable only up to 20kW capacity.
Complete test charges as applicable will be intimated through a proforma invoice. |
| 13(Physical requirements) |
- |
100000 |
|
Test charges applicable only up to 20kW capacity.
Complete test charges as applicable will be intimated through a proforma invoice. |
| 12(Chemical hazards) |
- |
10000 |
|
Test charges applicable only up to 20kW capacity.
Complete test charges as applicable will be intimated through a proforma invoice. |
| 11(Protection against liquid hazards) |
- |
50000 |
|
Test charges applicable only up to 20kW capacity.
Complete test charges as applicable will be intimated through a proforma invoice. |
| 10(Protection against Sonic Pressure hazards) |
- |
20000 |
|
Test charges applicable only up to 20kW capacity.
Complete test charges as applicable will be intimated through a proforma invoice. |
| 9(Protection Against Fire Hazards) |
- |
100000 |
|
Test charges applicable only up to 20kW capacity.
Complete test charges as applicable will be intimated through a proforma invoice. |
| 8(Protection Against mechanical Hazards) |
- |
20000 |
|
Test charges applicable only up to 20kW capacity.
Complete test charges as applicable will be intimated through a proforma invoice. |
| 7(Protection against electric shock and energy hazards) |
- |
75000 |
|
Test charges applicable only up to 20kW capacity.
Complete test charges as applicable will be intimated through a proforma invoice. |
| 6(Environmental Requirements and conditions) |
- |
500000 |
|
Test charges applicable only up to 20kW capacity.
Complete test charges as applicable will be intimated through a proforma invoice. |
| 5(Marking and documentation) |
- |
10000 |
|
Test charges applicable only up to 20kW capacity.
Complete test charges as applicable will be intimated through a proforma invoice. |
| 4(General testing requirements) |
- |
220000 |
|
Test charges applicable only up to 20kW capacity.
Complete test charges as applicable will be intimated through a proforma invoice. |
|
31 Dec, 2026 |
- ISS included w.e.f. 10/9/2018 |
| 11836 |
Central Power Research Institute (CPRI), Bangalore
| 6101024
| IS 16221 : Part 2 (2015) |
Safety of power converters for use in photovoltaic power systems: Part 2 particular requirements for inverters |
Inverter/500kW |
1265000 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 4(General Test Requireements) |
- |
370000 |
|
Test charges are applicable up to 20kW capacity.
Complete test charges as applicable will be intimated through a proforma invoice.
The test charges include the testing as per IS 16221 Part 1 standard also (as IS 16221 Part 2 refers to Part 1) |
| 5(Marking and documentation) |
- |
10000 |
|
Test charges are applicable up to 20kW capacity.
Complete test charges as applicable will be intimated through a proforma invoice.
The test charges include the testing as per IS 16221 Part 1 standard also (as IS 16221 Part 2 refers to Part 1) |
| 6(Environmental requirements and conditions) |
- |
500000 |
|
Test charges are applicable up to 20kW capacity.
Complete test charges as applicable will be intimated through a proforma invoice.
The test charges include the testing as per IS 16221 Part 1 standard also (as IS 16221 Part 2 refers to Part 1) |
| 7(Protection against electric shock and energy hazards) |
- |
75000 |
|
Test charges are applicable up to 20kW capacity.
Complete test charges as applicable will be intimated through a proforma invoice.
The test charges include the testing as per IS 16221 Part 1 standard also (as IS 16221 Part 2 refers to Part 1) |
| 8(Protection against Mechanical Hazards) |
- |
20000 |
|
Test charges are applicable up to 20kW capacity.
Complete test charges as applicable will be intimated through a proforma invoice.
The test charges include the testing as per IS 16221 Part 1 standard also (as IS 16221 Part 2 refers to Part 1) |
| 9(Protection against Fire Hazards) |
- |
100000 |
|
Test charges are applicable up to 20kW capacity.
Complete test charges as applicable will be intimated through a proforma invoice.
The test charges include the testing as per IS 16221 Part 1 standard also (as IS 16221 Part 2 refers to Part 1) |
| 10(Protection against Sonic Pressure Hazards) |
- |
20000 |
|
Test charges are applicable up to 20kW capacity.
Complete test charges as applicable will be intimated through a proforma invoice.
The test charges include the testing as per IS 16221 Part 1 standard also (as IS 16221 Part 2 refers to Part 1) |
| 11(Protection against Liquid Hazards) |
- |
50000 |
|
Test charges are applicable up to 20kW capacity.
Complete test charges as applicable will be intimated through a proforma invoice.
The test charges include the testing as per IS 16221 Part 1 standard also (as IS 16221 Part 2 refers to Part 1) |
| 12(Protection against Chemical Hazards) |
- |
10000 |
|
Test charges are applicable up to 20kW capacity.
Complete test charges as applicable will be intimated through a proforma invoice.
The test charges include the testing as per IS 16221 Part 1 standard also (as IS 16221 Part 2 refers to Part 1) |
| 13(Physical Requirements) |
- |
100000 |
|
Test charges are applicable up to 20kW capacity.
Complete test charges as applicable will be intimated through a proforma invoice.
The test charges include the testing as per IS 16221 Part 1 standard also (as IS 16221 Part 2 refers to Part 1) |
| 14(Components) |
- |
10000 |
|
Test charges are applicable up to 20kW capacity.
Complete test charges as applicable will be intimated through a proforma invoice.
The test charges include the testing as per IS 16221 Part 1 standard also (as IS 16221 Part 2 refers to Part 1) |
|
31 Dec, 2026 |
- ISS included w.e.f. 10/9/2018 |
| 11837 |
Central Power Research Institute (CPRI), Bangalore
| 6101024
| IS 16169 (2014) |
Utility - Interconnected photovoltaic inverters - Test procedure of islanding prevention measures |
Grid connected inverter/200kW |
110000 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 6 to 6.2, (Elec)(Test for single or multi-phase inverter to Pass/fail criteria) |
- |
110000 |
|
Test charges applicable up to 20kW capacity.
Complete test charges applicable will be intimated through proforma invoice. |
| 7, (Elec)(Documentation) |
- |
0 |
|
Complete test charges applicable will be intimated through proforma invoice. |
| Annex A, (Elec)(Islanding as it applies to PV systems) |
- |
0 |
|
Complete test charges applicable will be intimated through proforma invoice. |
| Annex B, (Elec)(Test for independent islanding device) |
- |
0 |
|
Complete test charges applicable will be intimated through proforma invoice. |
| 6 to 6.2(Test for single or multi-phase inverter to Pass/fail criteria) |
- |
110000 |
|
Complete test charges applicable will be intimated through proforma invoice. |
| 7(Documentation) |
- |
0 |
|
Complete test charges applicable will be intimated through proforma invoice. |
| Annex A(Islanding as it applies to PV systems) |
- |
0 |
|
Complete test charges applicable will be intimated through proforma invoice. |
| Annex B(Test for independent islanding device) |
- |
0 |
|
Complete test charges applicable will be intimated through proforma invoice. |
|
31 Dec, 2026 |
- - |
| 11838 |
Central Power Research Institute (CPRI), Bangalore
| 6101024
| IS 16169 (2019) |
Utility - Interconnected photovoltaic inverters - Test procedure of islanding prevention measures (First Revision) |
Grid connected inverters/200kW |
110000 View breakup
Rs.1,26,500/- +18%GST up to 20 kW, Rs.1,61,000/- +18%GST Above 20 kW- up to 50 kW, Rs.2,53,000/- +18%GST Above 50kW - up to 100kW, Rs.3,68,000/- +18%GST Above 100 kW- up to 200kW,
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 6 to 6.2(Test for single or multi-phase inverter to Pass/fail criteria) |
- |
110000 |
|
The testing charge is applicable only for inverters up to 20kW.
Complete test charges applicable will be intimated through proforma invoice. |
| 6(Test for single or multi-phase inverter) |
- |
110000 |
|
Complete test charges applicable will be intimated through proforma invoice. |
| Annex A(Islanding as it applies to PV systems) |
- |
0 |
|
Complete test charges applicable will be intimated through proforma invoice. |
| Annex B(Test for independent islanding device) |
- |
0 |
|
Complete test charges applicable will be intimated through proforma invoice. |
| 7(Documentation) |
- |
0 |
|
Complete test charges applicable will be intimated through proforma invoice. |
|
31 Dec, 2026 |
- REVISED VERSION OF IS 16169:2019 INCLUDED W.E.F. 10-6-21. |
| 11839 |
Central Power Research Institute (CPRI), Bangalore
| 6101024
| IS 14494 (2019) |
Elastomer insulated flexible cables for use in mines - Specification (First Revision) |
Elastomer Insulated Cables for use in mines |
715600 View breakup
LT cables: Rs.193720/- for 1-core; Rs.313090/- + 18% GST for 3-core; Rs.372780/- + 18% GST for 4-core; Rs.432460/- + 18% GST for 5-core; Rs.492150/- + 18% GST for 6-core; Rs.551830/- + 18% GST for 7-core HT cables: Rs.244850/- + 18% GST for 1-core; Rs.436550/- + 18% GST for 3-core; Rs.552060/- + 18% GST for 4-core; Rs.629750/- + 18% GST for 5-core; Rs.726350/- + 18% GST for 6-core; Rs.822950/- + 18% GST for 7-core
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 4(CONDUCTOR) |
- |
0 |
|
The complete test charges applicable, will be intimated through proforma invoice. |
| 5(INSULATION) |
- |
0 |
|
The complete test charges applicable, will be intimated through proforma invoice. |
| 5.1(Power Cores) |
- |
0 |
|
The complete test charges applicable, will be intimated through proforma invoice. |
| 5.2(Pilot and Earth Cores) |
- |
0 |
|
The complete test charges applicable, will be intimated through proforma invoice. |
| 6(SEMI-CONDUCTING COMPOUND) |
- |
0 |
|
The complete test charges applicable, will be intimated through proforma invoice. |
| 7.1(TAPE : Proofed Tape) |
- |
0 |
|
The complete test charges applicable, will be intimated through proforma invoice. |
| 7.2(TAPE : Polyethylene Terephalate (PETP) or
Polypropylene Base Tape) |
- |
0 |
|
The complete test charges applicable, will be intimated through proforma invoice. |
| 7.3(TAPE ) |
- |
0 |
|
The complete test charges applicable, will be intimated through proforma invoice. |
| 8(CENTRE) |
- |
0 |
|
The complete test charges applicable, will be intimated through proforma invoice. |
| 9.1(FILLERS) |
- |
0 |
|
The complete test charges applicable, will be intimated through proforma invoice. |
| 9.2(FILLERS) |
- |
0 |
|
The complete test charges applicable, will be intimated through proforma invoice. |
| 10(CRADLE SEPARATOR) |
- |
0 |
|
The complete test charges applicable, will be intimated through proforma invoice. |
| 11.1(ARMOUR) |
- |
0 |
|
The complete test charges applicable, will be intimated through proforma invoice. |
| 11.2(ARMOUR) |
- |
0 |
|
The complete test charges applicable, will be intimated through proforma invoice. |
| 11.2 a)(ARMOURING: Tensile Strength) |
- |
5300 |
|
The complete test charges applicable, will be intimated through proforma invoice. |
| 11.2 b)(ARMOURING: Elongation ) |
- |
5300 |
|
The complete test charges applicable, will be intimated through proforma invoice. |
| 11.2 c)(ARMOURING: Torsion Test (For round wire ) ) |
- |
500 |
|
The complete test charges applicable, will be intimated through proforma invoice. |
| 11.2 d)(ARMOURING: Uniformity of zinc coating) |
- |
700 |
|
The complete test charges applicable, will be intimated through proforma invoice. |
| 11.2 e)(ARMOURING: Mass of zinc coating ) |
- |
700 |
|
The complete test charges applicable, will be intimated through proforma invoice. |
| 12.1(SHEATH : Inner Sheath) |
- |
0 |
|
The complete test charges applicable, will be intimated through proforma invoice. |
| 12.2(SHEATH : Outer Sheath) |
- |
0 |
|
The complete test charges applicable, will be intimated through proforma invoice. |
| 13.1(REINFORCEMENT MATERIAL : Tape) |
- |
0 |
|
The complete test charges applicable, will be intimated through proforma invoice. |
| 13.2(REINFORCEMENT MATERIAL : Cord/Yarns) |
- |
0 |
|
The complete test charges applicable, will be intimated through proforma invoice. |
| 14.1(CONSTRUCTION : CONDUCTOR) |
- |
0 |
|
The complete test charges applicable, will be intimated through proforma invoice. |
| 14.2(CONSTRUCTION : CONDUCTOR) |
- |
0 |
|
The complete test charges applicable, will be intimated through proforma invoice. |
| 14.3(CONSTRUCTION : CONDUCTOR) |
- |
0 |
|
The complete test charges applicable, will be intimated through proforma invoice. |
| 14.4(CONSTRUCTION : CONDUCTOR) |
- |
0 |
|
The complete test charges applicable, will be intimated through proforma invoice. |
| 15(CONDUCTOR SCREENING) |
- |
0 |
|
The complete test charges applicable, will be intimated through proforma invoice. |
| 16.1(INSULATION) |
- |
0 |
|
The complete test charges applicable, will be intimated through proforma invoice. |
| 16.2(INSULATION : Thickness of Insulation) |
- |
1600 |
|
The test charges is applicable for one core and if the number core increases, test charges will also increase proportionally.
The complete test charges applicable, will be intimated through proforma invoice. |
| 16.3(INSULATION : Tolerance on Insulation Thickness) |
- |
0 |
|
The complete test charges applicable, will be intimated through proforma invoice. |
| 16.4(INSULATION : Application of Insulation) |
- |
0 |
|
The complete test charges applicable, will be intimated through proforma invoice. |
| 16.5(INSULATION) |
- |
0 |
|
The complete test charges applicable, will be intimated through proforma invoice. |
| 17.1(INSULATION SCREEN) |
- |
0 |
|
The complete test charges applicable, will be intimated through proforma invoice. |
| 17.2(INSULATION SCREEN) |
- |
0 |
|
The complete test charges applicable, will be intimated through proforma invoice. |
| 17.3(INSULATION SCREEN) |
- |
0 |
|
The complete test charges applicable, will be intimated through proforma invoice. |
| 17.4(INSULATION SCREEN) |
- |
0 |
|
- |
| 18(PROTECTIVE SCREEN) |
- |
0 |
|
The complete test charges applicable, will be intimated through proforma invoice. |
| 19(CONDUCTANCE OF SCREEN) |
- |
0 |
|
The complete test charges applicable, will be intimated through proforma invoice. |
| 19.1(Individual Core Screen) |
- |
0 |
|
The complete test charges applicable, will be intimated through proforma invoice. |
| 19.2(Collective Screen) |
- |
0 |
|
The complete test charges applicable, will be intimated through proforma invoice. |
| 20.1(CORE IDENTIFICATION) |
- |
0 |
|
The complete test charges applicable, will be intimated through proforma invoice. |
| 20.2(Colour Scheme for Identification) |
- |
0 |
|
The complete test charges applicable, will be intimated through proforma invoice. |
| 20.3(Scheme for Identification by Numbering) |
- |
0 |
|
The complete test charges applicable, will be intimated through proforma invoice. |
| 21.1(LAYING UP OF CORES) |
- |
0 |
|
The complete test charges applicable, will be intimated through proforma invoice. |
| 21.2(LAYING UP OF CORES) |
- |
0 |
|
The complete test charges applicable, will be intimated through proforma invoice. |
| 21.3(LAYING UP OF CORES) |
- |
0 |
|
The complete test charges applicable, will be intimated through proforma invoice. |
| 21.4(LAYING UP OF CORES) |
- |
0 |
|
The complete test charges applicable, will be intimated through proforma invoice. |
| 22.1(INNER SHEATH) |
- |
0 |
|
The complete test charges applicable, will be intimated through proforma invoice. |
| 22.2(Thickness of Inner Sheath) |
- |
1600 |
|
The complete test charges applicable, will be intimated through proforma invoice. |
| 22.3(INNER SHEATH) |
- |
0 |
|
The complete test charges applicable, will be intimated through proforma invoice. |
| 23.1(ARMOURING) |
- |
0 |
|
The complete test charges applicable, will be intimated through proforma invoice. |
| 23.2(ARMOURING) |
- |
0 |
|
The complete test charges applicable, will be intimated through proforma invoice. |
| 23.3(ARMOURING) |
- |
0 |
|
The complete test charges applicable, will be intimated through proforma invoice. |
| 23.4(ARMOURING) |
- |
0 |
|
The complete test charges applicable, will be intimated through proforma invoice. |
| 24.1(OUTER SHEATH) |
- |
0 |
|
The complete test charges applicable, will be intimated through proforma invoice. |
| 24.2(Thickness of Outer Sheath) |
- |
1600 |
|
The complete test charges applicable, will be intimated through proforma invoice. |
| 24.3(Tolerance on Thickness of Outer Sheath) |
- |
0 |
|
The complete test charges applicable, will be intimated through proforma invoice. |
| 24.4(OUTER SHEATH) |
- |
0 |
|
The complete test charges applicable, will be intimated through proforma invoice. |
| 25.1(CABLE CONSTRUCTION AND DIMENSIONS) |
- |
850 |
|
The complete test charges applicable, will be intimated through proforma invoice. |
| 27.2(Bending test followed by partial discharge test;) |
- |
9700 |
|
The complete test charges applicable, will be intimated through proforma invoice. |
| 27.4(Dielectric power factor test) |
- |
2700 |
|
The test charges is applicable for one core and if the number core increases, test charges will also increase proportionally.
The complete test charges applicable, will be intimated through proforma invoice. |
| 27.5(Heating cycle test followed by partial discharge test;) |
- |
45200 |
|
The complete test charges applicable, will be intimated through proforma invoice. |
| 27.6(Impulse voltage test; and) |
- |
19750 |
|
The test charges is applicable for one core and if the number core increases, test charges will also increase proportionally.
The complete test charges applicable, will be intimated through proforma invoice. |
| 26.3(Special Provisions) |
- |
0 |
|
The complete test charges applicable, will be intimated through proforma invoice. |
| 27.8(Flammability Test) |
- |
1600 |
|
The complete test charges applicable, will be intimated through proforma invoice. |
| 27.9(Water Absorption Test) |
- |
16100 |
|
The complete test charges applicable, will be intimated through proforma invoice. |
| 28(IDENTIFICATION) |
- |
0 |
|
The complete test charges applicable, will be intimated through proforma invoice. |
| 29.1(PACKING AND MARKING) |
- |
0 |
|
The complete test charges applicable, will be intimated through proforma invoice. |
| 29.2(PACKING AND MARKING) |
- |
0 |
|
The complete test charges applicable, will be intimated through proforma invoice. |
| 30(BIS CERTIFICATION MARKING) |
- |
0 |
|
The complete test charges applicable, will be intimated through proforma invoice. |
| Table 33®, Annex E(Electric tset on semi-conducting screen) |
- |
7500 |
|
The test charges is applicable for one core and if the number core increases, test charges will also increase proportionally.
The complete test charges applicable, will be intimated through proforma invoice. |
| Table 33(n), Cl. No. 27.7(High Voltage test for 4 hrs.) |
- |
5200 |
|
The test charges is applicable for one core and if the number core increases, test charges will also increase proportionally.
The complete test charges applicable, will be intimated through proforma invoice. |
| Table 33(j), Cl. No. 27.4(Dielectric Power Factor (as a function of Voltage)) |
- |
3750 |
|
The test charges is applicable for one core and if the number core increases, test charges will also increase proportionally.
The complete test charges applicable, will be intimated through proforma invoice. |
| Table 33(h), Cl. No. 27.2(Partial discharge test) |
- |
4000 |
|
The test charges is applicable for one core and if the number core increases, test charges will also increase proportionally.
The complete test charges applicable, will be intimated through proforma invoice. |
| Table 33(f)(Insulation resistance) |
- |
2800 |
|
The test charges is applicable for one core and if the number core increases, test charges will also increase proportionally.
The complete test charges applicable, will be intimated through proforma invoice. |
| Table 33(e)(Tear resistance on sheath) |
- |
5300 |
|
The complete test charges applicable, will be intimated through proforma invoice. |
| Table 33(e)(Oil resistance - Elongation on sheath) |
- |
11500 |
|
The complete test charges applicable, will be intimated through proforma invoice. |
| Table 33(e)(Oil resistance - Tensile strength on sheath) |
- |
6200 |
|
The complete test charges applicable, will be intimated through proforma invoice. |
| Table 33(e)(Permanent set on Sheath) |
- |
2300 |
|
The complete test charges applicable, will be intimated through proforma invoice. |
| Table 33(e)(Hot set on Sheath) |
- |
0 |
|
The complete test charges applicable, will be intimated through proforma invoice. |
| Table 33(e)(Ageing in air bomb - Elongation on Sheath) |
- |
5300 |
|
The complete test charges applicable, will be intimated through proforma invoice. |
| Table 33(d)(Ageing in air bomb - Tensile strength on Insulation) |
- |
5300 |
|
The complete test charges applicable, will be intimated through proforma invoice. |
| Table 33(d)(Ageing in air oven - Elongation on Insulation) |
- |
0 |
|
The complete test charges applicable, will be intimated through proforma invoice. |
| Table 33(d)(Ageing in air oven - Tensile strength on Insulation) |
- |
0 |
|
The complete test charges applicable, will be intimated through proforma invoice. |
| Table 33(d)(Elongation at break on Insulation) |
- |
6200 |
|
The test charges is applicable for one core and if the number core increases, test charges will also increase proportionally.
The complete test charges applicable, will be intimated through proforma invoice. |
| Table 33(d)(Tensile strength on Insulation) |
- |
6200 |
|
The test charges is applicable for one core and if the number core increases, test charges will also increase proportionally.
The complete test charges applicable, will be intimated through proforma invoice. |
| Table 33(c)(Resistivity of steel wire) |
- |
2300 |
|
The complete test charges applicable, will be intimated through proforma invoice. |
| Table 33(b)(Diameter of armour wire) |
- |
850 |
|
The complete test charges applicable, will be intimated through proforma invoice. |
| Table 4(Copper purity test) |
- |
2300 |
|
The complete test charges applicable, will be intimated through proforma invoice. |
| Table 33(a)(Conductor resistance test) |
- |
2300 |
|
The test charges is applicable for one core and if the number core increases, test charges will also increase proportionally.
The complete test charges applicable, will be intimated through proforma invoice. |
| Table 33(a)(Annealing test) |
- |
1450 |
|
The test charges is applicable for one core and if the number core increases, test charges will also increase proportionally.
The complete test charges applicable, will be intimated through proforma invoice. |
| 15.4 (b)(Cold impact) |
- |
7600 |
|
The complete test charges applicable, will be intimated through proforma invoice. |
|
31 Dec, 2026 |
- - |
| 11840 |
Central Power Research Institute (CPRI), Bangalore
| 6101024
| IS 335 (2018) |
New insulating oils - Specification (Fifth Revision) |
New Insulating oils for Transformers and Switchgears |
215750 View breakup
Type I oil with uninhibited: Rs.147510/-; Type I oil with trace inhibited: Rs.169920/-; Type I oil with inhibited: Rs.175670/-; Complete testing for type I oils:Rs.248710/-, Type II oil with uninhibited: Rs.147510/-; Type II oil with trace inhibited: Rs.169920/- Type II oil with inhibited: Rs.175670/- Complete testing for type II Rs.248710/-. (18% GST extra )
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 6.1(Viscosity) |
- |
8000 |
|
Charges for Type I Oils Viscosity @ 40 deg.C & -30 deg.C : Rs.5000
Charges for Type II Oils Viscosity @ 40 deg.C & 0 deg.C : Rs.5000 |
| 6.2(Pour Point) |
- |
3000 |
|
- |
| 6..3(Water Content) |
- |
3000 |
|
- |
| 6.4(Breakdown Voltage) |
- |
2000 |
|
- |
| 6.5(Dielectric Dissipation Factor (DDF)) |
- |
3000 |
|
- |
| 6.7(Acidity) |
- |
2000 |
|
- |
| 6.8(Interfacial Tension (IFT)) |
- |
2000 |
|
- |
| 6.9(Sulphur Content) |
- |
10000 |
|
- |
| 6.1(Corrosive Sulphur and Potentially Corrosive Sulphur) |
- |
11000 |
|
Charges for Corrosive sulphur as per DIN 51353 : Rs.3000/-
Charges for Potentially Corrosive sulphur as per IS 16310 : Rs.8000/- |
| 6.12(Oxidation Stability) |
- |
105000 |
|
OS Charges for Uninhibited oils : Rs.20000/-
OS Charges for Trace inhibited oils : Rs.40000/-
OS Charges for Inhibited oils : Rs.45000/- |
| 6.13(Gassing Tendency) |
- |
8000 |
|
- |
| 6.15(Flash Point) |
- |
2000 |
|
- |
| 6.16(Density) |
- |
2000 |
|
- |
| 6.17(Polycyclic Aromatics (PCA)) |
- |
8000 |
|
- |
| 6.18(Polychlorinated Biphenyls (PCB)) |
- |
8000 |
|
- |
| 6.19(2-Furfural (2-FAL) and Related Compounds Content) |
- |
8000 |
|
- |
| 6.2(Particle Content) |
- |
3750 |
|
- |
| 6.21(DBDS Content) |
- |
8000 |
|
- |
| 7.1 (a)(Total acidity) |
- |
2000 |
|
- |
| 6.11(Additives) |
- |
16000 |
|
Charges for inhibitors as per according to IS 13631/IEC 60666 : Rs.8000/-
Charges for Metal passivator additives according to IS 13631/IEC 60666 : Rs.8000/- |
| 6.6(Appearance) |
- |
1000 |
|
- |
|
31 Dec, 2026 |
- Excluding 6.14 (Electrostatic Charging Tendency (ECT)), 6.22 (Stray Gassing of Oil) |
| 11841 |
MSME Testing Centre, New Delhi
| 8101204
| IS 7532 (2018) |
Soft soap - Specification (First RevisIon) |
- |
11950 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| CL 5 ( 5.1)(The material shall be homogeneous translucent mass of jelly-like texture, free from putrescent, fishy or objectionable odour. It applies to soft soap with potassium or sodium base or a mixture of these bases. It does not apply to soaps for medicinal purposes. It may or may not be suitably perfumed subject to agreement between the purchaser and the supplier. It shall be free from foreign matter and visible impurities) |
- |
500 |
|
- |
| 5.2(5.2 The material shall quickly form a satisfactory lather while in use and shall show no sign of any deterioration on storage in original sealed containers under normal conditions for a period of 12 months.) |
- |
5000 |
|
- |
| 5.3(The soap shall not become liquid at 32°C, and no liquid shall separate when the soap is maintained at 0°C, for 24 h.) |
- |
1000 |
|
- |
| 5.4(Soft soap is liable to lose moisture on keeping. The results obtained for unsaponified and unsaponifiable matter, total free alkali and free caustic alkali by the specific methods of analysis shall, therefore, be recalculated in relation to the specified minimum total fatty matter by means of the equation: Recalculated result = Minimum specified total fatty matter content Actualresult× Actual total fatty matter conten) |
- |
0 |
|
- |
| Table-1 (i) IS.no 286(Total Fatty Matter ( Type 1 )) |
- |
1350 |
|
- |
| Table-1 (ii) IS.no 286 CL 12(Unsaponified and Unsaponified matter (Type 1 )) |
- |
1050 |
|
- |
| Table-1 (iii) IS.no 286 CL 14(Rosin acids percent by mass of total fatty matter ( Type 1)) |
- |
1050 |
|
- |
| Table-1 (iv) IS.no 286 Annex A(Total free alkali ( as K2O ) type 1) |
- |
950 |
|
- |
| 4.5, Table-1 (v) Type-1 & Type-2(Free caustic alkali (as K2O), IS 286) |
- |
950 |
|
- |
| 4.1(Description, IS 7532) |
- |
300 |
|
- |
|
31 Dec, 2026 |
- - |
| 11842 |
UL INDIA PRIVATE LIMITED, BENGALURU
| 6120526
| IS 16169 (2014) |
Utility - Interconnected photovoltaic inverters - Test procedure of islanding prevention measures |
Photovoltaic (PV) Inverter(s) |
400000 View breakup
Rs.4,00,000/-
10% discount to BIS
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 6 to 6.2, (Elec)(Test for single or multi-phase inverter to Pass/fail criteria) |
- |
320000 |
|
- |
|
12 May, 2027 |
- - |
| 11843 |
BLUESKY LAB LLP, GHAZIABAD
| 8170306
| IS 302 : Part 2 : Sec 14 (2009) |
Safety of household and similar electrical appliances: Part 2 particular requirements: Sec 14 electric kitchen machines (First Revision) |
- |
14700 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 6(Classification- IS 302-1 ) |
- |
200 |
|
10% discount offered to BIS |
| 7.1(Marking- IS 302-1) |
- |
100 |
|
10% discount offered to BIS |
| 7.3(Marking- IS 302-1) |
- |
100 |
|
10% discount offered to BIS |
| 7.4(Marking- IS 302-1) |
- |
100 |
|
10% discount offered to BIS |
| 7.6(Marking- IS 302-1) |
- |
100 |
|
10% discount offered to BIS |
| 7.7(Marking- IS 302-1) |
- |
100 |
|
10% discount offered to BIS |
| 7.8(Marking- IS 302-1) |
- |
100 |
|
10% discount offered to BIS |
| 7.11(Marking- IS 302-1) |
- |
100 |
|
10% discount offered to BIS |
| 7.12(Marking- IS 302-1) |
- |
100 |
|
10% discount offered to BIS |
| 7.13(Marking- IS 302-1) |
- |
100 |
|
10% discount offered to BIS |
| 7.14(Marking- IS 302-1) |
- |
500 |
|
10% discount offered to BIS |
| 7.15(Marking- IS 302-1) |
- |
100 |
|
10% discount offered to BIS |
| 8( Protection Against Electric Shock, IS 302-1) |
- |
1000 |
|
10% discount offered to BIS |
| 7.101(Marking) |
- |
0 |
|
10% discount offered to BIS |
| 10(Power Input and Current, IS 302-1) |
- |
1000 |
|
10% discount offered to BIS |
| 11(Heating, IS 302-1) |
- |
1200 |
|
10% discount offered to BIS |
| 13(Electrical Insulation and Leakage Current at Operating Temperature: Leakage current, IS 302-1) |
- |
700 |
|
10% discount offered to BIS |
| 13(Electrical Insulation and Leakage Current at Operating Temperature: High Voltage, IS 302-1) |
- |
700 |
|
10% discount offered to BIS |
| 14(Transient Over Voltages, IS 302-1) |
- |
1200 |
|
10% discount offered to BIS |
| 15(Moisture Resistance, IS 302-1) |
- |
2500 |
|
10% discount offered to BIS |
| 16(Electrical Insulation and Leakage Current at Operating Temperature: Leakage current, IS 302-1) |
- |
1000 |
|
10% discount offered to BIS |
| 17(Overload protection of Transformers and Associated Circuits, IS 302-1) |
- |
700 |
|
10% discount offered to BIS |
| 19.1(Abnormal Operation, IS 302-1) |
- |
1000 |
|
10% discount offered to BIS |
| 19.7(Abnormal Operation, IS 302-1) |
- |
500 |
|
10% discount offered to BIS |
| 19.8(Abnormal Operation, IS 302-1) |
- |
500 |
|
10% discount offered to BIS |
| 19.9(Abnormal Operation, IS 302-1) |
- |
500 |
|
10% discount offered to BIS |
| 19.101(Abnormal Operation) |
- |
200 |
|
10% discount offered to BIS |
| 20.1(Stability & Mechanical Hazards, IS 302-1) |
- |
500 |
|
10% discount offered to BIS |
| 20.2(Stability & Mechanical Hazards, IS 302-1) |
- |
500 |
|
10% discount offered to BIS |
| 20.101(Stability & Mechanical Hazards) |
- |
200 |
|
10% discount offered to BIS |
| 20.102(Stability & Mechanical Hazards) |
- |
200 |
|
10% discount offered to BIS |
| 20.103(Stability & Mechanical Hazards) |
- |
200 |
|
10% discount offered to BIS |
| 20.104(Stability & Mechanical Hazards) |
- |
200 |
|
10% discount offered to BIS |
| 20.105(Stability & Mechanical Hazards) |
- |
100 |
|
10% discount offered to BIS |
| 20.106(Stability & Mechanical Hazards) |
- |
100 |
|
10% discount offered to BIS |
| 20.107(Stability & Mechanical Hazards) |
- |
100 |
|
10% discount offered to BIS |
| 20.108(Stability & Mechanical Hazards) |
- |
200 |
|
10% discount offered to BIS |
| 20.109(Stability & Mechanical Hazards) |
- |
200 |
|
10% discount offered to BIS |
| 20.110(Stability & Mechanical Hazards) |
- |
200 |
|
10% discount offered to BIS |
| 20.111(Stability & Mechanical Hazards) |
- |
200 |
|
10% discount offered to BIS |
| 20.112(Stability & Mechanical Hazards) |
- |
200 |
|
10% discount offered to BIS |
| 20.113(Stability & Mechanical Hazards) |
- |
200 |
|
10% discount offered to BIS |
| 20.114(Stability & Mechanical Hazards) |
- |
200 |
|
10% discount offered to BIS |
| 20.115(Stability & Mechanical Hazards) |
- |
200 |
|
10% discount offered to BIS |
| 20.116(Stability & Mechanical Hazards) |
- |
200 |
|
10% discount offered to BIS |
| 21.1(Mechanical Strength, IS 302-1) |
- |
500 |
|
10% discount offered to BIS |
| 21.2(Mechanical Strength, IS 302-1) |
- |
500 |
|
10% discount offered to BIS |
| 22(Construction, IS 302-1) |
- |
1000 |
|
10% discount offered to BIS |
| 22.101(Construction) |
- |
200 |
|
10% discount offered to BIS |
| 22.102(Construction) |
- |
200 |
|
10% discount offered to BIS |
| 23.1(Internal Wiring, IS 302-1) |
- |
600 |
|
10% discount offered to BIS |
| 23.2(Internal Wiring, IS 302-1) |
- |
400 |
|
10% discount offered to BIS |
| 23.3(Internal Wiring, IS 302-1) |
- |
400 |
|
10% discount offered to BIS |
| 23.4(Internal Wiring, IS 302-1) |
- |
400 |
|
10% discount offered to BIS |
| 23.5(Internal Wiring, IS 302-1) |
- |
400 |
|
10% discount offered to BIS |
| 23.6(Internal Wiring, IS 302-1) |
- |
400 |
|
10% discount offered to BIS |
| 23.7(Internal Wiring, IS 302-1) |
- |
400 |
|
10% discount offered to BIS |
| 23.8(Internal Wiring, IS 302-1) |
- |
400 |
|
10% discount offered to BIS |
| 23.9(Internal Wiring, IS 302-1) |
- |
400 |
|
10% discount offered to BIS |
| 23.10(Internal Wiring, IS 302-1) |
- |
400 |
|
10% discount offered to BIS |
| 24.1(Components, IS 302-1) |
- |
1000 |
|
10% discount offered to BIS |
| 24.2(Components, IS 302-1) |
- |
1000 |
|
10% discount offered to BIS |
| 24.5(Components, IS 302-1) |
- |
500 |
|
10% discount offered to BIS |
| 24.6(Components, IS 302-1) |
- |
400 |
|
10% discount offered to BIS |
| 25.1(Supply Connection and External Flexible Cords, IS 302-1) |
- |
500 |
|
10% discount offered to BIS |
| 25.5(Supply Connection and External Flexible Cords, IS 302-1) |
- |
400 |
|
10% discount offered to BIS |
| 25.6(Supply Connection and External Flexible Cords, IS 302-1) |
- |
400 |
|
10% discount offered to BIS |
| 25.7(Supply Connection and External Flexible Cords, IS 302-1) |
- |
400 |
|
10% discount offered to BIS |
| 25.8(Supply Connection and External Flexible Cords, IS 302-1) |
- |
400 |
|
10% discount offered to BIS |
| 26.9(Supply Connection and External Flexible Cords, IS 302-1) |
- |
400 |
|
10% discount offered to BIS |
| 25.1(Supply Connection and External Flexible Cords, IS 302-1) |
- |
400 |
|
10% discount offered to BIS |
| 25.11(Supply Connection and External Flexible Cords, IS 302-1) |
- |
400 |
|
10% discount offered to BIS |
| 25.12(Supply Connection and External Flexible Cords, IS 302-1) |
- |
400 |
|
10% discount offered to BIS |
| 25.13(Supply Connection and External Flexible Cords, IS 302-1) |
- |
400 |
|
10% discount offered to BIS |
| 25.14(Supply Connection and External Flexible Cords, IS 302-1) |
- |
400 |
|
10% discount offered to BIS |
| 25.15(Supply Connection and External Flexible Cords, IS 302-1) |
- |
400 |
|
10% discount offered to BIS |
| 25.16(Supply Connection and External Flexible Cords, IS 302-1) |
- |
400 |
|
10% discount offered to BIS |
| 25.17(Supply Connection and External Flexible Cords, IS 302-1) |
- |
400 |
|
10% discount offered to BIS |
| 25.18(Supply Connection and External Flexible Cords, IS 302-1) |
- |
400 |
|
10% discount offered to BIS |
| 25.19(Supply Connection and External Flexible Cords, IS 302-1) |
- |
400 |
|
10% discount offered to BIS |
| 25.2(Supply Connection and External Flexible Cords, IS 302-1) |
- |
400 |
|
10% discount offered to BIS |
| 25.21(Supply Connection and External Flexible Cords, IS 302-1) |
- |
200 |
|
10% discount offered to BIS |
| 25.22(Supply Connection and External Flexible Cords, IS 302-1) |
- |
200 |
|
10% discount offered to BIS |
| 26(Terminals for External Conductors, IS 302-1) |
- |
500 |
|
10% discount offered to BIS |
| 27(Provision for Earthing, IS 302-1) |
- |
400 |
|
10% discount offered to BIS |
| 27.2(Provision for Earthing, IS 302-1) |
- |
600 |
|
10% discount offered to BIS |
| 27.3(Provision for Earthing, IS 302-1) |
- |
400 |
|
10% discount offered to BIS |
| 27.4(Provision for Earthing, IS 302-1) |
- |
400 |
|
10% discount offered to BIS |
| 27.5(Provision for Earthing, IS 302-1) |
- |
500 |
|
10% discount offered to BIS |
| 28(Screws & Connections, IS 302-1) |
- |
500 |
|
10% discount offered to BIS |
| 29.1(Clearances, Creepage distances and Solid Insulation, IS 302-1) |
- |
600 |
|
10% discount offered to BIS |
| 29.2(Clearances, Creepage distances and Solid Insulation, IS 302-1) |
- |
600 |
|
10% discount offered to BIS |
| 30.1(Resistance to Heat and Fire, IS 302-1) |
- |
1000 |
|
10% discount offered to BIS |
| 30.2(Resistance to Heat and Fire, IS 302-1) |
- |
1000 |
|
10% discount offered to BIS |
| 31(Resistance of Rusting, IS 302-1) |
- |
1000 |
|
10% discount offered to BIS |
| 19.11.4.4(Surge immunity test) |
- |
2000 |
|
10% discount offered to BIS |
|
22 May, 2028 |
- EMI/EMC tests (Electrostatic discharges, radiant fields, fast transient bursts, voltage surges, injected current, voltage dip and interruption, mains signals) (Cl.19.11.4.1 to 19.11.4.7) |
| 11844 |
BLUESKY LAB LLP, GHAZIABAD
| 8170306
| IS 302 : Part 1 (2008) |
Safety of household and similar electrical appliances: Part 1 general requirements (Sixth Revision) |
- |
42000 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 7(Marking and instructions) |
- |
1000 |
|
10% discount offered to BIS |
| 8.1.1(Protection against live parts in all positions) |
- |
200 |
|
10% discount offered to BIS |
| 8.1.2(Protection against live parts in openings) |
- |
200 |
|
10% discount offered to BIS |
| 8.1.3(Protection against live parts in visible glowing heating elements) |
- |
300 |
|
10% discount offered to BIS |
| 8.1.4(Protection against live parts against protective impedance) |
- |
200 |
|
10% discount offered to BIS |
| 10.1(Power input) |
- |
800 |
|
10% discount offered to BIS |
| 10.2(Current input) |
- |
800 |
|
10% discount offered to BIS |
| 11.1(General) |
- |
800 |
|
10% discount offered to BIS |
| 11.2(General) |
- |
1000 |
|
10% discount offered to BIS |
| 11.3(Heating) |
- |
1000 |
|
10% discount offered to BIS |
| 13.1(General) |
- |
100 |
|
10% discount offered to BIS |
| 13.2(Leakage current at operating temperature) |
- |
1200 |
|
10% discount offered to BIS |
| 13.3(Electric Strength at operating temperature) |
- |
1200 |
|
10% discount offered to BIS |
| 14(Transient Over Voltages) |
- |
1400 |
|
10% discount offered to BIS |
| 15.0(General) |
- |
200 |
|
10% discount offered to BIS |
| 15.1(Ingress Protection test other than IPX0 (IP test)) |
- |
2000 |
|
10% discount offered to BIS |
| 15.2(Spillage Test) |
- |
500 |
|
10% discount offered to BIS |
| 15.3(Humidity Test) |
- |
1500 |
|
10% discount offered to BIS |
| 16.0(General) |
- |
100 |
|
10% discount offered to BIS |
| 16.1(General) |
- |
100 |
|
10% discount offered to BIS |
| 16.2(Leakage Current (after Clause 15)) |
- |
1000 |
|
10% discount offered to BIS |
| 16.3(Electric Strength (after clause 15 and 16.2)) |
- |
1000 |
|
10% discount offered to BIS |
| 17(Over Load Protection of Transformers and associated circuits) |
- |
1300 |
|
10% discount offered to BIS |
| 19(Abnormal Operation) |
- |
2000 |
|
10% discount offered to BIS |
| 20(Stability test) |
- |
1500 |
|
10% discount offered to BIS |
| 21(Mechanical Strength Test) |
- |
1850 |
|
10% discount offered to BIS |
| 22(Construction verification related test) |
- |
5000 |
|
10% discount offered to BIS |
| 23(General) |
- |
1000 |
|
10% discount offered to BIS |
| 24(Components) |
- |
1300 |
|
10% discount offered to BIS |
| 25(Supply connection and external flexible cords) |
- |
1600 |
|
10% discount offered to BIS |
| 26(Terminals for external conductors) |
- |
1000 |
|
10% discount offered to BIS |
| 27(Provision for earthing) |
- |
2100 |
|
10% discount offered to BIS |
| 28(Screw test and connections) |
- |
800 |
|
10% discount offered to BIS |
| 29(clearance, creepage distances and solid insulation) |
- |
2500 |
|
10% discount offered to BIS |
| 30.1(Ball pressure test) |
- |
2000 |
|
10% discount offered to BIS |
| 30.2(Glow Wire Test) |
- |
2000 |
|
10% discount offered to BIS |
| 30.2(Needle Flame Test) |
- |
2000 |
|
10% discount offered to BIS |
| 31(Resistance to Rusting) |
- |
2100 |
|
10% discount offered to BIS |
| 19.11.4.4(Surge immunity test) |
- |
2000 |
|
10% discount offered to BIS |
|
22 May, 2028 |
view Scope file Exclusions: EMI/EMC (ESD, Radiated fields, EFT Surge, Conducted Immunity, Dips & Interruptions,
Harmonics &Interharmonics) (Cl.19.11.4.1 to 19.11.4.7), Capacitor Test (Cl.
24.1.1), Switching Cycle Operation Test (Cl. 24.1.3), Automatic Control Cycle Operation
Test (Cl. 24.1.4), Appliance Coupler and Interconnection (Cl. 24.1.5), Lamp Holder
Test (Cl. 24.1.6), Capacitor in Auxillary Winding of Motor Test (Cl. 24.5) and
Motors Basic Insulation Test (Cl. 24.6), Components (Cl.24), ], Radiation, Toxicity & Similar Hazards (cl.32)
"(1)Cooking ranges, hobs, ovens and similar appliances, (2)Commercial Dispensing Appliances and Vending Machines, (3) spin extractors
(For testing charges please refer relevant Part 2 standard in LIMS)" |
| 11845 |
CIPET, Hyderabad
| 6111634
| IS 14856 (2000) |
Glass fibre reinforced plastic (GRP) panel type door shutters for internal use - Specification |
- |
11181 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 6.1(CONSTRUCTION/ FABRICATION) |
- |
1000 |
|
- |
|
23 Feb, 2027 |
- - |
| 11846 |
BLUESKY LAB LLP, GHAZIABAD
| 8170306
| IS 302 : Part 2 : Sec 15 (2009) |
Safety of household and similar electrical appliances: Part 2 particular requirements: Sec 15 appliances for heating liquids (First Revision) |
- |
16838 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 6.0(Classification) |
- |
500 |
|
10% discount offered to BIS |
| 7(Marking and instructions) |
- |
1000 |
|
10% discount offered to BIS |
| 8(Protection against live parts) |
- |
1000 |
|
10% discount offered to BIS |
| 10(POWER INPUT AND CURRENT) |
- |
1500 |
|
10% discount offered to BIS |
| 11(HEATING) |
- |
2800 |
|
10% discount offered to BIS |
| 13(LEAKAGE CURRENT AND ELECTRIC STRENGTH AT OPERATING TEMPERATURE) |
- |
2500 |
|
10% discount offered to BIS |
| 14(TRANSIENT OVERVOLTAGES) |
- |
1400 |
|
10% discount offered to BIS |
| 15(MOISTURE RESISTANCE) |
- |
4200 |
|
10% discount offered to BIS |
| 16(LEAKAGE CURRENT AND ELECTRIC STRENGTH) |
- |
2200 |
|
10% discount offered to BIS |
| 17(OVERLOAD PROTECTION OF TRANSFORMERS AND ASSOCIATED CIRCUITS) |
- |
1300 |
|
10% discount offered to BIS |
| 19(ABNORMAL OPERATION) |
- |
2000 |
|
10% discount offered to BIS |
| 20(STABILITY AND MECHANICAL HAZARDS) |
- |
1500 |
|
10% discount offered to BIS |
| 21(MECHANICAL STRENGTH) |
- |
1850 |
|
10% discount offered to BIS |
| 22(CONSTRUCTION) |
- |
5000 |
|
10% discount offered to BIS |
| 23(INTERNAL WIRING) |
- |
1000 |
|
10% discount offered to BIS |
| 24(COMPONENTS) |
- |
1300 |
|
10% discount offered to BIS |
| 25(SUPPLY CONNECTION AND EXTERNAL FLEXIBLE CORDS) |
- |
1600 |
|
10% discount offered to BIS |
| 26(TERMINALS FOR EXTERNAL CONDUCTORS) |
- |
1000 |
|
10% discount offered to BIS |
| 27(PROVISION FOR EARTHING) |
- |
2100 |
|
10% discount offered to BIS |
| 28(SCREWS AND CONNECTIONS) |
- |
800 |
|
10% discount offered to BIS |
| 29(CLEARANCES, CREEPAGE DISTANCES AND SOLID INSULATION) |
- |
2550 |
|
10% discount offered to BIS |
| 30(RESISTANCE TO HEAT AND FIRE) |
- |
6000 |
|
10% discount offered to BIS |
| 31(RESISTANCE TO RUSTING) |
- |
2100 |
|
10% discount offered to BIS |
| 19.11.4.4(Surge immunity test) |
- |
2000 |
|
10% discount offered to BIS |
|
22 May, 2028 |
- Restricted to Non Pressure Rice cooker only. EMI/EMC tests (electrostatic Discharges,
Radiant Fields, Fast Transient burst, Voltage surges, Injected current, voltage dips & Interruptions, Mains signals) [cl.19.11.4.1 to Cl.19.11.4.7], Radiation, Toxicity & Similar Hazards (cl.32),
Components (Cl.24), |
| 11847 |
BIS, Western Regional Laboratory (WRL)
| None
| IS 13489 (2000) |
Textiles – Bed mattress – Specification (first revision) |
- |
- View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 5.1 a) (Length) |
- |
|
|
|
| 5.1 b) (Width) |
- |
|
|
|
| 5.1 c) (Thickness) |
- |
|
|
|
| 3 (TYPES) |
- |
|
|
|
| 4
Table 1 (MATERIALS) |
- |
|
|
|
| 4
Table 1 i)a)
IS 175 (Case) |
- |
|
|
|
| 4
Table 1 ii) a)
1S8391 (Cushioning) |
- |
|
|
|
| 4
Table 1 ii) b)
IS 1741 (Cushioning) |
- |
|
|
|
| 4
Table 1 ii) c)
IS 7933 (Cushioning) |
- |
|
|
|
| 4
Table 1 iii) a)
IS 1920 (Piping) |
- |
|
|
|
| 4
Table 1 ii) b)
IS 1741 (Cushioning) |
- |
|
|
|
| 4
Table 1 ii) c)
IS 7933 (Cushioning) |
- |
|
|
|
| 4
Table 1 iii) a)
IS 1920 (Piping) |
- |
|
|
|
| 4
Table 1 iii) b)
IS 3252 (Piping) |
- |
|
|
|
| 4
Table 1 iv)
IS 1895 (Tying tapes) |
- |
|
|
|
| 5.1
Fig. l (Type 1 Mattress) |
- |
|
|
|
| 5.2 (Type 2 Mattress) |
- |
|
|
|
| 5.2 a) (Length) |
- |
|
|
|
| 5.2 b) (Width) |
- |
|
|
|
| 5.2 c) (Thickness) |
- |
|
|
|
| 6.1 (MANUFACTURE) |
- |
|
|
|
| 6.2 (MANUFACTURE) |
- |
|
|
|
| 6.3 (MANUFACTURE) |
- |
|
|
|
| 6.4 (MANUFACTURE) |
- |
|
|
|
| 6.5 (MANUFACTURE) |
- |
|
|
|
| 3 (TYPES) |
- |
|
|
|
| cl. 7.2 (BIS certification marking) |
- |
|
|
|
| cl. 7.1 (marking) |
- |
|
|
|
|
- |
- - |
| 11848 |
BIS, Western Regional Laboratory (WRL)
| None
| IS 9873 : Part 4 (2017) |
Safety of toys: Part 4 swings, slides and similar activity toys for indoor and outdoor family domestic use |
- |
Rs.5475/- View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 4.1.1 and 6.2.1 ( Strength of toys other than swings) |
- |
|
|
|
| 4.1.2 and A.4.1.2 (Maximum height) |
- |
|
|
|
| 4.1.3 and A.4.1.3 (Corners and edges on moving parts) |
- |
|
|
|
| 4.1.4.1 and 6.7.1 and Fig.6 (Protruding parts) |
- |
|
|
|
| 4.1.4.2 and 6.7.1 and
Fig.7 (All protrusions) |
- |
|
|
|
| 4.1.4.3 and 6.7.1 and
Fig.8 (Upright protrusions) |
- |
|
|
|
| 4.1.4.4 and 6.7.2 (Motion rides) |
- |
|
|
|
| 4.1.4.5 and 6.7.1.2 and Fig.9 (Slides) |
- |
|
|
|
| 4.1.4.5 (Slides) |
- |
|
|
|
| 4.1.5 and A.4.1.5. (Climbing and swinging ropes, chains and cables) |
- |
|
|
|
| 4.1.6 (Open tubing IS 9873 -1 / ISO 8124-1.) |
- |
|
|
|
| 4.2 and A.4.2. (Barriers-Barriers for platforms from 760 mm to 1 000 mm above the ground) |
- |
|
|
|
| 4.2 and A.4.2. (Barriers-Barriers for platforms greater than 1 000 mm and up to 1 830 mm above the ground) |
- |
|
|
|
| 4.2 and A.4.2. (Barriers for platforms more than 1 830 mm above the ground) |
- |
|
|
|
| 4.2 and A.4.2. (Barriers for platforms from 760 mm to 1 000 mm above the ground shall have a maximum vertical opening of 610 mm between the lowermost member of the barrier and the platform that it surrounds.) |
- |
|
|
|
| 4.2 and A.4.2. (Barriers for platforms more than 1 000 mm above the ground shall be designed to minimize the likelihood of climbing. Openings within these barriers or between the barrier and the platform surface shall not permit the passage of the torso probe defined in 6.5.1) |
- |
|
|
|
| 4.2 and A.4.2. and 4.6.2 and 4.6.3 (For barriers with an uneven top design) |
- |
|
|
|
| 4.3 (Rung ladders, stepladders and stairways) |
- |
|
|
|
| 4.3 a and Fig.10 (The rung or tread shall have a substantial horizontal stepping surface with a lateral width of 240 mm or more) |
- |
|
|
|
| 4.3 b and Fig.10 (The distance between the upper surface of the rungs or treads on rung ladders or stepladders shall not be more than 310 mm and on stairways not more 230 mm when measured vertically in accordance with Figure 10.) |
- |
|
|
|
| 4.3 c (The surface of the tread shall not be slippery) |
- |
|
|
|
| 4.3 d (The diameter or cross-sectional dimension of the rungs on rung ladders) |
- |
|
|
|
| 4.3.e (The depth of treads on stepladders with closed risers or stairways) |
- |
|
|
|
| 4.3 f (The inclination of stairways) |
- |
|
|
|
| 4.3 f (The inclination of stepladders) |
- |
|
|
|
| 4.3 f (The inclination of rung ladders) |
- |
|
|
|
| 4.3 g (Stairways and stepladders with a height of 1 200 mm or more above the ground shall be provided with a means of continuous hand support from a height of 760 mm) |
- |
|
|
|
| 4.3 g (A means of continuous hand support from a height of 760 mm) |
- |
|
|
|
| 4.4.1 (Head and neck entrapment) |
- |
|
|
|
| 4.4.2 (Entrapment of clothing and hair) |
- |
|
|
|
| 4.4.3 (Entrapment of feet) |
- |
|
|
|
| 4.4.4 (Entrapment of fingers) |
- |
|
|
|
| 4.5.1 (Stability of activity toys other than slides, swings and toys with crossbeams - General) |
- |
|
|
|
| 4.5.2 (Stability of activity toys with a free height of fall of 600 mm or less) |
- |
|
|
|
| 4.5.3 (Stability of activity toys with a free height of fall of more than 600 mm) |
- |
|
|
|
| 4.6.1 and A.4.6. (Stability of slides) |
- |
|
|
|
| 4.6.2 a and A.4.6. (Retaining sides for slides -For slides with a height of more than 1 000 mm above the ground, the height, h, of the retaining sides shall be 100 mm or more) |
- |
|
|
|
| 4.6.2 b and A.4.6. (Retaining sides for slides - For slides with a height of 1 000 mm or less above the ground, the height, h, of the retaining sides shall be 50 mm or more.) |
- |
|
|
|
| 4.6.3 a and A.4.6. (Starting, sliding and run-out section on slides -The starting section for slides with a height of 1 000 mm or less above the ground shall have) |
- |
|
|
|
| 4.6.3 a and A.4.6. (Starting, sliding and run-out section on slides -The starting section for slides with a height of 1 000 mm or less above the ground shall have) |
- |
|
|
|
| 4.6.3 a and A.4.6. (Starting, sliding and run-out section on slides -The starting section for slides with a height of 1 000 mm or less above the ground shall have) |
- |
|
|
|
| 4.6.3 b and A.4.6. (Starting, sliding and run-out section on slides-The starting section for slides with a height of more than 1 000 mm above the ground shall have) |
- |
|
|
|
| 4.6.3 b and A.4.6. (Starting, sliding and run-out section on slides-The starting section for slides with a height of more than 1 000 mm above the ground shall have) |
- |
|
|
|
| 4.6.3 b and A.4.6. (Starting, sliding and run-out section on slides-The starting section for slides with a height of more than 1 000 mm above the ground shall have) |
- |
|
|
|
| 4.6.3 c and A.4.6. (Starting, sliding and run-out section on slides) |
- |
|
|
|
| 4.6.3 d and A.4.6. (The angle of inclination to the horizontal of the sliding section) |
- |
|
|
|
| 4.6.3 e and A.4.6. (The run-out section for the slide) |
- |
|
|
|
| 4.6.3 e and A.4.6. (The run-out section for the slide) |
- |
|
|
|
| 4.6.3 e and A.4.6. (The run-out section for the slide) |
- |
|
|
|
| 4.6.3 f and A.4.6. (The finishing end of the run-out section shall have a radius of 25 mm or more through at least 90°) |
- |
|
|
|
| 4.6.4 and A.4.6. (Roller slides) |
- |
|
|
|
| 4.6.4 and A.4.6. (Roller slides) |
- |
|
|
|
| 4.6.4 and A.4.6. (Roller slides) |
- |
|
|
|
| 4.7.2 and A.4.7.2 (Strength of crossbeams, swing devices, suspension connectors and suspension couplings) |
- |
|
|
|
| 4.7.3.1 (Swings intended for children under 36 months) |
- |
|
|
|
| 4.7.3.1 (Swings intended for children under 36 months) |
- |
|
|
|
| 4.7.5 (Minimum clearance between swing elements, and similar equipment and adjacent structures) |
- |
|
|
|
| 4.7.5 (Free swinging elements) |
- |
|
|
|
| 4.7.5 (Elements excluding free swinging) |
- |
|
|
|
| 4.7.6 and A.4.7.6 (Lateral stability of swing elements - The minimum distance between the suspension points of a swing measured along the crossbeam) |
- |
|
|
|
| 4.7.7 (Minimum clearance between swing elements and the ground - The seating surface of swing elements with flexible means of suspension where the crossbeam height is greater than 1 200 mm) |
- |
|
|
|
| 4.7.7 (Minimum clearance between swing elements and the ground - The seating surface of swing elements with rigid means of suspension where the
crossbeam height is greater than 1 200 mm) |
- |
|
|
|
| 4.7.7 (Minimum clearance between swing elements and the ground - The seating surface of swing elements where the crossbeam height is 1 200 mm or less) |
- |
|
|
|
| 4.7.7 (Minimum clearance between swing elements and the ground - Footrests of swing elements) |
- |
|
|
|
| 4.7.8 a and A.4.7.8 (Suspension connectors and means of suspension) |
- |
|
|
|
| 4.7.8 b and A.4.7.8 (Suspension connectors and means of suspension) |
- |
|
|
|
| 4.7.8 c and A.4.7.8 (Ropes used as means of suspension - Diameter ) |
- |
|
|
|
| 4.7.8 d and A.4.7.8 (Straps and chains - Width) |
- |
|
|
|
| 4.7.8 d and A.4.7.8 (Accessible chains) |
- |
|
|
|
| 4.7.8 e and A.4.7.8 (Suspension connectors and means of suspension) |
- |
|
|
|
| 4.7.8 f and A.4.7.8 (Suspension connectors and means of suspension) |
- |
|
|
|
| 4.8 (Seesaws - The central point of the sitting or standing position of the seesaw shall not exceed a height) |
- |
|
|
|
| 4.8 (Seesaws - The sitting or standing position of the seesaw may swing out of the horizontal) |
- |
|
|
|
| 4.8 (Seesaws ) |
- |
|
|
|
| 4.9 (Carousels and rocking toys) |
- |
|
|
|
| 4.9 (Carousels and rocking toys) |
- |
|
|
|
| 4.10.1 and A.4.10 (Inflatable activity toys - General) |
- |
|
|
|
| 4.10.2 and A.4.10 (Inflatable activity toys - Anchorage) |
- |
|
|
|
| 4.10.2 and A.4.10 (Inflatable activity toys - Anchorage) |
- |
|
|
|
| 4.10.2 and A.4.10 (Inflatable activity toys - Anchorage) |
- |
|
|
|
| 4.10.2 and A.4.10 (Inflatable activity toys - Anchorage) |
- |
|
|
|
| 4.10.2 and A.4.10 (Inflatable activity toys - Anchorage) |
- |
|
|
|
| 4.10.3 and A.4.10 (Connection tubes for continuous inflation) |
- |
|
|
|
| 4.10.4.1 and A.4.10 (Containment - General) |
- |
|
|
|
| 4.10.4.1 and A.4.10 (Containment - General) |
- |
|
|
|
| 4.10.4.1 and A.4.10 (Containment - General) |
- |
|
|
|
| 4.10.4.1 and A.4.10 (Containment - General) |
- |
|
|
|
| 4.10.4.2 and A.4.10 (Platforms - Any platform intended for sitting or standing) |
- |
|
|
|
| 4.10.4.2 and A.4.10 (Containment walls with a minimum height ) |
- |
|
|
|
| 4.10.4.2 and A.4.10 (Permanently roofed Containment walls) |
- |
|
|
|
| 4.10.4.3 and A.4.10 (Slopes shall be treated as a platform.) |
- |
|
|
|
| 4.10.4.3 and A.4.10 (The first metre at the top of slopes) |
- |
|
|
|
| 4.10.4.3 and A.4.10 (The remaining length of slopes greater than 30° that are 760 mm or more above the ground shall be provided with containing walls with a minimum height of 900 mm.) |
- |
|
|
|
| 4.10.4.4 and A.4.10 (Safe collapse) |
- |
|
|
|
| 4.10.4.4 a and A.4.10 (When tested in accordance with 6.9 the minimum time taken for the test load to reach its lowest point ) |
- |
|
|
|
| 4.10.4.4 b and A.4.10 (the opening of any tunnel or squeeze point under any platform shall not be reduced in height by more than 50 % within 30 s.) |
- |
|
|
|
| 4.11.1 (Paddling pools - General) |
- |
|
|
|
| 4.11.2 (Edges, points, and small parts) |
- |
|
|
|
| 4.11.3 (Paddling pools with inflatable walls) |
- |
|
|
|
| 4.11.3 (Paddling pools with inflatable walls) |
- |
|
|
|
| 5.1 (Labelling) |
- |
|
|
|
| 5.2 (Assembly and installation instructions) |
- |
|
|
|
| 5.3 (Maintenance instructions) |
- |
|
|
|
| 5.4 (Warnings) |
- |
|
|
|
|
- |
- Test facilities are not available for the following:
1) Loads & pulling arrangements |
| 11849 |
BIS, Western Regional Laboratory (WRL)
| None
| IS 9873 : Part 2 (2017) |
Safety of toys: Part 2 flammability (Third Revision) |
- |
Rs.2144/ View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 4.2.2-5.2 (Toys to be worn on the head-Beards, moustaches, wigs, etc. made from hair, pile, or material that behaves in a similar manner to hair (e.g. free-hanging ribbons, paper, cloth strands, or other flowing elements), which protrude 50 mm or more from the surface of the toy-Duration of the flame after the removal of the test flame) |
- |
|
|
|
| 4.2.2(a)-5.2 (Toys to be worn on the head-Test relating to Beards, moustaches, wigs, etc. made from hair, pile, or material that behaves in a similar manner to hair (e.g. free-hanging ribbons, paper, cloth strands, or other flowing elements), which protrude 50 mm or more from the surface of the toy- if ignition occurs, the maximum burnt length of hair, pile, or material that behaves in a similar manner when the initial length was 150 mm or more) |
- |
|
|
|
| 4.2.2(b)-5.2 (Toys to be worn on the head-Test relating to Beards, moustaches, wigs, etc. made from hair, pile, or material that behaves in a similar manner to hair (e.g. free-hanging ribbons, paper, cloth strands, or other flowing elements), which protrude 50 mm or more from the surface of the toy- if ignition occurs, the maximum burnt length of hair, pile, or material that behaves in a similar manner when the initial length was less than 150 mm) |
- |
|
|
|
| 4.2.3-5.3 (Toys to be worn on the head-Beards, moustaches, wigs, etc. made from hair, pile, or material that behaves in a similar manner to hair (e.g. free-hanging ribbons, paper, cloth strands, or other flowing elements), which protrude less than 50 mm and more than 5 mm from the surface of the toy-Duration of the flame after the removal of the test flame) |
- |
|
|
|
| 4.2.4-5.3 (Toys to be worn on the head-Full or partial moulded head masks-maximum distance between the upper edge of the burnt area and the point of application of the test flame) |
- |
|
|
|
| 4.2.5-5.4 (Toys to be worn on the head-Flowing elements of toys to be worn on the head (except those covered by 4.2.2 and 4.2.3), hoods, headdresses, etc. and masks not covered by 4.2.4 which partially or fully cover the head (e.g. fabric and cardboard masks, eye masks, face masks)-rate of spread of flame) |
- |
|
|
|
| 4.2.5-5.4 (Toys to be worn on the head-Flowing elements of toys to be worn on the head (except those covered by 4.2.2 and 4.2.3), hoods, headdresses, etc. and masks not covered by 4.2.4 which partially or fully cover the head (e.g. fabric and cardboard masks, eye masks, face masks)-Test relating to flowing elements of toys to be worn on the head (except those covered by 4.2.2 and 4.2.3), hoods, headdresses, etc. and masks not covered by 4.2.4 which partially or fully cover the head (e.g. fabric and cardboard masks, eye masks, face masks), toy disguise costumes and toys intended to be entered or worn by a child
) |
- |
|
|
|
| 4.3-5.4 (Toys to be worn on the head-Toy disguise costumes and toys intended to be worn by a child in play-rate of spread of flame) |
- |
|
|
|
| 4.3-5.4 (Toys to be worn on the head-Toy disguise costumes and toys intended to be worn by a child in play-Test relating to flowing elements of toys to be worn on the head (except those covered by 4.2.2 and 4.2.3), hoods, headdresses, etc. and masks not covered by 4.2.4 which partially or fully cover the head (e.g. fabric and cardboard masks, eye masks, face masks), toy disguise costumes and toys intended to be entered or worn by a child) |
- |
|
|
|
| 4.4-5.4 (Toys intended to be entered by a child-rate of spread of flame) |
- |
|
|
|
| 4.4-5.4 (Toys intended to be entered by a child-rate of spread of flame-Test relating to flowing elements of toys to be worn on the head (except those
covered by 4.2.2 and 4.2.3), hoods, headdresses, etc. and masks not covered by 4.2.4 which partially or fully cover the head (e.g. fabric and cardboard masks, eye masks, face masks), toy disguise costumes and toys intended to be entered or worn by a child) |
- |
|
|
|
| 4.4-5.4 (Toys intended to be entered by a child-rate of spread of flame-Test relating to flowing elements of toys to be worn on the head (except those
covered by 4.2.2 and 4.2.3), hoods, headdresses, etc. and masks not covered by 4.2.4 which partially or fully cover the head (e.g. fabric and cardboard masks, eye masks, face masks), toy disguise costumes and toys intended to be entered or worn by a child
) |
- |
|
|
|
| 4.5-5.5 (Soft-filled toys-rate of spread of flame ) |
- |
|
|
|
| 4.5-5.5 (Soft-filled toys-Test for soft-filled toys
) |
- |
|
|
|
|
- |
- - |
| 11850 |
BIS, Western Regional Laboratory (WRL)
| None
| IS 9873 : Part 1 (2019) |
Safety of toys: Part 1 safety aspects related to mechanical and physical properties (Fourth Revision) |
- |
16,189 View breakup
-
| Clause No. |
Exclusion |
Testing Charges (Excl. Of Taxes) |
Effective Date |
Remark |
| 4.1 (Normal use) |
- |
|
|
|
|
- |
- Test facilities are not available for the following:
1) clause 4.29 Acoustic requirements, |